1 ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme.
2 Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts the Kirkcaldy Esplanade and pedestrian promenade. The sea wall was built in the 1920s and has been effective as a coastal protection structure. However, it is now in poor condition. There is a history of coastal flooding related problems in relation to wave overtopping of the sea wall. This affects the pedestrian promenade, Esplanade Road and residential/commercial sea front properties, with periodic closures during adverse conditions. Fife Council proposes to upgrade the sea wall, improve the Esplanade and public access points to the beach. The general location of the project is shown below. -1-
3 The key objectives of the project are to: To upgrade the Kirkcaldy sea wall to provide more durable and effective coastal protection, that will allow for future modification resulting from potential future flood risk from rising sea levels. To modernise and enhance the sea wall promenade to function as a public open space and to meet accessibility standards expected for all users. To reduce the costs associated with current maintenance of the existing sea wall. Environmental Impact Assessment The findings of the Environmental Impact Assessment for the project have been reported in the Kirkcaldy Sea Wall Improvements Environmental Statement. This Non-Technical Summary outlines the principal environmental impacts identified during the assessment and the proposed mitigation. Consultation Consultation on the project has been undertaken through a public meeting in Kirkcaldy in November Specific consultations have also been carried out with affected parties as well as environmental regulators. The purpose of the consultation exercise was to establish existing site conditions and assist in defining the key environmental issues associated with the project. Feedback from consultations has helped inform the design of the scheme and environmental protection measures. Alternatives Alternatives considered during the planning and design of the project comprise: encasement of the existing wall in concrete or pre-casting of new wall units off-site for subsequent installation; and the transport of material to site by sea or road. The process of selecting a preferred option was undertaken based upon an assessment of the merits of these options and the extent to which each fulfilled the project objectives and environmental acceptability. Existing Environment Kirkcaldy is a coastal town in Fife on the tidal estuary of the Firth of Forth curving around a sandy bay between the East Burn to the north and the Tiel Burn to the south
4 The local environmental context of the project is shown in Figure 4.2. The A921 Esplanade provides access along the coast but physically separates the town from the promenade, sea and shore. Local roads lead from the town to the A921. Public access is provided to the beach from the promenade which runs adjacent to the A921, and is separated by grassed verges interspersed with public car parks. There are a number of residential and commercial properties on the western edge of the A921 including flats and semi-detached houses, Lidl, Dunelm Mill, Kwik Fit, Kirkcaldy Indoor Market and the Mercat Shopping Centre. The Forth Estuary is a Natura 2000 site (the Firth of Forth Special Protection Area) designated because of its importance for wintering waders and wildfowl. The sea wall and sands below are located within this Natura 2000 site. Kirkcaldy Harbour lies at the northern end of the promenade and is included within the Kirkcaldy Harbour and Port Brae Conservation Area. The project area includes public open space along the promenade and the beach. The promenade also forms part of the Fife Coastal Path, a long distance route from Kincardine on the Forth Estuary to Newburgh on the Tay Estuary. The promenade showing the poor condition of the sea wall and paving
5 The promenade showing the adjacent car parking and grass verges. The Proposed Scheme The scheme is illustrated on Figures 5.2a to 5.2e Scheme Design General Arrangement. The works involve refurbishing the sea wall by installing new precast wall units from Tiel Burn at the southern end of the Kirkcaldy promenade to Williamson s Quay at the northern end of the promenade, a distance of approximately 1.8km. The height of the sea wall will be increased by 500mm. Rock revetment will also be installed on the beach on front of the sea wall to protect it from coastal erosion. The scheme also includes improving access to the beach area (with the provision of five ramps and two stepped accesses), replacing existing promenade viewing platforms, raising a section of the promenade by 250mm and resurfacing the promenade. Construction of the project is expected to be undertaken over a period of approximately 14 months, commencing in June Environmental Impacts and Mitigation The project and associated mitigation measures have been designed to minimise adverse environmental effects. Nonetheless some impacts would arise from the proposals, as summarised below: Landscape and visual The main landscape and visual impacts will be the raising of the sea wall, with some loss of the existing open aspect to the sea in some sections from the A921 Esplanade. The installation of the rock revetment will result in some loss of the sandy inter-tidal shore and the introduction of a significant new component in the landscape. The Fife Coastal Path which runs along the length of the promenade will be subject to some visual change as a result of the sea wall being raised. However, the height of the promenade and the existing viewing platforms will be increased by 250mm for - 4 -
