MINUTES OF ORAL EVIDENCE. taken before HIGH SPEED RAIL COMMITTEE. on the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL. Tuesday 14 July 2015 (Morning)
|
|
- Abel Butler
- 5 years ago
- Views:
Transcription
1 PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE on the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL Tuesday 14 July 2015 (Morning) In Committee Room 5 PRESENT: Mr Robert Syms (Chair) Mr Henry Bellingham Sir Peter Bottomley Geoffrey Clifton-Brown Mr David Crausby IN ATTENDANCE: James Strachan, QC, Counsel, Department for Transport Witnesses: Mr John Gladwin, Chiltern Society Dr Haydon Bailey, Chiltern Society Mr Tim Smart, International Director for High Speed Rail, CH2M Hill IN PUBLIC SESSION
2 INDEX Subject Page Introduction by the Chair 3 Introduction by Mr Strachan 3 The Chiltern Society Submission by Mr Gladwin 5 Submissions by Dr Bailey 14 Further Submissions by Mr Gladwin 18 Dr Bailey, cross-examined by Mr Strachan 25 Mr Smart, examined by Mr Strachan 27 Mr Smart, cross-examined by Dr Bailey 35 Mr Smart, cross-examined by Mr Gladwin 38 2
3 (At 09.50) 1. CHAIR: Order, order. Welcome to the HS2 Select Committee. Nice to see you all here today. We re going to start with the fly-through of the Chilterns. 2. SIR PETER BOTTOMLEY: Where are we? 3. CHAIR: Coming north to south. 4. MR STRACHAN QC (DfT): We re going south starting at Chesham Road. We just started at Chesham Road and we re heading south. Did you want to come farther back? Can we start farther north? We skipped forward; can we go back? The road crossing over the line here is Nash Lee Road, and you can see Wendover up on the left towards the top of the screen and the start of the green tunnel, which goes past Wendover. I ll let this fly-through continue. 5. MR BELLINGHAM: The famous cricket pitch 6. MR STRACHAN QC (DfT): It would be on the right. Just pause there. 7. MR BELLINGHAM: Can we see it? 8. MR STRACHAN QC (DfT): It s coming up on the right. Just pausing there, I think that s the cricket pitch just underneath there. 9. SIR PETER BOTTOMLEY: It s a short boundary. 10. MR STRACHAN QC (DfT): It s a short boundary. The A413 and the Chiltern Line are just to the left of it, and Wendover here. Just pausing there, coming out of the green tunnel just here, the portal, I think you looked at a photo montage yesterday of a view from this bridge, if you just move the cursor. 11. SIR PETER BOTTOMLEY: Is that the church? 12. MR STRACHAN QC (DfT): St Mary s Church is up to the left and then we re coming to the Small Dean Viaduct, which is just in the foreground, and then a section of embankment heading towards the Wendover Dean Viaduct just coming up shortly. Wendover Dean Viaduct is now in the foreground, and now into the cuttings. That s Hunts Green Farm, which is shown here obviously with a green area. That s obviously 3
4 now not subject to sustainable placement. It is used for temporary material stockpiling, but not for sustainable placement anymore. South Heath is on the left and the cut-and-cover tunnel going past South Heath we re just coming to there. The tunnel starts at that point. 13. SIR PETER BOTTOMLEY: That tunnel is environmental protection for the locals or because of the topography. 14. MR STRACHAN QC (DfT): I think it s both, but primarily for the local protection of South Heath. Then of course we come towards the entrance for the bored tunnels at Mantle s Wood. You can see Mantle s Wood on either side. I m not sure how much you want to see of the line from there on, but you re now into the bored tunnels section. 15. CHAIR: Just keep going. I just want to see what the countryside is like. 16. MR STRACHAN QC (DfT): The area in light green is the vent shaft at Little Missenden. 17. MR BELLINGHAM: What road is crossing over it? 18. MR STRACHAN QC (DfT): That s the A413. You just come past the vent shaft and the A413 is just there. The River Misbourne, which we ll hear something about is just Shardeloes Lake and the River Misbourne are coming up. This is the Amersham vent shaft, just in the foreground there. 19. CHAIR: Keep going to the lakes. 20. MR STRACHAN QC (DfT): Yes. 21. SIR PETER BOTTOMLEY: Do you have transformers by the vent shafts or do you not need them? 22. MR STRACHAN QC (DfT): You do, yes, because there are electrics. Mr Smart is telling me not all, but yes, these ones. 23. SIR PETER BOTTOMLEY: Where you need them, that s how you do it. 24. MR STRACHAN QC (DfT): Yes. We ve been past the Chalfont St Peter vent 4
5 shaft. This one is Chalfont St Giles coming up. 25. CHAIR: No, I think the other way around. 26. MR STRACHAN QC (DfT): Sorry, it s the other way around. I apologise. Then the Chalfont St Peter vent shaft and then coming up into the foreground is the exit or entry into the twin-bored tunnels. We re moving into the Colne Valley, and you can see the lakes, Broadwater Lakes and the other lakes, coming up in the distance. 27. CHAIR: This is the construction site. 28. MR STRACHAN QC (DfT): Yes. We re now crossing the M25. Those are where the slips would come off the M25, which we talked about. 29. CHAIR: Keep going just over the lakes, so we hit Hillingdon at the other side. 30. MR STRACHAN QC (DfT): You see Broadwater Lake is on your left, as we come with the islands in the lake. We re coming round on to the Colne Valley Viaduct, which is crossing the lakes. 31. CHAIR: We re about to go over HOAC. 32. MR STRACHAN QC (DfT): We re about to go over the canal, the marina there, and HOAC is where the arrow is pointing to your right. 33. CHAIR: Good, thank you. Right, well we re pleased to hear petitioner 761 from the Chiltern Society. Are you going to kick off, Mr Gladwin? The Chiltern Society 34. MR GLADWIN: Yes, I will, sir. Thank you. My name s John Gladwin. I m the Roll B agent for the Chiltern Society. I m also a trustee and, by profession, a chartered accountant. 35. This first slide shows the Chilterns, both the AONB which is in dark green, and the lighter green, which is the area of the Chilterns that we take to be our bailiwick. Next slide, please. 36. Our presentation covers these topics. We will deal with them in more detail 5
6 through the presentation. Please note, we re asking for a three-bore tunnel to completely mitigate the impact of HS2 on the AONB. Next slide, please. 37. The Society was founded to conserve and enhance the Chiltern Hills. It s expanded steadily over the past 50 years, with currently nearly 7,000 members. Next slide, please. We have 500 volunteers, which is the largest group in any AONB. They cover a wide range of activities. Next slide, please. 38. We have eight interest groups, which cover both conservation and recreation. Next slide, please. The Rights of Way Group has a network of path wardens, who ensure footpaths are kept clear and call for maintenance where needed. The group provides the maintenance. We also manage a number of nature reserves and historic monuments, including the John Hampden memorial. Next slide, please. 39. Some notable achievements: the windmill was virtually derelict when we took it over and here you can see it as it is today. Next slide, please. A few more: we have recently expanded our recreation offering, with Nordic walking and geocaching to promote activities for younger people. Donate-a-Gate is about improving access to the countryside for disabled people. Next slide, please. We work with a number of Government agencies and non-government organisations. Next slide, please. 40. Why are we petitioning? This list covers the major reasons. I will deal with each in more detail through the presentation. One thing I would like to highlight is that we believe that higher standards of design need to be applied in the AONB, particularly with the design of viaducts and vent shaft head houses. We note that HS2 will be working with Chiltern District Council to develop a design code for works within the AONB. Unfortunately, this is constrained by cost. Next slide, please. We will come on to each one of these. Next slide, please. 41. The AONB was designated in It s the only AONB in either Phase One or Phase Two of HS2. Indeed, HS2 Ltd, in talking about developing Phase Two, stated that it was difficult to find a route through the National Parks, AONBs and SSSIs, but they managed it. However, it raises the question as to why it was decided to go through the Chilterns AONB. Next slide, please. 42. Here again we have the Chiltern Hills. They stretch from east of Luton down to 6
