1 Local Development Scheme August 2014

2 Local Development Scheme (August 2014) / Page 2

3 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation 6 Publication and submission 6 Sustainability Appraisals 6 Habitat Regulations Assessments 6 Examinations 6 Section 3: Emerging Great Yarmouth Borough Local Plan Local Plan Documents to be prepared 7 Supplementary Planning Documents to be prepared 8 Programme documents to be prepared 9 Planning documents which do not form part of the adopted Local Plan 9 Missed milestones from the previous Local Development Scheme (January 2014) 9 Recent Progress 10 Appendix 1: Glossary 11 Local Development Scheme (August 2014) / Page 3

4 Local Plan Evidence Base Section 1: Introduction 1.1 Great Yarmouth Borough Council s Local Development Scheme (LDS) sets out the proposed programme for the production of the Council s Local Plan which covers the Borough of Great Yarmouth (excluding the Broads Authority Executive Area) to This includes key milestones to inform people of opportunities to be involved in the plan-making process. This is the eighth review of the LDS and updates the previous version published in January This LDS has been prepared in accordance with the Localism Act (2011), the National Planning Policy Framework and the Local Planning Regulations (2012) as amended. Great Yarmouth s Development Plan 1.3 The borough s development plan includes the adopted and emerging Local Plans plus any neighbourhood plans and is defined in section 38 of the Planning and Compulsory Purchase Act As the Council s emerging Local Plan continues to take shape the development plan will change, Figures 1 and 2 below set out the existing and proposed planning framework for the borough. Figure 1: Great Yarmouth s Existing Planning Policy Framework National Planning Policy Framework (NPPF) + Planning Practice Guidance (PPG) Planning Policy for Traveller Sites Norfolk County Council Minerals and Waste Local Development Framework Supplementary Planning Documents Parish Councils and Neighbourhood Forums Neighbourhood Development Plans Neighbourhood Development Orders Community Right to Build Orders Saved Great Yarmouth Borough Wide Local Plan Policies Direction under paragraph 1(3) of the schedule 8 to the Planning and Compulsory Purchase Act (September 2007) Emerging Local Plan documents Core Strategy LPD (Publication Draft - September 2013) Programme Documents Local Development Scheme Annual Monitoring Report Statement of Community Involvement Documents not produced by Great Yarmouth Borough Council Documents produced by Great Yarmouth Borough Council Interim Housing Land Supply Policy (Adopted July 2014) Local Development Scheme (August 2014) / Page 4

5 Local Plan Evidence Base Figure 2: Great Yarmouth s Emerging Planning Policy Framework National Planning Policy Framework (NPPF) + Planning Practice Guidance Planning Policy for Traveller Sites Norfolk County Council Minerals and Waste Local Development Framework Supplementary Planning Documents Parish Councils and Neighbourhood Forums Neighbourhood Development Plans Neighbourhood Development Orders Community Right to Build Orders Great Yarmouth Borough Council Local Plan Local Plan Documents Core Strategy Development Policies and Sites Allocations Supplementary Planning Documents Planning Obligations Great Yarmouth Waterfront Area Programme Documents Documents not produced by Great Yarmouth Borough Council Documents produced by Great Yarmouth Borough Council Local Development Scheme Annual Monitoring Report Statement of Community Involvement 1.4 The Local Plan for the Borough of Great Yarmouth guides all future development in the borough (excluding the Broads Authority Executive Area). When new Local Plan documents are adopted by the Council, they will gradually replace the saved policies in the adopted Great Yarmouth Borough-Wide Local Plan (2001). Once adopted the new Local Plan will consist of three types of documents: Local Plan Documents (LPDs) Supplementary Planning Documents (SPDs) Programme documents which inform consultees of how and when we will involve them in planning and how policies are performing. These include the Statement of Community Involvement and the Annual Monitoring Report 1.5 The Norfolk County Council Minerals and Waste Local Development Framework prepared by Norfolk County Council guides the development and management of mineral resources and waste. Great Yarmouth Borough Council is not the minerals and waste planning authority so this LDS does not deal with these matters. 1.6 Under the Localism Act, Neighbourhood Development Plans and/or Orders can be produced by Parish Councils and Neighbourhood Forums to provide detailed guidance on specific or area based issues. These will be subject to independent examination and a local referendum. If approved at the referendum then the Council will adopt the Neighbourhood Development Plan. At the time of writing the Council no Neighbourhood Planning Area and Forum applications have been submitted to the Council. Local Development Scheme (August 2014) / Page 5

