1 Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 23, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK ACTION ITEM RECOMMENDATION It is recommended that the Commission approve the final design, finishes, and artwork for Vaughan Corporate Centre Station, which will be presented through the public consultation process. FUNDING Sufficient funds for this expenditure are included in the Toronto-York Spadina Subway Extension (TYSSE) Project, as set out on pages 1439 to 1442 of the TTC Capital Program (Category - Expansion) which was approved by City Council on December 8, BACKGROUND The TTC is planning the design and construction of an underground subway line from the existing Downsview Station on the Spadina Line located in the City of Toronto, to the proposed Vaughan Metropolitan Centre located in the City of Vaughan, Region of York as shown in Exhibit 1. The new 8.6 km long line will include both tunnelled and cut and cover sections. The Toronto-York Spadina Subway Extension (TYSSE) project is being funded by the Government of Canada, the Province of Ontario, the City of Toronto, and the Regional Municipality of York. The TTC is managing the design and construction of the TYSSE project and will own and operate the subway extension. At the Commission meeting of October 23, 2008, Contract A85-75C for the design of Vaughan Corporate Centre (VCC) Station was awarded to the design team lead by Arup Canada Inc. The architectural firm for this team is Grimshaw Architects. At its meeting of September 24, 2009, the Commission approved the TYSSE Station Design Philosophy with additional emphasis on achieving high quality architecture, urban design, streetscape, and landscape architecture as follows:

2 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 2 Integrated design of all elements with strong aesthetics and public artwork; Column-free structures wherever possible with high ceilings and simple flow of space; Bright, open spaces with daylight penetrating deep into stations where possible; Barrier-free with at least one fully accessible entrance; Use of TTC standard elements; and Sustainable design to meet Toronto Green Standard. At the Commission meeting of December 16, 2009, the Commission approved the conceptual design for this station. The project has been reviewed by the public and all stakeholders; including staff from York Region and the City of Vaughan. DISCUSSION DESIGN: Exhibit 1 TYSSE Map Exhibit 2 Aerial View on Opening Day Exhibit 3 Aerial View with Future Development Exhibit 4 Site Plan on Opening Day Exhibit 5 Site Plan with Future Development VCC Station is located north of Highway 7 to the west side of the relocated Millway Avenue. The station will have a tail track structure extending north of the station box and a crossover box extending south of the station underneath Highway 7. The VCC Station will be a multi-modal transportation hub with an on street Passenger Pick Up and Drop Off (PPUDO), and connections to York Region Transit (YRT) Bus Terminal and to Viva Bus Transit running along Highway 7. The YRT bus terminal and PPUDO will be owned and maintained entirely by York Region, and are currently under development by YRRTC. The station design consultant has worked through a value engineering exercise to reduce costs, producing several revised designs which were reviewed with YRRTC and resulted in a revised conceptual design at a significantly lower cost. The VCC Station project incorporates the following environmental initiatives: Cool roof to main entrance; Green roof to electrical substation; Increased daylight levels to reduce electric lighting power usage; LED lighting in pylon signs, and energy efficient lighting in illuminated wayfinding signage to reduce power consumption; Water efficient plumbing fixtures;

