Staff Report Sign Design

Size: px
Start display at page:

Download "Staff Report Sign Design"

Transcription

1 Staff Report Sign Design July 29, 2014 Planning & Zoning Commission Meeting Report date July 23, 2014 Project type Sign Design Legal description Section 2, Township 5, Range 82 Lots 3&4, S1/2NW1/4, SW1/4 Section 3 Township 5 Range 82 Lot 1, SE1/4, NE1/4SE1/4 Section 34 Township 4 Range 82 SE1/4SE1/4 Zoning Open Space, PUD Open Space (Wildridge) Address N/A Prepared By Brian Garner, Town Planner INTRODUCTION The West Avon preserve is a 478-acre open space parcel recently obtained by the Town of Avon as a conservation easement from the U.S. Forest Service. With construction of the segments comprising 6.5 miles of trails nearing completion this summer, the Town of Avon is developing a sign design for the trailheads and trail markers throughout the West Avon Preserve to help trail users navigate the system. As depicted on Exhibit A, trailhead signs are needed at four (4) proposed locations and trail markers are proposed at approximately 13 trail intersections. TRAIL PROJECT PARTNERS This sign design concept has been developed in accordance and shared with a number of trail project partners with a vested interest in the West Avon Preserve. Staff has gained a number of expert opinions on best practices of trail signage and how to best utilize signage in the West Avon Preserve. PROPOSED TRAILHEAD SIGNS Trailhead Sign Locations Trailhead signs are proposed for four (4) locations including: Nottingham Road Trailhead Singletree Trailhead O Neal Spur/Playground Way near the Wildridge Dog Park Trailhead Beaver Creek Point Trailhead Exact placement within these identified locations remains undetermined and will need to be field-verified to ensure best visibility, accessibility and placement on West Avon Preserve property. Trailhead Sign Design Considerations As depicted on the concept drawing attached as Exhibit B, the trailhead signs are proposed to be fabricated from wood and steel to be durable and attractive with several goals for the structures: Sign character and ability to blend-in with the Wildridge environment Appropriate sign scale and massing Durability for environmental conditions Ability to incorporate Town branding and Avon identity Ability to change-out sign components as needed to update and/or replace parts, rather than entire sign July 29, 2014 PZC Meeting 1

2 Trailhead Sign Header Message Each sign is proposed to include a header to include: Town logo/town of Avon West Avon Preserve Specific trailhead name i.e. Beaver Creek Point Trailhead Sign Copy The sign copy will contain the rules and etiquette of the trail. Staff again received input from our trail project partners to ensure the needs of all trail users are met. At this time, the following general messages are proposed for the copy component of the signs: Rules: Hours No on-street or overnight parking is permitted If parking is full, other parking areas available No smoking, alcohol or marijuana allowed Etiquette: Multi-use area Understand the use of each trail Hikers/walkers have the right-of-way at all times Bike riders must yield to other users up & down Carry-in/carry-out responsibility is yours Trailhead Map Staff is working with Eagle County GIS to develop the trail map copy. This component will be the last developed since on-site trail alignment will continue to occur until the trails are complete. Working with our trail project partners it is understood that the map needs to be: Legible and easy to understand Depict enough land detail to understand grades Illustrate trail difficulty Appropriate scale July 29, 2014 PZC Meeting 2

3 Trailhead Partners and Additional Message A simple message is proposed to thank our project partners and include their respective logos. Other message logos may be included here as needed i.e. Share the Trail Trailhead Sign Materials and Colors The sign structure materials are proposed to include wood and steel fabrication to be durable and long-lasting. Individual sign components are proposed to be.5 thick Medex material with the ability to change out components as needed for update or replacement. The stain or paint color is proposed to be a sage-brown tone for the wood and either black or sage-brown for the steel fabricated parts. Ideally, the signs will blend with the natural environment of Wildridge as much as possible. Note: Enlarged version attached as Exhibit B July 29, 2014 PZC Meeting 3

4 PROPOSED TRAIL MARKERS The concept for the trail markers is to utilize a simple and functional map that shows numbered trail junctions to illustrate the trail user s specific location within the system. Attached as Exhibit C is an example from the Dale Ball Trail System in Santa Fe, NM. This method makes production easier by replicating the map and including specific junction # for each post. Additional marker details: 4 x4 x7 wood posts, stained or painted Appropriate sized map with dot indicating location Share the Trail logo on each post Avon logo and West Avon Preserve on each post Dibond with inkjet print & laminate for components NEXT STEPS & TIMELINE July 29, 2014 PZC Meeting 4