6 Section 2: Plan Making Process 2.1 The process of preparing and adopting development plans is set out in the Town and Country Planning (Local Planning) (England) Regulations A summary of the plan making process is set out below. Public Participation 2.2 The Council will undertake early public participation in the preparation of the Local Plan. Community involvement is a key part of the plan making process. The scale and nature of community involvement will vary according to the stage of document production. Public participation will be guided by the Council s Statement of Community Involvement. Publication and Submission 2.3 Following the public participation stages the Council will prepare the document for publication, known as the proposed submission stage. Once published there is a period for representations on issues of soundness and legal compliance. The Council can make limited, minor amendments to the published document at this stage before submitting it to the Planning Inspectorate along with the representations and a summary of any changes. Sustainability Appraisals 2.4 To assess the potential impact of Local Plan documents they must be subjected to a Sustainability Appraisal, in order to fulfil the requirements of the European Strategic Environmental Assessment (SEA) Directive and the Local Planning Regulations. The appraisals are a systematic, iterative process, integrated into each phase of document production. Their purpose is to assess the extent to which emerging policies and proposals will help achieve the environmental, social and economic objectives. Habitats Regulations Assessment 2.5 In preparing Local Plan Documents, the need for an Appropriate Assessment has to be considered. Appropriate Assessment was introduced by the EU Habitats Directive and is an assessment of the potentially significant effects of a plan on European Sites designated for their nature conservation importance. A plan will only be approved after determining that it will not adversely affect the integrity of such sites. Examination 2.6 Once a Local Plan Document, its Sustainability Appraisal and all other supporting documentation have been submitted to the Planning Inspectorate it must be examined by an independent Planning Inspector. The Inspector is charged with examining whether the document complies with legislation and is sound. Details regarding the Soundness Test can be found in the National Planning Policy Framework. Local Development Scheme (August 2014) / Page 6

7 Section 3: Emerging Great Yarmouth Borough Local Plan 3.1 The Local Plan is a group of documents that sets out how the Borough of Great Yarmouth will develop over the next 15 years. The information below sets out which documents are to be prepared and when the key stages are in their preparation. Local Plan Documents to be prepared 3.2 The Core Strategy Local Plan Document sets out the key elements of the planning framework for the area. It comprises a long term vision and strategic objectives, a spatial strategy, core policies and a monitoring and implementation framework with clear objectives for achieving its delivery. All other Local Plan Documents will build on the strategic principles set out in the Core Strategy. 3.3 The Development Policies and Site Allocations Local Plan Document sets development control policies and identifies sites for uses such as housing, employment, retail and leisure. These policies will be used alongside the policies in the Core Strategy to assess planning applications. This document was originally intended to be prepared as two separate documents: one on development control policies and a separate document on site allocations. These documents were merged to enable the proposed policies to be brought forward more efficiently. 3.4 A full timetable for the production of the Local Plan documents is shown in Figure 3. It is important to note that some of the dates have less certainty, such as adoption dates, as they depend on the timing and length of examinations (indicated in italics). Figure 3: Local Plan Document preparation timetable Document Preparation Stage LDS target date Core Strategy Issues and Options (Part 1) consultation October December 2005 Issues and Options (Part 2) consultation March April 2006 Preferred Options consultation August September 2006 Preferred Options (Amendment) consultation February March 2009 Finalising our Options consultation November December 2012 Publication consultation September-November 2013 Submission April 2014 Examination in Public (Hearings) November 2014 Adoption February 2015 Local Development Scheme (August 2014) / Page 7

