Revised ATS route structure over the Irish Sea

Size: px
Start display at page:

Download "Revised ATS route structure over the Irish Sea"

Transcription

1 Revised ATS route structure over the Irish Sea (Isle of Man and Antrim Sectors) Airspace Change Proposal Prepared by CPW Peer-reviewed by JB NATS Future ATM & Policy - Airspace Change Assurance Team Issue th March 2017

2 Table of contents Table of contents 2 References 4 1 Introduction The Isle of Man and Antrim Airspace Sectors 5 2 Justification and Objectives Justification Objectives PC Antrim Alignment with the CAA s Future Airspace Strategy (FAS) Principles Enabler for network changes in Manchester TMA and Scottish TMA 6 3 Current Airspace Description Modernising the air route infrastructure Revision of minimum radar separation Traffic Figures & Aircraft Types for the year Traffic Forecasts Operational Efficiency, Complexity, Delays & Choke Points Environmental Issues Safety 11 4 Proposed Airspace Requirements What Would Not Change Under the Proposal What Would Change Under the Proposal RNAV equipage Route allocation 16 5 Impacts of Airspace Change Net Impacts Summary for Proposed Routes Noise, tranquillity, stakeholders on the ground, air quality, biodiversity CO 2 emissions & fuel burn Delays to air traffic General Aviation (GA) airspace users Impact on Aviation Safety, including safety analyses and complexity Non-NATS Units Affected by the Proposal IAA - UK-Ireland Functional Airspace Block (FAB) Partners MoD including BAE Systems Commercial Air Transport Impact & Consultation 19 IOM & Antrim Airspace Change Page 2

3 5.11 Economic Impact Sponsoring Unit Training Requirements 20 6 Analysis of options Introduction Design Principles and Envelope discussion Design Options General Design Options - Direct Route Airspace 23 7 Airspace Description Requirement 25 8 Supporting Infrastructure & Resources 26 9 Operational Impact Airspace & Infrastructure Requirements Environmental Requirements Appendix A: List of LoAs to update Appendix B: List of Proposed Amendments to the AIP 38 IOM & Antrim Airspace Change Page 3

4 References Reference 1: Consultation Document. Reference 2: Feedback Report Reference 3: CAP725 CAA Guidance on the Application of the Airspace Change Process. Reference 4: CAP1385 PBN Enhanced Route Spacing Guidance Reference 5: Evidence supporting the use of CAP1385 in an en-route environment (to follow early April) Reference 6: Evidence supporting the use of 2nm minimum CAS containment for RNAV1 environment Reference 7: Project Safety Assurance and Human Factors Plan Reference 8: Project Safety Hazard Identification and Human Error Safety Assurance Process Reference 9: Route Design Analysis Report Reference 10a, 10b, 10c: (a) Environmental and ATC Conflict Fast-Time Sim analysis report (b) Delay cost analysis report (c) Benefits summary report, combining (a) and (b). Reference 11: Airspace Design Definition ADD Reference 12: Chart of the region (switchable layers) Reference 13: Draft AIP submission (from standard CAA Excel sheet for WGS84 coordinate & bearing/distance validation) Reference 14: Draft Training Plan Reference 15: Air Traffic Project Safety Assessment APSA (to follow pre-implementation) Reference 16: Report on RNAV1 coverage for the Irish Sea region Reference 17: Validation Simulation Report (to follow early/mid-may) Reference 18: Zip file of s from senior aerodrome managers giving NATS permission to truncate certain STARs IOM & Antrim Airspace Change Page 4

5 1 Introduction NATS is proposing changes to the ATS route structure over the Irish Sea. We propose to introduce a system of RNAV1 routes, for flights in the Isle of Man and Antrim Sectors of NATS Prestwick Area Control Centre. This is part of a phased delivery of a wider programme agreed with our customers under the NATS Long Term Investment Plan (LTIP). By taking advantage of modern navigation performance known as RNAV1, routes can be spaced more closely than the legacy route structure which is based on VOR and NDB radio beacons. This will allow enhanced systemisation and enable more efficient use of the airspace. We consulted with aviation stakeholders from 4 th July to 30 th August 2016 and made changes to the design based on their feedback (Refs 1 & 2). If the proposal is approved by the CAA, implementation of the airspace change is planned for 09 Nov The Isle of Man and Antrim Airspace Sectors NATS Prestwick Centre (PC) manages all en-route air traffic in the northern half of the UK. The PC Isle of Man (IOM) sector of airspace handles much of the air traffic between Dublin and the UK/Europe, and also some of the UK s transatlantic arrivals/departures. PC Antrim sector handles all traffic to/from Northern Ireland, and traffic routing from western Scotland/Scandinavia to Eire. The current network is operating at capacity in the IOM sector. This proposal would provide additional capacity in the IOM sector, reducing the likelihood of delays in the region. It would also modernise this part of the network to take advantage of newer technology available on modern aircraft. PC Antrim PC IOM Figure 1 Prestwick Centre s Isle of Man (FL45-FL285) and Antrim (FL45-FL255) sectors. (Only the areas of PC IOM and PC Antrim sectors relevant to this proposal are shown.) PC IOM and PC Antrim sectors lie beneath PC Rathlin, Swanwick Centre s Sector 7 (SWN S7) and Sector 4 (SWN S4), these are not shown here due to chart complexity. There are also interfaces with the adjoining IAA Dublin and Shannon units, and other SWN/PC sectors. IOM & Antrim Airspace Change Page 5