3 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 3 Energy efficient HVAC system; Reduced storm water runoff into the municipal drainage system by utilizing green roof landscaping and soft landscaping areas adjacent to other building runoff areas; Bicycle parking; and Landscape with native and drought tolerant species provided. The footprint of the entrance building has been significantly reduced from the 30% design. PUBLIC REVIEW: The VCC Station functional design concept has been reviewed as follows: Commission meeting on December 16, 2009 Advisory Committee on Accessible Transportation (ACAT) Design Subcommittee on November 23, 2009; Public open house on March 10, 2010; and ACAT Design Subcommittee on July 28, The March 10, 2010 public open house was held specifically to exhibit functional design. There were 51 attendees with 12 written comment forms submitted. In general, the comments received were supportive of the station s functional design. Four raised the need for a PPUDO, one raised the need for proper bike storage, and two suggested the promotion of local employment during construction. General positive comments for the station design were heard in discussions while four written comments complimented the station design. The conceptual design was reviewed with the ACAT Design Subcommittee on November 23, Staff subsequently reviewed the completed design, finishes, and artwork with Design Subcommittee on July 28, Comments included: Design post-and-ring bicycle parking at the main entrance to provide a separation from pedestrian routes so that parked bicycles are not a hazard to blind patrons; Consider extending the unpaid elevator shaft from the surface down to platform level for use only when the paid elevator from concourse to platform is not functioning; and Require all future developer connections to concourse level be fully accessible to TTC standards. The second item is currently being reviewed by staff. The other two items will be implemented. The station design, finishes, and artwork will be reviewed at a second public open house in October 2010.

4 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 4 STATION DESIGN AND FINISHES: Exterior: Exhibit 6 Exterior View Exhibit 7 Sections An on-street PPUDO is located next to the main entrance on the west side of Millway Avenue just north of the intersection with Highway 7. A station emergency exit building (SEEB) and vent shafts will come to the surface on the west side of Millway Avenue, between Apple Mill Road and the future Vaughan Street. A second SEEB and vent shafts are located on the south-west corner of the intersection of Highway 7 and Millway Avenue. The electrical substation is located further south and has been designed to allow it to become a part of future developments. The most distinctive feature of this station is the domed main entrance building with a zinc standing seam roof. The metal roof will be constructed as a cool roof with a high solar reflectance to reduce heat absorption, and contain skylights to allow daylight to penetrate down to concourse. Although this station is located outside Toronto, the design team has worked with the City of Vaughan to reach an agreement on how to apply environmental standards, such as the Toronto Green Standard, to subway stations. As this station is largely underground and covered with vegetation, plazas, and sidewalks, only roof areas over the above grade structures are included in calculations. A green roof will be installed on the electrical substation. The dome is supported on a ring-beam clad in prefinished dark grey steel and the building is glazed in bird-friendly fritted glass in curtain wall framing. Bicycle parking will be in the form of post and rings arrayed around both ends of the entrance, located under roof overhangs. Street Level: Exhibit 8 Plan at Grade Exhibit 9 Interior View Surface Passengers arriving by YRT buses will enter the station either through the main entrance or through an underground connection, depending on the future YRT bus terminal concept. Passengers arriving at the station on foot or dropped off at the on-street PPUDO will enter the main entrance through one of four sets of doors. The entrance is open to the concourse level below with an elevator, escalators, and two sets of stairs. Daylight reaches down to concourse level through triangular openings between the doors. The ring-beam remains visible on the interior and is clad in prefinished dark grey steel to match the exterior. The building is glazed in bird-friendly fritted glass in curtain wall framing. Floors are in pale grey terrazzo. Stairs are dark granite with nosings in a paler colour to provide the contrast required to meet TTC barrier-free design standards with a field of TTC detectable warning tile at the top landing. The guardrails around both the triangular openings and the vertical circulation openings are tempered-laminated glass