8 Development Policies and Site Allocations Issues and Options December 2014 January 2015 Preferred Options May/June 2015 Publication December 2015 January 2016 Submission April 2016 Examination in Public (Hearings) September 2016 Adoption December 2016 Great Yarmouth Waterfront Area Action Plan Issues and Options March April 2006 Preferred Options November December 2010 The Council has decided to cease work on the Great Yarmouth Waterfront Area Action Plan. Consultation responses and background evidence used to prepare the Great Yarmouth Waterfront Area Action Plan will be used to inform the Great Yarmouth Waterfront Area Supplementary Planning Document. Supplementary Planning Documents to be prepared 3.5 Supplementary Planning Documents (SPDs) are produced to expand on policies within Local Plan Documents, providing additional information and guidance. They can be topic based or site specific. 3.6 The first SPD the Council intends to prepare is a Planning Obligations SPD. Once, adopted this SPD will provide guidance and standards on the planning obligations including commuted sums. 3.7 The second SPD to be prepared will be the Great Yarmouth Waterfront Area SPD. This SPD is intended to replace the previously scheduled Great Yarmouth Waterfront Area Action Plan document and to provide additional detail to support emerging Core Strategy Policy CS18. Once adopted, the SPD will seek to provide additional detail on the Council s regeneration ambitions for the waterfront area and provide clear guidance on planning matters and urban design within the defined waterfront area. Figure 4: Supplementary Planning Document preparation timetable Document Preparation Stage LDS target date Planning Obligations SPD Great Yarmouth Waterfront SPD Public consultation on Draft SPD May/June 2015 Adoption November 2015 Public consultation on Draft SPD December 2015 January 2016 Adoption April 2016 Local Development Scheme (August 2014) / Page 8

9 Programme documents to be prepared 3.8 The Statement of Community Involvement (SCI) sets out the ways in which the Council will involve the community in the preparation and review of all documents in the Local Plan and major planning applications. It sets out our overall vision for involving the community, the methods we will use and the opportunities to become involved. The current SCI was adopted in March The Council produces an Annual Monitoring Report (AMR) which provides a summary of all development delivered within the borough. In response to the Localism Act, Local Planning Authorities no longer have to submit Annual Monitoring Reports to the Secretary of State. However, the requirement to prepare and publish monitoring reports for the public remains The latest published version of the AMR (December 2013) was updated in part to reflect policies within the emerging Core Strategy. This enables policies in the Core Strategy to be more accurately assessed once they are adopted. The AMR also assesses whether or not targets and milestones related to the production of the Local Plan have been met. Planning documents which do not form part of the adopted Local Plan 3.11 In July 2014 the Council adopted the Interim Housing Land Supply Policy. The Interim Housing Land Supply Policy adoption falls outside of the statutory procedures for Local Plan adoption as such it will not form part of Great Yarmouth Borough Council s Development Plan. The Interim Housing Land Supply Policy will however be relied upon as a material consideration in the determination of planning applications The Interim Housing Land Supply Policy will only be used where the Council s five year housing land supply includes sites identified in the Strategic Housing Land Availability Assessment A six week public consultation on the draft Interim Housing Land Supply Policy commenced on Friday 21 February 2014 and ended on Monday 24 March During the consultation period, copies of the document and comments forms were made available at the Town Hall in Great Yarmouth, on the Council s website and at all public libraries throughout the Borough. In addition, consultees were also invited to attend a drop-in consultation event at the Town Hall in Great Yarmouth between 3pm and 6.30pm on Monday 3 March In total, approximately 30 people attended the event at the Town Hall. Missed milestones from the previous Local Development Scheme (January 2014) 3.14 There have been several missed milestones in the production of both the Core Strategy and the Development Policies and Site Allocations Local Plan Documents. Delays to the Core Strategy are primarily due to underestimating the length of time required to undertake a Local Plan examination. Local Development Scheme (August 2014) / Page 9

10 3.15 Delays to the Development Policies and Site Allocation document are directly related to staff shortages within the Strategic Planning Team and a need to prioritise work relating to the Core Strategy Examination. Recent progress 3.16 The Core Strategy Local Plan document was formally submitted in to the Secretary of State for Communities and Local Government (Secretary of State) for independent examination in April The Planning Inspectorate has appointed as independent Inspector Mr Malcolm Rivett BA (Hons) MSc MRTPI on behalf of the Secretary of State to undertake of the examination of the Core Strategy. In advance of the examination hearings scheduled for November the Council has also recently undertaken a review of its 2012 SHLAA In July 2014 the Council adopted the Interim Housing Land Supply Policy. The Interim Housing Land Supply Policy adoption falls outside of the statutory procedures for Local Plan adoption as such it will not form part of Great Yarmouth Borough Council s Development Plan. The Interim Housing Land Supply Policy will however be relied upon as a material consideration in the determination of planning applications. Local Development Scheme (August 2014) / Page 10