6 2 Justification and Objectives 2.1 Justification Capacity limitations in the IOM sector often result in the application of short-term ATC measures 1 (STAMs). A typical example is where Dublin declares dual runway operations, which enables them to expedite first rotation departures. The majority of these departures route through IOM sector in the climb to cruising levels. This situation quickly leads to the IOM sector reaching maximum capacity, which then result in STAMs being required at Dublin. If traffic continues to increase as forecast (or above), increasing levels of delay in the IOM sector are predicted. NATS is obliged through its operating licence to avail on a continuing basis any reasonable level of overall demand and it specifies this in terms of the provision of core services. The delays justify the necessity to make changes to the airspace to increase ATC capacity. 2.2 Objectives The current Monitor Value 2 (MV) for the IOM sector is 43. The objective of this proposal is to increase this by 10%, to 47. This would enable the region to operate with fewer flow restrictions being applied and hence less delay. We would achieve this objective by: a. Increasing the number of parallel east-west routes over the Irish Sea and the number of routes oriented northwest-southeast linking Northern Ireland and the mainland via the Isle of Man, increasing ATC capacity; and b. Optimising the route spacing in accordance with updated guidance from the CAA taking advantage of modern navigation performance; and We minimised the additional controlled airspace (CAS) required to contain these routes. 2.3 PC Antrim PC Antrim interacts very closely with the adjacent PC IOM. The proposed route changes to PC Antrim are required to deliver the increased ATC capacity and improved Monitor Value in PC IOM. PC Antrim sector would naturally benefit, but the specific justification for the changes to Antrim remain the forecast delay reduction in the adjacent IOM sector. 2.4 Alignment with the CAA s Future Airspace Strategy (FAS) Principles A contiguous design of routes in these sectors would improve systemisation. Systemisation is the aim of most future airspace designs. The CAA s Future Airspace Strategy (FAS) is the UK s strategy for modernising the air route infrastructure. 2.5 Enabler for network changes in Manchester TMA and Scottish TMA The proposed IOM & Antrim changes are part of the Prestwick Lower Airspace Systemisation (PLAS) programme of NATS LTIP changes. The changes described herein serve as an enabler for further changes planned to the ATS network in the Manchester and Scottish TMAs. These changes will bring further efficiencies across the network. 1 STAMs include Minimum Departure Intervals (MDIs), Miles in Trail (MIT), Airfield Reasonable Departure Separation (ARDS), Average Departure Interval (ADI), all of which are measures that can be applied to regulate the flow of traffic departing from airports. 2 Monitor Value is a guide value for the ATC supervisor. The greater the MV, the greater the hourly throughput of the sector under normal conditions, before the supervisor considers taking measures to regulate the anticipated flow. IOM & Antrim Airspace Change Page 6

7 3 Current Airspace 3.1 Description The charts on the next page illustrate the current ATS route structure from a flight-planning point of view, and also how the airspace volume is currently used in practice. Parallel routes are common in the ATS route network. PC IOM currently has a structure incorporating three east-west parallel ATS routes which are separated by 12nm (see Figure 2 on page 8 (U)L70, (U)L975 and (U)Y124). Currently ATC uses these routes for flight planning and navigation. When climbing and descending, conflicting aircraft are often tactically vectored off two of the flight-plan ATS routes: (U)L70 and (U)L975, creating sets of offset parallel tracks within the existing CAS volumes (see Figure 3). Traffic using (U)Y124 is generally left on its own navigation. A similar structure occurs in the airspace between BEL VOR and WAL VOR, this is also managed tactically by ATC to increase efficiency (see Figure 3 on page 8). This tactical vectoring requires the controller to be constantly monitoring the aircraft headings to ensure radar separation is maintained between all flights a relatively intense task - but it makes far more efficient use of the available airspace. Parallel vectoring means more aircraft can be simultaneously climbed and descended to their desired levels than if all flights follow the centre of the ATS routes, in trail. The proposal would provide the greater efficiency of systemised parallel routes. By using systemised routes rather than vectoring, controller workload will be reduced which will in turn reduce the likelihood of error and increase the capacity of the airspace. In order to achieve this objective two things are required: modernising the air route infrastructure, and revising the minimum radar separation. 3.2 Modernising the air route infrastructure As per the consultation document and feedback report, we propose to establish RNAV1 routes in this region, with updates to CAS volumes at the same time (a small increase in Class C CAS is required in a non-contentious region). Most commercial aircraft already have the ability to conform to RNAV1. The equipage rate for aircraft which are RNAV1 capable in the IOM sector is currently 94% 3. The CAA s Future Airspace Strategy (FAS) 4 also recommends that the ATS route network is improved, to take advantage of available technology such as RNAV Revision of minimum radar separation In order to comply with CAP1385 requirements, PC implemented 3nm radar separation 5 on the 2 nd March Specifically for this proposal, 3nm radar separation applies in the IOM sector up to FL285, and in the Antrim sector up to FL255. MATS Part 2 procedures ensure appropriate separation is maintained during the transition between 3nm and 5nm environments, and adjacent ANSPs/non-PC sectors. 3 NATS PBN equipage survey Jan-Feb 2017, % of airframes for flights through the IOM sector. 4 Civil Aviation Authority, Future Airspace Strategy for the United Kingdom 2011 to Between PC controllers under specified conditions in specified areas (details not included here). IOM & Antrim Airspace Change Page 7

8 Figure 2 IOM and Antrim existing RNAV5 routes & CAS Figure 3 IOM and Antrim existing tactical vectoring system used by controllers IOM & Antrim Airspace Change Page 8

9 3.4 Traffic Figures & Aircraft Types for the year 2016 The following data tables describe the aircraft types using the existing RNAV5 ATS routes within the region. The tables below detail the most frequent aircraft types using each route. The aircraft types covering 90% or more of the flights using each route are shown. (U)L70 UNDUX-BAGSO (U)L975 LIFFY-LYNAS flights in flights in 2016 AC Type Count Percent AC Type Count Percent B % B % A % A % AT % AT % B % B % A % A % A % A % A % A % RJ % B77W % B77W % B % B % B % B % B % B % A % B % B % E % DH8D % E % B % A % RJ % B % B77L % DH8D % E % B77L % E % Figure 4 Current traffic types by route: (U)L70, (U)L975 (U)Y124 DEXEN-LUTIP P6 REMSI-NELBO flights in flights in 2016 AC Type Count Percent AC Type Count Percent A % A % B % A % A % B % A % B % B % B % B % F % B % E % Figure 5 Current traffic types by route: (U)Y124, P6 B % IOM & Antrim Airspace Change Page 9

