NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT
|
|
- Ashlie Spencer
- 6 years ago
- Views:
Transcription
1 1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued a request for further information on a number of items. The additional information sought is provided below. 1. Construction depot/yard Additional information has been sought in relation to the possibility of a construction depot/yard within the southern bridge approaches construction zone. While the main Contractor s yard is expected to be sited at the northern bridge approaches and within the designation area (in the area of the new stormwater pond) the Contractor may set up additional yards to suit their methodology for instance close to the rail overpass construction site within the southern bridge approaches area. It is anticipated that any such yard would be contained within the land purchased for the project and covered by the designation. If the contractor considers that alternative yard location/s are more suitable for their purposes, then it will be their responsibility to obtain the use of any such land (for instance, by leasehold agreement), and to obtain any land use consents required. The main contractor s yard is expected to house Contractors office, meeting/lunch room, portaloos. These buildings are expected to be the standard relocatable container style Portacom buildings. Any further yards may well house similar buildings. Any potential construction yard at southern end of the abutment will need 1
2 to be sited so that it does not have any adverse effects on the operation of the West Coast Wilderness Trail. Impacts on the existing West Coast Wilderness Trail will be limited as the majority of the project works are off-line from the existing highway and cycle route. However, the tie-in s at either end will unavoidably have some impact on the cycle trail; however the Contractor is required to manage any impacts on the cycle trail through traffic management, and to keep this trail open and to a safe and appropriate standard throughout construction. Once the Contractor is appointed, they will complete the construction Environmental Management Plan before works on site commence, which will include a Traffic Management Plan. The finalised CEMP will be provided to both district councils for their information, prior to works commencing on site. 2. Locked Bollard Access In response to the query about the locked bollard access, the New Zealand Transport Agency (NZTA) has provided the following background information. The NZTA since consultation on the project began, been very aware of the interest of the bach owner/ occupier and the whitebaiters in the proposed changes to the access point to the Department of Conservation (DoC) land on the south side of the river immediately prior to the existing bridge necessitated by the new bridge construction. However, before further discussion it is important to consider the proposed access in the context of the existing informal situation. The current Crossing Place, (No 247), to and from SH6, which is a Limited Access Road, was granted to the Department of Land Information in 1996 for access to the adjacent scenic reserve land managed by the Department of Conservation. The use of the crossing place by the bach owner/occupier to access the bach and by whitebaiters accessing the river has never been formalised. Complicating matters further is that the users of this crossing place also cross the rail corridor. It is important to understand that there is a high probability that any new application for a crossing place at this location that included the current level of use by the bach owner/occupier and the whitebaiters would be declined by the NZTA on safety grounds. It would also be surprising if any formalised crossing of the rail corridor was allowed by KiwiRail. In considering options to replace the current access for DoC, the NZTA have been mindful of the desirability of any solution to also maintain some level of continued access for the bach owner/occupier and for the whitebaiters. 2
3 Remembering of course that replacement of the crossing place providing access to the DoC land is the NZTA s only actual legal obligation. The access solution which has been developed will utilise a widened and enhanced cycleway/pedestrian path, and has been agreed with DoC as serving their need for very infrequent maintenance access to the scenic reserve land. The NZTA believes that with appropriate management, this solution can also safely accommodate infrequent use by the bach owner/occupier and the whitebaiters. This philosophy has been the basis of all consultation to date including with the Westland District Council, the bach owner/occupier and the whitebaiters. While the NZTA are willing to go to extra expense to construct a path that preserves this informal access to the DoC managed land, for the bach owner/occupier and the whitebaiters in a safe manner, separated from both road and rail, the NZTA do not see it as their place to manage use of this access beyond that required for DoC. For further background, the NZTA also considered a separate access direct from the highway down the proposed embankment, however it soon became apparent that this could not be safely accommodated due to substandard sightlines from any intersection with the highway as a result of the safety barriers to be installed on the bridge and the embankment. In response to the specific queries you raise, I note that this aspect of the project continues to be further detailed as the project progresses. Section 8 Consultation simply reports what was discussed with Mr Russ on site, which has subsequently been superseded by the on-going discussions with David Inwood of Westland