1 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Y Sprinter/ Vlocity Down Line KP and KP (Down side of DEER PARK WEST ) Up Line KP km and KP Down side of DEER PARK WEST ) km (Down side of DEER PARK WEST) and km (Fisken St PCR Up side BACCHUS MARSH) km (Fisken St PCR Up side of BACCHUS MARSH) and BANK BOX LOOP (See Special Speed Restrictions) BANK BOX Loop and BALLARAT EAST (Humffray St PCR ) (See Special Speed Restrictions) (via North and South Lines BUNGAREE DEVIATION) BALLARAT EAST (Humffray St PCR km) and All Trains BALLARAT NORTH JUNCTION (through BALLARAT) BALLARAT NORTH JUNCTION to KP KP to KP KP to KP (Alfred Street PCR) KP (Alfred Street PCR ) to ARARAT 1A. VLOCITY RAIL CARS AUTHORISED 160KM/H PERMITTED SPEEDS REGIONAL FAST RAIL CORRIDOR SUNSHINE TO BALLARAT VLOCITY Up Line DEER PARK WEST to DEER PARK JUNCTION As per table 1 above for Sprinter Down Line DEER PARK JUNCTION to DEER PARK WEST 160 DEER PARK WEST to Down side of PARWAN LOOP KP KP Down side of PARWAN LOOP to KP down side of BANK BOX LOOP As per table 1 above for Sprinter KP down side of BANK BOX LOOP via BUNGAREE DEVIATION SOUTH Line to 160 KP approach to signal 52 at BALLARAT 2. SPECIAL SPEED RESTRICTIONS 1. The Speed of all UP trains between BALLAN and BACCHUS MARSH must NOT exceed km/h from km to km. 2. All Train movements to or from BALLARAT EAST Locomotive Depot must NOT exceed 10km/h. 4. All Down Trains entering the Arrival Track from BALLARAT EAST must NOT exceed 10km/h. 5. The speed of all trains when passing over Facing Points worked from an interlocking frame or wise securely fastened, or over Trailing Points shall be as shown hereunder: MAXIMUM SPEED When running to or from lines diverging from the straight track km/h When running on the straight track Over facing points held by hand Between DEER PARK WEST and BALLARAT 40 Line speed for Train Type Except as indicated to higher speed at the signal via the illuminated speed indicator, and BALLARAT EAST (Crossover on Up side of Humffray St PCR). 6. All self propelled Rolling Stock (Locomotives etc) including Track Machines and Track Maintenance vehicles which are not fitted TPWS must be restricted to a Maximum Speed of (eighty) KPH between Deer Park Junction and Ballarat. Print Date: Monday, 21 September 2015; Printed copies are uncontrolled Page 1 of 5

2 SECTION DOWN Deer Park Junction to DEER PARK WEST (Boral) G, XR, BL N GM, S, X 3. RULING GRADE LOADS (TONNES) Mod. A Class Non- Mod. A solo or A CLASSES OF LOCOMOTIVES Non- B H solo Mod. A or H, P, T or Y H T or P solo or H, P, T or Y T or P Y solo or T, Y, H or P Y MELTON BACCHUS MARSH BANK BOX LOOP BUNGAREE LOOP BALLARAT TRAWALLA ARARAT UP Ararat to BUANGOR TRAWALLA BALLARAT TO BUNGAREE LOOP BANK BOX LOOP BACCHUS MARSH PARWAN LOOP ROCKBANK DEER PARK JUNCTION SAFEWORKING SYSTEMS Automatic Block Signalling is in force on the Up and Down lines between DEER PARK JUNCTION AND DEER PARK WEST. Automatic and Track Control is in force between DEER PARK WEST and BALLARAT. The Regional Signal Controller at BALLARAT operates the points and signals at, DEER PARK WEST, ROCKBANK LOOP, MELTON LOOP, PARWAN LOOP, BACCHUS MARSH LOOP, BANK BOX LOOP and BUNGAREE DEVIATION by remote control from a Visual Display Unit located at BALLARAT. Station Yard Working is in force between BALLARAT EAST and WENDOUREE is controlled from a Visual Display Unit located at BALLARAT. Train Staff and Ticket is in force between BALLARAT and ARARAT. The Broad Gauge Signalling at Ararat is controlled from a Visual Display Unit at Centrol. Print Date: Monday, 21 September 2015; Printed copies are uncontrolled Page 2 of 5