5 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 5 panels with stainless steel handrails. The ceiling dome is formed from perforated metal panels containing acoustic absorbing material, and along with the skylights, form the art concept. Concourse: Exhibit 10 Concourse Plan Exhibit 11 Interior View - Concourse This station has been designed to maximise potential Transit Oriented Development (TOD) with seven knockout panels; three south of Highway 7, two north of Highway 7, and two just south of the future Vaughan Street. A single continuous concourse level provides opportunities for three future developer connections to the west of the station, and three to the east. An additional knockout panel is provided at the south end of the concourse for a future secondary entrance. All connections enter into the unpaid circulation area. All future connections to concourse level will be barrier-free. A second entrance to the station is provided from the Highway 7 Viva bus facility in the centre of Highway 7 to the south end of the concourse level. The configuration of this connection and the vertical circulation elements is being developed in consultation with Viva, and will be barrier-free. The concourse level also contains TTC service spaces. The collector s booth and associated fareline are located at the centre of the concourse. Moving through the fareline leads to an elevator, escalators, and stairs to platform level. Walls are clad with large ceramic wall panels in a pale grey colour. Floors are in pale grey terrazzo. Stairs are dark granite with nosings in a paler colour to provide the contrast required to meet TTC barrier-free design standards with a field of TTC detectable warning tile at the top landing. The guardrails around the vertical circulation openings are tempered-laminated glass panels with stainless steel handrails. Escalators are TTC standard high deck with stainless steel clad balustrades. The walls of the stair opening are clad in architectural concrete panels. Ceilings are architectural concrete beams with black spray-applied acoustic material in the coffers between the beams. Platform: Exhibit 12 Platform Plan Exhibit 13 Interior View - Platform The subway platform level is served by one elevator, escalators, and two sets of stairs from the concourse level. Emergency exit stairs will be provided from the north and south ends of the platform. Walls to service spaces on the centre platform are clad with large ceramic wall panels in a pale grey colour. Trainway walls will be exposed concrete. Floors are in pale grey terrazzo with yellow platform edge tiles to distinguish both edges of the platform, and a TTC standard wayfinding route is located off center along the length of the platform. Stairs are dark granite with nosings in a paler colour to provide the contrast required to meet TTC barrier-free design standards. Escalators are TTC standard high deck with stainless steel

6 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 6 clad balustrades. The walls of the stair opening are clad in architectural concrete panels. Ceilings are perforated metal panels containing acoustic absorbing material. Options are currently under review for mounting the platform edge sign bands. The optimal location for the platform edge sign band is to have it integrated into the header of the future platform edge doors. In the interim, options are being explored including suspending the platform edge sign band from ceiling or smoke canopies above the platform edges or mounting the information contained on the signs on the train wall. Artwork: Exhibit 14 Artwork A public art selection process resulted in the selection of Paul Raff as the public artist for VCC Station. The artist is intrigued by the dynamics of people interfacing with the built environment. He has developed a piece called Atmospheric Lense which has been approved by the Vaughan Corporate Centre Art Design Review Committee (ADRC). Artwork is integrated into the domed ceiling of the entrance building in a collaborative effort by the artist and the architect. The surface of the domed ceiling will be primarily a diffusion with some panels having a more reflective surface to provide a visual depth, optical richness, and subtle shifts of reflection with movement. Within the dome is a collection of apertures with sloping sides culminating in a skylight providing views to the sky. The skylights are oriented to the solar plane, which is emphasized with a surrounding field of reflective panels. The sides of these apertures will be coloured and angled to match the summer and winter solstices, and the spring and fall equinox. A fourth element is a glowing disk mounted on top of the elevator shaft so it is not directly visible to patrons, but will be reflected occasionally in the surfaces of the dome to provide a point of reference. A brief description of the art concept in the artists words will be placed on a number of plaques throughout the station. Project Impacts: As this site and surrounding area are largely undeveloped, there is minimal potential for impact on the surrounding community during the construction period. VCC Station will be the site of the tunnel boring machine (TB) extraction shaft for construction of the twin tunnels north from Highway 407 Station. To mitigate these environmental impacts, the following items will be in place for construction: Soil and groundwater management to address high volumes of dewatering from the large cut and cover area; Environmental Management Plan to monitor areas potentially affected by dewatering; Construction Monitoring Plans and programs to address noise, vibration, dust control, stray current and tree protection; and

