1 Bureau of Mining and Petroleum...the key to Queensland s resource development. The Queensland Coal Industry Review nd Edition

2

3 The Queensland Coal Industry Review nd Edition

4 Published by: Department of Natural Resources, Mines and Energy GPO BOX 2454 Brisbane Qld 4001 Australia This publication was prepared by officers of the Department of Natural Resources, Mines and Energy. It may be distributed to other interested individuals and organisations. This publication is intended to provide information only on the subject under review. It is not intended to, nor does it constitute, expert advice. Readers are warned against relying solely on the information contained herein. Further professional advice should be sought before acting on the information supplied in this report. While all care has been taken in the preparation of this document, neither the Department of Natural Resources, Mines and Energy, nor its officers or staff accept any responsibility for any loss or damage that may result from any inaccuracy or omission in the information contained herein. The State of Queensland (Department of Natural Resources, Mines and Energy) 2004 Copyright enquiries should be addressed to: The Director of Product Marketing Department of Natural Resources, Mines and Energy GPO Box 2454 Brisbane Qld 4001 ISSN QNRME04249 #27011 Compiled by: Ray Smith, David Coffey and Estelle Abbott Design, editing and proofreading: Web and Publishing Services For further information contact: The Bureau of Mining and Petroleum Department of Natural Resources, Mines and Energy Floor 3 41 George Street Brisbane Qld 4000 Australia Telephone: Facsimile: Cover photograph: Berthing of the Suirei Maru on 14 March 2003, the first vessel to use the new No. 3 Berth at the RG Tanna Coal Terminal, port of Gladstone. The vessel loaded more than tonnes of coal from the Kestrel mine for export to Japan (photograph courtesy of Gladstone Port Authority) Title page photograph: Coal being stacked, Moura mine (photograph courtesy of Anglo Coal Australia Pty Ltd) Acknowledgments The Department of Natural Resources, Mines and Energy gratefully acknowledges the cooperation and contributions of representatives from both government and industry, particularly the various coal mining companies, who provided much of the information contained in this publication. ii The Queensland Coal Industry Review

5 Minister s foreword In , the coal industry in Queensland again set new records for both production and exports, driven by growth in the international and domestic markets. Although global demand for high-quality coking and thermal coal increased, the industry faced a more difficult market with rising cost pressures resulting mainly from significant movements in currency exchange rates which eroded much of the competitive advantage of the previous year. The industry achieved record coal exports of million tonnes (Mt), thereby maintaining Queensland s position as the largest provincial exporter of coal in the world, with about 20 per cent of the world s seaborne coal trade. While an additional 6.1 Mt of coal were exported in , sales revenue declined by A$0.76 billion to A$7.98 billion free on board (FOB) compared with the previous year. Market conditions have since improved into 2004 and coal remains the state s largest export-earning commodity. Traditional Asian markets continued to rate as the most important buyers of Queensland coal, with Japan accounting for 50.5 Mt (39 per cent of total exports), and European countries collectively accounting for 25.5 Mt (20 per cent) for the year. Increased demand from Korea which received 19.8 Mt (15 per cent) and India which received 13.3 Mt (10 per cent) contributed to the increased sales performance. The coal industry is a key driver for regional economic development, and in it generated an increase in employment of 237 jobs compared with the previous year, with further expansion in progress. The industry and its supporting service providers have continued to bring prosperity to a significant portion of regional Queensland. The industry has maintained a high safety record, with workplace incidents again reduced throughout the year even Top: Stephen Robertson, Minister for Natural Resources, Mines and Energy though the workforce increased considerably. The safety performance of Queensland s coal mines remains equal to or better than that of comparable mines elsewhere. This achievement is underpinned by appropriate mine safety legislation and the collective commitment to safety by the operating companies, their personnel, and government. Internationally, growth in demand for coal continues to rise, and the Queensland coal industry is well positioned, in terms of both coal resources and infrastructure capacity, to meet this demand and maintain its share of an expanding market. This position is underpinned by a large resource inventory of coal within well-serviced areas of the Bowen Basin in central Queensland and the Surat Moreton basins in south-east Queensland. Expansion of the industry continued in , with new mines under development or at an advanced planning stage including the Hail Creek and Moorvale opencut operations, the new Broadmeadow underground punch longwall mine at Goonyella, and the Grasstree Colliery project at German Creek. The Queensland coal industry continues to offer opportunities for investors, with coal export growth showing no signs of slowing. The development and application of clean coal technologies, many still in their infancy, will continue to improve the status of coal over time. These and other technological solutions will help to ensure that coal remains an important commodity for the foreseeable future and continues to be a major contributor to Queensland s prosperity. Stephen Robertson Minister for Natural Resources, Mines and Energy The Queensland Coal Industry Review iii

6 In this review The Queensland coal industry Coal mining operations 5 Exploration and resources 11 Transport and shipping 19 The electricity industry 24 Coal research activities 28 Health and safety 32 Mine and company information 34 Queensland coal statistics 53 iv The Queensland Coal Industry Review

7 The Queensland coal industry Overview During fiscal , the Queensland coal industry continued to expand, achieving record production levels as well as record export and domestic sales. Coal continued to be the largest export earner for Queensland with the value of sales amounting to A$7.98 billion free on board (FOB). Raw coal mined increased from million tonnes (Mt) in to Mt in , up 5.1 Mt (2.7 per cent). On a mine-type basis, production of raw coal from open-cut operations increased by 9.1 Mt (6.0 per cent) from Mt to Mt, while production from underground mines declined by 4.0 Mt (10.3 per cent) from Mt to Mt. Production of saleable coal increased by 5.24 Mt (3.5 per cent) from Mt to Mt. On a mine-type basis, the tonnage of saleable coal derived from open-cut operations increased by 9.12 Mt (7.8 per cent) from Mt to Mt, while saleable production from the underground mines declined by 3.88 Mt (12.5 per cent) from Mt to Mt. Total coal sales during amounted to Mt. Queensland maintained its position in as the world s largest exporter of seaborne coal, with total exports of a record Mt to 35 countries throughout the world, up 6.11 Mt (5.0 per cent) on the tonnage of Mt. Statistical summary Saleable production Open-cut Mt Underground Mt Total Mt Exports Coking Mt Thermal Mt Total Mt Value ($A billion FOB 1 ) Domestic consumption Queensland Mt Interstate Kt 2 Employment as at 30 June 2003 Open-cut Underground Total Productivity tonnes of saleable coal per employee 3 Open-cut Underground Overall Number of mines at 30 June 2003 Open-cut 34 Underground 10 1 free on board 2 kilotonne 3 See explanatory notes, page 53 Top: Overburden removal Blackwater mine (Photograph Department of Natural Resources, Mines and Energy) The Queensland coal industry

8 Tonnes (millions) Tonnes (millions) Queensland coal production Year to June 30 Raw Saleable Saleable production Open-cut Underground Coking Thermal Total 2003 Figure 1: Queensland raw and saleable coal production Figure 2: Saleable production , by mining method and coal type Domestic coal sales within Queensland amounted to Mt, an increase of 0.48 Mt (2.0 per cent) on the figure of Mt. Approximately 90 per cent of the Queensland consumption was used in the state s electricity industry. Sales to customers in other Australian states amounted to approximately tonnes of coal. The total number of people employed in the Queensland coal industry increased by 237 (2.3 per cent) from on 30 June 2002 to on 30 June Of that number, 8185 were associated with open-cut operations, an increase of 199 on the 30 June 2002 level of The number of people associated with underground operations was 2528, as compared with 2490 on 30 June Two new open-cut mines commenced production during the financial year at New Acland (August 2002) and Moorvale (March 2003) while production from the Ebenezer open-cut mine west of Brisbane ceased in December In addition, the first of two bulk samples was taken from the Rolleston test pit between September and December Exploration activity continued to increase during the year with the area of the state covered by exploration permits for coal (EPCs) and EPC applications at an all-time high at year s end. While the current outlook for the Queensland coal industry appears to remain relatively strong, coal pricing, currency exchange rates, and the timely development of future projects and related infrastructure will continue to be key factors in ensuring the competitiveness of the industry in Queensland. Tonnes (millions) Queensland coal exports Year to June 30 Coking Thermal Figure 3: Coal exports fiscal years to , by coal type Production During , the Queensland coal industry achieved record production levels with total raw coal production of Mt from which Mt of saleable coal was produced, an increase of approximately 2.7 per cent on the total for Figure 1 shows the steady increase in production of raw and saleable coal from Queensland s mines over the financial five-year period from July 1998 to June Figure 2 shows the relative proportions of the state s saleable coal production by mining method and coal type. Approximately 82 per cent of the production ( Mt) was mined by open-cut methods with 2 The Queensland coal industry

