Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland

Size: px
Start display at page:

Download "Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland"

Transcription

1 enex Kidston Connection Project: raf t nvironmental ssessment eport Powerlink Queensland Chapter 8 \\autsv1fp001\projects\605x\ \6. raft ocs\6.1 eports\4. Compiled draft 17 September\Covers\Chapters\Ch 8.docx ev ision 17-Sep-2018 Prepared f or Powerlink Queensland B: /

2 C enex Kidston Connection Project xisting nvironment Protected areas represent those areas protected for the conservation of natural and cultural values at a Commonwealth, State and ocal level. Protected areas also include areas managed for production of forest resources, including timber and quarry material. his section does not discuss Indigenous and on-indigenous cultural heritage places. iscussion on these is provided in Chapter 16 Indigenous Cultural Heritage and Chapter 17 on-indigenous Cultural Heritage respectively. Protected areas within 10 km of the raft lignment were identified through a review of publically available desktop information, including the following databases: epartment of nvironment and nergy Protected atters Search ool State Planning Policy 2017 (SPP and SPP atters of State nvironmental Significance apping atabase Queensland overnment protected areas databases supplied through Queensland lobe ulf evelopment Plan 2000 (a non-statutory Plan ocal Planning Instruments for Hinchinbrook Council, Charters owers Council and theridge Council. he orth Queensland Plan is currently being prepared by the Queensland overnment, and has not been included within this assessment. It is anticipated that any protected areas identified in the Plan will also be found in the above desktop information for the raft lignment. he raft lignment does not traverse any existing protected areas. he protected areas which have been identified in proximity to the raft lignment are listed in able 8-1 from west to east along the alignment, and shown in Figure 8-1. able 8-1 in proximity of the raft lignment ame ype overning egislation Proximity to raft lignment ewcastle ange he aks ature efuge SS Protected rea (nature refuges 2.6 km north east irringun 350 m north iefway ature efuge SS Protected rea (nature refuges 1.6 km north north east annercost State Forest State Forest Forestry ct km north east ange View ature efuge SS Protected rea (nature refuges 10 km north east Poison ake ly Important Wetland / (irectory of Important Wetlands in ustralia 10 km north Wet ropics of Queensland World Heritage Property atters of nvironmental Significance nvironment Protection and Biodiversity ct 1999 World Heritage ist km north east (overlaps annercost State Forest evision 1 21-Sep-2018 Prepared for Powerlink Queensland B:

3 C enex Kidston Connection Project 133 ame ype overning egislation Proximity to raft lignment Wet ropics of Queensland Heritage Place atters of nvironmental Significance nvironment Protection and Biodiversity ct 1999 Heritage ist km north east he irringun is 277,868 ha in size and spans through three local government areas, including ablelands Council, Cassowary Cost Council and Hinchinbrook Council. he eastern section of the raft lignment is near ount Fox which is part of the. ount Fox is a dormant volcanic cone, and is holds tourism and visitor opportunities. track is present which allows visitors to climb to the summit of the volcanic cone, providing views of the crater and surrounding area. Further details on visual and landscape values of this area are discussed in Chapter 14 Visual menity. 8.2 Potential Impacts he raft lignment for the transmission line and substation locations does not affect any protected areas identified in able 8-1. he nearest identified protected area is the irringun, approximately 350 m north of the raft lignment at the eastern (ount Fox end. ll other identified protected areas are located greater than 1.5 km from the raft lignment. Potential impacts on protected areas are therefore anticipated to be limited to minor and indirect impacts on irringun associated with noise, dust and visual amenity. ust emissions may arise from earthworks, construction of structures and access track usage. he qualitative air quality risk assessment undertaken in Chapter 6 ir Quality determined that the unmitigated air emissions from the construction phase of the Project pose a low risk of dust soiling impacts. missions associated with the construction are expected to be localised to the immediate area and only present for a short period of time per work area. Construction noise sources will include light vehicles and machinery for vegetation clearing, access track construction, structure foundations, and helicopters for transmission line stringing. Based on the construction noise assessment undertaken in Chapter 19 oise and Vibration, construction noise impacts from vehicles and machinery is anticipated to be negligible beyond the southern boundary of irringun. Helicopter use in proximity to the will be short term for both construction activities and transmission line maintenance, and overall noise impacts on the are therefore anticipated to be negligible. he summit of ount Fox within irringun, is located approximately 1 km to the north of the nearest Project structure. he visual impact assessment undertaken in Chapter 14 Visual menity, identified that, although there will be noticeable change due to the close proximity of this scenic viewpoint, there will be no change to the fundamental visual character of the landscape and the structures will blend with the existing view to a considerable extent. It is also noted that irringun ( m elevation is higher in elevation than the Project corridor ( m elevation, therefore the Project is not anticipated to have a hydrological impact on the. evision 1 21-Sep-2018 Prepared for Powerlink Queensland B:

4 C enex Kidston Connection Project itigation and anagement easures he Project will not directly impact on a protected area, and indirect impacts on irringun, such as dust deposition and noise, are anticipated to be short term and of negligible significance. Standard mitigation measures, as provided in ppendix I nvironmental anagement Plans, will be implemented to minimise potential dust and noise impacts on protected areas, including the following. ctive management of dust emissions, such as restriction of vehicle speeds, application of dust suppressants or watering, and the covering of loads for transport to and from work sites. Standard environmental controls for noise management such as limiting working hours, fitting machinery with appropriate noise attenuation devises and shutting down equipment when not in use. evision 1 21-Sep-2018 Prepared for Powerlink Queensland B:

5 S Kinrara Crater W I I U Wairuna bergowrie arrawalt Valley f agoons C I W I FU B S Y P I S W I V Y H 1:700,000 egend Places ain oads raft lignment raft lignment raft lignment B ocal overnment rea World Heritge ondwana ainforests of ustralia Wet ropics Conservation Forest eserve esources eserve State Forest ature efuge VVIW ablelands ount Fox reenvale isclaimer: While every care is taken to ensure the accuracy of the Information Product, the State of Queensland makes no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and disclaims all responsibility and all liability (including without limitation, liability in negligence for all expenses, losses, damages (including indirect or consequential damage and costs which you might incur as a result of the product being inaccurate or Kidston Connection Project ata sources: CB, oads, Watercourses Site Features and ayout - C 2018 SISP Imagery 2017 V PC S PJC I: C BY: JB S IFI: CFS - 18-Sep-18 VSI: Filename: ocument Path: P:\605X\ \4. ech Work rea\4.99 IS\02_Xs\ W VSIS\ _F8-1_KidstonConnectionProject_Protectedreas_3_v2.mxd (when printed at 3 P Y HSH VP I 40 Charters owers 12 P V K iefway ature efuge 30 Flinders ount Fox ulay annercost State Forest Charters owers Flinders alan Y H Hells ates 20 Kilometers Kidston I S U SP I Hinchinbrook Blackbraes 10 Conjuboy theridge F U Charters owers S KH J SS 0 ange View ature efuge X iners ake reenvale yndhurstange View ature efuge Coordinate System: 1994 Zone 55 Projection: ransverse ercator P I irringun iefway ature efuge Pilkara Inset 1: Wallaman Poison ake I he ynd S W Hinchinbrook Y S K Y K I S S B F V C Conjuboy Kidston I S V H JU Cassowary Coast irringun H theridge B C does not warrant the accuracy or completeness of information displayed in this map and any person using it does so at their own risk. C shall bear no responsibility or liability for any errors, faults, defects, or omissions in the information. Undara Crater Y Windy Post innamoolka Craigs Pocket P I S B WBK urronga Crater inasleigh he Cliff he Canyon Undara Volcanic ablelands irramay Kirrama Y W ount Surprise US P V F I H U B U C H BI C K areeba 1 Figure F8-1 3 size

Crystal Spring SNA. Washington County N W N W N W N W N W92 45.