5 Planning Analysis Chapter of the Avon Municipal Code contains the Avon Sign Code. Although official governmental signs are exempt from the regulating criteria, the proposed signs comprise a significant project that warrants Planning & Zoning Commission review and approval. As such, the Sign Design Review Criteria is included for PZC to render an official decision on the application. Review Criteria , Design Review Criteria. The Planning and Zoning Commission shall consider the following items in reviewing proposed designs: (1) The suitability of the improvement, including materials with which the sign is to be constructed and the site upon which it is to be located; (2) The nature of adjacent and neighboring improvements; (3) The quality of the materials to be utilized in any proposed improvement; (4) The visual impact of any proposed improvement, as viewed from any adjacent or neighboring property; (5) The objective that no improvement will be so similar or dissimilar to other signs in the vicinity that values, monetary or aesthetic, will be impaired; (6) Whether the type, height, size and/or quantity of signs generally complies with the sign code, and are appropriate for the project; (7) Whether the sign is primarily oriented to vehicular or pedestrian traffic, and whether the sign is appropriate for the determined orientation. Staff Recommendation Staff recommends that the Sign Design application be approved as proposed and with the following findings: 1. The signs are approved due to compliance with the Review Criteria as listed in Recommended Motion I move to approve Case #SGN14006, an application for Sign Design Review for proposed trail signage on open space at the West Avon Preserve with the finding that the proposed signs are compliant with the review criteria. Exhibits A: West Avon Preserve Trails Map B: Proposed Sign Specifications C: Dale Ball Trail System Trail Marker Example D: Vicinity Map Open Space, PUD Open Space (Wildridge) E: Trailhead & Marker Sign Concept July 29, 2014 PZC Meeting 5

6 West Avon Preserve Feet Existing Trails Parcel Boundary Easy Trail - Proposed Town Boundary Moderate Trail - Proposed Slopes over 30% Strenuous Trail - Proposed U.S. Forest Service Family Flow Trail - Proposed Riparian Habitat Moderate Trail - Existing ND OU GR AY PL This map was created by the Eagle County GIS Department. Use of this map should be for general purpose only. Eagle County does not warrant the accuracy of the data contained herein. Wildridge Y WA W 10-MILE EASY L OOP O D E DG N W RI CO NN EC TO R AY W GL ET RE E S E LE SI N LE DD SA Eagle County, Colorado Govmnt, GIS Dept P:\Towns\Town_of_Avon\WestAvonPreserve\WestAvonPreserve.mxd Date: 5/9/2014 3:55:37 PM Name: aszczesny AV ON MASHER CLIMBING TRAIL ILD WES T R I D G E Singletree EXISTING TRAILS ASC X-CUT

7 40 x 60 x 2 Angle Steel Welded Inside frame 40 x 60 x 2 Square Tube Welded outside frame 40 x 60 x 2 squares Wire Cloth TRAILHEAD SIGN.5 Thick Medex for signs 8 x 34 HEADER 6 square tube Mounting strap with welded bracket 12 x 30 TRAIL RULES & ETIQUITE 20 x 30 MAP 6 x 63 Top piece TBD 6 x 6 Western Cedar Posts to be 8 ft out of ground 20 x 34 SPONSORS

8

9

10

11 TOWN OF AVON - WEST AVON PRESERVE BEAVER CREEK POINT TRAILHEAD TRAIL RULES & ETIQUETTE THIS TRAIL WEST AVON PRESERVE THIS TRAIL EXISTS DUE TO THE LOVE OF OUR PARTNER SPONSORS: JUNCTION 2

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

Architectural Review Commission

Architectural Review Commission Architectural Review Commission staff report Item 3: Project Planner: Applicant/Owner: VITALITY BOWLS SIGNAGE APPEAL 100 CRESCENT DRIVE PLN 14-0473 Jeff Olsen, (925) 671-5206, jolsen@ci.pleasant-hill.ca.us

More information

TRAILS INTERSECTION SIGNS

TRAILS INTERSECTION SIGNS TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction

More information

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE Northwest Triangle Redevelopment Proposal Property Acquisition, Engineering, and Demolition December, 2005 REDEVELOPMENT AUTHORITY OF THE CITY OF YORK York City Redevelopment Authority 14 West Market Street,

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

REQUEST FOR PLANNING COMMISSION ACTION

REQUEST FOR PLANNING COMMISSION ACTION REQUEST FOR PLANNING COMMISSION ACTION DATE: 06/03/09 ITEM NO: 5e Department Approval: Agenda Section: PUBLIC HEARINGS Item Description: Request by City of Roseville for the vacation of public right-of-way