10 L10 NW-bound FL255- via KELLY L10 SE-bound FL255- via KELLY flights in flights in 2016 (see also Figure 7) AC Type Count Percent AC Type Count Percent DH8D % BN2T % A % PA % AT % DA % SB % BE % A % A % ATP % C % L % ATP 6 2.0% E % DH8D 5 1.6% BE % A % PA % C % B % F % A % A % B % PC % A % B % B77W 2 0.7% BE % C % C56X 2 0.7% Figure 6 Current traffic types by route: L10 FL255-, split by direction of flight* *Note that this is L10 traffic SE-bound excluding EGNS departures, due to a quirk in the data tool. See below right for EGNS departures via L10 SE-bound. (U)L15 PEPOD-SOSIM EGNS departures via L10 (SE-bound) flights in flights in 2016 AC Type Count Percent AC Type Count Percent DH8D % AT % A % L % A % A % B % SB % B % C % E % ATP % B % DH8D % E % BE % PA % AT % AT % Figure 7 Current traffic types by route: (U)L15, and SE-bound EGNS departures via L Traffic Forecasts The traffic using each route in these sectors (the count columns, para 3.4 above) is forecast to increase as follows: 2016 (source data) to 2018 (first full year of implementation): %* 2016 (source data) to 2023 (implementation +5 years): %* * NATS 2016 Base Case Traffic Forecast. 3.6 Operational Efficiency, Complexity, Delays & Choke Points See para 2.1 for capacity limitation in IOM sector. See para 2.2 for objectives on Monitor Value. See para 3.1 for use of manual tactically-vectored parallel routes in the region. IOM & Antrim Airspace Change Page 10

11 3.7 Environmental Issues As per the consultation document para 6.2 (Ref 1), we aim to match the proposed route structure to the current vectoring system, thereby reducing controller workload and thus increasing capacity. The lengths of tracks flown by aircraft using the proposed route structure are likely to be comparable to the lengths of tracks flown by aircraft using the original (current) route structure. However they will be doing so in a more systemised way, and the flight plans will be a closer reflection of the actual route of flight. The consultation feedback report (Ref 2) para 4.1 discusses feedback from Dublin-based operators regarding the costs of a small increase in flight plan fuel burn vs the benefits of a reduction in delays. See paragraph 5.3 on page 17 for details of the environmental impacts of the proposal. 3.8 Safety There are no specific safety issues that this proposal is attempting to solve, but we are reducing controller workload to allow for increased capacity. See paragraph 5.6 on page 18 for safety details for this proposal. IOM & Antrim Airspace Change Page 11

12 4 Proposed Airspace 4.1 Requirements Maintain or improve the level of safety in the affected and neighbouring sectors; Reduce ATC workload (per flight); Increase sector capacity (measured by sector monitor value); Minimise additional controlled airspace required for changes (minimal impact on GA); Have negligible/no impact on military operations. 4.2 What Would Not Change Under the Proposal Existing RNAV5 routes would remain in place, but operators will be encouraged to file the RNAV1 routes via RAD restrictions. 4.3 What Would Change Under the Proposal See maps at Figure 8 and Figure 9 below. This proposal would: introduce four parallel RNAV1 routes over the Irish Sea between Wallasey (WAL) and Dublin; two eastbound and two westbound split by a tactical vectoring area, mimicking the current vectoring practice (see Feedback Report para 5.1); introduce five RNAV1 routes in the current airspace volume between WAL and Belfast (BEL), also mimicking the current vectoring practice (see Feedback Report para 5.1); introduce four RNAV1 link routes to ensure network connectivity is maintained or improved (see Feedback Report para 5.3); extend existing ATS route Y124 and adjust existing ATS route Q4 to improve network connectivity (see Feedback Report para 5.3); make minor amendments at high FLs to the STARs for Manchester, Liverpool, London City, Luton, Stansted and Southend airports, to align with the proposed routes (see Feedback Report para 5.3); simplify the CAS definitions & arrangements in the region (see Feedback Report para 5.2); and require a small strip of additional CAS over the Irish Sea as consulted upon (at least 15nm from any land and none below FL75). IOM & Antrim Airspace Change Page 12

13 TRA004 New controlled airspace Z196 link added for additional connectivity to NW from the E LISTO Figure 8 Proposed RNAV1 routes with additional CAS strip highlighted NUGRA Y124 extended to LISTO for STAR connectivity IOM & Antrim Airspace Change Page 13

14 Figure 9 Draft schematic of proposed route usage IOM & Antrim Airspace Change Page 14

15 Class D EGNS CTR/CTA Class D beneath en-route CAS (no change) Class E TMZ beneath Class C Class E TMZ Class C Figure 10 Proposed CAS arrangements (up to FL195) IOM & Antrim Airspace Change Page 15

16 4.4 RNAV equipage The equipage rate for aircraft which are RNAV1 capable in the IOM sector is currently 94% 6. RNAV5 aircraft would flight-plan the existing RNAV5 routes and would be monitored by ATC to ensure radar separation is maintained from all other traffic. Restrictions would apply to the retained RNAV5 routes in order to reduce the overall complexity of the network. 4.5 Route allocation The draft flight-plan route allocation is shown on Figure 9 on page 14. This route allocation system would not preclude controllers from vectoring flights, or from giving tactical directs, if they perceive an advantage in flexibility or efficiency. The overall requirement for vectoring would, however, be reduced, so the IOM sector capacity would increase. In accordance with the principle of best-equipped, best-served RNAV1 capable aircraft will be best served by flightplanning the RNAV1 routes. Level restrictions will be in place on the RNAV5 routes, and flight planning systems will default to flight plan RNAV1 aircraft on the RNAV1 routes. There will be no advantage to RNAV1 aircraft filing on RNAV5 routes, and this will be discouraged. See also the Airspace Design Definition (ADD, Ref 11). 6 NATS PBN equipage survey Jan-Feb 2017 based on % airframes using PC IOM sector. IOM & Antrim Airspace Change Page 16