7 the Goring Gap. You can see from this that the Misbourne Valley, where the proposed route goes, is in the centre of the Chilterns at its widest point. 43. CHAIR: Order, order. I m just going to adjourn for two minutes so they can switch the system on and off, and give it a kick. Sorry to disturb you just a moment, and you were making such good progress. Sitting suspended On resuming 44. CHAIR: Carry on, Mr Gladwin. 45. MR GLADWIN: I ll start at the beginning of this again. Here we have the Chiltern Hill, starting in Luton in the east and going right the way down to the Goring Gap. As you can see, the Misbourne Valley is right in the centre of the Chilterns and the proposed route effectively severs them. Next slide, please. 46. I will deal with landscape from footpaths in more detail subsequently. I would like to add that Natural England has raised many of the same issues as we have raised today, as set out in HS2 s evidence paper 0506, which I found quite interesting. Hedgerows act as routes for animals. Destroying 41 kilometres of these ancient features of the landscape is unbelievable. The cuttings and embankments will cut animal migration routes. Together, these will lead to a decline in wildlife, despite HS2 s proposed mitigations. They already admit that we re going to lose barn owls and red kites through collisions. 47. To put this in perspective, 41 kilometres is a quarter of the route from London to Birmingham. Even HS2 has described ancient woodland as irreplaceable. Grim s Ditch, a scheduled monument, is part of the pass that will be destroyed forever. The permanent loss of 530 acres of farmland, much of it best and most versatile, is something the country can hardly afford, and to lose more farmland to replacement planting for ancient woodland hardly makes sense. You will be aware of the temporary and permanent damage to a number of the farm enterprises. Next slide, please. 48. This slide shows the permanent features added to the landscape from construction. Our map of the Chilterns over here highlights the impact of construction on the Upper Misbourne Valley. You can see the number of work sites, etc. From Mantle s Wood to 7
8 Wendover, the cuttings, embankments and viaducts will form a scar across the land. The 27 balancing ponds will be a completely alien feature in the Chiltern landscape. Add to this the paraphernalia of the railway catenary towers, etc., and security fences not only by the track but around the balancing ponds and the vent house compounds, these change the landscape forever. 49. HS2 has announced recently the dumping of millions of cubic metres of spoil at Hunts Green Farm to be a temporary, rather than a permanent, measure. During that period, it will represent massive change to the landscape, as you will have seen on your visit. The question is: will this ever be returned to its original form? Next slide, please, 50. The introduction of noise and light pollution from trains running in the evening and early morning, together with night-time maintenance, will substantially impact the tranquillity. You ve only to be in the Chilterns at night to be able to appreciate the night sky, often a carpet of stars. Compare this to looking at a night sky with light pollution and one realises what is being proposed to be lost. Next slide, please. 51. The Chilterns have long been recognised as an ancient landscape. A map of Chequers Estate in 1620, prepared for Lady Mary Wolley, the then owner, shows the Upper Misbourne Valley, which was part of the estate at that time. The map was discovered by a local landscape historian, Alison Doggett, and compared to the current Ordnance Survey map. She found that the lanes, fields and names have hardly changed in 400 years. Alison is a petitioner; I m sure she will take you through this in due course. The picture there shows the relationship between Chequers, HS2 and Coombe Hill, which I believe you visited recently or some of you did. 52. The Ridgeway National Trail, together with the Icknield Way, are believed to be the oldest long-distance trading route in Britain. They run along the Chiltern escarpment. They will be impacted by the building of the Wendover cut-and-cover tunnel, with long diversions. The Society is involved in maintaining these national assets, as part of the Ridgeway Partnership. Natural England has raised the same concerns in their letter to HS2, in evidence paper There are 19 hill forts in the Chilterns. Boddington Camp, in Wendover Woods, overlooks the Misbourne Valley. This was recently cleared by some of our volunteers. It gives you some stunning views from there. There is evidence of Romano-British 8
9 villas every two to three kilometres in the Misbourne Valley. These are at risk if we build this railway above ground. We believe that this landscape is a living heritage. 54. SIR PETER BOTTOMLEY: You ve very kindly written out the words on the slides. There s no absolute need to read them aloud as well. If you just say, Look at 17, then you might say, Look at 18, we might 55. MR GLADWIN: Sorry, I m in a pattern with this. I will try to accommodate. 56. SIR PETER BOTTOMLEY: We understand. Do the best you can, please. 57. MR GLADWIN: Yes, I will. We believe this landscape is a living heritage, which should be kept intact for future generations. Next slide, please. 58. The network of footpaths in the Chilterns is believed to be the largest network in southern England. The footpaths across the valleys link the network of footpaths concentrated on the hills. Loss of this connectivity will reduce the number of people enjoying these routes. The impact of temporarily closing 29 footpaths is hard to imagine. I will not go into the details of individual footpaths, as there will be many petitions relating to these. 59. SIR PETER BOTTOMLEY: How many footpaths in the Chilterns are not affected? 60. MR GLADWIN: How many are not affected? 61. SIR PETER BOTTOMLEY: Yes. You start telling us there are 2, MR GLADWIN: There are 36 paths here that are affected. 63. SIR PETER BOTTOMLEY: I know. I was asking how many are not affected in the Chilterns. 64. MR GLADWIN: We ve got 2,000 kilometres of footpaths. How many individual footpaths there are I couldn t tell you. Just alone related to Missenden there are 32. There are another 32 related to Wendover. 65. SIR PETER BOTTOMLEY: We need to pay attention to how the railway affects the local area. Every now and again, we get what I call kitchen sinked, where we re 9
10 given the impression that the whole of the Chilterns is affected, when we know we re going through the Chilterns. It s still serious. 66. MR GLADWIN: That s why I ve said it s 36 paths that are affected directly by the HS2 route. The network is quite incredible, but it is destroying it in this area. 67. CHAIR: We saw a lot of backpackers when we were there. 68. MR GLADWIN: Sorry, I ll get back to where I was. As I said, the proposed diversions will run along the proposed route to get to a common crossing point hardly a walk in the country. Next slide, please. 69. We now come to the environment statement, which we believe to be flawed. Surveying only 40% of the route risks missing rare flora and fauna. As an example, the draft environmental statement identified Bacombe Hill SSSI as the only home in Britain of the fringed gentian. However, this was ignored in the final environment statement. The Wendover cut-and-cover tunnel sorry, green tunnel comes within 25 metres of this SSSI, with all the risks of construction pollution. Geological surveys are not comprehensive. Sink holes are not uncommon in the Chilterns. How will these be dealt with? 70. The traffic assessments were flawed, given a misleading picture of the impact of construction traffic on the local roads. An example is the roundabout of the A413 and the A404 at Amersham that s near Amersham Hospital where 60 HGVs entering the roundabout magically disappear; they never leave it. Another is a section of the A40, where the am peak flow shows over 4,000 vehicles per hour eastbound, and four westbound in the evening peak flow. These examples demonstrate that the environmental statement was not properly review or corrected and, therefore, should not be relied upon. 71. HS2 defines the rush hour as 8 to 9 in the morning, and 5 to 6 in the evening. In most of the Chilterns the rush hours are from 7 in the morning to 9.15, and from 3 to 7 in the evening. The morning starts with commuters, progresses through senior school to junior school; the order reverses in the evening. HS2 estimates that 15% of HGVs will be in the one-hour rush hour. How many more will impact the longer rush hours? 10
