NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

Size: px
Start display at page:

Download "NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT"

Transcription

1 1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued a request for further information on a number of items. The additional information sought is provided below. 1. Construction depot/yard Additional information has been sought in relation to the possibility of a construction depot/yard within the southern bridge approaches construction zone. While the main Contractor s yard is expected to be sited at the northern bridge approaches and within the designation area (in the area of the new stormwater pond) the Contractor may set up additional yards to suit their methodology for instance close to the rail overpass construction site within the southern bridge approaches area. It is anticipated that any such yard would be contained within the land purchased for the project and covered by the designation. If the contractor considers that alternative yard location/s are more suitable for their purposes, then it will be their responsibility to obtain the use of any such land (for instance, by leasehold agreement), and to obtain any land use consents required. The main contractor s yard is expected to house Contractors office, meeting/lunch room, portaloos. These buildings are expected to be the standard relocatable container style Portacom buildings. Any further yards may well house similar buildings. Any potential construction yard at southern end of the abutment will need 1

2 to be sited so that it does not have any adverse effects on the operation of the West Coast Wilderness Trail. Impacts on the existing West Coast Wilderness Trail will be limited as the majority of the project works are off-line from the existing highway and cycle route. However, the tie-in s at either end will unavoidably have some impact on the cycle trail; however the Contractor is required to manage any impacts on the cycle trail through traffic management, and to keep this trail open and to a safe and appropriate standard throughout construction. Once the Contractor is appointed, they will complete the construction Environmental Management Plan before works on site commence, which will include a Traffic Management Plan. The finalised CEMP will be provided to both district councils for their information, prior to works commencing on site. 2. Locked Bollard Access In response to the query about the locked bollard access, the New Zealand Transport Agency (NZTA) has provided the following background information. The NZTA since consultation on the project began, been very aware of the interest of the bach owner/ occupier and the whitebaiters in the proposed changes to the access point to the Department of Conservation (DoC) land on the south side of the river immediately prior to the existing bridge necessitated by the new bridge construction. However, before further discussion it is important to consider the proposed access in the context of the existing informal situation. The current Crossing Place, (No 247), to and from SH6, which is a Limited Access Road, was granted to the Department of Land Information in 1996 for access to the adjacent scenic reserve land managed by the Department of Conservation. The use of the crossing place by the bach owner/occupier to access the bach and by whitebaiters accessing the river has never been formalised. Complicating matters further is that the users of this crossing place also cross the rail corridor. It is important to understand that there is a high probability that any new application for a crossing place at this location that included the current level of use by the bach owner/occupier and the whitebaiters would be declined by the NZTA on safety grounds. It would also be surprising if any formalised crossing of the rail corridor was allowed by KiwiRail. In considering options to replace the current access for DoC, the NZTA have been mindful of the desirability of any solution to also maintain some level of continued access for the bach owner/occupier and for the whitebaiters. 2

3 Remembering of course that replacement of the crossing place providing access to the DoC land is the NZTA s only actual legal obligation. The access solution which has been developed will utilise a widened and enhanced cycleway/pedestrian path, and has been agreed with DoC as serving their need for very infrequent maintenance access to the scenic reserve land. The NZTA believes that with appropriate management, this solution can also safely accommodate infrequent use by the bach owner/occupier and the whitebaiters. This philosophy has been the basis of all consultation to date including with the Westland District Council, the bach owner/occupier and the whitebaiters. While the NZTA are willing to go to extra expense to construct a path that preserves this informal access to the DoC managed land, for the bach owner/occupier and the whitebaiters in a safe manner, separated from both road and rail, the NZTA do not see it as their place to manage use of this access beyond that required for DoC. For further background, the NZTA also considered a separate access direct from the highway down the proposed embankment, however it soon became apparent that this could not be safely accommodated due to substandard sightlines from any intersection with the highway as a result of the safety barriers to be installed on the bridge and the embankment. In response to the specific queries you raise, I note that this aspect of the project continues to be further detailed as the project progresses. Section 8 Consultation simply reports what was discussed with Mr Russ on site, which has subsequently been superseded by the on-going discussions with David Inwood of Westland District Council (WDC), as to the best agency to manage the locked bollard. Mr Russ has been advised of this change of proposal. Since the application was lodged on 24 May, there has been on-going discussion between the Deputy Project Manager, David Mallett, and WDC s Asset Manager David Inwood. The proposal is that the WDC will be responsible for the maintenance of the cycleway, and therefore is regarded as the most appropriate body to manage the operation of the cycleway. There will be a locked bollard at the southern end of the cycleway (by the local road intersection) which will be able to be removed to allow vehicle access to the cycleway. There will be another bollard that prevents vehicles using the cycleway to travel over the river bridge. The key/combination to the locked bollard (and who is given access to this and under what circumstances) will be controlled by the WDC. The NZ Transport Agency s understanding of the situation is that ultimately WDC will be responsible for the use of the cycleway by vehicles, and for monitoring this 3