7 TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT VAUGHAN CORPORATE CENTRE STATION APPROVAL OF FINISHES AND ARTWORK Page 7 Traffic Management Plan to address Highway 7 detours and truck movements associated with spoils removals. Cost and Schedule: The estimated final cost of construction costs for VCC Station is $200 million, inclusive of HST, including the cross-over tail track. While this current cost estimate will require further use of contingency funds, value engineering and cost reduction measures will be taken on this station work to keep the total Project costs within the approved budget. The proposed project schedule reflects completion of design development to 100% in spring VCC Station is scheduled for substantial completion by the end of Next Steps: A second public open house will be held in late October In the event that any issues arise, a report will be brought to a future Commission meeting. A report for contract award approval will be presented to the Commission in spring JUSTIFICATION Approval is required to allow the station design to be finalized for tender. July 29, Attachments: Exhibits 1 to

8 Vaughan Corporate Centre Station VAUGHAN CORPORATE CENTRE STATION Located at the Highway 7 and Millway Avenue intersection ti Tail track structure Crossover box structure On street PPUDO Connection to: Viva Bus Transit on Highway 7 Future YRT Bus Terminal Exhibit 1 TYSSE Map

9 Vaughan Corporate Centre Station Exhibit 2 - Aerial View on Opening Day

10 Vaughan Corporate Centre Station Exhibit 3 - Aerial View With Future Development

11 Vaughan Corporate Centre Station Exhibit 4 - Site Plan on Opening Day

12 Vaughan Corporate Centre Station Exhibit 5 - Site Plan With Future Development

13 Vaughan Corporate Centre Station Exhibit 6 - Exterior View

14 Vaughan Corporate Centre Station Exhibit 7 - Sections

15 Vaughan Corporate Centre Station BARRIER FREE ROUTE Exhibit 8 - Plan at Grade

16 Vaughan Corporate Centre Station Exhibit 9 - Interior View - Surface

17 Vaughan Corporate Centre Station BARRIER FREE ROUTE Exhibit 10 Concourse Plan

18 Vaughan Corporate Centre Station Exhibit 11 - Interior View - Concourse

19 Vaughan Corporate Centre Station BARRIER FREE ROUTE Exhibit 12 Platform Plan

20 Vaughan Corporate Centre Station Exhibit 13 - Interior View - Platform

21 Vaughan Corporate Centre Station Atmospheric Lense (WORKING TITLE) Exhibit 14 - Artwork This architecturally integrated artwork transforms the station s dome into a sculpture of reflected light. It is composed of mirrors which create a dynamic threedimensionally collaged view of life in the station, and skylights that are carefully aligned with solstice and equinox sun angles to accentuate the effects of sunlight through the deep spaces below.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 14, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 2, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES

More information

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President Meeting of the Board of Directors On June 9, 2011 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Spadina Subway Project Update YORK-#3369547

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE 9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE The Finance and Administration Committee recommends the adoption of the recommendations

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY

More information

Ossington Station Easier Access Project - Construction & Public Art Concept Update

Ossington Station Easier Access Project - Construction & Public Art Concept Update Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations

More information

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4. COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the

More information

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report Woodbine Station Easier Access Project Public Open House January 27, 2014 6:30 pm 8:30 pm Consultation Summary Report Danforth Mennonite Church 2174 Danforth Ave Prepared by Lito Romano February 18, 2014

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 29, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN ACTION ITEM RECOMMENDATIONS It is recommended that

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 24, 2014 SUBJECT: PROCUREMENT AUTHORIZATION TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT WILSON YARD CONNECTION AND WILSON

More information

St. Clair West Station Easier Access Project Community Update Open House

St. Clair West Station Easier Access Project Community Update Open House St. Clair West Station Easier Access Project Community Update Open House 1 Easier Access Program Wide Committed to making all 69 stations accessible by 2025 31 stations completed - almost halfway there

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 1, 2012 SUBJECT: LRT PROJECTS IN TORONTO - STATUS REPORT INFORMATION ITEM RECOMMENDATION It is recommended that the Commission

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that

More information

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a

More information

York Region Rapid Transit Corporation Board of Directors

York Region Rapid Transit Corporation Board of Directors Meeting of the Board of Directors on March 12, 2015 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Project Status Quarterly Q3 and Q4 2014 Ref:

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED 2015 Accessibility Plan Status Report Date: March 26, 2015 To: From: TTC Board Chief Executive Officer Summary This report describes, in detail, how the TTC is meeting, or

More information

Dover Downs Hotel and Conference Center

Dover Downs Hotel and Conference Center Dover Downs Hotel and Conference Center Dover, Delaware Brian Franco Lighting / Electrical Faculty Consultants: Dr. Mistrick and Dr. Moeck Location Dover, Delaware hotel and conference center off of route

More information

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN 1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s

More information

Capilano Substation Upgrade

Capilano Substation Upgrade Capilano Substation Upgrade Community Engagement Summary MAY 206 NOVEMBER 208 BCH8-278 Contents.0 Introduction............................................................................. 2.0 Methodology...........................................................................

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017 York Region Rapid Transit Corporation City of Vaughan VMC Sub-Committee October 18, 2017 0 Agenda Construction update >> current projects in Vaughan > Bathurst & Centre > Highway 7 West > Highway 7 Vaughan

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: December 17, 2008 SUBJECT: STATUS REPORT ARTS ON TRACK UNIVERSITY SUBWAY RENAISSANCE PROGRAM INFORMATION ITEM RECOMMENDATION

More information

First published December 2006 Copyright China Trend Building Press Limited

First published December 2006 Copyright China Trend Building Press Limited First published December 2006 Copyright China Trend Building Press Limited trend@building.com.hk 18 Macao Science Center client / owner Macao Foundation architect Pei Partnership Architects LLP with I.M.Pei

More information

York Region Rapid Transit Corporation Board of Directors

York Region Rapid Transit Corporation Board of Directors Meeting of the Board of Directors on March 7, 2013 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Project Status Year-End - 2012 Ref: YORK-#4549683

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 23, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES FOLLOW-UP REPORT ACTION ITEM RECOMMENDATIONS

More information

Eglinton-Scarborough Crosstown LRT Update

Eglinton-Scarborough Crosstown LRT Update Eglinton-Scarborough Crosstown LRT Update Councillor Matlow and Councillor Stintz Town Hall February 28 2012 Presented by: Anna Pace, Director Strategic Partnerships, TTC Transit Expansion Department 2/28/2012

More information

Improving Directional Signage for TTC Services at Pearson Airport

Improving Directional Signage for TTC Services at Pearson Airport For Action Improving Directional Signage for TTC Services at Pearson Airport Date: May 8, 2018 To: TTC Board From: Executive Director Corporate Communications Summary This report outlines the signage and

More information

Kaufland, Chirnside Park

Kaufland, Chirnside Park Kaufland, Chirnside Park WRITTENCONSENT OF 66 Maroondah Highway, Chirnside Park, A TOWN PLANNING APPLICATION 9/6/8 SJE Victoria, 6 ARTISTS IMPRESSION DRAWING LIST SHEET NUMBER SHEET NAME TP- TITLE SHEET

More information

WHO IS METROLINX?

WHO IS METROLINX? CROSSTOWN LRT WHO IS METROLINX? Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate

More information

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT 4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT The Transit Committee recommends the adoption of the recommendations contained in the following report, September 20, 2007, from the General

More information

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW TP- EX.RL+. EX.RL+. // SJE EX.RL+. TP- M PYLON SIGN - TYPE NEIGHBOURING SITE TP- EXISTING CARWASH EX.RL+. EX.RL+. A A TP- EX.RL+. EX.RL+. EX.RL+. TOW. EX.RL+. EX.RL+. EX.RL+. EX.RL+. EXISTING DAN MURPHY'S

More information

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016 TREASURE ISLAND FERRY SHELTER & BUS SHELTERS PHASE 3 - CD Arts Commission Civic Design Review APRIL 18, 2016 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete base of the Ferry Shelter