17 5 Impacts of Airspace Change 5.1 Net Impacts Summary for Proposed Routes Category Impact Evidence Safety/Complexity Capacity/Delay Fuel Efficiency/CO 2 Systemisation of route structure leads to conflict reduction of 53% (IOM sector) and 35% (Antrim sector) Increased MV by 10% Reduce total forecast delay by 100,000+ minutes per year (2023) compared with do-nothing. Reduced likelihood of STAM until 2021/22. System average 3.0kg/flight fuel disbenefit (2018) System average 3.3kg/flight fuel disbenefit (2023) Most affected individual route disbenefit 11kg/flight See Para 5.6 See Para 5.4 See Para 5.3 Noise Leq/SEL No impact See Para 5.2 Tranquillity, visual intrusion (AONBs & National Parks) No impact See Para 5.2 Local Air Quality No impact See Para 5.2 Other Airspace Users Minimal impact See Paras 5.5, 5.8, & 5.9 Table 1: Net Impacts Summary 5.2 Noise, tranquillity, stakeholders on the ground, air quality, biodiversity Under this proposal, all changes to flight-paths would be above FL75 (the majority would be above FL170). The great majority of the affected airspace is over the Irish Sea. The routes cross land at the following points (see Figure 8 on page 13): The northern edge of Anglesey (this route is 2nm south of the existing RNAV5 route, typically aircraft would be FL170 or higher). The south & central Isle of Man (the new routes mimic the current vectoring patterns, typically aircraft would be FL170 or higher). In the mainland area roughly bounded by WAL-AMPIT-NUGRA-LISTO, extended or amended routes are mostly FL150+ except Z197 s lowest useable FL90 within the busy MTMA. Therefore we assess that there would be no noticeable noise or visual intrusion impact to stakeholders on the ground in these areas, no changes to local air quality, and no direct impact on flora, fauna or biodiversity due to the height of the proposed changes. 5.3 CO 2 emissions & fuel burn This proposal aims to systemise the route structure and make it similar to the current vectoring system, reducing controller workload and thus increasing capacity. Systemising the routes would reduce the difference between the flightplanned track and the actual track flown. This has the effect of causing some flightplan routes to slightly increase or decrease in length to more accurately reflect the likely actual track. Consequently, the predictability of fuel uplift for this portion of the route is improved. In response to the consultation, some Dublin-based operators focused on the increase in proposed track lengths. As a result, these Dublin-based operators provided negative feedback on the basis of there being a small increase in flightplan fuel uplift. Users flight planning the proposed route M145 (Dublin jet arrivals) would typically be required to uplift an extra 11kg of fuel per flight. Other routes would benefit, including Dublin jet departures, whilst the reduction in complexity (quantified by calculated reduction in ATC conflicts) decreases greatly (see para 5.6). The Feedback Report para 4.1 (Ref 2) compared predicted costs due to additional fuel uplift with the benefit of reduced delays. See para 5.11 on page 19 for an updated prediction of these costs. Excluding the benefits of reduced delays, overall there would be a fuel disbenefit, summarised as: 2018 increased fuel uplift 519T Ref 10a,c 2023 increased fuel uplift 633T Ref 10a,c Note that flightplan fuel uplift does not necessarily translate into an actual increase in fuel burnt. IOM & Antrim Airspace Change Page 17

18 5.4 Delays to air traffic The objective of this proposal is to systemise the proposed route structure by mimicking the current vectoring system. This will reduce controller workload and hence reduce the requirement for STAM flow regulations, allowing for the Monitor Value (MV) of the IOM sector to increase by 10%. See also paragraph 2.2 on page 6 and Feedback Report para 4.1 (Ref 2). The delay predictions from the Feedback Report (Ref 2) have been updated. If this proposal was implemented, we predict minimal delays in the region until 2021/22. For this para, the results of delays and costs avoided (compared to the do nothing scenario) summarise as: Year Delay minutes avoided Cost avoided Refs , k Ref 10b,c , m Ref 10b,c Total over 5yrs , m Ref 10b,c 5.5 General Aviation (GA) airspace users The location and altitude of the proposed additional CAS (over the Irish Sea, FL75+ with the majority FL115+) means these proposed changes would have minimal impact on GA/VFR stakeholders. 5.6 Impact on Aviation Safety, including safety analyses and complexity. The main design principle behind this proposal was to reduce manual ATC vectoring (hence complexity), allowing greater capacity for the same controller workload. See para 2.2 for the objectives, para 3.1 for how the current airspace is managed, para 4.3 for how the region would change, and para 6.2 for the design principles of this proposal. Safety plan, information and analysis (Refs 4, 5, 6, 7, 8, 9, 15.) Ensuring the safety of proposed changes is a NATS priority. The proposal has been developed, and will be implemented in accordance with, NATS safety management systems. See the Project Safety Assurance and Human Factors Plan (Ref 7), the Project Safety Hazard Identification and Human Error Safety Assurance Process (Ref 8) and the APSA (Ref 15, supplied pre-implementation). The Route Design Analysis Report RDAR (Ref 9) demonstrates compliance with CAP1385 (Ref 4) and also contains a total design risk calculation. Compliance with CAP1385 (Ref 4) is relevant in the en-route environment. As recommended in CAP1385, assessment has been made of the increased altitude on the nominal navigation performance and the potential impact on route spacing. The assessment was made by the NATS PBN High Level High Speed trial (Ref 5) which specifically investigated the track keeping performance of aircraft at higher altitudes and speeds. The conclusion of this trial was: altitude and speed do not affect conformance to RNAV1 PBN straight leg routes and that the existing theoretical distribution for straight leg deviations is suitable for use in a high-level high-speed environment as well as in low level terminal airspace for a typical UK fleet mix. Hence in accordance with CAP1385 and the additional evidence provided by the HL-HS trial, the proposed route separations have been deemed to exceed the requirements for minimum route separation. The minimum CAS containment required for this proposal is 2.5nm, in order to reduce the volume of airspace required. Typically 3nm is the norm according to the CAA Controlled Airspace Containment Policy (Jan 2014). We have provided evidence that RNAV1 routes are safe using 2nm CAS containment (Ref 6). In due course NATS will propose to the CAA that 2nm becomes the norm for RNAV1 routes, and will request an update to the containment policy (outwith this proposal). Safety representatives from SARG have had oversight of the safety assurance process. Conflict analysis A fast-time simulation was carried out, comparing conflicts generated by the baseline airspace with those generated by the proposed structure, for forecast 2019 traffic levels. IOM & Antrim Airspace Change Page 18