More information

PARKS CANADA SIGNING ALONG PROVINCIAL HIGHWAYS

PARKS CANADA SIGNING ALONG PROVINCIAL HIGHWAYS Page 1 of 5 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GUIDE AND INFORMATION General National Parks, National Historic Sites, and National Marine Conservation Areas are present across

More information

Section Three, Part 14 Signs

Section Three, Part 14 Signs PART 14 SIGNS SIGNS 14.1 INTRODUCTION This part of the District Plan sets out the requirements in respect of signs. These matters were formerly controlled by bylaws. 14.2 OVERVIEW Signs form an integral

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

BOARD OF ADJUSTMENT AGENDA

BOARD OF ADJUSTMENT AGENDA BOARD OF ADJUSTMENT AGENDA February 28, 2018 I. Call to Order II. III. Approval of Minutes Old Business: 1. Coleman Bass Construction (VAR17-0112) Variance* 1800 NW Mystic Avenue Interior Side Setback

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan Washington Township MASTER PLAN Addendum: Washington Township Master Plan CHAPTER XI RECREATION CORE DISTRICT Introduction The Recreation Core District generally encompasses the areas north of 30 Mile

More information

LAND USE GUIDELINES NEW TOWN

LAND USE GUIDELINES NEW TOWN VI LAND USE A L T ETruRck TNraiAl T I V E S AarNnelDla D E S I G N W GUIDELINES NEW TOWN ad Ro DAVEN CA LF IRE ALTERNATIVE LAND USE PLANS AND DESIGN GUIDELINES - VI VI LAND USE ALTERNATIVES Asilomar Hotel

More information

Exterior Wayfinding Signage Design Standards

Exterior Wayfinding Signage Design Standards Exterior Wayfinding Signage Design Standards 05/25/12 TABLE OF CONTENTS CONTENTS SIGNAGE POLICY 2 VEHICULAR SIGNS 3 Main Gateway [Sign 1]... 3 Parking Lot [Sign 2]... 4 Building Identification [Sign 3]...

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban

More information

CITY OF WISCONSIN DELLS MEETING AGENDA - Updated

CITY OF WISCONSIN DELLS MEETING AGENDA - Updated CITY OF WISCONSIN DELLS MEETING AGENDA - Updated DESIGN REVIEW COMMITTEE Meeting Description Date: WEDNESDAY, JUNE 20, 2018 Time: 10:00AM Location: MUNICIPAL BUILDING - 300 LA CROSSE STREET, WISCONSIN

More information

DEPARTMENT OF PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT

DEPARTMENT OF PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT DEPARTMENT OF PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT DATE: December 11, 2015 TO: FROM: SUBJECT: City Council Kevin Cricchio, AICP Associate Planner Department of Planning, Community & Economic Development

More information

Sign Library. Florida Trail Association

Sign Library. Florida Trail Association 310: FTA SIGN LIBRARY December 2015 Sign Library Florida Trail Association Trail signs are used to inform the motoring public and/or trail users that they are approaching, or are on, the Trail. When blazes

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Hillsborough County Florida Hillsborough County s Trailways Addressing Program

Hillsborough County Florida Hillsborough County s Trailways Addressing Program Hillsborough County Florida Hillsborough County s 9-1-1 Trailways Addressing Program 2010 ProBike/ProWalk Florida -Conference May 12-13, 2010 1 REQUEST Staff from the Hillsborough County Sheriff s Office

More information

Rogue River Access and Management Plan Draft Alternatives

Rogue River Access and Management Plan Draft Alternatives Rogue River Access and Management Plan Draft Alternatives The Rogue River Access and Management Plan was initiated in December, 2011 and is being led by Jackson County Parks (JCP) and Oregon Department

More information

Trans Canada Trail Signage Guidelines MADE BY CANADA

Trans Canada Trail Signage Guidelines MADE BY CANADA Trans Canada Trail Signage Guidelines MADE BY CANADA Mission: We will promote and assist in the development and use of the Trans Canada Trail by supporting success at the local level in the creation of

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

ROYAL VIEW DEVELOPMENT

ROYAL VIEW DEVELOPMENT GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00

More information

How to Build Your Own Flour Mill and Sifter

How to Build Your Own Flour Mill and Sifter Prototype and plans developed by Hugo Gervais Custom Fabrication, North Hero, VT Materials List: How to Build Your Own Flour Mill and Sifter Quantity Materials 4 2 X 2 X 26 3 / 16 Square tubing 1 2 X 2