Crystal Spring SNA. Washington County N W N W N W N W N W92 45. W92 45.899 W92 45.835 W92 45.826 W92 45.814 Z o av ral eek s C r N45 15.465 W92 45.972 N45 15.439 W92 46.102 W92 45.913 hidden cove N45 15.413 W92 45.857 W92 45.791 W92 45.899 W92 45.835 W92 45.826 W92

More information

St. Croix Savanna SNA

St. Croix Savanna SNA N44 59.954 W92 46.946 N44 59.906 Na ve Plant Communi es* Dry Sand - Gravel Oak Savanna (Southern) * Source: Minnesota Biological Survey N44 59.673 W92 46.734 N44 59.754 W92 46.748 National Wetlands Inventory

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN CARLTON COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway

More information

Mille Lacs Moraine SNA Approach

Mille Lacs Moraine SNA Approach Approach Tower Road N46 16.636 W93 51.289 N46 16.491 W93 51.285 s Parking N46 16.329 W93 51.265 Approach Tower Road N46 16.636 W93 51.289 N46 16.491 W93 51.285 s Parking N46 16.329 W93 51.265 Borden s

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN RICHMOND COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN DODGES FERRY COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and

More information

AECOM City of London Pedestrian Pathway Connection Across CNR Lands in Kiwanis Park Municipal Class Environmental Assessment Screening Report

AECOM City of London Pedestrian Pathway Connection Across CNR Lands in Kiwanis Park Municipal Class Environmental Assessment Screening Report ity of ondon Pedestrian Pathway onnection cross ands unicipal lass nvironmental ssessment creening eport xecutive ummary Introduction he ity of ondon (ity) initiated a unicipal lass nvironmental ssessment

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN SORELL COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway

More information

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN HOBART AIRSPACE DESIGN BREAM CREEK COMMUNITY Airservices has undertaken a review of the Hobart Airport Standard Instrument Departures (SIDs) and Standard Instrument Arrivals (STARs) for Runway 12 and Runway

More information

U-Park Wyatt Street Temporary Event Space

U-Park Wyatt Street Temporary Event Space Adelaide City Council 26-May-2015 Doc No. 60427502-A15E01RP U-Park Wyatt Street Temporary Event Space Music Noise Assessment U-Park Wyatt Street Temporary Event Space Music Noise Assessment Client: Adelaide

More information

PROTECTED AREAS ZONE - POLICY

PROTECTED AREAS ZONE - POLICY PROTECTED AREAS ZONE - POLICY.1 Introduction The Protected Areas Zone applies to the land depicted on the Ruapehu District Plan Maps as: Amenity Policy Area. Protected Areas - Conservation. (c) Protected

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

Green Fields Leppington

Green Fields Leppington Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE

More information

UDIA Development Showcase ~ Sunshine Coast Adrian Allen ~ Project Director Caloundra South 25 February 2015

UDIA Development Showcase ~ Sunshine Coast Adrian Allen ~ Project Director Caloundra South 25 February 2015 UDIA Development Showcase ~ Sunshine Coast Adrian Allen ~ Project Director Caloundra South 25 February 2015 Overview Context Market Health Stockland on the Sunshine Coast Oceanside Overview Next 12 months

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

Conditions of Carriage

Conditions of Carriage Conditions of Carriage These Conditions of Carriage provide information about us and set out the legal terms and conditions on which we contract with you in relation to the booking by you of air taxi services

More information

TOWNSVILLE NORTH QUEENSLAND IN FOCUS LIVEABLE THE LARGEST CITY IN NORTHERN AUSTRALIA

TOWNSVILLE NORTH QUEENSLAND IN FOCUS LIVEABLE THE LARGEST CITY IN NORTHERN AUSTRALIA TOWNSVILLE NORTH QUEENSLAND IN FOCUS THE LARGEST CITY IN NORTHERN AUSTRALIA LIVEABLE 190,000 >40% Townsville is the largest city in Northern Australia with a population of approximately 190,000 and an

More information

Perth Noise Abatement Procedures - Change to Preferred Runways

Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary Preferred Runways Perth Perth Airport Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary April 2016 1 of 10 Environment Analysis

