1 Transporting Oil Products to Disaster Areas Yasuma Sasaki Rail Transport of Oil Products Generally, railways worldwide play a key role in carrying oil products using tank wagons over long distances between refineries, which are often in port areas, and inland oil depots. As an island nation, Japan imports nearly every barrel of oil it consumes because the country has almost no domestic oil reserves, so rail and road oil transport are key logistical operations. The following table shows the shares of transport volume in fiscal 2009 to the six prefectures in the Kanto and Tohoku regions of Japan where transport distances are 100 km or greater. It clearly demonstrates how oil transport by rail plays a major role in supporting the livelihoods of people in these regions. Transport Immediately after Great East Japan Earthquake and Tsunami The huge Magnitude 9 Great East Japan Earthquake struck northern Japan midmorning on Friday 11 March The massive damage to the region s power and transport infrastructure, first from the earthquake and then from the tsunami, immediately knocked out supply of oil products (petrol, kerosene, diesel, and fuel oil). Road and rail links were cut and powersupply disruptions even prevented pumping of petrol at stations that had survived the disaster unscathed. Although the rail network around greater Tokyo returned to operation gradually during the weekend, rolling blackouts from Monday 14 March coupled with damage to refineries in the area meant Double-headed DD51 diesel locomotives running on Ban etsu West line (JR Freight) Table 1 Shares of Transport Volume in FY 2009 (1000 kiloliter) Oil Sales Volume Rail Transport Volume Rail Transport Share Nagano Gunma Tochigi Yamanashi 4 Prefectures total Iwate Fukushima 2 Prefectures total Grand total (6 Prefectures) , % 75.6% 67.8% 42.0% 72.3% 23.0% 22.8% 22.8% 53.3% Figures for oil sales volume: Petroleum Association of Japan Japan Railway & Transport Review No. 60 Oct
2 Figure 1 Oil Product Transport Methods Tanker Truck Small volumes/high frequency Petrol station Railway Wagon Large volumes/stability Inland storage depot Small volumes/high frequency Petrol station that oil shipments to inland parts of the Kanto region soon backed up. Even in Tokyo, long lines formed at petrol stations as supplies ran short and unofficial rationing started. In light of this dire situation, on 14 March, JR Freight approached the Ministry of Land, Infrastructure, Transport and Tourism (MLITT) and JR East, which manages train operations in the affected areas, to gain their full support in assuring rail transport of oil. As a result, JR Freight managed to avoid the effects of rolling blackouts from 15 March and restarted oil transport in stages as refineries came back online. Transport to Stricken Areas The 24-hour TV news coverage was soon showing scenes of refugees shivering in the freezing winter cold at evacuation centres, because there was no kerosene for heaters. Increasingly longer queues of people and cars were forming at petrol stations. Before the disaster, oil freight trains to the Tohoku region mainly used the Tohoku Line (from Sendai Rinkai Railway to Morioka Freight Terminal or Koriyama and from the Keihin/Keiyo industrial regions to Koriyama). These lines had been cut and damaged at many locations and restoration work between Utsunomiya Freight Terminal and Morioka Freight Terminal was expected to require a long time to complete. Worse, the only oil refinery in the Tohoku region at Sendai as well as the JR Freight Sendai Rinkai Railway had both suffered major damage from the tsunami. Detour to Morioka Freight Terminal The cuts in the transport links forced planning of a 1030 km detour to Morioka Freight Terminal running from the Keihin area (Negishi ) via the Joetsu Line, Nihonkai Jukan Line, Aoimori Railway Line, and Iwate Galaxy Railway Line. On 16 March, planners hoped to get the detour operational on 19 March, but due to the strenuous efforts of all the companies involved, transport started a day earlier on 18 March. Although the Negishi Refinery of JX Nippon Oil & Energy Corporation had been affected by the earthquake, it managed to start shipping on the day the detour opened. The only tank wagons that Japan Oil Transportation could run over the full detour were thirty-six old Taki Series wagons built in the Japanese National Railways (JNR) era. They were spread all across Japan at the time and the company rushed to marshal them together as soon as possible. Normally, the Japan Oil Terminal oil depot only operated in the day, but the company immediately switched to night operations to match freight schedules. It was soon clear that running an 18-wagon train each day to the region would require three trains for a total of 54 wagons, meaning we would run out of wagons in 2 days using the 36 available. We frantically started working to find out if the new Taki 1000 Series, of which there were about 900 available, could run the full detour route. With JR East s cooperation, operations could start in a few days. Thanks to the everyone s dedication, the initial detour trains managed to run every day and a second daily run was added from 21 March. Detour to Koriyama Like Iwate Prefecture, Fukushima Prefecture was suffering a shortage of oil products too, so a 570-km detour was planned from Negishi to Koriyama via a route 29 Japan Railway & Transport Review No. 60 Oct 2012