6 the majority of the promenade length will this allow seaward views from the promenade to be retained for the majority of people. There will be beneficial effects on residents of Williamson s Quay, users of the Fife Coastal Path car park south and users of Kirkcaldy Sands due to the proposed improvements to the degraded seawall which will improve the existing view. The visual condition of the promenade will also be improved through resurfacing of the full length of the promenade and replacing the existing promenade viewing platforms. Refurbishment and/or replacement of existing lighting, seating and shelters will be considered as permitted development, to be agreed separately to the current planning application. Ecology The proposed scheme is located within the Firth of Forth Special Protection Area (SPA), Ramsar site and Site of Special Scientific Interest designated for its value to wintering birds. This is an extensive area covering a total of 6,314ha along the east coast of Scotland. Existing habitats affected by the proposed scheme are sand, shingle and boulders but these are commonplace and of no more than local ecological value. Birds are known to roost at two key locations on the stepped revetment at the northern and of the beach and at the mouth of the Tiel Burn to the south. The beach and existing stepped revetment. A very small proportion (approximately 0.026%) of the overall area of the Firth of Forth SPA will be taken to accommodate the new rock revetment. There will be some further disturbance to sand and shingle areas during the construction period however these areas will be reinstated following construction. Works will not be undertaken at the southern end of the sea wall between the beginning of November and the end of February so as to reduce the risk of disturbance of roosting birds
7 Community access Kirkcaldy promenade is used as an amenity route by pedestrians to enjoy the view out to the Firth of Forth. It forms part of the Fife Coastal Path. Existing access to the beach is via steps and ramps built into the sea wall along the promenade, as shown in the images below. Examples of the existing beach access. Parts of the promenade sea wall, surfacing and street furniture are currently in a poor condition. The current sea wall has a history of coastal flooding related problems resulting from wave overtopping. This affects the pedestrian promenade, the A921 Esplanade Road and residential/commercial sea front properties, with periodic closures during adverse conditions. Sea spray is a frequent hazard for pedestrians on the promenade. The promenade (and access steps/ramps) will be closed in sections to pedestrians and other users from the start of construction work in late June 2013 to July Signposting will direct users to a safe alternative diversion. An initial 250m length of promenade starting at the southern end will be closed and fenced off. As construction works progress, sections of the promenade will be reopened where it is safe to do so. Sections of beach where works are taking place will be closed as required for public safety reasons. Warning signs will be erected on the beach and a banksman will be at the work area during beach working hours to speak to any members of the public. Construction works during 2014 will be managed by phasing activities such that the Links Market can still take place
8 Illustrative example of a beach access ramp design. Upon completion of the scheme users of the promenade will benefit from reduced overtopping of the sea wall and reduced sea spray hazards. They will also benefit from the improved condition of the promenade and improved access to the beach via new beach access ramps and steps. Noise There will be elevated noise during the construction period. However, this will be localised and intermittent as construction activities take place across the linear working area. Normal working hours are and Monday to Friday and and on Saturdays. If an extension of working hours is necessary this will be agreed with Fife Council Public & Environmental Protection Team prior to work commencing. All construction activities will be undertaken in accordance with standard good site working practices to minimise noise disturbance or nuisance and noise monitoring will be undertaken during the works. The Contractor will be responsible for community liaison, and will provide a contact name where any noise issues/complaints can be directed. Summary Although there will be some localised environmental impacts associated with the Kirkcaldy Sea Wall Improvements, the completed scheme will provide a more durable and effective coastal protection. It will reduce the risk of coastal flooding affecting the pedestrian promenade, the A921 Esplanade Road and residential/commercial sea front properties. It will reduce spray overtopping the sea wall which is currently a frequent hazard for pedestrians on the promenade and has resulted in its closure. The completed scheme will also modernise and enhance the sea wall promenade to function as a public open space and meet accessibility standards expected for all users
9 A full copy of the Environmental Statement is available for public viewing, free of charge, at the following address during normal office hours and also on the Fife Council website ( Fife Council Kingdom House Kingdom Avenue Glenrothes KY7 5LY Printed copies of the Environmental Statement may be obtained, on written request, from the above address at a charge of 80. A CD is available for 5. Hard copies of the Non-Technical Summary are available free of charge. Any person wishing to comment on the Environmental Statement should write to the above address. Written responses are invited within 28 days of the advertised date of publication of the Environmental Statement
Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13
More informationThe reasons why coastal management is needed in Minehead:
1. Resource 1: Why did Minehead need new sea defences? Coastal management in Minehead In pairs, read the following resource and highlight the reasons why coastal management was needed in Minehead. The
More information^ox, 7. Environment Agency. Hayling Island North Strategy *. M ^, v. * > -.