9 underground mining accounting for the remaining 18 per cent (27.25 Mt). Coking coal accounted for 50 per cent (63.39 Mt) of the open-cut production and almost 79 per cent (21.47 Mt) of the underground production, or 55 per cent of the overall saleable production. Coal sales Buoyed by strong international demand, total coal sales during amounted to Mt, with exports setting a new record of Mt to 35 countries throughout the world. Exports increased by 6.11 Mt (5.0 per cent) on the tonnage of Mt and domestic coal sales within Queensland amounted to Mt, up by 0.48 Mt (2.0 per cent) on the figure of Mt. Sales to customers in other Australian states amounted to approximately tonnes of coal. Coal remains Queensland s largest export earner, with the industry achieving overseas sales revenue of A$7.98 billion (FOB) in , a decrease of 8.7 per cent on the value of coal exports in despite the additional 6.11 Mt shipped. The relatively low US dollar prices, particularly in the thermal coal spot market, and less favourable currency exchange rates decreased sales revenues in Australian dollars. During the year the Australian dollar appreciated in value from A$1.00 = US$0.548 in July 2002 to A$1.00 = US$0.667 in June 2003 (Reserve Bank of Australia web site, < Domestic sales that were comprised mainly of lower grade thermal coals added more than $0.5 billion (ex-mine) to the sales revenues of the mines. The Queensland Government received over $530 million in royalty revenue from coal mining in Exports International demand for Queensland metallurgical coals (coking and PCI coals) remained relatively static during while thermal coal exports increased significantly. Overall, coal exports increased by 6.11 Mt (5.0 per cent) in to a record Mt (Figure 3). On a coal-type basis, metallurgical coal exports, comprising coking coal used in steel making and coal used for pulverised coal injection Tonnes (millions) Queensland coal exports, by region Financial year Japan Other Asia Europe Other Figure 4: Coal exports by region, fiscal years to (PCI) into the blast furnace, increased marginally, by 0.65 Mt (0.75 per cent) from Mt in to Mt in Thermal coal exports increased by 5.46 Mt (14.8 per cent) from Mt in to Mt in Coal was shipped to 35 countries throughout the world. Japan continued to dominate as the largest importer of Queensland coals, buying Mt (29.33 Mt of coking coal and Mt of thermal coal) or 39 per cent of the state s coal exports for Korea maintained its position as the state s second largest coal customer, taking Mt, an increase of 20 per cent on the total tonnage purchased in Other major purchasers were India (13.29 Mt), Taiwan (5.93 Mt), the United Kingdom (5.67 Mt), France (5.10 Mt), Brazil (3.91 Mt) and the Netherlands (3.27 Mt). Collectively, shipments to Europe amounted to Mt, representing 20 per cent of Queensland s coal exports for the year. Figure 4 shows the change in the volume of Queensland coal exports to Japan, the rest of Asia, Europe, and other countries over the five-year period from to The average export price (FOB) of coking coal declined to $A71.17 per tonne, an 11 per cent decrease on the average price (CPI adjusted) for Similarly, the average price for thermal coal declined by 26 per cent to $A42.50 compared to the average price received in The Queensland coal industry

10 Domestic coal consumption During , domestic coal purchases in Queensland increased to Mt, up 0.48 Mt (2.0 per cent) on the Mt that was purchased in Approximately 90 per cent of the Queensland coal consumption was used in the state s electricity industry. Sales to customers in other Australian states amounted to approximately tonnes of coal. The increase in the Queensland consumption of coal in was almost entirely due to increased demand in the electricity industry, which purchased Mt, up 0.50 Mt (2.4 per cent) on the figure of Mt. Consumption by the other domestic industry groups recorded slight increases or remained almost static as shown in Table 1. Domestic coal consumption Domestic coal sales (Mt) Consumer group The number of employees associated with underground operations (2528) increased by 1.5 per cent on the number at 30 June Productivity per employee for the Queensland coal industry as a whole decreased by 6.1 per cent, from tonnes of saleable coal in to tonnes in On a mine-type basis, the average yearly output of saleable coal per employee for open-cut operations decreased by 4.2 per cent from tonnes during to tonnes during The average yearly output of saleable coals per employee for underground operations decreased by 15.4 per cent from tonnes during to tonnes during On an employee shift basis, the overall productivity of Queensland s underground mines in declined by 9.8 per cent to tonnes of saleable coal per employee shift, while productivity in open-cut operations increased by 1.5 per cent to 59.7 tonnes of saleable coal per employee shift in the same period. Electricity Metal processing Building materials Paper pulp and board Coke works Food processing Other Total Table 1 Employment and productivity 1 As at 30 June 2003, the Queensland coal industry directly employed a workforce (including contractors) of , an increase of 237 (2.3 per cent) on the level of employment at the end of (Figure 5). Open-cut operations accounted for 8185 persons (76.4 per cent of the total workforce), representing an increase of 2.5 per cent on the corresponding figure for 30 June Persons Queensland coal industry employment Open-cut At June 30 Underground 2003 Figure 5: Queensland coal industry employment, to , by mine type 1 See Explanatory notes, page XXX 4 The Queensland coal industry

11 Coal mining operations Queensland coal mine ownership A number of changes to mine and operating company ownership occurred during and in the subsequent period to the preparation of this text in early Since July 2002, a number of ownership changes, internal restructures and equity redistributions have occurred within certain companies and joint ventures operating within the Queensland coal industry. Some companies have formed strategic alliances or joint ventures with a number of Japanese companies that have had longstanding involvement in the state s coal industry. These Japanese companies have availed themselves of opportunities that have arisen in recent years to increase their equity position in Queensland coal projects. Currently, there are four major coal producers operating within the state that clearly dominate coal production. These are the BHP Billiton Mitsubishi Alliance (BMA) (also operating on behalf of BHP Mitsui Coal Pty Ltd); Rio Tinto Coal Australia Pty Limited; Anglo Coal Australia Pty Ltd (in joint venture with Mitsui Coal Holdings Pty Ltd); and Xstrata Coal Queensland Pty Ltd (a wholly owned subsidiary of Xstrata Plc). During coal mines operated by these four groups accounted for more than 76 per cent of Queensland s saleable coal production. In July 2002, Anglo American Plc and Mitsui & Co. Ltd of Japan completed a transaction for new joint venture arrangements between their wholly owned subsidiaries, Anglo Coal Australia Pty Ltd (Anglo Coal) and Mitsui Coal Holdings Pty Ltd (Mitsui). The arrangements included Mitsui s acquisition from Anglo Coal of a 30 per cent interest in the German Creek mine and a 49 per cent interest in the Theodore and Dawson deposits in the southern Bowen Basin and the Taroom deposit in the northern sector of the Surat Basin. In August 2002, the world s largest private-sector coal mining company, Peabody Energy Corporation of the USA (Peabody), returned to Australia with its purchase of the Wilkie Creek mine in the Surat Basin of southern Queensland. In the Wilkie Creek mine produced 1.04 Mt of high volatile thermal coal for export, mainly to customers in Japan. In November 2003, Peabody announced an agreement to purchase the RAG Coal International AG interests in the North Goonyella (100 per cent) and Burton (95 per cent) coking coal mines in the Bowen Basin along with the Twentymile underground mine in Colorado, USA. The transaction was completed in April RAG Australia Coal Pty Ltd had earlier, in January 2003, increased its ownership of the North Goonyella mine to 100 per cent by acquiring Thiess Pty Ltd s 40 per cent stake. As a joint venture partner in the original Moura mine with Thiess Bros and Mitsui & Co. Ltd, Peabody helped to pioneer the development of Queensland s modern export coal industry that has been largely based on the highly sought after coking coal resources of the Bowen Basin. Top: Coal mining, Commodore Mine (Photograph courtesy of Millmerran Operating Company Pty Ltd) Coal mining operations 5

