1 Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the Irish Sea) NATS SARG Project Leader Case Study commencement date 25/05/2017 Case Study report as at 30/06/2017 File Reference Instructions In providing a response for each question, please ensure that the Status column is completed using the following options: Yes No Partially N/A To aid the SARG Project Leader s efficient Project Management it may be useful that each question is also highlighted accordingly to illustrate what is: resolved Green not resolved Amber not compliant Red as part of the AR Project Leader s efficient project management.

2 Page 2 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ Introduction This report describes the environmental considerations relevant to the proposed Isle of Man (IoM)/Antrim Systemisation. The Airspace Change Proposal has been submitted by NATS, as part of its obligation to update airspace infrastructure. As part of the ACP process, the sponsor has submitted relevant documents so the environmental benefits of the proposal can be assessed. Revised ATS route structure over the Irish Sea, Issue 1.0, dated 29 th March 2017, is the main supporting document (hereafter Main document ), where all the aspects of the ACP and requirements of CAP 725 are presented. PLAS Deployment IoM/Antrim: ACP Benefits Report, referenced as 4162/RPT/70 A17033, (hereafter Benefits Report, presents detailed information of the benefits and dis-benefits declared as result of the ACP. L4162: PLAS Summary of Benefits Analysis for the IoM/Antrim Deployment, referenced as 4162/RPT/71 A17038, (hereafter Benefits Summary, presents summary information of the benefits and dis-benefits declared as result of the ACP. Consultation on revised ATS route structure over the Irish Sea (Isle of Man and Antrim Sectors), Issue 1.1, July Feedback report for the Consultation on revised ATS route structure over the Irish Sea (Isle of Man and Antrim Sectors of NATS Prestwick Centre), Issue 1, dated 27 th January 2017,(hereafter Feedback report, has also been considered for this environmental assessment. The Feedback report was presented to provide additional information, including information relevant to the environmental assessment, as some airline operators are negatively impacted (regarding fuel consumption and CO 2 emissions) by the proposed ATS structure as it would add track mileage to their routes. These five documents form the basis from which this assessment is made. 2. Guidance to the CAA Status 2.1 Is the proposal consistent with Government policy and/or guidance from Government to the CAA? Yes Guidance issued to the Civil Aviation Authority sets 1 out a framework for the environmental objectives that the CAA must consider when assessing airspace change proposals. In addition to these objectives, there may be other legitimate operational objectives, such as the overriding need to maintain an acceptable level of air safety, the desire for sustainable development or to enhance the overall efficiency of the UK airspace network, which need to be considered alongside these environmental objectives. The Government looks to the CAA to determine the most appropriate balance between these competing characteristics. Flights over National Parks and AONBs are not prohibited by legislation 2 as a general prohibition against over-flights would be impractical. 1 DfT, Guidance to the Civil Aviation Authority on Environmental Objectives Relating to the Exercise of its Air Navigation Functions, January National Parks and Access to the Countryside Act 1949, National Parks (Scotland) Act 2000, and Duties on relevant authorities to have regard to the purposes of National Parks, Areas of Outstanding Natural Beauty (AONBs) and the Norfolk and Suffolk Broads Guidance Note, DEFRA 2005.