19 PC IOM s conflicts decreased by 53%, PC Antrim s conflicts decreased by 35%. This is a significant complexity benefit, leading to improved capacity as per the objectives of this proposal. See Ref 10a para 4.2 for details. 5.7 Non-NATS Units Affected by the Proposal The IAA s Shannon and Dublin units were engaged (see para 5.8 below), as was the MoD and BAE Systems Warton (see para 5.9 below). Isle Of Man Ronaldsway Airport was also engaged and had no objection. Airports where STARs would change/truncate at high level were also notified of the proposed change and had no objection (Manchester, Liverpool, London City, Luton, Stansted, Southend). 5.8 IAA - UK-Ireland Functional Airspace Block (FAB) Partners NATS UK-Ireland FAB partners the IAA were identified as a key stakeholder in the proposed changes, as PC IoM sector has a direct interface to both the IAA s Shannon and Dublin units. The IAA has contributed to design workshops and simulations to ensure that the impact of the designs does not detrimentally impact the FAB airspace. During consultation, the IAA stated that some of their Dublin-based customers had raised concerns regarding additional costs this proposal might have on their operation (see para 4.1 of the feedback report Ref 2), and that there could be issues caused by changing the presentation of westbound traffic. Following engagement with the IAA we have mitigated their concerns regarding presentation of traffic. We acknowledge the comments of the IAA s customers as per para 5.3, which led to the IAA s reservations about the impact this proposal could have. We are continuing to work with the IAA on interface agreements using the modified design proposed in this document, mitigating impacts as far as reasonably possible. At the request of the IAA the proposed route structure interfaces with the existing arrival transitions and SIDs at Dublin, hence there are no changes to the COPs at the FIR boundary (see para re Dublin s proposed new parallel runway and associated implications). 5.9 MoD including BAE Systems The MoD (DAATM) and BAE Systems Warton were identified early on as the stakeholders having the most interest in these changes due to their operations in this area. There was pre-engagement with these stakeholders (see Feedback Report para 2.1 Ref 2). Extract from MoD (DAATM SO3) letter, our ref NTMAC26-1: Having reviewed the stakeholder consultation document, dated June 2016, the MOD has no objections to the implementation of RNAV 1 systemised procedures or the additional airspace proposed to facilitate these routes. Extract from BAE Systems letter, our ref NTMAC03-1: Providing NATS can assure Warton that it can manage Warton s entry into the airspace, and that the Unit has autonomy within it, we do not object to the proposal. Both the MoD and BAE Systems queried the proposed upgraded classification of Y911 to C. That upgrade has been deleted from the final proposal, which would remain Class E TMZ Commercial Air Transport Impact & Consultation Most commercial air transport operators supported or had no objection to the proposal. As per para 5.3 above, some Dublin-based operators fed back concerns that the proposed airspace arrangement would cause increased costs to their operation. This concern was answered in the Feedback Report para 4.1 (Ref 2), which compared the predicted small increases in fuel uplift with the benefit of reduced delays. See next para for more details Economic Impact The Feedback Report para 4.1 (Ref 2) contained a table for forecasts regarding predicted delay avoidance vs potential fuel costs with respect to Dublin operators. This has been updated for the ACP, for 2018 (first full year of operation) and 2023 (five years after implementation). The Benefits Summary report Ref 10c combines and summarises the more detailed evidence in Ref 10a and Ref 10b. IOM & Antrim Airspace Change Page 19

20 Whilst Dublin arrivals in particular would accrue additional fuel costs per flight of 11kg, this is partly mitigated by other routes in the proposed structure (eastbound), and also greatly outweighed by the benefits of systemisation i.e. reduced complexity/conflicts leading to fewer delays. Over the five years the predicted net benefit of delay cost avoidance vs additional fuel cost would accumulate to c. 12m Sponsoring Unit Training Requirements See Ref 14 for draft training plan. IOM & Antrim Airspace Change Page 20

21 6 Analysis of options 6.1 Introduction The NATS model for end-to-end airspace design is characterised by steps, starting with design principles, through design envelopes and finally to specific route alignments. Each step reduces the number of options whilst increasing the detailed understanding of those options that move through to the next stage. The finalised design proposed here is the result of the refinement of the options. 6.2 Design Principles and Envelope discussion CAS volumes in part of the region are being redefined as specified CTAs rather than based on widths of ATS routes (CAA AIC Yellow Y068/2016 refers), and much of the region is being converted from Class A to Class C. CAS containment has been designed to 3nm in general and 2.5nm in specific places. Evidence supplied by NATS Analytics (referenced in paragraph 5.6) shows that 2nm containment would be acceptable under RNAV1 conditions for this proposal. (A parallel review of CAS Containment Policy for RNAV1 routes is ongoing. This piece of evidence will form part of NATS basis for requesting a permanent change to the CAA Containment Policy Statement). The proposed routes have been designed in accordance with the CAA PBN enhanced route spacing guidance in a terminal environment (CAP1385) using a minimum radar separation (MRS) of 3nm. Further supporting evidence supplied by NATS Analytics (referenced in paragraph 5.6 on page 18) shows that the spacings defined in CAP1385 can be expanded to include the en-route high speed high level environment. The design takes into account the constraints of the neighbouring sectors, where flights have an MRS of 5nm. Sector procedures will ensure safe, efficient interactions when transiting between sectors. These have been based on current-day vectoring practices with the proposed aircraft flows being positioned in the same general areas as today. Flight planning rules will ensure that aircraft are flight planned to follow the appropriate route, and each route will keep aircraft separated safely when they are established on the parallel sections. ATC will continue to monitor the traffic flows but intervention will be required much less often. The current RNAV5 routes will need to remain because they provide flight-planning connectivity for non-rnav1- capable aircraft within the region. The overlying Swanwick Sector 7 and the IAA s Shannon sector have 5nm radar separation environments. Hence (for example) traffic climbing from IOM into SWN S7 will transition from MRS 3nm to MRS 5nm. For this reason the proposed eastbound routes, Q36 & Q37, are spaced 5.5nm apart since traffic on these routes will typically climb into the overlying sector. The route spacing has been optimised to take account of the differing radar separation standards, ensuring that transfer to the next sector would always give at least the required 5nm radar separation. Likewise on the proposed westbound routes M144 & M145, aircraft will often be descending from SWN S7 MRS 5nm into the MRS 3nm of IOM. So these routes are separated by 5nm. Flexible Central Tactical Vectoring Area concept The central tactical track allows for the airspace to be systemised for the majority of traffic, but will allow for vectoring flexibility when required. This is the first piece of en-route RNAV1 systemised airspace in the UK, however it is still completely surrounded by non-systemised airspace, and includes a small proportion of traffic which is not yet RNAV1-capable. As the wider network is optimised and systemised over time, the need for tactical vectoring will diminish, however in the near term a degree of tactical intervention will be essential. Aircraft will continue to be monitored by ATC to ensure separation. 6.3 Design Options General Do nothing (rejected) In the short term, fuel use for Dublin arrivals would not increase as it would under the proposed systemised structure (see para 5.3 on page 17). However, in the longer term delays would build up as para 5.4 on page 18. These delay costs rapidly outweigh the fuel disbenefit over the next five years, hence doing nothing was rejected. IOM & Antrim Airspace Change Page 21