12 In December 2003, Rio Tinto Limited announced changes in the management of its Australian coal operations. The corporate and service functions of its 75.7 per cent owned subsidiary, Coal & Allied Industries Limited, and 100 per cent owned subsidiary, Pacific Coal Pty Limited, has been amalgamated and is now administered by Rio Tinto Coal Australia Pty Limited out of its office in Brisbane (from 1 February 2004). Ownership of the Clermont coal project changed in mid 2003 when Mitsubishi Corporation and Rio Tinto Plc reached agreement to include Electric Power Development Company of Japan (J-Power) in the joint venture. The new ownership arrangements are Queensland Coal Pty Limited (50.1 per cent), Mitsubishi Development Pty Limited (34.9 per cent) and J-Power (15 per cent). The project is expected to begin coal production around 2008 and will replace production from the Blair Athol mine as its reserves are mined out. The Queensland-based mining house MIM Holdings Limited was taken over by Xstrata Plc in June Xstrata Plc acquired a 100 per cent interest in a share buy-out following shareholder acceptance of its offer of A$1.72 per share. The transaction was reported to be valued at around A$3.44 billion. Later in 2003, Xstrata Plc sold down its interests in several of its Queensland coal assets to its joint venture partners Itochu Corporation and Sumitomo Corporation of Japan for around A$555 million. These included a 20 per cent interest in the Newlands Collinsville Abbot Point (NCA) Joint Venture, a 20 per cent interest in the Oaky Creek Coal Joint Venture, and a 25 per cent interest in four Xstrata Coal Queensland Pty Ltd projects Rolleston, Wandoan, Red Rock and Pentland. Washington H. Soul Pattinson and Company Limited (Soul Pattinson) listed its per cent owned subsidiary, New Hope Corporation Limited, on the Australian Stock Exchange in September With an associated share offer, New Hope Corporation raised almost $10 million in new development capital. The listing has reduced the combined holding of Soul Pattinson and its associate Brickworks Limited in New Hope Corporation to about 64.5 per cent. New Hope Corporation s major coal interests are a majority ownership of the Jeebropilly, New Oakleigh and New Acland open-cut coal mines in south-east Queensland, a 50 per cent stake in the coal export terminal in Brisbane, and a per cent stake in PT Adaro which owns and operates a large open-cut coal mine in South Kalimantan, Indonesia. In December 2003, Macarthur Coal Ltd announced the completion of the purchase of joint venture interests from AMCI Australia Pty Ltd and the unification of the Coppabella and Moorvale joint ventures. The new joint venture interests in the Coppabella and Moorvale Joint Venture are beneficially owned by Macarthur Coal (73.3 per cent), CITIC Australia Pty Ltd (7.0 per cent), Marubeni Corporation (7.0 per cent), Nissho Iwai Corporation (7.0 per cent), Kawasho Corporation (3.7 per cent) and Nippon Steel Trading Co. Ltd (2.0 per cent). AMCI Australia Pty Ltd was one of the original investors in the Coppabella and Moorvale mines and remains involved in the marketing of coals from both of these operations. Macarthur Coal Ltd s share of coal production from these two operations is expected to increase by about one million tonnes per year as a result of this transaction. In mid 2003, AuIron Energy Limited, a publicly listed company, announced that it had reached agreement to acquire control of Yarrabee Coal Company Pty Ltd from Resource Management & Mining Pty Ltd. The transaction was finalised in October 2003 and the AuIron Sydney office was later relocated to Brisbane. AuIron Energy Limited formally changed its name to Felix Resources Limited in late November The Yarrabee mine produced 1.21 Mt of saleable coal in and the company has entered into a new three-year contract to supply 0.35 Mt of coal annually to a Japanese steel mill from April In December 2003, ownership changes were announced regarding the Millmerran Power Project (comprising the 3.5 Mtpa Commodore mine and adjacent Millmerran power station 2 x 420 megawatt units) and the Callide C power 6 Coal mining operations

13 plant (2 x 420 megawatt units). At that time InterGen N.V. (InterGen), owned by Bechtel Enterprises Inc. and Shell International Gas Ltd, entered into an agreement to sell half of its stake in the Queensland power industry to the China Huaneng Group (CHG). The transaction involved CHG acquiring 50 per cent of OzGen B.V., which is the holding company for InterGen N.V. s Australian assets. These assets comprise a 53.7 per cent share of the Millmerran power station and a 50 per cent share of the Callide C power station near Biloela. CHG also acquired a 50 per cent share in OzGen s operations management and trading companies. Mine developments: existing and new operations Between July 2002 and December 2003, three new open-cut coal mines commenced operations. These were the New Acland mine, located in the Clarence Moreton Basin northwest of Toowoomba, and Hail Creek and Moorvale mines, both located in the Bowen Basin, west of Mackay. These projects have required capital expenditure in excess of $500 million and provided permanent employment for around 400 persons, giving a major boost to the respective regional economies. In addition, operations at the Moura mine were extended southwards into new mining areas in the northern part of the Theodore deposits. Queensland s coal industry is now entering a more mature stage of development and while some operations have the capacity to ramp up production to meet future demand, other mine operators will need to begin the development of new projects to enable existing sales volumes to be maintained. Examples of mines that are undertaking new developments principally to maintain existing production levels include Xstrata Coal Queensland Pty Ltd at its Newlands mine, Anglo Coal Australia Pty Ltd at its German Creek operations, and Rio Tinto Coal Australia Pty Limited at its Blair Athol mine, production from which will be replaced by development of the nearby Clermont deposit. During the year, BMA commenced surface works for the fullscale development of the Broadmeadow underground mine at Goonyella, Anglo Coal Australia continued development work on the Grasstree Colliery project, a new underground coking coal mine, and the Oak Park open-cut project, while RAG Australia Coal Pty Ltd committed to the development of the Eaglefield open-cut project located within the North Goonyella mine lease area. Hail Creek mine The new Hail Creek mine, located in central Queensland s Bowen Basin approximately 35 km north-west of the township of Nebo, was officially opened on 5 November 2003, having been developed at a cost of about $460 million by the Hail Creek Joint Venture. The joint venture partners are Queensland Coal Pty Limited (92 per cent and a wholly owned subsidiary of Rio Tinto Limited), Marubeni Coal Pty Ltd (5.33 per cent) and Sumisho Coal Development Queensland Pty Ltd (2.67 per cent). The mine produces hard coking coal from seams within the Rangal Coal Measures for the export market. The first coal export shipment was made in mid- August 2003 and production is planned to ramp up to a nominal 5.5 Mtpa by Coal products are destined for use in the iron and steel industries of Japan, Korea, Taiwan, India, Europe and Brazil. Mining is to be conducted using conventional dragline and truck/shovel techniques, with a new P&H MinePro 9020 dragline under construction at the site and due to commence overburden removal in the latter part of A new 52 kilometre rail spur was constructed to link the mine into the Goonyella electrified rail system to transport coal for export to the Dalrymple Bay Coal Terminal at Hay Point, a haulage distance of about 175 km. QR (formerly Queensland Rail) is the freight manager. Moorvale mine The Moorvale deposit which contains relatively shallow coal resources in the Rangal Coal Measures is located approximately 15 km south-west of the Coppabella mine and 5 km east of the Peak Downs railway line. Practical Coal mining operations 7

14 completion of all major works associated with the construction of the new open-cut mine was achieved by the end of calendar year 2003, having commenced in December the previous year. First coal was mined from the site in March 2003 and prior to completion of the rail load-out facility and commissioning of the preparation plant in December 2003, the raw coal was transported by road to the Coppabella mine for treatment and loading onto the rail network. Electrification of the new rail spur between the main Goonyella Hay Point railway line and the mine site was completed in late January The mine is expected to produce about 1.5 Mt of saleable coal annually using a contract workforce of approximately 100 persons. Selective mining will allow preparation of a suite of different coal products ranging from a low volatile, high energy PCI coal, a medium ash thermal coal, and a soft coking coal. North Goonyella mine Eaglefield open-cut RAG Coal Australia Pty Ltd committed to the development of a new open-cut operation to extract some relatively shallow coal resources within the Goonyella Middle Seam, which are present over a limited area on the North Goonyella mining lease. Production will augment supply from the underground mine. Coppabella mine From the initial design capacity of 2 Mtpa, output from the Coppabella mine has been progressively scaled up over the past two years to its current level of around 4.3 Mtpa. In January 2002, the Coppabella joint venture partners were granted Mining Lease (ML) contiguous with, and to the south of, the initial mine area. This area contains additional coal resources amounting to almost 20 million tonnes of raw coal in situ. In order to access this coal, it became necessary to relocate a 6 kilometre section of both the Peak Downs Highway and the Goonyella Hay Point railway line. Civil works commenced on the relocation project in November 2002 with practical completion of the new section of the highway achieved in June 2003 and the new section of rail line becoming fully operational on 16 December New Acland mine The New Acland mine near Oakey in the Clarence Moreton Basin is designed to produce about 2 Mtpa of saleable thermal coal and commenced mining operations in August It is operated by New Acland Coal Pty Ltd (a wholly owned subsidiary of New Hope Corporation Limited) and supplies coal to the export market through the port of Brisbane as well as domestic consumers including the Swanbank power station. Proposed mine developments and advanced projects Broadmeadow mine In July 2003 BMA announced plans to develop a new underground punch longwall coal mine (to be named Broadmeadow Mine) at Goonyella in central Queensland. Cost of the project has been estimated at A$102 million and the mine will have the capacity to produce up to 3.6 Mtpa of high quality coking coal. Development commenced in the third quarter of 2003 and longwall operations are expected to start in the second half of A workforce of around 90 people will be employed to operate the mine. The coal will be washed at the Goonyella coal preparation plant and incorporated into the range of prime coking coals produced by BMA, mainly for export. Clermont project Mining of the Clermont deposit (Rio Tinto Limited, through its wholly owned subsidiary Queensland Coal Pty Limited 50.1 per cent, Mitsubishi Development Pty Limited 34.9 per cent, and Electric Power Development Company of Japan [J-Power] 15 per cent) will be phased in to replace production at Blair Athol as that resource is exhausted. The project was declared a significant project under the State Development and Public Works Organisation Act 1971 in August The environmental approvals process, which is being coordinated by the Department of State Development and Innovation, has commenced with first coal production 8 Coal mining operations