4 situation. The access situation for the full range of expected users is detailed below, but has yet to be discussed and finalised with David Inwood. 1. Whitebait stand owners The southern bank of the Taramakau River includes 17 whitebait stands to the west of the proposed road. These are currently accessed by the existing DoC access, followed by an informal track (grass/earth surface, less than 3m wide) running along the road reserve. The existing track is used by whitebaiters to limit the amount of walking they need to do down the informal track with their equipment. It is estimated that currently there are 16 vehicles per day using this access, moving in and out with the tides during the whitebait running season which extends from 1 September to 22 November each year. It is expected that limited access to whitebaiters will still be provided via the cycleway. This will be provided at the start and end of each season for equipment to be transported to the start of the informal track, and this access would be limited to a set time range (for instance a two hour period to be agreed between the Whitebaiters Association and WDC which is to be managed by WDC). Between these times whitebaiters will be expected to walk/cycle from the local road along the cycleway to access the informal track and their whitebait stands, and if the above vehicle access window is missed whitebaiters are not precluded from using the cycleway to transport their equipment on foot or cycle. This will add approximately 450m to the distance they are required to walk from the car park (note ample room has been retained for this on the side of the new local road). This access period is expected to be monitored by the WDC, with the key/combination not provided to individual whitebaiters. b) Bach owner There is an existing Bach located on road reserve land immediately west of the cycleway as this building is informally located on road reserve without any legal arrangement, it therefore has no legal standing and pays no rates on it. Vehicle access to this bach can be provided by the cycleway, however it is expected that this access will be limited to one entry and one exit per day, with the vehicle giving way to cyclists at all times. It is expected that the bach owner will be provided with a key/combination to the bollard for this access. 4

5 c) Department of Conservation (DoC) The only access required by DoC is for maintenance of their parcel of land, which is considered uncommon, and in which case DoC would contact WDC as required to arrange access. DoC have been consulted regarding this, and support this arrangement as advised by dated 15 March d) WDC WDC will maintain the cycleway and will therefore need access to the cycleway for maintenance from time to time. This maintenance work will be subject to a Traffic Management Plan that will be required to take account of user safety. e) NZTA Access to the embankment planting and stormwater pond for maintenance is provided via the cycleway. Maintenance requirements here are expected to be infrequent, and subject to liaison with WDC on a case-by-case basis. f) KiwiRail Access from the cycleway may be requested to reach certain parts of the track alignment, however this is considered unlikely. Access will be subject to liaison with WDC on a case-by-case basis. 3. Vesting of Retired Section of Highway in WDC A 300m section of the existing highway is to be retired, and then vested by the NZ Transport Agency in the Westland District Council, to be owned and operated as a local road. It is noted that the vesting of road in the Council is a separate process to the Notice of Requirement under the RMA, and this process will be undertaken in accordance with the Local Government Act. Detailed design drawings will be provided to WDC for review once NZ Transport Agency reviews are complete. The NZ Transport Agency will work with the WDC Asset Manager to ensure that the road to be vested is handed over in an agreed condition. At the consultation meeting held on site on 15 March, Geoff Griffiths of the NZ Transport Agency advised that this section of existing highway would be resealed as part of the project, to leave it in good condition and to minimise the on-going maintenance requirement for the district council. Further discussions will take place to cover all the details, and the vesting process, in due course. 5

