Weekly Operational Notice

Size: px
Start display at page:

Download "Weekly Operational Notice"

Transcription

1 ISSUE NO. 22 WEEK BEGINNING 29/05/2018 Issued on behalf of Metro Trains and V/Line Weekly Operational Notice

2 THE WEEKLY OPERATIONAL NOTICE DATE OF ISSUE The Weekly Operational Notice is issued every Tuesday. An acknowledgement of its receipt is not necessary. Every person whose duty requires them to have a copy is held responsible for obtaining one of each issue, and for communicating to their staff any instructions applicable to them. If not received at the usual time or in doubt as to your obligations, contact your Supervisor. TEMPORARY REDUCTIONS OF SPEED OF TRAINS (a) (I) Repairs and renewals are being effected at the following places and, until further notice, the speed of trains must, if required, be reduced as shown. Each location will be protected when necessary, either by hand signals, or by special permanent way signals. Train Crews must keep a good look-out at these locations for such signals, which must be exhibited in accordance with these rules. (ii) In the absence of such signals, trains may be run at the ordinary rate of speed. (b) Drivers are reminded that repairs of lines necessitating reductions of speed, of which it has not been able to give notice, may be necessary at other places beside those mentioned in this notice. They must, therefore, be always on the lookout and be prepared to stop or to run at reduced speed whenever and wherever hand signal are exhibited. (c) Work Group Supervisors and others in charge of works at the following places where the requirements render it necessary that the speed of train be reduced, must understand that this information does not in any way relieve them of the responsibility of seeing that Competent hand signallers, furnished with the necessary Hand Signals and Audible Track Warners are stationed at the places named for the purpose of signalling in accordance with these rules, or that the special way Warning and Caution signals are exhibited, as each case may require. Special permanent way warning and Caution signals are exhibited at the locations contained in the following tables. For instructions regarding the use of these signals see Rule 7, Section 15 of the Rules and Operating Procedures (d) Unless otherwise specified, all reductions of speed shown in this notice apply until the issue of the next Weekly Operational Notice. Any temporary reduction of speed which appeared in the last issue of the Weekly Operational Notice, and which is not included in this edition, may be regarded as cancelled. (e) Subject to any temporary modifications in the foregoing or other current instructions, the permanent way reductions of speed and the speed limitations shown in the Working Time-tables, and all additions to and amendments thereof, must be carefully observed. Signallers, Train crews, Work Group Supervisors, Gangers and others must promptly report their Supervisors, any case in which they observe trains running in excess of the speed laid down at or between any of the points where speed is appointed to be reduced. These reports must be forwarded to the Safety Manager of the relevant company. Page 2 of 31 Weekly Operational Notice No. 22/2018

3 METROPOLITAN RAIL NETWORK TEMPORARY SPEED RESTRICTIONS AS FROM INNER AREA WESTERN LINES 16/03/18 STATIONS BETWEEN Werribee (East & West Lines) (Up & Down Trains) KM START KM END Nil TSR SPEED CIRCULAR REASON TS.029/18 Operational requirements. * Circular TS.071/2017 is cancelled and replaced by TS.029/18 a/c speed increased to 60 KPH. TS.087/17 is Cancelled and replaced a/c East Line Speed reduced to 30kph vide TS.071/17 on 15/05/17. Area of speed restriction extended; 28/05/15 speed reduced from 65 to 60 kph. NORTHERN LINES 03/11/17 Watergardens - Diggers Rest (Down Line) TS.109/17 Track geometry 23/05/17 Sunbury (Down Line) TS.054/17 Rough ride through Gap Rd Level crossing. # Broadmeadows (Down Line) TS.045/18 Points & Crossings condition & track clearance through platform. # Circular TS.044/2017 Is Cancelled And Replaced A/C re-instate TS.73/16. Circular TS.073/2016 Is Cancelled And Replaced by TS.044/18 A/C Speed Reduced To 15 Kph. 17/10/16 extended to km. *24/01/18 Roxburgh Park - Broadmeadows (Up Line) TS.011/18 Operational requirements a/c Signalling (28/05/2007) and warning times for Dunkeld St & Smeaton Ave and Critical Rail Temperature requirements. * Circular TS.036/2017 Is Cancelled And Replaced A/C Speed Reduced To 80 Kph. Circular TS.001/2017 Is Cancelled And Replaced a/c Area Of Speed Restriction Reduced And Speed Increased To 100 Kph. Craigieburn #01/11/ TS.108/17 Signalling issue (28/03/2011). (Down line) # Circular TS.077/2017 Is Cancelled And Replaced TS.108/17 a/c Area Of Restriction Reduced And Reverts To Area Of TS.023/2011. TS.023/2011 Cancelled And Replaced by TS.077/17 a/c Area Of Restriction Extended And Speed Reduced. TS.018/11 amended by TS.023/2011 on 15/05/11 Donnybrook - Craigieburn ^28/11/ TS.124/17 Track condition/mud hole. (Up Line) ^ TS.053/2017 is cancelled and replaced by TS.124/17a/c area of restriction reduced. 08/06/17 08/06/17 22/03/18 *10/01/18 Fawkner - Gowrie (Down Line) Fawkner - Gowrie (Up Line) Clifton Hill (Down Line) Thornbury - Croxton (Up Line) TS.064/ TS.065/17 Level crossing warning times Box Forest Rd. Level crossing warning times Box Forest Rd TS.031/18 Poor geometry through crossing, TS.008/18 Normanby Ave & Woolton Ave Level crossing approach. Page 3 of 31 Weekly Operational Notice No. 22/2018

4 * TS.003/18 cancelled and replaced by TS.008/18 a/c provision of reminder C Board at Up end of Thornbury Station. TS.121/17 cancelled & replaced by TS.003/18, reverting to TS.051/2015. TS.051/2015 cancelled and replaced by TS.111/17 a/c condition of sleepers in Thornbury pit. TS.111/17 cancelled and replaced by TS.112/17 reverting to TS.051/15. Circular TS.112/2017 cancelled and replaced by TS.121/17 a/c RFD fault. 04/08/15 Ruthven Reservoir (Up trains) TS.050/15 High St Level Crossing Approach. 03/05/18 Eaglemont - Heidelberg (Down Line) TS.040/18 Sighting distance of Signal HDB142. Montmorency - Eltham 12/04/18 Up & Down trains EASTERN LINES Ringwood Ringwood East 27/08/08 (Down Line) Croydon - Ringwood East 28/11/16 (Up Line) Kooyong Tooronga 23/01/14 (Down line) SOUTHERN LINES Yarraman Dandenong - General 24/09/15 Motors (Down line) General Motors - Dandenong (Up Line) 29/03/18 Cranbourne Line (Up Trains) TS.037/18 Structural and track condition of trestle bridge TS.082/08 Level crossing approach TS.101/16 Dublin Road Level Crossing warning time TS.008/14 Toorak Rd. Level crossing approach TS.058/15 Signal Overlap issues TS.032/18 Signal Overlap issues. * TS.028/2018 is cancelled and replaced by TS.032/18 a/c restriction reverting to original area per TS.059/2015. Circular TS.059/2015 is cancelled and replaced by TS.028/18 a/c area of speed restriction extended a/c track condition. Narre Warren 24/05/ TS.047/18 Poor track geometry through station pit. (Down Line) 15/07/17 06/09/11 Cardinia Road - Officer (Up Line) Cardinia Road Pakenham (Down line) TS.086/17 01/07/09 Pakenham (Up line) # TS.069/16 #03/10/16 speed reduced to 85 kph. Pakenham ^20/04/18 (North line, Down trains) ^ 20/04/18 Pakenham (South Line Down trains) Pedestrian crossing works and line of sight TS.059/11 Level crossing Approach, McGregors Road TS.038/ TS.038/18 Level crossing Approach, McGregors Road; Chief Engineer s directive. Level crossing approach warning times for Racecourse Rd. Chief Engineer s directive. Poor track geometry, line and top faults and Level crossing approach warning times for Racecourse Rd. Chief Engineer s directive. ^ Circular TS.081/2016 is cancelled and replaced by TS.038/18 a/c South line area extended and speed reduced. 04/11/16 speed increased to 110 kph. Pakenham 03/10/16 (North & South lines, Up trains) #04/11/16 speed increased to 110 kph. Dandenong Lynbrook 10/07/15 Up trains Down trains *Replaces TS.046/15 (07/07/15). Mordialloc No. 1A track 10/09/13 (Down Trains) TS.082/16# *TS.047/15 Level crossing approach warning times Racecourse Rd; Chief Engineer s directive. Level crossing warning times & Greens Road PCR condition TS.085/13 Track Condition. Page 4 of 31 Weekly Operational Notice No. 22/2018