15 expected sometime between 2008 and The coal quality is somewhat similar to that at Blair Athol and ready market acceptance of the product is expected. Curragh North project The Curragh North coal project (formerly named the Pisces project) is located approximately 15 km north of the Curragh mine and contains more than 100 million tonnes of relatively shallow coal resources. In July 2002, Stanwell Corporation Limited sought competitive offers to develop the project, in order to provide (as an optional source of supply) thermal coal for use in its Stanwell power station. In January 2003, Wesfarmers Curragh Pty Ltd was announced as the successful tenderer to develop and manage the project, and mining lease applications were lodged in September Wesfarmers Curragh Pty Ltd is contracted to supply steaming coal to the Stanwell power station until 2016 and the development will ensure the long-term surety and price competitiveness of coal supply to the power station. Being similar in quality, the coal at Curragh North will be blended into the existing range of products presently supplied by the Curragh mine. First coal production is expected in the second half of Annual exports of metallurgical coal by Wesfarmers Curragh Pty Ltd are anticipated to increase from the 4.0 Mtpa recorded in to around 5.0 Mtpa when Curragh North becomes fully operational. Grasstree Colliery project Anglo Coal (Capcoal Management) Pty Limited s Grasstree Colliery project is a new underground longwall mine currently under development in order to access prime coking coal reserves that are located down-dip of the present Southern Colliery workings on the main German Creek mining lease. The project commenced in early 2001 with the construction of two vertical shafts (one for ventilation and one for personnel and materials) to the German Creek Seam. Both shafts have now been sunk to seam level and a limited amount of in-seam development has been completed. Installation of the longwall mining equipment is scheduled to occur during 2006, and run-of-mine (ROM) coal will be washed at the German Creek preparation plant. When fully operational, the annual production of saleable prime coking coal from the new mine is planned to ramp up progressively to 3 5 Mtpa. Kennedy project During 2003, BMA commenced a major review of its Kennedy project (formerly Humboldt) located in the southern portion of the Blackwater mining leases. This involved a substantial amount of drilling to obtain additional information on coal quality and geological structure as well as providing further geotechnical and groundwater information particularly for the Tertiary basalts that cover much of the area. The work was incorporated into a pre-feasibility study for the commencement of open-cut mining in this part of the mine area. Lake Lindsay (formerly Girrah) project In January 2003, following the completion of a competitive tender process, Wesfarmers Limited announced that it had reached an agreement to sell its Girrah coal deposit to Anglo Coal (German Creek) Pty Limited and Mitsui German Creek Investments Pty Limited, the joint owners of the German Creek mining leases. The deposit is favourably situated with respect to operations at the German Creek mine, being located approximately 16 km south-east of the German Creek East open-cut and adjacent to the Oak Park deposit. The new owners have renamed the deposit as Lake Lindsay, the name formerly used in previous exploration and assessment projects by the former Department of Mines and previous tenure holders. Monto project Macarthur Coal Ltd and joint venture partner Burnett Coal Pty Ltd plan to jointly develop a small open-cut mine south of Monto with an initial capacity of up to 1 Mtpa. Activities were suspended in August 2003 due to unfavourable market conditions at that time. Coal mining operations 9

16 Newlands Northern underground and Suttor Creek projects In the northern Bowen Basin, Xstrata Coal Queensland Pty Ltd is planning to commence mining within the Suttor Creek deposit (located about 18 km south of the Newlands coal preparation plant and load-out facility) by the second half of The company is also developing the Northern underground mine to replace production from the Southern underground mine upon its anticipated closure in late Surface works for this new punch longwall mine have been completed and underground development is to commence in the first quarter of The Newlands mine, which commenced operations in the latter part of 1983 at a rate of about 4 Mtpa, achieved a total of 100 Mt of coal exported through the port of Abbot Point in September The mine exported 8.27 Mt in Rolleston project In February 2004, the board of Xstrata Plc approved the development of the Rolleston open-cut coal project in the south-western sector of the Bowen Basin (Mining Lease 70307) at an estimated cost of $291 million. This decision followed the evaluation of an additional tonne bulk sample which was taken in late 2003 for further testing by potential customers. Xstrata Coal Queensland Pty Ltd has a 75 per cent share, and its partners, Sumitomo Corporation and Itochu Corporation, each have a 12.5 per cent interest. The development of the mine involves construction of a new 110 kilometre rail connection to the Blackwater railway line near BMA s Blackwater Mine load-out facility. This new rail infrastructure, the Bauhinia Rail Project, will be built, owned and operated by QR, for an estimated capital cost of $230 million. located about 15 km north-east of Dysart. The deposit is contained within the Rangal Coal Measures and the company proposes to produce metallurgical coals for export through the Dalrymple Bay Coal Terminal. Mine closures The Ebenezer open-cut mine, located in the West Moreton Coalfield near Ipswich, ceased production in December 2002 and was placed under care and maintenance. The mine, which is wholly owned by Idemitsu Kosan Company (Japan), commenced production in In , the mine employed about 120 persons and produced about 1.6 Mt of coal for use in the nearby Swanbank power station and for export. Rising costs, unfavourable currency movements and falling thermal coal prices contributed to the closure. Coal supplied to the Swanbank power station has been substituted from other nearby mining operations (Jeebropilly, New Oakleigh) and from the New Acland mine west of Toowoomba. New Hope Corporation closed its Swanbank open-cut mine in July 2003, ending an era of coal mining within the Ipswich coalfield that has spanned about 160 years. Ipswich coal has provided the major energy base for general industry and electricity generation in south-east Queensland since the colonial times of the 1840s. Production has been transferred to operations at the company s mines on the Walloon Coal Measures near the townships of Rosewood (New Oakleigh and Jeebropilly mines) and Oakey (New Acland mine). Vermont project In the second half of 2003, Bowen Basin Coal Pty Ltd initiated the environmental approvals process that will involve the completion of an environmental impact statement (EIS) for the development of a new 2.5 Mtpa open-cut coal mine centred on the Vermont coal deposit, 10 Coal mining operations

17 Exploration and resources Coal exploration and development tenures During coal exploration expenditure in Queensland on both production and exploration tenements increased markedly to $55.3 million (Australian Bureau of Statistics Cat. no ), an increase of more than 60 per cent over the $34.1 million spent during the previous year (Figure 6). The Department of Natural Resources, Mines and Energy received 43 EPC applications during compared with the 65 applications lodged during (Figure 7) and 47 were granted, bringing the total number of EPCs granted and in force as of 30 June 2003 to 131 (Figure 8). Collectively, these 131 EPCs covered a total area of sub-blocks (about sq. km) compared with an area of 6535 sub-blocks (approximately sq. km) for the 95 EPCs that were current as of 30 June As of 1 January 2004, the number of EPCs granted and in force had risen further to a total of 138 with a further 53 applications under assessment by the department. Three mineral development licences (MDLs) for coal were granted during and two applications were lodged. Twelve mining lease applications for coal were lodged with the department during and seven were granted. Seven applications were in connection with existing mines at Kestrel (2), Foxleigh (2), Norwich Park, Jellinbah East and Callide. The remainder were associated with new coal projects at Moorvale (now operating), Oak Park and Rolleston as well as Millenium Coal Pty Ltd s project west of Poitrel. New coal A$ millions Number Coal exploration expenditure in Queensland Exploration permits for coal (EPCs): applications received Source: Australian Bureau of Statistics Figure 7: Number of applications received for exploration permits for coal (EPCs) Figure 6: Private expenditure on coal exploration in Queensland Top: Seismic surveying, Bowen Basin (Photograph courtesy of Velseis Pty Ltd) Exploration and resources 11

18 mining leases were granted in for mining at Moorvale, Norwich Park, South Marshmead (Blackwater area) and Rolleston. Coal exploration activity The Queensland Government s staged release of the Central Queensland Coal Area, Restricted Area 55 (RA55) which commenced in 1993 sparked considerable Australian and international interest at the time. Subsequent exploration has led to the discovery of a number of previously unknown, small-to-medium sized coal deposits throughout the Bowen Basin, mainly in the Rangal Coal Measures. Some of these coal deposits have since been developed into operating mines. More than ten years on from this government initiative, the level of coal exploration activity within the state is now at an unprecedented high. Most of the interest is still centred on the Bowen Basin, which was the focus of nearly 70 per cent of the EPC applications received by the department in Between July and September 2003, the department conducted another airborne geophysical survey over an area of approximately sq. km within the central portion of the Bowen Basin. This survey extended the northern survey that was undertaken in the basin in The new survey collected about line km of magnetic and radiometric data, at a line spacing of 400 metres and a height of 80 metres. The digital data set was publicly released in November 2003 and plans are underway to continue with further surveys to cover the southern parts of the basin. In the central Bowen Basin, Anglo Coal Australia Pty Ltd also undertook a variety of geophysical surveys during the year at a number of its mine sites and exploration areas. This work included extensive 2D seismic surveys in the northern portion of the the Moura deposits, 3D seismic surveys over future longwall blocks at the Moranbah North mine, as well as ground magnetics and trial surface resistivity surveys over some potential underground resource blocks within the German Creek mining lease which sought to identify igneous intrusions. To the north of German Creek and west of the Norwich Park mine, BMA undertook further 2D Mini-Sosie seismic surveys in the Picardy exploration area (EPC 718) during 2003, having previously identified some shallow resource blocks of low volatile coal in the area. In the northern Bowen Basin, Xstrata Coal Queensland Pty Ltd focused its activities on pre-development planning of the Newlands northern underground and Suttor Creek open-cut mining projects. Additional exploration work by the company in this region involved some 2D Mini-Sosie seismic surveys together with field mapping to identify potential targets of shallow coal that could be developed as satellite operations of Collinsville and Newlands mines. QCoal Pty Ltd, a Brisbane-based company, also conducted a considerable amount of exploration in the north Bowen Basin (EPC 586 and EPC 639) during the year and has identified coking and thermal coal resources at shallow depth in the Moranbah Coal Measures. The deposit is located adjacent to the Bowen Developmental Road and the Newlands to Abbot Number Exploration permits for coal (EPCs): current and applications pending Current EPCs Applications pending Figure 8: Exploration permits for coal (EPCs): current and applications pending (at 30 June) Exploration and resources