3 Page 3 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Government policy focuses on minimising the over-flight of more densely populated areas below 7,000 feet (amsl), but balances this with CO 2 emissions between 4,000 and 7,000 feet (amsl). However, where it is practical to avoid over-flight of National Parks and AONBs below 7,000 feet (amsl), the Guidance asks that the CAA encourages this. 3. Rationale for the Proposed Change Status 3.1 Does the rationale for the ACP include environmental reasons? No As stated by the sponsor, (Page 6, Main document) the systemisation of the IoM/Antrim Sectors is a response to capacity limitations experienced in the sector within the current airspace design (leading to operational delays). In addition, traffic is forecast to increase and, therefore, increasing levels of delays are predicted. The avoidance of delays is the main justification for the changes proposed. The modernisation of the IoM/Antrim sector involves the introduction of RNAV1 and the systemisation involves the introduction of routes mirroring current vectoring practices. In so doing, controller workload will be reduced and, consequently, capacity will be increased. The capacity increase will reduce delays and their cost. The new design means a slight increase in the average track mileage of flight-plannable routes. In particular, Dublin operators on arrival routes are predicted to increase fuel uplifted by 11kg (with 1.7NM median additional track mileage) see Benefits Report. The difference between the current and the proposed flight plannable routes is considered the worst case scenario in terms of fuel dis-benefit, however, as the sponsor states in the Main document (Section 3.7 Environmental Issues) the lengths of tracks flown by aircraft using the proposed route structure are comparable to the lengths of tracks flown by aircraft using the current route structure... doing so in a more systemised way, and the flight plans will be a closer reflection of the actual route of the flight. In addition, the sponsor states, in the consultation to aviation stakeholders (section 6.2) that no impact is expected in terms of fuel consumption or CO 2 emissions due to the similarity of the proposed flight paths with the current vectoring system. 4. Nature of the Proposed Change Status 4.1 Is it clear how the proposed change will operate, and therefore what the likely environmental impacts will be? Yes The sponsor s objective is to modernise and systemise the airspace. The modernisation comes as a result of introducing RNAV1 navigation, replacing the current RNAV5, which will still operate for aircraft without RNAV1 capability. Systemisation is achieved by introducing new flight-plannable routes which mirror the routes used currently for tactical vectoring. By doing so, controller intervention is reduced thus enabling an increase in capacity which in turn will avoid or decrease delays and their subsequent cost. In detail, the sponsor proposes to achieve the objectives of this ACP by: Increasing the number of parallel east-west routes, and northwest-southeast routes. Taking advantage of RNAV1 capabilities the route spacing can be optimised (reduced separation distance required) allowing enhanced systemisation and a more efficient use of airspace

4 Page 4 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 In the IoM sector, the introduction of four parallel RNAV1 routes over the Irish Sea between Wallasey and Dublin (east-west), two in each direction, and separated by tactical vectoring area used for both directions. Also the introduction of five RNAV1 routes in the northwestsoutheast direction, mirroring current vectoring practices. The sponsor is clear in that tactical vectoring will still continue to be used by controllers, but they predict the avoidance of delays up until 2022 with the new design (Table 1, Feedback Report). The sponsor states that Systemising the routes would reduce the difference between the flight-planned track and the actual track flown. This has the effect of causing some flight-planned routes to slightly increase or decrease in length to more accurately reflect the likely actual track. The predictability of fuel uplift is improved. It should be noted though that even with improved predictability, aircraft will uplift more fuel if the flight-planned route becomes longer, and vice-versa if the flight-planned route becomes shorter. Dublin aircraft operators would be the worst affected as they need an extra 11kg of fuel uplift per arrival flight at Dublin. Some departure routes from Dublin benefit from a shorter track length, offsetting partially the arrivals extra consumption. However, the sponsor argues that although there is a slight fuel dis-benefit for some operators, the reduced complexity of the airspace will translate into a reduction of delays which in turn brings operational reliability and avoidance of cost of delays. (Note that the impact of or the reasonableness of the claim about delay reduction is not covered by this report.) The prediction of a median of 11kg fuel uplift increase per flight refers to the difference between the flight-plannable routes of the new design versus the current flight-plannable routes, namely it is an enabled increase rather than an actual increase. Current tactical vectoring is not dissimilar to the new proposed routes so this means that the actual fuel consumption difference between the new proposed route and the likely route-vector followed at present is likely to be considerably less than the estimated 11kg per flight. No other environmental impact has been declared. 4.2 Have alternative options been considered, and have the environmental impact of each alternative been assessed? Yes Chapter 6 of the Main document presents analysis of the options considered. The options presented try to address the systemisation and modernisation of the airspace in the IoM/Antrim sectors. A number of alternatives, including do nothing, are presented such as the addition of new COPs (coordination points), closer route spacing, Controlled Airspace (CAS) containment options, airspace reclassification, etc. Some aspects of some rejected alternatives have been progressed but they were all rejected as they would not enable the systemisation of operations in a satisfactory manner. These proposed changes are taking place at an altitude (all above FL75) where there is no direct detriment to non-aviation stakeholders. The only environmental aspect associated with this ACP is the emissions of CO 2 as a result of fuel burn. Fuel dis-benefit has been stated in options presented if relevant (i.e Main document, page 23).