11 72. Thus, the environment statement underestimates the impact of construction traffic on local areas. This particularly applies to Beaconsfield on the A355. That s the road that runs from Amersham up to Beaconsfield. This is a defined construction route for virtually all the worksites in the Misbourne Valley, and will add up to 800 vehicles morning and evening to the already severely congested route. Currently, it can take 20 minutes or longer to get through one roundabout. This impact on communities more than one kilometre from the proposed route has been ignored. 73. A number of communities were missed, although quite severely impacted by the scheme. An example is Prestwood, which has 6,500 people. This is just next to Great Missenden, just above it. It s the largest community in the Upper Misbourne after Wendover. I will talk a little bit more about the communities in a minute. 74. In the environmental statement, HS2 recognises the sensitivity of the AONB as a national asset. They have then sought to reduce the severity of the impact, with comments like, As 18% of the area is woodland, compared to a national average of 10%, woodland is a receptor of low sensitivity. The sensitivity of woodland, we believe, should be seen in a national context, where it would be a receptor of high sensitivity. There are a number of other examples. I think Mr Mould gave a couple yesterday, when he was talking about it s only a very small percentage of the AONB that s going to be impacted. There were a couple of other comments like that. 75. Natural England has also expressed concern about the evaluations of sensitivity by HS2 Ltd. I refer you again to HS2 evidence note 0506 from Natural England. HS2 has clarified phrases like reasonably practical in their petition response document, such as are used in the code of construction practice. However, the overall impression is that there is wriggle room everywhere. We believe that a higher standard of performance should be required of contractors working in the AONB, and are pleased that HS2 Ltd has confirmed that they recognise the importance and special character of the Chilterns AONB, and will seek to work with Chiltern District Council to develop design principles that could reasonably be applied to the design and appearance of HS2 works in the AONB. We are somewhat concerned that this is caveated with reasonable and within the HS2 budget. This does not give a lot of comfort. Next slide, please. 76. There will be up to 18 trains per hour each way, more than one every two minutes. 11
12 These will add noise, both in the day and at night. In addition at night, they will add light from the train. We estimate the last train will pass through at nearly 11pm, and the first train will be at about 5.30am. Chance for a night s sleep, one might think, but no; all the track maintenance will be at night, including rail driving and train movements from and to the sidings at Stoke Mandeville. Imagine the impact of this area of medium tranquillity. That s HS2 s assessment. 77. In addition, local businesses will have suffered from the disruption, particularly tourism and farming, including some that will have to close. We believe it will take a number of years for those that survive to recover after the route opens. Next slide, please. 78. The impact during construction will be much more severe. The substantial increase in vehicle movements will create delays for many commuters, mothers taking their children to school, etc. Significant numbers of pupils travel by bus to schools in Chesham, Amersham and Aylesbury from Great Missenden, with inevitable increases in their travel time. This impact on their education could last up to six years. 79. I believe you visited Wendover Campus, a school for children with behavioural issues. There is another similar sized branch of that school in Prestwood, which was not recognised in the environment statement. They draw pupils from all over the county. The majority of the pupils at both schools arrive by taxi. Many are likely to be disrupted. Villages such as South Heath and The Lee use Great Missenden for banking, professional services, schools, as well as to shop, eat out, access the railway, etc. This interconnectivity was not identified by HS2 Ltd. With the construction work between Mantle s Wood and Leather Lane, there will be significant delays in travelling between them. It will also have an impact on the businesses relying on their custom. Next slide, please. 80. The Colne Valley is an invaluable resource for Northwest London. It provides an area of recreation and relaxation close to the outer edge of London. It also has an important SSSI for migratory waterfowl. The introduction of a huge viaduct will eliminate facilities like the Hillingdon Outdoor Activities Centre, the sailing club and the water-ski centre. You have recently heard a substantial number of petitions on this subject. Therefore, we will not go into more detail, other than to say that we support 12
13 proposals by Hillingdon Council to tunnel underneath the Colne Valley. Next slide, please. 81. We now come to one of our major concerns with regard to the proposed route. That is the impact on water. These are the particular areas of concern to the Society. Next slide, please. 82. We are concerned about the risk to the River Misbourne, both the loss of water and the loss of wildlife habitat. Chalk streams are globally rare. There are only 210 chalk streams in the world, 76% of which are in England. This makes each one very precious. The Misbourne is vulnerable to abstraction for drinking water and to lack of rainfall, thus it needs careful management. Recently, we have discussed with Affinity Water and the Environment Agency about how to reduce the abstraction in the valley to help maintain the flow. Tunnelling through the aquifer underneath risks changing the flow of water through the aquifer and away from the river. Next slide, please. 83. The main concern here is the impact of construction on the water in the Colne and the Colne aquifer. HS2 Ltd has confirmed that there is some risk here. As I understand it, their expectation is that it will be low, but should one be taking such a risk with part of London s water supply? The proposed route passes very close to the Chalfont St Giles public water supply abstraction point. We understand that there is a good possibility that this pumping station will have to close because of the HS2 tumbling. 84. Next slide? These pictures here are that s the Misbourne and there you can see Shardeloes Lake which we saw in the flyover. There are risks to the mid-colne Valley and Weston Turville SSSI, both of which provide important habitats for resident and migratory birds. The Colne Valley SSSI is important for migratory birds with over 70 bird species regularly breeding there. It is sensitive to pollution in the Colne. 85. The Weston Turville SSSI is fed from the spring line which runs along the base of the northern escarpment of the Chiltern Hills. It was formed in 1797 to feed the Wendover arm of the Grand Union Canal. This is home to 46 breeding bird species. The Wendover Green tunnel and subsequent cutting threaten to divert water away from the SSSI, thus risking its future. I believe you will hear more about this this afternoon from Wendover yes, Wendover and Halton are coming aren t they. 13
14 86. CHAIR: Are you opposed to the Green Tunnel at Wendover? 87. MR GLADWIN: Yes. 88. CHAIR: So we should take it out? 89. MR GLADWIN: What we believe is that there should be an underground tunnel, because with the underground tunnel, you can go deeper and you can avoid the problems. 90. CHAIR: Right. 91. MR GLADWIN: We ve raised the issue of settlement along the line, particularly at Chalfont St Giles. The underlying ground here is particularly fractured, with the risk of significant settlement. You will hear more about this later. The concerns are increased by the number of older numbers in Chalfont St Giles which have minimal foundations. 92. Next slide please? How do we reduce these risks? Well, tunnelling near the top of the aquifer brings greater risks of diverting water through a different route. Basically, water in the aquifer runs through fractures. If you disturb that, you can channel the water away from the existing route. Drilling deeper reduces these risks. Our witness, Dr Bailey, will elaborate on this. This brings next slide please? this brings me to Dr Bailey, over to you Haydon? 93. DR BAILEY: Thank you very much, John. In addition to the note you ve got there with regard to my CV, I d like to add that I m just an ordinary member of the Chiltern Society; I ve been a member for probably about 12 years now. I was asked to be the geological advisor to the Chiltern Society back in the Spring of So, some time before HS2 became an issue. 94. One of the things I have to ask: why are we tunnelling at all? Why do we there s a basic principle: tunnels are built to go under physical barriers. We put them under seaways, such as the Channel Tunnel; under major rivers, such as HS1 going under the Thames or the Mersey Tunnel; we put them under mountains, like the Gotthard Tunnel; or under cities, like Crossrail. Rarely if ever do we drive a tunnel under a valley for a small, ephemeral stream, such as the River Misbourne. 14