19 Point railway line, about 6 km to the south of the township of Collinsville. The company is continuing investigations into the feasibility of developing a new mine. In the southern portion of the basin, Wesfarmers Curragh Pty Ltd continued its evaluation of the Curragh North deposit by undertaking an infill airborne geophysical survey to supplement the departmental regional survey completed in September 2003, and conducting a number of surface resistivity surveys over the northern portion of the deposit. The company also completed an extensive resource assessment drilling program during the year, to further evaluate the initial mining area. Other seismic surveys completed during the 2003 field season were conducted on behalf of New Hope Corporation in the north Bowen Basin west of the Burton mine and for Macarthur Coal in the eastern sector of the basin, south of the Peak Downs Highway. Other smaller companies including Millennium Coal Pty Ltd, Aquila Coal Pty Ltd and Nebo Central Coal Pty Ltd have also been actively involved during the year, exploring the Rangal Coal Measures in the region extending southwards from the Burton mine to the Poitrel area where the coal seams have potential to yield a range of coking, PCI and thermal coal products. In the far south-west of the basin, Macarthur Coal Ltd undertook some scout drilling in the Springsure-Rolleston area following previous field mapping in the region that had indicated some potential for the presence of shallow occurrences of Bandanna Formation coals. Also in this region (EPC 800), the Foxleigh Joint Venture partners completed a small scout drilling program during the year, seeking to locate shallow occurrences of coal in the Reids Dome beds. As of 1 January 2004, virtually all of the prospective areas for coal exploration within the Surat and Moreton basins were either held under granted EPCs or were the subject of EPC applications. In these areas, exploration appeared to be targeted at locating satellite deposits near operating mines or identifying resources that could supply high volatile thermal coal either for export (subject to the availability of suitable infrastructure) or for local power generation in the medium to longer term. Native title Land access for mineral exploration has been a major focus of the Queensland Government in and will continue to be a high priority. The Native Title and Indigenous Land Services (NT&ILS) group within the department provides a wide range of specialist skills and expertise, which is necessary for dealing with native title issues in Queensland. NT&ILS is the lead agency in the state for all native title issues, including policy and legislation development, facilitation and negotiation of the right-to-negotiate processes and indigenous land use agreements (ILUAs), and resolution of issues in relation to mining and petroleum tenures. Following a review of native title procedures for grants of exploration and mining tenures in consultation with key stakeholders, the Mineral Resources Act 1989 was amended to allow the state to revert to the right-to-negotiate procedure of the Native Title Act 1993 (Cth). Improved procedures The transition from a state regime to the Commonwealth procedure means that the expedited procedure can be adopted to enable grants of exploration permits subject to native title protection conditions. Developed through consultation with the Queensland Resources Council and the Queensland Indigenous Working Group, the conditions prescribe post-grant procedural steps to involve native title parties in protecting significant cultural sites from impacts of exploration. These conditions are intended to ensure that the procedure works effectively by minimising objections to its use. The first applications to be dealt with under this procedure were advertised in November Unless the parties negotiate alternative agreements, new applications for exploration permits will proceed under the expedited procedure. Progression of earlier applications is Exploration and resources 13

20 proceeding through the former alternative state provisions or via ILUAs. Queensland has developed particular expertise in these agreements, having close to 60 per cent of the total number of registered ILUAs in Australia. The new system has opened the door to more exploration in Queensland by giving mining companies the certainty they need, while continuing to protect Indigenous interests. More detailed information is available from the Office of the Director General, Department of Natural Resources, Mines and Energy: contact Native Title and Indigenous Land Services, telephone Queensland coal inventory 1 Estimates of the amount of raw coal in situ for Queensland s coal basins have been compiled from available company information by the department to assist government with strategic planning as well as land and mineral tenure management for the state. The tonnage estimates, presented on a basin-wide basis in Table 2, have been derived by aggregating estimates of yet-to-be-mined resources and/or reserves at operating coal mines, with estimates of identified coal contained within other undeveloped coal deposits within the state. Details of the tonnage estimates for each mine or deposit contributing to the aggregate figures presented in the table were presented by Mutton (2003). Base information for the compilation has been obtained from a variety of sources and falls into two broad groups comprising the following: Estimates which have been publicly reported by companies as complying with the Australasian Joint Ore Reserves Committee (JORC) Code for Reporting of Mineral Resources and Ore Reserves Estimates obtained from information supplied to the department by exploration and mining companies, but not nominated as being compliant with JORC requirements. Generally, companies provide estimates within this group to the department to comply with statutory requirements for exploration reporting. These estimates have been prepared in accordance with accepted practice, following the guidelines described by Galligan and Mengel (1986). It is important to note that estimates from these two groups are derived using different parameters and, as such, may not be directly comparable. Consequently, as the rounded aggregate totals in Table 2 contain estimates from both groups, the information provides a guide only to the state s inventory of identified coal, and is not intended to demonstrate or imply potential commercial viability. Only resources classified as Measured or Indicated categories, as defined under either the JORC Code or in accordance with Galligan and Mengel, are included in the inventory. Estimates of Inferred coal resources, which would add significantly to the total coal inventory tonnage, are not included. Of the state s coal inventory (Table 2), Permian coals within the Bowen Basin in central Queensland account for approximately 70 per cent of the estimated total, while Mesozoic coals found mainly in the Clarence Moreton, Surat, Callide and Tarong basins make up the remainder. Shallow coal potentially amenable to open-cut mining makes up about 55 per cent of the inventory, with the remaining 45 per cent present at greater depths. Thermal coals (including PCI coals) represent about 65 per cent of the inventory, with the remainder being identified as coking coal. The Permian coal measures contain almost 100 per cent of the identified coking coal resources. Approximately 40 per cent of the coal inventory occurs at or within close proximity to operating mines within the state. The coal inventory total of approximately 33 billion tonnes of raw coal in situ represents a decrease of about 5 billion tonnes on the total figure previously reported by the department. The main reason for this reduction is the change by many companies in reporting their resource and reserve estimates to comply with the JORC Code. Significant reductions in tonnages are largely attributed to the decrease or exclusion of underground resources, which under JORC requirements are presently not considered to have 1 Modified extract from Queensland coals, 14th edition, Exploration and resources

21 Queensland coal inventory summary (million tonnes) 1 Period/Basin Coking coal Thermal coal 2 Total Open-cut Underground Open-cut Underground M+I 3 M+I M+I M+I M+I Permian Bowen Galilee Subtotal Mesozoic Callide Clarence Moreton Ipswich Laura Mulgildie Styx Surat Tarong Subtotal Total Table 2 1 raw coal in situ 2 includes PCI coals 3 M+I = Measured + Indicated status Note: The inventory totals comprise estimates reported by companies as being compliant with the JORC Code as well as estimates supported by other information supplied to the department which have not specificially been stated as being JORC compliant. Estimates from these two groups are derived using different parameters and may not be directly comparable. Since the rounded aggregate totals in the table contain estimates from both groups, the information provides a guide only to the state s coal inventory and is not intended to demonstrate or imply potential commercial viability. reasonable prospects for eventual economic extraction or which have been reclassified as Inferred resources. References Galligan, AG & Mengel, DC 1986, Code for reporting of identified coal resources and reserves, Queensland Government Mining Journal, vol. 87, pp Mutton, AJ (compiler) 2003, Queensland coals, 14th edition, Department of Natural Resources, Mines and Energy, Brisbane. A copy of the JORC Code can be obtained from < Exploration and resources 15

22 Queensland coal Figure 9: The location of known coal measures within Queensland 16 Exploration and resources

23 Central Queensland coal Figure 10: The locations of operating coal mines and undeveloped coal deposits within central Queensland Exploration and resources 17

24 South-east Queensland coal Figure 11: The locations of operating coal mines and undeveloped coal deposits within south-east Queensland 18 Exploration and resources

