ATTACHMENT B. Page 1 of 49

Size: px
Start display at page:

Download "ATTACHMENT B. Page 1 of 49"

Transcription

1 Page 1 of 49

2 Page 2 of 49

3 Page 3 of 49

4 Page 4 of 49

5 Page 5 of 49

6 Page 6 of 49

7 Page 7 of 49

8 Page 8 of 49

9 Page 9 of 49

10 Page 10 of 49

11 Page 11 of 49

12 Page 12 of 49

13 Page 13 of 49

14 MA Attachment A County of Orange Regional Riding and Hiking Trails Design Guidelines Adopted by the Board Of Supervisors on September 13, Page 14 of 49

15 Trails included in the Master Plan of Regional Riding and Hiking Trails should be developed in accordance with the following standards. The term "regional riding and hiking trails" as used in this document is meant to include hiking/jogging, equestrian, and mountain biking (non-motorized) use. However, a specific trail may be restricted from one of the aforementioned user groups for special reasons. Such restrictions are to be determined on a case-by-case basis and approved by the Director of Harbors, Beaches, and Parks and subject to an appeal process. In special locations where physical constraints preclude the practical implementation of a trail under the following standards, the Director of the Environmental Management Agency, or his designee, may approve a modification of these trail standards if public safety is not jeopardized and the purpose of the Master Plan of Regional Riding and Hiking Trails is carried out. Strict standardization among regional hiking and riding trails or even segments of the same trail is impractical because of the vast differences in topography and other physical characteristics and because of dissimilarities in kinds and extent of use. Standards are good, but flexibility is necessary. Therefore, design may vary among different trails or segments of trails according to development constraints and various special conditions. Nevertheless, certain basic standards, allowing for flexibility and for the safety and maintenance of the trail and their related facilities should be followed. 1. Trail Tread Width: (see Appendix A) 10 ft. minimum - service trail, major trail 4 ft. minimum - single track trail The actual trail width needs to be determined according to the level of use or the expected level of use. However, the trail width is not to be less than the minimum standard. 2. Trail Types: (see Appendix A) Service Trail: Multi-use, unpaved. This trail type is preferred for multiple use under most conditions. A majority of the Master Plan of Regional Riding and Hiking Trails are of this type. Service vehicles could use this trail, if necessary. Typical examples of existing such trails are unimproved fire and cattle ranch access roads. The Telegraph Canyon Trail is a good example of this. Single Track Trail: Unpaved, narrow gauge trail. This type of trail is for natural areas and steep terrain where environmental or topographic constraints require a minimum impact trail. These trails are not typically used in an urban or rural setting. They are more suitable for mountain areas, ridges, near creeks and other sensitive areas. Sections of the Wood Canyon Trail are a good example of this. Major Trails: Paved and unpaved, multi-use trail with shoulder. This serves as a major, multi-use trail where space and topography are not limiting factors. This type is ideal for projected high use -2- Page 15 of 49

16 trails. It provides adequate space for all three uses in a safe, effective manner. If possible, the equestrian trail could be separated with a landscape buffer or post fence. If construction funds or future maintenance is an issue, the 2-foot shoulder can be eliminated. Service vehicles could use this trail, if necessary. The Santa Ana River Trail North is a good example of this. 3. Shy Distances: (Horizontal Clearance) 4. Right-of-Way: (including easements) 5. Setbacks: (see Appendix A) 6. Vertical Clearance: (see Appendix A) 2 ft. minimum - flat ground, upslope, and downslope flatter than 4:1 slope. 4 ft. minimum - downslope steeper than 4:1 slope. Minimum - Trail tread width plus appropriate shy distances and ancillary trail improvements (i.e. retaining walls, fencing, etc.). 5 ft. minimum setback from existing or future curb face, edge of sidewalk or edge of paved or unpaved shoulder. 4 ft. minimum buffer separation from bikeway, sidewalk or other trails. 2 ft. minimum setback from retaining walls or fences. 12 ft. minimum vertical clearance beneath structures or tree limbs (see Appendix A for clarification). 7. Trail Fencing: Should be provided where horses need to be firmly confined within the trail width or for safety such as in specific areas of community and regional parks, steep slope areas, bridges, golf courses, and other potential hazard or high-traffic and general public use areas. The following are suggested standards for split rail and pole fencing when needed to separate the trails. However alternative materials and design standards may be allowed. Split-Rail Fencing Pole Fencing Material Wood such as Cedar Wood such as Cedar or Lodge Pole Pine Rail Size 2" x 3" min. 2½" min. Post Size 4" x 5" min. 4½" min. Post Spacing 6½" max. 7 to 8 Other standards: 1. Fence height should not exceed four feet (4) at the maximum. A threefoot (3) fence height may be appropriate for trails bordering on residential areas (bridge fencing excepted). -3- Page 16 of 49

17 2. The top of the post shall not exceed 6" above the top rail. 3. The height above the ground of the top rail shall be 48" ± 2" maximum. 4. The center to center distance between the top and bottom rails shall be 21" ± 3". 5. All posts shall be treated with a sealant from the bottom to 4" above ground level, plus what is required for installation as approved by the Building Department. Posts shall exhibit a minimum penetration of 1/8" on all treated surfaces. 6. Hitching Posts shall be constructed of 611 square posts, set one foot into the ground, reaching a 41 height. Rings for tethering horses will be attached to the top of the post. 7. Barbed-wire is prohibited as a trail fencing material. In the event of existing barbed-wire along a trail, additional fencing should be constructed to protect the trail user from the barbed-wire. 8. Other fencing may also be suitable and acceptable as trail fencing. Plantings such as trees, hedges, or large rocks can also serve as trail fencing or barriers. 9. Trails Signs: a. Consistency in signing is important to provide an identity to the County trails. All County trails should have specific and consistent signing that identifies them as such. b. Trail name signs should be placed at entry points, halfway points and other points where trail identification is needed. c. Directional signs should be placed, as appropriate, to clarify trail destination and direction to trail users. d. Signs should offset from the trail edge a minimum of 2 ft. However, exact location for the best visibility can only be done in the field. e. Signs should identify hazard points, clearance requirements or safety precautions, as warranted. f. Mileage signs should be located at trailheads. g. Trail user yielding signs should be placed at all trail heads and posted periodically, especially at trail crossings and along trails that accommodate a variety of users. h. Trail head signs should contain the following information: 1. Trail name -4- Page 17 of 49

18 Optional 2. Approximate length 3. Difficulty (see Difficulty Grading Standards, Appendix Q 4. Nearest staging area(s) 5. Allowed uses 1. Area map (location) 2. Illustrative elevation 3. Hazards 4. Common plants (i.e., poison oak) 5. Common animals 6. Hours of operation 7. Trail Description 8. Phone number where to obtain trail maps and other trail information i. Types of signs shall include directional signs, destination signs, warning signs, informational signs, and intersection signs: 1. Directional Signs: To be placed at intersections with roads or other trails, where paths could be confused. 2. Destination Signs: To be placed at appropriate locations to inform trail users of the distance and destination on various routes. These signs should be accompanied by directional arrows where confusion with other routes is possible. 3. Warning Signs: To be placed on the trail to warn trail users of hazardous conditions on the trail. 4. Informational Signs: To be used to provide miscellaneous information about the trail including restroom locations, mileage markers, water, etc. 5. Intersection Signs: To placed at intersections to warn both the trail user and oncoming traffic. j. Adopt-A-Trail signs are to be allowed on the trails. Adopt-A-Trail is a program geared to involve the community with trail maintenance. All trail signs should be located so as to be easily read from the trail. The copy should be large enough so that it is easily legible (21' high letters). Height of signs should be determined by vegetation and other surroundings, but usually 40 inches from the ground to bottom of a sign is a good rule. Material: Wood signs should be used, as they are most compatible with the natural environment and are economical to manufacture and maintain. California State Park System can be referenced for further details. Lettering may be -5- Page 18 of 49

19 either blazed into the sign or placed under plexiglass for easy updating and/or replacement. Metal signs should be used where vandalism may be a problem or where signs interface with public roadways where standard metal signs are used. Concrete signs and markers can also be used as a less expensive material in the construction of trail signs. Coloring: The County should adapt "trail colors" in order to uniform the signs; however, there must be enough contrast between the background and the wording to be legible. Location: In addition to signs posted at trail access points and midway, signs should be posted at crossings. Install trail yield instruction signs at all multi-use trail heads/ crossings. See Appendix B for Sign Examples. 9. Roadway Treatments: a. Street signage to warn motorists of impending trail crossings should be located in advance of trail crossings. Signs should meet County and State standards. b. Marking for trail crossings should consist of striping on the roadway surface and, where feasible, texturing (sandblasting) of the roadway surface. 10. Staging Areas: a. Staging areas provide a clearly perceptible, safe means to park a vehicle and enter the trail system. A staging area's most important function is to advise people of rules and regulations, trail etiquette (see Appendix E), potential health hazards, and permitted trail uses, and to-display a map(s) of the trail. Such information is commonly presented in a kiosk, bulletin-board format. b. Staging areas may vary in size depending on location, physical constraints and the type of traffic the trail demands. (i.e. A heavily used trail may need to accommodate up to 50+ trucks and trailer, while a less used trail may only need to accommodate less than 5 cars.) Parking lots may also be used as staging areas when there are no feasible alternatives. c. Where feasible, staging areas should be located within regional or state parks or be adjacent to arterial highways. d. Surfacing with well-drained, non-cohesive soils is desirable, where feasible. e. Following is a list of general guidelines for staging area design: -6- Page 19 of 49

20 1) Locate staging areas at key access points, no more than 10 miles apart. 2) Locate staging area signs near the main roadway. 3) Reduce the need to build new staging areas by using existing parking facilities such as those in local and regional park. f. Incorporate as many of these elements as is feasible and appropriate for the site of the staging area: 1) Identification signs, including trail signs (see section 9.g). 2) Marked parking stalls long enough for a car and horse trailer and laid out so that straight-ahead entrance and exit is possible. 3) Water for horses. 4) Water for riders and hikers. 5) Hitching posts. 6) Picnic tables. 7) Rest rooms. 8) Shade. 9) Trash receptacles. 10) Bicycle racks. 11) Pay phones. See Appendix D for Optimal Staging Area Design. See Appendix E for Mixed-Use Trail Etiquette. 11. Rest Areas: Rest areas-are smaller facilities that accommodate fewer people than staging areas, and they may or may not accommodate parking spaces. Rest areas for trail users should be located within regional or local parks, state parks, and staging areas as first priority and at other feasible locations to seek a desirable minimum spacing of 3 to 5 miles. Rest areas should also be near neighborhoods and other areas to reduce the need for large staging facilities. Rest areas should provide the following: a. Hitching posts. b. Water for horses. c. Water for hikers and riders. d. Identification signs. e. Picnic tables. f. Rest rooms, where feasible. g. Shade. h. Trash receptacle. i. Bicycle racks. 12. Grades: Should be a maximum of 10% consistent with adjacent terrain (10-foot rise in 100 linear -7- Page 20 of 49

21 feet). Grades of 1%-7% are ideal. Maximum grades should be as follows: Less than % Less than % Greater than % Long stretches of a given grade should be avoided. The grade should undulate gently to provide natural drainage and to eliminate monotonous level stretches. No grade should be so steep that erosion is a problem. Grades should be lessened at approaches to switchbacks and the turns should be as nearly level as practical. Approaches to road crossings should be nearly level. 13. Drainage: Requires a special study of precipitation, runoff, springs, and streams in the area. Surface water must be diverted from the trail's surface before it builds up to an erosive force. The method used to drain the trail will depend on the quantity and speed of the water, the type of soil in the area, and the grade of the trail. The best and simplest drainage is to slope the trail surface, 2%-3%, to allow the water to sheet off, rather than run in a stream down the trail. Low grades help prevent drainage problems; steep grades allow the water to flow faster building up an erosive force. Drainage (i.e. culverts, ditches) should not be located in the pathway of the trail. Landscaping next to trails, especially along urban trails can help to facilitate better drainage. Emphasis should be placed on the importance of maintaining the integrity of the trail as part of the landscape design. 14. Surfacing Materials: The trail may be treated or surfaced in areas where: the dust caused by trail use presents a problem; it is needed to prevent erosion; or it is needed to improve slick or muddy conditions. Surfacing color and type should always be compatible with the surrounding environment. Landscaping next to trails, especially in urban trails can help to facilitate better drainage. Emphasis should be placed on the importance of maintaining the integrity of the trail as part of the landscape design. See Appendix F for Surfacing Materials. -8- Page 21 of 49

22 15. Proximity to Roadway: In combined trail systems, the bicycle trail should be located closest to a roadway. 16. Raised Push Buttons: Raised push buttons should be installed at all signalized intersections interfacing with trails. 17. Barriers: To prevent motorcyclists and automobiles from using the trails, log barriers (i.e. bollards) may be placed appropriately at trail entrances. 18. Undercrossings: Should be used when an at-grade crossing is unsafe and a bridge is not feasible. The rectangular dimension of a culvert should be at least 121x 101. They should have no bends and should be separate from creeks. They should have textured surfaces. They should also be provided with adequate drainage and lighting as required for safety. 19. Bridges & Trestles: Bridges/trestles are not usually necessary for crossing water, and they may necessitate an unnecessary expense. They should be used only when there are no feasible alternatives. Prefabricated bridges may be used. Also, the possibility of utilizing old railroad cars needs to be researched; they have been successfully used in other parts of the country. The following are minimum bridge/trestle standards. However, additional research needs to be done to determine more specific bridge standards. a. Width: Minimum - 10 ft. Optimum - 20 ft. (i.e. over freeways) b. Side Railings: Must provide for some type of visual blockage such as a solid wall or a privacy cloth. The purpose of this is to prevent the horse from becoming distracted by its surroundings (i.e. freeway traffic). Additionally, the railings must provide for some type of physical barrier to prevent one from falling off the bridge or trestle. c. Side Railing Height: Minimum - 5 ft. Optimum - 6 ft. Maximum - 8 ft. d. Camber: Slope of Bridge: 5% - 8% 10% maximum for short distances with increased surface texture. -9- Page 22 of 49

23 e. Surface: Non-skid, textured. (i.e. rubber, wood, cement) f. Bridges should never be completely enclosed. 20. Wet Crossings & Puncheons: Wet crossings (such as fords) should be utilized, as needed, to cross creeks, rivers, streams, etc.. Generally, bridges are not necessary for crossing water, and they may necessitate an unnecessary expense. Puncheon structures are log or timber structures built close to the ground (31 or less) with or without hand railings. It may be used to cross small drainages, wet areas or other places where turnpikes or causeways are not effective. It usually consists of mud sills, stingers and wood decking. Something as simple as stumps across a low flow creek can be used as a wet crossing for equestrian (i.e. Handy Creek in Orange Park Acres). See Appendix G for Wet Crossing and Puncheon Examples. 21. Culverts: When surface flows or subterranean springs are intercepted by a trail, a culvert may be placed perpendicular to the trail in such a manner to redirect the water and divert it to the downhill side of the trail. All culvert outflows shall be directed into the natural watercourse of the intercepted flow. The size of the culvert should be sufficient to adequately carry the maximum peak flow of water anticipated and promote self-cleaning. See Appendix G for Culvert Examples Page 23 of 49

24 APPENDIX A Trail Dimension Criteria & Trail Definition Types -11- Page 24 of 49

25 SERVICE TRAIL: Multi-use, unpaved This trail type is preferred for multiple use under most conditions. A majority of the Master Plan of Regional Riding and Hiking Trails are of this type. Service vehicles could use this trail, if necessary. Typical examples of existing such trails are unimproved fire and cattle ranch access roads. Suggested Standards Width 10.0 feet minimum Maximum Grade 10% Suggested Uses Equestrian, mountain bike, hiking Surface Packed dirt, decomposed granite Sample Trail Telegraph Canyon Trail -12- Page 25 of 49

26 SINGLE TRACK TRAIL: Unpaved, narrow gauge trail This type of trail is for natural areas and steep terrain where environmental or topographic constraints require a minimum impact trail. These trails are not typically used in an urban or rural setting. They are more suitable for mountain areas, ridges, near creeks and other sensitive areas. Suggested Standards Width 4.0 feet minimum Maximum Grade 10% Suggested Uses Hiking; equestrian and mountain bike as trail design and conditions permit Surface Packed dirt or gravel, decomposed granite, bark (Gravel can only be used in the base material) Sample Trail Wood Canyon Trail -13- Page 26 of 49

27 MAJOR TRAIL: Paved & unpaved, multi-use trail with shoulder This serves as a major, multi-use trail where space and topography are not limiting factors. This type is ideal for projected high use trails. It provides adequate space for all three uses in a safe, effective manner. If possible, the equestrian trail could be separated with a landscape buffer or post fence. If construction funds or future maintenance is an issue, the 2 foot shoulder can be eliminated. Service vehicles could use this trail, if necessary. Suggested Standards Width 10.0 feet paved 4.0 feet equestrian tread 2.0 feet ped. tread Maximum Grade 10% Suggested Uses All Surface Asphalt, decomposed granite Sample Trail Santa Ana River Trail North -14- Page 27 of 49

28 -15- Page 28 of 49

29 APPENDIX B Trail Signs Page 29 of 49

30 COUNTY TRAIL MARKER UNIFORM TRAIL MARKER FOR ALL COUNTY TRAILS: HEIGHT: MATERIAL: 4 FEET 4 x 4 WOOD POSTS, CONCRETE POSTS, OR SOME OTHER SUITABLE MATERIAL INFORMATION: TRAIL MARKER SHALL HAVE THE TRAIL NAME, DIRECTIONAL ARROW, AND YIELD SIGN TO DEPICT MULTI-USE. OPTIONAL INFORMATION SHALL INCLUDE, BUT NOT LIMITED TO, A MILEAGE INDICATOR AND THE COUNTY SEAL. (We use Carsonite type sign post and name stickers along the Regional Trails and Bikeways now Note: 2006) Page 30 of 49

31 -18- Page 31 of 49

32 -19- Page 32 of 49

33 APPENDIX C Difficulty Grading Standards -20- Page 33 of 49

34 Suggested DIFFICULT GRADING STANDARDS 1. GOOD (G) or NOT DIFFICULT (ND): Majority of the trail is on a 0%-8% slope. Trail is well marked, maintained, cleared, and graded. Frequent acess points, so that there is a possibility of any length of ride. Great for leisure hikes and would present no difficulty for equestrians or bikers. 2. MODERATE (M) or MODERATELY DIFFICULT (MD): Majority of the trail is on a 8%-12% slope. Less clearance, more climbs, more river crossings., more downed timber. Less access points. Better for the imtermediate rider or biker or experienced hiker. 3. DIFFICULT (D): Majority of the trail is on a 12% or greater slope. This would be a less frequently maintained trail. Requires one to be in good physical condition and an experienced horse. May require bikers to have advanced skills Page 34 of 49

35 APPENDIX D Staging Area Diagram -22- Page 35 of 49

36 -23- Page 36 of 49

37 -24- Page 37 of 49

38 APPENDIX E Trail Etiquette -25- Page 38 of 49

39 MIXED-USE TRAIL ETIQUETTE* 1. Reckless/negligent use on all trails will be prohibited. All persons shall ride or operate at a safe, controlled speed and in a responsible manner. Excessive speed and reckless/negligent operation are prohibited. 2. Control your horse or bike. Be alert and attentive. 3. Keep to the right of the trail. 4. Be sensitive to the trail. Even on open trails, you should not ride or hike under conditions where you will leave evidence of your passing, such as on certain soils shortly after rain. Respect the surrounding environment and sensitive habitats. Be sure to f1pack-out" at least as much as you "packin." 5. Remain on designated trails only. Respect trail closures and do not trespass on private property. Obey all directional and instructional signs. 6. Safety helmet use is recommended for mountain bikers and equestrians. 7. Yielding: Except as dictated by special conditions, bikers shall yield to both pedestrians and equestrians, and pedestrians shall yield to equestrians. Equestrians shall be aware and considerate of bikers and pedestrians. 8. Make known your approach well in advance. A friendly greeting is considerate and works well; don't startle others. Show your respect when passing others by slowing down or even stopping. Anticipate that other trail users may be around corners or in blind spots. 9. Never spook animals. All animals are startled by an unannounced approach, sudden movement, or loud noise. This can be dangerous for you, for others, and for the animals. Give animals extra room and time to adjust to you. 10. Motorized vehicles are prohibited. *NOTE: The contents may be altered by the Director of Harbors, Beaches, and Parks as appropriate Page 39 of 49

40 APPENDIX F Surfacing Specifications -27- Page 40 of 49

41 SURFACING SPECIFICATIONS Trail Type Hiking - Backcountry Distance Hiking - Internally within a campground or other facility Horse*& Mtn. Bikes - Including pack animals Surfacing Material Natural with rock added in wet areas covered with soil cement, dirt, and/or DG Natural if possible, gravel woodchips, or a combination of all three Natural if possible, gravel in wet areas covered with soil cement, dirt, and/or DG Woodchips do not make a good surface for trails * If the trail is other than a single-purpose trail (multipurpose) the design requirements will be geared to the most demanding specification within the planned uses. SOURCE: Department of Interior, Bureau of Outdoor Recreation, Land Between the Lakes, Tennessee Valley Authority, National Trails Council, Parks and Recreation Administration, The University of Tennessee at Martin, Proceedings of the Third National Trail Symposium, 1975; page Page 41 of 49