6 4. Other matters Stormwater ponds A number of new stormwater ponds are being installed as part of the bridge approaches realignment. The stormwater ponds on the southern bridge approaches will be maintained by the NZ Transport Agency, as part of normal highway maintenance. Lighting The WDC is suggesting that there is merit in the provision of basic flag lighting for pedestrians and cyclists at each end of the cycleway, and in the underpass for safety reasons. As proposed in the Notice of Requirement, the highway realignment and bridge project has made no provision for any lighting, on the basis that no lighting is currently provided at this site or along this route, and as the site is within a rural zone. This approach has been tested and confirmed through the detailed design safety audit process. 5. West Coast Wilderness Trail (Cycleway) a) Construction impacts Impacts on the existing West Coast Wilderness Trail will be limited as the majority of the project works are off-line from the existing highway and cycle route. Establishment of the site office, construction works on the north side, and the tie-in s at either end will unavoidably have some impact on the cycle trail; however the Contractor is required to manage any impacts on the cycle trail through traffic management, and to keep this trail open and to a safe and appropriate standard throughout construction. Temporary traffic management and construction management plans can be provided to WDC for information once confirmed with the Contractor. b) Management of cycleway Maintenance drawings have been circulated to the Westland District Council which incorporates comments from an earlier revision. These drawings show that the cycleway over the bridge will be maintained by the NZ Transport Agency with WDC maintaining the cycleway elsewhere, and confirm the demarcation line for maintenance purposes (refer to drawings SK701 to SK703, sent via to David Inwood 18/05/2016). The management details and other issues concerning the cycleway are still being finalised, and is the subject of on-going discussion between the NZ Transport Agency and GDC/WDC. Similarly the possible cycleway extension for some 250m is still under development and negotiation. It is noted that the Notice of Requirement is a critical path item and so was finalised and lodged prior to all the cycleway matters being completely resolved. Details 6

7 concerning the cycleway can be addressed by agreement between the parties involved, which can then be formalised by the exchange of correspondence, and does not need to be contained within the designation process. c) Clip-on structure The existing clip-on cycleway structure on the road/rail bridge is an NZTA asset and is subject to an agreement between the NZ Transport Agency and KiwiRail. A cycleway to the Cochrane/Molloy property entry has never been included in the scope of the project, and is being discussed outside of this project by WDC and the landowner. Potentially Affected Parties I would appreciate the opportunity to discuss this matter with you, prior to your final determination. I hope that the information provided above is sufficient, but if you need further clarification please contact me directly. However, hopefully the information provided is detailed enough and you will now be able to resume processing the Notice of Requirement. Yours sincerely Andrea Jackson Principal MEM 7

8 8

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

waterview connection Completing the Western Ring Route the Waterview Connection

waterview connection Completing the Western Ring Route the Waterview Connection waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information

Regional Transport Committee OPEN MINUTES

Regional Transport Committee OPEN MINUTES Regional Transport Committee OPEN MINUTES Minutes of a meeting of the Regional Transport Committee held in Council Chambers, Waikato Regional Council, 401 Grey Street, Hamilton East on 11 June 2018 at

More information

OPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING. Meeting Date: Thursday, 8 February 2018

OPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING. Meeting Date: Thursday, 8 February 2018 Hastings District Council Civic Administration Building Lyndon Road East, Hastings Phone: (06) 871 5000 Fax: (06) 871 5100 WWW.hastingsdc.govt.nz OPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

Rangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY

Rangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY A top priority The Waikato Expressway is a key transport corridor for the Waikato region and is a top priority for the government. It is made up of 10 separate sections between Mercer and Cambridge. When

More information

Abbey Chesterton bridge Questions & Answers

Abbey Chesterton bridge Questions & Answers Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound

More information

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE 15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Transport

More information

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for: 6. POUND ROAD ROAD STOPPING AND LAND SWAP General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Asset and Network Planning Manager

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes

More information

TOURISM IN WESTLAND MARCH 2012

TOURISM IN WESTLAND MARCH 2012 TOURISM IN WESTLAND MARCH 2012 Tourism in Westland The Westland District Council co-ordinated three tourism industry related meetings during February 2012. These were held in Haast, Fox Glacier and Hokitika.