3 5. SPECIAL NOTES A Signaller will be in attendance at Ararat when Staff Tickets are being used. The Broad Gauge platform at Ararat has a standing room of 103 meters. 6. DISTANCES FROM MELBOURNE AND CLEAR LENGTHS OF CROSSING ROADS MARKED DISTANCE FROM MELBOURNE CLEAR LENGTH OF CROSSING ROADS (LENGTH IN METRES) NO. 1 NO. 2 SIDINGS DEER PARK JUNCTION DEER PARK WEST 20.5 BORAL RESOURCES SIDING # ROCKBANK LOOP MELTON LOOP Siding A 245 PARWAN LOOP BACCHUS MARSH No 3 152, No No 5 113, No Sidings A 170, B 194, C 98, D 186 BANK BOX LOOP BALLAN 79.6 BUNGAREE DEVIATION LINE EAST END BUNGAREE DEVIATION LINE WEST END WARRENHEIP BALLARAT EAST END BALLARAT NORTH BALLARAT JUNCTION (via BALLAN marked distance) NORTH BALLARAT JUNCTION (via NORTH GEELONG) ARARAT Note # Fitters required to attend onsite to operate point locking. Bungaree Deviation South Line is 5kms shorter than Bungaree Deviation North Line. This causes a kilometre change at the West End of Bungaree Deviation. 7. TRACK CLASS Track is maintained to the following CLASS standards: SECTION CLASS DEER PARK JUNCTION - BALLARAT Down line Single Line km km km km CLASS 1 CLASS 1 Single line km km CLASS 2 Single line km km CLASS 1 Single line km km CLASS 2 Single line km km CLASS 2M Single line km km CLASS 2 Single line km km CLASS 1 Single line km km CLASS 2 DEER PARK WEST DEER PARK JUNCTION Up line km km CLASS 2 ROCKBANK CROSSING LOOP km km CLASS 2 MELTON CROSSING LOOP km km CLASS 2 PARWAN CROSSING LOOP km km CLASS 2 BACCHUS MARSH NO 1 ROAD km km CLASS 2 BANK BOX CROSSING LOOP km km CLASS 2 BUNGAREE CROSSING LOOP 93.0 km km CLASS 2 BALLARAT ARARAT km km CLASS 2 Print Date: Monday, 21 September 2015; Printed copies are uncontrolled Page 3 of 5

4 NAME AND KMS OF NEAREST STATION 8. PROTECTED LEVEL CROSSINGS LEVEL CROSSING DISTANCE Print Date: Monday, 21 September 2015; Printed copies are uncontrolled Page 4 of 5 TYPE NUMBER VICROADS ID NO. ROCKBANK LOOP 30.1 Hopkins Road BB AO244 Troupes Road BB AO278 Leakes Road BB AO295 Rockbank Station PG AO298 * Paynes Road BB AO312 * Mount Cottrell Road BB AO329 * Ferris Road BB AO346 MELTON Station Road (Exford Road) BB, PG AO370 Coburns Road BB, PG AO3 * Telephone Road BB AO419 * Staughton Siding Road BB AO427 PARWAN LOOP * Occupation Crossing BB AO451 * Occupation Crossing BB AO457 * Whelans Road BB AO468 BACCHUS MARSH Fisken Street BB AO503 Parwan Road BB, PG AO512 * Osborne Road BB AO523 * Kerr s Road BB AO534 * Rowsley Station Road FL AO546 BANK BOX LOOP.3 * Occupation Crossing 64.7 FL AO649 * Ironbark Road BB AO669 * Manns Road BB A0710 * Ingliston Drive BB AO724 BALLAN * Gillets Lane FL AO733 * Occupation Crossing FL AO740 * Occupation Crossing FL AO760 * Ingliston Road BB AO779 * Windle Street BB AO787 * Cowie Street BB AO796 * Old Geelong Road.138 BB AO1 * Daylesford Road.769 BB AO7 123 * Occupation Crossing FL AO822 * Occupation Crossing FL AO829 * Bostock Crossing FL AO837 * Llandeilo Lane 85.0 BB AO859 * Occupation Crossing FL AO864 * Mount Egerton Road.783 BB AO7 * Boundary Road 91.8 BB AO919 * Occupation Crossing FL AO923 BUNGAREE NORTH LINE Old Melbourne Road BB AO944 Westcotts (Wallace) Road BB AO979 * Bungaree/Wallace Road BB AO Bungaree/Wallace Road BB A1026 (Old Western Highway) Lester Road BB A1038 BALLARAT Torpy s Road BB A1017 (Distances via Bungaree South Line ) * Occupation Crossing BB A1026 * Old Melbourne Road BB, PG A1033 (Dunnstown Road) * Tierney Road FL A1041 * Ti Tree Road BB A1060 Humffray Street BB, PG A1181 Yelta Line Marker Posts Only Lydiard Street IG A1189 Doveton Street BB A1193 McArthur Street BB A1198 Creswick Road / Midland BB A Highway Burnbank Street BB A1211 WENDOUREE Forrest Street BB A1223