More information

SUMTER COUNTY ANNUAL TRAFFIC COUNT PROGRAM 2017 TRAFFIC REPORT

SUMTER COUNTY ANNUAL TRAFFIC COUNT PROGRAM 2017 TRAFFIC REPORT U U U FFI U PG FFI P very year, the ake~umter etropolitan Planning rganization (P), in cooperation and partnership with umter ounty Public orks epartment, implements a traffic count program. he P collects

More information

CoreLogic Property Market Indicator Summary All data to week ending 21 May 2017

CoreLogic Property Market Indicator Summary All data to week ending 21 May 2017 Preliminary figures show 77.2 per cent of auctions were successful across the combined capital cities, while auction activity rises week-on-week Auction activity across the combined capital cities increased

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

Manatee County Impact Fee Schedule Effective April 18, 2016 (1)

Manatee County Impact Fee Schedule Effective April 18, 2016 (1) anatee County Impact Fee Schedule ffective pril 8, 206 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per Housing Unit) SIGL-FILY CH 000 sq ft or less $78 $95 $2,290 $2,85 $,686 $,335 $430 $96

More information

Property Flipping Report. Prepared by CoreLogic

Property Flipping Report. Prepared by CoreLogic Property Flipping Report Prepared by CoreLogic About CoreLogic About CoreLogic CoreLogic Australia is a wholly owned subsidiary of CoreLogic (NYSE: CLGX), which is the largest property data and analytics

More information

Exclusively offered by da Vinci Realty, LLC E. Aspen Ave., Flagstaff, AZ 86001

Exclusively offered by da Vinci Realty, LLC E. Aspen Ave., Flagstaff, AZ 86001 Office Building 718 North Humphreys Flagstaff, Arizona 86001 FOR SALE $880,000 view from land facing Southeast www.davincirealty.com Exclusively offered by da Vinci Realty, LLC Darien Mark T. Belsanti,

More information

Appendix 8.D Water Vole and Otter Survey Report

Appendix 8.D Water Vole and Otter Survey Report Appendix 8.D Water Vole and Otter Survey Report Entec UK Limited Entec UK Limited Water Vole and Otter Survey Report June 2009 Final Client Job Name Report title File reference E.ON Renewables Ltd Water

More information

Ship Scrapping - Market Pressures. IMSF Oslo Foteini Kanellopoulou, Senior Analyst 23 May 2012

Ship Scrapping - Market Pressures. IMSF Oslo Foteini Kanellopoulou, Senior Analyst 23 May 2012 Ship Scrapping - Market Pressures IMSF Oslo Foteini Kanellopoulou, Senior Analyst 23 May 212 Disclaimer The material and the information contained herein (together, the "Information") are provided by H.

More information

CAIRNGORMS NATIONAL PARK AUTHORITY

CAIRNGORMS NATIONAL PARK AUTHORITY CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION ANDREW TAIT, (PLANNER, DEVELOPMENT CONTROL) DEVELOPMENT PROPOSED: REFERENCE: APPLICANT: FULL PLANNING PERMISSION

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA

General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA 5 6 7 8 A A B B General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA SECONDARY ROUTE - - - - - 9 WETLAND OR MARSH - - - - - - - - - CHURCH AND CEMETERY - - - - - - - - CEMETERY - - - - - LM 78

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Survey of Deadwater Fell and Peel Fell

Survey of Deadwater Fell and Peel Fell 4 December 2014 Survey of Deadwater Fell and Peel Fell Team: John Barnard, Chris Crocker, Richard Cooper and Graham Jackson 1) Introduction Deadwater Fell (Hill 3542, Section 33, OS 1:50000 Map 80, OS

More information

Review of Environmental Factors

Review of Environmental Factors Port Authority of New South Wales 24-Jan-2018 Review of Environmental Factors Client: Port Authority of New South Wales ABN: 50 825 884 846 Prepared by AECOM Australia Pty Ltd Level 21, 420 George Street,