11 Appendix 1: Glossary Term Acronym Definition Adoption The final confirmation of a Local Plan Document as having statutory status by a Local Planning Authority Area Action Plan AAP A Local Plan Document that may be used by the local planning authority to provide a planning framework for areas of significant change or conservation. Intended to deal with specific areas and specific requirements such as the redevelopment of an area of derelict land and buildings Annual Monitoring Report Great Yarmouth Borough-Wide Local Plan (2001) Core Strategy Development Policies and Site Allocations LPD AMR BWLP A required report undertaken by a Local Planning Authority that reports on the implementation of the Local Plan and to what extent and effectiveness policies are being achieved. A plan produced by local authorities under the former planning system. The Great Yarmouth Borough-Wide Local Plan is being replaced by the Local Plan. A Local Plan Document which sets the long-term spatial vision for the local planning authority area, and the spatial objectives and strategic policies to deliver that vision. A Local Plan Document that seeks to implement the strategic policies in the Core Strategy through the use of detailed development control policies and non strategic site allocations. Examination in Public EiP Local Plan Documents and the Statement of Community Involvement will be subjected to independent scrutiny by way of an Examination in Public. Issues and Options Document(s) produced during the pre-submission stage of preparing Local Plan Documents for the purpose of gaining public consensus on proposals before submission to the government for independent examination. Local Plan Documents LPD Sat within the Local Plan portfolio are Local Plan Documents that have been subject to independent testing. Local Plan Documents collectively deliver the spatial planning strategy for the local planning authority's area. Local Plan Local Development Scheme LDS Is a term used to describe a folder of Local Plan Documents that provides the local planning authority's policies for meeting the community s economic, environmental and social aims for the future of the area where this effects development and the use of land. A public project plan identifying which Local Plan Documents will be produced within the Local Plan, in what order and when, over a three year period. National Planning Policy Framework Planning Inspectorate Agency NPPF PINS New planning legislation which has recently been adopted. The framework replaces existing Planning Policy Statements and Guidance Notes as part of Government reforms to make the planning system less complex and more accessible with an overarching goal of achieving sustainable development. A Government body with multi-facing tasks including the processing of planning and enforcement appeals and holding enquiries into Local Plan Documents. Preferred Options Policy Map Soundness Document(s) produced as part of the preparation of Local Plan Documents, and issued for formal public consultation. The adopted Policy Map illustrates on a base map (reproduced from an Ordnance Survey map to a registered scale) all the policies contained in Local Plan Documents. It is site and location specific, unlike the Key Diagram. The proposals map is revised as each new Local Plan Document is adopted and reflects the up to date planning strategy in the area. Considered against a robust and credible evidence base and being the most appropriate strategy when considered against reasonable alternatives. In order to be sound a document must be deliverable, flexible and must have the capacity to be monitored. Local Development Scheme (August 2014) / Page 11

12 Statement of Community Involvement Supplementary Planning Document Sustainability Appraisal SCI SPD SA Document setting out how and when stakeholders and other interested parties will be consulted and involved in the preparation of the Local Plan and Development Control decisions. Local Plan document that has not been subject to independent testing and does not have the weight of development plan status; it is used to provide further detail of policies in the required Local Plan Documents. Identifies and evaluates the effects of the strategy or plan on social, environmental and economic conditions. Local Development Scheme (August 2014) / Page 12

13

14 Strategic Planning Team, Great Yarmouth Borough Council Town Hall, Hall Plain, Great Yarmouth, Norfolk, NR30 2QF Telephone:

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA (Ljubljana, 7 to 8 March 2002) International Civil Aviation

More information

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE PERTH AND KINROSS COUNCIL 6(ii) 16/437 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE Report by Senior Depute Chief Executive (Equality, Community Planning and Public Service Reform) PURPOSE OF REPORT

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Guildford Borough Council Topic Paper

Guildford Borough Council Topic Paper Further information and alternative formats If you would like further information or to read this document in a different format such as large print or a different language please contact Planning Policy

More information

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34 Renfrewshire Planning Performance Framework 2017 2018 Contents Introduction 3 Part 1: Defining and Measuring a High Quality Planning Service 4 Part 2: Supporting Evidence 34 Part 3: Service Improvements

More information

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment NON EXEMPT HAVANT BOROUGH COUNCIL Cabinet SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment REPORTNO FOR DECISION Portfolio: CLLR D. GUEST - PLANNING & BUILT ENVIRONMENT

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

PUBLIC CONSULTATION - THE PURPOSE

PUBLIC CONSULTATION - THE PURPOSE PUBLIC CONSULTATION - THE PURPOSE ² To review the sites identified for housing development; ² To introduce new sites that have come forward since the last Public Consultation with potential for housing

