West of England response to the Great Western Specification Consultation. June (with amendments 04/07/14)

Size: px
Start display at page:

Download "West of England response to the Great Western Specification Consultation. June (with amendments 04/07/14)"

Transcription

1 West of England response to the Great Western Specification Consultation June 2014 (with amendments 04/07/14)

2 Summary This response was submitted by 26 June 2014 deadline and formally endorsed at the Joint Transport Board on 4 July Arising from the Board minor changes were made to questions 4 and 7. We welcome the opportunity to respond to the Great Western Specification Consultation and look forward to working closely with the Department for Transport and the train operator over the period of the Direct Award. Using the current level of train services as the basis for the Direct Award is welcomed as are the proposals for four IEP services an hour between Bristol and London with one service an hour extended to and from Weston-super-Mare. Our responses to the individual questions are set out below. Ahead of these we have two main issues to raise regarding rolling stock and our MetroWest proposals. The West of England continues to see impressive growth in rail passenger numbers up 94% in the last ten years (West of England Annual Rail Survey). The current rolling stock fleet can barely cope with existing passenger numbers and with growth set to continue, on past trends, the need for additional rolling stock is paramount. We expect to see the Direct Award include the cascade of the Class 165/6 Thames Turbos fleet to services in the West of England city region. Even with the Class 165/6s we remain concerned over the national shortage of diesel multiple units and the rapidly ageing and unsuitable nature of the current fleet. The Direct Award must require the operator to secure new or at least newer rolling stock over and above the cascade of Class 165/6s. The reliability of the current, ageing rolling stock fleet with cancellations and short formed trains is of increasing concern and will undermine passenger confidence and ultimately passenger numbers if not addressed. Our 100m MetroWest proposals will see half hourly services across the local rail network and the reopening of the Portishead and Henbury lines. We welcome the requirement for the train operator to work with promoters of schemes under development (section 5.22) but we would like to see a more specific reference to a duty to co-operate and assist in the delivery of MetroWest Phase 1 and 2 as per the wording of the first Direct Award or through a formally worded co-operation obligation agreement. Phase 1 is currently planned to start operation before the end of the Direct Award and Phase 2 could well be under construction. We would like to add our support to the Direct Award for being up to five years in duration. With all the disruption to the network arising from electrification of the Great Western Main Line, four tracking of Filton Bank, remodelling of Bristol Temple Meads, Heathrow Western Link, the completion of Reading station and Crossrail and the implementation of MetroWest it is sensible that one operator runs the franchise throughout this period. To change operator midway would only add to the disruption and confusion. If the Direct Award is less than five years we request early 1

3 engagement with the Department for Transport on franchise arrangements for delivering MetroWest Phase 1 and 2. West of England Response to the Great Western Specification Consultation 1. Respondents are encouraged to consider whether any additional objectives should be reflected in the franchise specification for the 5 year period from September 2015 We suggest there should be an objective for the train operator to work with the Local Transport Authorities on timetables and services to more closely align demand for train services and support housing and employment developments. Our response to question 2. highlights the level of growth expected in the West of England area and its close relation to the rail network. With 100m investment in MetroWest it is essential we are fully involved in the specification of local train services with the ability to input into and influence fares, destinations and frequencies. We see this as a first step towards decentralisation (response to question 22) and to delivering MetroWest (see response to question 5.). A further objective should be for the train operator to enter into an Alliance arrangement with Network Rail. South West Trains has had such an Alliance since 2012 and this works extremely well with a single management team now responsible for track and train. Given this and the opportunity the Direct Award presents it is surprising that an Alliance is not proposed for the Great Western Franchise. 2. Respondents are encouraged to consider and identify any specific local factors that they believe might influence the future level of passenger demand, which should be reflected in the specification for the new franchise. Passenger Growth The West of England continues to see impressive growth in rail passenger numbers. From the Office of Rail Regulation s own figures passengers have grown by 67% over the last ten years in our area. On the Severn Beach Line the figure is 174%. Our annual West of England Rail Survey which counts all passengers, not just ticket sales, shows higher growth at 94% across all stations and 231% on the Severn Beach Line (see Figure One). Between 2013 and 2014 passengers on the Severn Beach line grew by a further 16%. The Direct Award must take account of this historic growth in planning capacity to

4 Daily passengers Figure One: West of England Rail patronage growth 2003 to Total except Temple Meads Severn Beach Line As part of the West of England Joint Local Transport Plan we have a target to increase rail passengers by 41% by 2019 from a 2008 base. This target is based on the one used by Network Rail s Great Western Route Utilisation Strategy, From Figure Two below it is clear the 41% target was met in 2013, six years early. We will look at setting a revised target as part of the Joint Local Transport Plan s Annual Progress Report Figure Two: West of England Joint Local Transport Plan Rail Target Target Actual

5 Employment and housing growth The West of England has a substantial economic growth agenda which is being developed through our Strategic Economic Plan. Our current share of national economic growth (GVA) is the highest of any core city region at 3.1%. Our overall vision is to build on this economic growth through a range of interventions including improving access to major employment sites for the skilled workforce catchment. Population is expected to exceed 1.1 million by Planning for this growth means our city region needs to make sure its transport infrastructure is not only fit for purpose, but has the ability to respond to increasing demand, and therefore maximise potential for continued economic growth. The modal share for journey to work within the Temple Quay Enterprise Zone is increasing rapidly; a recent survey identified that 40% of commuters travel by rail. Our five Enterprise Areas are now becoming established and are expected to be major trip generators, and we anticipate that rail will play a significant part in meeting this demand (see Figure Three and Table One). We play a key role as a gateway for the South West and Wales. Table One: Enterprise Zone and Enterprise Areas (see also Figure Three) Enterprise Zone/Area Jobs Rail Schemes Bristol Temple Quarter Enterprise Zone and new arena 15% of journeys to work by train# 17,000 MetroWest Phase 1 and 2 New Stations Package Portway Platform Bath City Riverside Enterprise Area 9,000 MetroWest Phase 1 New Stations Package J21 Enterprise Area (Weston-super- 10,000 MetroWest Phase 1 and 2 Mare) Emersons Green/Science Park 7,000 MetroWest Phase 2 Enterprise Area via Bristol Parkway Filton Enterprise Area 6,000 MetroWest Phase 2 Avonmouth Severnside Enterprise Area 8,000 MetroWest Phase 1 and 2 12,000 South Bristol Priority Growth Location 10,400 MetroWest Phase 1 Source: West of England draft Strategic Economic Plan, December Figures are in addition to those in the Core Strategies. # Transport Report, Temple Quarter Enterprise Zone, Halcrow, 2012 As Table Two shows a considerable number of new homes and jobs are planned in the West of England area to Whilst the last nine years of this are outside the Direct Award timescale the train operator needs to start planning now. Table Three underlines this with major housing areas directly served or capable of being served by rail. 4