22 6.3.2 New Coordination points (COPs) at UK/Ireland FIR boundary (rejected) The current route structure links to the coordination points (COPs) BAGSO and LIFFY at the UK/Ireland FIR boundary. New COPs had been considered, as has using current COP BOYNE in a different way, however the IAA has requested that the proposed IOM routes terminate at COPs BAGSO and LIFFY so that the Dublin SIDs & STARs will be unchanged. When the planned Dublin new parallel runway is brought into service, provisionally in 2021, the SIDs & STARs for Dublin will be changed, and at that time it is proposed to introduce more COPs and review the interface with the IOM routes, potentially changing the use of current COP BOYNE CAS containment options (3nm and 2.5nm progressed, 2nm rejected) Variations of the minimum CAS containment have been considered. The first is based on the extant minimum CAS containment, i.e. 3nm distance between the outer-most route centre-line and the edge of CAS. This requires a greater overall volume of CAS, however it is in line with extant CAA guidelines. 3nm containment has been used for all new routes except to the NE of P6 in the Antrim sector, where this would require an additional 0.5nm wide strip of CAS to accommodate the proposed M148. In order to avoid adding this 0.5nm fillet, 2.5nm CAS containment is the preferred option in this area. See Design Principles paragraph 6.2 on page Closer route spacing, to CAP1385 minima (rejected) If the absolute minimum route separations as described in CAP1385 were used between the routes, the routes could be spaced slightly closer together. The reason for choosing 5nm/5.5nm spacing is due to the transitions between MRS 3nm and MRS 5nm as discussed in the Design Principles paragraph 6.2 on page 21. This design option for route separations of significantly less than 5nm was therefore not progressed Place RNAV1 route(s) coincident with original RNAV5 routes (partially progressed) One option considered involved overlaying the IOM sector s extant RNAV5 routes (L975 and L70) with RNAV1 routes, and inserting two new RNAV1 routes between them. This would require that the minimum route spacing as per CAP1385 were utilised. This option was not progressed for the reasons in above. However in the proposed route structure the existing IOM RNAV5 route L70 would be partly overlaid with a new RNAV1 route (M144), and the Antrim RNAV5 route L15 would be partly overlaid with a new RNAV1 route (Q38). It is possible to have coincident route segments (with different designators) using the same waypoints, one RNAV5 and the other RNAV1. Hence whilst we are not seeking to overlay all the RNAV5 routes with RNAV1 routes, there are two instances of this in the proposed design Additional airspace south of L975 (rejected) One option considered extending the airspace to the south of L975. This was discounted due to the impact on military operations in the North Wales Military Training Area (NWMTA) Airspace Classification (Class C favoured over Class A) PC IOM is currently a mix of Class C (at all levels) and Class A (below FL195). PC Antrim is a mix of Class C (above FL195), and Classes E, D and A (below FL195). These CAS volumes are all defined in UK AIP ENR3.1 via ATS routes, airway widths, intersections and complex additional volumes. We propose that, within the region covered by PC IOM and PC Antrim SE of the IOM VOR: ATS-route Class A definitions are changed to Class C in UK AIP ENR3.1; Matching Class C CTAs are established, defined in UK AIP ENR2.1 (incorporating the additional 3nm fillet) so that, in time, CAS defined by ATS routes can be withdrawn leaving the CTAs in place, with ATS route centrelines moving to UK AIP ENR3.3; Matching Class D CTAs are established, unchanged in extents from today for the same reason, except for minor modifications to Strangford CTAs; and The complex confluence of Classes A C, D and E TMZ in the vicinity of BOYNE and IOM VOR would be simplified. Changing the classification of Y911 from Class E TMZ to Class C was consulted upon, considered but discounted (see Feedback Report para 4.57). See Figure 10 on page 15 for overview. See chart Ref 12, selecting appropriate layers. IOM & Antrim Airspace Change Page 22