5 13/01/17 *26/05/18 26/03/15 *29/06/17 Seaford - Carrum (Up Line) Kananook - Carrum (Up Line) TS.007/17 SPAD Mitigation TS.046/18 * Circular TS.007/17 is cancelled and replaced by TS.046/18 a/c Track Slew at Seaford. Frankston; Up & Down lines and Nos. 1, 2, 3 & 4 Rds. Baxter - Somerville (Up & Down trains) SPAD Mitigation and track slew at Seaford TS.026/15 Pedestrian crossing Approach timing TS.075/17 Track Circuit issues Eramosa Rd; precautionary directive from Chief Engineer. * Area extended 15/08/16. Area extended 15/09/16; TS.064/2016 is cancelled and replaced by TS.074/17 and TS.075/17 a/c area of restriction divided. Track condition and Level crossing 13/03/15 *Tyabb Hastings TS.022/15 warning time. * TS.031/08 amended by TS.036 on 25/04/08; amended by TS.001/11 on 28/01/11; amended by TS.007/11 on 23/02/11; amended by TS.022/2015 on 13/03/15. Page 5 of 31 Weekly Operational Notice No. 22/2018

6 INFRASTRUCTURE BOOKED OUT OF SERVICE LOCATION CIRCULAR EQUIPMENT CAUSE Newport ( E Siding) Points Condition of Siding Westall Yard (from 07/12/09) SW.342/09 No. 2 track Track & Civil works Dandenong - No. 5 track & Siding A Track condition Dandenong Through siding SW.045/07 Down end points No. 677 Condition of Points (Rust) Lyndhurst V/Line TON.522/10 Crosslocks Nos. 678 & 679 Track condition Brighton Beach (25/07/10) SW.170/10 No. 1 track Newport Workshops Garden Platform Track not returned to service after UBU Project works. SW.053/11 No. 2 Rd Clearance requirements Flinders Street (17/06/13) SW.279/13 ^No. 1 West Track Track condition ^ A water hydrant line installed a/c urgent works is foul of the Booked Out portion of line and MUST not be booked back into service without the permission of the Chief Engineer and the Track Delivery Manager. No impact to operational lines. Pakenham (25/11/13) - Works Siding (Down end of No. 3 Rd) Condition of rail (rust) Parcels Dock Siding and points Nos. 38, 40U & 40D, 41, 43 & 48, Flinders Street Spencer Street SW.301/2014 SW.301/2014 Signalling Strategy/Junction Points Nos. 227 & 471 (in lead Rationalisation Project between City Circle & Burnley Loop Viaducts and tracks Nos. 6 9A inclusive). Points No. 14U & 14D. (Between No. 8 South Track and the City Circle Loop Viaduct line). Signalling Strategy/Junction Rationalisation Project Dandenong SW.134/2015 Sidings Nos. 4, 5 & 9 Track condition Ashburton (26/11/14) SW.153/2015 Siding Sleeper condition Werribee SW.248/2015 Points Nos. 9 & Hour Rule Condition of Points (Rust) Oakleigh (11/03/16) SW.080/2016 Points *27, 29 & *31 (sidings B & C ). Chief Engineer Directive Oakleigh (13/04/16) SW.103/2016 Sid s B & C Track condition * Any operation of Points Nos. 27 & 31 will require permission of Chief Engineer and Track Maintenance, Footscray TBA Emergency Crossover Condition of Points Kimberley Clark Siding (Dandenong) TBA Siding TBA Caulfield Normal: Points nos. 608U, 608D, SW.385/17 610D, 613U, 613D, 623, 633. Reverse: Points nos. 652 & 662. Enquiries concerning the above should be directed to Caulfield to Dandenong Level Crossing Removal Project Works Page 6 of 31 Weekly Operational Notice No. 22/2018

7 SAFEWORKING NOTICES NEWPORT WORKSHOPS NO. 2 GARDEN PLATFORM TRACK RESTORED TO SERVICE On Tuesday 23rd May 2018, No. 2 Garden Platform Track at Newport Workshops will be returned to service. The lockable point clip on the CCW type hand points between No. 2 and No. 3 Garden platform tracks will be removed and the points will be unspiked. Safeworking Circular SW.053/2011 is cancelled. Metro SW.135/2018 NORTH MELBOURNE POINT MACHINE RENEWAL WORKS Between 21:00 hours on Wednesday 6th June 2018 and 04:00 hours Thursday 7th June 2018, points No.427 will be provided with M3A type point machine. The Following Will Be Affected During These Works: Points: 427 Signals: NME526, NME527, NME528 & NME567. The above works will be conducted under cover of an Absolute Occupation. Metro SW.139/2018 METROL PARLIAMENT NORTHERN UNDERGROUND LOOP LINE AUTOMATIC SIGNAL NO. 464 CONVERTED TO LED Between 21:00 hours Monday 4th June 2018 and 04:00 hours on Tuesday 5th June 2018, Automatic Signal No. 464 will be upgraded to LED Tri-Colour type. The following will be affected during these works; Signals: 464. The above works will be conducted under cover of an Absolute Occupation. Metro SW.157/2018 Page 7 of 31 Weekly Operational Notice No. 22/2018

8 HEIDELBERG MACLEOD COMMISSIONING OF ST. JAMES ROAD PEDESTRIAN CROSSING WESTRACE DATA UPDATE DECOMMISSIONING AND REMOVAL OF KEY SWITCHES AT MACLEOD Between 21:00 hours on Friday 25th May 2018 and 04:00 hours on Monday 28th May 2018 the following alterations will be implemented: Commissioning of the St. James Road Pedestrian Crossing, with the Express/Stopping selection interlocked with Automatic signal S468 on the Up approach. Westrace Data update to fix the route locking issues associated with signal HDB140. Decommissioning and removal of the 11P keyswitch and associated point handle from the Macleod Panel. Decommissioning and removal of the 5P keyswitch from signal post MCD111. The above works will be conducted under cover of an Absolute Occupation. Amend signal diagram No. 25/18 titled Dennis to Macleod. An updated signal diagram will be issued at a later date. NOTE: A Network Safety Representative will NOT be in attendance to sign the Certificate ofsignalling. Metro SW.131/2018 CAULFIELD - OAKLEIGH AUTHORITY TO PASS HOME SIGNALS (NOT YET IN SERVICE) DEFINED AREA Effective from 21:00 hours Tuesday 29/05/2018, in conjunction with Absolute Occupations O.697/2018 & O.698/2018, Home Signals within the area as defined hereunder, are to be considered not yet in service and do not require authority for the passage of rail traffic: The Down Line between Signal Posts: CFD712 & OAK606 (inclusive). The Up Line between Signal Posts: OAK719 & CFD733 (inclusive). The arrangements outlined herein will remain in place only until the commencement of Signal Commissioning activities. The Operational Safeworking Supervisor will provide advice to the T.F.P.C. that the provisions of this circular will no longer be in effect and that authority must now be granted prior to the passage of rail traffic. PROTECTION OF POINTS At Caulfield, the Track Force Protection Coordinator (T.F.P.C.) must ensure that a Permit to Foul Limit Board is affixed to the rail head, on both the Up & Down Dandenong Line Leads, on the Down Side of Points No. 612, at a point clear of the Fouling Point. Page 8 of 31 Weekly Operational Notice No. 22/2018