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018 NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction

More information

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager 4(3)(ii) 13/138 Erection of a Structure for Floral Display in the Public Park,

More information

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer Today s presentation What is the Development Plan for Rushmoor

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire Meeting of Lanarkshire NHS Board: 30 th March 2016 Lanarkshire NHS Board Kirklands Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk SUBJECT: Integration of Health & Social

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Decision Strategic Plan Commission Paper 5/ th May 2017

Decision Strategic Plan Commission Paper 5/ th May 2017 Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES PROCESS OVERVIEW PROCESS AIMS PROCESS STAGES PROCESS PROCEDURES STAGE 1: BUSINESS PLANNING SCHEDULE STAGE 2: OUTLINE PLANNING PERMISSION STAGE 3: FULL PROPOSAL CONSIDERATION GENERAL PROCEDURES VALIDATION

More information

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference. East West Rail Consortium 14 th June 2018 Agenda Item 3: Terms of Reference Recommendation: It is recommended that the meeting consider and agree subject to any amendment agreed by the meeting the revised

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

Norfolk Parking Partnership Joint Committee

Norfolk Parking Partnership Joint Committee Norfolk Parking Partnership Joint Committee Item No Report title: Annual Report 2015/16 Date of meeting: 29 September 2016 Responsible Chief Tom McCabe - Director of Community and Officer: Environmental

More information

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case A21 TONBRIDGE TO PEMBURY DUALLING Statement of Case In Respect of Applications for the Demolition of Listed Buildings Under the Provisions of the Planning (Listed Buildings and Conservation Areas) Act

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No. 1. Inadequate justification Existing retail floor space is underused so no point in extending retail floor space. Instead, would prefer to have sympathetic housing development in the City Centre to attract

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Swallow House, 10 Swallow Street, Birmingham, B1 1BD Committee Date: 20/02/2014 Application Number: 2013/08477/PA Accepted: 29/11/2013 Application Type: Full Planning Target Date: 28/02/2014 Ward: Ladywood Swallow House, 10 Swallow Street, Birmingham, B1

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

AUDIT COMMITTEE CHARTER

AUDIT COMMITTEE CHARTER Qantas Airways Limited Adopted ABN 16 009 661 901 AUDIT COMMITTEE CHARTER Objectives 1. The objectives of the Qantas Audit Committee are to assist the Board in fulfilling its corporate governance responsibilities

More information

Site Allocations Plan. Leeds Local Plan

Site Allocations Plan. Leeds Local Plan Site Allocations Plan Leeds Local Plan Development Plan Document Updated Infrastructure Background Paper (including IDP) July 218 1 Introduction 1.1 This paper is a full update of the Infrastructure Background

More information

ARTICLE 29 Data Protection Working Party

ARTICLE 29 Data Protection Working Party ARTICLE 29 Data Protection Working Party XXXX/07/EN WP132 Opinion 2/2007 on information to passengers about transfer of PNR data to US authorities Adopted on 15 February 2007 This Working Party was set

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

EDIT THIS TEXT IN INSERT > HEADER / FOOTER. INCLUDE TEAM NAME, SECURITY CLASSIFICATION AND DRAFT STATUS. CLICK APPLY TO ALL. 02 February

EDIT THIS TEXT IN INSERT > HEADER / FOOTER. INCLUDE TEAM NAME, SECURITY CLASSIFICATION AND DRAFT STATUS. CLICK APPLY TO ALL. 02 February Introducing s consultations - Draft National Policy Statement & UK Airspace Policy David Elvy, Tim May - Department for Transport Heathrow Community Noise Forum, 2 February 2017 EDIT THIS TEXT IN INSERT

More information

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089 Safety & Airspace Regulation Group Code of Practice Issue 13, August 2013 Civil Aviation Authority 2013 All rights reserved. Copies of this publication may be reproduced for personal use, or for use within

More information

FORWARD PLAN. October January 2019

FORWARD PLAN. October January 2019 FORWARD PLAN October 2018 - January 2019 PUBLISHED ON 3 SEPTEMBER 2018 This Forward Plan supersedes all previous Forward Plans. Any person wishing to make representations regarding any of the items listed