District Council (WDC), as to the best agency to manage the locked bollard. Mr Russ has been advised of this change of proposal. Since the application was lodged on 24 May, there has been on-going discussion between the Deputy Project Manager, David Mallett, and WDC s Asset Manager David Inwood. The proposal is that the WDC will be responsible for the maintenance of the cycleway, and therefore is regarded as the most appropriate body to manage the operation of the cycleway. There will be a locked bollard at the southern end of the cycleway (by the local road intersection) which will be able to be removed to allow vehicle access to the cycleway. There will be another bollard that prevents vehicles using the cycleway to travel over the river bridge. The key/combination to the locked bollard (and who is given access to this and under what circumstances) will be controlled by the WDC. The NZ Transport Agency s understanding of the situation is that ultimately WDC will be responsible for the use of the cycleway by vehicles, and for monitoring this 3
4 situation. The access situation for the full range of expected users is detailed below, but has yet to be discussed and finalised with David Inwood. 1. Whitebait stand owners The southern bank of the Taramakau River includes 17 whitebait stands to the west of the proposed road. These are currently accessed by the existing DoC access, followed by an informal track (grass/earth surface, less than 3m wide) running along the road reserve. The existing track is used by whitebaiters to limit the amount of walking they need to do down the informal track with their equipment. It is estimated that currently there are 16 vehicles per day using this access, moving in and out with the tides during the whitebait running season which extends from 1 September to 22 November each year. It is expected that limited access to whitebaiters will still be provided via the cycleway. This will be provided at the start and end of each season for equipment to be transported to the start of the informal track, and this access would be limited to a set time range (for instance a two hour period to be agreed between the Whitebaiters Association and WDC which is to be managed by WDC). Between these times whitebaiters will be expected to walk/cycle from the local road along the cycleway to access the informal track and their whitebait stands, and if the above vehicle access window is missed whitebaiters are not precluded from using the cycleway to transport their equipment on foot or cycle. This will add approximately 450m to the distance they are required to walk from the car park (note ample room has been retained for this on the side of the new local road). This access period is expected to be monitored by the WDC, with the key/combination not provided to individual whitebaiters. b) Bach owner There is an existing Bach located on road reserve land immediately west of the cycleway as this building is informally located on road reserve without any legal arrangement, it therefore has no legal standing and pays no rates on it. Vehicle access to this bach can be provided by the cycleway, however it is expected that this access will be limited to one entry and one exit per day, with the vehicle giving way to cyclists at all times. It is expected that the bach owner will be provided with a key/combination to the bollard for this access. 4
5 c) Department of Conservation (DoC) The only access required by DoC is for maintenance of their parcel of land, which is considered uncommon, and in which case DoC would contact WDC as required to arrange access. DoC have been consulted regarding this, and support this arrangement as advised by dated 15 March d) WDC WDC will maintain the cycleway and will therefore need access to the cycleway for maintenance from time to time. This maintenance work will be subject to a Traffic Management Plan that will be required to take account of user safety. e) NZTA Access to the embankment planting and stormwater pond for maintenance is provided via the cycleway. Maintenance requirements here are expected to be infrequent, and subject to liaison with WDC on a case-by-case basis. f) KiwiRail Access from the cycleway may be requested to reach certain parts of the track alignment, however this is considered unlikely. Access will be subject to liaison with WDC on a case-by-case basis. 3. Vesting of Retired Section of Highway in WDC A 300m section of the existing highway is to be retired, and then vested by the NZ Transport Agency in the Westland District Council, to be owned and operated as a local road. It is noted that the vesting of road in the Council is a separate process to the Notice of Requirement under the RMA, and this process will be undertaken in accordance with the Local Government Act. Detailed design drawings will be provided to WDC for review once NZ Transport Agency reviews are complete. The NZ Transport Agency will work with the WDC Asset Manager to ensure that the road to be vested is handed over in an agreed condition. At the consultation meeting held on site on 15 March, Geoff Griffiths of the NZ Transport Agency advised that this section of existing highway would be resealed as part of the project, to leave it in good condition and to minimise the on-going maintenance requirement for the district council. Further discussions will take place to cover all the details, and the vesting process, in due course. 5