9 WORKSITE RAIL TRAFFIC WITHIN DEFINED AREA Rail traffic must not pass over points inside the defined area until a suitably qualified project representative has ensured that the track is fit for traffic, the points blades are in the correct position and secured for the intended movement. Prior to the commencement of any worksite rail traffic movement, points must be secured by a point securing device and padlock. Should the movement require the points to be altered, the Track Force Protection Coordinator must request a suitably qualified project representative to operate the points into the required position. The TFPC must re-apply the point securing device and padlock prior to the movement. When the relevant conditions herein have been met, the person in charge of the movement may permit the passage of rail traffic past the relevant Home Signals. WORKSITE RAIL TRAFFIC OUTSIDE DEFINED AREA Prior to commencing any worksite rail traffic movements outside of the defined area, the T.F.P.C. must obtain permission from the relevant Signaller (either Caulfield or Westall Panel) to undertake the movement. The Permit to Foul Limit Boards on the leads to the Up & Down Dandenong Lines at Caulfield, as required herein, may only be removed by the T.F.P.C. after authority has been granted by the Signaller Caulfield to commence the rail traffic movement. Metro SW.134/2018 OAKLEIGH SIGNAL CONTROL PANEL ABOLISHED Commencing 21:00 hours on Tuesday 29th May 2018 until 06:00 hours Saturday 16th June 2018, construction activities will be undertaken between Caulfield and Huntingdale as part of the CTD Project (Area 1) works. These works will be conducted under the cover of Absolute Occupation (O.697/2018 & O.698/2018). After the Absolute Occupations have been granted by the Signaller at Oakleigh, the interlocking must be disarranged by the MTM Signal Maintenance Representative in accordance with the provisions of Section 5 Rule 10 of the 1994 Book of Rules and Operating Procedures. At this time the Signal Control Panel and all associated signalling infrastructure at Oakleigh will be abolished. The details of the new signalling arrangements at Oakleigh will be described in a SW Circular which will be issued prior to the completion of the Absolute Occupation. Metro SW.162/2018 HAMPTON REPLACEMENT OF PEDESTRIAN & EMERGENCY GATES HAMPSTON STREET LEVEL CROSSING Civil works have been undertaken to replace the existing pedestrian and emergency gates exit gates with magnetic pedestrian gates and electromagnetically latched emergency exit gates. The Down side emergency exit gates will be commissioned into service on Friday 25th May The Up side emergency exit gates & relocated Flashing Light No. 3 will be commissioned into service on Friday 8th May Metro SW.136/2018 Page 9 of 31 Weekly Operational Notice No. 22/2018

10 Issued: 25 May 2018 Number L&D-BUL Metro Academy Training Calendar & Extensions Requests The purpose of this bulletin is to alert Suppliers and Worksite Protection personnel of the process for extension requests over the upcoming recertification window. As Metro is the only provider approved to deliver recertification training the following must be adhered to. What do I do if my Lookout, Handsignaller, TFPC or TVO competency is about to expire OR has expired? 1. You need to log in to the Platform and book a course (If you are new to the Platform see below) Once you ve booked in you will be sent an confirming your attendance. 2. Your employer will need to send the following to competencies@metrotrains.com.au no later than 10-days before your competence is due to expire: a. The name, RIW Number, role competency and expiry date for each worker, b. A statutory declaration confirming how many occasions over the last 3-months each worker has been practicing their role on the MTM network, and c. The confirmation from the Platform that each worker has been booked into the course. Note. The request and statutory declaration can be for multiple workers. 3. On review, if your extension is successful MTM will upload an extension letter into your RIW profile with the date set to 10 days past course completion. Note. Extensions will be granted at the highest level of competency that you are required to extend, given your evidence supports the extension level requested. This will automatically extend the subordinate levels. MTM competency extension will not be accepted for other rail operators. 4. Within 48hours of course completion, you will be able to access your certificate of completion within the Platform. This will need to be uploaded into your RIW for verification. Will there be any more training sessions? You can find the sessions within the Platform and at the end of this bulletin. Further sessions will be uploaded into the Platform over the coming weeks and learners/employer administrators should continue to access the Platform to monitor the available dates. How do I log in to the Platform? If you are a first time user to The Platform, please click here to register. If you have used The Platform before, please click here to log on. Page 1 of 1 Page 10 of 31 Weekly Operational Notice No. 22/2018

11 Instructions on how to use the Platform For Learners For Administrators Please direct enquiries to: Rail Safety Worker Competency Website Page 2 of 2 Page 11 of 31 Weekly Operational Notice No. 22/2018

12 Engcon Sleeper Grabber Failure Background On Sunday 13 May 2018 a worker was injured when a Sleeper Grabber attachment, commonly known as an Octopus, disengaged from the Engcon unit. The worker suffered serious personal injuries and is recovering. The incident is still under ICAM investigation, however the following two causal factors have been identified: 1. The incompatibility of the excavator mounting pins with the Engcon Quick Hitch Unit. 2. Plant and people exclusion zones. Please see attached contractor s Safety Alert for more information. L4 SQE FOR 068(2) Immediate Actions 1. For all plant currently in use on site, ensure all plant attachments are compatible with Engcon Quick Hitch Unit size, and verify with manufacture or suppliers. 2. Managers in charge of work are to advise contractors to undertake assessment of compatibility prior to future use. 3. For all works supervisors to reinforce the adherence to plant and people exclusion zones, and that no worker should be in the proximity of a suspended load. Verification for LXRP Projects: Document method of communication that was used to convey the above actions, and provide to your assigned MTM SER Coordinators. Next Steps When the investigation is concluded, any further relevant recommendations will be distributed. Authorised By Jonathan Reed Rail Safety and OHS Manager Level Crossing Removal Program Projects Division John Salter Program SERQ Manager Level Crossing Removal Program Projects Division Alert Number PRJ ALRT Issue Date 23/05/2018 Expiry Date 23/07/2018 Page 12 of 31 Weekly Operational Notice No. 22/2018

13 L4-SQE-FOR-068(2) Alert Number INF-ALRT Issue Date 25/05/2018 Expiry Date 25/07/2018 Page 13 of 31 Weekly Operational Notice No. 22/2018

14 VICTORIAN COUNTRY RAIL NETWORK TEMPORARY SPEED RESTRICTIONS AS FROM STATIONS BETWEEN SOUTH WESTERN LINES Geelong - Warrnambool Line 16/01/2018 3/01/ /05/ /05/ /04/ /04/ /04/2018 9/08/2017 9/08/2017 South Geelong - Marshal South Geelong - Waurm Ponds South Geelong - Marshall Marshall to Waurn Ponds Waurn Ponds - Winchelsea Winchelsea - Birregurra (Down Only) Winchelsea - Birregurra Geelong - Warrnambool Marshall - Warrnambool KM START KM END ESTIMATED TSR SPEED CIRCULAR REASON REMOVAL DATE TS0013/ TS0003/ TS0211/ TS0138/18 Operational restriction as SPAD mitigation for DOWN trains approaching Marshall station. Operational restriction for UP trains approaching Marshal town Rd Level Crossing Operational Restriction as SPAD mitigation for UP train approaching MSL24 - MSL26 Temporary joints in CWR as per NIST-2650 section 17.5 Temporary Mechanical Joints 30/12/ /12/ /12/ /05/ TS0089/18 Track condition 30/06/ TS0086/ TS0088/18 Increased truck traffic with major works in this area. Increased truck traffic with major works in this area. Up direction 30/12/ /12/ TS0287/17 Overhead Bridge Works 1/12/ TS0288/17 Overhead Bridge Works 1/12/ /05/2018 Birregurra - Colac TS0126/18 Track condition - Rough ride reports. 30/06/ /05/2018 Colac - Camperdown TS0127/18 Track condition - Rough ride reports. 30/06/ /01/2017 Colac - Camperdown Inadequate sighting distance at Occo TS0015/17 30/06/2017 crossing. Down direction 18/05/2018 Camperdown - Terang TS0130/18 Track condition. Rough ride reports. 30/06/2018 Embankment failure Up side of bridge 12/01/2017 Camperdown - Terang TS0020/17 at Also inadequate sighting 30/06/2017 distance at Occo crossing Up and Down direction 18/05/2018 Terang - Warrnambool TS0128/18 Track condition - Rough ride report. 30/06/ /05/2018 Terang - Sherwood Park TS0129/18 Track condition 30/06/2018 6/03/2018 Terang - Warrnambool TS0038/18 Track Condition 30/04/2018 Werribee - Geelong Line 19/05/2016 North Geelong - Geelong (East Track) TS0074/16 Track condition at 133 points Geelong 04/07/2016 Page 14 of 31 Weekly Operational Notice No. 22/2018