3 Figure 2 Damage to JR Freight and JR Group Companies from Great East Japan Earthquake Number of damaged rolling stock (registered to JR Freight) and containers 4 locomotives, 172 container wagons, 46 privately owned freight wagons, 1095 containers, approximately 130 privately owned containers Sapporo (Terminal) Sendai Rolling Stock Inspection and Repair Shed Electric locomotive shed: One locomotive axle derailed, and pit rails bent Provisionally restored on 20 April 2011 Fully restored on 2 June 2011 Diesel locomotive shed: Foundation broken, and locomotive derailed on all axles to drop and break rails Restored and restarted operation on 1 August 2011 Hachinohe Rinkai Railway Flooded area around Kitanuma on Rinkai Line Operations restarted on 2 June 2011 after provisional restoration Hakodate Freight Yukawa Yard flooded Provisionally restored on 14 March 2011 Fully restored on 28 May 2011 Hakodate Freight Koriyama Terminal (Left), Koriyama Rolling Stock Inspection and Repair Shed (Right) Higashi- Aomori Kitanuma Hachinohe Freight Morioka (Terminal) In addition to ground cracks in yard, inspection and ceiling crane disengaged and wagon body support platform dislocated in repair shed Fully restored on 28 April Mito Severe damage to freight handling equipment in Baiko Depot from liquefaction Date of restoration undecided Freight train derailment (one axle of wagon) (Tohoku Main Line Nagamachi yard) Kogota Sendai Freight Depot Rikuzen-Sanno Rikuzen-Yamashita Sendaiko (West, North, Futo stations) Sendai (Terminal) Ishinomakiko Kuroiso Locomotive Depot Koriyama Freight Depot Izumi Miyashita Takasaki Locomotive Depot Hitachi Onahama Tsuchiura Mito To Nagano Shin-Hokota Taiyo Sumidagawa Tokyo (Terminal) Kashima Soccer Stadium Kamisu Okunoyahama Tsuchiura Utility poles damaged and container platform deformed by liquefaction Poles removed on 25 April 2011; Surface repaired on 10 May 2011 Keiyo-Kubota Tokyo (Terminal) Liquefaction in part of yard, and station building subsided, but no operation disruption Legend To Tokai/Kansai Negishi Kashima Rinkai Railway Area around north pier on Kashima Rinko Line destroyed by tsunami and Kamisu damaged by liquefaction Commercial operations restarted between Kamisu and Kashima Soccer Stadium stations on 25 May 2011, and between Okunoyahama and Kamisu stations on 7 June 2011; Oarai Kashima Line passenger line restored on 12 July 2011 between Taiyo and Shin-Hokota stations Fukushima Rinkai Railway Miyashita to Onahama on Rinkai Line as well as head office building, Onahama station building, and inspection/repair shed destroyed by tsunami Recovery of swept-away containers and movement of rubble completed; Freight train operations restarted on 1 February Major JR Freight/group company station or depot damaged Other station Port railway line Note: Terminal means freight terminal Japan Railway & Transport Review No. 60 Oct
4 Ishionomaki Entire station yard as well as shipper s dedicated line and JR Freight owned and operated Senseki Freight Branch Line destroyed by tsunami Containers swept away on land recovered, disassembly of destroyed locomotives and wagons and removal of line equipment completed Sendai Rinkai Railway Entire length of Rinkai Line from underpass No. 10 to end of line as well as head office building, station building, and inspection/repair shed destroyed by tsunami Recovery of swept-away containers, movement of rubble offsite, disassembly of destroyed wagons, and removal of destroyed line equipment completed Sendainishiko reopened on 25 November 2011; Sendaifuto reopened on 16 March 2012; Sendaiko reopened on 19 March 2012; and Sendaikitako to reopen in September 2012 Freight train derailment (Joban Line between Yamashita and Hamayoshida stations) Locomotive hit by tsunami with driver still onboard (about 15:50); 20 freight wagons and 75 containers swept away, but locomotive not derailed and driver unhurt Freight wagon and container disassembly and removal completed; Locomotive disassembly and removal completed in mid-november Japan Railway & Transport Review No. 60 Oct 2012
5 Figure 3 Alternative Oil Transport Routes and Volumes Higashi- Aomori Negishi No. 1 (Equivalent to tanker trucks) Negishi No. 2 (Equivalent to 22 tanker trucks) Negishi to Morioka Terminal approx km Morioka Terminal Storage depot To Morioka Terminal First run Second run (16-18 Wagons) (8 Wagons) March 21 March 16 April April Note: Suspended 8 and 9 April due to major aftershock Nihonkai Jukan Line Sendaikitako Approx. 190 km Niigata Terminal Storage depot Negishi to Koriyama approx. 570 km Approx. 160 km Approx. 560 km Ban etsu West Line Koriyama Ban etsu West Line (two runs a day) (Equivalent to 60 tanker trucks) Joetsu Line Storage depot Utsunomiya Terminal Joetsu Line (one run a day) (Equivalent to 60 tanker trucks) Negishi Terminal To Koriyama 25 March 26 and 28 March 27 and 29 March 30 and 31 March 1 14 April 15 and 16 April Joetsu Line Ban etsu West Line (20 Wagons) (10 Wagons) Note: Suspended 8 April due to major aftershock including the Joetsu and Ban etsu West lines. A major hurdle was the fact that no freight had run on the Ban etsu West Line since 2007, so a lot of the work involved securing sufficient locomotives and drivers to meet the transport capacity. DD51 diesel locomotives were needed, because part of the route was not electrified. Eight locomotives were brought from as far as Hokkaido, Nagoya, Osaka, and Kyushu. Normally, drivers undergo a month of training before driving on lines that they do not normally work on. However, since there was no time, with JR East s cooperation we conducted intensive training of JR Freight drivers on 25 March when the Ban etsu West Line was restored. The transport capacity of the Joetsu Line is 20 wagons, but the steep grade on the Ban etsu West Line only allowed haulage of 10 wagons even with double-headed DD51 locomotives. Consequently, a 20-wagon train was run every other day on the Joetsu Line from the start of operations on 25 March and it was divided at Niigata Freight Terminal into Japan Railway & Transport Review No. 60 Oct