15 95. There s been a change in public attitude in recent years, away from putting a scar on the landscape, such as the M40 cutting at Stokenchurch through the Chilterns; or the M3, down through Twyford Down in Wiltshire. Public opinion has now moved to tunnelling, including the A3 Hindhead tunnel under the Devil s Punch Bowl in the Surrey Hills area of outstanding natural beauty. 96. SIR PETER BOTTOMLEY: Was that a worthwhile? 97. DR BAILEY: It depends on how much you value the landscape around there. 98. SIR PETER BOTTOMLEY: If you d tucked the A3 just to the Farnham side of Hindhead, and come up by the A3 south of Hindhead, you could ve built the thing with only a minor viaduct at Thursley and you would ve built a road for 71 million; and had an extra 300 million for environmental protection and improvement elsewhere couldn t you? 99. DR BAILEY: I m not going to argue with you; it s not a project I was involved in. But what I would say is that I m using that as an example; the fact that people have now gone to tunnel to actually looking upon that as a protection for the visual landscape SIR PETER BOTTOMLEY: The alternative, I suppose, consideration is not to have a tunnel but a choice of a viaduct at Oakhampton; you could ve put the road on a viaduct to the north of the town, instead of which it crawls along inside the National Trust land, alongside the disused railway that was invisible to virtually everybody DR BAILEY: I agree with that. I think the move in terms of one of the examples that I would also include in that is the A505 tunnelling along the north side of the Chilterns at Baldock where green tunnels were introduced and in fact, where those tunnels were put in place, driving along that road now, you re completely unaware that you re going to go to a tunnel until about less than half a mile before you reach it. So it has the amount of visual impact in the region has been reduced right down. That s the move that when you compare that with what you have at Stokenchurch for example in the Chilterns already it makes a major difference. That s what we re talking about here So what we re doing, we re actually putting a tunnel underneath the valley 15
16 principally to conserve an area of area of outstanding natural beauty. Can I have the next slide please? This is a geological cross-section, running from north to south, through the Chilterns, roughly along the line of the proposed HS2 route. The hills of the Chilterns are made up of the chalk, and if we look at the geology of the chalk, without going into a huge amount of detail, traditionally, it can be split into three broad, informal units. We have an upper chalk there, and I ve made a note there that this is a first class aquifer; it s well documented, it s intensely fractured, but it also has common to abundant flints running through it. It s the typical chalk that we see with banded flints. So that, therefore, causes difficulty. Flint is one of the most difficult things to tunnel through; there are issues when tunnelling machines are used in going through flint Below this we have the middle chalk, which is graded as a moderate aquifer. It is still fractured; it has fewer flints, far fewer flints, and therefore it s easier to tunnel through. Then below that we have the lower chalk. The lower chalk is much richer in clay and marl. It s a poor aquifer; there are few, very few fractures running through it. There are no flints. So it s the easiest to tunnel through; in fact it s the direct equivalent of the Channel Tunnel. So the level that we re talking geologically, if you compare it with the Channel Tunnel, would be the middle to lower chalk Can I have the next slide please? The current HS2 proposal can we go back to the previous one? There are two lines of tunnels in there. There s an upper one; that is, if you like, the level of the HS2 proposal, which goes through the upper and middle chalk, causing the maximum potential damage to the aquifer. It goes through the most difficult strata to tunnel, which is the flint ridge, upper chalk If we actually remove, sort of ignore that, and then look at the lower level, the lower tunnel through there. This is the level of a three-bore tunnel that we are proposing, targeting the older chalk. It would cut through the middle and lower chalk, below the main aquifer and below the level where flints occur. This would actually create a major time saving when it comes to tunnelling, with the potential reduction in costs Can we have the next slide please? 107. SIR PETER BOTTOMLEY: How much lower is that second tunnel, roughly? 16
17 108. DR BAILEY: You re probably talking about dropping it by about 30 metres or so SIR PETER BOTTOMLEY: Right DR BAILEY: The proposed route for HS2 crosses the Misbourne Valley in the southern area, in the vicinity of Chalfont St Giles SIR PETER BOTTOMLEY: If you want to poke at the screen, it miraculously 112. MR GLADWIN: There s Chalfont St Giles there SIR PETER BOTTOMLEY: Okay DR BAILEY: So that gives you an area where it s roughly crossing where, in fact, on the screen that you ve got in front of you, there s a circle with an x in it, which is quite useful. That s very, very close to where the line crosses Now, half a million years ago, before what was called the Anglian glaciation, this area lay within the valley of a major river. It was the proto-thames. The Thames used to flow north-eastwards, over the Beaconsfield area, past to the north of where Watford now lies, and through the Vale of St Albans, moving eastwards, until it reached the North Sea through East Anglia. That major river and it was a very major river, would have had a considerable impact on the underlying chalk, which formed the riverbed. Added to which this chalk would ve been very badly damaged and broken up by the natural freeze thaw action and the cycles of freezing and thawing which occurred during the glaciation. So, the presence of this broken, rubbly chalk in the subsurface, is proven. If we examine borehole data, which comes from the existing borehole marked with that x in the Chalfont St Giles pumping station So can we go to the next slide please? This is a diagram it s a copy of the original driller s description for when the borehole was drilled. I m just going to go through it from top to bottom very briefly. From around about a metre 1.10 metres down to 5.6 metres, it s described as being rounded flint and gravel so we just have gravel there. From 5.6 metres down to a depth of 16 metres, it s described as firm, brownish, white putty chalk, with some gravel sized pieces of moderately weak white chalk, and in brackets, the driller has put, Weathered upper chalk. In other words, 17
18 we re going through the upper chalk and this has been damaged, it s weathered, it s been damaged by that river action and by that frost action from the glaciation. It s not until we get down to 16 metres between 16 and 18.5 metres that it s described as moderately weak to moderately strong white chalk. Then below that, at 18.5 metres, we have what is regionally known as the chalk rock, which is a very hard, white, crystalline chalk. So, at best, the first moderately strong chalk is at about 16 metres. We don t see solid, competent, white, hard chalk until 18.5 metres below surface Can we have the next slide please? So this slide illustrates the interpretation beneath Chalfont St Giles, with the original tunnel crown around about 22 metres below surface. Consequently, there s the proposed route of the Misbourne Valley, the tunnel crown will be at a level with less than 6 metres of competent chalk above it. Above this, we ve got gravel and where the rubbly chalk in my opinion, there s certainly a threat of ground failure at the valley crossing point at Chalfont St Giles. I just don t think it s been taken into consideration sufficiently to date Can we just try the next slide, to see what happens? No, we will go back to that one. Had the slide been animated, you would ve seen the river disappear at this point. The chances of the Misbourne River surviving must be closer to zero, with the resulting loss of environmental benefits, the wildlife habitats and the public amenities The chalk aquifer below the Misbourne Valley is a major regional water supply with numerous public water sources and boreholes in proximity to the proposed route, including the one I ve illustrated at Chalfont St Giles. That public water supply will certainly be jeopardised by tunnel construction, and several other boreholes along the Misbourne Valley at Amersham and Great Missenden will also be threatened. In addition, as we ve already noted to this I m using HS2 figures something like 22% of all of London s water supply is at risk should there be any damage or pollution to the chalk aquifer in this and the adjacent Colne Valley. From a tunnelling point of view, modern engineering and tunnelling methods can certainly tunnel through difficult ground. But by putting a three bore tunnel deeper, we would alleviate a considerable number of the risks that we ve highlighted in this presentation, thank you very much MR GLADWIN: Thank you, Haydon. Next slide please? I would like to review the trend taken by successive governments over the previous 60 years on planning 18