5 Page 5 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ Noise Status 5.1 Has the noise impact been adequately assessed? Yes From the Main document, paragraph 5.2 refers to noise analyses (as well as tranquillity, stakeholders on the ground, air quality and biodiversity). The change sponsor argues that all of the proposed changes to flight paths would be above FL75, the majority of which would be above FL170 and over the Irish Sea. There are three instances where the routes cross land, two of which is at FL170 and the third at FL90. Consequently, the sponsor has assessed that there would be no noticeable noise or visual intrusion impact to stakeholders on the ground in these areas, no changes to local air quality, and no direct impact on flora, fauna or biodiversity due to the height of the proposed changes. The CAA accepts this argument. 5.2 Has the noise impact been adequately presented in the consultation and the submitted proposal? Yes As explained in section 5.1, no noise impact assessment was undertaken or consulted on, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea 6. Emissions Status 6.1 Has the impact on CO 2 emissions been adequately assessed? Yes As stated above, the main objective of this ACP is to modernise and to systemise the controlled airspace. Systemisation involves the introduction of new flight-plannable routes which aircraft have previously used for tactical vectoring therefore reducing controller workload. The fuel consumption difference is not significant as a result of this ACP as aircraft will follow a flight-planned route that to a great extent mirrors the vectored route that is currently given by ATC. Nonetheless, there are slight differences in track distance in some routes between the flight-plannable route in the current form and the flight-plannable route proposed in this ACP. In the Main document, section 5.3, the sponsor forecasts an increased fuel uplift of 519 tonnes in 2018 and 633 in 2023 (which would translate into 1,650 and 2,014 tonnes of CO 2 emissions annually respectively if that additional fuel were actually used in order to fly a longer route, Benefits Report, page 22). The Feedback report includes a detailed itemisation of delays, cost of delays, increased fuel burn, cost of extra fuel and overall benefit (Table 1). The economic assessment of delays versus extra fuel and the reduction of complexity of the airspace seem to capitalise the argument for the change, though as noted earlier in this report, the assessment of the reduction in the delays and the sponsor s estimated impacts is not covered in this report. The sponsor states an average increase of fuel uplift of 3 kg fuel per operation. The highest dis-benefit is observed on arrivals to Dublin airport which entails 11 kg extra uplift fuel per operation. All in all, for this ACP, the difference of the flight-plannable routes (current and proposed) translates into an enabled requirement of additional fuel of between 500 and 600 tonnes per year according to the forecast

6 Page 6 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 presented in Table 1 of the Feedback report. This theoretical increase in fuel burn due to the increase in flight-plannable mileage can be taken as a worst case impact in terms of CO 2 emissions, as the actual difference in CO 2 emissions is likely to be much less, primarily due to the additional fuel burned as a result of the increase in weight from carrying a small addition of uplifted fuel. 6.2 Has the impact on CO 2 emissions impact been adequately presented in the consultation and the submitted proposal? The impacts on fuel burn and CO 2 emissions were consulted on with aviation stakeholders (there was no consultation with non-aviation stakeholders). The impact on CO 2 emissions has been adequately addressed and presented in the Benefits report. Table 2 and Table 3 of the Benefits report present the necessary information (delays routes, number of movements per route, median track distance change, median fuel burn, annual fuel burn and annual CO 2 emissions change) for 2018 (the year of implementation) and 2023 (implementation year + 5 years). Also, Table 1 of the Feedback report presents a summary of the impacts, including increased fuel burn. The tables presented in the Benefits report address the differences between the current and proposed flight plannable routes, which can be considered the worst case scenario. In the consultation to aviation stakeholders they also state that the proposed routes mirror current vectoring paths, subsequently, noticeable increases of fuel consumption (or CO 2 emissions) are not expected (section 6.2 of consultation document). Yes Item 51 of the list of environmental requirements, page 35 Main document, the requirement specifies that sponsors should estimate the total annual fuel burn for the current situation and the situation following the airspace change Sponsors should produce estimates for each airspace option considered. The sponsor noted Not applicable in that section. Despite the inconsistency in this declaration, the CAA is satisfied with the information supplied by the sponsor in relation to fuel burn and CO 2 emissions. Item 53 of the list of environmental requirements, page 35 Main document, the requirement specifies that where the need to provide additional airspace capacity, reduce delays or mitigate other environmental impact results in an increase in the total annual fuel burn/ mass of carbon dioxide in metric tonnes between the current situation and the situation following the airspace change, Sponsors should provide justification. The sponsor noted Not applicable. The CAA takes the justification of this ACP, modernisation and systemisation, as justification for the increase in fuel burn. The CAA also understands that the fuel burn difference presented is a theoretical one as aircraft are flying at present a set of tracks that are closer in design to the proposed ACP than to the current design. 7. Local Air Quality Status 7.1 Has the impact on Local Air Quality been adequately assessed? Yes The sponsor concluded that the proposed changes would have no impact on Local Air Quality, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea and therefore no detailed assessment was undertaken. The CAA