More information

South East Queensland Stabling Site Selection Report January 2014

South East Queensland Stabling Site Selection Report January 2014 South East Queensland Stabling Site Selection Report January 2014 1 Contents Page 1. Introduction... 3 2. Project Background... 3 2.1 Stabling Options... 3 3. Site Selection Process... 4 4. Site Assessment

More information

Aeronautical Prices and Terms and Conditions

Aeronautical Prices and Terms and Conditions Aeronautical Prices and Terms and Conditions 1 July 2017 Terms and Conditions Christchurch International Airport Limited ( CIAL ) is registered as a limited liability company under the Companies Act in

More information

FOR SALE. TOWN & COUNTRY BUILDING B TRUCKEE AIRPORT ROAD #2 Truckee, CA Listing Price: $685,750.00

FOR SALE. TOWN & COUNTRY BUILDING B TRUCKEE AIRPORT ROAD #2 Truckee, CA Listing Price: $685,750.00 FOR SALE TOWN & COUNTRY BUILDING B 40169 TRUCKEE AIRPORT ROAD #2 Truckee, CA 96161 Listing Price: $685,750.00 Amazing Martis Valley View - Off Highway 267 South Breath-taking views of Northstar-at-Tahoe

More information

Map 1.1 Wenatchee Watershed Land Ownership

Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership The Wenatchee watershed lies in the heart of Washington state in Chelan County. Just larger than the state of Rhode

More information

Performance of Wind Farms in Thailand

Performance of Wind Farms in Thailand Performance of Wind Farms in Thailand Based on Mott MacDonald s in country experience Sasaraj Laoharatchapruek Bangkok, 06 June 2018 Sasaraj Laoharatchapruek Renewable Energy Consultant Bangkok Based Experience

More information

4.19 Parks, Recreation, and Conservation Lands

4.19 Parks, Recreation, and Conservation Lands interchange would have on the Reed Paige Clark Homestead located on the north side of Stonehenge Road. Alternative D would also affect Palmer Homestead, E.F. Adams House, and Knapp Brothers Shoe Manufacturing

More information

Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by

Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR Closes 8 April 2010 Submission by Logan and Albert Conservation Association Prepared by Anne Page (BA Hons Dip Ed M Env Mgt)

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Gold Coast Noise Information pack June 2012

Gold Coast Noise Information pack June 2012 Gold Coast Noise Information pack June 2012 Table of Contents Purpose 2 Overview 2 Hours of Operation/Curfews 3 Runway Configuration 3 Air Traffic 4 Track Density Plot 4 Typical tracks for Wind Conditions

More information

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki COASTAL CONSERVANCY Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I File No. 03-142 Project Manager: Richard Retecki RECOMMENDED ACTION: Authorization to disburse up to $455,000

More information

Sudbury to Hudson Transmission Reliability Project

Sudbury to Hudson Transmission Reliability Project An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,

More information

Canberra Noise Information Pack December 2011

Canberra Noise Information Pack December 2011 Canberra Noise Information Pack December 2011 Table of Contents Purpose 2 Overview 2 Canberra Airport 3 Hours of Operation/Noise Abatement Areas 3 Runway Configuration 3 Air Traffic 3 Track density plot

More information

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves EAST-WEST TIE TRANSMISSION PROJECT ENVIRONMENTAL ASSESSMENT REPORT APPENDIX 3-I-B Alternative Route Assessment Around Provincial Parks and Conservation Reserves Report No. 1536607/2000/2018 TABLE OF CONTENTS

More information

State of Conservation Report Sagarmatha National Park (Nepal) (N 120)

State of Conservation Report Sagarmatha National Park (Nepal) (N 120) State of Conservation Report Sagarmatha National Park (Nepal) (N 120) Submitted to World Heritage Center United Nations Educational, Scientific and Cultural Organization (UNESCO) Paris, France Prepared

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0 Index to Paragraph umbers - TAR Parts 91, 125, 135, 121 Issue 10-0 Part 91 Part 125 Part 135 Part 121 Subpart A General 1 91.1 Applicability 125.1 Applicability 135.1 Applicability 121.1 Applicability