6 Table Two: Planned housing and employment growth in the West of England Council Homes Jobs Bath & North East Somerset* 13,000 10, Bristol City 32,800 21, North Somerset* 17,130 14,000** South Gloucestershire 28,355 18,600-21, All 91,285 68,070 Source: Core Strategies and supporting evidence documents *Proposed figures and subject to local plan examinations on going ** Homes updated February 2014 but job figures to be revised. Table Three: Major new housing areas served by rail schemes Housing Area Homes Rail Schemes Cribbs Patchway New Neighbourhood 5, ha MetroWest Phase 2 (Henbury Line) employment land North Yate 3,000 MetroWest Phase 2 Keynsham (incl. Somerdale former 2,150 (incl. MetroWest Phase 1 Cadbury site adjacent to station) 700 at Somerdale) Weston-super-Mare 11,000 MetroWest Phase 1 and 2 Source: Core Strategies. Housing area figures are included in the Core Strategies. The Atkins report Unlocking Our Potential: The Economic Benefits of Transport Investment in the West of England, November 2012 found that MetroWest delivers some 2,500 jobs, which based upon on our level of self-containment equates to unlocking some 2,900 homes. MetroWest, therefore, has significant benefits in bringing forward private sector investment and the potential to support regeneration, new houses and job growth in several disadvantage areas. 3. Respondents are encouraged to highlight interfaces with any other schemes that are likely to be delivered during the next five years, which the operator may need to consider. Our MetroWest proposals for half hourly local train services and reopened Portishead and Henbury lines will interface directly with the Direct Award. Core Strategy Period The 200m MetroBus network of express bus services, separated from general traffic, with faster and more reliable journey times has been designed to link and connect with existing rail and bus services. The first part of the MetroBus network will open from Bristol Temple Meads to Ashton Vale in March 2016, followed by the South Bristol Link in December 2016 and North Fringe to Hengrove in May MetroBus and MetroWest are interlinked projects and key to enhancing connectivity and supporting economic growth. 5

7 Network Rail s 170m development proposals Plan for Bristol Temple Meads will transform the station and the surrounding Temple Quarter Enterprise Zone including the Bristol Arena scheme. It emphasises the stations role as a key hub and links to wider objectives for connectivity and accessibility to London, Wales and the South West. The proposals are supported by the West of England s Strategic Economic Plan. As previously mentioned under the response to question 2. - the Temple Quarter Enterprise Zone, the five Enterprise Areas and major new housing developments all interface with the local rail network. This will be further strengthened through a 4m revenue bid for funding in 2015/16 from the Local Sustainable Transport Fund. This will focus on links to the Enterprise Zone and Areas and new neighbourhoods. To support the Hinkley Point nuclear power station development in Somerset and to maximise access and sustainable travel we will support the Heart of the South West LEP s ask for 2-3 trains per hour between Bristol, Weston-super-Mare, Taunton and Exeter whilst maintaining half hourly services to all local West of England stations. 6

8 Figure Three: MetroWest and the Enterprise Zone and Areas 7

9 4. Respondents are invited to identify any changes or reorganisation to the routes served by the Great Western franchise that they would recommend; and to explain their rationale. The Direct Award should consider the Bristol, Swindon to Oxford market as a priority. As high tech clusters and with electrification to all three destinations plus the links opened up by East-West Rail to Milton Keynes and Cambridge there is a new market to be tapped into here. It would enable a service to be provided for a new station at Corsham (Swindon and Wiltshire LEP priority scheme). Extension to Cardiff could be added. Our Strategic Economic Plan stresses the importance to the regional economy of the Cardiff to Bristol to Portsmouth route and the need for enhancements is recognised. Consideration should be given to measures for train lengthening and upgraded trains. The service is key for travel between Bath and the Wiltshire towns of Bradford-on-Avon, Trowbridge and Westbury, all of which fall within the city s travel to work area. To cater for local demand we believe an overlay stopping service on the busiest parts of the Cardiff to Portsmouth route is required running from Cardiff to Bristol to Bath Spa with possible extension to Swindon enabling a new station at Corsham to be served. If extended to Oxford this would provide an alternative way to provide the Bristol to Oxford service. With electrification of the Great Western Main Line there is the opportunity to run this service using electric trains cascaded from Thameslink. Electrification should not be used as a reason to delay implementation of this service using diesel units. We are concerned that overcrowding caused by a lack of capacity will act as a growth constraint on the Cardiff to Portsmouth route. Based on the proposals above and in discussion with our neighbouring authorities of Wiltshire, Somerset, Gloucestershire, Swindon and Monmouthshire we recommend the following services are included in the Direct Award: Three trains an hour between Cardiff and Bristol with one fast limited stop and two slower stopping services. Minimum five car trains on peak services. Extension of one service to Bath Spa, Swindon and Oxford (for links to East-West Rail and a new station at Corsham). The other two services would continue to Westbury and Portsmouth. Consideration should be given to extending to Swansea to maximise connectivity between South Wales and the West of England. Maintain the current Cardiff to Bristol to Taunton services with train lengthening. Three trains per hour between Bristol, Weston-super-Mare, Taunton and Exeter with one fast limited stop and two slower stopping services including half hour services to all local West of England stations. One of these services to be the hourly extension of the London to Bristol via Bristol Parkway IEP service (see response to question 9.). Maintain the current Gloucester to Westbury services with train lengthening. Improvements to the Heart of Wessex line. Additional service Severn Tunnel Junction to Bristol Parkway for commuters and connections at Parkway. 8