7 Page 7 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 accepts this argument. 7.2 Has the impact on Local Air Quality been adequately presented in the consultation and the submitted proposal? Yes No Local Air Quality assessment was undertaken or consulted on. This is reasonable, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea and thus have no effect on Local Air Quality. 8. Tranquillity Status 8.1 Has the impact on tranquillity been adequately considered? Yes The sponsor concluded that there would be no impact on tranquillity as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea. The CAA accepts this argument. 8.2 Has the impact on tranquillity been adequately presented in the consultation and the submitted proposal? Yes No tranquillity assessment was undertaken or consulted on. This is reasonable, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea and thus have no effect on tranquillity. 9. Visual Intrusion Status 9.1 Has the impact of visual intrusion been adequately considered? Yes The sponsor concluded that there would be no impact on visual intrusion as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea. The CAA accepts this argument. 9.2 Has the impact of visual intrusion been adequately presented in the consultation and the submitted proposal? Yes No visual intrusion assessment was undertaken or consulted on. This is reasonable, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea and thus have no effect on tranquillity. 10. Biodiversity Status 10.1 Has the impact upon biodiversity been adequately considered? Yes

8 Page 8 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 The sponsor concluded that there would be no impact on biodiversity as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea. The CAA accepts this argument Has the impact upon biodiversity been adequately presented in the consultation and the submitted proposal? Yes No biodiversity assessment was undertaken or consulted on. This is reasonable, as the proposed changes would be above FL75, the majority of which would be above FL170 and over the Irish Sea and thus have no effect on tranquillity. 11. Continuous Descent Approaches Status 11.1 Has the implementation of, or greater use of, CDAs been considered? Yes The Sponsor states that the incorporation of CDA profiles is not applicable to this proposal (since CDAs normally take place below FL70) and that The changes will not affect the ability of IFR traffic to perform CDAs & LPLD. The CAA accepts this argument. 12. Impacts Upon National Parks and/or AONBs Status 12.1 Does the proposed change have an impact upon any National Parks or Areas of Outstanding Natural Beauty (AONBs)? The sponsor states in section 5.2 of Main document that there would be no noticeable noise or visual intrusion impact to stakeholders on the ground in these areas, no changes to local air quality, and no direct impact on flora, fauna or biodiversity due to the height of the proposed changes. The CAA is satisfied with the sponsor s conclusion. No 13. Traffic Forecasts Status 13.1 Have traffic forecasts been provided, are they reasonable, and have these been used to reflect the future impact of the proposal? Section 3.5 presents the traffic forecast used in the calculations. In 2018 the traffic forecast is that of % and in 2023 (implementation + 5 years) is that of %. Growth of traffic is not the justification behind this ACP, i.e. the proposal is not being made with the purpose that it will increase traffic over and above the growth that is expected to occur regardless. Yes 14. Consultation Status