^ox, 7 Environment Agency Hayling Island North Strategy *. M ^, v. * > -. Consultation Document for Preferred Coastal Defence Options - Septem ber 2005 We are the Environment Agency. It s our job to look
More informationMaximising Beneficial Reuse through the use of a Novel Dredging Contract
Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007
More informationMonifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta
Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council, Dundee City Council Main catchment Dundee coastal Summary of flooding impacts
More informationPerth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager
Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,
More informationF6. Coastal Ferry Terminal Zone
F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.
More information10 Morayvale Aberdour, Fife, KY3 0XE Offers in the region of 150,000
10 Morayvale Aberdour, Fife, KY3 0XE Offers in the region of 150,000 10 Morayvale Aberdour KY3 0XE Situated in quiet cul de sac, which provides easy access to the playing fields and Silver Sands beach,
More informationA303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016
Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities
More informationSKYLINER. Prime Residential Development Site PRS or Private Sale Potential. OCEAN DRIVE, EDINBURGH EH6 6JH
Prime Residential Development Site PRS or Private Sale Potential SKYLINER OCEAN DRIVE, EDINBURGH EH6 6JH www.skylineredinburgh.com GUTHRIE AERIAL PHOTOGRAPHY APPROX. AREA FOR ILLUSTRATIVE PURPOSES ONLY
More informationAberlyn. Charlestown, Fife, KY11 3DP
Aberlyn Charlestown, Fife, KY11 3DP Description Aberlyn was built around 1850 and is a fine example of a detached Victorian country house. Having been sympathetically modernised in recent years, the home
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationDraft Marine and Harbour Facilities Strategy
Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet
More informationNon-technical summary
Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,
More information8 HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, CUPAR, KY14 6EW
8 HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, CUPAR, KY14 6EW Jamesfield Farm Steading, Newburgh, Cupar, Perthshire, KY14 6EW A903 0.7m, Abernethy 2m, Newburgh 3m, M90 J9 6m, Perth 10m, Cupar 13m,
More informationSUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan
SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION ANDREW TAIT, (PLANNER, DEVELOPMENT CONTROL) DEVELOPMENT PROPOSED: REFERENCE: APPLICANT: FULL PLANNING PERMISSION
More informationUPPER FORTH CROSSING AT KINCARDINE: MEETING THE ENVIRONMENTAL CHALLENGE
UPPER FORTH CROSSING AT KINCARDINE: MEETING THE ENVIRONMENTAL CHALLENGE 1.0 INTRODUCTION Steven Brown BSc, CEng, MICE, AIEMA Transport Scotland Helen Bradley BEng, CEng, MICE, MIHT Jacobs One of the biggest
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More informationMs P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/
Unit 2 Eclipse Office Park High Street Staple Hill Bristol BS16 5EL T: 0117 956 1916 E: all@tetlow-king.co.uk F: 0117 970 1293 W: www.tetlow-king.co.uk Ms P Goldfinger Date: 18 September 2017 Head of Programme
More informationPlanning Committee. Thursday, 26 May 2016
Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),
More informationWest Fife & Coastal Villages Community Council Forum Comrie Community Centre Thursday 29 November 2012
West Fife & Coastal Villages Community Council Forum Comrie Community Centre Thursday 29 November 2012 Agenda Discussion Points Action Present Sheila Carribine Marie Crane John Bonnar John Crane Willie
More informationDevelopment Control Committee
Development Control Committee Minutes Tuesday, 09 February 2016 at 18:30 PRESENT : Councillor Reynolds (in the Chair); Councillors Andrews, Collins, Jermany, Lawn, Linden, Sutton and Wright Councillor
More information13 Abbey Park Place, Dunfermline, Fife, KY12 7PT. Offers in the region of 400,000.