25 Transport and shipping An extensive rail network links Queensland s coal mines to six coal export terminals at four ports on the state s eastern seaboard, and to domestic coal users. Figures 9, 10 and 11 show the locations of the rail network and ports in relation to the operating mines and coal resources. The Queensland Government has continued its commitment to develop rail and port capacity ahead of increasing demand for domestic and export coal. Coal rail network QR s coal network links over 30 coal mines in Queensland to six coal export terminals as well as to domestic coal users. For coal haulage operations, the interconnected system is divided into five rail systems comprising approximately 2000 km of rail line, of which about 70 per cent is electrified. The five rail systems that make up the network are (from north to south): The Newlands rail system is a non-electrified line connecting coal mines in the northern Bowen Basin to the Abbot Point coal terminal, north of Bowen. Trains operating on this system typically haul about 4600 tonnes of coal. The Goonyella rail system is an electrified line connecting coal mines in the central Bowen Basin (i.e. Gregory Mine in the south, North Goonyella Mine in the north and Blair Athol Mine in the west) to the Dalrymple Bay and Hay Point coal export terminals, south of Mackay. Trains operating on this system typically haul about 9600 tonnes of coal. The Blackwater rail system is an electrified line connecting coal mines in the southern Bowen Basin, from the Gregory mine in the north and Blackwater mine in the south, to the RG Tanna and Barney Point coal export terminals at Gladstone, and to domestic coal users in the Rockhampton area. Trains operating on this system typically haul about 7200 tonnes of coal. The Moura rail system is a non-electrified line connecting the Moura, Callide and Boundary Hill mines to the RG Tanna and Barney Point coal export terminals at Gladstone. It also links the three mines with the Gladstone power station and other domestic users in the Gladstone area. Trains operating on this system typically haul about 6000 tonnes of coal. The Surat/West Moreton rail system is a non-electrified line connecting coal mines in the eastern Surat Basin and the Moreton Basin, west of Brisbane, to the Fisherman Islands coal export terminal at the port of Brisbane and the Swanbank power station. Trains operating on this system typically haul about 1900 tonnes of coal. In , QR railed a record 139 Mt, compared with 135 Mt in During , QR expects to further increase railings of coal to more than 143 Mt. The increased railings were achieved through QR improving the productivity of its fleet and working closely with the coal industry. Top: Berthing and ship-loading facilities, Dalrymple Bay Coal Terminal (Photograph courtesy of Prime Infrastructure Management Limited) Transport and shipping 19

26 The strong global demand for Australian coals is opening up expansion opportunities for many Queensland coal miners. QR are now targeting a haulage task of more than 194 Mta within five years in Queensland alone. QR already has plans in place to meet this anticipated strong growth and major locomotive and wagon projects have already been committed. Coal customers are set to benefit from the substantially lower freight rates that have recently been offered on the Goonyella and Blackwater corridors. These reflect the lower haulage costs that QR expects to achieve from its productivity improvement initiatives that are currently underway or planned on those corridors. Contact: During , a record Mt of coal was exported from the six terminals, increasing from Mt in The Dalrymple Bay, Hay Point and RG Tanna terminals collectively handled more than Mt, or approximately 84 per cent of Queensland s coal exports, in this period. Total handling capacity of the ports continued to increase, with expansions at Dalrymple Bay and RG Tanna terminals progressing on schedule. Information on each of the coal export terminals, and developments that have occurred or are planned, is presented on the following pages. Table 3 summarises the main specifications and capacities of each terminal, and the coal exports handled in The Gladstone Port Authority was renamed the Central Queensland Ports Authority commencing 1 July General Manager Coal, Coal & Freight Services Level 10 Rail Centre 1, 305 Edward Street Brisbane Qld 4000 Australia Phone: ; Fax: qr.coal@qr.com.au Web site: Export terminals Coal destined for the export market is handled through six coal terminals at four deepwater ports located along the Queensland coast. From north to south, these are the port of Abbot Point, the port of Hay Point (incorporating the separate Dalrymple Bay and Hay Point coal terminals), the port of Gladstone (incorporating the RG Tanna and Barney Point terminals) and the port of Brisbane (Fisherman Islands). 20 Transport and shipping

27 Abbot Point Ownership Operator Berths Maximum vessel size Annual capacity Main users Expansion plans The Ports Corporation of Queensland Abbot Point Bulkcoal Pty Ltd One dead weight tonnes (dwt) 12 Mtpa (nominal) Newlands and Collinsville mines Can expand to 16 Mt annual capacity, and to >24 Mtpa Brisbane (Fisherman Islands) Ownership Queensland Bulk Handling Pty Ltd Operator Queensland Bulk Handling Pty Ltd Berths One Maximum vessel size dwt Annual capacity 5 Mtpa Main users New Hope Coal Australia, Ebenezer (ceased production December 2002) and Wilkie Creek mines Expansion plans None at present Contact details Abbot Point Bulkcoal Pty Ltd PO Box 207 Bowen Qld 4805 Phone: Web site: Barney Point (Gladstone) Ownership Gladstone Port Authority Operator Gladstone Port Authority Berths One Maximum vessel size dwt (fully loaded) or dwt (part loaded) Annual capacity 5 Mtpa Main users Kestrel, Moura, Gregory, Blackwater, Jellinbah East, Curragh, Ensham, Oaky Creek, Yarrabee, Peak Downs, Norwich Park and Cook mines (potentially the same as RG Tanna coal terminal) Expansion plans Expansion of capacity is not planned at the present time Contact details Gladstone Port Authority Yarroon Street Gladstone PO Box 259 Gladstone Qld 4680 Phone: Fax: Web site: Contact details Queensland Bulk Handling Pty Ltd 3 Bulk Terminal Drive Fisherman Islands PO Box 348 Wynnum Central Qld 4178 Phone: Fax: Web site: Dalrymple Bay Ownership The Ports Corporation of Queensland In September 2001, the Queensland Government awarded the tender for the long term lease of the Dalrymple Bay coal terminal (DBCT) to a consortium led by investment bank Babcock & Brown. Prime Infrastructure, a public company that was established by Babcock & Brown following its purchase of the lease, now controls the terminal under the lease agreement. Operator Dalrymple Bay Coal Terminal Pty Ltd The operator is owned by some of the coal exporters who use the terminal Blair Athol Coal Pty Ltd, Capricorn Coal Management Pty Ltd, Moranbah North Coal (Management) Pty Ltd, BHP Mitsui Coal Pty Ltd, Xstrata Plc and Burton Coal Pty Ltd. Berths Extended berths for three vessels with three ship loaders Maximum vessel size dwt Annual capacity 55.5 Mtpa Transport and shipping 21

28 Dalrymple Bay (cont d) Main users Blair Athol, Burton, Coppabella, German Creek, Goonyella/Riverside, Foxleigh, Hail Creek, Moorvale, Moranbah North, North Goonyella and Oaky Creek mines Expansion plans Stage 6 of the terminal s expansion, involving the construction of a third ship-loader and a new berth (Berth 3), mooring dolphins and conveyor galleries, commenced in April 2002 and was completed in June 2003 at a cost of approximately $115 million. These works raised the terminal s rated throughput capacity from 45.5 Mtpa to 55.5 Mtpa. Prime Infrastructure has developed a Master Plan that forms the basis for future expansion of DBCT and already covers expansion of the nominal capacity to 74 Mtpa. Contact details Dalrymple Bay Coal Terminal Pty Ltd Mail Service F 283 Mackay Qld 4740 Phone: Web sites: Hay Point Ownership Central Queensland Coal Associates Joint Venture Operator Hay Point Services Pty Ltd Berths Two, allowing simultaneous loading Maximum vessel size dwt (No.1 berth), dwt (No. 2 berth) Annual capacity 34 Mtpa Main users Goonyella, Peak Downs, Saraji, Norwich Park, Gregory/Crinum and South Walker Creek mines Expansion plans No further expansion is planned at the present time Contact details Hay Point Services Pty Ltd Mail Service 283 Mackay Qld 4740 Phone: Web site: RG Tanna (Gladstone) Ownership Gladstone Port Authority 1 Operator Gladstone Port Authority Berths Two, allowing simultaneous loading Maximum vessel size > dwt each berth Annual capacity 40 Mtpa Main users Kestrel, Moura, Gregory, Blackwater, Jellinbah East, Curragh, Ensham, Oaky Creek, Yarrabee, Peak Downs, Norwich Park and Cook mines Expansion plans The RG Tanna Coal Terminal Expansion Project was officially completed in June 2003 at a cost of $80 million, increasing its throughput capacity from 30 Mtpa to 40 Mtpa. Gladstone Port Authority has plans in place to expand coal export capacity to more than 60 Mtpa. Contact details Gladstone Port Authority 1 Yarroon Street Gladstone PO Box 259 Gladstone Qld 4680 Phone: Fax: Web site: 1 The Gladstone Port Authority was renamed the Central Queensland Ports Authority commencing 1 July Transport and shipping