9 Page 9 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ If undertaken, has evidence of non-aviation stakeholder consultation been provided? N/A Aviation stakeholders were consulted but consultation with non-aviation stakeholders was not undertaken as local air quality, noise and other deleterious effects of aviation activity were considered not significant (see section 5.2. of the Main document). The changes in this proposal take place typically above FL170, the minimum is FL90 (approx. 9000ft). The CAA agrees with the sponsor s assessment that at that altitude, ground stakeholders would not be negatively affected by the changes proposed Has account been taken of the results of the environmental factors raised by consultees or has evidence been provided to indicate why this has not been possible? No consultation was undertaken. N/A 15. Compliance with CAP 725 Status 15.1 Have all environmental assessment requirements specified in CAP 725 been met, where applicable? Yes The sponsor claims that no changes at or below 7000 ft will take place. Local air quality, noise, AONBs, National Parks, biodiversity, tranquillity and visual intrusion are typically affected by lower flying aircraft. Therefore, the sponsor has not undertaken a specific environmental analysis with regards to those impacts (Chapter 11, Environmental requirements, items 3 and 4). However, all environmental aspects raised in CAP725 have been adequately addressed in the proposal, and most specifically CO 2 emissions have been analysed and estimated. 16. Other Aspects Status 16.1 Are there any other aspects of the ACP, that have not already been addressed in this report, that may have a bearing on the environmental impact? No No 17. Recommendations Status 17.1 Are there any recommendations for the Post-Implementation Review? Yes

10 Page 10 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 The sponsor has made a number of assumptions in modelling and analysing the environmental impact of this ACP, principally the effect on fuel burn and CO 2 emissions. They include assumptions on traffic forecast, fleet mix and the representativity of the sample days among others. The sponsor, as part of the Post-Implementation Review, should re-examine the accuracy of the assumptions with actual data at the end of the first year of implementation, aimed at confirming the extent of the environmental impact declared in the documentation of this ACP, or updating it. 18. Government Approval Status 18.1 Is the approval of the Secretary of State for Transport required in respect of the environmental impact of the airspace change proposal? The environmental impact of this proposal is negative but not significant, and therefore it is reasonable to conclude that approval from the Secretary of State is not required. No 19. Conclusions 19.1 Can an overall environmental benefit be demonstrated (or justified/supported)? No The sponsor s main reason for this change is to modernise and systemise the airspace infrastructure in a way that offers less interventions from ATC. There is a small fuel dis-benefit between the current flight-plannable route and the flight-plannable route following this ACP which can be viewed as a worst case increase in CO 2 emissions. There is an even smaller fuel dis-benefit between the actual flight path flown at present and the proposed route design. Outstanding Issues Serial Issue Action Required 1 2

11 Page 11 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Additional Compliance Requirements (to be satisfied by Change Sponsor) Serial Requirement 1 2 Environmental Assessment Sign-off/Approval Name Signature Date Environmental Assessment completed by: Environmental Assessment approved by: Associate Noise Analysis Head Noise Analysis 15/06/ /06/2017 Programme Head - Environment Comments:

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas

PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas IRISH SEA AIRSPACE CHANGE PROPOSAL PART D: Potential environmental impact of proposals affecting Southport, Formby, Ormskirk, Skelmersdale and surrounding areas Page D1 of D12 Introduction 1. This part

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Response from the Aviation Environment Federation 18.3.10 The Aviation Environment

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL Safety & Airspace Regulation Group Airspace, Air Traffic Management and Aerodrome Division Edinburgh Airport Limited Scotland EH12 9DN 29 October 2018 CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

LONDON AIRSPACE MANAGEMENT PROGRAMME (LAMP) PHASE 1A CAA DECISION: PART APPLICABLE TO LAMP PHASE 1A MODULE E CAP 1366/E

LONDON AIRSPACE MANAGEMENT PROGRAMME (LAMP) PHASE 1A CAA DECISION: PART APPLICABLE TO LAMP PHASE 1A MODULE E CAP 1366/E LONDON AIRSPACE MANAGEMENT PROGRAMME (LAMP) PHASE 1A CAA DECISION: PART APPLICABLE TO LAMP PHASE 1A MODULE E CAP 1366/E Published by the Civil Aviation Authority, 2015 Version 1 First published 22 December