13 Abbey Park Place, Dunfermline, Fife, KY12 7PT. Offers in the region of 400,000. Particulars of Sale A C listed Victorian villa (previously used as offices) offering a range of development options in
More informationE40. Temporary activities
E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming
More informationClam Harbour Provincial Park
Clam Harbour Provincial Park Public Engagement Session Thursday, September 14 th, 2017 5:30pm 7:30pm Webbers Store 11470 Nova Scotia Trunk 7 Lake Charlotte, NS Agenda Overview of the Provincial Parks System
More information03 Opportunities and Strategies Union Canal Study 17
03 Opportunities and Strategies 17015 Union Canal Study 17 Introduction This chapter summarises the issues, opportunities for improvement and proposed strategy outcomes of the study of the towpath. The
More informationEnergy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B
Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationInitial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk
Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment
More informationProposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement
Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the
More informationVolume Three. 3.9 Planning Area No. 9 North Shore Location and Role Vision Statement Key Character Elements
3.9 Planning Area No. 9 North Shore 3.9.1 Location and Role This Planning Area includes the Sunshine Coast Airport and surrounding lands, including the localities of Mudjimba, Pacific Paradise, North Marcoola
More informationTHAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.
Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationProject No Brent Cross, Cricklewood London, UK Phase 1A North RMA
Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx
More informationThree Sisters Campground Redevelopment
Three Sisters Campground Redevelopment In 2013 heavy rains in southern Alberta caused flooding along the Bow River that resulted in damage to facilities in the Kananaskis Region including the Three Sisters
More informationDOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016
DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER Spring 2016 WELCOME The Port handles 13 million passengers, 2.5 million freight vehicles and up to 119 billion of UK/European trade. It supports 22,000 jobs,
More information2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002
2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number
More informationWELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE
PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen
More information(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY
(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationBroomhill Park - 10 Year Vision Document
Broomhill Park will provide a vibrant community focal point functioning as a green oasis within Strood, emphasizing the views of the surrounding countryside and giving consideration to biodiversity within
More informationFinn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
More informationNewcastle Transport Program Newcastle Light Rail Determination Report
Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction
More informationRegulatory Committee
Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationLocation reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8
Location reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8 Chapter 4 PDZ8 12 February 2011 DISCUSSION AND DETAILED POLICY DEVELOPMENT The Marazion area contains
More informationATTACHMENT A. P a g e 6 I t e m #
EVENT IMPACT STATEMENT AUSTRALIAN INTERNATIONAL 3 DAY EVENT EVENT NAME EVENT ORGANISER Australian International 3 Day Event (AI3DE) Adelaide Horse Trials Management Inc. EVENT DATES Thursday 13 to Sunday
More informationPlanning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council
Senior Executive Officer, Planning Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8. 25 th February 2016 BY HAND Re: No 6 St. Mary s Road, Ballsbridge Dublin 4 Planning application for
More informationDraft Strategic Plans for Coillte s eight Business Area Units ( )
Draft Strategic Plans for Coillte s eight Business Area Units (2011-2015) Response to Public Consultation from Mountaineering Ireland April 2013 1 Introduction Mountaineering Ireland welcomes this opportunity
More informationAN OUTSTANDING SINGLE HOUSE PLOT AND UP TO 2.48 ACRES OF LANDS AT HATCHBANK, KINROSS-SHIRE, KY13 0LF FOR SALE AS A WHOLE OR IN 2 LOTS
AN OUTSTANDING SINGLE HOUSE PLOT AND UP TO 2.48 ACRES OF LANDS AT HATCHBANK, KINROSS-SHIRE, KY13 0LF FOR SALE AS A WHOLE OR IN 2 LOTS M90 JUNCTION 5 1.5m CLEISH 2m KINROSS 2.5m DUNFERMLINE 10m GLENROTHES
More informationLISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS
WELCOME The London Fire Brigade (LFB) and partners U+I are working together to develop proposals for 8 Albert Embankment. Thank you to everyone who visited our previous public exhibition and provided feedback
More informationRESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX
RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX RESIDENTIAL DEVELOPMENT SITE AT WHITEHILLS SAWMILL, MILL FARM ROAD, BY CROSSGATES, FIFE, KY4
More informationFelixstowe Branch Line FAQ
Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.