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate

More information

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand Preamble 1. Transport Canada, Civil Aviation Directorate

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board Certification Memorandum Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board EASA CM No.: CM CS-008 Issue 01 issued 03 July 2017 Regulatory requirement(s):

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Appendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No

Appendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No Appendix D Media Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Auckland s Northern Motorway

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

Lake Dunstan Trail Project - Geotechnical Review

Lake Dunstan Trail Project - Geotechnical Review 11 July 2018 Oli Monthule-Mcintosh Planning Officer Central Otago District Council 1 Dunorling Street PO Box 122 Alexandra WSP Opus Alexandra Office Tarbert Buildings, 69 Tarbert Street PO Box 273, Alexandra

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

Western Bay of Plenty District Council

Western Bay of Plenty District Council Western Bay of Plenty District Council Minutes of Meeting No. JRS7 of Joint Road Safety Committee held on 8 August 2018 in the Council Chamber, Barkes Corner, Tauranga commencing at 10.00am Present Councillor

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Frequently Asked Questions South Head Paper Roads By the South Head Action Group

Frequently Asked Questions South Head Paper Roads By the South Head Action Group Frequently Asked Questions South Head Paper Roads By the South Head Action Group May 2010 What is the issue about? The Rodney District Council is planning to close a safe public vehicle accessway to the

More information

STRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall

STRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall East Dean & Friston PC Clerk Katrina Larkin Councillor Stephen Shing Councillor Daniel Shing Ian Johnson Principal Traffic and Safety Officer Kevin Morris Highway Steward STRENGTHENING LOCAL RELATIONSHIPS

More information

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS 3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the

More information

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02. Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury - Consultation Report November 2010 Project Number B1555300 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT

THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT The Northern Corridor Improvements Project is the last link in the Western Ring Route, connecting the north with the west long SH1 and SH18. Major benefits of

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury Final Report for JTB March 2012 Project Number B1649000 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

WOKING INTEGRATED TRANSPORT PROJECT

WOKING INTEGRATED TRANSPORT PROJECT Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business

More information

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1 Ashton Vale Industrial Estate alternative access report on second micro-consultation MetroWest Phase 1 January 2017 THIS REPORT REMAINS IN DRAFT FORM AS THE WORKSTREAM ENDED AND IS MADE AVAILABLE FOR INFORMATION

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Enterprise Way. The new Airport City link road. June 2017 Progress Update Enterprise Way The new Airport City link road June 2017 Progress Update Airport City Manchester is one of the most exciting business destinations in development today. The total planning area of Airport

More information

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan. March 19, 2014 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Vern Keller Coconino National Forest Attn: Plan Revision 1824 South Thompson Street Flagstaff, Arizona 86001 coconino_national_forest_plan_revision_team@fs.fed.us

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS Date: 20 th January 2015 Venue: Committee Room 4, County Hall Apologies: Cllr Kay Twitchen, Cllr Melissa McGeorge, Cllr William Archibald, Beverley Gould Principal

More information

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used? Report to: Cabinet Date: 27 November 2013 Title: Portfolio Holder(s) Divisions Affected St Mary s and Penzance Harbours Improvements Bert Biscoe CC - Transport and Waste Penzance Central Relevant Scrutiny

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

Conservation Area Consent for demolition of existing building

Conservation Area Consent for demolition of existing building Committee Date: 19/09/2013 Application Number: 2013/02378/PA Accepted: 03/05/2013 Application Type: Conservation Area Target Date: 28/06/2013 Consent Ward: Ladywood 34 Carver Street, Jewellery Quarter,

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

Otorohanga Stopbank Pathway - Project Overview

Otorohanga Stopbank Pathway - Project Overview Otorohanga Stopbank Pathway - Project Overview Introduction Otorohanga District Council with the support of the Otorohanga Community Board are constructing a 3.5 km long gravel pathway for shared use on

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Notes form the North of Horsham development Parish Liaison Meeting. at Roffey Millennium Hall Crawley Road, Horsham.