More information

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace Title: Airway Q41: Reclassify to Class G below Flight level 55 Subject Release of Controlled and Segregated Airspace Version: V3.0 Status: Final Reference FASVIG 20161026 V3.0 Author: Publication Date:

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways

Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways Our vision: sustainable growth Our vision: To enhance the

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

DEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP

DEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP 12 DEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP EUROCONTROL is due to release by the end of this year its first detailed assessment of the aviation industry s forecast environmental footprint in

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Measurement of environmental benefits from the implementation of operational improvements

Measurement of environmental benefits from the implementation of operational improvements Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY

More information

London Airspace Consultation Part E Proposed Changes to London City and Biggin Hill Routes between 4,000ft and 7,000ft over parts of Essex and Kent

London Airspace Consultation Part E Proposed Changes to London City and Biggin Hill Routes between 4,000ft and 7,000ft over parts of Essex and Kent London Airspace Consultation Part E Proposed Changes to London City and Biggin Hill Routes between 4,000ft and 7,000ft over parts of Essex and Kent Contents 1 Introduction... 2 2 Today s Airspace Usage...

More information

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018 NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Birmingham Airport Airspace Change Proposal

Birmingham Airport Airspace Change Proposal Birmingham Airport Airspace Change Proposal Deciding between Option 5 and Option 6 Ratified Version 1. Introduction Birmingham Airport Limited (BAL) launched the Runway 15 departures Airspace Change Consultation

More information

Edinburgh Airport TUTUR1C Trial Findings Report

Edinburgh Airport TUTUR1C Trial Findings Report Edinburgh Airport TUTUR1C Trial Findings Report Trial period: 25 June 28 October 2015 Report published: 26 January 2016 Produced by Edinburgh Airport 2016 1 Contents Executive summary... 3 Summary of trial

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 Page 2 Contents Contents 1. Introduction 2. Airspace change process 3. Redesigning our airspace 4. Airspace design principles 5. Have your say Page

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Birmingham Airport Airspace Change Proposal. Proposed changes to flightpaths for aircraft departing Runway 33

Birmingham Airport Airspace Change Proposal. Proposed changes to flightpaths for aircraft departing Runway 33 Birmingham Airport Airspace Change Proposal Proposed changes to flightpaths for aircraft departing Runway 33 Contents Foreword... 5 Introduction... 6 What is an Airspace Change Proposal?... 6 Background

More information

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters. NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change

More information

A1/3 Page D - 3 Issue 7 AL19 30/03/2007

A1/3 Page D - 3 Issue 7 AL19 30/03/2007 SARG Management System ANNEX D to A1/3 ASSESSMENT 1. The proposal was initiated by Framework Briefing in June 2012 and was developed over a considerable period. The initial consultation took place between

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011

1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011 Stockholm 04 May, 2011 1. Background By this document SAS want to argue against a common statement that goes: Green departures are much more fuel/emission efficient than green arrivals due to the fact

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

What is an airspace change?

What is an airspace change? What is an airspace change? Our airspace is regulated by the Civil Aviation Authority (CAA) who keep it safe, efficient and cost-effective. Airspace is broken down into two categories: Uncontrolled where

More information

Birmingham International Airport Standard Instrument Departures from Runway 15: CAA decision CAP 1398

Birmingham International Airport Standard Instrument Departures from Runway 15: CAA decision CAP 1398 Birmingham International Airport Standard Instrument Departures from Runway 15: CAA decision CAP 1398 Contents Published by the Civil Aviation Authority, 2016 Civil Aviation Authority, Aviation House,

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

London Airspace Consultation Part G Justification and Further Detail for Proposed Changes including Effects on Aviation

London Airspace Consultation Part G Justification and Further Detail for Proposed Changes including Effects on Aviation London Airspace Consultation Part G Justification and Further Detail for Proposed Changes including Effects on Aviation Contents 1. Introduction... 2 2. Scope of Consultation... 3 3. Consultation Strategy...