5 NAME AND KMS OF NEAREST STATION LEVEL CROSSING DISTANCE TYPE NUMBER Gillies Street BB PG A1231 Ring Road BB A1249 Dowling Road FL A1293 Draffins Road.879 FL A8 Powells Road FL A1326 Windermere Road FL A1344 Carpenter Road FL A1362 Avenue of Honour BB PG A13 Burrumbeet Road FL A1394 Cockpit Lagoon Road BB A1413 BEAUFORT Black Bottom Road BB A1507 Langi Kal Kal Road FL A1570 Waterloo Road FL A1572 Smiths Lane BB A1591 Packhams Lane BB A1608 Racecourse Road FL A1636 Lawrence Street FL A1646 Kings Street FL A10 Shirley Road FL A1677 Finnegans Road FL A1706 Old Shirley Road FL A1748 Streatham Road FL A1759 Goulds Lane FG A1795 Middle Creek Road BB A1814 Yerabbin Road BB A1856 High Street FL A1874 ARARAT Gravel Route Road FL A1892 Langi Ghiran Picnic Ground BB A1983 Road Gorrin Cattle Yard Road FG A2028 Warrayatkin Road FL A2033 Green Hill Lake Road FL A2070 Health Street FL A2088 Alfred Street BB A2096 VICROADS ID NO. BB Boom Barriers CC Crib Crossing FL Flashing Lights IG Interlocked Gates NSW R.I.C. Distance from Sydney PB Pedestrian Barriers PG Pedestrian Gates SG Standard Gauge T Equipped Telephone Communication VIC Victorian Broad Gauge FG Frangible Gates Note * Indicates those level crossings where an increase in speed may be permitted if the train is travelling at or above 50 km/h upon passing the predictor indicator board. At these Level Crossings indicated above operated Level Crossing Predictors, the Predictor boards will be placed in accordance Rule 9 (Section 36) of the Rules and Operating Procedures. Note Level crossing fitted VicRoads Active Advance Warning Signs. Warning sign faults are to be reported to the VicRoads Fault Centre on Print Date: Monday, 21 September 2015; Printed copies are uncontrolled Page 5 of 5

Train Operating Data NA_NSP_02.01 R

Train Operating Data NA_NSP_02.01 R 1. CLASS OF LOCOMOTIVE AND PERMITTED SPEEDS (KM/H) CLASS OF LOCOMOTIVE G, XR, BL A, B, GM, N, S, X H, P, T Sprinter/ Vlocity WERRIBEE and NORTH SHORE 66.513km 130 NORTH SHORE 66.513km and GEELONG 72.190km

More information

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS)

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS) Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) (31.05.1920) Opened. Points secured by two staff locks one rodded to catch, other rodded to safety points (WN 22/20 extracts, Staff lock register II) (06.09.1921)

More information

V/Line Asset Management

V/Line Asset Management Shaping the Future of Railway V/Line Asset Management Jim Hunter GM Network Engineering 21 st September 2016 Monash IRT 1 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016 Opportunities at V/Line

More information

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM 13.12.1878 Opened for passenger traffic. Centre line of platform at 51 miles 68 chains 52 links adjacent to level crossing at 51 miles 70 chains

More information

Briefing to ICN VIC 2011 Major Project Forum. Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011

Briefing to ICN VIC 2011 Major Project Forum. Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011 Briefing to ICN VIC 2011 Major Project Forum Regional Rail Link Authority CEO Corey Hannett Monday 1 August 2011 PRESENTATION OVERVIEW The case for Regional Rail Link (RRL) RRL project overview Key benefits