Notes form the North of Horsham development Parish Liaison Meeting. at Roffey Millennium Hall Crawley Road, Horsham. Notes form the North of Horsham development Parish Liaison Meeting held on Friday 28 th September 2018 at 10am at Roffey Millennium Hall Crawley Road, Horsham. Planning application:- DC/16/1677 Development

More information

Wanaka Community Board 15 April Report for Agenda Item: 4

Wanaka Community Board 15 April Report for Agenda Item: 4 Wanaka Community Board 15 April 2015 Department: Infrastructure Report for Agenda Item: 4 Mt Burke Station Stopping and Vesting of Road Purpose 1 To obtain the Board s support for a stakeholder agreement

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

4. Omokoroa Structure Plan

4. Omokoroa Structure Plan 4. Omokoroa Structure Plan 4.1 Infrastructure Schedule Project Funding Source() Developer Council Council Other Financial Contributions Rates Water Supply 72.6 27.4 Wastewater Reticulation 73.0 11.0 16.0

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

Stainforth & Keadby Canal Installation of Multiuser Path

Stainforth & Keadby Canal Installation of Multiuser Path Stainforth & Keadby Canal Installation of Multiuser Path Introduction North Lincolnshire Council has entered into an agreement with Canal & River Trust to develop proposals to introduce a multiuser path

More information

Appendices for Fox Glacier Heliport Proposal for Hokitika Airport Limited

Appendices for Fox Glacier Heliport Proposal for Hokitika Airport Limited Appendices for Fox Glacier Heliport Proposal for Hokitika Airport Limited 1 Survey Plan SO2474 (overview and close view) 2 DOC Map of the site 3 Site Plans 4 Oblique View 5 Site Photos 6 NZTA Access Upgrade

More information

BARROW GURNEY PARISH COUNCIL

BARROW GURNEY PARISH COUNCIL BARROW GURNEY PARISH COUNCIL Minutes of the Annual Parish Meeting of the Parish Council held in the village hall, Barrow Gurney, on 11 May 2015. Present: Eric Gates (Chairman), Phil Carnell, Andy Robbins,

More information

NGA PUNA WAI and CANTERBURY AGRICULTURAL PARK MANAGEMENT PLAN 2010

NGA PUNA WAI and CANTERBURY AGRICULTURAL PARK MANAGEMENT PLAN 2010 NGA PUNA WAI and CANTERBURY AGRICULTURAL PARK MANAGEMENT PLAN 2010 ACKNOWLEDGEMENTS Key stakeholders, user groups and Christchurch City Council staff were consulted in the preparation of the Nga Puna Wai

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10 CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN 28 March 2014 V10 419879.1ws34.tmp Page 1 TABLE OF CONTENTS 1.0 Introduction... 3 2.0 Aircraft Noise - Operations... 5 2.1 City Plan Requirements...

More information

CLEM7 Project South Community Liaison Group Meeting #29

CLEM7 Project South Community Liaison Group Meeting #29 CLEM7 Project South Community Liaison Group Meeting #29 Venue: Date: 19 May 2009 Time: Attendees: Apologies: Distribution: Leckhampton House, Shafston Avenue, Kangaroo Point 6pm CLG MEMBERS: Joy Logie,

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

$745 $10 $41 OVERVIEW

$745 $10 $41 OVERVIEW 2015 1 National Land Transport Programme Southern SOUTHERN REGIONAL SUMMARY The NZ Transport Agency s Southern region comprises the local government regions of Canterbury, Otago, Southland and the West

More information

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront

More information

Minutes of the Planning Committee meeting of Chidham & Hambrook Parish Council held at Chidham Village Hall on 19 th September 2017 at 7.00 p.m.

Minutes of the Planning Committee meeting of Chidham & Hambrook Parish Council held at Chidham Village Hall on 19 th September 2017 at 7.00 p.m. Minutes of the Planning Committee meeting of Chidham & Hambrook Parish Council held at Chidham Village Hall on 19 th September 2017 at 7.00 p.m. Present: Cllr Andy Collins (Chairman) Cllr Ina Littlefield

More information

Assessment of Flight and Duty Time Schemes Procedure

Assessment of Flight and Duty Time Schemes Procedure Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management

More information

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding. 145 11. TRAM EXTENSION PROJECT PROPOSED PARKING CHANGES AND STREET MODIFICATIONS IN LICHFIELD STREET, MANCHESTER STREET, HIGH STREET, TUAM STREET, ASH STREET, BEDFORD ROW AND OXFORD TERRACE General Manager

More information

Regional summary - Wellington

Regional summary - Wellington Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

The Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton

The Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton Board Meeting Minutes Date & time Location Board Membership Apologies NZTA staff in attendance 12 August 2016, 8.00am 12.30pm Board Strategy Session 1.00pm 2.30pm The Cobham Room, Novotel Hamilton Tainui,

More information