6 Class EF81 freight locomotive hauling tanker wagons (JR Freight) two 10-wagon trains to run daily on the Ban etsu West Line. When enough drivers were ready on 30 March, a 20-wagon train was run every day on the Joetsu Line, with two 10-wagon trains running every day on the Ban etsu West Line. Transport Results for Detour Trains As shown in the following table, between 18 March and 19 April, detour trains to Morioka Freight Terminal hauled the equivalent of 1850 oil tanker trucks. From 25 March to 14 April detour trains to Koriyama hauled the equivalent of 1000 oil tanker trucks. transport to Koriyama is by one train a day from Negishi via the Tohoku Line plus the two trains a day running as in the pre-quake days from refineries in the Keihin/Keiyo area, for a total of three trains a day. Emergency oil transport was achieved after the earthquake by the cooperation of the companies involved. We are sure that, through these efforts, the importance of logistics as part of the social infrastructure has come to be recognized by more people than ever before. Terminus Transport Volume (10,000 kiloliters) Oil Tanker Truck Equivalent Morioka Freight Terminal Koriyama Total Note: Conversion to tanker truck loads = Transport volume (kl)/20 kl (capacity of one tanker truck) Oil Transport after Tohoku Line Reopening Although it has been more than a year since the disaster, Sendaikitako has still not recovered even after the full reopening of the Tohoku Line on 21 April 2011, so oil transport to Morioka Freight Terminal is using two oil freight trains a day from Negishi via the Tohoku Line. Oil Yasuma Sasaki Mr Yasuma Sasaki handles oil and chemical product transport at Marketing Department, Logistics Headquarters at JR Freight. 33 Japan Railway & Transport Review No. 60 Oct 2012
Impact on Oil Distribution and Lessons from the Great East Japan Earthquake
Impact on Oil Distribution and Lessons from the Great East Japan Earthquake April 2015 Oil Information Center 1 Introduction The Great East Japan Earthquake (1) Date: March 11, 2011 (2) Magnitude (scale
More informationDamage and Provision of Aid of Water Supply in Disaster-hit Areas, the Great East Japan Earthquake and Tsunami
Damage and Provision of Aid of Water Supply in Disaster-hit Areas, the Great East Japan Earthquake and Tsunami By Research and Publication Department, JAPAN WATER RESEARCH CENTER () Updated Wednesday March
More informationTransport and Travel in Japan
Transport and Travel in Japan Singapore Jakarta: 900km Singapore KL : 300km Yellow Circle: Area within a radius of 30 kilometers from Fukushima Daiichi Nuclear Plant. 22 Fukushima Dai-ichi Atmospheric
More informationEarthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami
1. Damages caused by the Great East Japan Earthquake 2. MLIT s emergency response to the Great East Japan Earthquake 3. Recent policy changes regarding tsunami disaster countermeasures 10 Basic Principles
More informationJR East Damage and Recovery from Great East Japan Earthquake and Tsunami
JR East suffered major damage in the Great East Japan Earthquake and tsunami. Examples of the damage and recovery are shown here. No revenue services were derailed on the Tohoku Shinkansen by the earthquake.
More informationHigh Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France
High Speed Network in Asian Countries: China, Korea and Japan Naoto YANASE UIC, Senior Advisor High Speed Paris, France Content Chinese high speed network Korean high speed network Japanese high speed
More informationDamage to JR East from Great East Japan Earthquake and Current Situation
Damage to JR East from Great East Japan Earthquake and Current Situation JR East Reconstruction Planning Dept. Facilities Dept. Construction Dept. Extent of Damage Overview At 14:46 on 11 March 2011, a
More informationEconomic Impact of the Great East Japan Earthquake and current status of Recovery. April, 2011 May 4, 2011 Embassy of Japan in France Japan
Economic Impact of the Great East Japan Earthquake and current status of Recovery April, 2011 May 4, 2011 Embassy of Japan in France Japan Contents 1. Reconstruction from the Present Earthquake (1) Tohoku
More informationHigh-Speed Rail Operations in Japan Takao NISHIYAMA
High-Speed Rail Operations in Japan Takao NISHIYAMA Director of Japan Railways Group New York Office New York, NY, U.S.A. Introduction Transportation Planning Train Variation and Efficiency Contents Risk
More informationConstruction Scheme of Shinkansen
Construction Scheme of Shinkansen *These slides were created and provided to IHRA by Ministry of Land Infrastructure, Transport and Tourism (MLIT), Japan. *No part of these slides may be reproduced in
More informationEconomic Impact of the Great East Japan Earthquake and current status of Recovery. Embassy of Japan in Denmark
Economic Impact of the Great East Japan Earthquake and current status of Recovery Embassy of Japan in Denmark 1 Contents 1. Reconstruction from the Present Earthquake (1) Tohoku Expressway 2 (2) Railroads
More informationWe have been pursuing initiatives in light of the Group Philosophy since 1987.
We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. Transportation
More information34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents
Contents 2 Our History 3 Business Portfolio 4 Risks and Opportunities 6 Our Calling 8 Financial Highlights 10 Selected Financial Data 13 Stock Information 14 A Message from the Management 16 Interview
More informationJR East: International and Domestic Perspectives
Peer Group Comparisons In this section, several key performance indicators illustrate how JR East compares with selected well-known companies. In scale and profitability, JR East is not to be outdone by
More informationJR East: Earthquake Measures
JR East: Earthquake Measures and their effectiveness 11 July 2012, Parallel sessions: Operation 1 (Risk analysis) Content Part 1 Outline of JR East and our risk evaluation Part 2 Two earthquakes that occurred
More informationShinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company
Shinkansen Network in Japan and OutlineO of East Japan Railway Company East Japan Railway Company 2004.7.5 Major JR lines, stations, and airports throughout Japan Geography of Shinkansen network in Japan
More informationKeiichi Inoue Vice-President of PIARC. Exchange knowledges and techniques on roads and road transportation
Keiichi Inoue Vice-President of PIARC 11 March, 2011 14:46(JST) 100km Disaster By TUNAMI By Earthquake Distribution of seismic intensity March 11 th, 2011 14:46 (JST) The earthquake caused extensive damages
More informationHigh Speed System in Japan
High Speed System in Japan Toru MIYAUCHI SIAFI 2006, SPADs Team Senior Technical Advisor, UIC Railway Technical Research Institute (RTRI), Japan 1/25 Japan Sapporo Land area 380 thousands km2 Population
More informationCities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake
Cities Necessity to build intercity networks for their self-sustainability : Lessons learned from the Great East Japan Earthquake 2012 Annual Meeting of UGC August 21-27 TU Dortmund Masateru HINO Tohoku
More informationKORIYAMA reasons for choosing. Niigata. Ban. Joetsu Shinkansen. Expressway. Tohoku Expressway Kan-Etsu. Joban Expressway
SUSTAINABLE CITY KORIYAMA reasons for choosing Welcome to the city with the optimal base for business Yamagata Ban Niigata Port -Ets uw est L Ban-Etsu East Line Wakamatsu Shin-Shirakawa Iwaki Tohoku Kan-Etsu
More informationEpicenter of the Eastern Japan Great Earthquake
Epicenter of the Eastern Japan Great Earthquake Epicenter The supply-demand situation and the power-saving measures taken this summer as a result of the stoppage of Nuclear Power Plants caused by the Eastern
More informationIOC/UNESCO Bulletin No. 8 As of 23 March 2011
IOC/UNESCO Bulletin No. 8 As of 23 March 2011 Casualties by the Earthquake and Tsunami As of 06:00z 23 Mar 2011 The National Police Agency Dead: 9,452 Missing: 14,715 Road destruction: 1,749 Bridge destruction:
More informationJR East: Domestic and International Perspectives
Peer Group Comparisons In this section, several key performance indicators illustrate how JR East compares with selected well-known companies. In scale and profi tability, JR East is not to be outdone
More informationTransportation >Tokyo Metropolitan Area Network
REVIEW OF OPERATIONS Transportation >Tokyo Metropolitan Area Network JR East s greatest strength is having a service area that includes the Tokyo metropolitan area, which accounts for about one-third of
More informationMeasures Perpetuating JR East s Unlimited Growth Potential
FEATURE Measures Perpetuating East s Potential Potential 1. Series E6 railcars Enhancement of the Shinkansen Network Operation of Shinkansen at Faster Speeds Starting March 2013, East raised the maximum
More informationEvaluation of the National Railway Reform in Japan
Evaluation of the National Railway Reform in Japan Paris, 8 th September, 2010 Takashi Yanagawa, Kobe University Ichiro Yoshino, Nagoya University of Commerce & Business Kozo Harimaya, Ritsumeikan University
More informationEducation for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company
Education for Pedestrians at Level Crossings Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company 1 Contents 1. Outline of JR East 2. JR East Group Safety Plan 2018 (five-year
More informationApril 13, Dear Sir and Madam,
4-23-10-402, Taito, Taito-ku Tokyo 110-8567 Japan T +81-3-3837-0211 F +81-3-3837-1231 April 13, 2011 Dear Sir and Madam, One month has been passed since the massive earthquake and tsunami on March 11.