29 Queensland coal ports Port/Terminal Coal exports Annual Hourly Maximum Dredged Berth Berth loading loading vessel channel length (lwd) capacity rate size (lwd 2 ) (nominal) (Mt) (Mtpa) (tph) (dwt 1 ) (m) (m) (m) Abbot Point Abbot Point Brisbane Fisherman Islands # Gladstone Barney Point RG Tanna No. 1* > No. 2* > No. 3* > Hay Point Dalrymple Bay No.1* No.2* No Hay Point No No Total Table 3 Notes 1 2 dead weight tonnes low water depth # Or up to dwt partly loaded * Berths adjoin at this port Transport and shipping 23

30 The electricity industry Queensland power generation utilities Three separate Queensland Government owned corporations (Stanwell Corporation Ltd, Tarong Energy Corporation Ltd and CS Energy Ltd) and a number of private power producers supply the electricity produced in Queensland at several power stations. These include coal-fired power stations located (from north to south) at Collinsville, Stanwell, Gladstone, Callide, Tarong, Swanbank and Millmerran. In addition, a new 750 MW coal-fired power station is to be built in south-east Queensland at Kogan Creek, with work planned to start in the latter part of Table 4 lists details of the output capacities and amount of coal purchased by the Queensland power stations. Table 5 shows the typical quality specifications of the coals purchased by and consumed in each power station. Callide The Callide power station, located near the township of Biloela in central Queensland, has a generation capacity of 1720 MW and is operated by CS Energy Ltd. It is a minemouth plant based on the large resources of shallow coal in the Callide deposits controlled by Anglo Coal Australia Pty Ltd. The complex comprises the 700 MW Callide B station (2 x 350 MW units); the 120 MW Callide A station (4 x 30 MW units) which has been taken out of service; Queensland power stations coal fired capacity and coal purchases Power Installed Coal Coal sources station capacity purchases (mines) (Mwe 1 ) (Mt) received received Callide A Callide Callide B Callide Callide C Callide Collinsville Collinsville Gladstone Blackwater, Callide, Curragh, Ensham, Gregory-Crinum, Jellinbah East, Rolleston Millmerran Commodore Stanwell Blackwater, Burton, Cook, Curragh, Ensham Swanbank B Ebenezer, Jeebropilly, New Acland, New Hope, New Oakleigh Tarong Meandu, New Acland 1 2 Total megawatts of electrical power Callide A withdrawn from service in 2002 Table 4 Top: Millmerran Power Station (Photograph courtesy of Millmerran Operating Company Pty Ltd) 24 The electricity industry

31 Typical coal quality supplied to Queensland power stations Power Specific Volatile station energy (GJ/t 1 )matter (%) Moisture (%) Sulphur (%) Ash (%) Callide Collinsville Gladstone Millmerran Stanwell Swanbank B Tarong Table 5 1 gigajoules per tonne, which is equivalent to megajoules per kilogram (MJ/kg) Note: all figures on an as received basis and the 900 MW Callide C station (2 x 450 MW supercritical units). Callide C is owned by a joint venture between CS Energy Ltd and InterGen 50 per cent Callide Energy Pty Ltd (subsidiary of CS Energy Ltd) and 50 per cent IG Power Callide Ltd. Callide A station, an old 120 MW plant, was retired from service in In December 2003, InterGen announced the sale of half of its Australian power generation interests to the China Huaneng Group (CHG). The transaction involved CHG acquiring 50 per cent of OzGen B.V., the holder of InterGen s Australian assets. Collinsville In September 2002, NRG Energy Inc. completed the sale of its 50 per cent interest in the 192 MW Collinsville power station to its existing partner, a subsidiary of Transfield Services Limited. Transfield Services is now the 100 per cent owner and operator of the 35-year-old coal-fired power station located approximately 80 km west of the coastal township of Bowen. Gladstone The Gladstone power station provides 1680 MW of base/intermediate load from 6 x 280 MW turbines, largely to supply local industries and domestic users in the Gladstone area. The station was completed in 1982 and in 1994 was sold by the Queensland Government to its present owners, which include Comalco Aluminium Limited (41.13 per cent), NRG Energy, Inc. (37.50 per cent), SLMA GPS (8.5 per cent), Ykk GPS Queensland (4.75 per cent) and Mitsubishi (7.13 per cent). NRG Gladstone Operating Services operate the plant. Electricity output from the power station is purchased and marketed by Enertrade, a wholesale energy trader owned by the Queensland Government. Under the arrangement with the owners, Enertrade bids the entire output of the Gladstone power station into the electricity market. This effectively preserves the position of the owners and operators of the power station, as well as preserving the state s rights to that part of the output retained by the state under the terms of sale of the power station. Millmerran The 840 MW Millmerran power station and adjacent Commodore mine, south-west of Toowoomba, were officially opened in January Cost of the total development including both the mine and power station was an estimated $1.5 billion. The first 420 MW unit was completed in September 2002, while construction of the second unit was completed in late The power station is operated by the Millmerran Operating Company Pty Ltd (a wholly owned subsidiary of InterGen [Australia] Pty Ltd) on behalf of Millmerran Power Partners. The Millmerran plant is among the first in Australia to use supercritical boiler technology and air-cooled system design. Supercritical boilers increase plant efficiency compared to conventional coal-fired boilers. Air cooling was adopted to The electricity industry 25

32 reduce water consumption to a fraction of that used by conventional plant. Millmerran is the first major supercritical power station in Australia specifically designed to burn environmentally friendly coals from the Walloon Coal Measures of the Surat and Clarence Moreton basins of southern Queensland. As outlined in the earlier section, Coal mining operations, in December 2003 InterGen announced changes in the ownership of the Millmerran Power Project (comprising the 3.5 Mtpa Commodore Mine and adjacent Millmerran power station) and the Callide C power station. At that time InterGen, owned by Bechtel Enterprises Inc. and Shell International Gas Ltd, entered into an agreement to sell half of its stake in the Queensland power industry to the China Huaneng Group (CHG). The transaction involved CHG acquiring 50 per cent of OzGen B.V., which is the holding company for InterGen N.V. s Australian assets. These assets comprise a 53.7 per cent share of the Millmerran power station and a 50 per cent share of the Callide C power station near Biloela. CHG also acquired a 50 per cent share in OzGen s operations management and trading companies. Stanwell The Stanwell power station, located 22 km west of Rockhampton, is owned and operated by Stanwell Corporation Ltd. The fully automated coal-fired power station became fully operational in 1996, with an original capacity of 1400 MW (4 x 350 MW units), and modifications have allowed the station to reach a total output of 1440 MW. In January 2003, Stanwell Corporation announced an agreement with Wesfarmers Curragh Pty Ltd, under which Wesfarmers will develop Stanwell s Pisces coal resource. The deposit, renamed Curragh North, is located 10 km from Wesfarmers Curragh mine, a major supplier of coal to the power station. The resource will be developed to ensure a secure supply of domestic steaming coal, similar to the current Curragh mine product, to the power station until Swanbank CS Energy Ltd also owns and operates the Swanbank power station near Ipswich. The facility has a 480 MW coal-fired facility (Swanbank B), with additional capacity provided by the 385 MW gas-fired Swanbank E station, completed in November This has replaced the capacity previously provided by the mothballed 396 MW Swanbank A coal-fired station. The coal supply is sourced from mines in the Clarence Moreton and Surat basins and railed or trucked to the site. In addition to its major gas supplies sourced via pipeline from the Scotia gas field near Roma (a coal seam methane project), Swanbank E power plant also burns gas produced at the adjacent land-fill waste site operated by Thiess Services Pty Ltd. In this renewable energy source provided around 150 terajoules 1 of energy, equivalent to the energy contained in approximately 6000 tonnes of coal (as received). Tarong The 1400 MW Tarong power station is a mine-mouth operation owned and operated by Tarong Energy, a Queensland Government owned corporation. It is located 180 km north-west of Brisbane, near the township of Yarraman. The power station became fully operational in 1986, and uses coal supplied by the nearby Meandu mine, which is owned by Rio Tinto Coal Australia Pty Limited. The Tarong North project is a 450 MW power station sited adjacent to the Tarong power station and was completed in July The estimated cost of the project was approximately $650 million. The supercritical plant is more efficient than older plant because of the much higher steam pressures (25 MPa 2 compared to 17 MPa) and higher temperatures (566 C compared with 538 C) in the steam cycle. 1 1 terrajoule = 1 x joules 2 megapascal 26 The electricity industry

33 The Tarong North power station is owned (50/50) by a joint venture of Tarong Energy and TM Energy (Aust) Pty Ltd which, in turn, is owned by Tokyo Electric Power Company (70 per cent) and Mitsui & Co. Ltd (30 per cent). The combined coal requirement for both Tarong and Tarong North stations is about 7 Mtpa, sourced mainly from the nearby Meandu mine. Tarong Energy is investigating the development, including the associated rail transport infrastructure, of its Glen Wilga coal deposit in the Surat Basin near Chinchilla, as an alternative longer term coal supply option for the power station. Kogan Creek The proposed Kogan Creek mine-mouth power station project comprises a single 750 MW supercritical unit and a new open-cut coal mine on the adjacent Kogan Creek coal deposit, located near Chinchilla in south-east Queensland. The project is wholly owned by CS Energy Ltd and will be the next large-scale base load power generation project under the Queensland State Government s Clean Energy Policy. This $1.1 billion project was given final approval to proceed to construction by the Queensland Government in May 2004, and is scheduled to come on-line towards the end of When operational, the Kogan Creek Power Project is expected to have a permanent workforce of about 130 persons, of which about 70 persons will be employed in the power plant and about 60 persons in the coal mine. During construction, employment numbers are expected to reach more than The electricity industry 27