15 WESTERN LINES (STANDARD GAUGE) Dimboola - Rainbow Line 17/04/2018 Tarranyurk - Ellan TS0087/18 IEV100 Faults - Top - Twist - Gauge 30/04/ /11/2016 Jeparit - Ellam TS0215/16 Excess rail, poor sleeper condition low ballast profile causing line defects. 30/06/2017 Maryborough - Ararat Line 11/05/2018 Avoca - Ararat TS0122/18 Restriction for the level crossing approach at Burns Street Ararat for up train movements only 31/12/2019 Murtoa - Hopetoun Line Warracknabeal - 05/05/2010 Beulah 09/10/2016 Murtoa - Hopetoun TS0078/10 Line of sight at Level crossings 31/12/ TS0147/16 20/10/2017 Warracknabeal - Hopetoun TS0401/17 24/04/2014 Beulah - Hopetoun INTERSTATE CORRIDOR MELBOURNE - WOLSELEY LINE Refer to ARTC WebRams Access WESTERN LINE (BROAD GAUGE) Ballarat - Ararat Line 10/05/2018 Wendouree - Beaufort TS0115/18 Level crossing track circuit altered (shortened)> 18/07/16 Track geometry fault also. AK Car - Geometry Faults Recorded & Mud Holes 31/12/ /11/ TS0170/14 Line of sight at Level crossings 31/12/ /05/2018 Beaufort - Ararat TS0116/18 Beaufort - 11/05/2018 Ararat Sunshine - Ballarat Line 18/05/2018 Caroline Springs - Bacchus Marsh NORTH WESTERN LINES Bendigo - Swan Hill Line 01/04/ /02/ /05/ /05/ /05/ /05/ /05/2017 Nth Bendigo Junction - Eaglehawk Eaglehawk - Raywood Eaglehawk - Tandarra Bendigo - Swan Hill Bendigo - Swan Hill Bendigo - Swan Hill Bendigo - Swan Hill 200mm Track-lift, TSR allow for consolidation of track Bridges at & replaced with box culverts. 24/05/ /05/ TS0033/18 Level Crossing Renewals 08/06/ TS0125/ TS0042/ TS0020/ TS0171/ TS0162/ TS0170/ TS0163/ TS0164/17 TSR imposed due to cattle entering the rail reserve on a regular basis. Poor fencing in the area on down side between KP and Level Crossing circuitry requirements for Thunder St and Weeroona Ave Level Crossing approach times. Hopkins St Level crossing, short stacking. Line of sight for down trains approaching Fitzpatrick Rd Level Crossing. Sight distance restricted by angles Sight distrance restricted by angles - Greenhills Road Sight distance restricted by angles Sight distance restricted by angles 31/12/ /06/ /12/ /12/ /05/ /05/ /05/ /05/2018 Page 15 of 31 Weekly Operational Notice No. 22/2018

16 22/02/2017 Dingee - Pyramid Hill TS0070/17 Rough riding on curve at the transition of curve. Poor riding at 80kph over turnout. 24/03/ /05/2017 Bendigo - Swan Hill TS0166/17 Sight distance restricted by angles - Mologa Durham Ox Rd. 02/05/ /05/2017 Bendigo - Swan Hill TS0167/17 Sight distance restricted by angles - Mologa Durham Ox Road. 02/05/ /05/2017 Bendigo - Swan Hill TS0168/17 Sight distance restricted by angles - Prices, O'Tools, Griffin & Abbattoirs Rd 02/05/ /05/2017 Bendigo - Swan Hill TS0169/17 Sight distance restricted by angles - Prices, O'Tools, Griffin & Abbattoirs Road 02/05/ /05/2017 Pyramid - Kerang TS0185/17 Sighting distance due to Worsley Rd - Down Trains only 31/05/ /05/2017 Pyramid - Kerang TS0186/17 Sighting distance due to Worsley Rd - UP trains only. 31/05/ /05/2017 Pyramid - Kerang TS0187/17 Sighting distance due to McPhail Rd. Down trains only. 31/05/ /05/2017 Pyramid - Kerang TS0188/17 Sighting distance due to McPhail Rd. Up trains only. 31/05/ /05/2017 Kerang - Mystic Park TS0200/17 Sighting distance restriction due to White Lane - Down trains only. 31/05/ /05/2017 Kerang - Mystic Park TS0190/17 Sighting distance due to White lane. UP trains ONLY. 31/05/ /05/2017 Kerang - Lake Boga TS0183/17 Line of sight issues at Lake Road Crossing. This TSR applies to DOWN trains only. 31/05/ /05/2017 Kerang - Mystic Park TS0191/17 Sighting distance restricted by Lake Rd & Gorton Dr. Up Trains only. 31/05/ /05/2017 Mystic Park - Lake Boga TS0194/17 Sighting distance restrictions on Bailey Rd, Jeffer Road & Tresco Rd. Down trains ONLY. 31/05/ /05/2017 Kerang - Lake Boga TS0184/17 Line of sight issues at Baily Rd, Jeffer Rd &Tresco Rd Crossing - Up Trains 31/05/ /05/2017 Lake Boga - Swan Hill TS0195/17 Sighting distance restriction due to Farm Rd, Maher Rd & Aerodrome Extension Rd - DOWN Trains ONLY. 31/05/ /05/2017 Lake Boga - Swan Hill TS0197/17 Sighting distance restriction due to Aerodrome Rd. UP trains ONLY. 31/05/2018 Boort - Manangatang Line 08/02/2018 Barraport - Gredgwin TS0026/18 Rough ride - Geometry faults. Line, Cant and Top 31/03/2018 Dunolly - Inglewood Line 19/04/2016 Arnold Block Point - Inglewood TS0266/16 Up end points Inglewood (Eaglehawk) in poor condition. Update: 07/12/16: Non conforming sighting distance at Sullivan St and Calder Highway 30/05/2017 Page 16 of 31 Weekly Operational Notice No. 22/2018

17 Dunolly - Mildura Line 06/05/2018 Bealiba - Emu TS0113/18 22/03/2018 Bealiba - Emu (Up and Down Tracks) TS0057/18 06/05/2018 Dunolly - Donald TS0112/18 Sleepers lifted above height of bridge gravel beams, leaving insufficent ballast to control lateral stability Regauging of trailable points has changed the design of them to out of stanadard Short warning times for level crossings in St Arnaud 12/06/ /06/ /06/ /04/2018 St Arnaud - Ouyen TS0108/18 Rough ride reported by train crew. 30/05/ /04/2018 Cope Cope - Donald TS0067/18 IEV100 geomerty faults 14/06/ /05/2018 Watchem Loop TS0140/18 07/05/ /04/2018 Morton Plains - Birchip Morton Plains - Birchip TS0114/18 Points not yet commissioned - Degraded state. Geometry top 30mm in occo crossing on a curve 14/06/ /06/ TS0066/18 IEV100 geometry faults 14/06/ /05/2018 Birchip Loop TS0141/18 Points not yet commissioned. Degraded state. 14/06/2018 3/05/2018 Birchip - Ouyen TS0111/18 Geometry faults through turnout. 3/06/ /04/2018 Tempy - Nunga TS0068/18 IEV100 Faults 16/04/ /04/2018 Nunga - Kiamai TS0063/18 20/05/2018 Nunga - Kiamai TS0136/18 24/05/2018 Ouyen to Yelta TS0139/18 Echuca - Deniliquin Line 07/03/2018 Echuca - Barmes TS0029/18 Patrolman faults and non tensed track Patrolman faults and non tensed track Points not yet commissioned, degraded state Works being completed during the summer period which has the potential to impact the lateral stability of the track. 14/06/ /06/ /05/ /03/2018 7/07/2017 Echuca - Deniliqin TS0248/17 Track geometry faults 31/07/2017 Gheringhap - Ballarat Line 02/05/2014 5/01/ /05/ /05/ /07/ /05/2018 Gheringhap - Meredith Lethbridge - Meredith Gheringhap - Meredith Gheringhap - Ballarat Meredith - Lal Lal Gheringhap - Ballarat TS0200/ TS0004/ TS0201/ TS0134/ TS0139/ TS0135/18 Inadequate sighting distance at Lower Plains and Quarry Roads Level crossing in a DOWN DIRECTION. Non conforming line of sight at Quarry Lane and Lower Plains Rd Inadequate sighting distance at Lower Plains and Quarry Roads Level crossing in an UP DIRECTION. Top, Twist and Line faults over section resulting in ride quality issues Track conditions and inadequate sighting distance at Doyles Road Level crossing in both directions. Top and Line faults through turnout 31/12/ /12/ /12/2016 1/06/ /12/ /06/2019 Page 17 of 31 Weekly Operational Notice No. 22/2018