More informationFOR SALE. On behalf of. Surplus Land and Buildings at the MURRAY ROYAL HOSPITAL PERTH Available as a whole or in two lots
FOR SALE On behalf of Surplus Land and Buildings at the MURRAY ROYAL HOSPITAL PERTH Available as a whole or in two lots Location The surplus land and buildings at the Murray Royal Hospital, Perth are located
More informationOssington Station Easier Access Project - Construction & Public Art Concept Update
Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations
More informationBridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE
Committee Date: 22/01/2015 Application Number: 2014/05949/PA Accepted: 08/12/2014 Application Type: Full Planning Target Date: 02/02/2015 Ward: Sutton Vesey Bridge School, Longmoor Campus, Coppice View
More informationPre-application submission for Committee: Phase 4 development at West Hendon
Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate
More informationPenzance Heliport Ltd.
Penzance Heliport Ltd. Penzance Heliport Ltd is planning to reinstate the popular scheduled helicopter service between Penzance and the Isles of Scilly. To operate the service, it proposes to build a new
More informationCity of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance
City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale
More informationFORTH ESTUARY LOCAL PLAN DISTRICT
FORTH ESTUARY LOCAL PLAN DISTRICT COASTAL FLOODING The area of the Forth Estuary Local Plan District that is affected by coastal flooding 1 is shown in Figure 1. This Local Plan District has 375km of coastline
More informationLand Management Summary
photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the
More informationChapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017
kpmg Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017 Prepared for: The Chapleau Economic Development Corporation Corporation of the Township of Chapleau 1 Chapleau
More informationSilverburn Park LEVEN FIFE KY8 5PU
on behalf of Silverburn Park LEVEN FIFE KY8 5PU The Opportunity GVA Humberts Leisure Fife Council wish to dispose of a range of substantial property assets at Silverburn Park, either as a whole or separately,
More informationI508. Devonport Peninsula Precinct
I508. Devonport Peninsula Precinct I508.1. Precinct description The purpose of the Devonport Peninsula precinct is to provide for the comprehensive residential development of the former Navy housing land
More informationBrisbane Metro Infrastructure Association of Queensland 14 February 2018
Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationSouthsea Flooding and Coastal Erosion Risk Management Scheme
Southsea Flooding and Coastal Erosion Risk Management Scheme Public Consultation Report 3 rd November 29th December 2014 TABLE OF CONTENTS 1 INTRODUCTION... ERROR! BOOKMARK NOT DEFINED. 1.1 Purpose of
More informationPlanning Committee 26 August Irvine, 26 August At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m.