10 IEP Cardiff to London two trains per hour service should stop at Bristol Parkway to enable connections to the Midlands, South West, South Wales, Swindon, Didcot, Reading and the North. Although not part of the Great Western Franchise, the train services operated by South West Trains from London Waterloo to Salisbury to Bath Spa and Bristol Temple Meads form a valuable addition to the local rail network by giving connectivity to the rail network in South and South-East England. We are keen to ensure that train paths are maintained in this Direct Award to accommodate those services and any greater frequency of service and/or calling pattern that South West Trains may wish to operate. 5. Respondents who wish to promote service changes should clearly identify these in their response to this consultation, as well as any supporting business case or value for money (VfM) analysis. MetroWest The possible length of the Direct Award to 2020 will see the introduction of MetroWest Phase 1 services in May Given the advanced nature and maturity of the scheme and the commitment to funding (see below) we formally request that Phase 1 is incorporated into the franchise requirements as part of the base specification. Technical work (see Technical Documents below) show MetroWest Phase 1 will generate 1m passengers a year. We welcome MetroWest Phase 1 services being listed under section 5.20 but request that in the Direct Award the words MetroWest Phase 1 are added in brackets after each to aid clarity. Equally we welcome the requirement for the train operator to work with promoters of schemes under development (section 5.22) but we would like to see a more specific reference to MetroWest and a clear duty to co-operate and assist in the delivery of Phase 1 as per the wording of the first Direct Award or through a formally worded cooperation obligation agreement. Under the current timescale agreed by the Joint Transport Executive Committee in 2013 Phase 2 will open in May 2021 which lies outside of the Direct Award period. Development work, however, has already started and as with Phase 1 we would expect to see in the Direct Award a co-operation obligation agreement with the train operator to work together on implementing Phase 2. We would expect this to include work on the operational cost of Phase 2 services. The West of England Local Enterprise Partnership s Strategic Economic Plan aspiration is to see Phase 2 accelerated. In the event of Phase 2 opening timescales coming forward into the Direct Award period a commitment to operating the new service under the most appropriate funding mechanism is required. There are considerable demands from business and local communities for the earlier delivery of Phase 2 and its links to the Cribbs Patchway New Neighbourhood and Filton Enterprise Area. It should be noted that devolved major transport schemes 9

11 funding for Phase 2 is only available from 2021/22 and earlier delivery will require higher levels of revenue support. More detail on Phase 1 and 2 is set out below. Phase 1 Phase 1 (see Figure Four) will see half hourly train services for the Severn Beach line, local stations between Bristol Temple Meads and Bath Spa (Keynsham and Oldfield Park) and on the line to Weston-super-Mare (Bedminster and Parson Street) and the reopened Portishead line (Pill and Portishead). Cost is 44m to 55m with construction starting in 2017 and new service operating in May Phase 1 rail has been prioritised for 44.9m of devolved major schemes funding from 2015/16 by the West of England Local Transport Body with additional funding provided by the local authorities. Phase 2 Phase 2 will see half hourly train services to Yate and Weston Milton and hourly services on a re-opened Henbury line (capacity for two new stations) with additional stations at Ashley Down and Horfield. Costs are estimated at 43.1m with construction starting in 2019 and services operating in May Phase 2 has been identified by the West of England Local Transport Body as the second priority for 36.5m of devolved major schemes funding from 2021/22. The Strategic Economic Plan s ambition is to reopen the Henbury line as a loop, subject to a full business case. New Stations Package The New Stations Package for Saltford, Ashton Gate and Corsham (Wiltshire Council scheme) stations may be implemented as opportunities and funding arise over the period 2017 to For Ashton Gate the nearby stadium is being redeveloped, under a 40m scheme, as a major sporting, conference, exhibition and events venue. Strategic Economic Plan Phase 1 and 2 are included as priorities in the West of England Local Enterprise Partnership s Strategic Economic Plan. The Plan identifies transport investment to improve connection and accessibility for business and communities and unlock and accelerate growth in new jobs and homes. The most significant investment for the region is in MetroWest. Funding bids to the Local Growth Fund are included to make up the shortfall for Phase 1 construction costs ( 8.5m) and 4.5m for Phase 2 development costs. 10

12 Technical Documents Technical documents (with web links) to support the case for MetroWest are: West of England Rail Studies report, Halcrow April 2012 sets out proposals for Phase 1 and 2 and New Stations Package. Greater Bristol Metro Bristol Area Rail Study Final Report, Halcrow, February 2013 detailed work on Phase 1 including passenger demand, Railsys timetable modelling and wider regional links. Unlocking Our Potential: The Economic Benefits of Transport Investment in the West of England, Atkins, November identified the economic impact of MetroWest. Summary report Full report Network Rail Analysis and Forecasting MetroWest Interim Report, November 2013 reviewed technical work to date on MetroWest Phase 1, options to take forward, infrastructure constraints and network capacity challenges. Bristol North Fringe Stations Study, March looks at the location options, demand, station requirements, layouts and construction costs of new stations including two on the Henbury line. Strategic Economic Plan, West of England Local Enterprise Partnership, March 2014 includes outline business cases for MetroWest and funding shortfall bids. A great deal of technical work is currently underway for Phase 1 and 2 including: Phase 1 GRIP Stage 1-2 report July Phase 1 Preliminary Business Case September Phase 1 GRIP Stage 3 report October Phase 2 GRIP Stage 1-2 report December Phase 2 Preliminary Business Case March Bristol Stations Study investigations into potential stations at Ashton Gate, Ashley Down, Horfield (with alternative site at Constable Road) autumn Extending Electrification study investigating extension to Weston-super-Mare, Yate, Severn Beach, Portishead and Henbury lines as well as changes in operating costs and revenues, train availability, depots and the minimum size of train fleet summer We are happy to share these reports when published with the Department for Transport and the train operator. 11