18 Inglewood - Wycheproof Line 22/09/2017 Korong Vale - Boort Line 3/08/2017 Charlton - Teddywaddy Korong Vale - Manangatang Maryborough - Dunolly Line 4/12/ /09/ /09/2016 1/04/2018 Ouyen - Panitya Line Maryborough - Dunolly Maryborough - Dunolly Maryborough - Dunolly Dunolly Station Limits TS0341/ TS0271/17 Level crossing design deficiency. Engineering currently awaiting design modifications + additional IEV100 faults Poor sleeper condition & termite damage 24/05/ /08/ TS0439/17 Bridge Works 22/12/ TS0134/ TS0133/ TS0047/18 14/06/2011 Ouyen - Walpeup TS0062/11 14/06/2011 Ouyen - Panitya TS0063/11 13/12/2016 Underbool - Cowangie Wycheproof - Sea Lake Line 22/09/2017 Berriwillock - Sea Lake Inadequate sighting distance at Timor Road Level Crossing Down direction. Inadequate sighting distance at Timor Road Level Crossing for Up direction. Murray Basin rail project construction works Level crossing line of sight restrictions. Level crossing line of sight restrictions. 05/09/ /09/2018 9/03/ /12/ /12/ TS0100/16 Defect rail 30/06/ TS0342/17 Buried rail inspection failures + IEV100 faults 23/12/2017 NORTHERN LINES Sydenham - Bendigo Line 4/05/2018 Sunbury - Track geometry faults & rail Gisborne TS0110/18 profile fault. (East Track) 30/06/2018 Elphinstone - 01/06/2017 Castlemaine (West Track) TS0225/17 Broken Rail 05/06/2017 NORTH EAST BROAD GAUGE LINE Donnybrook - Seymour Line Kilmore East - 17/11/2017 Wallan (Up Track) TS0421/17 Rough Ride at kp up line 17/12/2017 Donnybrook - 11/12/2017 Wallan (Down Track) Seymour - Shepparton Line 01/05/2017 Seymour - Shepparton 01/05/2017 Seymour - Shepparton 01/05/2017 Seymour - Shepparton 01/05/2017 Seymour - Shepparton 01/05/2017 Seymour - Shepparton TS0449/ TS0158/ TS0159/ TS0153/ TS0160/ TS0157/17 Rough Track, some works have been completed Sight distance restricted by angles Sight distance restricted by angles Sighting distance restricted by angles Sight distance restricted by angles Sight distance restricted by angles 31/03/ /05/ /05/ /05/ /05/ /05/2018 Page 18 of 31 Weekly Operational Notice No. 22/2018

19 08/05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/2017 Seymour - Shepparton Seymour - Shepparton Seymour to Shepparton Seymour to Shepparton Toolamba - Mooroopna Toolamba - Mooroopna Seymour - Shepparton Seymour - Shepparton Shepparton - Tocumwal Line 06/03/ /06/2017 Shepparton - Tocumwall Shepparton - Tocumwal INTERSTATE CORRIDOR MELBOURNE - ALBURY LINE Refer to ARTC WebRams Access EASTERN LINE Pakenham - Sale Line 09/11/2016 Morwell - Maryvale TS0180/ TS0161/ TS0146/ TS0147/ TS0142/ TS0151/ TS0154/ TS0156/17 Sighting distance restricted by angles Sight distance restricted by angles Aracadia Road LX - Sight distance restricted by angles Arcadia Road LX - Sight distance restricted by angles Destress and welding works to be completed. Level Crossing sighting issues for DOWN trains only. (Sighting Distance reviewed) Sighting distance restricted by angles Sight distance restricted by angles 01/01/ /05/ /05/ /05/ /05/ /03/ /05/ /05/ TS0032/18 Tie Renewal 28/04/ TS0236/17 Joint conditions on corridor 29/09/ TS0210/16 Cross levels - Tops of Skeleton Bridge and through both turnouts of GIFT and APM, excessive wear on turnouts. 30/05/2017 Sale - Bairnsdale Line 12/05/2018 Sale - Stratford TS0118/18 Line of sight issues due to vegetation and short visual warning for heavy vehicles 12/05/2019 crossing occupation crossing. 21/01/2016 Sale - Bairnsdale TS0014/16 Track condition on bridge. 31/12/ /12/2016 Stratford - Bairnsdale TS0273/16 27/04/2017 Sale - Bairnsdale TS0219/17 27/04/2017 Sale - Bairnsdale TS0218/17 12/05/ /05/2017 Stratford - Bairnsdale Sale to Bairnsdale TS0119/ TS0144/17 Line of sight issues at Occupation Crossing for Down trains only. Sight distance restricted by angles Sight Distance restricted by angles Line of sight issues for the up direction only, this is due to BIO Site vegetation reserve on the curve approach to occupation crossing. Sight distance restricted by angles 15/12/ /04/ /04/ /05/ /04/2018 Page 19 of 31 Weekly Operational Notice No. 22/2018

20 Speed Restrictions and Track Warnings - Segment: Somerton Loop - Austrak - Seymour Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Craigieburn and Donnybrook South 164/ km to km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Donnybrook South and Donnybrook Loop 165/ km to 33.9km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Beveridge and Wallan Loop 31/ km to 44.85km 21/02/ /80 Yes Track geometry - Condition Geometry defects. Estimated removal date: 31/12/2018 Wallan Loop and Wandong 1/ km to 55.14km 2/01/ /80 Yes Track - Condition (Other) Geometry defects within track-rough ride report. Estimated removal date: 31/03/2019 Segment: Seymour Loop - Benalla Junction No At or Between Kms Date Pass/Oth Dir Boards Reason Longwood Loop and Balmattum 122/ km to km 24/04/ /80 Yes Track geometry - Condition Geometry defects within the bridge. Estimated removal date: 24/07/2018 Longwood Loop and Balmattum 19/ km to km 31/01/ /60 Yes Track - Condition (Other) Condition of transom timbers on Faithful Street bridge. Estimated removal date 31/03/2019 Euroa and Violet Town Loop 135/ km to km 2/05/ /80 Yes Track - Condition (Other) Multiple issues including top, line, twist and pumping. Estimated removal date: 31/12/2018. Violet Town Loop and Benalla Platform 81/ km to km 27/03/ /80 Yes Track - Condition (Other) Condition of turnout. Estimated removal date: 31/12/2018 Page 20 of 31 Weekly Operational Notice No. 22/2018

21 Speed Restrictions and Track Warnings - Segment: Somerton Loop - Austrak - Seymour Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Craigieburn and Donnybrook South 164/ km to km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Donnybrook South and Donnybrook Loop 165/ km to 33.9km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Beveridge and Wallan Loop 31/ km to 44.85km 21/02/ /80 Yes Track geometry - Condition Geometry defects. Estimated removal date: 31/12/2018 Wallan Loop and Wandong 1/ km to 55.14km 2/01/ /80 Yes Track - Condition (Other) Geometry defects within track-rough ride report. Estimated removal date: 31/03/2019 Segment: Seymour Loop - Benalla Junction No At or Between Kms Date Pass/Oth Dir Boards Reason Longwood Loop and Balmattum 122/ km to km 24/04/ /80 Yes Track geometry - Condition Geometry defects within the bridge. Estimated removal date: 24/07/2018 Longwood Loop and Balmattum 19/ km to km 31/01/ /60 Yes Track - Condition (Other) Condition of transom timbers on Faithful Street bridge. Estimated removal date 31/03/2019 Euroa and Violet Town Loop 135/ km to km 2/05/ /80 Yes Track - Condition (Other) Multiple issues including top, line, twist and pumping. Estimated removal date: 31/12/2018. Violet Town Loop and Benalla Platform 81/ km to km 27/03/ /80 Yes Track - Condition (Other) Condition of turnout. Estimated removal date: 31/12/2018 Page 21 of 31 Weekly Operational Notice No. 22/2018