More information

Environment and Climate Change Unit

Environment and Climate Change Unit Environmental Assessment of Interim Procedure Alternative to KEELS SID Runway 03 Perth Airport October 2010 ARMS 208275 DISCLAIMER This report contains a summary of data collected from external and internal

More information

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Quarter 1 2014 (January to March) 1 Version Control Version Number Detail Prepared by Date 1 - Environment June 2014 2 Updated text

More information

Short Term Monitoring Program South Dingley Village, VIC

Short Term Monitoring Program South Dingley Village, VIC Short Term Monitoring Program Version Control Page Summary Version 2: 11 May 2015 4 and 5 Update of dot point 8 (page 4) regarding contribution of community noise on captured events. Deletion of Table

More information

CoreLogic Property Market Indicator Summary All data to week ending 25 March 2018

CoreLogic Property Market Indicator Summary All data to week ending 25 March 2018 Auction activity reaches its highest level not only over the year-to-date, but the highest volume of auctions ever recorded across the combined capital cities and Melbourne individually The pre-easter

More information

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY Town of, MA Trails Map 6a SPLIT ROCK PRIMARY SECONDARY PRIVATE PRIVATE PROPERY STAY ON HEAD FUTURE TO SKINNER (NOT MARKED) 0 miles 0.25 0.250 0.5 Mapbox, Data Odbl, OpenStreetMap contributors primary use

More information

Introduction. Hotel Price Index

Introduction. Hotel Price Index 1 Introduction The tourism sector in the United Arab Emirates became one of the most important sectors that have evolved remarkably in recent years. The Emirate of Abu Dhabi is one of the most attractive

More information

1.2) "Agent" means Yorkshire Coastal Cottages whose registered office is at 11a Crossley Street, Wetherby LS22 6RT

1.2) Agent means Yorkshire Coastal Cottages whose registered office is at 11a Crossley Street, Wetherby LS22 6RT PLEASE READ THIS CAREFULLY. WHEN YOU MAKE A RESERVATION REQUEST WITH US (WHETHER BY EMAIL, TELEPHONE OR POST), THESE CONDITIONS ARE DEEMED TO HAVE BEEN ACCEPTED BY YOU. 1. DEFINITIONS 1.1) "Additional

More information

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc. 2018 2018 Goldwedge Mines Inc. Licence of Occupation Management Plan Photo: xxxx Goldwedge Mines Inc. March 2018 TABLE OF CONTENTS TABLE OF CONTENTS... i Figures... i 1. Background... 2 Project Overview...

More information

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia First Steps Towards Sustainable Operation of Road Tunnels George Mavroyeni Australia Road Tunnel Operations First steps towards sustainable operation of road tunnels Available on PIARC website here PIARC

More information

VIEWPOINT JANUARY Japan Hotel Market Outlook

VIEWPOINT JANUARY Japan Hotel Market Outlook Japan Hotel Market Outlook Kiyoshi Tsuchiya Director, CBRE Hotels, Japan Mami Hattori Associate Consultant, CBRE Hotels, Japan Yoshitaka Igarashi Associate Director, Research Asuka Honda Associate Director,

More information

The Soldotna Wednesday Market

The Soldotna Wednesday Market Join us for the 2015 Soldotna Wednesday Market Market days will be each Wednesday, starting June 3, 2015 and ending on August 26, 2015. It will be held in The Soldotna Creek Park. * Hours of operation

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

Tanker Market Outlook. 12th Mare Forum Ship Finance 2012 Foteini Kanellopoulou, Senior Analyst Amsterdam, 31 October 2012

Tanker Market Outlook. 12th Mare Forum Ship Finance 2012 Foteini Kanellopoulou, Senior Analyst Amsterdam, 31 October 2012 Tanker Market Outlook 12th Mare Forum Ship Finance 212 Foteini Kanellopoulou, Senior Analyst Amsterdam, 31 October 212 Tanker Market Outlook 12th Mare Forum Ship Finance 212 Disclaimer The material and