13 Figure Four: MetroWest Phases 1 and 2 12

14 6. Respondents are encouraged to bring to our attention research, evidence or publications which they believe should be considered in the development of the franchise specification. In addition to the research listed under question 5. we would like to draw the Department for Transport s attention to: Joint Local Transport Plan to 2026, March Joint Local Transport Plan 3 refresh, March 2013 Joint Local Transport Plan 3 Public Transport Supplementary Document, March 2013 draft West of England Annual Rail Survey 2014 TravelWatch South West Greater Western, Lesser Western report, September Severnside Community Rail Partnership Progress Report, January Heart of Wessex Community Rail Partnership Annual Report 2013/14, May 2014 There is considerable public support for investment in rail and improvements to local services through the direct Award and the Department for Transport will be receiving responses to the consultation from local stakeholder groups. Where possible we have sought to incorporate these into this response. 7. Respondents are invited to propose any changes to the current service pattern which they feel should be considered and to explain their rationale, for example by identifying specific local factors which might influence the future level of passenger demand which they consider should be reflected in a revised specification. Whilst recognising that the flexibility to squeeze more out of timetables is limited we would like to see at the earliest opportunity improved capacity and services for: Filling existing gaps at Bedminster and Parson Street stations including stopping the from Weston-super-Mare and from Taunton. Weekend services and station calls to Weston-super-Mare to take account of changing travel patterns with more leisure and shopping trips. Increased local train capacity on weekday and weekend services on the Cardiff to Taunton, Bristol to Gloucester and Bristol to Westbury routes. Hourly peak service to Severn Beach station. Restore stops at St Andrew s Road and Sea Mills on the Seven Beach Line assuming reliability can be improved in other ways. More calls at Patchway (Bristol to Cardiff Services) with the potential to call at Pilning. First and last trains of the day particularly on Fridays and Saturdays. 13

15 Improved connections for all local rail services whilst recognising that the flexibility to make changes will be limited with the need to ensure improving connections for one set of passengers is not at the expense of connections for others Going forward we believe that implementation of the MetroWest proposals will be essential to meet the continuing growth in passenger demand and facilitate growth in the city region. 8. Respondents are invited to say whether they value a faster headline journey time, or more intermediate stops, on a particular journey that they make (and to identify that journey). Whether there should be faster journey times or more stops depends on the local situation. We strongly support for example the non-stop IEP Bristol Parkway to London Paddington service and its extension as a semi fast hourly stopping service from Bristol Temple Meads to Weston-super-Mare. We believe the reference on Figure 7.1 to Weston Milton is incorrect and that this should be Worle. An extension for off peak IEP services to extend to Taunton is mentioned under section 7.10 but not shown on Figure 7.1. We suggest this could be extended to a peak service. Of concern is the IEP proposal to stop only one IEP Cardiff to London service at Bristol Parkway. Connections to Bristol Temple Meads, the Midlands, South West, South Wales, Swindon, Didcot, Reading and the North are thus lost. For Cardiff to Portsmouth, Cardiff to Taunton, Bristol to Westbury/Salisbury/Southampton and Weymouth to Gloucester/Cheltenham/Great Malvern services stops at appropriate intermediate stations are essential to meet local demand. 9. Should any elements of the indicative modelled intercity service pattern be mandated, and can it be improved? What should the priority be for intercity services where IEP trains are not planned to operate? The hourly IEP service to Weston-super-Mare shown in Figure 7.1 should be mandated to ensure this growing town of 100,000 people has a direct route to London without all the disbenefits of having to change at Bristol Temple Meads. With further housing and employment growth this link is incredibly important. Four trains an hour from Bristol Temple Meads to London Paddington with the fast IEP service non-stop from Bristol Parkway should be mandated to provide a high speed link between the two cities. As flagged up in the response to question 8., both IEP trains per hour from Cardiff to London should call at Bristol Parkway. 14

16 10. What do you feel the Great Western operator s priorities on the suburban network should be once it is electrified in 2016 e.g. for additional higher capacity, fast commuter services, or improved journey times? No comment. 11. After the electrification to Newbury, expected in 2016 would passengers needs be best served by a diesel service from Bedwyn, Hungerford and Kintbury to Newbury connecting into a fast service to London Paddington, or a diesel stopping service from Bedwyn to Reading connecting to a fast service from Reading to London Paddington, or other options? The former would give faster journey times to London but add a change at Newbury for passengers to Reading. No comment. 12. Respondents are invited to suggest ways in which Community Rail Partnerships could deliver more of the beneficial outcomes for passengers achieved so far. It is good to see the importance of the Severnside and Heart of Wessex Community Rail Partnerships acknowledged in the Consultation document (section 7.22). Funding and support for the Severnside and Heart of Wessex Community Rail Partnerships must continue in the Direct Award. Both partnerships are highly active in promoting local rail travel and enhancing the rail experience through value for money station improvement schemes. We greatly appreciate the funding and resources currently provided by First Great Western for the two Community Rail Partnerships. Tangible results and a great deal of community support for rail services have been achieved at a very modest cost and without a lot of bureaucracy. We believe we could deliver still more through greater delegation and a can do attitude to adopting new ideas from the train operator. We also request that the Direct Award should mandate that the train operator must not seek to impose additional bureaucracy or onerous conditions on the partnerships. The Severnside Community Rail Partnership is submitting its own response to the Consultation on some of the detailed challenges and issues which will face the new franchise and we fully support these. 13. While maintaining end-to-end service frequency, could the needs of passengers be better met by providing the operator with some flexibility over calling patterns on branch lines? Having raised the issue of capacity being the main challenge (section 7.19) this question rather misses the point in asking about flexibility over calling patterns. If rolling stock is needed to meet current and future demand including MetroWest (see response to question 5.) no amount of tinkering with calling patterns is going to resolve this. See also our response to question 16. In addition we believe that a consistent service pattern is important to passengers as different service patterns can cause confusion. 15