More information

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title of Airspace Change Proposal Change Sponsor Lands End Airport Introduction of Area Navigation Global Navigation Satellite System

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach

More information

Making the World A better place to live SFO

Making the World A better place to live SFO Making the World A better place to live SFO August 2016 Emissions Reduction Roadmap Industry is strongly committed to achieve the targets Only with several lines of actions it is possible to reach 2020

More information

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725)

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725) Airspace Regulator (Coordination) Devon and Somerset Gliding Club Ltd Airspace, ATM and Aerodromes North Hill Airfield Safety and Airspace Regulation Group Sheldon CAA House Honiton 45-59 Kingsway Devon

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Edinburgh Airport Airspace Change Proposal. What we have proposed and why

Edinburgh Airport Airspace Change Proposal. What we have proposed and why Edinburgh Airport Airspace Change Proposal What we have proposed and why Contents Page 01 Executive Summary 02 02 Welcome 10 03 Why do we need to change? 12 04 Current airspace 16 05 Proposed flight paths

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

Directorate of Airspace Policy

Directorate of Airspace Policy Directorate of Airspace Policy All NATMAC Representatives 17 February 2012 CAA DECISION LETTER RECLASSIFICATION OF THE GLASGOW CONTROL AREA (CTA) 1 INTRODUCTION 1.1 The Glasgow CTA was formed on 28 September

More information

Heathrow s Blueprint for noise reduction. Ten practical steps to cut noise in 2016/17

Heathrow s Blueprint for noise reduction. Ten practical steps to cut noise in 2016/17 Heathrow s Blueprint for noise reduction Ten practical steps to cut noise in 2016/17 Working together with our communities As part of our commitment to engage openly and constructively with our local communities

More information

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page

More information

CDA Continuous Descent Approach

CDA Continuous Descent Approach CDA Continuous Descent Approach Pilots view Cpt. Ir. Dirk De Winter EUROCONTROL - Brussels The European Organisation for the Safety of Air Navigation CDA Pilots Perspective What? CDA is all about the ability

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

Subpart A General Purpose... 7

Subpart A General Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Subpart

More information

Review of brisbane Airport Noise Abatement Procedures

Review of brisbane Airport Noise Abatement Procedures Review of brisbane Airport Noise Abatement Procedures 1. Summary This document presents an overview of the findings of the review of the Noise Abatement Procedures in place for Brisbane Airport. The technical

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Noise Action Plan Summary

Noise Action Plan Summary 2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise

More information

Small Group Exercise 1: Emissions Monitoring Plan

Small Group Exercise 1: Emissions Monitoring Plan Small Group Exercise 1: Emissions Monitoring Plan Introduction: According to the draft Annex 16, Volume IV, the aeroplane operator shall submit an Emissions Monitoring Plan (EMP) to the State to which

More information

Airspace Consultation Feedback Report Part B The Proposed Airspace Design

Airspace Consultation Feedback Report Part B The Proposed Airspace Design Airspace Consultation Feedback Report Part B The Proposed Airspace Design Contents Executive Summary...3 1. Introduction to...7 2. The South Coast, LAMP, and NATS... 10 3. Justifications and Objectives

More information

Definition of overflight

Definition of overflight Policy Programmes Team Definition of overflight CAP 1498 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority, Aviation House, Gatwick Airport South, West Sussex, RH6 0YR. You can copy

More information

PJ25: AMAN Arrival Streaming

PJ25: AMAN Arrival Streaming PJ25: AMAN Arrival Streaming NATS Operational Activity 2018-19 Gatwick Coupled AMAN-DMAN Gatwick XMAN Heathrow XMAN Extended Range Arrival Streaming Current Heathrow XMAN Operational Heathrow AMAN has

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

Performance through Innovation. Case study: Singapore airspace Enhancing airport performance

Performance through Innovation. Case study: Singapore airspace Enhancing airport performance Performance through Innovation Case study: Singapore airspace Enhancing airport performance Innovative ways to maximise performance We provide services and consultancy for airports of all sizes, from the