More information

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/5-IP/3 02/11/11 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) FIFTH MEETING Montréal, 7 to 11 November 2011 Agenda Item 9: Other Business Report

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Appendix 4.8 A. Agency Correspondence and Final APE Statement

Appendix 4.8 A. Agency Correspondence and Final APE Statement Appendix 4.8 A Agency Correspondence and Final APE Statement Area of Potential Effect for Cultural Resources Introduction The South Coast Rail project requires review by the Army Corps of Engineers (Corps),

More information

MANAGEMENT DIRECTION STATEMENT March 2003

MANAGEMENT DIRECTION STATEMENT March 2003 Skeena Region MAAGEMET DIRECTIO STATEMET March 2003 for Lava Forks Provincial Park Ministry of Water, Land and Air Protection Environmental Stewardshi Division This management direction statement was

More information

TOWNSVILLE NORTH QUEENSLAND QUARTERLY ECONOMIC SNAPSHOT

TOWNSVILLE NORTH QUEENSLAND QUARTERLY ECONOMIC SNAPSHOT TOWNSVILLE NORTH QUEENSLAND QUARTERLY ECONOMIC SNAPSHOT SEPTEMBER 2017 TOWNSVILLE NORTH QUEENSLAND QUARTERLY ECONOMIC SNAPSHOT SEPTEMBER 2017 The Townsville North Queensland Economic Snapshot provides

More information

Skytech Colours Avenue

Skytech Colours Avenue Skytech Colours Avenue Noida Extension (Greater Noida West)- the city's most prestigious and exclusive neighborhood.. At its heart Skytech - Colours Delight, the main corridor of business leisure, progress

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

Weston County, Wyoming

Weston County, Wyoming The Sweet 200-Acre Property Weston County, Wyoming A unique opportunity to own a little piece of the old West, where one can experience unparalleled scenery, adventure and history walk in the footsteps

More information

North South Bypass Tunnel Investor Briefing. Andy Summers, Chief Executive, UGL Infrastructure 26 th March 2009

North South Bypass Tunnel Investor Briefing. Andy Summers, Chief Executive, UGL Infrastructure 26 th March 2009 North South Bypass Tunnel Investor Briefing Andy Summers, Chief Executive, UGL Infrastructure 26 th March 2009 UGL Infrastructure Overview Leading provider of construction, engineering and maintenance

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base xhibit -40, udget ine Item ustification: 2016 rmy ate: ebruary 2015 2031: ircraft rocurement, rmy / 01: ircraft / 10: ixed Wing I ode (=ervice eady, =ot ervice eady) : rogram lements for ode Items: ther

More information

THURSDAY, 17 NOVEMBER 12H00

THURSDAY, 17 NOVEMBER 12H00 CONSOLIDATION AUCTION ON SITE FARM GROOTFONTEIN 714 KQ - THABAZIMBI 1145HA GAME FARM & PRIVATE NATURE RESERVE APPROVAL IN PLACE FOR SUBDIVISION INTO TWO PORTIONS (610HA & 535HA) THURSDAY, 17 NOVEMBER 2016

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

PERTH AND KINROSS COUNCIL. 20 June 2018

PERTH AND KINROSS COUNCIL. 20 June 2018 PERTH AND KINROSS COUNCIL 20 June 2018 Planning Reference 18/00200/FLN - Section 42 of the Town and Country Planning (Scotland) Act 1997 to modify condition 3 (landscaping) of planning permission 12/00948/FLM

More information

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Cruise Down Under. Final Report September, 2010

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Cruise Down Under. Final Report September, 2010 Economic Impact Assessment of the Cruise Shipping Industry in Australia, 2009-10 Cruise Down Under Final Report September, 2010 Document Control Job ID: 15640 Job Name: Project Director: Project Manager:

More information

The Needle View Ranch

The Needle View Ranch The Needle View Ranch Hot Springs County, Wyoming Presented by: 58 E. Benteen Street Buffalo, Wyoming 307-684-9556 or 888-684-9557 SUBJECT The Needle View Ranch is located approximately 14.5 miles northwest

More information

Regional planning in Queensland

Regional planning in Queensland Regional planning in Queensland Overview Regional plans are long-term strategic plans that support local growth and development while also protecting a region s natural resources. Regional plans help the

More information

Waterside. Your new home by the water.