42 TRAIL SURFACING (By Soil Type) A) Loams, sandy loams, well graded gravel B) Sands, loamy sands, decomposed granite *C) Clays, clayey loams, Silts, Silty loams, loess D) Cinders on railroad ROW's dirt roads *E) Wet, boggy soils Wetting & Composition (Dust Oils may be necessary) Clay (or lime) or soil cement wetting & composition crushed aggregate surfacing perhaps 3 thick as a base material with a surface covering of DG or clean soil compacted 90% Satisfactory Flat stones covered with small rocks or gravel for support or timber puncheon if flat rocks not available * These soils do not make satisfactory trail surfaces due to problems of dust, muddiness and poor wear resistance. SOURCE: Department of Interior, Bureau of Outdoor Recreation, Land Between the Lakes, Tennessee Valley Authority, National Trails Council, Parks and Recreation Administration, The University of Tennessee at Martin, Proceedings of the Third National Trail Symposium, 1975; page Page 42 of 49

43 APPENDIX G Wet Crossings & Puncheons and Culverts -30- Page 43 of 49

44 -31- Page 44 of 49

45 -32- Page 45 of 49

46 -33- Page 46 of 49

47 -34- Page 47 of 49

48 Page 48 of 49

49 Page 49 of 49

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Stephens State Park Trails

Stephens State Park Trails TRAILS OF ALLAMUCHY MOUNTAIN & STEPHENS STATE PARKS Allamuchy Mountain and Stephens State Parks contain 28 marked trails providing access to diverse landscapes for walking, hiking, biking, bird-watching,

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Other Agencies and Organizations

Other Agencies and Organizations Daniel Boone National Forest 1700 Bypass Road WInchester, KY 40391 859-745-3100 Location Northern terminus is near Morehead, Kentucky. Southern terminus is located in the Big South Fork NRRA in Tennessee.

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

esigning Camp and Picnic Units

esigning Camp and Picnic Units Chapter D esigning Camp and Picnic Units Camp units are designed for overnight use and may include a parking pad. Picnic units generally are for day use only. Equestrian camp and picnic units do not have

More information

Lake Apopka Trail Loop Design Guidelines

Lake Apopka Trail Loop Design Guidelines November 2002 Prepared for 14908 Tilden Road Winter Garden, FL 34787 Prepared by 140 North Orlando Avenue Suite 295 Winter Park, FL 32789 November, 2002 I. INTRODUCTION...1 II. DESIGN GUIDELINES FOR TRAILS...3

More information

CHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS

CHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS 2006 Edition Page 2H-1 CHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS Section 2H.01 Scope Recreational or cultural interest areas are attractions or traffic

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

Snowmobile Trail Signing REF: DNR Trail Signing Handbook

Snowmobile Trail Signing REF: DNR Trail Signing Handbook AWSC FALL WORKSHOP TRAIL SIGNING & MAINTENANCE NOVEMBER 5, 2011 Workshop presenters: Larry Erickson, AWSC Trails Committee Chairman, Iron County Director Dave Peterson, Langlade County Director Snowmobile

More information

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property

More information

Staff Report Sign Design

Staff Report Sign Design Staff Report Sign Design July 29, 2014 Planning & Zoning Commission Meeting Report date July 23, 2014 Project type Sign Design Legal description Section 2, Township 5, Range 82 Lots 3&4, S1/2NW1/4, SW1/4

More information

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E).

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E). West Mountain Trails Poison Creek Trail #134 Length: 2.9 miles (4.7 km) Difficulty Horseback: A good trail for the first time west mountain rider, some steep sections Hiking: Most Difficult USGS Maps:

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

2.0 Physical Characteristics

2.0 Physical Characteristics _ 2.0 Physical Characteristics 2.1 Existing Land Use for the Project The site is comprised of approximately 114 acres bounded by Highway 101 to the north, the existing town of Los Alamos to the east, State

More information

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis for Vehicular Access: This report supplements the project s certified EIR s Alternatives Analysis.

More information

2019 DAY HIKE AT IRON MOUNTAIN SATURDAY, JANUARY 19

2019 DAY HIKE AT IRON MOUNTAIN SATURDAY, JANUARY 19 WHERE? In Google Maps, paste the following coordinates for Iron Mountain: 32.978215,-116.972593 or CLICK ON THIS LINK. I. Purpose of the Day Hike A. THE WBC Day Hike is a relatively short trail hike to

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

National Recreation Trail Update Form

National Recreation Trail Update Form National Recreation Trail Update Form Introduction Thank you for taking the time to complete this form. Your assistance will help ensure that the National Recreation Trail (NRT) database is complete and

More information

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west USGS topographic maps useful to this hike are the Bradford and Stickney 7.5 minute sectionals. These notes are designed to assist in identifying distance and location using geophysical and man-made characteristics