More information

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures Introduction The purpose of this document is to present an overview of the findings of the review of the Noise Abatement Procedures (NAPs) in place

More information

Aeronautical Studies (Safety Risk Assessment)

Aeronautical Studies (Safety Risk Assessment) Advisory Circular Aeronautical Studies (Safety Risk Assessment) FIRST EDITION GEORGIAN CIVIL AVIATION AGENCY Chapter LIST OF EFFECTIVE PAGES Pages Amend. No Date of Issue List of effective pages 2 0.00

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

ATC PROCEDURES WORKING GROUP. Transition Level

ATC PROCEDURES WORKING GROUP. Transition Level SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Airspace change process: Information pack. CAP 1465b

Airspace change process: Information pack. CAP 1465b Airspace change process: Information pack CAP 1465b Published by the Civil Aviation Authority, 2016 Civil Aviation Authority, Aviation House, Gatwick Airport South, West Sussex, RH6 0YR. You can copy and

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

CAA stakeholder engagement Draft airspace modernisation strategy

CAA stakeholder engagement Draft airspace modernisation strategy CAA stakeholder engagement Draft airspace modernisation strategy 19 July to 10 September 2018 Civil Aviation Authority airspace.policy@caa.co.uk CAP 1690 1 1 We are asking for responses to this stakeholder

More information

Glasgow Prestwick Airport RNAV1 Routes

Glasgow Prestwick Airport RNAV1 Routes Glasgow Prestwick Airport RNAV1 Routes Airspace Change Proposal NATS Airspace Change Assurance Team Issue 2.0 Redacted Submission October 2017 Table of contents Table of contents 2 References 4 1 Introduction

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Opportunities to improve noise management and communications at Heathrow

Opportunities to improve noise management and communications at Heathrow Opportunities to improve noise management and communications at Heathrow Summary of a dialogue between Aviation Environment Federation, British Airways, HACAN, Heathrow Airport and NATS 1. Introduction

More information

Airports Commission s Senior Delivery Group - Technical Report Number 01

Airports Commission s Senior Delivery Group - Technical Report Number 01 Airports Commission s Senior Delivery Group - Technical Report Number 01 Implementation of Performance-Based Navigation in the UK Summary The UK Future Airspace Strategy (FAS) is a programme designed to

More information

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport Environmental Assessment Runway 14 Smart Tracking Approach Gold Coast Airport Table of Contents Introduction ` 3 Runway 14 Smart Tracking approach 3 Assessment 3 Assumptions 3 Nominated aircraft 3 How

More information

Arriving and departing aircraft at Edinburgh Airport

Arriving and departing aircraft at Edinburgh Airport Arriving and departing aircraft at Edinburgh Airport Contents Introduction... 3 Arriving aircraft... 3 The Instrument Landing System (ILS)... 6 Visual Approach... 6 Non Directional Beacon Approach... 6

More information

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules SIP/ASBU/MEXICO/2013-WP/20 SAMPLE TEMPLATE 1. AIR NAVIGATION REPORT FORM (ANRF) (This template demonstrates how ANRF to be used. The data inserted here refers to ASBU B0-CDO as an example only) Regional

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2015052 Date: 20 Apr 2015 Time: 1010Z Position: 5324N 00211W Location: 4nm NE Manchester Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

How to Manage Traffic Without A Regulation, and What To Do When You Need One?

How to Manage Traffic Without A Regulation, and What To Do When You Need One? How to Manage Traffic Without A Regulation, and What To Do When You Need One? Identification of the Issue The overall aim of NATS Network management position is to actively manage traffic so that sector

More information

(Presented by the United States)

(Presented by the United States) International Civil Aviation Organization 31/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

Revised ATS route structure over the Irish Sea

Revised ATS route structure over the Irish Sea Revised ATS route structure over the Irish Sea (Isle of Man and Antrim Sectors) Airspace Change Proposal Prepared by CPW Peer-reviewed by JB NATS Future ATM & Policy - Airspace Change Assurance Team Issue

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE