1 JR East suffered major damage in the Great East Japan Earthquake and tsunami. Examples of the damage and recovery are shown here. No revenue services were derailed on the Tohoku Shinkansen by the earthquake. However, there was extensive damage to viaducts and electric poles. Ceilings collapsed in Sendai Station, a major shinkansen station in Miyagi Prefecture. Service resumed on 29 April, or 49 days after the earthquake. It returned to the regular timetable service on 23 September Nasu-Shiobara Shiroishi-Zao and Sendai Viaduct Damage between Shiroishi-Zao and Sendai Station (left) was restored in March 2011 (right). Utsunomiya Oyama Omiya Ueno Tokyo Japan Railway & Transport Review No. 60 Oct

2 Furukawa Yamagata Shinkansen Yamagata Sendai Sendai Station Shiroishi-Zao Ceilings collapsed Sendai is a major station on the. Ceilings collapsed on shinkansen platforms, but it was re-opened for passenger service on 29 April Top: damage, bottom: After partial restoration Fukushima Koriyama Shin-Shirakawa Photographs are courtesy of JR East unless otherwise stated 3 Japan Railway & Transport Review No. 60 Oct 2012

3 Shin-Aomori Shichinohe-Towada Hachinohe Ninohe Between Shin-Hanamaki and Morioka Viaducts Restoration was completed in March 2011 (right). Iwate-Numakunai Morioka Akita Shinkansen Shin-Hanamaki Kitakami Mizusawa Esashi Ichinoseki Kurikoma-Kogen Between Mizusawa Esashi and Kitakami Electric Poles Restoration was completed in March Furukawa Continued on page 73 Japan Railway & Transport Review No. 60 Oct

4 Photostory Damage to Conventional Lines Conventional lines in the Tohoku region also suffered major damage including loss of bridge girders, railway tracks, embankments, station buildings, ballast, etc. Senzan Line (Sendai~Uzenchitose) Sakunami and Yatsumori Uzenchitose Yamagata Senzan Line Sakunami Yatsumori Aoba-dori Sendai Joban Line (Nippori~Iwanuma) Shinchi and Sakamoto Washed-away embankment Iwanuma Bridge girders swept away iigata Yamagata Shinkansen Yonezawa Watari Shiroishizao Sakamoto Shinchi Fukushima Soma Haranomachi West Ban-etsu Line 30 km 20 km 10 km Yard at Shinchi Koriyama Fukushima Daiichi Nuclear Power Plant Hirono Top: damage, bottom: after restoration Shin-Shirakawa Shirakawa Shirasaka Toyohara Yotsukura Iwaki (Tokyo~Morioka) Toyohara and Shirasaka Landslides Kuroiso Nasushiobara Suigun Line Izumi Joban Line Mito and Katsuta Embankment subsidence Utsunomiya Hitachiota Mito Katsuta Oyama Tomobe Omiya Nippori Tokyo Ueno After restoration completed in March Japan Railway & Transport Review No. 60 Oct 2012

5 Damages to Conventional Lines Aomori Hachinohe Line (Hachinohe~Kuji) Shukunohe and Rikuchu-Yagi Bridge girders and track swept away Shin- Aomori Noheji Shichinohe-Towada Misawa Hirosaki Ou Main Line Hachinohe Hachinohe Line Odate Ninohe Shukunohe Rikuchu-Yagi Higashi Noshiro The entire line reopened on 17 March Kuji Ishinomaki Line (Kogota~Onagawa) Yard at Onagawa Akita Akita Shinkansen Koma Morioka Iwatenumakunai Iwaizumi Line Iwaizumi Moichi Yamada Line Tsugaruishi Miyako Sokei ne Omagari Kitakami Line Hanamaki Shinhanamaki Kamaishi Line Rikuchu-Yamada Orikasa Yokote Kitakami Kamaishi Ou Main Line Mizusawaesashi Rikuzen-Yahagi Take koma Sakari Ofunato Hosoura Senseki Line (Aoba-dori~Ishinomaki) Yard at Nobiru Roadbed swept away Shinjo East Rikuu Line Ichinoseki Kesennuma Oyakaigan Motoyoshi Kurikoma-Kogen Rikuzen-Koizumi Nitta Umegasawa Yanaizu Kesennuma Line Ofunato Line Uzenchitose Yamagata Senzan Line Furukawa Sakunami Yatsumori Aoba-dori Sendai Kogota Maeyachi Ishinomaki Onagawa Takagimachi Urashuku Watanoha Nobiru Tagajo Senseki Line Ishinomaki Line Iwanuma Japan Railway & Transport Review No. 60 Oct

6 Yamada Line (Morioka~Kamaishi) Soeki and Tsugaruishi Rikuchu-Yamada and Orikasa Bridge girders swept away Ofunato Line (Ichinoseki~Sakari) Rikuzen-Yahagi and Takekoma Kesennuma Line (Maeyachi~Kesennuma) Yard at Oyakaigan Yard at Hosoura Rikuzen-Koizumi and Motoyoshi Bridge girders swept away (Tokyo~Morioka) Umegasawa and Nitta Washed-away embankment Left: subsidence, right: after restoration 75 Japan Railway & Transport Review No. 60 Oct 2012

Damage to JR East from Great East Japan Earthquake and Current Situation

Damage to JR East from Great East Japan Earthquake and Current Situation Damage to JR East from Great East Japan Earthquake and Current Situation JR East Reconstruction Planning Dept. Facilities Dept. Construction Dept. Extent of Damage Overview At 14:46 on 11 March 2011, a

More information

Station Name Sendai Morioka Hachinohe Shin-Aomori f. Basic fare 5,780 8,190 9,350 9,870 Express train charge 5,110 6,150 6,500 7,000

Station Name Sendai Morioka Hachinohe Shin-Aomori f. Basic fare 5,780 8,190 9,350 9,870 Express train charge 5,110 6,150 6,500 7,000 1. s for Hayabusa on main sections for which approval has been applied (adult passenger, normal season) Station Name Hachinohe Aomori f Basic fare 5,780 8,190 9,350 9,870 5,110 6,150 6,500 7,000 * Differences

More information

New Shinkansen Carriages

New Shinkansen Carriages New Carriages Series E7/W7 The Series E7 shinkansen (called W7 by JR West) was developed jointly by and JR West for use on sections between Tokyo and Kanazawa (Nagano Kanazawa section due open in 14 March

More information

High Speed Lines Operation in Japan

High Speed Lines Operation in Japan High Speed Lines Operation in Japan Takumi ISHII Deputy director, JR East Paris Office Senior Advisor High Speed Passengers and High Speed Department, UIC PALACIO EUSKALDUNA BILBAO 23-24 /02 /2015 Nazioarteko

More information

Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety

Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety Norihiko Mandai General Manager of Shinkansen Transport Department. (Former General Manager of Transport

More information

IOC/UNESCO Bulletin No. 8 As of 23 March 2011

IOC/UNESCO Bulletin No. 8 As of 23 March 2011 IOC/UNESCO Bulletin No. 8 As of 23 March 2011 Casualties by the Earthquake and Tsunami As of 06:00z 23 Mar 2011 The National Police Agency Dead: 9,452 Missing: 14,715 Road destruction: 1,749 Bridge destruction:

More information

Transport and Travel in Japan

Transport and Travel in Japan Transport and Travel in Japan Singapore Jakarta: 900km Singapore KL : 300km Yellow Circle: Area within a radius of 30 kilometers from Fukushima Daiichi Nuclear Plant. 22 Fukushima Dai-ichi Atmospheric

More information

Japanese Station Lunchbox Wrappers

Japanese Station Lunchbox Wrappers Japanese Station Lunchbox Wrappers Railways started in Japan in 1872. As the network spread and more people travelled by train, there was increasing demand for more onboard food services. One answer to

More information

Transporting Oil Products to Disaster Areas

Transporting Oil Products to Disaster Areas Transporting Oil Products to Disaster Areas Yasuma Sasaki Rail Transport of Oil Products Generally, railways worldwide play a key role in carrying oil products using tank wagons over long distances between

More information

FY Second Quarter Financial Results Presentation. October 28, 2011 East Japan Railway Company

FY Second Quarter Financial Results Presentation. October 28, 2011 East Japan Railway Company FY2012.3 Second Quarter Financial Results Presentation October 28, 2011 East Japan Railway Company Contents I. FY2012.3 Second Quarter Financial Results (Non-consolidated) III. Progress in Restoration

More information

Economic Impact of the Great East Japan Earthquake and current status of Recovery. April, 2011 May 4, 2011 Embassy of Japan in France Japan

Economic Impact of the Great East Japan Earthquake and current status of Recovery. April, 2011 May 4, 2011 Embassy of Japan in France Japan Economic Impact of the Great East Japan Earthquake and current status of Recovery April, 2011 May 4, 2011 Embassy of Japan in France Japan Contents 1. Reconstruction from the Present Earthquake (1) Tohoku

More information

Role of Railways in Building Resilient Against Natural Disaster-Lessons from Japan

Role of Railways in Building Resilient Against Natural Disaster-Lessons from Japan Role of Railways in Building Resilient Against Natural Disaster-Lessons from Japan February 27, 2018 Yoshitaka Motoda Professor Emeritus Iwate Prefectural University Japan Contents Introduction Great East

More information

Earthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami

Earthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami 1. Damages caused by the Great East Japan Earthquake 2. MLIT s emergency response to the Great East Japan Earthquake 3. Recent policy changes regarding tsunami disaster countermeasures 10 Basic Principles

More information

Damage from the Tohoku-Pacific Ocean Earthquake and future prospects

Damage from the Tohoku-Pacific Ocean Earthquake and future prospects Damage from the Tohoku-Pacific Ocean Earthquake and future prospects March 30, 2011 Nippon Telegraph and Telephone East Corporation 1 Status of the impact on communication facilities Kesen Ohashi Relay

More information

Damage from the Tohoku-Pacific Ocean Earthquake and future prospects

Damage from the Tohoku-Pacific Ocean Earthquake and future prospects Damage from the Tohoku-Pacific Ocean Earthquake and future prospects March 30, 2011 Nippon Telegraph and Telephone East Corporation 1 Status of the impact on communication facilities Kesen Ohashi Relay

More information

Current Status of Reconstruction and Challenges

Current Status of Reconstruction and Challenges Current Status of Reconstruction and Challenges Reconstruction progress of the six years and the policies ahead 1. Providing Health and Living Support 2. Restoration of Towns and Housings 3. Reviving Industry

More information

Economic Impact of the Great East Japan Earthquake and current status of Recovery. Embassy of Japan in Denmark

Economic Impact of the Great East Japan Earthquake and current status of Recovery. Embassy of Japan in Denmark Economic Impact of the Great East Japan Earthquake and current status of Recovery Embassy of Japan in Denmark 1 Contents 1. Reconstruction from the Present Earthquake (1) Tohoku Expressway 2 (2) Railroads

More information

Hokkaido. Oga. Akita. Shinjo. Aterazawa. Yamagata Yamagata. Shinkansen. Nikko. Takasaki. Omiya. Oku-Tama Musashi- Itsukaichi Hachioji

Hokkaido. Oga. Akita. Shinjo. Aterazawa. Yamagata Yamagata. Shinkansen. Nikko. Takasaki. Omiya. Oku-Tama Musashi- Itsukaichi Hachioji JR EAST GROUP CSR REPORT 217 Corporate Info Service Area Hokkaido Shinkansen Mimmaya Ominato Aomori Noheji Tokyo branch office Yokohama branch office Hachioji branch office Omiya branch office Takasaki

More information

Path forward for reconstruction after the disaster

Path forward for reconstruction after the disaster Path forward for reconstruction after the 3.11 2011 disaster 2.16 2013 1- Immediate Impact of the 3.11 Disaster Earthquake Magnitude: 9.0 Casualties: Dead : over 15,800 Missing: over 2,700 Injured: over

More information

Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto)

Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto) Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto) Shoshi Shimamura Introduction The Hokkaido Shinkansen (between Shin-Aomori and Sapporo) is essential for the revitalization

More information

Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan

Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan NTT DOCOMO, INC. March 30, 2011 Damage to Base Stations & Restoration Measures 788 base stations requiring inspection as of March 22

More information

We have been pursuing initiatives in light of the Group Philosophy since 1987.

We have been pursuing initiatives in light of the Group Philosophy since 1987. We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. Transportation

More information

Characteristics of damage to transportation facilities induced by the ground shaking and the tsunami of the 2011 East Japan mega earthquake

Characteristics of damage to transportation facilities induced by the ground shaking and the tsunami of the 2011 East Japan mega earthquake Characteristics of damage to transportation facilities induced by the ground shaking and the tsunami of the 2011 East Japan mega earthquake Ö. Aydan, Tokai University, Ocean Research Institute, Shizuoka,

More information

Economic Policy and condition after the great east Japan earthquake

Economic Policy and condition after the great east Japan earthquake Economic Policy and condition after the great east Japan earthquake Mr. Itsushi Tachi Senior Fellow, Economic & Social Research Institute Cabinet Office, Government of Japan Sources: National Policy Unit

More information

FY Second Quarter Financial Results Presentation. October 29, 2015 East Japan Railway Company

FY Second Quarter Financial Results Presentation. October 29, 2015 East Japan Railway Company FY2016.3 Second Quarter Financial Results Presentation October 29, 2015 East Japan Railway Company Contents I. JR East Group Management Vision Ⅴ - Ever Onward - FY2016.3 Second Quarter Financial Results

More information

JR East: Earthquake Measures

JR East: Earthquake Measures JR East: Earthquake Measures and their effectiveness 11 July 2012, Parallel sessions: Operation 1 (Risk analysis) Content Part 1 Outline of JR East and our risk evaluation Part 2 Two earthquakes that occurred

More information

Lessons Learnt from the Recent Off the Pacific Coast of Tohoku Earthquake in Japan

Lessons Learnt from the Recent Off the Pacific Coast of Tohoku Earthquake in Japan International Platform for Reducing Earthquake Disasters (IPRED) 26~28-7-211 UNESCO-IPRED 4th Workshop, in Santiago, CHILE Lessons Learnt from the Recent Off the Pacific Coast of Tohoku Earthquake in Japan

More information

References for Tohoku Trip June Contents

References for Tohoku Trip June Contents References for Tohoku Trip 28-29 June 2012 Contents 1. Inundated Area Ishinomaki City 01 Onagawa Town 03 Minamisanriku Town 04 Kesennuma City 05 2. Maps before and after damage Minamisanriku Town 06 Kesennuma

More information

High-Speed Rail Operations in Japan Takao NISHIYAMA

High-Speed Rail Operations in Japan Takao NISHIYAMA High-Speed Rail Operations in Japan Takao NISHIYAMA Director of Japan Railways Group New York Office New York, NY, U.S.A. Introduction Transportation Planning Train Variation and Efficiency Contents Risk

More information

Relationship with Society

Relationship with Society Relationship with Society Strengthening Collaboration with Communities The very existence of the JR East Group depends on the health of the east Japan area and of Japan as a whole. As a company responsible

More information

The 11th Fukushima Vocal Ensemble Competition March 22 - March 26, 2018 Fukushima, Japan

The 11th Fukushima Vocal Ensemble Competition March 22 - March 26, 2018 Fukushima, Japan The 11th Fukushima Vocal Ensemble Competition 2018 March 22 - March 26, 2018 Fukushima, Japan Contents Hosts / Co-hosts / Sponsors 1 Venue Tentative Schedule Program Competition Rules 2~3 Category Entry

More information

In depth damage report by affected cities

In depth damage report by affected cities The Great Eastern Japan Earthquake (GLIDE: EQ-2011-000028-JPN) 2011.04.28 In depth damage report by affected cities SEEDS Asia Table of Contents I: Overview II: The Earthquake and Tsunami: Their Impact

More information

FY Financial Results Presentation. May 1, 2014 East Japan Railway Company

FY Financial Results Presentation. May 1, 2014 East Japan Railway Company FY2014.3 Financial Results Presentation May 1, 2014 East Japan Railway Company Contents I. JR East Group Management Vision Ⅴ - Ever Onward - Current Situation and Foresight JR East Group Management Vision

More information

Scenario Analysis of Mega Earthquake and Tsunami in Central Japan

Scenario Analysis of Mega Earthquake and Tsunami in Central Japan Scenario Analysis of Mega Earthquake and Tsunami in Central Japan IRDR International Conference, Beijing 1 Nov, 2011 Naoki Fujiwara CTI Engineering Co., Ltd. Japan ICHARM International Centre for Water

More information

The 2011 off the Pacific coast of Tohoku Earthquake

The 2011 off the Pacific coast of Tohoku Earthquake The 2011 off the Pacific coast of Tohoku Earthquake Situation Report 9 2011.03.27 Source: "Reuters/ALY SONG, courtesy Trust.org - AlertNet" SEEDS Asia www.seedsasia.org Table of Contents I. Overview II.

More information

WCO General Session JAPAN. Rengo Co., Ltd. May 23, 2011 / Montreal

WCO General Session JAPAN. Rengo Co., Ltd. May 23, 2011 / Montreal WCO General Session JAPAN Rengo Co., Ltd. May 23, 2011 / Montreal 3.11 the Great East Japan Earthquake -- earthquake, tsunami and Fukushima Nuclear Accident 1 3.11 the Great East Japan Earthquake Latitude

More information

Tatsuya Satomi Director, Office for Support of Earthquake Disaster Reconstruction Urban Renaissance Agency

Tatsuya Satomi Director, Office for Support of Earthquake Disaster Reconstruction Urban Renaissance Agency Preventive Urban Development UR s Support for Restoration in Recovery after the Great East Japan Earthquake 10 October 2016 Tatsuya Satomi Director, Office for Support of Earthquake Reconstruction Urban

More information

MLIT Recovery and Rehabilitation Plan

MLIT Recovery and Rehabilitation Plan MLIT Recovery and Rehabilitation Plan in response to the Great East Japan Earthquake June 0 Ministry of Land, Infrastructure, Transport and Tourism (MLIT) Ministry of Land, Infrastructure, Transport and

More information

Shinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company

Shinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company Shinkansen Network in Japan and OutlineO of East Japan Railway Company East Japan Railway Company 2004.7.5 Major JR lines, stations, and airports throughout Japan Geography of Shinkansen network in Japan

More information

34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents

34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents Contents 2 Our History 3 Business Portfolio 4 Risks and Opportunities 6 Our Calling 8 Financial Highlights 10 Selected Financial Data 13 Stock Information 14 A Message from the Management 16 Interview

More information

Mar 23th, Berkeley

Mar 23th, Berkeley Mar 23th, 2015 @UC. Berkeley International Workshop on Nuclear Safety: From accident mitigation to resilient society facing extreme situations Measurement of risk perception and social acceptability: On-going

More information

The 2011 off the Pacific coast of Tohoku Earthquake. (immediate version)

The 2011 off the Pacific coast of Tohoku Earthquake. (immediate version) 2011.3.15 The 2011 off the Pacific coast of Tohoku Earthquake SituationReport 1 (immediate version) SEEDS Asia Map of Seismic Intensity Tohoku Earthquake of 14:46(JST), 11 March 2011 Source : Japan Meteorological

More information

Transportation Shinkansen Network

Transportation Shinkansen Network REVIEW OF OPERATIONS Transportation Shinkansen Network Competition with Airlines 100% Required Fare Akita Hybrid Shinkansen 3:49 16,810 15 Aircraft (Akita ) 2:38 23,210 7 Joetsu Shinkansen + Uetsu Honsen

More information

REPORT OF STUDY TRIP (TOHOKU)

REPORT OF STUDY TRIP (TOHOKU) INTERNATIONAL INSTITUTE OF SEISMOLOGY AND EARTHQUAKE ENGINEERING (IISEE) REPORT OF STUDY TRIP (TOHOKU) 14 18 November 2011 Prepared by: Nur Intan Irzwanee Nurashid T course (Malaysia) 5/12/2011 Day 1:

More information

The Event: once in 1,000 years

The Event: once in 1,000 years East Japan Earthquake and Tsunami: Post disaster Issues and Challenges http://www.dailymail.co.uk Rajib Shaw http://www.iedm.ges.kyoto u.ac.jp/ t / http://www.dailymail.co.uk The Event: once in 1,000 years

More information

lessons we should learn from the Great East Japan Disaster?

lessons we should learn from the Great East Japan Disaster? What lessons we should learn from the Great East Japan Disaster? The Univerisity of Tokyo, Science Council of Japan April 2 nd, 2012 1 Organization of Science Council of Japan President Vice-President

More information

High Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France

High Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France High Speed Network in Asian Countries: China, Korea and Japan Naoto YANASE UIC, Senior Advisor High Speed Paris, France Content Chinese high speed network Korean high speed network Japanese high speed

More information

The 2011 off the Pacific coast of Tohoku Earthquake

The 2011 off the Pacific coast of Tohoku Earthquake The 2011 off the Pacific coast of Tohoku Earthquake (GLIDE: EQ-2011-000028-JPN) Situation Report 13 2011.04.10 Source: "Reuters/ALY SONG, courtesy Trust.org - AlertNet" SEEDS Asia www.seedsasia.org Table

More information

Tokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662.

Tokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662. Shinkansen Network Review of Operations Competition with Airlines Akita Hybrid Shinkansen 3:50 16,810 15 Aircraft (Akita ) 2:53 24,110 7 Joetsu Shinkansen + Uetsu Honsen Tokyo-Niigata 4.7 million passengers

More information

Taisei MORISHITA, Hiroaki SAITO and Shin TANI Hydrographic and Oceanographic Department (JHOD) Japan Coast Guard

Taisei MORISHITA, Hiroaki SAITO and Shin TANI Hydrographic and Oceanographic Department (JHOD) Japan Coast Guard Taisei MORISHITA, Hiroaki SAITO and Shin TANI Hydrographic and Oceanographic Department (JHOD) Japan Coast Guard 1. Earthquake and Tsunami (review) 2. JHOD s Response Activities (overview) 3. Hydrographic

More information

Transportation >Tokyo Metropolitan Area Network

Transportation >Tokyo Metropolitan Area Network REVIEW OF OPERATIONS Transportation >Tokyo Metropolitan Area Network JR East s greatest strength is having a service area that includes the Tokyo metropolitan area, which accounts for about one-third of

More information

MARCH 2011, TSUNAMI DISASTER IN JAPAN

MARCH 2011, TSUNAMI DISASTER IN JAPAN MARCH 2011, TSUNAMI DISASTER IN JAPAN Dr. Neelima Satyam D 1 and Dr. D V Reddy 2 1 Assistant Professor Earthquake Engineering Research Centre International Institute of Information Technology Hyderabad

More information

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 5. SEEDS Asia

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 5. SEEDS Asia 2011.3.20 The 2011 off the Pacific coast of Tohoku Earthquake Situation Report 5 SEEDS Asia Table of contents - Overview - Situation by Affected Prefectures - Relief Operation by Japanese Humanitarian

More information

The 2011 off the Pacific coast of Tohoku Earthquake

The 2011 off the Pacific coast of Tohoku Earthquake The 2011 off the Pacific coast of Tohoku Earthquake (GLIDE: EQ-2011-000028-JPN) Situation Report 8 2011.03.24 Source: "Reuters/SALY SONG, courtesy Trust.org - AlertNet" SEEDS Asia www.seedsasia.org Table

More information

The 2011 Great Eastern Japan Earthquake

The 2011 Great Eastern Japan Earthquake The 2011 Great Eastern Japan Earthquake (GLIDE: EQ-2011-000028-JPN) Situation Report 16 2011.04.30 Source: "Reuters/ALY SONG, courtesy Trust.org - AlertNet" SEEDS Asia www.seedsasia.org Table of Contents

More information

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 6. SEEDS Asia

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 6. SEEDS Asia 2011.3.21 The 2011 off the Pacific coast of Tohoku Earthquake Situation Report 6 SEEDS Asia Table of contents - Overview - Situation by Affected Prefectures - Relief Operation by Japanese Humanitarian

More information

Earnings per share Diluted. Total assets Net assets Equity ratio. Millions of yen Millions of yen %

Earnings per share Diluted. Total assets Net assets Equity ratio. Millions of yen Millions of yen % Consolidated Financial Results for the Nine-Month Period Ended December 31, 2014 (Japanese GAAP) (Unaudited) Fiscal 2015 (Year ending March 31, 2015) Third Quarter means the nine months from April 1 to

More information

Executive Summary of Urgent Field Survey of Earthquake and Tsunami Disasters by the 2011 off the Pacific coast of Tohoku Earthquake

Executive Summary of Urgent Field Survey of Earthquake and Tsunami Disasters by the 2011 off the Pacific coast of Tohoku Earthquake March 25, 2011 Executive Summary of Urgent Field Survey of Earthquake and Tsunami Disasters by the 2011 off the Pacific coast of Tohoku Earthquake Port and Airport Research Institute (PARI) has accomplished

More information

REPORT OF STUDY TRIP (TOHOKU)

REPORT OF STUDY TRIP (TOHOKU) INTERNATIONAL INSTITUTE OF SEISMOLOGY AND EARTHQUAKE ENGINEERING (IISEE) REPORT OF STUDY TRIP (TOHOKU) 14 18 November 2011 Prepared by: Dwi Hartanto T course (Indonesia) 0 DAY 1: NOVEMBER 14, 2011 On March

More information

Chapter 2 Brief Overview of the Tohoku 3.11 Mega Earthquake, Tsunami, and Fukushima NPS Disasters

Chapter 2 Brief Overview of the Tohoku 3.11 Mega Earthquake, Tsunami, and Fukushima NPS Disasters Chapter 2 Brief Overview of the Tohoku 3.11 Mega Earthquake, Tsunami, and Fukushima NPS Disasters 1 Facts on the 3.11 Earthquake and Tsunami Scale Based on the Mid-June 2011 White Paper on Disaster Reduction

More information

POLICY ANALYSIS ON BUILDING REGULATIONS AND THE RECOVERY OF EARTHQUAKE / TSUNAMI AFFECTED AREAS

POLICY ANALYSIS ON BUILDING REGULATIONS AND THE RECOVERY OF EARTHQUAKE / TSUNAMI AFFECTED AREAS Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan POLICY ANALYSIS ON BUILDING REGULATIONS AND THE RECOVERY

More information

Tsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster. Takehiko Fujita

Tsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster. Takehiko Fujita May 25, 2011 Tsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster Takehiko Fujita Acting President Port and Airport Research Institute, Japan Contents 1. Outline of the earthquake

More information

Proposing/Implementing Key Measures for Industrial Recovery from the Great East Japan Earthquake

Proposing/Implementing Key Measures for Industrial Recovery from the Great East Japan Earthquake Global Conference on the International Network of Disaster Studies in Iwate, Japan "Iwate Conference" Proposing/Implementing Key Measures for Industrial Recovery from the Great East Japan Earthquake 2018.07.18

More information

Northeast Pacific Japan Earthquake and Tsunami

Northeast Pacific Japan Earthquake and Tsunami Northeast Pacific Japan Earthquake and Tsunami Current status of JPF s Relief Efforts As of 25 April 2011 (a month and 2 weeks after the earthquake) Japan Platform Japan Platform info@japanplatform.org

More information

Ganbarou! TOHOKU. to the Great East Japan Earthquake

Ganbarou! TOHOKU. to the Great East Japan Earthquake Ganbarou! TOHOKU Response of Tohoku Regional Bureau, MLIT, espo se o o o u eg o a u eau,, to the Great East Japan Earthquake Outline of the Great East Japan Earthquake Date/Time: March 11 14:46, 46 2011

More information

and Current Status of Recovery Consulate General of Japan in New York

and Current Status of Recovery Consulate General of Japan in New York Economic Impact of the Great East Japan Earthquake and Current Status of Recovery May 13, 2011 Consulate General of Japan in New York Contents 1. Extent of the affected areas 2 2. Reconstruction and recovery

More information

REPORT OF STUDY TRIP (TOHOKU)

REPORT OF STUDY TRIP (TOHOKU) INTERNATIONAL INSTITUTE OF SEISMOLOGY AND EARTHQUAKE ENGINEERING (IISEE) REPORT OF STUDY TRIP (TOHOKU) 10-14 JULY 2011 PREPARED BY: MAZNI BINTI AZIS MALAYSIA SUBMISSION DATE: JULY 29, 2011 TSUNAMI DISASTER

More information

FY Financial Results Presentation. May 1, 2017 East Japan Railway Company

FY Financial Results Presentation. May 1, 2017 East Japan Railway Company FY2017.3 Financial Results Presentation May 1, 2017 East Japan Railway Company Contents I. JR East Group Management Vision Ⅴ - Ever Onward - Current Situation and Foresight FY2017.3 Financial Results (consolidated,

More information

JAPAN RAIL PASS Exchange Order cannot be purchased inside Japan.

JAPAN RAIL PASS Exchange Order cannot be purchased inside Japan. Japan Rail Pass is the key to Convenient Sightseeing in Japan. The pass is offered by the Japan Railways Group (JR Group) that comprises of 6 railway companies. JAPAN RAIL PASS Exchange Order cannot be

More information

Impact on Oil Distribution and Lessons from the Great East Japan Earthquake

Impact on Oil Distribution and Lessons from the Great East Japan Earthquake Impact on Oil Distribution and Lessons from the Great East Japan Earthquake April 2015 Oil Information Center 1 Introduction The Great East Japan Earthquake (1) Date: March 11, 2011 (2) Magnitude (scale

More information

Quaternary Research for Extreme Natural Hazards: Lessons from March 11, 2011 Earthquake and Tsunami Koji Okumura (Hiroshima University) March 11, 2011 Tohoku Earthquake and Tsunamis fatalities missing

More information

KNOWLEDGE NOTE 4-1. Infrastructure Rehabilitation. CLUSTER 4: Recovery Planning. Public Disclosure Authorized. Public Disclosure Authorized

KNOWLEDGE NOTE 4-1. Infrastructure Rehabilitation. CLUSTER 4: Recovery Planning. Public Disclosure Authorized. Public Disclosure Authorized KNOWLEDGE NOTE 4-1 CLUSTER 4: Recovery Planning Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Prepared by Junko Sagara, CTI Engineering,

More information

NGO Support Donation "NGO Relief Fund for Japan Earthquake and Tsunami" Activity Report for September, 2012

NGO Support Donation NGO Relief Fund for Japan Earthquake and Tsunami Activity Report for September, 2012 NGO Support Donation "NGO Relief Fund for Japan Earthquake and Tsunami" Activity Report for September, 2012 February 19, 2013 Japan NGO Center for International Cooperation Period covered: September 1

More information

Campaign to promote the various attractions of Tohoku in the winter, this year with an additional Activities category.

Campaign to promote the various attractions of Tohoku in the winter, this year with an additional Activities category. October 31, 2018 East Japan Railway Company Off to Tohoku! A Special Winter Trip campaign Campaign to promote the various attractions of Tohoku in the winter, this year with an additional Activities category.

More information

Keiichi Inoue Vice-President of PIARC. Exchange knowledges and techniques on roads and road transportation

Keiichi Inoue Vice-President of PIARC. Exchange knowledges and techniques on roads and road transportation Keiichi Inoue Vice-President of PIARC 11 March, 2011 14:46(JST) 100km Disaster By TUNAMI By Earthquake Distribution of seismic intensity March 11 th, 2011 14:46 (JST) The earthquake caused extensive damages

More information

Response to Tsunami Disaster -the Great East Japan Earthquake 2011-

Response to Tsunami Disaster -the Great East Japan Earthquake 2011- Response to Tsunami Disaster -the Great East Japan Earthquake 2011- JAPAN COAST GUARD Hydrographic and Oceanographic Department (JHOD) Outline I. Response to Tsunami Disaster 2011 II. International meeting

More information

Measures Perpetuating JR East s Unlimited Growth Potential

Measures Perpetuating JR East s Unlimited Growth Potential FEATURE Measures Perpetuating East s Potential Potential 1. Series E6 railcars Enhancement of the Shinkansen Network Operation of Shinkansen at Faster Speeds Starting March 2013, East raised the maximum

More information

2. Overview of Damage

2. Overview of Damage 2. Overview of Damage (1) Inundation and Land Subsidence Tsunamis caused by the 2011 Earthquake Off the Pacific Coast of Tohoku devastated Pacific coastal areas in eastern Japan. According to a report

More information

Pursuing Our. Unlimited Potential

Pursuing Our. Unlimited Potential Pursuing Our Unlimited Potential For the year ended March 31, 2012 JR East s Strengths 1 AN OVERWHELMINGLY SOLID AND ADVANTAGEOUS RAILWAY NETWORK JR EAST S SERVICE AREA TOKYO The railway business of the

More information

Arriving at Narita Airport and Traveling to Aizu-Wakamatsu

Arriving at Narita Airport and Traveling to Aizu-Wakamatsu Arriving at Narita Airport and Traveling to Aizu-Wakamatsu Keep your airline boarding passes, if you are being reimbursed here. These instructions assume you will take the Keisei Skyliner from Narita Airport

More information

Iwate. A record of the reconstruction from March 2011 to March 2017 after the Great East Japan Earthquake and Tsunami. July 2017

Iwate. A record of the reconstruction from March 2011 to March 2017 after the Great East Japan Earthquake and Tsunami. July 2017 IWATE A record of the reconstruction from March 20 to March 2017 after the Great East Japan Earthquake and Tsunami July 2017 Iwate Kitakami The 16 th National Sports Festival for People with Disabilities

More information

REGENERATION. February 21 st, 2012 Takashi ONISHI Professor, the University of Tokyo President, Science Council of Japan

REGENERATION. February 21 st, 2012 Takashi ONISHI Professor, the University of Tokyo President, Science Council of Japan REGENERATION fromthe East Japan Great Earthquake February 21 st, 2012 Takashi ONISHI Professor, the University of Tokyo President, Science Council of Japan Gratitude and Contents Thanks for the help hl

More information

Minami-Sanriku town field trip (17 March 2013)

Minami-Sanriku town field trip (17 March 2013) Minami-Sanriku town field trip (7 March 23) By Anawat Suppasri, Abdul Muhari, Fumihiko Imamura, IRIDeS, Tohoku University. Background of tsunamis in Tohoku region There were three major tsunami events

More information

Population Movement in the Tohoku Region after the Great East Japan Earthquake Disaster

Population Movement in the Tohoku Region after the Great East Japan Earthquake Disaster 83 Population Movement in the Tohoku Region after the Great East Japan Earthquake Disaster Takashi ABE Abstract This paper clarifies the demographic change in the Tohoku Region after the Great East Japan