6 4. Other matters Stormwater ponds A number of new stormwater ponds are being installed as part of the bridge approaches realignment. The stormwater ponds on the southern bridge approaches will be maintained by the NZ Transport Agency, as part of normal highway maintenance. Lighting The WDC is suggesting that there is merit in the provision of basic flag lighting for pedestrians and cyclists at each end of the cycleway, and in the underpass for safety reasons. As proposed in the Notice of Requirement, the highway realignment and bridge project has made no provision for any lighting, on the basis that no lighting is currently provided at this site or along this route, and as the site is within a rural zone. This approach has been tested and confirmed through the detailed design safety audit process. 5. West Coast Wilderness Trail (Cycleway) a) Construction impacts Impacts on the existing West Coast Wilderness Trail will be limited as the majority of the project works are off-line from the existing highway and cycle route. Establishment of the site office, construction works on the north side, and the tie-in s at either end will unavoidably have some impact on the cycle trail; however the Contractor is required to manage any impacts on the cycle trail through traffic management, and to keep this trail open and to a safe and appropriate standard throughout construction. Temporary traffic management and construction management plans can be provided to WDC for information once confirmed with the Contractor. b) Management of cycleway Maintenance drawings have been circulated to the Westland District Council which incorporates comments from an earlier revision. These drawings show that the cycleway over the bridge will be maintained by the NZ Transport Agency with WDC maintaining the cycleway elsewhere, and confirm the demarcation line for maintenance purposes (refer to drawings SK701 to SK703, sent via to David Inwood 18/05/2016). The management details and other issues concerning the cycleway are still being finalised, and is the subject of on-going discussion between the NZ Transport Agency and GDC/WDC. Similarly the possible cycleway extension for some 250m is still under development and negotiation. It is noted that the Notice of Requirement is a critical path item and so was finalised and lodged prior to all the cycleway matters being completely resolved. Details 6
7 concerning the cycleway can be addressed by agreement between the parties involved, which can then be formalised by the exchange of correspondence, and does not need to be contained within the designation process. c) Clip-on structure The existing clip-on cycleway structure on the road/rail bridge is an NZTA asset and is subject to an agreement between the NZ Transport Agency and KiwiRail. A cycleway to the Cochrane/Molloy property entry has never been included in the scope of the project, and is being discussed outside of this project by WDC and the landowner. Potentially Affected Parties I would appreciate the opportunity to discuss this matter with you, prior to your final determination. I hope that the information provided above is sufficient, but if you need further clarification please contact me directly. However, hopefully the information provided is detailed enough and you will now be able to resume processing the Notice of Requirement. Yours sincerely Andrea Jackson Principal MEM 7
8 8
Rangitīkei District Council
Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationPlanning Committee. Thursday, 26 May 2016
Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationSouthwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock
Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationSarawia Street Laxon Terrace Rail Level Crossing Removal
Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail
More informationRegional Transport Committee OPEN MINUTES
Regional Transport Committee OPEN MINUTES Minutes of a meeting of the Regional Transport Committee held in Council Chambers, Waikato Regional Council, 401 Grey Street, Hamilton East on 11 June 2018 at
More informationOPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING. Meeting Date: Thursday, 8 February 2018
Hastings District Council Civic Administration Building Lyndon Road East, Hastings Phone: (06) 871 5000 Fax: (06) 871 5100 WWW.hastingsdc.govt.nz OPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING
More informationLLANBEDR ACCESS IMPROVEMENTS
LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr
More informationRangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY
A top priority The Waikato Expressway is a key transport corridor for the Waikato region and is a top priority for the government. It is made up of 10 separate sections between Mercer and Cambridge. When
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More information15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE
15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Transport
More information1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:
6. POUND ROAD ROAD STOPPING AND LAND SWAP General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Asset and Network Planning Manager
More informationEXPLANATORY STATEMENT
THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.
More informationAppendix 8 Sawston Greenway Review
Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationArrangements for the delivery of minor highway maintenance services by Town and Parish Councils
Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationHIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015
HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationWAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council
WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes
More informationTOURISM IN WESTLAND MARCH 2012
TOURISM IN WESTLAND MARCH 2012 Tourism in Westland The Westland District Council co-ordinated three tourism industry related meetings during February 2012. These were held in Haast, Fox Glacier and Hokitika.