17 14. Respondents are asked to suggest what mitigating actions and steps the GW operator should be expected to take to meet the needs of its passengers both during the planned disruption to the GW franchise as a result of planned upgrade works and when force majeure events such as extreme weather, impact the network. Trains should be used instead of replacement buses to minimise disruption and the need to change modes. Services as close to the existing timetable should be provided. During electrification blockades of the Great Western Main Line more trains between London and Bristol should be run via Salisbury to provide an attractive alternative to coach travel. If there is no choice but to use replacement buses then they must be low floor and capable of carrying pushchairs and bikes. The train operator should work closely with bus and coach operators to provide a wide range of travel options. As recommended by Passenger Focus the franchise should include a requirement to fully adopt all elements of the ATOC Approved Code of Practice on passenger information during disruption (The Great Western Franchise 2013 onwards: an initial submission from Passenger Focus, December 2011). We draw attention to the Passenger Focus finding that only 8% of passengers support blockades during major engineering works (Great Western Franchise Key findings from passenger research, 2012). We welcome Network Rail s move towards providing a seven day railway and minimise the need for weekend engineering work and strongly urge the Government to take action on measures to improve the long term resilience to flooding of the railway line between Bristol and Taunton. 15. Where the provision of temporary, alternative service is unavoidable, respondents are invited to suggest what alternative provisions they would prefer the GW operator to put in place. See the response to question Respondents are encouraged to consider what steps the GW operator should be expected to take when reacting to changes in passenger demand, and what targets for capacity should be set. The Direct Award must take account of this growth in planning capacity to The current rolling stock fleet can barely cope and on occasions can t cope with existing passenger numbers and with growth set to continue, on past trends, the need for additional rolling stock is paramount. We expect to see the Direct Award include the cascade of the Class 165/6 Thames Turbos fleet to services in the West of England city region. Section 5.6 s reference to the release of London suburban diesel multiple units for redeployment elsewhere on the network is welcome in this respect. 16

18 Even with the Class 165/6s we remain concerned over the national shortage of diesel multiple units and the rapidly ageing and unsuitable nature of the current fleet. The Direct Award must require the operator to secure new or at least newer rolling stock over and above the cascade of Class 165/6s. The reliability of the current, ageing rolling stock fleet with cancellations and short formed trains is of increasing concern and will undermine passenger confidence and ultimately passenger numbers if not addressed. Targets should be set for: No standing on journey legs exceeding 10 minutes and on all days of operation including Saturdays and Sundays. Maximum number of short formed trains allowable. Passengers in excess of capacity (PIXC) counts. These apply in London and the South East should be extended to cover the whole area of the Great Western Franchise. The train operator should then have the flexibility to work out the best way to meet these targets. 17. Respondents are invited to highlight if there are specific stations or services where they feel particular attention should be paid to reliability or punctuality. These include: Short formed trains trains on the Cardiff to Weston-super-Mare to Taunton and Cardiff to Wesbury routes cut from three to two cars in the peak. Reliability of ageing, life expired rolling stock. Reliability of Gloucester to Westbury trains. Severn Beach line cancellations, short formed trains and services terminated at Clifton Down and Avonmouth. Overcrowding on peak hour trains at Filton Abbey Wood, Yate, Severn Beach Line and services to Weston-super-Mare. Principles of contingency planning should be agreed with the local authorities. 18. Are there any areas of the GW franchise where you feel cost savings could be made? We welcome First Great Western s recent recruitment of 20 additional revenue protection officers and emphasise the need to continue to increase the collection of fares especially on the Severn Beach line. Greater collection of fares increases revenues and reduces the overall cost of running services. Overcrowding and short formed trains currently hinders fare collection and the Direct Award should address both. We would like a Direct Award commitment to implement smart ticketing (see also response to 22.) on Great Western routes to make revenue collection and ticket retailing more robust. 17

19 19. Respondents are encouraged to consider which locations merit consideration for future improvement under these schemes. Locations which require work to improve access, security and safety in the West of England area are: Ashley Hill footbridge - like for like stepped footbridge replacement under electrification. Bedminster provision of CCTV. Freshford - lack of step free access to the Westbury-bound platform. Keynsham ramp under construction but lack of Real Time Information (RTI) and some security issues. Lawrence Hill access issues. Nailsea & Backwell provision of ramps. Narroways Hill footbridge as per Ashley Hill. Oldfield Park provision of CCTV, lacks RTI and some security issues. Parson Street - step free access. Patchway station as per Ashley Hill. Pilning station footbridge (evacuation point for Severn Tunnel train incidents) - as per Ashley Hill. Severn Beach provision of CCTV. Shirehampton - pedestrian access improvements. Stanley Farm Road footbridge - as per Ashley Hill. Stapleton Road access issues. Yate access issues. Network Rail s proposed like for like stepped footbridge replacement under electrification (see above list) is not supported by the local transport authorities. The electrification project must fund the replacement of these bridges with accessible ones. We are extremely disappointed over the reallocation of Access for All funding for the ramps at Nailsea in 2013/14 and its subsequent omission from the list of schemes for funding in 2014/15. We believed this was a shovel ready scheme accompanied by 0.7m worth of adjacent car park works by North Somerset Council. At no point were the local authorities informed that the funding had been reallocated or could not be carried over into 2014/15. We note that the Table 8.2 referred to under section 8.5 is missing. We expect the Direct Award to include a duty on the train operator to address and secure funding for access and Equalities Act issues. The West of England places great value on the work of the British Transport Police in ensuring a safe and secure environment for travel. The existing coverage of the area from British Transport Police offices at Bath Spa, Bristol Temple Meads, Gloucester and Swindon together with the co-ordination of the British Transport Police with Avon & Somerset Police and other agencies has been very successful in reducing crime and anti-social behaviour. We wish to see the prominent role of the 18

20 British Transport Police maintained and funded over the period of the Direct Award. CCTV should be provided on all High Speed Trains. 20. Respondents are encouraged to consider how best to communicate information with passengers across the franchise and how best to keep passengers informed during times of disruption. We agree timely and accurate information is a key priority for passengers and the full use of the National Rail Enquiry Service, real time information and social media should continue. We would also support the proposal for rail information to be added to the Transport Direct website. The use of smart phone accessible train apps and journey planners would be welcome. The use of paper documents and posters should not, however, be neglected. For many passengers paper will remain the main source of information. Whilst the figures relate to bus passengers, Passenger Focus research in the West of England revealed that 43% of people relied on paper timetables (Bus Passenger Survey autumn 2013 results West of England Area, Passenger Focus, January 2014). Similar figures are likely to apply to rail passengers. Real Time Information (RTI) is still needed at Keynsham and Oldfield Park Stations. RTI at unstaffed stations like these complements paper timetables and posters and helps passengers make informed decisions, especially at times of disruption. 21. Rail Executive is considering what the appropriate approach for monitoring and improving service quality in the new franchise would be. Respondents are invited to say what matters most to them (for example, cleanliness of trains and stations, or the helpfulness of staff) in terms of the service quality they receive. From our experience with understanding satisfaction with the Great Bristol Bus Network and the recent Passenger Focus research on what Great Western Passenger want we suggest the following are appropriate for monitoring and improving service quality: Reliability and punctuality. Information provision (especially in the case of delay). Helpfulness of staff. Cleanliness of trains. Value for money. Getting a seat. 22. Please indicate if there are any additional areas that you think Rail Executive should consider consulting on and that have not already been addressed during stakeholder engagement. Length of Direct Award We would like to add our support to the Direct Award for being up to five years in duration. With all the disruption to the network arising from electrification of the 19