19 policy and guidance towards AONBs. Next slide please? Set out here is the legal history of the protection for the National Parks and the AONBs and I will not dwell on it as you ve probably heard it many times before. Suffice to say that the emphasis is on placing great weight on conserving and enhancing our highest quality English landscape and protection their scenic beauty. Next slide please? The National Planning Policy Framework replaced a series of planning guidelines, in particular PPS7. The latter goes back to 1992 and sets out four key tests related to planning in an AONB or a National Park. These were reconfirmed in the NPPF. These tests are highlighted here. The key issue is that major development should not take place in AONBs except in exceptional circumstances after appropriate tests have been made. These tests relate to the most rigorous examination including assessing development not impacting the AONB or National Park and ensuring that the decision is in the national interest. Is this relevant? I suggest that it is. In our view, the tests were not rigorous enough. In this case, the first principle of mitigation should be applied, i.e. avoid rather than mitigate or compensate We will now review the steps taken. Next slide please? As I m sure you re aware, HS2 s evaluation of alternative routes was carried out at a strategic level and at a relatively early stage of their analysis. Alternative routes that did not cross the Chilterns AONB were ruled out for a variety of reasons quite early on in the process. One route, following the M1, which goes up by Luton and there s a gap in the AONB up there, was ruled out because it required too much tunnelling and was five minutes slower. Even though HS2 Limited marked it as not crossing the AONB. There might ve been a score for it! It s interesting to note that since then, quite a lot of tunnelling has been added to the proposed route, since its selection HS2 Limited did not continue to evaluate this route in greater depth, even though it might ve been regarded as their preferred non-aonb route. This would ve enabled them to demonstrate that they had complied with the thrust of public policy, and two, to have a second-best solution before Parliament, should Parliament have rejected a route across the AONB. Thus, we believe they failed the four tests. We suggest that this was tantamount to denying Parliament the opportunity to conduct a comprehensive and fair assessment of whether exceptional circumstances exist or existed to allow for HS2 to cross the Chilterns AONB. The key question is: has the government s obligation to conserve and enhance the AONB been met? We believe that answer is no. 19
20 123. We recognise, of course, that the issue of alternative routes that do not cross the AONB is outside of the Select Committee s remit. The various Acts that also laid down that a relevant authority shall have regard to the purpose of conserving and enhancing the natural beauty of the AONB. A relevant person is any Minister of the Crown, and public body, and statutory undertaker, any person holding public office. As such, we respectfully suggest that it is open to the Select Committee to consider these longstanding principles of public policy and to recommend to Parliament the solution that causes the minimum of harm to the Chilterns AONB. In our view, gentlemen, that solution should be a three-bore tunnel under the Chilterns AONB. Thank you Next slide please? Why a three-bore tunnel? Let s look at these in more detail. Next slide please? Here are some of the key factors of a three-bore tunnel. It s the same design concept as the Channel Tunnel. The central tunnel provides a safe area for passengers in the event of an incident where passengers need to evacuate the train. It provides good access to the tunnels for maintenance work; it s also capable of running motorised transport. Imagine an incident in one rail tunnel, such as a derailment, where the train could not reach a fire fighting point. The only escape for passengers in a twobore system is the other tunnel. However, in this case, this has up to 18 trains per hour running at 320km/h. Even HS2 admit this is hardly a safe area. That s in SC16, Extracts from Tunnelling Options Next slide please? The greatest advantage of a three-bore tunnel is that it eliminates all damage to the AONB. It greatly reduces the risk of damage to the aquifer. It offers a proven safety system; to date, there have been a number of incidents in the Channel Tunnel but not one with a loss of life. The minimal gradient offers operational benefits, when compared to a tunnel that goes up and down. A deeper tunnel offers more flexibility in choosing an alignment Next slide please? Turning to safety: best practice safety management requires a rigorous safety assessment of alternatives. EU Regulations reflect this with a requirement for a special safety investigation for any long tunnel, particularly where there are significant numbers of trains running in that tunnel. Next slide please? We believe that rigorous comparative safety assessments should be made by HS2 Limited for all Chiltern tunnel options, including the proposed scheme and verified by independent specialists. This would inform the Select Committee on any trade off on 20
21 safety against cost. We believe a key question for the Select Committee is, can the prospect of a higher level of public safety provided by a three-bore tunnel be discounted? 127. Next slide please? This all comes at a cost. Please note that the estimate at the top of the slide is not by HS2 Limited. This was left on the slide in error, and I apologise for that. The cost differential of 800 million is our estimate of the construction cost differential compared to the proposed scheme. This has been calculated using the tunnel, costing model that the Select Committee asked HS2 to provide for petitioners. Thank you for that MR CLIFTON-BROWN: Can I just ask you, what was the change between HS1 and HS2. HS1 doesn t have a third tunnel, so why should HS2 have this third tunnel arrangement which is obviously going to be a lot more expensive? 129. MR GLADWIN: Well, it depends on what length of tunnel you re looking at. HS1 does have a third tunnel; it s called the Channel Tunnel MR CLIFTON-BROWN: But there are a lot of tunnels on HS1 that don t have a third tunnel MR GLADWIN: Yes, but they don t run with the frequency of trains; the highest frequency of trains running at the moment in Europe is 12 trains an hour in France. Here we are looking at running 18 trains an hour. Obviously, if you re going to build and design a railway system, then you need to test it at the maximum capacity that it s designed to run at. Also, I think you ll find that most of the trains on HS1 don t run at 320km/h. I think they re somewhere around MR CLIFTON-BROWN: But presumably you wouldn t be just arguing for the third tunnel in the Chilterns tunnel; you d be arguing it as a third if you re arguing this on safety grounds, there would need to be a third tunnel all the way along this HS2 route. Have you costed that? 133. MR GLADWIN: Not necessarily. I mean, it depends on how many long tunnels are there on the route. I don t think there are that many; most of them are relatively short. 21
22 134. SIR PETER BOTTOMLEY: What s the longest continuous tunnel on HS1? 135. MR STRACHAN QC (DfT): 10km SIR PETER BOTTOMLEY: You need to go a bit beyond that before you need either an intervention gap or you need a third tunnel? 137. MR STRACHAN QC (DfT): Certainly MR GLADWIN: I think it depends until you do the safety assessment, you cannot say that, because as I say, I think the HS1 or the Channel Tunnel runs somewhere in the region of about 10 trains an hour, each way that s including both passenger about four passenger trains an hour 139. SIR PETER BOTTOMLEY: Just to save a semi-technical description, the reason for having a third tunnel or an intervention is if there s a problem you need to be able to get people out? And you can either do that with an intervention gap or you can do it with a third tunnel, or 140. MR GLADWIN: As is proposed here, if you have a in the proposed scheme, if a train derails, and you can t get to an intervention gap or you can t get out of the tunnel, the only other place that passengers can go to is the alternative tunnel SIR PETER BOTTOMLEY: That s the first time you ve said it; I m just trying to help you and Geoffrey, let you move on MR GLADWIN: Sorry, let me re-gather my thoughts. The 800 million is made up of a differential calculated for two and three-bore tunnel, of 400 million; plus there was an identified differential cost for a two-bore tunnel such as the Chilterns Long Tunnel of 400 million. I believe that 400 million is, from what I saw yesterday million is it now, I think it s something like that. There was some increase yesterday. However, there are offset and savings, such as those listed. These savings have been prepared by a consultancy called S2W, retained by Chiltern Ridges Action Group. I don t propose to go into these costs, these figures here, because I understand they will be explained by Chiltern Ridges Action Group CHAIR: I was going to ask you as an accountant, a saving of 206 million for no 22