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationSubmission to NSW Koala Strategy Consultation Process. March 2017
Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft
More informationUnlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe
Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate
More informationTechnical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand
Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand Preamble 1. Transport Canada, Civil Aviation Directorate
More informationSeek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More informationCertification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board
Certification Memorandum Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board EASA CM No.: CM CS-008 Issue 01 issued 03 July 2017 Regulatory requirement(s):
More informationTHRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES
BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure
More informationWhite Mountain National Forest Saco Ranger District
United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,
More information2.2 For these reasons the provision of tourist signing will only be considered:
TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationAppendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No
Appendix D Media Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Auckland s Northern Motorway
More informationWolverhampton City Council
Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION
More informationLake Dunstan Trail Project - Geotechnical Review
11 July 2018 Oli Monthule-Mcintosh Planning Officer Central Otago District Council 1 Dunorling Street PO Box 122 Alexandra WSP Opus Alexandra Office Tarbert Buildings, 69 Tarbert Street PO Box 273, Alexandra
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationSUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT
ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International
More informationWhite Mountain National Forest Saco Ranger District
United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950
More informationWestern Bay of Plenty District Council
Western Bay of Plenty District Council Minutes of Meeting No. JRS7 of Joint Road Safety Committee held on 8 August 2018 in the Council Chamber, Barkes Corner, Tauranga commencing at 10.00am Present Councillor
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More informationFrequently Asked Questions South Head Paper Roads By the South Head Action Group
Frequently Asked Questions South Head Paper Roads By the South Head Action Group May 2010 What is the issue about? The Rodney District Council is planning to close a safe public vehicle accessway to the
More informationSTRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall
East Dean & Friston PC Clerk Katrina Larkin Councillor Stephen Shing Councillor Daniel Shing Ian Johnson Principal Traffic and Safety Officer Kevin Morris Highway Steward STRENGTHENING LOCAL RELATIONSHIPS
More information3.0 LEARNING FROM CHATHAM-KENT S CITIZENS
3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the
More informationSubmission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.
Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment
More informationRE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts
September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,
More informationAll reports. 1. Governance Service receive draft report Name of GSO DPR
DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following
More informationKent Pedestrian Guard Railing Assessment
Kent Pedestrian Guard Railing Assessment Canterbury - Consultation Report November 2010 Project Number B1555300 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control
More informationProvincial Railway Guides Section:
This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance
More informationBusiness Case Approved. Under Construction. Business Case Approved. Under Construction
Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations
More informationAppendix 9 Melbourn Greenway Review
Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationTHE NORTHERN CORRIDOR IMPROVEMENTS PROJECT
THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT The Northern Corridor Improvements Project is the last link in the Western Ring Route, connecting the north with the west long SH1 and SH18. Major benefits of
More informationSawtooth National Forest Fairfield Ranger District
United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December
More informationKent Pedestrian Guard Railing Assessment
Kent Pedestrian Guard Railing Assessment Canterbury Final Report for JTB March 2012 Project Number B1649000 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control
More informationWOKING INTEGRATED TRANSPORT PROJECT
Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business
More informationAshton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1
Ashton Vale Industrial Estate alternative access report on second micro-consultation MetroWest Phase 1 January 2017 THIS REPORT REMAINS IN DRAFT FORM AS THE WORKSTREAM ENDED AND IS MADE AVAILABLE FOR INFORMATION
More informationDufferin Jog Elimination Project
Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More information2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD
2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;
More informationEnterprise Way. The new Airport City link road. June 2017 Progress Update
Enterprise Way The new Airport City link road June 2017 Progress Update Airport City Manchester is one of the most exciting business destinations in development today. The total planning area of Airport
More informationThank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.
March 19, 2014 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Vern Keller Coconino National Forest Attn: Plan Revision 1824 South Thompson Street Flagstaff, Arizona 86001 coconino_national_forest_plan_revision_team@fs.fed.us
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationDATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration
PUBLIC WORKS COMMISSION DATE: April 19, 2016 REPORT NO. PW2016-034 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger General Manager, Public Works Commission
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationLOCAL HIGHWAYS PANEL MINUTES AND ACTIONS
LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS Date: 20 th January 2015 Venue: Committee Room 4, County Hall Apologies: Cllr Kay Twitchen, Cllr Melissa McGeorge, Cllr William Archibald, Beverley Gould Principal
More informationUrgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?
Report to: Cabinet Date: 27 November 2013 Title: Portfolio Holder(s) Divisions Affected St Mary s and Penzance Harbours Improvements Bert Biscoe CC - Transport and Waste Penzance Central Relevant Scrutiny
More informationCHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS
CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,
More informationMEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM
MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham
More informationTHE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW
THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED
More informationKirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.
ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts
More informationConservation Area Consent for demolition of existing building
Committee Date: 19/09/2013 Application Number: 2013/02378/PA Accepted: 03/05/2013 Application Type: Conservation Area Target Date: 28/06/2013 Consent Ward: Ladywood 34 Carver Street, Jewellery Quarter,
More informationE40. Temporary activities
E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming
More informationOtorohanga Stopbank Pathway - Project Overview
Otorohanga Stopbank Pathway - Project Overview Introduction Otorohanga District Council with the support of the Otorohanga Community Board are constructing a 3.5 km long gravel pathway for shared use on
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationDate 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.
DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process
More informationNotes form the North of Horsham development Parish Liaison Meeting. at Roffey Millennium Hall Crawley Road, Horsham.
Notes form the North of Horsham development Parish Liaison Meeting held on Friday 28 th September 2018 at 10am at Roffey Millennium Hall Crawley Road, Horsham. Planning application:- DC/16/1677 Development
More informationWanaka Community Board 15 April Report for Agenda Item: 4
Wanaka Community Board 15 April 2015 Department: Infrastructure Report for Agenda Item: 4 Mt Burke Station Stopping and Vesting of Road Purpose 1 To obtain the Board s support for a stakeholder agreement
More informationPART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT
PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support
More information4. Omokoroa Structure Plan
4. Omokoroa Structure Plan 4.1 Infrastructure Schedule Project Funding Source() Developer Council Council Other Financial Contributions Rates Water Supply 72.6 27.4 Wastewater Reticulation 73.0 11.0 16.0
More informationThe original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:
5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in
More informationStainforth & Keadby Canal Installation of Multiuser Path
Stainforth & Keadby Canal Installation of Multiuser Path Introduction North Lincolnshire Council has entered into an agreement with Canal & River Trust to develop proposals to introduce a multiuser path
More informationAppendices for Fox Glacier Heliport Proposal for Hokitika Airport Limited
Appendices for Fox Glacier Heliport Proposal for Hokitika Airport Limited 1 Survey Plan SO2474 (overview and close view) 2 DOC Map of the site 3 Site Plans 4 Oblique View 5 Site Photos 6 NZTA Access Upgrade
More informationBARROW GURNEY PARISH COUNCIL
BARROW GURNEY PARISH COUNCIL Minutes of the Annual Parish Meeting of the Parish Council held in the village hall, Barrow Gurney, on 11 May 2015. Present: Eric Gates (Chairman), Phil Carnell, Andy Robbins,
More informationNGA PUNA WAI and CANTERBURY AGRICULTURAL PARK MANAGEMENT PLAN 2010
NGA PUNA WAI and CANTERBURY AGRICULTURAL PARK MANAGEMENT PLAN 2010 ACKNOWLEDGEMENTS Key stakeholders, user groups and Christchurch City Council staff were consulted in the preparation of the Nga Puna Wai
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationCHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10
CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN 28 March 2014 V10 419879.1ws34.tmp Page 1 TABLE OF CONTENTS 1.0 Introduction... 3 2.0 Aircraft Noise - Operations... 5 2.1 City Plan Requirements...
More informationCLEM7 Project South Community Liaison Group Meeting #29
CLEM7 Project South Community Liaison Group Meeting #29 Venue: Date: 19 May 2009 Time: Attendees: Apologies: Distribution: Leckhampton House, Shafston Avenue, Kangaroo Point 6pm CLG MEMBERS: Joy Logie,
More informationPerth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13
More information$745 $10 $41 OVERVIEW
2015 1 National Land Transport Programme Southern SOUTHERN REGIONAL SUMMARY The NZ Transport Agency s Southern region comprises the local government regions of Canterbury, Otago, Southland and the West
More informationIsland Eastern Corridor Boardwalk-Cycleway Feasibility Study
For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront
More informationMinutes of the Planning Committee meeting of Chidham & Hambrook Parish Council held at Chidham Village Hall on 19 th September 2017 at 7.00 p.m.
Minutes of the Planning Committee meeting of Chidham & Hambrook Parish Council held at Chidham Village Hall on 19 th September 2017 at 7.00 p.m. Present: Cllr Andy Collins (Chairman) Cllr Ina Littlefield
More informationAssessment of Flight and Duty Time Schemes Procedure
Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management
More information4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.
145 11. TRAM EXTENSION PROJECT PROPOSED PARKING CHANGES AND STREET MODIFICATIONS IN LICHFIELD STREET, MANCHESTER STREET, HIGH STREET, TUAM STREET, ASH STREET, BEDFORD ROW AND OXFORD TERRACE General Manager
More informationRegional summary - Wellington
Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the
More informationTerms of Reference: Introduction
Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS
More informationLafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services
Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility
More informationThe Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton
Board Meeting Minutes Date & time Location Board Membership Apologies NZTA staff in attendance 12 August 2016, 8.00am 12.30pm Board Strategy Session 1.00pm 2.30pm The Cobham Room, Novotel Hamilton Tainui,
More information