More information

Tesco, Swan Shopping Centre, Coventry Road, Yardley, Birmingham, B26 1AD

Tesco, Swan Shopping Centre, Coventry Road, Yardley, Birmingham, B26 1AD Committee Date: 18/04/2013 Application Number: 2013/00607/PA Accepted: 30/01/2013 Application Type: Variation of Condition Target Date: 01/05/2013 Ward: South Yardley Tesco, Swan Shopping Centre, Coventry

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009 PERTH AND KINROSS COUNCIL 4 09/494 Enterprise and Infrastructure Committee 4 November 2009 STRATEGIC PRIORITIES FOR TOURISM AND AREA TOURISM PARTNERSHIP ARRANGEMENTS Report by Depute Director (Environment)

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector Introduction easyjet started flying in 1995. Since then we have

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Paul Griffiths, BEng (Hons), IENG, MCIHT

Paul Griffiths, BEng (Hons), IENG, MCIHT The Cheshire East Borough Council (Crewe Green Link South) Compulsory Purchase Order 2013 Public Inquiry Further Statement of Evidence Spur Roads Paul Griffiths, BEng (Hons), IENG, MCIHT June 2013 Contents

More information

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 Page 2 Contents Contents 1. Introduction 2. Airspace change process 3. Redesigning our airspace 4. Airspace design principles 5. Have your say Page

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January U

Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January U Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January 2016. U Subject: WINDERMERE ROAD & SURROUNDING STREETS - PETITION Summary statement:

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Welcome to the latest occasional bulletin from the East Midlands Heritage Forum, which highlights recent national and local developments.

Welcome to the latest occasional bulletin from the East Midlands Heritage Forum, which highlights recent national and local developments. BULLETIN March 2018 Welcome to the latest occasional bulletin from the East Midlands Heritage Forum, which highlights recent national and local developments. This issue includes: Joining up support for

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Conservation Area Consent for demolition of existing building

Conservation Area Consent for demolition of existing building Committee Date: 19/09/2013 Application Number: 2013/02378/PA Accepted: 03/05/2013 Application Type: Conservation Area Target Date: 28/06/2013 Consent Ward: Ladywood 34 Carver Street, Jewellery Quarter,

More information

Enhanced Engagement Terms of Reference:

Enhanced Engagement Terms of Reference: Official Enhanced Engagement Terms of Reference: Assessment of how well HAL is engaging with and responding to the airline community on its plans for capacity expansion at Heathrow and whether this engagement

More information

PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 ADULT SUPPORT AND PROTECTION. Report by the Executive Director (Housing & Community Care)

PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 ADULT SUPPORT AND PROTECTION. Report by the Executive Director (Housing & Community Care) PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 10 08/508 ABSTRACT ADULT SUPPORT AND PROTECTION Report by the Executive Director (Housing & Community Care) To inform the Council of the progress towards the implementation

More information

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire Council Policy Published by South Cambridgeshire District Council November 2016 Adoption and Maintenance of Sustainable

More information

Supporting information to an application for preapplication 3 rd February 2017

Supporting information to an application for preapplication 3 rd February 2017 Development Services, West Lindsey District Council, Guildhall, Marshall s Yard, Gainsborough DN21 2NA Supporting information to an application for preapplication advice. 3 rd February 2017 Proposal for

More information

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014 Draft Mobility Management Plan Background

More information

PERTH AND KINROSS COUNCIL LIFELONG LEARNING COMMITTEE 2 NOVEMBER 2016

PERTH AND KINROSS COUNCIL LIFELONG LEARNING COMMITTEE 2 NOVEMBER 2016 3 Minute of meeting of the Lifelong Learning Committee held in the Gannochy Suite, First Floor, Dewar s Centre, Glover Street, Perth on Wednesday 2 November 2016 at 2.00pm. Present: Councillors B Band,

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 PSR3-10 SUBMISSION FROM THE HIGHLAND COUNCIL 1.0 1.1 1.2 1.3 1.4 2.0 2.1 Introduction Highland Council remains committed

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Revalidation of UKPHR s registrants: Guidance

Revalidation of UKPHR s registrants: Guidance March 2016 Revalidation of UKPHR s registrants: Guidance Index Page No. Foreword by the Registrar 2 Who is this guidance for? 3 What is covered in this guidance? 4 Standards on revalidation 5 Practical