21 Great Western Main Line, four tracking of Filton Bank, remodelling of Bristol Temple Meads, Heathrow Western Link and the completion of Reading station and Crossrail and the implementation of MetroWest it is sensible that one operator runs the franchise throughout this period. To change operator midway would only add to the disruption and confusion. For MetroWest the loss of continuity would be a great risk to opening Phase 1 in Nonetheless we are keen to ensure that any further Direct Award is far more than simply an extension of the existing franchise. As our responses to the Consultation document make clear we expect to see issues around rolling stock, capacity, new and enhanced services and our MetroWest proposals included in the Direct Award. Smartcards and multi-modal ticketing Whilst smart technology and integrated ticketing is included under objectives for the franchise in section 4.1 we look for a firm commitment to and timescale for the implementation of smartcards on all Great Western Franchise services. The AvonRider multi-operator bus ticket now covers over 95% of bus services in the West of England city region and the next logical step is to integrate it with the Freedom Travelpass multi-modal ticket. Research by Passenger Focus (Smarter Ticketing: Oxford Smart Zone, September 2013) underlines the importance of smarter ticketing making life easier and cheaper for passengers and the need for the right product. We look for a commitment to carry out the work necessary during the proposed Direct Award franchise. Carnet tickets should be introduced as an alternative to season tickets to cater for passengers who travel frequently and flexibly but not frequent enough to justify the cost of a season ticket. Decentralisation proposals Decentralisation only gets a passing mention under section 6.2. As part of the Government s consultation on the decentralisation of rail powers in 2012, the West of England expressed an interest in Option 3 for one franchise with multiple specifications. This was subject to agreement on levels of funding. Option 3 remains our position and we expect the Direct Award to make firm provision to explore decentralisation proposals for implementation as part of the new franchise that will follow in Interchanges The train operator must work with bus operators and the local authorities to promote better bus rail interchange including MetroBus at main line and local stations. 20

22 Station Improvements As well as improving access and security (see response to question 19.) there is still much that could be done to improve the overall condition of many stations across the West of England including: Expand the network of Real Time Information to all local stations. Proposals and ideas for running stations. CCTV at all stations and car parks. Programme of station improvement schemes to bring local stations up to modern standards. Ticket Offices Passenger Focus has demonstrated the most popular way to buy a ticket remains the ticket office (42%) (Great Western Franchise Key findings from passenger research, 2012). The Direct Award must retain all existing ticket offices and peak hour ticket sellers with no reduction in opening hours or staffing. New technology should not be used as an excuse to reduce the role of the ticket office. Consideration should be given to providing new and extending the role of ticket offices to provide retail and refreshment facilities. Car Parking Car travel is the second most popular way of getting to the station representing 29% of all trips (West of England Rail Survey 2010). The availability and price of car parking is an issue at Bristol Parkway, Bristol Temple Meads and Keynsham. The train operator must work with local authorities on pricing and provision of parking at stations. We are concerned that the cost of parking can exceed the train fare acting as a disincentive to use the train. Cycling Given the national importance attached to cycling it is surprising there are no references to it in the consultation document. This is all the more difficult to understand as the 2012 Great Western Franchise consultation recognised the importance of providing cycle parking at stations. Of equal concern is the lack of reference to increasing space for cycles on trains. Increasing the provision for cycles on trains from the current baseline must be part of the Direct Award specification. It must not, however, be at the cost of providing for disabled passengers. Cycle docks, similar to those introduced on the South West Trains franchise, should be introduced at major stations. In all, 6% of passengers cycle to or from the station (West of England Annual Rail Survey 2010). 21

Investing in our local rail network June 2014

Investing in our local rail network June 2014 Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Joint Local Transport Plan 3 Update

Joint Local Transport Plan 3 Update West of England Partnership Joint Transport Executive Committee 1 July 2011 Agenda item 10 Joint Local Transport Plan 3 Update Purpose 1. To update Members on Joint Local Transport Plan 3 (JLTP3) issues

More information

Henbury rail loop and the sale of the former goods yard

Henbury rail loop and the sale of the former goods yard West of England Partnership Joint Scrutiny Committee 12 December 2008 Agenda item 9 Henbury rail loop and the sale of the former goods yard 1. Purpose of Report To review the recent sale of the former

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

Joint Local Transport Plan 3

Joint Local Transport Plan 3 Joint Local Transport Plan 3 2013 refresh and supplementary documents Introduction 1. Introduction 1.1 It may only be two years old but since our Joint Local Transport Plan (JLTP3) was adopted in 2011

More information

Response from the Heart of the South West Local Enterprise Partnership

Response from the Heart of the South West Local Enterprise Partnership Great Western Rail Franchise Consultation Response from the Heart of the South West Local Enterprise Partnership Introduction The Heart of the South West Local Enterprise Partnership is part of the Peninsula

More information

Railway Upgrade Plan Western 2017/18

Railway Upgrade Plan Western 2017/18 2 Railway Upgrade Plan 2017/18 Glossary CaSL Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. Passenger satisfaction

More information

Member & Public Forum

Member & Public Forum Agenda item 3 West of England Planning, Housing and Communities Board 18 December 2014 Member & Public Forum Notice has been given for the following representations: Statements Items 1: Item 3: David Redgewell

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

3. Coach Supporting Statement

3. Coach Supporting Statement 3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy

More information

Greater Western franchise. December 2006 timetable. Passenger Focus briefing document

Greater Western franchise. December 2006 timetable. Passenger Focus briefing document Greater Western franchise December 2006 timetable Passenger Focus briefing document Summary Passengers and stakeholders across the new Greater Western franchise area have expressed widespread and considerable

More information

Bath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery)

Bath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery) Bath Corridor Works Matt Barnes FGW Regional Development Manager Chris Prior FGW Project Manager (Major Possessions Delivery) Objectives To work collaboratively with Network Rail and key stakeholders such

More information

Chapter 1: Strategic Case

Chapter 1: Strategic Case Chapter 1: Strategic Case Contents Page 1.1 Introduction... 1-2 1.1.1 The MetroWest Programme... 1-2 1.1.2 Structure of this Chapter... 1-4 1.2 Sub-Regional Context... 1-5 1.2.1 Sub-Region Overview...