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary

More information

Harcourt - Golden Square

Harcourt - Golden Square Harcourt - Golden Square BARKERS CREEK SIDING (80 3/4 MILES) 15.04.1887 Contract gazetted for earthworks etc. Let to T.F. Hutchinson for 82/10/0 (Government Gazette, 2784/87) 28.09.1887 Opened for outwards

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC

SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC SOMERSAULT MAY 2014 VOL 37, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC Page 38 SOMERSAULT Vol 37 No 3 SOCIETY CONTACT INFORMATION Published by the Signalling Record Society Victoria Inc (A0024029F)

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Piloting Rail Traffic Procedure Number: 9006 Version 1.0, 31 March 2016 Piloting Rail Traffic Procedure Number: 9006 Document Control Identification Document title

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version

More information

The Times November 2007

The Times November 2007 The Times November 2007 A journal of transport timetable history and analysis Whatever happened to the Roadside Goods? Inside: Vanishing Goods trains SMR W.A. Hike trains RRP $2.95 Incl. GST The Times

More information

What is Rail Futures?

What is Rail Futures? What is Rail Futures? Rail Futures Institute is an independent nonpartisan group. It was formed to advocate cost-effective rail and intermodal solutions for public transport and freight problems based

More information

GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY

GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY GRAMPIANS AND BARWON SOUTH WEST REGION PASSENGER SERVICES COST & FEASIBILITY STUDY FINAL REPORT March 2017 John Hearsch Consulting Pty Ltd 2 Steering Committee Peter Brown, CEO, Horsham Rural City Council

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015 GE/RT8000/TW8 Rule Book Module TW8 Level crossings - drivers instructions Issue 7 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available

More information

1300 TRIBECA tribeca.com.au

1300 TRIBECA tribeca.com.au THORNHILL 1300 TRIBECA PARK tribeca.com.au Masterplan FUTURE INTERSECTION STAGE 9B WESTERN FREEWAY WESTERN FREEWAY 35 Minutes to Melbourne > MOUNT COTTRELL ROAD FUTURE INTERSECTION HOME CONSTRUCTION HOME

More information

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book Uncontrolled when printed GERT8000-TW8 Rule Book Level crossings - drivers instructions Module TW8 Issue 8 September 2017 Comes into force 02 December 2017 Conventions used in the Rule Book A black line

More information

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014 GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

A fresh perspective every single day

A fresh perspective every single day A fresh perspective A fresh perspective every single day Stonehill is an exciting new masterplanned community in an inspiring location, rising above with commanding views. On a clear day you can see the

More information

ROYAL NATIONAL PARK. The Royal National Park was the second national park in the world, after Yellowstone in the United States.

ROYAL NATIONAL PARK. The Royal National Park was the second national park in the world, after Yellowstone in the United States. ROYALNATIONALPARK TheRoyalNationalParkwasthesecondnationalparkintheworld,after YellowstoneintheUnitedStates. Thefirsttennationalparksintheworld. Becauseitwassuchanearlynationalpark,theauthoritieswerenotsure

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part B Faculty of Engineering and Information Sciences 2018 Let's get moving with the affordable medium-speed

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC

Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC Strong Arguments for the Mildura Passenger Train Large population

More information

Welcome to Exford Waters

Welcome to Exford Waters Your new residential community. Your escape from the hustle and bustle of everyday life. Welcome to Exford Waters Exford Waters is a new residential community, where you can enjoy a lifestyle built around

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

STIRLING TO KINCARDINE RE-OPENING OF LINE

STIRLING TO KINCARDINE RE-OPENING OF LINE PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th

More information

Ombined End of Year Ride with Morning Tea at King River Cafe Oxley

Ombined End of Year Ride with Morning Tea at King River Cafe Oxley December, 2015 Western Australia Trip - October, 2015 Thanks to Kate and Graham s well named Ultimate home away from home, Graham s and my trip to the west was comfortable and well organised. We travelled

More information

SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC

SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC SOMERSAULT MAY 2015 VOL 38, NO 3 SIGNALLING RECORD SOCIETY OF VICTORIA INC Page 38 SOMERSAULT Vol 38 No 3 SOCIETY CONTACT INFORMATION Published by the Signalling Record Society Victoria Inc (A0024029F)