Planning Committee 26 August 2015 Irvine, 26 August 2015 - At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m. Present Matthew Brown, John Ferguson, Robert Barr, John Bell, Ian
More informationAbout this consultation
About this consultation With under 18 months to go until the XX Commonwealth Games in Glasgow, the role of each of the Games Venues is coming sharply into focus. Glasgow 2014 Ltd. will be progressing planning
More informationStainforth & Keadby Canal Installation of Multiuser Path
Stainforth & Keadby Canal Installation of Multiuser Path Introduction North Lincolnshire Council has entered into an agreement with Canal & River Trust to develop proposals to introduce a multiuser path
More informationPERTH AND KINROSS COUNCIL
PERTH AND KINROSS COUNCIL Fossoway Llp Eko Planning FAO Nicholas Lawrence North Bridge Studios 28 North Bridge Edinurgh EH1 1QG Pullar House 35 Kinnoull Street PERTH PH1 5GD Date 31 May 2012 Town and Country
More informationHydro-Electric Schemes Compliance Report June June 2013
File Reference: 4.00212 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 20 June 2013 Report From: Nick Zaman, Pollution Prevention
More informationRESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director
RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in
More informationSantos Tour Down Under Tour Village and Bike Expo
The Adelaide City Council invites engagement from the community about Santos Tour Down Under Tour Village and Bike Expo Project Summary The Adelaide City Council has received an application from Events
More informationENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY
FOR SALE Aviator Park, Station Road, Addlestone, Surrey KT15 2PG ibrochure - www.cbre-ibrochure.co.uk/addlestone ENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY LOCATED WITHIN THE HIGHLY DESIRABLE
More informationNOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT
1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued
More informationUniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.
August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationTraffic calming on major roads: a traffic calming scheme at Costessey, Norfolk
Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on
More informationRURAL LAND RESOURCES Case study area 1- the erosional features of the Dorset Coast.
Case study area 1- the erosional features of the Dorset Coast. Scene setting;- This area lies on the far south coast of England, between the settlements of Lyme Regis and Bournemouth, in the county of
More informationConcept Curtin Precinct Map and Code
Concept Curtin Precinct Map and Code Proposed changes from the revised Curtin Group Centre Draft Master Plan recommendations Disclaimer: This document is intended to show the proposed changes to the existing
More informationThe Old Mill, Glamis Road, Kinghorn, Fife, KY3 9UR. Offers over 310,000.
The Old Mill, Glamis Road, Kinghorn, Fife, KY3 9UR. Offers over 310,000. Particulars of Sale Kirkcaldy 3 miles, Dunfermline 13 miles, Edinburgh Airport 21 miles, Edinburgh City Centre 24 miles & St Andrews
More informationI211. Viaduct Harbour Precinct
I211. Viaduct Harbour Precinct I211.1. Precinct description The Viaduct Harbour precinct incorporates Viaduct Harbour and the land fronting the harbour (including Hobson Wharf), and the adjacent coastal
More informationSainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT
Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton
More informationNorth Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,
North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government
More informationROBERTS CREEK PROVINCIAL PARK MASTER PLAN. November, 1981
Ministry of Lands, Parks and Housing Parks and Outdoor Recreation Division Park Operations Branch North Vancouver, B. C. ROBERTS CREEK PROVINCIAL PARK MASTER PLAN November, 1981 Mr. G. Trachuk Director
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationPerth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager
Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager 4(3)(ii) 13/138 Erection of a Structure for Floral Display in the Public Park,
More informationRyeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment
TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro
More informationAt a meeting of the Development Management Committee held on 22 February 2018
1 HAVANT BOROUGH COUNCIL At a meeting of the held on Present Councillor Keast (Chairman) Councillors Buckley, Hughes, Keast, Perry, Satchwell, Lloyd and Guest (Standing Deputy) 105 Apologies for Absence
More informationFigure 3.3 Panoramic photograph across the site
ROYAL PIER WATERFRONT, SOUTHAMPTON Royal Pier Figure 3.3 Panoramic photograph across the site managed by ABP lies between Town Quay and Trafalgar Dock further to the east, and provides 140 berths. 3.14
More informationLogo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road
Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationAirdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1
Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)
More informationProject Manager, Cairns Airport Land Use Plan Submissions Cairns Airport Pty Ltd PO Box 57 Airport Administration Centre Cairns Airport, QLD, 4870
Project Manager, Cairns Airport Land Use Plan Submissions Cairns Airport Pty Ltd PO Box 57 Airport Administration Centre Cairns Airport, QLD, 4870 Dear Madam/Sir, The Cairns and Far North Environment Centre
More information2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,
More information