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Rail Update, Decentralisation and Fares consultations

Rail Update, Decentralisation and Fares consultations Agenda item 12 West of England Joint Transport Executive Committee 19 June 2012 Rail Update, Decentralisation and Fares consultations Purpose 1. To provide Members with a response to the Department for

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir, East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33

More information

Joint Transport Executive Committee

Joint Transport Executive Committee Agenda item 6 Draft minutes of meeting of the Joint Transport Executive Committee Friday 21 January 2011, 10.30am 13.00pm, BAWA, Filton Present Cllr Charles Gerrish Cllr Gary Hopkins Cllr Elfan Ap Rees

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

West of England One Front Door Programme Schemes

West of England One Front Door Programme Schemes West of England One Front Door Programme Schemes Note: Funding Streams include Local Growth Fund (), Economic Development Fund (EDF) and Revolving Infrastructure Fund (RIF) Schemes fully approved Schemes

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

What s happening with Transport in Bristol?

What s happening with Transport in Bristol? What s happening with Transport in Bristol? Bristol Local Transport Plan Update Autumn 2002 getting Bristol to work Bristol s five-year Local Transport Plan was published in July 2000 after extensive public

More information

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act. Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating

More information

Progress Report. Severnside Community Rail Partnership. Published January Working with communities to improve local stations and train services

Progress Report. Severnside Community Rail Partnership. Published January Working with communities to improve local stations and train services Severnside Community Rail Partnership Progress Report Published January 2012 c.i.c Working with communities to improve local stations and train services Working with communities to improve local stations

More information

South of England north-south connectivity

South of England north-south connectivity South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare

More information

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of

More information

ASLEF s Response to the East Anglia Rail Franchise Consultation

ASLEF s Response to the East Anglia Rail Franchise Consultation ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

FRONT COVER TITLE AND PICTURE

FRONT COVER TITLE AND PICTURE FRONT COVER TITLE AND PICTURE 1 Inside Cover Endorsements 2 The Peninsula Rail Task Force has been working with the Department of Transport, Network Rail, train operators, our communities, businesses and

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

Response to Consultation on the re-planning of Network Rail s Investment Programme

Response to Consultation on the re-planning of Network Rail s Investment Programme Response to Consultation on the re-planning of Network Rail s Investment Programme To: hendyconsultation@dft.gsi.gov.uk via email From: Richard Tyndall on behalf of Thames Valley Berkshire Local Enterprise

More information

FirstGroup plc South Western

FirstGroup plc South Western FirstGroup plc South Western Rail franchise award Monday 27 March 2017 Overview Delighted to be selected by the Department for Transport (DfT) to operate the South Western franchise for at least seven

More information

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A 21 Agenda Item 5 CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of the Report PART A 1. To present the

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

West of England. Priority Places Requiring Public Investment

West of England. Priority Places Requiring Public Investment West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

Our new Great Western Franchise. Tarka Rail Association AGM June 2015 Our new Great Western Franchise Tarka Rail Association AGM June 2015 To cover New Franchise - recap Implications for the line Taking forward the strategy 3 Second Great Western Direct Award Overview Brand

More information

Thames Valley Branch Lines Notes of Meeting

Thames Valley Branch Lines Notes of Meeting Thames Valley Branch Lines Notes of Meeting Date: Time: Venue: Attendees: 05 December 2016 10.00am 4 Marlow Road, Maidenhead Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes,

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

Outline Business Case for the Henbury Loop

Outline Business Case for the Henbury Loop Outline Business Case for the Henbury Loop What is the Henbury Loop? The Henbury loop line is a piece of railway line, from Filton North Station through to Chittening Station, (see map) which connects

More information

Strategic Cross Border Planning in the West Midlands

Strategic Cross Border Planning in the West Midlands Strategic Cross Border Planning in the West Midlands RTPI Planners, Birmingham 21/02/2018 Adam Harrison, TfWM Transport Governance and WMCA Renaissance: Why the West Midlands? Transforming our place? Challenges

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

West of England One Front Door Programme Schemes

West of England One Front Door Programme Schemes West of England One Front Door Programme Schemes Note: Funding Streams include Local Growth Fund (), Economic Development Fund (EDF) and Revolving Infrastructure Fund (RIF) Schemes fully approved Schemes

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY Railfuture is pleased to submit this consolidated national response on Cross-Border Road and Rail

More information

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council Welcome Fiona Piercy Oxford City and Oxfordshire County Council Oxford Station & UK Rail strategy David Sexton Department for Transport Oxford station and UK Rail Strategy David Sexton Department for Transport

More information

South Western Railways December 2018 Timetable Consultation

South Western Railways December 2018 Timetable Consultation South Western Railways December 2018 Timetable Consultation Introduction & Summary The three transport Authorities of Bournemouth, Poole & Dorset and the Dorset Local Enterprise Partnership welcome the

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

North Somerset District Council s Revised Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008

North Somerset District Council s Revised Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008 Portishead branch line (MetroWest Phase 1) Revised Statement of Community Consultation September 2017 Portishead branch line (MetroWest Phase 1) North Somerset District Council s Revised Statement of Community

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool Transport Focus 2016 Bus Passenger Survey Briefing 22 March 2017 - Liverpool Presentation of BPS 2016 results David Sidebottom & Robert Pain Bus Passenger Survey 2016 - Scope 42 areas in England: a. 6

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response. Response The case for rail devolution in London Submission to the London Assembly Transport Committee Pedro Abrantes Senior Economist pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1