More information

COUNCIL BUSINESS MANAGEMENT COMMITTEE COMMUNITY GOVERNANCE REVIEW - DRAFT REORGANISATION ORDER

COUNCIL BUSINESS MANAGEMENT COMMITTEE COMMUNITY GOVERNANCE REVIEW - DRAFT REORGANISATION ORDER BIRMINGHAM CITY COUNCIL PUBLIC REPORT Report to: COUNCIL BUSINESS MANAGEMENT COMMITTEE Report of: Service Director Localisation Date of Decision: 17 November 2015 SUBJECT: COMMUNITY GOVERNANCE REVIEW -

More information

Economic regulation at Gatwick from April 2014: Notice granting the licence

Economic regulation at Gatwick from April 2014: Notice granting the licence Economic regulation at Gatwick from April 2014: Notice granting the licence CAP 1152 Economic regulation at Gatwick from April 2014: Notice granting the licence Civil Aviation Authority 2014 All rights

More information

CCB Board Meeting Tuesday 7 th February 2017

CCB Board Meeting Tuesday 7 th February 2017 MINUTES OF MEETING OF THE CHILTERNS CONSERVATION BOARD HELD ON TUESDAY 7 TH FEBRUARY 2017 at the William East Room, Berkshire College of Agriculture, Hall Place, Burchett Green commencing at 10.10 am MEMBERS

More information

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord

More information

Explanatory Note to Decision 2015/013/R. Additional airworthiness specifications for operations CS-26

Explanatory Note to Decision 2015/013/R. Additional airworthiness specifications for operations CS-26 Additional airworthiness specifications for operations CS-26 RELATED NPA/CRD 2012-13 OPINION NO 08/2013 RMT.0110 (21.039(K)) 8.5.2015 EXECUTIVE SUMMARY In the Joint Aviation Authorities (JAA) system, Joint

More information

YORKSHIRE LAND. Limited. PO Box 785, HARROGATE, HG1 9RT Telephone:

YORKSHIRE LAND. Limited. PO Box 785, HARROGATE, HG1 9RT   Telephone: YORKSHIRE LAND Limited PO Box 785, HARROGATE, HG1 9RT Email: office@yorkshireland-ltd.com Telephone: 01423 770335 Our Ref YLL/TPT/2017-09.01 21 September 2017 TOURISM AND THE TRANS PENNINE TRAIL We enclose

More information

CAIRNGORMS NATIONAL PARK AUTHORITY LOCAL PLAN PUBLIC INQUIRY - LIST OF CORE DOCUMENTS

CAIRNGORMS NATIONAL PARK AUTHORITY LOCAL PLAN PUBLIC INQUIRY - LIST OF CORE DOCUMENTS CAIRNGORMS NATIONAL PARK AUTHORITY LOCAL PLAN PUBLIC INQUIRY - LIST OF CORE DOCUMENTS SCOTTISH GOVERNMENT PUBLICATIONS CD1.0 Legislation and Policy Statements CD1.1 The Town and Country Planning Act (Scotland)

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

opyright East Riding of Yorkshire Cou

opyright East Riding of Yorkshire Cou STATEMENT OF COMMUNITY INVOLVEMENT NOVEMBER 2009 EASTERN PARK & RIDE HULL ENGLAND & LYLE LTD MORTON HOUSE MORTON ROAD DARLINGTON DL1 4PT T: 01325 469236 F:01325 489395 opyright East Riding of Yorkshire

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Revalidation: initial consultation

Revalidation: initial consultation Revalidation: initial consultation During 2009, we will be formulating our proposals for revalidation. Please help us to shape our policy by offering your views. Page 2 GOC revalidation: initial consultation

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 22/6/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 31: Other high-level policy issues to be considered by the Executive Committee THE

More information

PROPOSED REVISIONS TO THANET DISTRICT COUNCIL S LOCAL PLAN (PREFERRED OPTIONS)

PROPOSED REVISIONS TO THANET DISTRICT COUNCIL S LOCAL PLAN (PREFERRED OPTIONS) Agenda Item No 14 Subject: PROPOSED REVISIONS TO THANET DISTRICT COUNCIL S LOCAL PLAN (PREFERRED OPTIONS) Meeting and Date: Cabinet 1 March 2017 Report of: Nadeem Aziz, Chief Executive Portfolio Holder:

More information

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan. Addendum to Guildford Borough Proposed Submission Local Plan June 2016 Strategic Highway Assessment Report: High level review of potential of key changes in the Guildford borough Proposed Submission Local

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information