More information

Design Considerations For Accessible Parks & Trails

Design Considerations For Accessible Parks & Trails Design Considerations For Accessible Parks & Trails Measuring Up: Campbell River 2008 Dave Calver Consulting City of Campbell River Legacies Now: Measuring Up Design Guidelines Design Considerations for

More information

Appendix E: Railroad Route Evaluation, Maps and Tables

Appendix E: Railroad Route Evaluation, Maps and Tables Appendix E: Railroad Route Evaluation, Maps and Tables LandPeople E-1 Table of Contents 1.0 Railroad Operations...3 2.0 Rails-with-Trails...3 3.0 Methodology...3 4.0 Trail Design Assumptions...4 5.0 Typical

More information

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL Completed trail segments that (1) follow the route identified in the 1982 National Park Service (NPS)

More information

09 LBL Turkey Bay Off-Highway Vehicle Area Rules & Regulations

09 LBL Turkey Bay Off-Highway Vehicle Area Rules & Regulations 09 LBL Turkey Bay Off-Highway Vehicle Area Rules & Regulations Revised 3-2009 ABOUT TURKEY BAY OHV AREA Turkey Bay Off-Highway Vehicle (OHV) Area is a designated area for OHV riding and camping. Turkey

More information

National Recreation Trail Application for Designation

National Recreation Trail Application for Designation National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December

More information

10.3 TRAIL DESIGN STANDARDS

10.3 TRAIL DESIGN STANDARDS 10.3 TRAIL DESIGN STANDARDS BICYCLE AND PEDESTRIAN MASTER PLAN Introduction This chapter provides guidelines to both public and private entities for the future development of various types of trails. The

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Uniform Interjurisdictional Trail Design, Use, and Management Guidelines

Uniform Interjurisdictional Trail Design, Use, and Management Guidelines Uniform Interjurisdictional Trail Design, Use, and Management Guidelines In Fulfillment of County General Plan Policy PR-TS(i) 6A) Santa Clara County Interjurisdictional Trails Committee A Program of the

More information

GOLDEN EARS PROVINCIAL PARK

GOLDEN EARS PROVINCIAL PARK GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

BHS ADVICE ON Dimensions of Width, Area and Height

BHS ADVICE ON Dimensions of Width, Area and Height BHS ADVICE ON Dimensions of Width, Area and Height 2 In providing specifications for equestrian ways and facilities, The British Horse Society considers all equestrian users, which may result in a high

More information

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013 Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:

More information

Those with Interest in the City of Cambridge Trail System

Those with Interest in the City of Cambridge Trail System Community Services Department City Hall 50 Dickson Street, P.O. Box 669 Cambridge ON N1R 5W8 Tel: 519-740-4681 July 20, 2010 To: Re: Those with Interest in the City of Cambridge Trail System City of Cambridge

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

A Guide to Trail Etiquette

A Guide to Trail Etiquette Share Our Trails A guide to Trail Etiquette Page 12 www.garlic.com/~lbha lbha@vfr.net P.O. Box 2326 Loomis CA 95650 Page Sharing Our Trails A Guide to Trail Etiquette NON-PROFIT U.S. POSTAGE PAID Loomis,

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

ISOM & ISSOM forbidden symbol comparison

ISOM & ISSOM forbidden symbol comparison & forbidden symbol comparison Forbidden symbols and their relatives Symbol 2000 (Long, Middle) 2007 (Sprint) 201 Impassable cliff An impassable cliff, quarry or earth bank (see 106) is shown with a 0.35

More information

Proposed Peninsula Bay Bike Track Development

Proposed Peninsula Bay Bike Track Development Proposed Peninsula Bay Bike Track Development May 2018 BACKGROUND The area of land at the northern extreme of Wanaka's Peninsula Bay development (Lot 923 DP 501325), currently owned by Infinity Investment

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction Braceville Nature Preserve is one of MetroParks largest preserves.

More information

Tiger Mountain State Forest:

Tiger Mountain State Forest: 98 60 hikes within 60 miles: SEATTLE 20 Tiger Mountain State Forest: West Tiger Mountain Three Loop i KEY AT-A-GLANCE INFORMATION Length: 5.1 miles round-trip Configuration: Loop Difficulty: Moderate difficult

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

Briarhill Neighborhood Polecat Priority List. Exhibit D-4 Briarhill Neighborhood Polecat Priority List Exhibit D-4 March 11, 2013 The following list of trail head issues and design elements was developed by Briarhill 2/3 neighborhood residents living near the

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

Becker County Trail Routing Feasibility Study

Becker County Trail Routing Feasibility Study 2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3