More information

FORT YORK PEDESTRIAN & CYCLE BRIDGE

FORT YORK PEDESTRIAN & CYCLE BRIDGE FORT YORK PEDESTRIAN & CYCLE BRIDGE November 2006 urban design landscape architecture architecture DTAH This is a new concept for the Fort York Pedestrian and Cycle Bridge linking Stanley Park (South)

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

First published December 2006 Copyright China Trend Building Press Limited

First published December 2006 Copyright China Trend Building Press Limited First published December 2006 Copyright China Trend Building Press Limited trend@building.com.hk 60 Sands Macau Casino When the gaming monopoly right owned by STDM was expired in 2001, the Government of

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

EP8.2 Presentation Exhibition GO Station Improvements

EP8.2 Presentation Exhibition GO Station Improvements EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts

More information

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building LA.09.TOR TORONTO DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Edward R. Sajecki, Commissioner of Planning and Building Proposed Rezoning and Master Plan Union

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue. TORONTO TRANSIT COMMISSION REPORT No S7 MEETING DATE June 4, 1968 FROM: General Manager Subway Construction Date June 3, 1968 Subject: QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

York Region Rapid Transit Corporation Pg. 1. edocs: York-#

York Region Rapid Transit Corporation Pg. 1. edocs: York-# York Region Rapid Transit Corporation Pg. 1 Table of Contents 1.0 VIVANEXT RAPID TRANSIT SYSTEM NETWORK... 4 2.0 MANAGEMENT AND OPERATIONAL HIGHLIGHTS... 5 3.1 BUS RAPID TRANSIT (BRT) PROGRAM... 8 ENTERPRISE

More information

DEVEL OPMENT APPROVED

DEVEL OPMENT APPROVED DEVELOPMENT APPROVED Overview Home sweet home... The ageless and clean architectural design caters for today s practical living in a diverse urban culture. It delivers indoor and alfresco living spaces

More information

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP) 2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Improving Transit Service to Major Music Festivals

Improving Transit Service to Major Music Festivals For Action Improving Transit Service to Major Music Festivals Date: May 8, 2018 To: TTC Board From: Chief Operating Officer Summary The purpose of this report is to respond to the Board s request to report

More information

Pier Enhancements April 6, 2017

Pier Enhancements April 6, 2017 Pier Enhancements April 6, 2017 Pier Enhancement Categories Pier Plaza Improvements Contingency Play Elements Destination Differentiators Water Recreation Zone Furniture, Fixtures & Equipment Transportation

More information

2600 COLORADO ENTRY DESIGN

2600 COLORADO ENTRY DESIGN 2600 COLORADO ENTRY DESIGN SANTA MONICA ARB REVIEW COVER 2600 COLORADO AVENUE, SANTA MONICA, CALIFORNIA 11/13/2017 A001 PROJECT DESCRIPTION 2600 COLORADO WILL SERVE AS A NEW HOME FOR ORACLE CORPORATION.

More information

WATERFRONT PROGRAM PROGRESS REPORT

WATERFRONT PROGRAM PROGRESS REPORT WATERFRONT PROGRAM PROGRESS REPORT 2016 (April - June) Highlights from 2016 In April, released the Supplemental Draft Environmental Impact Statement (EIS) for the Alaskan Way, Promenade, and Overlook Walk.

More information

Beijing Airport. Beijing, China

Beijing Airport. Beijing, China Beijing Airport Beijing, China 2003-2008 Completed as the gateway to the city for the twenty-ninth Olympiad in 2008, Beijing's international terminal is the world's largest and most advanced airport building

More information

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE 1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration

More information

AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN

AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN DATE: 01 MARCH 2017 Page 2 Good ambience can make the whole experience seem better Page 3 The challenge posed by a project of

More information

York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President

York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Meeting of the Board of Directors on September 16, 2010 To: From: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Subject: Q2 2010 Recommendation It is recommended

More information

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development

More information

architectural stabilized aluminium foam

architectural stabilized aluminium foam architectural stabilized aluminium foam Index What is ALUSION?... Technical Details... Versions... Applications... Projects... Contact us... 03 04 06 08 09 28 ALUSION Architectural Stabilized Aluminium