22 Speed Restrictions and Track Warnings - Segment: Somerton Loop - Austrak - Seymour Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Craigieburn and Donnybrook South 164/ km to km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Donnybrook South and Donnybrook Loop 165/ km to 33.9km 17/05/ /80 Yes Track geometry - Condition Geometry defects within track. Estimated Removal Date : 29/06/2018 Beveridge and Wallan Loop 31/ km to 44.85km 21/02/ /80 Yes Track geometry - Condition Geometry defects. Estimated removal date: 31/12/2018 Wallan Loop and Wandong 1/ km to 55.14km 2/01/ /80 Yes Track - Condition (Other) Geometry defects within track-rough ride report. Estimated removal date: 31/03/2019 Segment: Seymour Loop - Benalla Junction No At or Between Kms Date Pass/Oth Dir Boards Reason Longwood Loop and Balmattum 122/ km to km 24/04/ /80 Yes Track geometry - Condition Geometry defects within the bridge. Estimated removal date: 24/07/2018 Longwood Loop and Balmattum 19/ km to km 31/01/ /60 Yes Track - Condition (Other) Condition of transom timbers on Faithful Street bridge. Estimated removal date 31/03/2019 Euroa and Violet Town Loop 135/ km to km 2/05/ /80 Yes Track - Condition (Other) Multiple issues including top, line, twist and pumping. Estimated removal date: 31/12/2018. Violet Town Loop and Benalla Platform 81/ km to km 27/03/ /80 Yes Track - Condition (Other) Condition of turnout. Estimated removal date: 31/12/2018 Page 22 of 31 Weekly Operational Notice No. 22/2018

23 Speed Restrictions and Track Warnings - Segment: Maroona - Portland No At or Between Kms Date Pass/Oth Dir Boards Reason Maroona and Grone Kalari Siding 14/ km to km 25/01/ /60 Yes Sleeper/fastening assembly - Condition Comment: Poor sleeper condition in hot temperatures. Estimated removal date: 30/04/2018 Segment: Newport - Anakie Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Newport and Paisley 226/ km to 12.75km 28/07/ /40 Yes Track - Condition (Other) Comment: Top faults. Estimated removal date: 31/12/2018 SCT - Laverton and Manor Loop 393/ km to 28km 9/12/ /80 Yes Road/pedestrian/other crossing - Cond. Comment: Multiple top faults in bitumen level crossing. Tamping and replacement of IRJ has allowed reduction in this TSR. Elders and North Shore 97/ km to 61.7km 6/04/ /60 Yes Track - Condition (Other) Comment: Crippled blade-heel block and blade are grabbing. Estimated removal date: 31/12/2018 Segment: Moorabool Loop - Gheringhap Loop No At or Between Kms Date Pass/Oth Dir Boards Reason Moorabool Loop and Gheringhap Loop 369/ km to 83km 18/12/ /60 Yes Track - Condition (Other) Comment: Wing of v is chipping out, multiple woth oltop and twist defects. Estimated removal date: 30/09/2018 Segment: Gheringhap Loop - Maroona No At or Between Kms Date Pass/Oth Dir Boards Reason Gheringhap Loop and Inverleigh 370/ km to 83.75km 18/12/ /60 Yes Track - Condition (Other) Comment: Wing of v is chipping out, multiple mudholes with oltop and twist defects. Estimated removal date: 31/12/2018 Wingeel Loop and Werneth B/Pt. 252/ km to km 15/08/ /40 Yes Points and crossing - Other Comment: Points defect. Estimated removal date: 31/12/2018. Berrybank Loop and Tooli Loop 173/ km to 152.8km 13/06/ /60 Yes Track - Condition (Other) Comment: Top faults. Estimated removal date: 30/07/2018 Page 23 of 31 Weekly Operational Notice No. 22/2018

24 Speed Restrictions and Track Warnings - Tooli Loop and Vite Vite 364/ km to km 11/12/ /60 Yes Points and crossing - Geometry Comment: Top fault in bitumen PCR. Estimated removal date: 26/10/2018 Tatyoon Loop and Tatyoon Loop 621/ km to km 24/12/2010 0/0 No Track Warning Comment: Tatyoon Loop a speed restriction of 25KMH applies to up trains only and only while a train is stationary in loop track due to sighting distance for road traffic. Notice Boards are erected. Tatyoon Loop and Maroona 626/ km to km 25/12/2010 0/0 No Track Warning Comment: A Speed restriction of 30kmh applies to down trains only while a train is stationary in loop track at Tatyoon due to sighting distance for road traffic, [ This amends T/W ].Notice Boards are erected. Segment: Pyrenees Loop - Murtoa No At or Between Kms Date Pass/Oth Dir Boards Reason Stawell and Deep Lead Loop 638/ km to km 27/12/2010 0/0 No Track Warning Comment: Stawell siding booked out by V/line. Deep Lead Loop and Glenorchy 643/ km to km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Deep Lead Loop number 2 road are restricted to 40km/h account track geometry. Segment: Murtoa - Dimboola No At or Between Kms Date Pass/Oth Dir Boards Reason Murtoa Loop and Dooen 633/ km to km 27/12/2010 0/0 No Track Warning Comment: Jung siding booked out due to turnout and track condition. Segment: Dimboola - Serviceton No At or Between Kms Date Pass/Oth Dir Boards Reason Dimboola and Gerang Gerung 644/ km to km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Dimboola Loop number 2 road are restricted to 40 km/h account track geometry. Page 24 of 31 Weekly Operational Notice No. 22/2018

25 Speed Restrictions and Track Warnings - Kiata and Nhill 645/ km to km 29/12/2010 0/0 No Track Warning Comment: Effective immediately departure speed for all movements departing the Salisbury Loop number 2 road are restricted to 35km/h account track geometry. Nhill and Tarranginnie 345/ km to km 23/11/ /60 Yes Track - Condition (Other) Comment: Top fault in Bitumen PCR on curve. Estimated removal date: 26/10/2018 Tarranginnie and Miram 43/ km to 418.7km 17/02/ /80 Yes Track - Condition (Other) Comment: Track design issue. Estimated removal date: 29/06/2018 Miram and Kaniva 646/ km to km 29/12/2010 0/0 No Track Warning Comment: Effective immediately the departure speed for all movements departing the Kaniva Loop number 2 road are restricted to 35km/h account track geometry. Page 25 of 31 Weekly Operational Notice No. 22/2018

26 SAFEWORKING NOTICES PERSONAL ISSUE OF MASTER KEY Permission is granted to Mr D White, for the personal issue of an extended period of a Master Key applicable to the Bendigo - Deniliquin Train Order Corridor, by the Signaller at Echuca from Friday 25th May 2018 to Monday 28th May Permission is granted for the Master Key applicable to Bendigo - Deniliquin Corridor to be issued for these works to be utilised on the Seymour Tocumwal Corridor. Mr White will be personally responsible for the security of the Master Key during the period it is issued to him. Prior to the initial issue of the Master Key, permission must be obtained from the Train Controller at Centrol. The Signaller at Echuca must complete an entry in the Train Register Book stating that the number of the Master Key that has been issued. Both Mr White and the Signaller must then sign the entry. Prior to the operation of any Master Key locked points, Mr. White must advise and obtain authority from the Train Controller, Centrol. In addition, Mr. White must endorse the Track Warrant form, Occupation form, or Track Protection Record Book (Depending on the method of track protection the Track Machines will be working under). When the Master Key is returned, the Signaller at Echuca must complete an entry in the Train Register Book to this effect. Both Mr White and the Signaller must then sign the entry. The Train Controller is to endorse the Master Key Log of the above details. The Master Key will be used for locking-away of Track Machine s at Toolamba during Track Works being conducted between Toolamba and Echuca. V/Line SW.192/2018 PERSONAL ISSUE OF MASTER KEY Permission is granted to Mr I Bell, for the personal issue of an extended period of a Master Key applicable to the Seymour Tocumwal Train Order Corridor, by the Signaller at Seymour from Monday 28th May 2018 to Thursday 31st May Mr Bell will be personally responsible for the security of the Master Key during the period it is issued to him. Prior to the initial issue of the Master Key, permission must be obtained from the Train Controller at Centrol. The Signaller at Seymour must complete an entry in the Train Register Book stating that the number of the Master Key that has been issued. Both Mr Bell and the Signaller must then sign the entry. Prior to the operation of any Master Key locked points, Mr. Bell must advise and obtain authority from the Train Controller, Centrol. Page 26 of 31 Weekly Operational Notice No. 22/2018

Train Operating Data NA_NSP_02.01 R

Train Operating Data NA_NSP_02.01 R 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Sprinter/ Vlocity WERRIBEE and NORTH SHORE 66.513km 130 NORTH SHORE 66.513km and GEELONG 72.190km

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version

More information

Victoria Media List. Metro Newspapers. Suburban Newspapers. Source:

Victoria Media List. Metro Newspapers. Suburban Newspapers. Source: Metro Newspapers The Herald Sun (03) 9292 1226 Q Magazine 0422 632 690 The Age (03) 8667 2000 The Australian (03) 9288 3000 The Australian Financial Review 1800 646 990 The Sunday Age (03) 8667 2000 The

More information

V/Line Asset Management

V/Line Asset Management Shaping the Future of Railway V/Line Asset Management Jim Hunter GM Network Engineering 21 st September 2016 Monash IRT 1 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016 Opportunities at V/Line

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Piloting Rail Traffic Procedure Number: 9006 Version 1.0, 31 March 2016 Piloting Rail Traffic Procedure Number: 9006 Document Control Identification Document title

More information

DEER PARK JUNCTION TO ARARAT

DEER PARK JUNCTION TO ARARAT 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Y Sprinter/ Vlocity Down Line KP 19.350 and KP 21.000 (Down side of DEER PARK WEST ) Up Line KP

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM 13.12.1878 Opened for passenger traffic. Centre line of platform at 51 miles 68 chains 52 links adjacent to level crossing at 51 miles 70 chains

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 7... 7... 7... 9... 9... 9... 10... 11... 12... 12...

More information

Harcourt - Golden Square

Harcourt - Golden Square Harcourt - Golden Square BARKERS CREEK SIDING (80 3/4 MILES) 15.04.1887 Contract gazetted for earthworks etc. Let to T.F. Hutchinson for 82/10/0 (Government Gazette, 2784/87) 28.09.1887 Opened for outwards

More information

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS)

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS) Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) (31.05.1920) Opened. Points secured by two staff locks one rodded to catch, other rodded to safety points (WN 22/20 extracts, Staff lock register II) (06.09.1921)

More information

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC Strong Arguments for the Mildura Passenger Train Large population

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC

SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC Page 38 SOMERSAULT Vol 38 No 3 SOCIETY CONTACT INFORMATION Published by the Signalling Record Society Victoria Inc (A0024029F)

More information

SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC

SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC Page 38 SOMERSAULT Vol 37 No 3 SOCIETY CONTACT INFORMATION Published by the Signalling Record Society Victoria Inc (A0024029F)

More information

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note)

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) Page 1 VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) FRANCIS J DENAHY STEPHEN JONES & ASSOC PLAZA SHOP 4-829 FIFTEENTH

More information

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note)

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) Page 1 VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) FRANCIS J DENAHY D P HARE 97 HIGH STREET 117 GREAT OCEAN ROAD MARYBOROUGH

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices REQUIREMENTS FOR C OF R, C OF A, CONTINUING AIRWORTHINESS AND MAINTENANCE CONTROL OF HOT AIR BALLOONS 1. Purpose The purpose of this Airworthiness Notice is to provide information and guidance to the commercial

More information

AIRWORTHINESS NOTICE

AIRWORTHINESS NOTICE AIRWORTHINESS DIRECTIVES AND MANDATORY SERVICE BULLETINS AIRWORTHINESS NOTICE VERSION : 3.3 DATE OF IMPLEMENTATION : 11-06-2011 OFFICE OF PRIME INTEREST : AIRWORTHINESS DIRECTORATE 11/06/2011 AWNOT-015-AWAA-3.3

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

TOTTENHAM TO ALBURY JUNE We re progressing our planning in Victoria for Inland Rail Australia s largest rail freight project

TOTTENHAM TO ALBURY JUNE We re progressing our planning in Victoria for Inland Rail Australia s largest rail freight project We re progressing our planning in Victoria for Inland Rail Australia s largest rail freight project TOTTENHAM TO ALBURY JUNE 2018 The need for Inland Rail About Inland Rail Inland Rail is a once-in-a-generation

More information

Airworthiness Directive Policy PO.CAP

Airworthiness Directive Policy PO.CAP Name Validation Date Prepared by: Caroline RUGA Validated 03/09/2010 Verified by: Alain LEROY Validated 09/09/2010 Reviewed by: Veronique MAGNIER Validated 09/09/2010 Approved by: Alain LEROY Validated

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Final Report AIC PAPUA NEW GUINEA ACCIDENT INVESTIGATION COMMISSION ACCIDENT INVESTIGATION REPORT. Bayswater Road Ltd VH-ATO

Final Report AIC PAPUA NEW GUINEA ACCIDENT INVESTIGATION COMMISSION ACCIDENT INVESTIGATION REPORT. Bayswater Road Ltd VH-ATO Final Report AIC 17-1003 PAPUA NEW GUINEA ACCIDENT INVESTIGATION COMMISSION ACCIDENT INVESTIGATION REPORT Bayswater Road Ltd VH-ATO Government Aircraft Factory (GAF) Nomad N22C Wheels-up landing Buka Aerodrome,

More information

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 145 CAA Consolidation 10 March 2017 Aircraft Maintenance Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 145 prescribes rules governing the certification

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

Briefing to ICN VIC 2011 Major Project Forum. Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011

Briefing to ICN VIC 2011 Major Project Forum. Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011 Briefing to ICN VIC 2011 Major Project Forum Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011 PRESENTATION OVERVIEW The case for Regional Rail Link (RRL) RRL project overview Key benefits

More information

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009) between Athlone and Westport Report 08061401 (issued 11 th of May 2009) Function of the Railway Accident Investigation Unit The Railway Accident Investigation Unit (RAIU) is a functionally independent

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS

More information

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur Lecture - 01 Rules and Regulation For Civil Aviation in India Hello everyone

More information

Investment on the Interstate Rail

Investment on the Interstate Rail Infrastructure Development and Investment on the Interstate Rail Network Malcolm Owens, General Manager, Infrastructure Strategy & Performance, ARTC Presentation to CEDA 2005, Melbourne, 26 October 2005

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements Committee for Melbourne Briefing Note 2013-14 Victorian State Budget Overview of Key Announcements Strong and secure finances In 2013-14, the Coalition Government will deliver an estimated operating surplus

More information

Terms of Hire TERMS AND CONDITIONS OF AGREEMENT FOR HIRE OF CAMPER TRAILER FROM BEATS WORKING CAMPER HIRE 1. INTRODUCTION 2. RENTAL OF CAMPER TRAILER

Terms of Hire TERMS AND CONDITIONS OF AGREEMENT FOR HIRE OF CAMPER TRAILER FROM BEATS WORKING CAMPER HIRE 1. INTRODUCTION 2. RENTAL OF CAMPER TRAILER Terms of Hire TERMS AND CONDITIONS OF AGREEMENT FOR HIRE OF CAMPER TRAILER FROM BEATS WORKING CAMPER HIRE The Hirer or nominated 2nd Driver name in Annexure A to this Agreement ( the Hirer ) by agreeing

More information

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Administration Policies & Procedures Section Commercial Ground Transportation Regulation OBJECTIVE METHOD OF OPERATION Definitions To promote and enhance the quality of Commercial Ground Transportation, the public convenience, the safe and efficient movement of passengers and their luggage

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 66 AIRCRAFT MAINTENANCE PERSONNEL LICENSING AND AUTHORISATION Published by Air Safety Support International Ltd Air Safety Support International

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

All-Weather Operations Training Programme

All-Weather Operations Training Programme GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to

More information

Step by Step Set Up Guide

Step by Step Set Up Guide lite Step by Step Set Up Guide 1 lifting lug Secure lifting lugs to a certified lifting sling. Stand and stabilize escape system under work platform. Position module with round lunette ring facing work

More information

Aircraft Maintenance Organisations - Certification. Contents

Aircraft Maintenance Organisations - Certification. Contents Contents Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 4 Summary of submissions... 5 Examination of submissions... 6 Insertion of Amendments... 6 Effective date of rule...