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au INLAND RAIL Connecting Australia RICHARD WANKMULLER - CHIEF EXECUTIVE OFFICER INLAND RAIL 5 June 2018 National Infrastructure Summit 2018 inlandrail.com.au The Australian Government is delivering Inland

More information

ROCKBANK PRECINCT STRUCTURE PLAN

ROCKBANK PRECINCT STRUCTURE PLAN Rockbank Precinct Structure Plan August 2016 potential rail stabling yard Primary OLD LEAKES RD PAYNES RD WESTCOTT PDE TOOLERN RD ROCKBANK RD Primary LEONID DR Rockb Town Primary ES RD Primary ROCKBANK

More information

Toolern Waters Quick Facts. Transport

Toolern Waters Quick Facts. Transport Toolern Waters Estate is a new estate made up of 900 lots nestled next to the Melton Weir and located in the new suburb of Toolern in the Shire of Melton. Designed as a master plan community aimed at young

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

Projects Update: December 2015

Projects Update: December 2015 Projects Update: December 2015 Project BALLARAT WEST GROWTH ZONE (BWGZ) Janet Dore Update Activation of the Ballarat West Employment Zone (BWEZ) Broadbent Grains Pty Ltd has been announced as the first

More information

FibreGuard Closure with SLIDE-N-LOCK Fiber Management

FibreGuard Closure with SLIDE-N-LOCK Fiber Management DECEMBER 2008 FibreGuard Closure with SLIDE-N-LOCK Fiber Management PREPARATION Express Fiber Cable 1. From the expressed cable loop, identify and select the loose buffer tube with the fibers required

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS)

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS) 23.05.1862 Contract gazetted for construction of buildings and other works for passenger station to William Porter for 11157/0/9 (Government Gazette) 06.06.1862 Contract gazetted for manufacture & erection

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

Access Statement for The Roald Dahl Museum and Story Centre

Access Statement for The Roald Dahl Museum and Story Centre Access Statement for The Roald Dahl Museum and Story Centre Introduction The Roald Dahl Museum and Story Centre is a small family-friendly Museum that welcomes all visitors. The Museum is situated in Great

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Did you enjoy the ride?

Did you enjoy the ride? Did you enjoy the ride? To learn more, check us out at www.operationlifesaver.ca Activities Shape & assembling calculation Games Messages OLOG-020-P rev. June/13 901 Answers Page 4: 1=b 2=c 3=a Page 8:

More information

Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012

Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012 Town of Gordonsville, Virginia Agenda Item Summary June 18, 2012 AGENDA ITEM 10a Unfinished Business AGENDA TITLE: Discussion of Railroad Quiet Zone DISPOSITION: [ ] Action Required [X] For Discussion

More information

SURROUND YOURSELF IN BEAUTY ESTATE. tribeca.com.au tribeca EYNESBURY

SURROUND YOURSELF IN BEAUTY ESTATE. tribeca.com.au tribeca EYNESBURY SURROUND YOURSELF IN BEAUTY 1300 tribeca EYNESBURY ESTATE tribeca.com.au WHY CHOOSE EYNESBURY? Infrastructure In-place already Many unique natural assets with 50% dedicated open space & surrounded by Green

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official STAFF REPORT ACTION REQUIRED Sign Variance Report - Revised 29 Algie Avenue Date: January 11, 2010 To: From: Chair and Members, The Etobicoke York Community Council Mark Sraga, Director and Deputy Chief

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................

More information

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book GE/RT8000/HB18 Rule Book Uncontrolled When Printed Handbook 18 Duties of a level crossing attendant Handbook 18 Issue 4 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative

More information

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018 Page 1 of 5 INDIANA HARBOR BELT RAILROAD COMPANY BULLETIN ORDER NO. S-28 May 4, 2018 Effective: 0001 Sunday May 6, 2018 General Orders in effect: NONE A. Operating Manuals 1. Timetable Authority: IHB Timetable

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

PSP 1078 Plumpton and PSP 1080 Kororoit

PSP 1078 Plumpton and PSP 1080 Kororoit PSP 1078 Plumpton and PSP 1080 Kororoit METROPOLITAN PLANNING AUTHORITY Revision D 17 March 2015 PSP 1078 Plumpton and PSP 1080 Kororoit Project no: Document title: Revision: IS078200 Date: 17 March 2015