Waterside. Your new home by the water. Waterside. Your new home by the water. Welcome to Waterside, the heart of the Lakes District, Penrith Valley. Waterside Taking its name from the five lakes gracing the neighbourhood, Waterside sits in

More information

Citigroup Investor Conference October 2010

Citigroup Investor Conference October 2010 Citigroup Investor Conference October 2010 Disclaimer Important information This presentation ti has been prepared in good faith, but no representation ti or warranty, express or implied, is made as to

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond Phase 2b Route Decision Moving Britain Ahead July 2017 September 2016 High Speed Two: From Crewe to Manchester, West Midlands

More information

PROPOSED PROCESS FOR WRITING THE MASTER PLAN FOR THE BIG SUR PORTION OF THE CALIFORNIA COASTAL TRAIL

PROPOSED PROCESS FOR WRITING THE MASTER PLAN FOR THE BIG SUR PORTION OF THE CALIFORNIA COASTAL TRAIL PROPOSED PROCESS FOR WRITING THE MASTER PLAN FOR THE BIG SUR PORTION OF THE CALIFORNIA COASTAL TRAIL PURPOSE The purpose of this process is to agree on the Master Plan for the portion of the California

More information

Cairns Airport Aircraft Noise Information Report

Cairns Airport Aircraft Noise Information Report Cairns Airport Aircraft Noise Information Report Quarter 4 2015 (October to December) 1 Version Control Version Number Detail Prepared by Date 1 - Environment February 2016 Airservices Australia. All rights

More information

Instructions. Fibrlok TM 2670 Multi-Fiber Ribbon Construction Tool. November, B

Instructions. Fibrlok TM 2670 Multi-Fiber Ribbon Construction Tool. November, B Instructions Fibrlok TM 2670 Multi-Fiber Ribbon Construction Tool November, 1998 34-7032-7181-6-B Contents: 1.0 General... 3 2.0 Ribbon Construction Tool Kit...3 3.0 Preparing the Fibers...3 4.0 Arranging

More information

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Executive Summary Cruise Down Under

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Executive Summary Cruise Down Under Economic Impact Assessment of the Cruise Shipping Industry in Australia, 2013-14 Executive Summary Cruise Down Under September, 2014 Disclaimer: Whilst all care and diligence have been exercised in the

More information

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Quarter 1 2015 (January to March) 1 Version Control Version Number Detail Prepared by Date 1 - Environment June 2015 Airservices

More information

Cairns Airport Aircraft Noise Information Report. Quarter (July to September)

Cairns Airport Aircraft Noise Information Report. Quarter (July to September) Cairns Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 19 December 2012 Airservices Australia. All

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

Neart na Gaoithe Offshore Wind Farm: Onshore Works Environmental Statement Effects Assessed 2 The following effects have been considered:

Neart na Gaoithe Offshore Wind Farm: Onshore Works Environmental Statement Effects Assessed 2 The following effects have been considered: 17 17.1 Introduction 1 This chapter considers the effects of the proposed Onshore Works for the Neart na Gaoithe Offshore Wind Farm on socioeconomics. It details likely direct, indirect and induced employment

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

NOVA Gas Transmission Ltd NGTL System Expansion Project Foldout Maps. Appendix Detailed Route Map Boundary Lake Section

NOVA Gas Transmission Ltd NGTL System Expansion Project Foldout Maps. Appendix Detailed Route Map Boundary Lake Section NOVA Gas Transmission Ltd. 07 NGTL System Expansion Project Foldout Maps Appendix - Detailed Route Map Boundary Lake Section March 0 :,00,000 7 8 9 0 Legend % Meter Station Chinchaga Wildland % Compressor

More information

M4 Junctions 3 to 12 Smart motorway

M4 Junctions 3 to 12 Smart motorway Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic

More information