1 ISSUE 43 AUGUST 2017 MOVING AHEAD PROJECT AUGUST UPDATE Andrew Wolstenholme, CEO PROGRAMME 85% 60% The Crossrail project team continues to work around the clock to deliver the Elizabeth line, the new railway for London and the South East. Over the summer the final central station platform was completed at Whitechapel station. At all of the central station sites teams are now installing architectural finishes and railway systems to turn these spaces into the fully functional platforms passengers will use from December Many of the stations are now emerging above the hoardings, visible as you walk by Crossrail construction sites. You can see the first section of the 120 metre-long canopy roof at Paddington, the black stone walls of Tottenham Court Road station s western ticket hall, the striking ceilings of Farringdon station, the curved timber station building at Abbey Wood; just some of the bespoke station architecture now visible from the street. At Mile End, Stepney Green, Cambridge Heath and other nearby sites, the station head houses, which serve as emergency and maintenance access points, have also taken shape and their designs are now on show. The first of the new trains has entered passenger service on the TfL Rail route between Liverpool Street and Shenfield, giving a glimpse of the new railway to come. As each train rolls off the production line in Derby, they undergo extensive testing before progressively being introduced onto the network. Through the Crossrail Art Foundation the project continues to work with the City of London Corporation, leading galleries and sponsors to deliver an exciting series of public art at seven of the central stations. Joining a list of world-renowned artists selected to date is British artist, Simon Periton, who will be delivering two art installations at Farringdon. An enormous amount of activity is taking place together with a diverse supply chain. From architects and engineers designing and building the infrastructure, to the small and mediumsized businesses delivering specialised components the railway, the project is drawing on expert skills within the UK and beyond to deliver a world-class railway. 699 APPRENTICES ON THE PROJECT TO DATE 62% of suppliers based outside of London 96% OF CONTRACTS AWARDED BY ARE TO COMPANIES WITHIN THE UK PROJECT TIME LINE STATION CONSTRUCTION & CIVIL ENGINEERING NETWORK RAIL WORKS RAILWAY SYSTEMS TRAINS AND RAILWAY DEPOT PUBLIC SPACE AND DEVELOPMENT AROUND STATIONS TFL RAIL NEW TRAINS AND SERVICES ELIZABETH LINE PHASED OPENING

2 COMING UP Woolwich station ABOVE GROUND At many sites across the route, the new Elizabeth line stations are emerging from behind the Crossrail hoardings. The station head houses, which serve emergency and maintenance access or house ventilation equipment, can also now be seen. As the year goes on, more will be seen as buildings come up above ground, and their bespoke designs come to life. Paddington station Farringdon station Stepney Green See the curved concrete wall which will later be wrapped with a metal motif, inspired by the parkland, as well as green climber plants. Mile End Walk around the single storey which is topped with a green roof. CUSTOM HOUSE See the brickwork on the outside of the station building and ventilation building. WOOLWICH ABBEY WOOD Abbey Wood station See the steel frame for the 120 metre-long glazed canopy, which will filter natural light down to the platforms, and ventilation shafts. TOTTENHAM COURT ROAD Look into the eastern ticket hall at the corner of Lindsey Street and Long Lane to see the square coffered ceiling inspired by the Barbican. FARRINGDON LIVERPOOL STREET Tottenham Court Road WHITECHAPEL Durward Street CANARY WHARF Canary Wharf station Custom House station Walk past the station, which was built like a giant jigsaw using pre-fabricated concrete segments, and see the station to the west. See the curved, timber roof and glass station entrance from Harrow Manor Way. Spencer Finch s A Cloud Index artwork, which is now in production, will stretch across the entire length of the canopy. PADDINGTON BOND STREET See inside the first storey of the dark and cinematic western ticket hall on the corner of Dean Street and Oxford Street. Notice the decorative bell-wave pattern on the cladding here which celebrates the historical significance of the bell industry at Whitechapel. Cambridge Heath Walk inside the exotic rooftop garden or visit the restaurants and shops above the station. Beside the station ticket hall, see the brickwork surrounding the ventilation shaft. Copper cladding will be applied to the building, a nod to the former brewery and copper stills that were once housed on this site.

3 CENTRAL STATIONS UPDATE ALL PLATFORMS COMPLETE All new central station Elizabeth line platforms are now complete following the installation of the final platform at Whitechapel station at the beginning of the summer. The completion of the 240 metre-long platforms makes way for architectural and railway systems fit-out works to progress. Flooring, wall finishes, platform screen doors and lighting will now need to be installed on the platforms as part of the works to help turn these construction sites into an operational railway. Platforms installed at Whitechapel station TRACK INSTALLATION NEARS COMPLETION Later this summer the final section of permanent track for the project will be laid at Whitechapel station, marking the end to all new track installation in the new tunnels. Five different types of track have been installed. Standard track slab forms 80 per cent of tracks in the central section. Direct fixed track has been used in Connaught Tunnel and floating track slab (light and heavy) and high attenuation sleepers have been used to reduce noise and vibration in sensitive areas such as underneath Soho and the Barbican. Track installation in the tunnels More than 50 kilometres of tracks have been laid using approximately 70,000 sleepers and 57 kilometres of rail and 13,500 cubic metres of concrete. Installing OHLE system at Connaught Tunnel POWERING LONDON S NEWEST RAILWAY A dedicated team of engineers is working around the clock to install the overhead catenary system that the new Elizabeth line trains will use to draw power to operate inside the tunnels. Installation is now underway at Connaught Tunnel and will continue to move west through the central section. The main power supply in the tunnels under central London will come from two new bulk supply points one at Pudding Mill Lane in the east and the other at Kensal Green to the west.

4 ELIZABETH LINE TRAIN ENTERS PASSENGER SERVICE Following an extensive testing and assurance process, the first class 345 future Elizabeth line train was introduced into passenger service in June and will continue operating during off-peak services for now. The train is now part of the fleet that runs on the TfL Rail services between Liverpool Street and Shenfield. Over the next 18 months, more of the new trains will be introduced into passenger service, progressively replacing the existing fleet. At full length (nine carriages; 200 metres long), the accessible, lightweight air-conditioned trains will offer space for 1,500 people. Production of the full fleet of 70 trains continues at Passengers on the new trains Bombardier s factory in Derby. Once built, each train has to go through extensive testing before being introduced into service. BRITISH ARTIST SIMON PERITON TO CREATE NEW ARTWORK AT FARRINGDON Artist s impression of artwork at the eastern ticket hall Simon Periton has joined the team of world-renowned artists delivering public artworks for the Elizabeth line. Periton, whose work ranges from subtly inserting messages into genteel cut-outs to large scale public commissions, has found inspiration for this latest work in Farringdon s rich history. At Farringdon station s western ticket hall, large diamonds will appear to tumble around the escalators on the lower concourse level. A homage to the goldsmiths, jewellers and ironsmiths of nearby Hatton Garden, the two metre tall designs will be digitally printed onto the glass wall panels. The glass wrapping three sides of the eastern ticket hall building will be covered with a subtle pattern that reflects the elaborate Victorian metalwork of the historic Smithfield Market opposite. Changing shadows will be cast across the interior space during the day, while in the evening, station lights will illuminate the design from inside, offering a dramatic new perspective. New public art will be installed at seven Elizabeth line stations. With 200 million passengers a year, this will make the Elizabeth line one of the UK s largest public galleries. WALLASEA ISLAND BECOMES A WILDLIFE HAVEN More than seven million tonnes of earth was excavated during Crossrail s tunnelling marathon. Three million tonnes of it was used to help create a wildlife sanctuary at Wallasea Island in Essex. Two years on from completing the new wetland and breaching the sea wall, a record number of wildlife have made this sanctuary their home. A diverse mix of 12,000 wintering birds were recorded on the island by the Royal Society for the Protection of Birds (RSPB).. Wallasea Island

5 TWO FAMILY EXHIBITIONS To discover more about Crossrail s story you can also visit... Discover the design story on Crossrail s YouTube channel LOOK FORWARD TO CUSTOM HOUSE Integrated with the existing DLR station with homes to the north and ExCeL London to the south, the new station makes the most of the limited space it has available. Designed to create a welcoming civic presence for local people and regional and international visitors, the station plan is a simple, straightforward journey from the entrance to platforms. An 18 degree angle, derived from the road junction at the southern end of the station features in the patterns on the ceiling and pavement. Air-filled translucent pillows form the roof, providing shelter and natural light to filter into the station. Passengers will experience a simple, straightforward journey, with step-free access, from the street to the train doors. Access to the Elizabeth line platforms is via lifts, stairs and escalators from a spacious upper concourse. Urban realm enhancements include a new landscaped area with planting, cycle parking, wayfinding and improved lighting. A new public artwork will be created with the local community for the two kilometre trackside wall. The design will run from Custom House through to Silvertown and North Woolwich. Information on how the local community can get involved in its design will be available soon at Museum of London Docklands Exhibition closes 3 Sep 2017 FREE ENTRY To discover more about Crossrail s stations, art story and you public space can Stations, art and public space on the Elizabeth line also visit... on the Elizabeth line An exhibition about the design of London s newest railway. Visit London Transport Museum Exhibition extended until Jan 2018 Children go FREE DON T MISS OUT ON NEWS AND EVENTS FROM Get project updates and event news delivered straight into your inbox. Subscribe at EA1032/CH CONTACT US Find out more and join mailing lists call hr helpdesk@crossrail.co.uk visit write FREEPOST (no postage or address required) follow CrossrailLtd CrossrailLtd MOVING LONDON FORWARD

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT ISSUE 42 MAY 2017 MOVING AHEAD PROJECT MAY UPDATE Howard Smith, Operations Director PROGRAMME 83% 60% In May this year, the Crossrail project will achieve a major milestone. The first of the new trains

More information

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd ISSUE 40 OCTOBER 2016 MOVING AHEAD PROJECT OCTOBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd PROGRAMME 77% 60% The project is more than 75% complete. There is a huge amount of work underway to complete

More information

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE. ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE Andrew Wolstenholme CEO Crossrail Ltd CROSSRAIL PROGRAMME 67% 60% The programme to build the new railway for London and the South

More information

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY MOVING AHEAD ISSUE 34 MARCH 2015 WELCOME FROM ANDREW WOLSTENHOLME It s an exciting time for Crossrail, as we continue to build a new railway for London and the South East; safely, on time, and on budget.

More information

CROSSRAIL Moving London Forward

CROSSRAIL Moving London Forward CROSSRAIL Moving London Forward XX Crossrail: Header here The Project max 30 characters Cost 14.8bn Net benefit 42bn Length 118km Stations 40 (10 new) Jobs supported 55,000 Business opportunities Trains

More information

Crossrail / Elizabeth Line An Update

Crossrail / Elizabeth Line An Update Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with

More information

Crossrail transforming travel across London - Infrarail

Crossrail transforming travel across London - Infrarail Crossrail transforming travel across London - Infrarail Jeremy Long, MTR Corporation, CEO European Business 2 May 2018 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail the 15bn

More information

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre Crossrail Bulletin www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 20 Mar 2010 Crossing the Capital Connecting the UK Jobcentre Plus - at the Visitor Information Centre Crossrail is committed

More information

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Crossrail transforming travel across the capital - Railtex conference Jeremy Long, MTR Corporation, CEO European Business 9 May 2017 Page 1 The Crossrail Journey Construction May 2015 Dec 2018 Page 2 Crossrail

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

Route Windows Central route section

Route Windows Central route section Route Windows Central route section Route Window index Central route section Route Window Crossrail station Worksites / temporary features Shaft sites Permanent project C1 Royal Oak Portal Royal Oak Worksite

More information

Elizabeth line Services

Elizabeth line Services Elizabeth line Services Steve Murphy Managing Director MTR Crossrail 17 th April 2018 London TravelWatch Timescales Stage 0-1: Shenfield / Liverpool Street Stage 0 (May 2015) marked the commencement of

More information

EDITED PRESS RELEASES

EDITED PRESS RELEASES EDITED PRESS RELEASES TRANSPORT FOR LONDON TRANSPORT FOR LONDON INVITES ARCHITECTS TO SUBMIT PLANS ON 55 BROADWAY 5 August 2013 Transport for London has begun the process of tendering architects to assess

More information

WESTON HOUSE HIGH HOLBORN WC1

WESTON HOUSE HIGH HOLBORN WC1 WESTON HOUSE 242-246 HIGH HOLBORN WC1 High quality refurbished offices in London s Midtown 22,936 sq ft of grade A office space with available floors ranging from 1,800 sq ft to 8,612 sq ft MARYLEBONE

More information

MOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL

MOVING AHEAD ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED FREEPOST CROSSRAIL MOVING AHEAD www.crossrail.co.uk 0345 602 3813 FREEPOST CROSSRAIL ISSUE 31 SPRING 2014 LAST OF THE GREAT MACHINES LAUNCHED Tunnel Boring Machine (TBM) Ellie has begun her journey from Pudding Mill Lane

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET PRESENTED BY DEVELOPMENT BY GREENVIEW COURT West London s newest destination for luxury living THE DEVELOPMENT Three

More information

Crossrail: Socio-Economic Technical Report

Crossrail: Socio-Economic Technical Report Crossrail: Socio-Economic Technical Report Cross London Rail Links Ltd Feb 2005 Crossrail: Socio-Economic Technical Report - Project No: 72711 Feb 2005 Prepared by: Approved by: John Siraut, Paul Buchanan,

More information

Magazine London. Venue Brochure. Magazine London. Created by Venue Lab A Vibration Group Greenwich Peninsula London SE10 0QE

Magazine London. Venue Brochure. Magazine London. Created by Venue Lab A Vibration Group Greenwich Peninsula London SE10 0QE Magazine London Venue Brochure Magazine London Greenwich Peninsula London SE10 0QE Created by Venue Lab A Vibration Group Company @magazinelondon +44 (0) 20 3892 4181 magazinelondon.co.uk hire@magazinelondon.co.uk

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

BREATHTAKING VIEW OF LONDON & A THRILLING, UNIQUE SLIDE EXPERIENCE

BREATHTAKING VIEW OF LONDON & A THRILLING, UNIQUE SLIDE EXPERIENCE BREATHTAKING VIEW OF LONDON & A THRILLING, UNIQUE SLIDE EXPERIENCE YOUTH GROUP TRAVEL GUIDE The ArcelorMittal Orbit looks forward to welcoming your group The ArcelorMittal Orbit looks forward to welcoming

More information

Round 2 Consultation Document August to October 2004

Round 2 Consultation Document August to October 2004 Developing Crossrail Round 2 Consultation Document August to October 2004 Update Crossing the Capital Connecting the UK Introduction from Crossrail s Chief Executive Crossrail wants to hear from you! That

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

Consultation Round 2: Results and Crossrail s Response

Consultation Round 2: Results and Crossrail s Response Consultation Round 2: Results and Crossrail s Response February 2005 Crossing the Capital Connecting the UK Contents 01 Introduction 2 02 Why did we consult? 3 03 Who did we consult? 3 04 When did we consult?

More information

BRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT

BRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT BRAND NEW FULLY-FITTED OFFICES OPPOSITE STATION AVAILABLE TO RENT 2,800 SQ FT Stratosphere Tower is a spectacular 36 storey tower located in the heart of Stratford, providing a luxurious collection of

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London Chapter 13 Route Window NE12 Harold Wood station HAROLD WOOD STATION 13 Route Window NE12 Harold Wood station 13.8 Harold Wood station is on Gubbins Lane close to the junction of A12 Colchester Road and

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013 Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth

More information

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential 64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole

More information

BLACKWALL WAY SHAFT CROSSRAIL PROPOSALS. Blackwall Way Shaft

BLACKWALL WAY SHAFT CROSSRAIL PROPOSALS. Blackwall Way Shaft the Capital, Connecting the UK BLACKWALL WAY SHAFT CROSSRAIL PROPOSALS East India Station Blackwall Station Aspen Way River Thames Blackwall Way Intermediate shafts are required where there are distances

More information

Time to discover LIFE AT

Time to discover LIFE AT Time to discover LIFE AT LIVING SHOPPING RELAXING 03 Life begins at Hallsville Quarter A unique opportunity. A unique product. The creation and delivery of an entirely new town centre, providing the expanding

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 14, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

Bognor Regis Camera Club - Practical Visit Open House London

Bognor Regis Camera Club - Practical Visit Open House London Bognor Regis Camera Club - Practical Visit Open House London Saturday 20 th September Open House occurs just one weekend a year and is the only chance to see inside some of London s most amazing buildings.

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 23, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES

More information

The renovations will include the enhancements listed below, with further exciting changes to be announced in the coming months.

The renovations will include the enhancements listed below, with further exciting changes to be announced in the coming months. The renovations will include the enhancements listed below, with further exciting changes to be announced in the coming months. The Verandah Exactly 80 years after the first Cunard Verandah Grill went

More information

St. Patrick s Street Development Brief

St. Patrick s Street Development Brief St. Patrick s Street Development Brief Bardas Chorcai Cork Corporation August 2001 Contents Introduction and background The Development Brief Area Protected and valuable buildings Urban context Objectives

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

WELCOME. Welcome to the first public exhibition of proposals for the development of the Paddington Central Management Office.

WELCOME. Welcome to the first public exhibition of proposals for the development of the Paddington Central Management Office. WELCOME Paddington Central Welcome to the first public exhibition of proposals for the development of the Paddington Central Management Office. British Land is currently at the early stage in establishing

More information

London and Crossrail 2. Chris Moores Transport for London

London and Crossrail 2. Chris Moores Transport for London London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London

More information

22-26 HATTON WALL, CLERKENWELL EC1

22-26 HATTON WALL, CLERKENWELL EC1 22-26 HATTON WALL, CLERKENWELL EC1 1 THE BUILDING A NEW CREATIVE LANDMARK FOR CLERKENWELL Black Bull Yard is a spectacular new development behind the retained facade of a former Victorian warehouse. Providing

More information

THEFUTUREWORKSSLOUGH.COM

THEFUTUREWORKSSLOUGH.COM BROUGHT TO YOU BY AGENTS THEFUTUREWORKSSLOUGH.COM THE FUTURE WORKS SLOUGH IS EVOLVING A three phase office development set within an entirely new commercial quarter in the Heart of Slough, providing 350,000

More information

THIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1

THIRTY FIVE GREAT SUTTON ST. CLERKENWELL EC1 Converted warehouse building, comprehensively refurbished. Office suites arranged over the 1st, 2nd and 3rd floors located in one of London s most lively locations. Newly refurbished contemporary reception

More information

EALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm

EALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm EALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm PRESENT: Independent Members: Peter Smith (Independent Chair) Ealing Councillors: Councillors Bell, H Tailor, Joanna Dabrowska, David Millican,

More information

Time to discover LIFE AT

Time to discover LIFE AT 01 Time to discover LIFE AT 03 Life begins at Hallsville Quarter A unique opportunity. A unique product The creation and delivery of an entirely new town centre, providing the expanding community of Canning

More information

168 SHOREDITCH HIGH ST.

168 SHOREDITCH HIGH ST. 168 SHOREDITCH HIGH ST. SHOREDITCH E1 01 02 THE BUILDING 168 Shoreditch High Street offers up to 35,819 sq ft of contemporary workspace over six floors in Shoreditch s most sought after location. High

More information

PARKSIDE BOW, LONDON E3

PARKSIDE BOW, LONDON E3 A STUNNING PARKSIDE LOCATION MOMENTS FROM CANARY WHARF Presented By Galliard Homes Ltd / Hurlington Ltd Local Authority Tower Hamlets Location Furze Street, Bow E3 3RX Tenure 250 year leasehold Building

More information

Queensway House, High Street, Stratford E15 2TF

Queensway House, High Street, Stratford E15 2TF On the instructions of Timothy Perkin & David Barber of CBRE acting as Joint Fixed Charge Receivers Queensway House, 275-285 High Street, Stratford E5 2TF East London Residential Development Opportunity

More information

+ UNRIVALLED PROMINENCE. 02 R+ Reading

+ UNRIVALLED PROMINENCE. 02 R+ Reading R+ READING + UNRIVALLED PROMINENCE 02 R+ Reading + LANDMARK + LANDMARK + Dominating the entrance to the town centre and in the heart of Reading s business core, R+ is perfectly positioned directly opposite

More information

Friends Meeting House, Hitchin. 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH. National Grid Reference: TL Statement of Significance

Friends Meeting House, Hitchin. 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH. National Grid Reference: TL Statement of Significance Friends Meeting House, Hitchin 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH National Grid Reference: TL 18282 29279 Statement of Significance A meeting house of 1957 designed by Paul V. Mauger and erected

More information

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK FREEING UP MELBOURNE'S BIGGEST BOTTLENECK PRESENTATION TO THE TOURISM INDUSTRY 29 AUGUST 2017 Evan Tattersall, CEO, Melbourne Metro Rail Authority MELBOURNE S CHALLENGES POPULATION GROWTH NORTHERN +450,000

More information

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station

More information

ENCOMPASS THE INFINITE POSSIBILITIES

ENCOMPASS THE INFINITE POSSIBILITIES ENCOMPASS THE INFINITE POSSIBILITIES A NEW 109,000 SQ FTGRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT 2 3 4 5 I N N E R SPACE

More information

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by: UPDATE JANUARY 2016 HISTORY IN THE MAKING The UK s most important city centre development outside London. Being delivered by: THE HEART OF THE CITY St Philip s Square Birmingham Museum & Art Gallery A

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

Altitude 13, ,245 sq ft office space Available Q1 2019

Altitude 13, ,245 sq ft office space Available Q1 2019 Royal Albert Dock Altitude 13,886 120,245 sq ft office space Available Q1 2019 1 BUSINESS ISN T A DESTINATION MAKE THE JOURNEY IT S A JOURNEY RAD 2 3 A brand new waterside development and dynamic commercial

More information

Doncaster Circular Walk Growth of a market town

Doncaster Circular Walk Growth of a market town Doncaster Circular Walk Growth of a market town Walk summary: A short, historical walk around the heritage of the market town of Doncaster. You will visit the river, canal and railway, all of which helped

More information

Copper Roof Key To Beautiful, Low Maintenance Exterior By Krista Hovis. Associate Editor

Copper Roof Key To Beautiful, Low Maintenance Exterior By Krista Hovis. Associate Editor tweddle.qxp 8/23/2007 2:56 PM Page 1 12 DesRosiers Architects has been designing some of the most intricate residential projects in Michigan since 1974. Founded by Louis DesRosiers, the Bloomfield Hills-based

More information

25-27 FARRINGDON ROAD, LONDON, EC1. Prime City Fringe Retail Investment for sale

25-27 FARRINGDON ROAD, LONDON, EC1. Prime City Fringe Retail Investment for sale 25-27 FARRINGDON ROAD, LONDON, EC1 Prime City Fringe Retail Investment for sale LOCATION The property is located in the heart of Clerkenwell, an area which has successfully reinvented itself during the

More information

High quality refurbished offices adjacent to Canary Wharf

High quality refurbished offices adjacent to Canary Wharf High quality refurbished offices adjacent to Canary Wharf Image of remodeled entrance 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and

More information

Crossrail Business Case Update: Summary Report July 2011

Crossrail Business Case Update: Summary Report July 2011 Crossrail Business Case Update: Summary Report July 2011 This report provides an update to the July 2010 Crossrail business case, including taking into account a number of changes to the costs and revenues

More information

SPRING/SUMMER Commercial

SPRING/SUMMER Commercial SPRING/SUMMER 2016 Commercial Welcome to Royal Wharf In 2010, a vision document by the Mayor of London described the future of the Royal Docks and identified 22 billion of development potential for a new

More information

SILVER STURGEON A 21ST CENTURY RIVER YACHT

SILVER STURGEON A 21ST CENTURY RIVER YACHT SILVER STURGEON A 21ST CENTURY RIVER YACHT SILVER STURGEON RIVER THAMES LONDON GREAT BRITAIN 21ST CENTURY RIVER YACHT Silver Sturgeon s interiors and decks have been created by leading British designers

More information

KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015

KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015 Building for future generations KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015 See p.10 for events taking place this May 24/7 HELPLINE: 020 3600 0001 LENDLEASE.COM/ELEPHANTANDCASTLE

More information

Ossington Station Easier Access Project - Construction & Public Art Concept Update

Ossington Station Easier Access Project - Construction & Public Art Concept Update Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 2, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES

More information

Hermes Street: In The Heart Of It All. Eclectic and diverse, Pentonville is thriving from abundant urban renewal taking place all around.

Hermes Street: In The Heart Of It All. Eclectic and diverse, Pentonville is thriving from abundant urban renewal taking place all around. Hermes Studios Hermes Street: In The Heart Of It All Eclectic and diverse, Pentonville is thriving from abundant urban renewal taking place all around. Sitting on a stretch of London spanning King s Cross

More information

HIGH HOLBORN WC1

HIGH HOLBORN WC1 242-246 HIGH HOLBORN WC1 HIGH QUALITY REFURBISHED OFFICES IN LONDON S MIDTOWN 63,357 sq ft of grade A office space over seven floors ranging from 3,295 to 12,977 sq ft Computer Generated Image GET A FASHIONABLE

More information

[PR] Re-invigorating the Event Industry INTERTENT /2015. Press release "Re-invigorating the event industry"

[PR] Re-invigorating the Event Industry INTERTENT /2015. Press release Re-invigorating the event industry 11/2015 Press release "Re-invigorating the event industry" Re-invigorating the Event Industry INTERTENT2015 The three-day specialised trade fair INTERTENT came to a close mid- November after setting a

More information

STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING

STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING 01 STUNNING GRADE A OFFICE FINAL SUITE 12,220 SQ FT J12 M4 READING < welcome > 2 BE AT 01 < inspirational and motivational working environment inside and out. > < welcome > FINAL < hello > SUITE

More information

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular

More information

33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION

33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION 33 WELBECK STREET PRESTIGIOUS, NEWLY REFURBISHED OFFICE BUILDING PRIME MARYLEBONE LOCATION WELCOME TO WELBECK WORKS Computer generated image This imposing, traditional triple-fronted, brick building is

More information

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018 Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains

More information

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018 Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018 Railway to Blackpool South on track to reopen The railway between Preston and Blackpool

More information

33 Farringdon Road London EC1. 5,952 sq ft of newly refurbished office space

33 Farringdon Road London EC1. 5,952 sq ft of newly refurbished office space 33 Farringdon Road London EC1 5,952 sq ft of newly refurbished office space A refreshed office building for the Farringdon District Farringdon Point has been remodelled to offer 5,952 sq ft of sophisticated

More information

A NEW 109,000 SQ FT GRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT

A NEW 109,000 SQ FT GRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT A NEW 109,000 SQ FT GRADE A TOWN CENTRE OFFICE HEADQUARTERS A 5 MINUTE WALK FROM SLOUGH TRAIN STATION EXCELLENT CAR PARKING RATIO OF 1:418 SQ FT 2 3 4 5 I N N E R SPACE 25 WINDSOR ROAD WILL BENEFIT FROM

More information

Our Lady and St Edward. Gordon Road, St Ann s, Nottingham NG3. National Grid Reference SK Statement of Importance

Our Lady and St Edward. Gordon Road, St Ann s, Nottingham NG3. National Grid Reference SK Statement of Importance Our Lady and St Edward Gordon Road, St Ann s, Nottingham NG3 National Grid Reference SK 586 409 Statement of Importance The rather unprepossessing exterior of the church contrasts with the reposeful and

More information

The Docklands. IBM Recovery Centre. 6/7 Harbour Exchange. 6&7 Harbour Exchange Square, Isle of Dogs, London, E14 9HE

The Docklands. IBM Recovery Centre. 6/7 Harbour Exchange. 6&7 Harbour Exchange Square, Isle of Dogs, London, E14 9HE IBM Recovery Centre The Docklands 6/7 Harbour Exchange 6&7 Harbour Exchange Square, Isle of Dogs, London, E14 9HE Facility This recovery centre occupies five floors of the multi storey building. The complex

More information

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London Chapter 9 Route Window C8 Whitechapel station Transport for London WHITECHAPEL STATION 9 Route Window C8 Whitechapel station Pedley Street Worksite Pedley Street to Mile End (Devonshire Street) sidings

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

A MODERN CLASSIC 5 THE SQUARE IS A LANDMARK OFFICE BUILDING AT THE HEART OF STOCKLEY PARK, ONE OF EUROPE S PREMIER BUSINESS PARKS.

A MODERN CLASSIC 5 THE SQUARE IS A LANDMARK OFFICE BUILDING AT THE HEART OF STOCKLEY PARK, ONE OF EUROPE S PREMIER BUSINESS PARKS. A MODERN CLASSIC 5 THE SQUARE IS A LANDMARK OFFICE BUILDING AT THE HEART OF STOCKLEY PARK, ONE OF EUROPE S PREMIER BUSINESS PARKS. 5 THE SQUARE has been comprehensively refurbished, transforming the existing

More information

ROYAL ARSENAL, LONDON SE18

ROYAL ARSENAL, LONDON SE18 ROYAL ARSENAL, LONDON SE18 - 8,000-30,000 SQ FT OF STUNNING OFFICE SPACE - EXCEPTIONAL CONVERTED WAREHOUSE - EXPOSED BRICK WALLS, PAINTED STEEL COLUMNS AND 4-6M CEILING HEIGHTS - 1 MINUTES WALK FROM CROSSRAIL

More information

A BUSTLING HUB OF INDUSTRY IN TODAY, WE CALL ROYAL DOCKS WEST HOME.

A BUSTLING HUB OF INDUSTRY IN TODAY, WE CALL ROYAL DOCKS WEST HOME. THE FACTS INTRODUCTION Much has changed since the Royal Victoria Dock was first opened in 1855. Once a bustling hub of industry, a place of innovation and great ambition, it is now a place to call home.

More information

High quality refurbished offices adjacent to Canary Wharf

High quality refurbished offices adjacent to Canary Wharf High quality refurbished offices adjacent to Canary Wharf 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and flexible office accommodation

More information

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) A travel description of the Brisbane Airport Domestic Terminal Precinct Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) Brisbane Airport is located approximately 18 kilometres

More information

The newest addition to iconic East Sydney.

The newest addition to iconic East Sydney. The newest addition to iconic East Sydney. Located between Stanley & William Streets, 58 Riley is a boutique commercial space located in the heart of East Sydney s restaurant, cafe, gallery and creative

More information

Saffron House 6/10 Kirby Street Farringdon EC1

Saffron House 6/10 Kirby Street Farringdon EC1 Saffron House 6/10 Kirby Street Farringdon EC1 .01 Saffron House has been remodelled to provide a contemporary new reception area and elegant media-style office space. Design The newly reconfigured ground

More information

AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5

AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5 AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5 WHY BUY A HOME FROM ST GEORGE? St George is proud to be part of the Berkeley Group. For 40 years, the group has

More information

ADELAIDE OVAL REDEVELOPMENT

ADELAIDE OVAL REDEVELOPMENT ADELAIDE OVAL REDEVELOPMENT 2015 AUSTRALIAN CONSTRUCTION ACHIEVEMENT AWARD Technical Paper Stage 2 Entry / February 2015 / ELECTRONIC COPY CONTENTS Introduction Brief Summary Scope Design Challenges &

More information

architectural hardware for glass door handles (4)

architectural hardware for glass door handles (4) Uniclass L4181:P4 CI/SfB (31.59) Xh EPIC D181:X4 architectural hardware for glass door handles (4) An exciting range of tubular stainless steel handles. We offer the architect or designer a wide range

More information

New office space. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA

New office space. Alconbury Enterprise Campus. To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA OFFICE New office space Alconbury Enterprise Campus To Let Flexible office space from 350 sq m (3,770 sq ft) up to 1,500 sq m (16,145 sq ft) PE28 4XA alconbury-campus.co.uk A new office building is coming

More information

APPLICATION No. D/2016/476. Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection:

APPLICATION No. D/2016/476. Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection: 8 June 2016 APPLICATION No. D/2016/476 118A DARLINGHURST ROAD, DARLINGHURST NSW 2010 Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection: Background:

More information

ARCHITECTURE INTERIOR DESIGN VISUALISATION TRANSPORTATION

ARCHITECTURE INTERIOR DESIGN VISUALISATION TRANSPORTATION ARCHITECTURE INTERIOR DESIGN VISUALISATION TRANSPORTATION ARCHITECTURE INTERIOR DESIGN VISUALISATION Practice Profile CPMG is an award winning firm providing services in architecture, interior design and

More information

Retail & Restaurants

Retail & Restaurants Retail & Restaurants 1 Introduction The Bower is a landmark quarter for, featuring 320,000 sq ft of beautifully designed, modern, inspiring space and a vibrant new restaurant and retail destination. This

More information

SOUTH EAST LONDON S ONLY NEW SPECULATIVELY CONSTRUCTED INDUSTRIAL/WAREHOUSE DEVELOPMENT. AVAILABLE LATE 2015

SOUTH EAST LONDON S ONLY NEW SPECULATIVELY CONSTRUCTED INDUSTRIAL/WAREHOUSE DEVELOPMENT. AVAILABLE LATE 2015 SOUTH EAST LONDON S ONLY NEW SPECULATIVELY CONSTRUCTED INDUSTRIAL/WAREHOUSE DEVELOPMENT. AVAILABLE LATE 2015 LOCATION IS KEY A new high specification industrial/distribution development of three units

More information

The quality of Breezefree s products is excellent. Their safety is impeccable. They are also very adaptable and helpful. They are a great team.

The quality of Breezefree s products is excellent. Their safety is impeccable. They are also very adaptable and helpful. They are a great team. PRODUCT OVERVIEW The quality of Breezefree s products is excellent. Their safety is impeccable. They are also very adaptable and helpful. They are a great team. CHRISTOPHER JAMES SNR. CONSTRUCTION MANAGER

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that

More information

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE

THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE THE OLD VINYL FACTORY, BLYTH ROAD, HAYES, UB3 1HA SHIPPING BUILDING SCROLL TO DISCOVER MORE SHIPPING BUILDING SHIPPING BUILDING The Shipping Building is a landmark art deco building designed by Wallis,

More information