More information

Draft proposed amendments. Chapter Terminology

Draft proposed amendments. Chapter Terminology Draft proposed amendments Chapter 20.100 - Terminology 20.100.010 - General Terms The words and terms expressly defined in this chapter have the specific meanings assigned, unless the context expressly

More information

Filming on the GCR - Alan Brassey details the filming for

Filming on the GCR - Alan Brassey details the filming for Filming on the GCR - Alan Brassey details the filming for the BBC. Graham Wignall was on hand to take the spectacular photographs The Great Central Railway rightly enjoys a very good reputation for providing

More information

Important Information

Important Information Important: Please read these instructions carefully prior to installation. Please refer to your fi tting instruction to ensure that the crossbars are installed in the correct locations. Check the contents

More information

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Three ski or snowshoe routes are available from the Fernan Saddle Parking Lot which either do not cover routes ordinarily groomed for snow machine

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel The people of Melbourne s west have a huge problem with noise and poisonous exhaust from hundreds of trucks on their residential

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 7... 7... 7... 9... 9... 9... 10... 11... 12... 12...

More information

BALLARAT LIFE ACTIVITIES CLUB Inc. (Member of the Life Planning Foundation of Australia Inc.) Inc. No: A J

BALLARAT LIFE ACTIVITIES CLUB Inc. (Member of the Life Planning Foundation of Australia Inc.) Inc. No: A J BALLARAT LIFE ACTIVITIES CLUB Inc. (Member of the Life Planning Foundation of Australia Inc.) Inc. No: A0052468J NEWSLETTER January, February, March 2017 Volume 65 Correspondence to: - P.O. Box 1090, Bakery

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Treasury Circular Industrial Relations NSWTC August 2015

Treasury Circular Industrial Relations NSWTC August 2015 Treasury Circular Industrial Relations NSWTC15-17 28 August 2015 Review of Meal, Travelling and other Allowances Various expense and work related allowances in the Crown Employees (Public Service Conditions

More information

Welcome to Exhibition Park

Welcome to Exhibition Park Section 1 Section 3 Welcome to Exhibition Park Wagtail Way Campground Section 2 Wagtail Way Campground Section 3 Section 2 Amenities Section 1 MAIN GATE Closed 9pm Open 8am Gate 2 Flemington Rd BUS STOP

More information

Just following up on our last discussion about Pitt Street Mall and whether there is anything I need to provide you with at this stage?

Just following up on our last discussion about Pitt Street Mall and whether there is anything I need to provide you with at this stage? From: XXXX To: XXXX Date: 19/06/2017 13:51 Subject: Pitt Street Mall and Martin Place Hi XXXX I hope you re well. Just following up on our last discussion

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Waverley Council Executive Manager, Creating Waverley Waverley Council Manager, Transport and Development Waverley Council Traffic Engineer

Waverley Council Executive Manager, Creating Waverley Waverley Council Manager, Transport and Development Waverley Council Traffic Engineer MINUTES OF THE WAVERLEY TRAFFIC COMMITTEE MEETING HELD AT WAVERLEY COUNCIL CHAMBERS, CNR PAUL STREET AND BONDI ROAD, BONDI JUNCTION ON THURSDAY, 25 MAY 2017 Voting Members Present: Cr B Mouroukas Sgt L

More information

WILTSHIRE ARCHAEOLOGICAL AND NATURAL HISTORY SOCIETY WILTSHIRE MUSEUM - ACCESS STATEMENT

WILTSHIRE ARCHAEOLOGICAL AND NATURAL HISTORY SOCIETY WILTSHIRE MUSEUM - ACCESS STATEMENT WILTSHIRE ARCHAEOLOGICAL AND NATURAL HISTORY SOCIETY WILTSHIRE MUSEUM - ACCESS STATEMENT This Access Statement is a description of our current facilities and the services we offer, to enable you to make

More information

201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND

201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND STATUTORY INSTRUMENTS 201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND The Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Manchester Street Modification) Order Made -

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

1. Case Study Area and Character Sections

1. Case Study Area and Character Sections ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona

More information

The Daylesford Access Statement October 2015

The Daylesford Access Statement October 2015 The Daylesford Access Statement October 2015 Access Statement Introduction The Daylesford Hotel is situated in the town of Torquay. The nearest city is Exeter which is 22 miles to the North. The Daylesford