23 6.4 Design Options - Direct Route Airspace Currently, when aircraft transition between DRA airspace and lower airspace (using the Belfast TMA) they file direct (DCT) routes to enable a continuous flight planned climb or descent. This flight planning technique works well within the current airspace network. To fully utilise the proposed structure, aircraft need to be flying on the RNAV1 route and not on DCTs even if they are coincidental, as the aircraft could be flying to an unknown navigation standard. This issue has a greater effect on Belfast TMA inbounds as it has the potential to increase either the fuel uplift for aircraft by forcing early descent onto the proposed structure, or to not take full advantage of the systemised route spacing. The following options are possibilities to reduce/negate this: Replicate the current DCTs (rejected) Replicate the REMSI DCT NELBO with a REMSI DCT LIMKA (M146) and a DCT from REMSI to UVPOK and then ROBOP (M147). It would eliminate the systemisation for the equivalent routes (M146/M147) Introduce DCTs for the shortest allowable time/distance (rejected) Introduce REMSI DCT NINEB (M146) and REMSI DCT UVPOK (M147). It would create a fuel disbenefit as aircraft would have to plan on being at FL250 by NINEB and UVPOK which is too low, especially for BTMA easterly operations. This would, however, allow the aircraft to use the systemised routes after NINEB/UVPOK and take advantage of the reduced route spacing earlier than in option 1 & Introduce middle distance DCTs (rejected) Introduce REMSI DCT NINEB DCT IDGAS (M146) and REMSI DCT UVPOK DCT MATUT (M147) Whilst allowing for more efficient flight planning, there is no flexibility for differing rates of descent. If aircraft are at FL250 before IDGAS/MATUT they cannot be treated as being on the systemised routes, which might increase the level of monitoring and therefore the workload of the controllers. This option is better than the previous two, but not ideal Install routes into DRA airspace for a limited area (progressed) For BTMA arrivals, M147 and M148 s upper limit would be FL460 within a limited area in the DRA, and RAD restricted to limit their use. Aircraft would fly the routes but tactically separated above FL255. As soon as they descend through FL255, systemised separation can be applied. BTMA arrivals must be FL250 by IDGAS/MATUT this is a reasonable expectation for BTMA arrivals. For BTMA departures, Q38 and Q39 s upper limit would be FL460 within a limited area in the DRA, and also RAD restricted. This would allow BTMA departures to have continuous flight planned climb at a flexible rate using the systemised routes until passing FL255 when tactical separation would be applied. Route M146 would climb traffic into the DRA or would continue below, without the need for special arrangements. Route Z198 would only be used for traffic below the DRA linking to M148. This option provides a good balance between allowing flexible descent/climb profiles out of/into the DRA, and using the underlying systemised routes for a sustained period of time, reducing controller workload Introduce RNAV1 STARs into the Belfast TMA (not progressed, potential future development) BTMA arrivals could transit from the upper air routes at the entry point to the DRA, and join RNAV1 STARs for the appropriate airfield. This is the most flexible method for BTMA arrivals and would not involve level restrictions being imposed on inbounds, replicating the descent profile of today s operation. This is not a solution for BTMA departures either RNAV1 SIDs or other RNAV1 solution would be required simultaneously. This is a potential future solution DRA Summary The solution we are progressing is detailed in para Whilst we believe a good solution for inbounds would be the introduction of RNAV1 STARs, a future project may be tasked with making Belfast TMA changes and the introduction of RNAV1 STARs would be under that project s remit. The STAR method also does not address the systemisation of BTMA departures, requiring a solution to be implemented at the same time. IOM & Antrim Airspace Change Page 23

24 This would allow routes into the DRA for a limited area, RAD restricted to ensure they are only used for Belfast TMA arrivals/departures. Aircraft could flight plan for continuous descent (in most scenarios) as well as enabling controllers to take advantage of route systemisation once aircraft have entered PC Antrim s airspace (below FL255 NW of REMSI). It has the added benefit that controllers can take advantage of route systemisation for BTMA departures until they pass FL255. The other DRA options provide less satisfactory solutions, and hence were not progressed: is the most flexible for descent profile but doesn t allow for route systemisation; is the least flexible and most restrictive but uses route systemisation; and sits between the others without adequately allowing for the differences in descent profile between BTMA easterly and westerly operations. IOM & Antrim Airspace Change Page 24

25 7 Airspace Description Requirement CAP 725 Appendix A Paragraph A5 provides a list of requirements for a proposed airspace description. These are listed below: CAA CAP725, Appendix A paragraph 5 Description for this Proposal Requirement. The proposal should provide a full description of the proposed change including the following: a The type of route or structure; e.g. Airway, UAR, Conditional Route, Advisory Route, See para 4.3 CTR, SIDs/STARs, Holding Patterns, etc; b The hours of operation of the airspace and any seasonal variations; As per current hours/conditions of operation c Interaction with domestic and international en-route structures, TMAs or CTAs with an explanation of how connectivity is to be achieved. See para 4.5 and ADD Ref 11. Connectivity to aerodromes not connected to CAS should be covered; d Airspace buffer requirements (if any); N/A e Supporting information on traffic data including statistics and forecasts for the various categories of aircraft movements (Passenger, Freight, Test and Training, Aero Club, Other) and Terminal Passenger numbers; See paras 3.4 and 3.5 f Analysis of the impact of the traffic mix on complexity and workload of operations; RNAV1 vs RNAV5 traffic would be split, and airframes that are RNAV1-equipped exceed 94% in the IOM sector. g h i j k Evidence of relevant draft Letters of Agreement, including any arising out of consultation and/or Airspace Management requirements; Evidence that the Airspace Design is compliant with ICAO Standards and Recommended Practices (SARPs) and any other UK Policy or filed differences, and UK policy on the Flexible Use of Airspace (or evidence of mitigation where it is not); The proposed airspace classification with justification for that classification; Demonstration of commitment to provide airspace users equitable access to the airspace as per the classification and where necessary indicate resources to be applied or a commitment to provide them in-line with forecast traffic growth. 'Management by exclusion' would not be acceptable; Details of and justification for any delegation of ATS. See section 12 Appendix A: List of LoAs to update (LoAs will be updated pre-implementation, presuming approval) CAP1385 applied, with supporting evidence, also CAS containment evidence See para 5.6 and Refs 4, 5, 6, 9. Majority changed from Class A to Class C. See Figure 10, design principles para 6.2 and chart Ref 12. The classification of the airspace volumes would be honoured as per AIP ENR 1.4 No change to delegation of ATS to the IAA at the western FIR boundary adjacent to Dublin. IOM & Antrim Airspace Change Page 25

26 8 Supporting Infrastructure & Resources CAA CAP725 Appendix A Paragraph A6 provides a list of requirements for supporting infrastructure/resources. These are listed below: a b c d e f g CAA CAP725, Appendix A Paragraph 6, general Requirements Evidence to support RNAV and conventional navigation as appropriate with details of planned availability and contingency procedures. Evidence to support primary and secondary surveillance radar (SSR) with details of planned availability and contingency procedures. Evidence of communications infrastructure including R/T coverage, with availability and contingency procedures. The effects of failure of equipment, procedures and/or personnel with respect to the overall management of the airspace must be considered. The Proposal must provide effective responses to the failure modes that will enable the functions associated with airspace to be carried out including details of navigation aid coverage, unit personnel levels, separation standards and the design of the airspace in respect of existing international standards or guidance material. A clear statement on SSR code assignment requirements is also required. Evidence of sufficient numbers of suitably qualified staff required to provide air traffic services following the implementation of a change. Evidence of Compliance/Proposed Mitigation See Report on RNAV1 coverage (Ref 16) No change, demonstrably adequate for purpose No change, demonstrably adequate for purpose Failure modes will be analysed and appropriate contingency procedures established as per NATS safety management Failure modes will be analysed and appropriate contingency procedures established as per NATS safety management No change to SSR code allocation. Suitably trained staff will be in place before implementation (see draft training plan Ref 14). IOM & Antrim Airspace Change Page 26