More information

Construction of Ueno Tokyo Line

Construction of Ueno Tokyo Line Construction of Ueno Tokyo Line JR East Construction Department Introduction East Japan Railway Company has a wide-ranging operations area from Kanto and Koshin etsu to Tohoku. When JR East was established

More information

people have been evacuated and rescue operations are ongoing.

people have been evacuated and rescue operations are ongoing. Japan earthquake and tsunami Situation Report No. 7 16 March 2011 As of 14:30 hrs Manila time All times stated below are in Tokyo time. SITUATION SUMMARY A 9.0 magnitude earthquake (updated from the 8.8

More information

Japan s Challenges Towards Recovery

Japan s Challenges Towards Recovery 2011/SOM2/018 Agenda Item: 1 Japan s Challenges Towards Recovery Purpose: Information Submitted by: Japan Second Senior Officials Meeting Big Sky, United States 17-18 May 2011 Japan s Challenges Towards

More information

Recovery from Great East Japan Earthquake: Full Resumption of Services on Sanriku Railway

Recovery from Great East Japan Earthquake: Full Resumption of Services on Sanriku Railway Recovery from Great East Japan Earthquake: Full Resumption of Services on Sanriku Railway Atsushi Tomite The shaking and duration of the immense M9 undersea earthquake that struck the coast off north-eastern

More information

EXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1

EXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1 EXECUTIVE VICE PRESIDENT Masaki OGATA Copyright 2010 East Japan Railway Company. All rights reserved 1 Company Profile of JR East Copyright 2010 East Japan Railway Company. All rights reserved 2 Company

More information

Development of Transportation Networks

Development of Transportation Networks 1 Development of Railway Networks We promote the improvement of railway networks. Some of our activities include the construction of new shinkansen lines to develop the axis of national transportation,

More information

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 4. SEEDS Asia

The 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 4. SEEDS Asia 2011.3.18 The 2011 off the Pacific coast of Tohoku Earthquake Situation Report 4 SEEDS Asia Table of contents - Overview - Situation by Affected Prefectures - Relief Operation by Japanese Humanitarian

More information

Rebuilding Japan after the Great East Japan Earthquake:

Rebuilding Japan after the Great East Japan Earthquake: Rebuilding Japan after the Great East Japan Earthquake: The Situation Today, Issues for the Future, and Initiatives by DBJ October 12, 2012 Tohoku Revival Reinforcement Office, Tohoku Branch title 1 ½

More information

Index. Page numbers followed by e, f, and t indicate equations, figures, and tables, respectively.

Index. Page numbers followed by e, f, and t indicate equations, figures, and tables, respectively. Index Page numbers followed by e, f, and t indicate equations, figures, and tables, respectively. Advanced National Seismic System (ANSS, USGS) 29 Aichi prefecture 23t Allowable Stress Design (pseudostatic

More information

Construction Scheme of Shinkansen

Construction Scheme of Shinkansen Construction Scheme of Shinkansen *These slides were created and provided to IHRA by Ministry of Land Infrastructure, Transport and Tourism (MLIT), Japan. *No part of these slides may be reproduced in

More information

JR East: International and Domestic Perspectives

JR East: International and Domestic Perspectives Peer Group Comparisons In this section, several key performance indicators illustrate how JR East compares with selected well-known companies. In scale and profitability, JR East is not to be outdone by

More information

Disaster Committee, Tohoku Chapter Mr. Mitsuo Ikami, Taiheiyo Cement Co. (Translated by Shunsuke Otani, University of Tokyo)

Disaster Committee, Tohoku Chapter Mr. Mitsuo Ikami, Taiheiyo Cement Co. (Translated by Shunsuke Otani, University of Tokyo) Tohoku Chapter, Architectural Institute of Japan Reconnaissance Report (18) on Miyako City and Kamaishi City The 2011 off the Pacific Coast of Tohoku Earthquake Released on April 15, 2011 Disaster Committee,

More information

Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake

Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake 2012 Annual Meeting of UGC August 21-27 TU Dortmund Masateru HINO Tohoku

More information

Higashi-Matsushima -- Disaster Recovery and FutureCity

Higashi-Matsushima -- Disaster Recovery and FutureCity Higashi-Matsushima -- Disaster Recovery and FutureCity Overview of Higashi-Matsushima [Location and Climate] Higashi-Matsushima is located to the northeast of Sendai, the capital of Miyagi Prefecture.

More information

P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University)

P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University) P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University) 1 Multi-hazards - Mega Earthquake, Mega Tsunami and Nuclear Power Plant Accident When did it happen? March 11, 2011, at

More information

KORIYAMA reasons for choosing. Niigata. Ban. Joetsu Shinkansen. Expressway. Tohoku Expressway Kan-Etsu. Joban Expressway

KORIYAMA reasons for choosing. Niigata. Ban. Joetsu Shinkansen. Expressway. Tohoku Expressway Kan-Etsu. Joban Expressway SUSTAINABLE CITY KORIYAMA reasons for choosing Welcome to the city with the optimal base for business Yamagata Ban Niigata Port -Ets uw est L Ban-Etsu East Line Wakamatsu Shin-Shirakawa Iwaki Tohoku Kan-Etsu

More information