More information

North Forty Area ( area bounded by Lark Avenue, Los Gatos Boulevard, Highway 85 and

North Forty Area ( area bounded by Lark Avenue, Los Gatos Boulevard, Highway 85 and RESOLUTION 2015-056 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING GENERAL PLAN AMENDMENTS NECESSARY FOR THE NORTH FORTY SPECIFIC PLAN. THE PLAN AREA COMPRISES APPROXIMATELY 44 ACRES

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

Proposed Peninsula Bay Bike Track Development

Proposed Peninsula Bay Bike Track Development Proposed Peninsula Bay Bike Track Development May 2018 BACKGROUND The area of land at the northern extreme of Wanaka's Peninsula Bay development (Lot 923 DP 501325), currently owned by Infinity Investment

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission STAFF REPORT December 5, 2012 Village of Glenview Appearance Commission TO: Chairman and Appearance Commissioners FROM: Planning and Economic Development Department CASE MANAGER: Tony Repp, Planner SUBJECT:

More information

OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016)

OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016) OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016) 2007 2016 Millage Accomplishments Timeline in Pull-out The Mission

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Arvidson, Adam R. Adam,

Arvidson, Adam R. Adam, Arvidson, Adam R. From: Andrew Hestness Sent: Wednesday, May 18, 2016 5:39 PM To: Arvidson, Adam R. Cc: Renee Spillum; Schroeder, Michael Subject: RE: Park Dedication Attachments: FranklinPlan - Bystrom

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

County of Elgin Tourism Signage Policy Addendum A

County of Elgin Tourism Signage Policy Addendum A 1.0 INTRODUCTION County of Elgin Tourism Signage Policy Addendum A 1.1 PURPOSE OF ELGIN TOURISM SIGNAGE POLICY To define the eligibility, use, design and authority for tourism oriented directional signage

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

TUCSON PATIO AWNING INSTALLATION MANUAL

TUCSON PATIO AWNING INSTALLATION MANUAL TUCSON PATIO AWNING INSTALLATION MANUAL Toll Free 877-792-1775 Fax 877-792-0031 swsuncontrolpro.com sales@swsuncontrol.com 1 INTRODUCTION...3 1.1 Symbols used in this manual... 3 1.2 Personnel requirements...

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS SOUTH COAST CAC PLANNING AREA 4.10 NAVARRO RIVER TO MALLO PASS CREEK PLANNING AREA (Includes Greenwood/Elk) This planning

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014 Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014 OPEN SPACE MATTERS: Boise s First Reserve Master Plan Julia Grant Foothills and Open Space Manager City of Boise Ellen Campfield

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Welcome to the Cross County Trail Public Input Session!

Welcome to the Cross County Trail Public Input Session! Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

The Vision for the San Juan Islands Scenic Byway

The Vision for the San Juan Islands Scenic Byway The Vision for the San Juan Islands Scenic Byway 2 Judd Cove, Orcas Island, Courtesy of Kurt Thorson (kurtthorson.com) and San Juan County Land Bank Vision for the San Juan Islands Scenic Byway The San

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

ROYAL GORGE PARK and RECREATION AREA. A Feat of Natural and Man-Made Engineering

ROYAL GORGE PARK and RECREATION AREA. A Feat of Natural and Man-Made Engineering ROYAL GORGE PARK and RECREATION AREA A Feat of Natural and Man-Made Engineering As Growth Resumed in the 1870 s Town Leaders Began to Envision a Tourist Industry. The Arkansas River Canyon was advertised

More information

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer) CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Bringing the World to America KEY BRANDING SUGGESTIONS

Bringing the World to America KEY BRANDING SUGGESTIONS Bringing the World to America KEY BRANDING SUGGESTIONS 2018 PREMIUM PLACEMENT. MAXIMUM VISIBILITY. HIGH IMPACT. THE FOLLOWING KEY BRANDING OPPORTUNITIES DELIVER A BIG IMPRESSION AT IPW. Please go to this

More information

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring Trail revitalising Western Australia Bibbulmun Track 973 km Cape to Cape Track 135 km Two of the world s great long distance walking tracks 1062 km Off-road cycle touring Trail revitalising 1. Framework

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

TOWN COUNCIL REPORT. The PZC recommendation was ratified on September 6, 2016, and included the following findings:

TOWN COUNCIL REPORT. The PZC recommendation was ratified on September 6, 2016, and included the following findings: TOWN COUNCIL REPORT To: Honorable Mayor Jennie Fancher and Avon Town Council From: Matt Pielsticker, Planning Director Meeting Date: September 13, 2016 Agenda Topic: First Reading of Ordinance 2016-20,