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

MORRISTOWN REIMAGINED OUNT KEMBLE

MORRISTOWN REIMAGINED OUNT KEMBLE MORRISTOWN REIMAGINED OUNT KEMBLE OVERVIEW Ownership is breathing new life into a 425,000 RSF property to create a contemporary workplace for today s workforce. New amenities, new finishes, new common

More information

Union Station Rail Corridor East

Union Station Rail Corridor East Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed

More information

Marymount University Ballston Center Redevelopment

Marymount University Ballston Center Redevelopment Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

Prime Waterfront Location in the Heart of the City

Prime Waterfront Location in the Heart of the City Prime Waterfront Location in the Heart of the City Best Place to Live TORONTO The developer reserves the right to make modifications and changes to prices, deposit schedule, package inclusions, estimated

More information

WIPO ADMINISTRATION BUILDING GENEVA, SWITZERLAND, 2011

WIPO ADMINISTRATION BUILDING GENEVA, SWITZERLAND, 2011 WIPO ADMINISTRATION BUILDING The administration building for the World Intellectual Property Organization, WIPO, is located in Geneva s international district, immediately adjacent to the European Headquarters

More information

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019 Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview

More information

Attachment 1. York Region Rapid Transit Corporation Pg. 1. edocs: York-#

Attachment 1. York Region Rapid Transit Corporation Pg. 1. edocs: York-# Attachment 1 York Region Rapid Transit Corporation Pg. 1 Table of Contents 1.0 VIVANEXT RAPID TRANSIT SYSTEM NETWORK...4 2.0 BUS RAPID TRANSIT (BRT) PROGRAM... 5 HIGHWAY 7 EAST (H3)... 5 DAVIS DRIVE (D1)...

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava Preparation of Terminal Reconstruction and Addition Preparation started in 2003 2004 and was motivated by the following:

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

MOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

MOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT ISSUE 43 AUGUST 2017 MOVING AHEAD PROJECT AUGUST UPDATE Andrew Wolstenholme, CEO PROGRAMME 85% 60% The Crossrail project team continues to work around the clock to deliver the Elizabeth line, the new railway

More information

Copper Roof Key To Beautiful, Low Maintenance Exterior By Krista Hovis. Associate Editor

Copper Roof Key To Beautiful, Low Maintenance Exterior By Krista Hovis. Associate Editor tweddle.qxp 8/23/2007 2:56 PM Page 1 12 DesRosiers Architects has been designing some of the most intricate residential projects in Michigan since 1974. Founded by Louis DesRosiers, the Bloomfield Hills-based

More information

Pioneer Events Center

Pioneer Events Center Planning Workshop for the Concept Design of the Pioneer Events Center Filer, Idaho May 3, 2014 With The Twin Falls County Fair Board and Staff By: Populous Architects / Planners David Forkner ASLA Principal

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

York Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers

York Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers York Region Rapid Transit Corporation 0 York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers 2014 Annual Report April 2015 1 2014 Annual Report - Overview

More information

Kansas City Aviation Department. August 25, 2015

Kansas City Aviation Department. August 25, 2015 Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning

More information

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package. San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Schematic Design June 10,

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

10641 Scripps Summit Court San Diego, CA 92131

10641 Scripps Summit Court San Diego, CA 92131 10641 Scripps Summit Court San Diego, CA 92131 EXPERIENCE SUMMIT POINTE Central location with Visibility & access A distinctive opportunity Summit Pointe is a unique tenant focused offi ce renovation in

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

STAFF REPORT INFORMATION ONLY

STAFF REPORT INFORMATION ONLY nsert TTC logo here STAFF REPORT INFORMATION ONLY PRESTO/TTC Farecard Project Status and Implementation Overview Presentation Date: June 22, 2015 To: From: TTC Board Allan Foster, Senior Project Manager

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information