More information

General Issues with the Portland Parks & Recreation Trail Design Guidelines for Portland s Park System ( Portland Guidelines )

General Issues with the Portland Parks & Recreation Trail Design Guidelines for Portland s Park System ( Portland Guidelines ) Why the City of Portland s current Trail Design Guidelines (2009) are substandard & need to be updated. For purposes of this discussion we will be referring to the following natural surface trail guidelines:

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

County of Elgin Tourism Signage Policy Addendum A

County of Elgin Tourism Signage Policy Addendum A 1.0 INTRODUCTION County of Elgin Tourism Signage Policy Addendum A 1.1 PURPOSE OF ELGIN TOURISM SIGNAGE POLICY To define the eligibility, use, design and authority for tourism oriented directional signage

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Buena Vista Community Trails Plan

Buena Vista Community Trails Plan Buena Vista Community Trails Plan Prepared by the Buena Vista Trails Advisory Board For the Buena Vista Board of Trustees May 2008 Table of Contents Acknowledgments 1 Introduction 1 I. Trails and the Town

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Date: October 19, 2009 DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Introduction Background Whom Guidelines Apply To How to Submit Comments Contact for Further Information General Issues:

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

CRAZY HORSE TRAIL GUIDE

CRAZY HORSE TRAIL GUIDE CRAZY HORSE TRAIL GUIDE Abridged Version: July 2016 This is a short form of our interpretive trail guide for the Crazy Horse Trail. The full version of the guide has a more detailed description of the

More information

clearance on either side of the trail tread should be 2 feet, creating a trail corridor ranging from 6 to 9 feet.

clearance on either side of the trail tread should be 2 feet, creating a trail corridor ranging from 6 to 9 feet. This section focuses on the different specifications for different types of backcountry trails, such as biking, equestrian and multiple use. The standards and construction methods described in Basic Construction

More information

Hitch Hiker Operating Instructions

Hitch Hiker Operating Instructions 1 Hitch Hiker Operating Instructions Read Completely and Carefully Before Operating The Hitch Hiker is designed as an electric pedal assist system. A pedal assist system helps the riders propel the cycle

More information

Snowmobile GUIDELINES FOR TRAIL SIGNING

Snowmobile GUIDELINES FOR TRAIL SIGNING STATE OF NEW HAMPSHIRE BUREAU OF TRAILS Snowmobile GUIDELINES FOR TRAIL SIGNING TRAIL FUNDED BY REGISTRATION FEES Table of Contents Introduction... Some Things to Take Into Consideration... BOT Provided

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

CHAPTER 5. Chapter 5 Recreation Element

CHAPTER 5. Chapter 5 Recreation Element CHAPTER 5 Recreation Element Chapter 5 Recreation Element The Recreation Element of the Meyers Area Plan is a supplement to the Recreation Element of the TRPA Regional Plan and the El Dorado County General

More information

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT Santa Barbara Trails Council * Prepared by Ray Ford February 1,2012 The following notes accompany the Santa Barbara Trails Council map for the Las Varas

More information

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services DCS-04 Page 1 of 8 POLICY DCS-04: Tourism Directional Sign Policy Development and Cultural Services Approval Date: March 11, 2008 Approval Authority: Council, Resolution No. 7 Effective Date: March 11,

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE 65-13-1 Use of Other Power-Driven Mobility Devices by Persons with Mobility Disabilities at State Park Facilities See Also: 28 CFR 35 Title

More information

Subj: POLICY FOR MAINSIDE TRAIL USE AT MARINE CORPS BASE QUANTICO

Subj: POLICY FOR MAINSIDE TRAIL USE AT MARINE CORPS BASE QUANTICO UNITED STATES MARINE CORPS MARINE CORPS BASE QUANTICO, VIRGINIA 22134-5001 MCBO 5090.4 B 04 MARINE CORPS BASE ORDER 5090.4 From: Commander To: Distribution List Subj: POLICY FOR MAINSIDE TRAIL USE AT MARINE

More information

Walking Track Classification System Parks and Wildlife Service

Walking Track Classification System Parks and Wildlife Service Appendix A Walking Track Classification Specifications Walking Track Classification System Parks and Wildlife Service This Walking Track Classification System is the outcome of a review of the track classifications

More information

TRAILS INTERSECTION SIGNS

TRAILS INTERSECTION SIGNS TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

Who is Beneficial Designs?

Who is Beneficial Designs? Who is Beneficial Designs? Beneficial Designs works towards universal access through research, design, and education. We believe all individuals should have access to the physical, intellectual, and spiritual

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information