More informationRole of Railways in Building Resilient Against Natural Disaster-Lessons from Japan
Role of Railways in Building Resilient Against Natural Disaster-Lessons from Japan February 27, 2018 Yoshitaka Motoda Professor Emeritus Iwate Prefectural University Japan Contents Introduction Great East
More informationJapanese Station Lunchbox Wrappers
Japanese Station Lunchbox Wrappers Railways started in Japan in 1872. As the network spread and more people travelled by train, there was increasing demand for more onboard food services. One answer to
More informationWCO General Session JAPAN. Rengo Co., Ltd. May 23, 2011 / Montreal
WCO General Session JAPAN Rengo Co., Ltd. May 23, 2011 / Montreal 3.11 the Great East Japan Earthquake -- earthquake, tsunami and Fukushima Nuclear Accident 1 3.11 the Great East Japan Earthquake Latitude
More informationHigh Speed Lines Operation in Japan
High Speed Lines Operation in Japan Takumi ISHII Deputy director, JR East Paris Office Senior Advisor High Speed Passengers and High Speed Department, UIC PALACIO EUSKALDUNA BILBAO 23-24 /02 /2015 Nazioarteko
More informationHigh Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015
High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015 Topics 1. Why high speed rail (HSR) is preferred 2. Japan s experience in HSR project 3. HSR era has come to Sweden 4. JOIN
More informationJapan Railways Successful Financing Models
Japan Railways Successful Financing Models March 26, 2009 Masashi Hiraishi First Secretary, Embassy of Japan in India Contents 1. Financial scheme for the construction of new line in Japan 2. Integrated
More informationName Plate Design of Japanese Express Trains
Name Plate Design of Japanese Express Trains Fuji and Sakura In 1912, the Japanese Government Railways (JGR) inaugurated a luxurious express service, composed of 1st and 2nd class carriages only, between
More informationJAPAN RAIL PASS Exchange Order cannot be purchased inside Japan.
Japan Rail Pass is the key to Convenient Sightseeing in Japan. The pass is offered by the Japan Railways Group (JR Group) that comprises of 6 railway companies. JAPAN RAIL PASS Exchange Order cannot be
More informationKNOWLEDGE NOTE 4-1. Infrastructure Rehabilitation. CLUSTER 4: Recovery Planning. Public Disclosure Authorized. Public Disclosure Authorized
KNOWLEDGE NOTE 4-1 CLUSTER 4: Recovery Planning Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Prepared by Junko Sagara, CTI Engineering,
More informationTsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster. Takehiko Fujita
May 25, 2011 Tsunami Impacting Eastern Japan and Preparedness for Extraordinary Natural Disaster Takehiko Fujita Acting President Port and Airport Research Institute, Japan Contents 1. Outline of the earthquake
More informationGreat East Japan Earthquake and Tsunami, Fukushima Daiichi NPP Accident (1/5)
Great East Japan Earthquake and Tsunami, Accident (1/5) < About Great East Japan Earthquake and Tsunami > Date and Time: March 11, 2011 14:46 JST Epicenter: Off the Sanriku coast (38 6.2 N, 142 52 E) Depth
More informationRESTORATIONS AND SYSTEM INTERACTIONS OF LIFELINES IN THE GREAT EAST JAPAN EARTHQUAKE DISASTER, 2011
Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan RESTORATIONS AND SYSTEM INTERACTIONS OF LIFELINES IN THE
More informationPopulation Movement in the Tohoku Region after the Great East Japan Earthquake Disaster
83 Population Movement in the Tohoku Region after the Great East Japan Earthquake Disaster Takashi ABE Abstract This paper clarifies the demographic change in the Tohoku Region after the Great East Japan
More informationOverview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto)
Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto) Shoshi Shimamura Introduction The Hokkaido Shinkansen (between Shin-Aomori and Sapporo) is essential for the revitalization
More informationFigure Pre- and post-disaster satellite topographical maps
2.1.3 Image analysis by JAXA JAXA conducted ongoing emergency observations using Daichi in the wake of the Great East Japan Earthquake, releasing reporting of its analysis of eastern Japan and Hokkaido
More informationKNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KNOWLEDGE NOTE 1-3 CLUSTER 1: Structural Measures Hydro-meteorological Disasters Associated
More informationEXECUTIVE VICE PRESIDENT. Masaki OGATA. Copyright 2010 East Japan Railway Company. All rights reserved 1
EXECUTIVE VICE PRESIDENT Masaki OGATA Copyright 2010 East Japan Railway Company. All rights reserved 1 Company Profile of JR East Copyright 2010 East Japan Railway Company. All rights reserved 2 Company
More informationThe 11th Fukushima Vocal Ensemble Competition March 22 - March 26, 2018 Fukushima, Japan
The 11th Fukushima Vocal Ensemble Competition 2018 March 22 - March 26, 2018 Fukushima, Japan Contents Hosts / Co-hosts / Sponsors 1 Venue Tentative Schedule Program Competition Rules 2~3 Category Entry
More informationTechnical Report for. Asian Barometer Survey Japan wave4
Institute of Political Science at Academia Sinica Technical Report for Asian Barometer Survey Japan wave4 July 21, 2016 Central Research Services, Inc. 1 [RESEARCH DESIGN] - Research Method:
More informationOutlook for Japan Titanium Industry 2011
Outlook for Japan Titanium Industry 2011 International Titanium Association 27 th Annual Conference & Exhibition October 3 rd, 2011 Shozo Nishizawa Chairman of the Japan Titanium Society 1 Agenda 1. Summary
More informationJapan s Nuclear Accident - Update - June 7, 2011 Ministry of Economy, Trade and Industry Government of Japan
Japan s Nuclear Accident - Update - June 7, 2011 Ministry of Economy, Trade and Industry Government of Japan Great Support of the International Community Japan deeply appreciates the assistance offered
More informationReferences for Tohoku Trip June Contents
References for Tohoku Trip 28-29 June 2012 Contents 1. Inundated Area Ishinomaki City 01 Onagawa Town 03 Minamisanriku Town 04 Kesennuma City 05 2. Maps before and after damage Minamisanriku Town 06 Kesennuma
More informationIn depth damage report by affected cities
The Great Eastern Japan Earthquake (GLIDE: EQ-2011-000028-JPN) 2011.04.28 In depth damage report by affected cities SEEDS Asia Table of Contents I: Overview II: The Earthquake and Tsunami: Their Impact
More informationSituation and response of JAEA to the Earthquake in Northeastern Japan (Outline of activities on March 11-18)
As of 19:30, March 18, 2011 Japan Atomic Energy Agency Situation and response of JAEA to the Earthquake in Northeastern Japan (Outline of activities on March 11-18) Summary The Japan Atomic Energy Agency
More informationTokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662.
Shinkansen Network Review of Operations Competition with Airlines Akita Hybrid Shinkansen 3:50 16,810 15 Aircraft (Akita ) 2:53 24,110 7 Joetsu Shinkansen + Uetsu Honsen Tokyo-Niigata 4.7 million passengers
More informationMARCH 2011, TSUNAMI DISASTER IN JAPAN
MARCH 2011, TSUNAMI DISASTER IN JAPAN Dr. Neelima Satyam D 1 and Dr. D V Reddy 2 1 Assistant Professor Earthquake Engineering Research Centre International Institute of Information Technology Hyderabad
More informationThe 2011 off the Pacific coast of Tohoku Earthquake. (immediate version)
2011.3.15 The 2011 off the Pacific coast of Tohoku Earthquake SituationReport 1 (immediate version) SEEDS Asia Map of Seismic Intensity Tohoku Earthquake of 14:46(JST), 11 March 2011 Source : Japan Meteorological
More informationP. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University)
P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University) 1 Multi-hazards - Mega Earthquake, Mega Tsunami and Nuclear Power Plant Accident When did it happen? March 11, 2011, at
More informationDevelopment of Transportation Networks
1 Development of Railway Networks We promote the improvement of railway networks. Some of our activities include the construction of new shinkansen lines to develop the axis of national transportation,
More informationConstruction of Ueno Tokyo Line
Construction of Ueno Tokyo Line JR East Construction Department Introduction East Japan Railway Company has a wide-ranging operations area from Kanto and Koshin etsu to Tohoku. When JR East was established
More informationand Current Status of Recovery Consulate General of Japan in New York
Economic Impact of the Great East Japan Earthquake and Current Status of Recovery May 13, 2011 Consulate General of Japan in New York Contents 1. Extent of the affected areas 2 2. Reconstruction and recovery
More informationEffectiveness of Electrical Safety Management Service proven by the Great East Japan Earthquake
Effectiveness of Electrical Safety Management Service proven by the Great East Japan Earthquake Seiji Watanabe Tohoku Electrical Safety Inspection Association 1 Fédération Information Internationale pour
More informationJapan s Current Status and Challenges Towards Recovery
Japan s Current Status and Challenges Towards Recovery June 22, 2011 Hiroshi Inomata Consul General of Japan in San Francisco 1. Japan Faces an Unprecedented Challenge (Enormous Earthquake, Tsunamis and
More informationCERTIFICATE. with the organizational units/sites as listed in the annex UM
CERTIFICATE This is to certify that with the organizational units/sites as listed in the annex has implemented and maintains an Environmental Management System. : processes associated with: The sales of
More informationGREAT EARTHQUAKE DISASTER NILIM, JAPAN
EAST- JAPAN GREAT EARTHQUAKE DISASTER 11 MARCH in 2011 NILIM, JAPAN CONTENTS 1. Outline of the EARTHQUAKE DISASTER 2. History of EARTHQUAKE/TSUNAMI occurred in Japan 3. Disaster Prevention Policy and Strategy
More informationCurrent Status of Reconstruction and Challenges
Current Status of Reconstruction and Challenges Reconstruction progress of the six years and the policies ahead 1. Providing Health and Living Support 2. Restoration of Towns and Housings 3. Reviving Industry
More informationTable Major analysis products provided by JAXA
Report on JAXA s Response to the Great East Japan Earthquake - Assistance using earth observation satellites and communication satellites - 2.1.5 Product provision and utilization by users for disaster
More informationTransportation Shinkansen Network
REVIEW OF OPERATIONS Transportation Shinkansen Network Competition with Airlines 100% Required Fare Akita Hybrid Shinkansen 3:49 16,810 15 Aircraft (Akita ) 2:38 23,210 7 Joetsu Shinkansen + Uetsu Honsen
More informationREPORT OF STUDY TRIP (TOHOKU)
INTERNATIONAL INSTITUTE OF SEISMOLOGY AND EARTHQUAKE ENGINEERING (IISEE) REPORT OF STUDY TRIP (TOHOKU) 14 18 November 2011 Prepared by: Nur Intan Irzwanee Nurashid T course (Malaysia) 5/12/2011 Day 1:
More informationGanbarou! TOHOKU. to the Great East Japan Earthquake
Ganbarou! TOHOKU Response of Tohoku Regional Bureau, MLIT, espo se o o o u eg o a u eau,, to the Great East Japan Earthquake Outline of the Great East Japan Earthquake Date/Time: March 11 14:46, 46 2011
More informationThanks to the efforts of so many people and their support including that of international society, reconstruction is moving steadily ahead.
Minister Yoshino s Keynote Speech at the Luncheon Plenary of the U.S.-Japan Council Annual Conference Reconstruction from the Great East Japan Earthquake (November 13, 2017, Washington DC) Ladies and gentlemen,
More informationPath forward for reconstruction after the disaster
Path forward for reconstruction after the 3.11 2011 disaster 2.16 2013 1- Immediate Impact of the 3.11 Disaster Earthquake Magnitude: 9.0 Casualties: Dead : over 15,800 Missing: over 2,700 Injured: over
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER 30/8/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 28: No Country Left Behind Initiative QUICK RESPONSE AFTER EARTHQUAKE IN KUMAMOTO AIRPORT
More informationPost tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami
Date : 18 Nov., 2015 Venue : Furama Ballroom 1 SESSION 1 : A Decade of Partnerships in Sustainable Development of the Seas of East Asia: Synergies and Achievements WORKSHOP 1.1 : Managing Risks in Climate
More informationProposing/Implementing Key Measures for Industrial Recovery from the Great East Japan Earthquake
Global Conference on the International Network of Disaster Studies in Iwate, Japan "Iwate Conference" Proposing/Implementing Key Measures for Industrial Recovery from the Great East Japan Earthquake 2018.07.18
More informationThe 2011 off the Pacific coast of Tohoku Earthquake. Situation Report 3. SEEDS Asia
2011.3.17 The 2011 off the Pacific coast of Tohoku Earthquake Situation Report 3 SEEDS Asia Overview With the massive earthquake and the following tsunamis happened on 11 March 2011 (14:46 JST), the death
More informationGreat East Japan Earthquake Kimiaki Nagashima
Great East Japan Earthquake Kimiaki Nagashima Japan Water Works Association 12.05.2011 Great East Japan earthquake 1 earthquake 2 Tsunamis 3Floods 4fires 5Nuclear disasters From the daily yomiuri Mar 12,2011
More informationFeature: Priority Initiative 01 Railway Network Expansion
Feature: Priority Initiative 01 Railway Network Expansion Following on from the March 2015 opening of the Hokuriku Shinkansen Line from Nagano to Kanazawa, March 2016 saw the opening of the Hokkaido Shinkansen
More informationOportunidade de Negócios com Empresas Japonesas. JETRO São Paulo Atsushi Okubo
Oportunidade de Negócios com Empresas Japonesas JETRO São Paulo Atsushi Okubo Our Mission Our strengths Quickly connecting Japanese companies to the world by making full use of our global network! JETRO:
More informationA Railway Operator s Perspective on the Lessons of the Great Hanshin-Awaji Earthquake WEST JAPAN RAILWAY COMPANY. Takayuki Sasaki
A Railway Operator s Perspective on the Lessons of the Great Hanshin-Awaji Earthquake WEST JAPAN RAILWAY COMPANY Takayuki Sasaki Introduction 1 Welcome to Kyoto! Outline of JR-West JR West Service Area
More informationKnow-How List. HQ operation.
Know-How List This is an unofficial English translation of the Japanese leaflet which is to compile what the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) has done for response and recovery
More informationpeople have been evacuated and rescue operations are ongoing.
Japan earthquake and tsunami Situation Report No. 7 16 March 2011 As of 14:30 hrs Manila time All times stated below are in Tokyo time. SITUATION SUMMARY A 9.0 magnitude earthquake (updated from the 8.8
More informationSpecial feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety
Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety Norihiko Mandai General Manager of Shinkansen Transport Department. (Former General Manager of Transport
More informationEast Japan Disaster- Preliminary Report
East Japan Disaster- Preliminary Report NEWS LETTER 2011 Association of Japanese Consulting Engineers (AJCE) 1. Introduction At 14:46 March 11, 2011, It started with slight shakes. Japan has a lot of earthquakes.
More informationTRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1
TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1 Overview Major International Airports: Normal operation (excluding Sendai Airport) Shinkansen Express Train : Normal
More informationJapan earthquake and tsunami Situation Report No March 2011 As of 1830 hrs Manila Time
Japan earthquake and tsunami Situation Report No. 03 12 March 2011 As of 1830 hrs Manila Time SITUATION SUMMARY An 8.8 earthquake occurred at 05.46.23 UTC on 11 Mar 2011 in Japan, hitting the northeast
More informationResponse to Tsunami Disaster -the Great East Japan Earthquake 2011-
Response to Tsunami Disaster -the Great East Japan Earthquake 2011- JAPAN COAST GUARD Hydrographic and Oceanographic Department (JHOD) Outline I. Response to Tsunami Disaster 2011 II. International meeting
More informationToward More Competitive Economy and Society
Chapter 5: Toward More Competitive Economy and Society Developing wide-based transport networks Developing highways Japan is lagging behind the U.S. and European countries in terms of highway development.
More informationWorking Across political Boundaries to Realize Quality Infrastructure Investment -Case of Japan-
Working Across political Boundaries to Realize Quality Infrastructure Investment -Case of Japan- Kazuko Ishigaki Director, International Planning for Construction Industry Ministry of Land, Infrastructure,
More informationMonthly Report of Tuberculosis Surveillance, Japan January, 2016
Surveillance Center, RIT, JATA Monthly Report of Tuberculosis Surveillance, Japan January, 216 The reporting and recording of tuberculosis () and Latent Infection (LI) are managed at public health centers
More informationJAL Group Announces Consolidated Financial Results for Full Fiscal Year 2011
JAL Group Announces Consolidated Financial Results for Full Fiscal Year 2011 TOKYO May 14, 2012: The JAL Group (JAL) announced today the consolidated financial results for the full fiscal year of 2011
More informationMonthly Report of Tuberculosis Surveillance, Japan May, 2018
Surveillance Center, RIT, JATA Monthly Report of Tuberculosis Surveillance, Japan May, 218 The reporting and recording of tuberculosis () and Latent Infection (LI) are managed at public health centers
More informationMonthly Report of Tuberculosis Surveillance, Japan September, 2018
Surveillance Center, RIT, JATA Monthly Report of Tuberculosis Surveillance, Japan September, 218 The reporting and recording of tuberculosis () and Latent Infection (LI) are managed at public health centers
More informationThe Railway Museum as Science, Industry and History Museum Past, Present, and Future
The Railway Museum as Science, Industry and History Museum Past, Present, and Future Ichiro Tsutsumi Introduction This article presents a short history of railway museums in Japan, their current state,
More informationCopyright 2017 East Japan Railway Company. All rights reserved. Rethinking the Safety Philosophy Yasutake Kojima Director June 12, 2017
Copyright 2017 East Japan Railway Company. All rights reserved. Rethinking the Safety Philosophy Yasutake Kojima Director June 12, 2017 One: Overview of JR EAST Two: JR EAST Safety Plan 2018 TABLE OF CONTENTS
More informationRestoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City
City of Sendai Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City Akira TAKAHASHI akira_takahashi_a@city.sendai.jp Director, Disaster-Resilient and Environmentally-Friendly
More informationTohoku Pacific Ocean Earthquake: Current Status and Restoration Plan
Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan NTT DOCOMO, INC. March 30, 2011 Damage to Base Stations & Restoration Measures 788 base stations requiring inspection as of March 22
More informationGlossary. Rolling Stock Kilometers means the number of train kilometers (as defi ned below) multiplied by the number of railcars comprising the train.
Glossary C Commuter Pass refers to a credit card sized pass that is either magnetically encoded or contains an integrated circuit (IC) chip to allow travel between two stations during a period of one,
More informationAn Analytical Model on Time Series Data in Inland Prefecture of Japan
An Analytical Model on Time Series Data in Inland Prefecture of Japan Shoichi Kaneko Faculty of Management Information Yamanashi Gakuin University Kofu, Yamanashi, JAPAN shoichi@ygu.ac.jp Takaaki Kawanaka
More informationPhotos courtesy of the Japanese Ministry of Foreign Affairs: Flooding at Sendai International Airport
Dear Friends, I. Sendai International Airport On March 11 th Japan was struck by a three-fold disaster causing the loss of nearly 20,000 lives. In the following days and weeks, 19,703 members of the US
More informationJNR(Japan National Railways) Reform. *No part of these slides may be reproduced in any form with out permission.
JNR(Japan National Railways) Reform *No part of these slides may be reproduced in any form with out permission. Timeline of JNR Reform 1872 1964 The first railway Opened (UK s cooperation) The first HSR
More informationTHE IMPACT OF THE PARTLY-OPENED KYUSHU SHINKANSEN
THE IMPACT OF THE PARTLY-OPENED KYUSHU SHINKANSEN Toshiji TAKATSU, Executive Director, JRTT* Jun SUEHARA, Acting Director, 1 st Shinkansen Division, Shinkansen Department, JRTT*, Staff, 1 st Shinkansen