23 landscape impact, what does that mean? 144. MR GLADWIN: Well, it s how do you value landscape? I know we had a discussion yesterday on that, where Mr Mould was saying that the landscape impact on the whole proposed scheme was 1 billion. So there are methodologies for it; I am not in that business CHAIR: So as an accountant, it s not real money, in the sense that isn t a saving? So you have a cost; that wouldn t come off the bill, because that is an assumed cost of that loss of view, or an environment. But it s not cash? 146. MR GLADWIN: I think you re right; it s not particularly cash, but you need to value your environment because if you tear up the environment, where do we finish up? I mean, why are we having so many conversations about maintaining the greenbelt when we have such pressure for housing? Because everybody recognises that you need to have open spaces for people, and there are methodologies now that monetise that. I don t know them; I m not that type of accountant. I spent most of my life in the chemical industry I think the other interesting thing is that most of the spoil that would be derived from this tunnel by going deeper would be, I understand, chalk and clay that would be suitable for cement making. The interesting thing is, when you do the calculation, that if you just sold the cement for the cost of removal, that s a saving of 163 million. I believe these things need to be looked at in the round, carefully by HS2. I don t think they ve looked at it carefully We believe that the Select Committee should require HS2 Limited to prepare comparative costings with offsetting benefits of each tunnel option with a review by an independent panel, much as requested by your colleague Nick Hurd on 1 July for the Colne Valley options Interestingly, Natural England have confirmed at paragraph 2.37 of evidence paper 0506 that they believe it would seem that an extended bore tunnel could provide the most effective means of mitigating the landscape and visual effects on the AONB. The CFA9 report goes on to consider a range of additional, extended tunnel options. We advise there is a need for greater clarity regarding the environmental benefits and 23
24 dis-benefits of all the extended tunnel options, to aid understanding and comparison between them Next slide please? I would like to wrap up with a review of mitigation. Next slide please? This sets out our minimum expectations: lowering the line will reduce the visual impact of viaducts and embankments and catenary towers and enable more of the natural landscape to be unchanged. We believe that, as much as possible, that the spoil generated should be removed from the AONB and not used to alter its landscape. Green bridges, at least 100m wide would enable each footpath to be reconnected on its original alignment. They would also help to create new migration routes for animals. HS2 have said they will restore hedgerows, but we would want an undertaking that these will recreate the old field patterns, with species-rich hedges to encourage wildlife. Currently the main undertaker will have the right to alter the vertical line of the track by up to 5 metres. We ask that this is restricted to ensure that the main undertaker cannot raise the track; he would almost certainly do so to reduce his construction costs The construction routes defined by HS2 Limited include the A413 and the A4010 that s the road from High Wycombe up towards Aylesbury. These are the two main routes from Southern Bucks to the main Accident and Emergency Centre at Stoke Mandeville. With the forecast congestion, this suggests that people s lives are put at risk. Add to this the number of men working for HS2 on a dozen worksites, in inherently dangerous jobs, and we believe that HS2 Limited need to fund a minimum of one additional air ambulance to provide a safe level of emergency cover. You can see just from this map just how many worksites there are with people working Next slide please? Moderate level mitigation. We believe that a two-bore tunnel offers a moderate level of mitigation in that it reduces substantially the impact on a number of areas. However, this still leaves vent shafts and an intervention gap. I believe the vent shafts have now gone up to seven or eight, from the conversation I heard yesterday. An underground intervention gap improves the level of mitigation; an open gap would create traffic and disturbance during construction and leave a large, unnatural hole in the AONB Next slide please? A three-bore tunnel provides the ideal mitigation of all. This would eliminate any impact on the AONB. 24
25 154. SIR PETER BOTTOMLEY: Are you coming to a rough estimate of what the cost of the three-bore tunnel is at a lower depth compared with the possibility of a long tunnel with an intervention gap? 155. MR GLADWIN: We have estimated it at somewhere between 800 million and 1 billion SIR PETER BOTTOMLEY: I am not sure I put my question clearly enough. You re proposing a long tunnel through the Chilterns. Part of it is going to be tunnelled anyway by the promoters. So, we re talking about the additional part. You re saying that a moderate way would be to have a continued tunnel but with an intervention gap; or to have a lower tunnel with three-bores. I was asking what the different might be between the second and the third of the options MR GLADWIN: We believe it would be about 500 million more SIR PETER BOTTOMLEY: Than having a long tunnel with an intervention gap? 159. MR GLADWIN: Yes. The other final thing is, as that line says there, this would enable Parliament to fulfil its obligations to conserve and enhance the natural beauty of the Chilterns AONB. Next slide please? Right, this is our last slide, you ll be pleased to hear. If HS2 has to cross the Chilterns AONB, the only acceptable solution in the national interest is a three-bore tunnel. Thank you CHAIR: Thank you, sorry for the interruption at the beginning. I hope we got you on television for your public, Mr Gladwin. Mr Strachan? 161. MR STRACHAN QC (DfT): Thank you. I am conscious the committee is midway hearing the case in relation to the Chiltern tunnel options which we dealt with yesterday and you re coming back to that on Wednesday, so I m going to try not to overlap too much and just responding to this There are two principal areas where there are specific asks or specific concerns, and those concerns to the River Misbourne, and tunnel through chalk, and the consequential requests for a three-bore tunnel. I m going to ask Mr Smart to deal briefly with those two things first of all if I may? Could I, just before he takes his seat, just ask Dr Haydon Bailey a couple of questions because he s taking his seat. 25
Higher Viaduct. Route - January 2012
480000 490000 500000!!! Aylesbury!! HS2 in the Chilterns Route Revisions 210000 January 2012 210000 At Grade Shallow cutting Longer Green Tunnel Wendover!! Higher Viaduct Cutting Embankment Green Tunnel
More informationEXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee
Reference No: HOC/10002 Petitioner: Reference Material Published to Collaboration Area: Monday 25-Mar-2019 EXHIBIT LIST Page 1 of 9 No Exhibit Name Page 1 R391 HS2 Residents Charter.pdf (R391) 2-3 2 R392
More informationRegulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation
Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Response from the Aviation Environment Federation 18.3.10 The Aviation Environment
More informationQuestions inviting views and conclusions in respect of the three short-listed options
Questions inviting views and conclusions in respect of the three short-listed options Q1: What conclusions, if any, do you draw in respect of the three short-listed options? In answering this question
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More informationAppendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes
Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of
More informationRights of Way in the Chilterns
Rights of Way in the Chilterns The Chilterns is a nationally significant landscape, particularly the Chilterns Area of Outstanding Natural Beauty. AONBs were not created for the benefit of those fortunate
More informationSTANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED
STANSTED MOUNTFITCHET PARISH COUNCIL STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 S TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED 1 INTRODUCTION 1.1 Stansted Mountfitchet Parish
More informationConsultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England
Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May
More informationHS2 in Buckinghamshire