More information

Antenna Tower Positioning System

Antenna Tower Positioning System Model 1052 Antenna Tower Positioning System User Manual (Antenna not included) ETS-Lindgren L.P. reserves the right to make changes to any product described herein in order to improve function, design,

More information

TRAIN ALTERATION ADVICE No: Amendment 1

TRAIN ALTERATION ADVICE No: Amendment 1 Northern / Southern Program Areas Transport Heritage NSW 12 th - 16 th April 2018 THNSW MAITLAND STEAMFEST 2018 THE FOLLOWING TIMETABLES WILL APPLY: Thursday 12 th April Timetable for Empty Train 6S60

More information

Clearly the Best FLEXIBLE PVC SOLUTION

Clearly the Best FLEXIBLE PVC SOLUTION Clearly the Best FLEXIBLE PVC SOLUTION M.T.I. See-Thru STRIP DOORS MT.I. Flexible See-Thru Strip Doors are an economical answer to various barrier problems including shops, factories, warehouses, food

More information

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note)

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) Page 1 VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) FRANCIS J DENAHY STEPHEN JONES & ASSOC PLAZA SHOP 4-829 FIFTEENTH

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car Tube and train The nearest stations are Stratford station and Stratford International station and both provide stepfree access from entrance to platform. Stratford station is served by: Docklands Light

More information

SCOPE Chapter 2D shall Apply to Any Road or

SCOPE Chapter 2D shall Apply to Any Road or SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less

More information

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

FUJITSU SERVICE COVERAGE

FUJITSU SERVICE COVERAGE FUJITSU SERVICE COVERAGE Note: This Fujitsu Service Coverage matrix applies for maintenance, warranty and extended warranty services on Fujitsu products sold by Fujitsu Australia. Service Coverage is within

More information

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note)

VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) Page 1 VES Rural Practices & VASSS Practices All practices are part of the VES with some also providing VASSS services (see foot note) FRANCIS J DENAHY D P HARE 97 HIGH STREET 117 GREAT OCEAN ROAD MARYBOROUGH

More information

Pelican AMR Gateway User Guide

Pelican AMR Gateway User Guide Pelican AMR Gateway User Guide Document Reference: 8194 June 2016 Version: 2 Version Date Author Changes Number 1 Feb 2014 Bettina Rubek-Slater 2 Jun 2016 Sam Smith Branding updated API section updated

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

LCFC AC C ESS STA TEM E N T

LCFC AC C ESS STA TEM E N T LCFC AC C ESS STA TEM E N T Updated: August 2018 HOW TO GET TO KING POWER STADIUM 2 CONTENTS HOW TO GET TO KING POWER STADIUM 3 WHILE YOU RE AT KING POWER STADIUM 4 VIEWING AREAS 6 ACCESSIBLE TOILETS 8

More information

World War II Secret City Gates (As published in The Oak Ridger s Historically Speaking column on April 5, 2006)

World War II Secret City Gates (As published in The Oak Ridger s Historically Speaking column on April 5, 2006) From 1943 to 1949 the city of Oak Ridge (fifth largest city in Tennessee) was not on any maps and existed as a secure gated community. The installation of fences and guard portals at the various roads

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

Switchman s Timetable. HO Division. Aug. 16, HO Division Rev 2.2. AMRS HO Division Signals. Arizona Model Railroading Society

Switchman s Timetable. HO Division. Aug. 16, HO Division Rev 2.2. AMRS HO Division Signals. Arizona Model Railroading Society AMRS HO Division Signals Steady Red: Stop Do not proceed without Warrant from Dispatcher Flashing Red: Stop Check track ahead for obstructions and properly aligned turnouts. Proceed with caution if safe

More information

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES Message from the Chair, Cr Margaret O Rourke Regional Cities Victoria Growing Regional Victoria Regional Cities Victoria (RCV) is uniquely positioned

More information

Economic Stimulus Plan A progress report. Investing in Australia s Future

Economic Stimulus Plan A progress report. Investing in Australia s Future Economic Stimulus Plan A progress report Investing in Australia s Future future The Australian Government s Nation Building Economic Stimulus Plan was put in place to protect the nation from the global