More information

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Recommended Wilderness Background The Whitefish Range has a long management and legislative history associated

More information

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY Town of, MA Trails Map 6a SPLIT ROCK PRIMARY SECONDARY PRIVATE PRIVATE PROPERY STAY ON HEAD FUTURE TO SKINNER (NOT MARKED) 0 miles 0.25 0.250 0.5 Mapbox, Data Odbl, OpenStreetMap contributors primary use

More information

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 29, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN ACTION ITEM RECOMMENDATIONS It is recommended that

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Trails Technical Committee

Trails Technical Committee Trails Technical Committee Winter 2017 Draft Report Alignment Proposals for the Inyo National Forest and the Town of Mammoth Lakes Map ID #S18 February 08, 2017 Map ID #S18 Key Agreements As of February

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

Mickelson Connector Feasibility Study

Mickelson Connector Feasibility Study Friends of the Norbeck PO Box 2003 Rapid City, SD 57709 www.friendsofthenorbeck.org Summary Comments on the Mickelson Connector Feasibility Study Prepared by Brian Brademeyer Submitted to Wyss Associates

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Mount Diablo Terrace. Master Sign Program. Dec. 29, Program: 13.SWIFT.0001 DRAWINGS CHECKED BY: PROGRAM MANAGEMENT DESIGN PRODUCTION

Mount Diablo Terrace. Master Sign Program. Dec. 29, Program: 13.SWIFT.0001 DRAWINGS CHECKED BY: PROGRAM MANAGEMENT DESIGN PRODUCTION Mount Diablo Terrace Master Sign Program Dec. 9, 04 Program: 3.SWIFT.000 DRAWINGS CHECKED BY: PROGRAM MANAGEMENT DESIGN PRODUCTION INSTALLATION 03 GNU Group. The physical and intellectual contents of this

More information

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE GLENWOOD AVE MULTI-USE DIAMONDS VINCENT AVE N MORGAN AVE N PENN AVE N DOG PARK MULTI-USE FIELDS PLAYGROUND AK E RD S CHESTNUT AVE DA

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Proposed Area-Specific Amendment to Chapter 694, Signs, General, with Respect to Ricoh Coliseum and BMO Field and a Portion of Exhibition Place Date: July 23, 2014 To: From:

More information

The following resource management issues have been identified as significant in the Art Deco Quarter:

The following resource management issues have been identified as significant in the Art Deco Quarter: Chapter 59 ART DECO QUARTER SIGNS INTRODUCTION The Art Deco Quarter is Napier City s foremost shopping precinct as well as being the most important public place and pedestrian area. As such there are many

More information

Greenbelt Route Signage Guidelines

Greenbelt Route Signage Guidelines Greenbelt Route Signage Guidelines Revised March 31, 2015 Waterfront Regeneration Trust (416) 943-8080 info@wrtrust.com Greenbelt Foundation (416) 960-0001 info@greenbelt.ca www.greenbeltcycles.com Greenbelt

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

Sundance Square. Liberty Hill, Texas 78642

Sundance Square. Liberty Hill, Texas 78642 RETAIL / OFFICE DEVELOPMENT OPPORTUNITY Bulk Sale of ±24 Acres at $4.00 / sq. ft. Existing Williamson CAD Tax Parcels Property Features Area of high residential development growth Situated at the entrance

More information

MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011

MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 Mayor Bolender called the meeting to order at 7:00 p.m. The following Commissioners were present at roll call: Commissioner Dickmann,

More information

STORY MILL COMMUNITY PARK

STORY MILL COMMUNITY PARK OWNER: City of Bozeman Department or Parks and Recreation P.O. Box 1230, 415 N. Bozeman Street Bozeman, MT 59715 Tel: (406)-582-2908 APPLICANT: The Trust for Public Land 1007 E. Main Street, Suite 300

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

COMMERCIAL LAND/BUILDING

COMMERCIAL LAND/BUILDING www.jimgrievesalesteam.com COMMERCIAL LAND/BUILDING Salmon Arm Industrial Park 5101 48 th Avenue SE Salmon Arm BC For Sale $1,749,000 LEASED INDUSTRIAL BLDG WITH 7% ROI ON ASKING PRICE - 13,600 square

More information

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Peter Axelson. Beneficial Designs, Inc. Minden, NV Peter Axelson Beneficial Designs, Inc. Minden, NV Arroya Sit Ski Mono Ski Dynamic Seating Spring Assist Cross Country Ski Hand Bike Adaptive Canoe Seating Available from Chosen Valley Canoe Accessories

More information