HS2 in Buckinghamshire Route Wide Issues Martin Tett, Leader 24 October 2016 AGREEMENTS Good progress on rights of way and HS2 Ltd have provided 13 assurances across the county in 8 County Councillor divisions
More informationEXHIBIT LIST No Exhibit Name Page 1 A417 Presentation.pdf (A417) 2-42
EXHIBIT LIST Reference No: HOL/00562 Petitioner: Published to Collaboration Area: Wednesday 19-Oct-2016 Page 1 of 42 No Exhibit Name Page 1 A417 Presentation.pdf (A417) 2-42 HOL/00562/0001 HS2 in Buckinghamshire
More informationMINUTES OF ORAL EVIDENCE. taken before HIGH SPEED RAIL COMMITTEE. On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL
PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE On the HIGH SPEED RAIL (LONDON WEST MIDLANDS) BILL Monday, 21 September 2015 (Afternoon) In Committee Room 5 PRESENT: Mr Robert
More informationHigh Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond
High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond Phase 2b Route Decision Moving Britain Ahead July 2017 September 2016 High Speed Two: From Crewe to Manchester, West Midlands
More informationCAA consultation on its Environmental Programme
CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the
More informationTOWPATH MOWING GUIDELINES
TOWPATH MOWING GUIDELINES 24 September 2007 CONTENTS Introduction Scope and Status of Guidelines Influences on the Guidelines Health and Safety Biodiversity INTRODUCTION Towpath management is a key issue
More informationCouncillor Briefing on Elvetham Chase
Councillor Briefing on Elvetham Chase In partnership with the Calthorpe Estate, Wates Developments vision for Elvetham Chase is to provide an outstanding new community for Hart District that will become
More informationSarah Olney s submission to the Heathrow Expansion Draft Airports National Policy Statement
Sarah Olney s submission to the Heathrow Expansion Draft Airports National Policy Statement https://www.gov.uk/government/consultations/heathrow-expansion-draftairports-national-policy-statement Question
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationTfL Planning. 1. Question 1
TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February
More informationTOWN TRUST. Bury St Edmunds Railway Station
BURY ST EDMUNDS TOWN TRUST conserving buildings of historic interest The future of Bury St Edmunds Railway Station Part I Report October 2015 1 The future of Bury St Edmunds Railway Station NOTE: This
More informationRecreational Carrying Capacity
9 th Annual Caribbean Sustainable Tourism Conference Recreational Carrying Capacity Graham C Barrow What is Recreational Carrying Capacity? It s not about fixing absolute numbers of visitors/tourists that
More informationDate: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council
Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering
More informationHEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:
7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk
More informationREAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC
Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the
More informationBedfordshire and Luton Species Action Plan: Hazel Dormouse
Bedfordshire and Luton Species Action Plan: Hazel Dormouse Released November 2006 Last updated July 2010 Hazel dormouse, Muscardinus avellanarius Photo by Björn Schulz Bedfordshire Dormouse Group Hazel
More informationSaighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network
Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY
More informationWithyham Parish Council Response to Gatwick consultation deadline 14 th August
Withyham Parish Council Response to Gatwick consultation deadline 14 th August For questions 1 AND 2 I suggest we tick other and write: Questions 1a, 1b, 1c & 1d do not affect Withyham Parish and its residents,
More informationQ: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.
Southampton Airport Masterplan FAQ 4 October 2018 Background Southampton Airport Today Q: How many passengers currently use Southampton Airport and how has this changed over the last 5 years? A: Over the
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationDetails of individual in organisation
Organisation details Organisation name Inland Waterways Association Details of individual in organisation First name(s) Philip G. Last name Sharpe Address line 1 34 Old Eaton Road Address line 2 Rugeley,
More informationFreshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC
Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC 1. Please would IWC confirm the date the Plan area was designated.
More informationCuadrilla Elswick Ltd
Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary
More informationThe Government s Aviation Strategy Transport for the North (TfN) response
The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering
More informationTHAMES GATEWAY BRIDGE INQUIRY ENDS
Media Briefing May 2006 THAMES GATEWAY BRIDGE INQUIRY ENDS The public inquiry into controversial plans by Transport for London (TfL), to build a 6-lane road bridge across the Thames between east and south
More informationLower Thames Crossing consultation response
Lower Thames Crossing consultation response Context: This is the response from Campaign for Better Transport to the Department for Transport s consultation Options for a new Lower Thames Crossing. Consultation
More informationOUTLINE RESPONSE FROM WELWYN PLANNING & AMENITYGROUP (WPAG) TO CONSULTATION OVER PROPOSED EXPANSION OF LUTON AIRPORT
OUTLINE RESPONSE FROM WELWYN PLANNING & AMENITYGROUP (WPAG) TO CONSULTATION OVER PROPOSED EPANSION OF LUTON AIRPORT This draft follows the format of the supplied response booklet. The contents have been
More informationSeek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
More informationBoxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure
Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction
More informationViews of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report
Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report Summary i) We strongly recommend that the Government reject
More informationReference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:
Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord
More informationFOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE
FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE 1. A Tale of two Long Barrows Long barrows were constructed as earthen or drystone mounds with flanking ditches and acted as funerary monuments during
More informationA303 Stonehenge Amesbury to Berwick Down
A303 Stonehenge Amesbury to Berwick Down The case for the scheme Contents The A303 Corridor 4 Amesbury to Berwick Down 5 The case for the scheme 5 Map of the area 6 Objective 1: Transport 7 Objective 2:
More informationRESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director
RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in
More informationIn your area. Warmfield to Swillington and Woodlesford LA15. June Introduction
June 2018 www.hs2.org.uk In your area Warmfield to Swillington and Woodlesford LA15 LA15 Rothwell to Leeds A642 M62 M1 Woodlesford Oulton Bottom Boat to York HS2 Phase 2b Altofts A642 Swillington Methley
More informationRE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts
September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,
More informationTeam London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise
Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction
More informationVisual and Sensory Aspect
Updated All Wales LANDMAP Statistics 2017 Visual and Sensory Aspect Final Report for Natural Resources Wales February 2018 Tel: 029 2043 7841 Email: sw@whiteconsultants.co.uk Web: www.whiteconsultants.co.uk
More informationAIRSPACE INFRINGEMENTS BACKGROUND STATISTICS
AIRSPACE INFRINGEMENTS BACKGROUND STATISTICS What is an airspace infringement? A flight into a notified airspace that has not been subject to approval by the designated controlling authority of that airspace
More informationPUBLIC CONSULTATION - THE PURPOSE
PUBLIC CONSULTATION - THE PURPOSE ² To review the sites identified for housing development; ² To introduce new sites that have come forward since the last Public Consultation with potential for housing
More informationMeasure 67: Intermodality for people First page:
Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the
More informationEast Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)
Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and
More informationExemplar for Internal Achievement Standard Geography Level 1. Conduct geographic research, with direction
Exemplar for internal assessment resource Geography for Achievement Standard 91011 Exemplar for Internal Achievement Standard Geography Level 1 This exemplar supports assessment against: Achievement Standard
More information2.2 For these reasons the provision of tourist signing will only be considered:
TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationEast West Rail Consortium