More information

Official Journal of the European Union L 59/1. (Non-legislative acts) REGULATIONS

Official Journal of the European Union L 59/1. (Non-legislative acts) REGULATIONS 1.3.2012 Official Journal of the European Union L 59/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 173/2012 of 29 February 2012 amending Regulation (EU) No 185/2010

More information

Dublin Airport Update Presented by Pat Molloy

Dublin Airport Update Presented by Pat Molloy Dublin Airport Update Presented by Pat Molloy daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and

More information

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),

More information

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, New Delhi CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI DATED 21 st

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SERIES 'F', PART VII ISSUE II, 10 th August, 1999 EFFECTIVE

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY

GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY FINAL REPORT March 2017 John Hearsch Consulting Pty Ltd 2 Steering Committee Peter Brown, CEO, Horsham Rural City Council

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in

More information

Two s Too Many BY MARK LACAGNINA

Two s Too Many BY MARK LACAGNINA BY MARK LACAGNINA Two s Too Many Angled taxiways limiting the pilots view of the runway, clearances issued and read back hastily and incorrectly, and crossed radio transmissions 1 were among the common

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Check-in to China Program 2016 Terms & Conditions

Check-in to China Program 2016 Terms & Conditions Check-in to China Program 2016 Terms & Conditions THE TERMS AND CONDITIONS BELOW CONSTITUTE A LEGALLY BINDING AGREEMENT BETWEEN YOU AND DESTINATION MELBOURNE LIMITED WHEN IT FACILITATES THE MAKING OF BOOKINGS

More information

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL. Pres

PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL. Pres PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL Order in Council Al;-:, Approved and Ordered juti 0 ZOCA Executive Council Chambers, Victoria Lieutenant Governor On the recommendation

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

Appendix A COMMUNICATION BEST PRACTICES

Appendix A COMMUNICATION BEST PRACTICES Appendix A COMMUNICATION BEST PRACTICES 1. GENERAL 1.1 It is apparent from investigation reports and surveys regarding runway safety occurrences that communication issues are frequently a causal or contributory

More information

The Amusement Ride Safety Regulations, 2017

The Amusement Ride Safety Regulations, 2017 AMUSEMENT RIDE SAFETY, 2017 A-18.2 REG 2 1 The Amusement Ride Safety Regulations, 2017 being Chapter A-18.2 Reg 2 (effective January 1, 2018). NOTE: This consolidation is not official. Amendments have

More information

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA r N$383u WINDHOEK- 15 August 1997 No 1637 CONTENTS Page GENERAL NOTICE No 211 Proposed Civil Aviation Regulations: Part 141 -Organisations: Aviation Training

More information

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES START DATE 20 th April 2015 END DATE 11 TH September 2015 DURATION 6 MONTHS Issue 1

More information

What is Rail Futures?

What is Rail Futures? What is Rail Futures? Rail Futures Institute is an independent nonpartisan group. It was formed to advocate cost-effective rail and intermodal solutions for public transport and freight problems based

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT Procedure Title Parent Policy Cooling Tower Management Procedure n/a Date Effective June 2014 Review Date June 2017 Procedure Owner Category Manager, OH&S Operational Version Number 1.1 Content Enquiries

More information

M&EE Stabling Point Safety Survey

M&EE Stabling Point Safety Survey M&EE Stabling Point Safety Survey Location Southall West Siding Stannox number Date of assessment 27/06/2016 Compiled by Name Company Daniel Crisp Colas Rail Telephone 07753 798016 email address daniel.crisp@colasrail.co.uk

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced

More information

STIRLING TO KINCARDINE RE-OPENING OF LINE

STIRLING TO KINCARDINE RE-OPENING OF LINE PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

Appendix 2. Advertised Call for Submission No Description of catchments and services by catchment

Appendix 2. Advertised Call for Submission No Description of catchments and services by catchment Appendix 2 Advertised Call for Submission No.2148 Description of s and services by Contents Introduction 1 Overview of Department of Health Regions 1 s 2 profile by region and 4 Region-based services Catchment-based

More information

Tri-Glide Instruction Manual

Tri-Glide Instruction Manual Tri-Glide Instruction Manual 12 Timber Lane Marlboro NJ 07746 09/09/2011 tel: 732.462.6277 fax:732.462.6355 email: sales@hilmanrollers.com CONTENTS Contents Page Warnings 3 Operating Instructions 4 General

More information

InterCity and AirTrain The Rail Futures blueprint for faster and better regional trains in Victoria and re-balancing population growth

InterCity and AirTrain The Rail Futures blueprint for faster and better regional trains in Victoria and re-balancing population growth InterCity and AirTrain The Rail Futures blueprint for faster and better regional trains in Victoria and re-balancing population growth Presenta0on to MAV Na0onal Local Government Infrastructure and Asset

More information

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble AC-MMEL/MEL Contents SUBPART A Number AC-MMEL/MEL.001 (a) AC-MMEL/MEL.003 Subject Limit of MEL Applicability Compliance SUBPART B Number AC-MMEL/MEL.010(c) AC-MMEL/MEL.025 AC-MMEL/MEL.030 AC-MMEL/MEL.040/080

More information

Shaping the Future of the Railway

Shaping the Future of the Railway Shaping the Future of the Railway Thursday 14 September Paul O Halloran, Director Engineering Metro Trains Melbourne 50 Level Crossing Removals $5-6 billion 50 level crossings to be removed over 2 full

More information

Kontrol Kube Advanced Owners Manual

Kontrol Kube Advanced Owners Manual Mobile Containment. Simplified. TM Kontrol Kube Advanced Owners Manual KONTROL KUBE www.kontrolkube.com 800.343755 1 IMPORTANT SAFETY INFORMATION SAVE THESE INSTRUCTIONS. CAREFULLY READ AND FOLLOW THESE

More information

October 2007 ISSUE, RENEWAL OR RE-ISSUE OF A MEDICAL CERTIFICATE FOR FLIGHT CREW, CABIN CREW MEMBERS AND AIR TRAFFIC CONTROL LICENCES

October 2007 ISSUE, RENEWAL OR RE-ISSUE OF A MEDICAL CERTIFICATE FOR FLIGHT CREW, CABIN CREW MEMBERS AND AIR TRAFFIC CONTROL LICENCES Advisory Circular TCAA-AC-PEL017 October 2007 ISSUE, RENEWAL OR RE-ISSUE OF A MEDICAL CERTIFICATE FOR FLIGHT CREW, CABIN CREW MEMBERS AND AIR TRAFFIC CONTROL LICENCES 1.0 PURPOSE 1.1 This Advisory Circular

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS)

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS) 23.05.1862 Contract gazetted for construction of buildings and other works for passenger station to William Porter for 11157/0/9 (Government Gazette) 06.06.1862 Contract gazetted for manufacture & erection

More information

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

BERMUDA 1994 : 2 MERCHANT SHIPPING (DEMISE CHARTER) ACT 1994

BERMUDA 1994 : 2 MERCHANT SHIPPING (DEMISE CHARTER) ACT 1994 The Laws of Bermuda Annual Volume of Public Acts 1994 : 2 BERMUDA 1994 : 2 MERCHANT SHIPPING (DEMISE CHARTER) ACT 1994 [Date of Assent 10 March 1994] [Operative Date 22 August 1994] ARRANGEMENT OF CLAUSES

More information

Mail Call Couriers Price List - Car Up to 25KG

Mail Call Couriers Price List - Car Up to 25KG Abbotsford - 3067 20 $23.17 $46.36 $69.53 Brunswick West - 3055 13 $17.17 $34.33 $51.51 Aberfeldie - 3040 14 $18.02 $36.06 $54.08 Bulleen - 3105 20 $23.17 $46.36 $69.53 Airport West - 3042 11 $15.46 $30.90

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue

More information

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...

More information

AIRWORTHINESS PROCEDURES MANUAL CHAPTER 26. Modifications and Repairs

AIRWORTHINESS PROCEDURES MANUAL CHAPTER 26. Modifications and Repairs November 2017 Page 1 of 10 CHAPTER 26 1. Introduction Modifications and Repairs 1.1 CAR M states that a person or organisation repairing an aircraft or component should assess the damage against published

More information