More information

Train Stations are not just arrival and departure locations

Train Stations are not just arrival and departure locations Train Stations are not just arrival and departure locations The Railway Study Association Mike Goggin 31 October 2017 Contents Introduction to Steer Davies Gleave The Passenger The Neighbour & Non-Traveller

More information

Cornwall Great Western Railway. Luke Farley Assistant Regional Development Manager

Cornwall Great Western Railway. Luke Farley Assistant Regional Development Manager Cornwall 2018 Great Western Railway Luke Farley Assistant Regional Development Manager What s on at GWR? Electrification of the route from London to Bristol and South Wales Introduction of new IETs on

More information

The Rail Network in Wales

The Rail Network in Wales The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This

More information

GTR 2018 timetable proposals

GTR 2018 timetable proposals GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

M6 CORRIDOR. Strategic Infrastructure Prospectus

M6 CORRIDOR. Strategic Infrastructure Prospectus CORRIDOR Strategic Infrastructure Prospectus May 2017 IntRODuCtIOn cumbria has real potential. We have a strong economy with major capability in energy, advanced manufacturing, logistics, agri-food and

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Reducing traffic: a new plan for public transport

Reducing traffic: a new plan for public transport Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail

More information

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1 Ashton Vale Industrial Estate alternative access report on second micro-consultation MetroWest Phase 1 January 2017 THIS REPORT REMAINS IN DRAFT FORM AS THE WORKSTREAM ENDED AND IS MADE AVAILABLE FOR INFORMATION

More information

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine Emerging Strategy Executive Summary November 2016 Midlands Connect Powering the Midlands Engine Foreword Sir John Peace Chairman of Midlands Engine and Midlands Connect As we get closer to the finalisation

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers ASHTON GATE SPORTS & CONVENTION CENTRE A New Home For Bristol Flyers THE VISION I n 2016 Ashton Gate/ Bristol Sport delivered the 45m redevelopment of the home of Bristol City FC and Bristol Bears Rugby.

More information

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS MAY, 2016 HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS Type of document (Final)

More information

Bristol. Filton Enterprise Area. Avonmouth Severnside Enterprise Area. Emersons Green Enterprise Area. Bristol Temple Quarter Enterprise Zone

Bristol. Filton Enterprise Area. Avonmouth Severnside Enterprise Area. Emersons Green Enterprise Area. Bristol Temple Quarter Enterprise Zone Filton Enterprise Area Avonmouth Severnside Enterprise Area Emersons Green Enterprise Area Bristol Bristol Temple Quarter Enterprise Zone Bath City Riverside Enterprise Area Development J21 Enterprise

More information

Member & Public Forum

Member & Public Forum Agenda item 3 West of England Joint Transport Board 12 December 2014 Member & Public Forum Notice has been given for the following representations: Statements ITEM 1: David Redgewell on behalf of South

More information

PLYMOUTH White Papers

PLYMOUTH White Papers WWW.LUKEPOLLARD.ORG APRIL 2018 PLYMOUTH White Papers Issue 1: Ambition April 2018 #PlymouthWhitePapers An initiative by Luke Pollard MP 1 CHALLENGE Thoughtful pieces designed to confront and challenge

More information

insouthglos Economy .co.uk Our economy

insouthglos Economy .co.uk Our economy insouthglos Economy South Gloucestershire plays an important role in the West of England Local Enterprise Partnership which is working to create 95,000 jobs across the West of England by 2030. Our economy

More information

CrossCountry Future Timetable Consultation

CrossCountry Future Timetable Consultation CrossCountry Future Timetable Consultation 1 Contents 1. Executive Summary... 3 2. Introduction... 4 3. Future Timetable Concept... 5 3.1 Introduction... 5 3.2 Passenger requirements... 5 3.3 How our timetable

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

ACTIVITY & ACHIEVEMENT FOR DORSET

ACTIVITY & ACHIEVEMENT FOR DORSET ACTIVITY & ACHIEVEMENT FOR DORSET Dorset Local Enterprise Partnership (LEP) is a business-led private and public sector partnership that aims to promote local economic growth and prosperity. Acting as

More information

Rail passengers priorities for improvement November 2017

Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Foreword We asked more than 12,800 passengers across the country to rank 31 possible improvements

More information

North Somerset District Council s Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008

North Somerset District Council s Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008 June 2015 Portishead branch line (MetroWest Phase 1) North Somerset District Council s Statement of Community Consultation pursuant to Section 47 of the Planning Act 2008 June 2015 1 Introduction North

More information

163,000 sq ft HQ development adjacent to Bristol Parkway station. WORK CONNECTED.

163,000 sq ft HQ development adjacent to Bristol Parkway station. WORK CONNECTED. 163,000 sq ft HQ development adjacent to Bristol Parkway station. WORK CONNECTED. Bristol City Centre 3 1 2 4 M32 J1 5 6 M4 J19 The Approach Bristol Motorway 1 MOD Abbeywood (Procurement HQ) 8 9 Bristol

More information

The future of the TransPennine Express and Northern rail franchises

The future of the TransPennine Express and Northern rail franchises The future of the TransPennine Express and Northern rail franchises 1. Name: Friends of Eccles Station (FRECCLES) 2. Are you responding as an individual or on behalf of an organisation? Organisation 3.

More information

SHAPING REGIONAL INFRASTRUCTURE

SHAPING REGIONAL INFRASTRUCTURE SHAPING REGIONAL INFRASTRUCTURE PRIORITIES FOR GROWTH YORKSHIRE AND THE HUMBER APRIL 2017 1 Introduction As the UK begins its exit from the EU, there will need to be a renewed focus on delivering growth

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Alton Line Users' Association

Alton Line Users' Association Alton Line Users' Association 39 years serving users of Alton, Bentley, Farnham, Aldershot and Ash Vale stations Enquiries: Paul Barber, 41 Cherry Way, Alton, Hants, GU34 2AX; Phone: 01420 84972 E-mail:

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

1. Shrewsbury Aberystwyth Rail Liaison Committee held on Friday, 12 th February 2016.

1. Shrewsbury Aberystwyth Rail Liaison Committee held on Friday, 12 th February 2016. Paper to: The Montgomeryshire Committee on Wednesday, 13 th April 2016. Author: County Councillor J. Michael Williams, Powys County Council s Montgomeryshire Rail Representative. Subject: The Shrewsbury

More information