East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The
More informationThe Chilterns Conservation Board The Lodge Station Road Chinnor Oxon OX39 4HA
The Chilterns Conservation Board The Lodge Station Road Chinnor Oxon OX39 4HA Tel: 01844 355500 Fax: 01844 355501 E Mail: office@chilternsaonb.org www.chilternsaonb.org PRESS RELEASE Chilterns Commons
More informationLocal Development Scheme
Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation
More informationRail passengers priorities for improvement November 2017
Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Foreword We asked more than 12,800 passengers across the country to rank 31 possible improvements
More informationGreat Barrier Reef Ports Strategy Have your say
Great Barrier Reef Ports Strategy Have your say Written submission form The Great Barrier Reef Ports Strategy presents the vision and principles guiding the Queensland Government s approach to future port
More informationNOTE TO INQUIRY BACKGROUND CRASH RATE DEFINITIONS. TRUDY AUTY, BSc, ARCS FOR LAAG
TOWN AND COUNTRY PLANNING ACT 1990 - SECTION 77 AND TOWN AND COUNTRY PLANNING (INQUIRIES PROCEDURE) (ENGLAND) RULES 2000 APPLICATIONS BY LONDON ASHFORD AIRPORT LTD SITE AT LONDON ASHFORD AIRPORT LIMITED,
More informationSubmission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy
Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail
More informationPLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY
PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as
More informationDECISIONS ON AIR TRANSPORT LICENCES AND ROUTE LICENCES 4/99
UNITED KINGDOM CIVIL AVIATION AUTHORITY DECISIONS ON AIR TRANSPORT LICENCES AND ROUTE LICENCES 4/99 Decision of the Authority on its proposal to vary licence 1B/10 held by British Airways Plc and licence
More informationLake Manyara Elephant Research
Elephant Volume 1 Issue 4 Article 16 12-15-1980 Lake Manyara Elephant Research Rick Weyerhaeuser World Wildlife Fund - U.S. Follow this and additional works at: https://digitalcommons.wayne.edu/elephant
More informationSilvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS
Silvia Giulietti ETIS Conference Brussels 28.01.2016 An EEA reporting mechanism on tourism and environment and ETIS Main content Why tourism and environment? Why a reporting mechanism on tourism and environment
More informationExperienced Acro-pilot
DHV Accident Report 9.01.2011 Date 18.12.10 Time 15:15:00 Land Germany Site Brauneck Pilot 32 years old, DHV A- Licence since 2004 Equipment: PG U-Turn Thriller 20m² acro glider Experienced Acro-pilot
More informationHenderson Mess, RAF Halton, Buckinghamshire
Henderson Mess, RAF Halton, Buckinghamshire An archaeological watching brief for Stepnell Ltd by Stephen Hammond Thames Valley Archaeological Services Ltd Site Code RHA03/85 October 2003 Summary Site name:
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationCAIRNS A STRATEGIC PORT
CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 6 JUNE 2018 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best standards
More informationN4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction
Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National
More informationUnion Station Rail Corridor East
Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed
More informationBoddington PC Petition
Boddington PC Petition (no. 759) Presented by Fred Dumbleton; Engineer and resident of Lower Boddington Boddington PC Petition Boddington Parish Council have consistently asked for a level of mitigation
More informationOfficial Journal of the European Union L 7/3
12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far
More informationAIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM
AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM Designing A Thriving Place LBA Airport Link Road Consultation Leeds City Council Leeds LS2 8HD West Yorkshire 26 February 2016 Dear Sir This is the response
More informationOld Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT
Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD
More informationA358 Taunton to Southfields Dualling Scheme. Corfe Parish THE FACTS
A358 Taunton to Southfields Dualling Scheme Corfe Parish THE FACTS A358 (Southfields to M5) Highways England only proposed 1 route for public consultation Other A303 schemes recently been in public consultation
More informationBon Portage Island Conservation Campaign
Bon Portage Island Conservation Campaign Protecting a Coastal Treasure Final Report to Nova Scotia Habitat Conservation Fund September 2012 Protection of Bon Portage Island Over the course of this two-year
More informationHeathrow Consultation January March 2018
A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in
More informationSummary. - Retain the cap of 480,000 on the number of flights permitted at Heathrow;
NOISE ACTION PLANS This HACAN report outlines the flaws in the Government s approach to the Noise Action Plan for Heathrow and suggests the issues which it should address. June 2009 Summary The European
More informationMinutes of Public Meeting
Minutes of Public Meeting Oxford-Bicester Rail Improvements Merton Village Hall, 31 st March 2015, 7.30pm The meeting was convened by Merton Parish Council, and was opened by Cllr. Fred Foxon (FF). He
More informationMAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS
MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS 1. Introduction A safe, reliable and efficient terminal
More informationJohn Betts School Crossing Review
John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the
More informationSainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT
Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton
More informationThe Mayor s draft The London Plan Consultation. Response from the Richmond Heathrow Campaign 2 March 2018
The Mayor s draft The London Plan Consultation Response from the Richmond Heathrow Campaign 2 March 2018 INTRODUCTION 1. This is the written response of the Richmond Heathrow Campaign to the Mayor s draft
More informationA120 BRAINTREE TO A12 Consultation on Route Options. 17 January 14 March 2017
A120 BRAINTREE TO A12 Consultation on Route Options 17 January 14 March 2017 1 2 A120 Braintree to A12 Consultation on Route Options 1. FOREWORD I am delighted to announce the start of the public consultation
More informationWokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement
Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy
More informationPutting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism
1 of 5 ICME papers 2002 Putting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism By Clare Mateke Livingstone Museum, P O Box 60498, Livingstone,
More informationLiving & Working Tourism
Living & Working Tourism 5.10Tourism Background 5.10.1 Tourism is a major rural industry in Dorset, contributing over 600 million in visitor expenditure and supporting over 21,000 jobs directly and indirectly
More informationRE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001
RE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001 ------------------------------------------------------------------------------------------------------- Bord
More informationIn your area. Stonebroom to Clay Cross LA09. June Introduction
June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton
More informationTourism 201 CHAPTER 10
Tourism 201 CHAPTER 10 202 Doncaster Unitary Development Plan Tourism 203 Tourism INTRODUCTION 10.1 The increasing importance of tourism is recognised in the UDP by having its own chapter. The benefits
More informationIn your area. South Kirkby to Sharlston Common LA14. June Introduction
June 2018 www.hs2.org.uk In your area South Kirkby to Sharlston Common LA14 A645 to Leeds A628 A638 Sharlston A639 Crofton Wragby HS2 Phase 2b Wintersett A638 Kinsley Ryhill A628 Hemsworth A6201 South
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationINFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES
Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion
More informationHS2 Update 19 FEBRUARY 2017
HS2 Update 19 FEBRUARY 2017 Agenda HS2 Proposal Alternatives Issues HS2 Meeting Feedback Call to Action Help and Resources HS Proposal Overview of proposed route and operations Route Overview Branch line
More informationNoise Action Plan Summary
2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise
More informationA120 Braintree to Marks Tey Consultation
Mr Chris Shuker HARD COPY TO FOLLOW BY POST Project Leader A120 consultation Highways Agency Heron House 49-53 Goldington Road Bedford. MK40 3LL Thursday June 16 th 2005 Dear Mr Shuker A120 Braintree to
More informationAppendix 7 Local Green Spaces - Detailed Evidence
Appendix 7 Local Green Spaces - Detailed Evidence Neigh Bridge Country Park, Somerford Keynes General information Neigh Bridge Country Park is situated at the southern entrance to Somerford Keynes village.
More information