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters. NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

CAA AIRSPACE CHANGE DECISION

CAA AIRSPACE CHANGE DECISION Safety and Airspace Regulation Group All NATMAC Representatives 14 April 2016 CAA AIRSPACE CHANGE DECISION RECLASSIFICATION OF THE BELFAST TERMINAL CONTROL AREA AIRSPACE Organisation proposing the change:

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas

PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas IRISH SEA AIRSPACE CHANGE PROPOSAL PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas Page D1 of D12 Introduction 1. This part

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item

More information

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace Title: Airway Q41: Reclassify to Class G below Flight level 55 Subject Release of Controlled and Segregated Airspace Version: V3.0 Status: Final Reference FASVIG 20161026 V3.0 Author: Publication Date:

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Review of brisbane Airport Noise Abatement Procedures

Review of brisbane Airport Noise Abatement Procedures Review of brisbane Airport Noise Abatement Procedures 1. Summary This document presents an overview of the findings of the review of the Noise Abatement Procedures in place for Brisbane Airport. The technical

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Civil Aviation Authority Table of Contents Background... 1 Final decision... 1 The introduction

More information

NDS Subject to NOTAM: No

NDS Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

GATWICK RNAV-1 SIDS CAA PIR ROUTE ANALYSIS REPORT

GATWICK RNAV-1 SIDS CAA PIR ROUTE ANALYSIS REPORT GATWICK RNAV-1 SIDS GATWICK RNAV-1 SIDS CAA PIR ROUTE ANALYSIS REPORT ROUTE ANALYSIS REPORT FOR GATWICK This section explains the track distribution of conventional SIDs and the RNAV SID replications using

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Airports Commission s Senior Delivery Group - Technical Report Number 01

Airports Commission s Senior Delivery Group - Technical Report Number 01 Airports Commission s Senior Delivery Group - Technical Report Number 01 Implementation of Performance-Based Navigation in the UK Summary The UK Future Airspace Strategy (FAS) is a programme designed to

More information

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

ATC PROCEDURES WORKING GROUP. Transition Level

ATC PROCEDURES WORKING GROUP. Transition Level SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining

More information

Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ. STAKEHOLDER CONSULTATION FEEDBACK Issue 1. EGSS TMZ Stakeholder Consultation Feedback

Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ. STAKEHOLDER CONSULTATION FEEDBACK Issue 1. EGSS TMZ Stakeholder Consultation Feedback A B C D Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ STAKEHOLDER CONSULTATION FEEDBACK Issue 1 EGSS TMZ Stakeholder Consultation Feedback Executive Summary This document provides feedback to all stakeholders

More information

London Southend Airport Airspace Change Proposal. Annex B to Part B of the Consultation Document Runway 23 Departures via CLN

London Southend Airport Airspace Change Proposal. Annex B to Part B of the Consultation Document Runway 23 Departures via CLN London Southend Airport Airspace Change Proposal Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation - 2016 Annex B to Part B of

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

Civil Aviation Authority. Information Notice. Number: IN 2016/052

Civil Aviation Authority. Information Notice. Number: IN 2016/052 Civil Aviation Authority Information Notice Number: IN 2016/052 Issued: 9 June 2016 EASA ED Decision 2016/09/R Rescue and Firefighting Services Remission Factor, Cargo Flights, etc. This Information Notice

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY International Civil Aviation Organization 16/10/06 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Fifth Meeting of the Air Traffic Management / Communications, Navigation and Surveillance

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

Transition Altitude (TA) Consultation Commonly Asked Questions & Answers

Transition Altitude (TA) Consultation Commonly Asked Questions & Answers Transition Altitude (TA) Consultation Commonly Asked Questions & Answers Why am I being consulted? Why does the current system have to change? Why do you need to raise the TA? A harmonised Transition Altitude

More information

Civil and military integration in the same workspace

Civil and military integration in the same workspace Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

Considerations for Facility Consolidation

Considerations for Facility Consolidation Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Civil Approach Procedural Controller Military Terminal Radar Controller

Civil Approach Procedural Controller Military Terminal Radar Controller AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach

More information

LETTER OF AGREEMENT. Between. and RELATING TO

LETTER OF AGREEMENT. Between. and RELATING TO LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO

More information

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title of Airspace Change Proposal Change Sponsor Lands End Airport Introduction of Area Navigation Global Navigation Satellite System

More information

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL Safety & Airspace Regulation Group Airspace, Air Traffic Management and Aerodrome Division Edinburgh Airport Limited Scotland EH12 9DN 29 October 2018 CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

More information

Measurement of environmental benefits from the implementation of operational improvements

Measurement of environmental benefits from the implementation of operational improvements Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO) ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA-AC-OPS031A SECURITY OVERSIGHT AGENCY May 2017 1.0 PURPOSE EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1.1 This advisory circular (AC) provides guidance to

More information

Glasgow Prestwick Airport RNAV1 Routes

Glasgow Prestwick Airport RNAV1 Routes Glasgow Prestwick Airport RNAV1 Routes Airspace Change Proposal NATS Airspace Change Assurance Team Issue 2.0 Redacted Submission October 2017 Table of contents Table of contents 2 References 4 1 Introduction

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725)

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725) Airspace Regulator (Coordination) Devon and Somerset Gliding Club Ltd Airspace, ATM and Aerodromes North Hill Airfield Safety and Airspace Regulation Group Sheldon CAA House Honiton 45-59 Kingsway Devon

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo

More information

London Southend Airport Airspace Change Proposal. Annex E to Part B of the Consultation Document Runway 05 Departures via CLN

London Southend Airport Airspace Change Proposal. Annex E to Part B of the Consultation Document Runway 05 Departures via CLN London Southend Airport Airspace Change Proposal Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation - 2016 Annex E to Part B of

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

Defining and Managing capacities Brian Flynn, EUROCONTROL

Defining and Managing capacities Brian Flynn, EUROCONTROL Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All

More information