34 Coal research activities Research and development into all aspects of coal production and utilisation is widely supported within Australia by the coal industry, governments and universities. Much of the research support and implementation is managed through the Commonwealth Government Cooperative Research Centres (CRC) program and also through the Australian Coal Association Research Program (ACARP). The Queensland Government actively supports research in various facets of the black coal industry through: operations of the Department of Natural Resources, Mines and Energy (NRM&E) Safety in Mines Testing and Research Station (Simtars) at its laboratories at Redbank and Mackay (refer to Health and Safety section of this review) participation in the Cooperative Research Centre (CRC) for Coal in Sustainable Development (CCSD) funding of facilities to house the Queensland Centre for Advanced Technologies (QCAT) in Brisbane support for coal-related projects at The University of Queensland. The Queensland Government also supports the Australian Centre for Mining Environmental Research (ACMER, < which conducts mining-related environmental research. This centre is also located at QCAT and received a special grant of $2.5 million towards base funding. The Bureau of Mining and Petroleum, forming part of the Department of Natural Resources, Mines and Energy, makes a significant contribution to the mining industry through the development of policies, legislation and strategies associated with the exploration and development of minerals, coal and petroleum. Through the Mines Inspectorate, it also administers legislation dealing with the safety and health of mining industry employees and monitors the mining industry s performance in these areas. Further information is available from the NRM&E web site, < Centre for Low Emission Technology In November 2003, the Queensland State and Commonwealth governments announced the launch of a new initiative, the Centre for Low Emission Technology. In partnership with CSIRO and the coal and power generation industries, the Centre will build upon the existing research capability at the Queensland Centre for Advanced Technologies (QCAT) to coordinate and facilitate targeted research into low emission technologies in the power generation sector. The Queensland Government, industry and research organisations are working closely with the Commonwealth to advance this research objective. Cooperative Research Centre for Coal in Sustainable Development The Cooperative Research Centre for Coal in Sustainable Development (CCSD) was established on 1 July 2001 (web site < Its headquarters are located at the Top: Simbot mine investigation robot (Photograph Department of Natural Resources, Mines and Energy) 28 Coal research activities

35 Queensland Centre for Advanced Technologies (QCAT) at Pullenvale, Brisbane (web site < and it is sponsored by the Queensland Government to the value of $ per year. CCSD has eighteen participating organisations including black coal producers and users, and research and government organisations in Queensland, New South Wales and Western Australia. The centre will invest more than $61 million over a sevenyear period and is focusing its research efforts towards new, clean coal technologies that will lead to more efficient coal utilisation and improved environmental performance, through the reduction of greenhouse gases and other emissions. Research work is conducted under a number of discrete programs, consisting of economic, social and environmental assessment, current power generation, transitional power generation, future scenarios and technology, iron making, and by-products and waste. In 2003, CCSD produced a wide range of publications and fact sheets and its representatives delivered (and published) papers at national and international conferences. Research work was undertaken in collaboration with Japan s Central Research Institute for the Electric Power Industry (<criepi.denken.or.jp>) on coal gasification and ash slagging behaviour and prediction methods. Other projects were progressed in Sweden using a major European pilot-scale blast furnace facility. Collaborative work with CSIRO was undertaken on new methods for power station fly-ash characterisation, the use of biomass and coal co-firing in conjunction with ACIRL and power industry participants, and improving the performance of domestic power stations. Australian Coal Association Research Program (ACARP) The Australian Coal Association Research Program (ACARP) is managed under the direction of the Australian Coal Association (ACA) and funded by all Australian black coal producers, with each contributing $0.05 per saleable tonne of product coal. This program has been in operation since In total funding of $10.04 million was allocated to projects in the five key areas of interest: underground mining (32 per cent), open-cut mining (35 per cent), coal preparation (18 per cent), coal utilisation (7 per cent) and greenhouse gas mitigation (8 per cent). Most projects also receive funding from other sources and the total committed to all projects was $26.3 million. New projects are selected annually according to industry priorities, with a strong emphasis on safety in underground mines and managing the environmental impact of open-cut operations. Improving maintenance procedures and productivity are also key areas. For example, major improvements in dragline efficiency have been achieved from implementation of the results of ACARP projects. The program is ideally suited to addressing industry problems that benefit from a collaborative approach. For example, research related to problems associated with water use and mine subsidence has benefited from the pooling of experience and knowledge of individual operations. ACARP has committed funding to develop an industry strategy for water use which impacts on all underground and open-cut coal-mine operations, and is also an important component of the successful rehabilitation of spent mining leases. As subsidence can cause problems that may impact on all underground operations, being able to accurately predict subsidence and manage its consequences is critical in maintaining good relationships with neighbouring communities. ACARP has significantly increased the proportion of funding directed toward subsidence management. ACARP also contributes to the work undertaken at the CRC for Coal in Sustainable Development (CCSD) and the CRC for Greenhouse Gas Technologies (CO2CRC), with $4.5 million Coal research activities 29

36 and $1.8 million respectively committed over the seven-year term of each centre. In addition, ACARP sponsors a number of mine safety related research projects through the Queensland Government Safety in Mines Testing and Research Station (Simtars) near Brisbane. In recognition of the need to maintain technical skills in the industry, ACARP has instituted a postgraduate scholarship in which people who have been in the industry for a minimum of three years can be supported to upgrade their skills by completing either a masters or a PhD degree. One scholarship has been awarded to date. Reports for completed projects as well as information about current projects supported through the ACARP program can be viewed at < CRC for Mining Technology and Equipment/CRC Mining The CRC for Mining Technology and Equipment (CMTE) commenced operations on 1 July 1991 under the Commonwealth Government Cooperative Research Centres (CRC) Program, which was founded to strengthen links between industry, research organisations, educational institutions and government. The objective of the CMTE was to deliver safety and productivity enhancing technologies to the Australian mining industry. During CMTE research programs focused on drilling systems, automation of mining systems, geo-sensing, and development of new systems to enhance the reliability of mining equipment. Some research outputs for the coal industry include: novel drilling systems for economically removing gas from coal seams a new rigging and control system for draglines a new cruise-control automation system for draglines new algorithms for emulating core logs from geophysical measurements. CMTE was replaced by CRC Mining which commenced from I July 2003 with funding of $27 million from the Queensland Government over the next seven years and a further estimated $100 million from industry and university partners over the same period. The new CRC Mining will develop systems to streamline processes at mine sites and achieve substantial cost savings through research across three programs as follows: Smart Mining Machines, Smart Mining Systems and Step-Change Mining Systems. CMTE, which was funded under the Cooperative Research Centres Program until 2004, will spend the year from July 2003 completing its research work whilst ramping up the program of CRC Mining. Core participants of CRC Mining include Anglo Coal Australia Pty Ltd, BHP Coal Pty Ltd (BHP Billiton Mitsubishi Alliance), Hamersley Iron Pty Ltd, Rio Tinto s Technological Resources Pty Ltd, WMC Resources Ltd, The University of Queensland and The University of Sydney. Other full member organisations include P&H MinePro Services Australia, Komatsu Australia Ltd and AJ Lucas Group Ltd. Research conducted through CMTE is making a major contribution to improvement in open-cut coal mining efficiency through its Universal Dragline System. This new rigging and control system has been demonstrated in field trials to increase dragline productivity by more than 25 per cent. CSIRO and the Queensland Centre for Advanced Technologies The Queensland Centre for Advanced Technologies (QCAT) is a joint venture between the Commonwealth Scientific and Industrial Research Organisation (CSIRO) and the State Government of Queensland. The establishment of the centre at Pullenvale in Brisbane flowed from an agreement between the Commonwealth Government and the Queensland Government to expand and diversify the research and development activities undertaken by CSIRO in Queensland. 30 Coal research activities

37 QCAT represents a world-class facility for research and development in all aspects of the mining, energy and manufacturing industries, with the goal of increasing the international competitiveness and efficiency of Queensland and Australian resource-based and related industries. The centre provides science and engineering solutions in the areas of mineral exploration, geophysics, coal mining, coal processing, coal utilisation, minerals mining, mineral processing, mine-site rehabilitation and foundry technology. Significant components of the following four CSIRO divisions are located at QCAT: Exploration and Mining; Minerals; Energy Technology; and Manufacturing and Infrastructure Technology. Coal-related research carried out at the centre includes work in: Major activities include applied research and development in mining, minerals processing and coal preparation as well as consulting, commercial software development and support, hardware product marketing and laboratory services. Some current coal-related projects include: underground coal mining geomechanics modeling of underground coal mining roof support systems dragline modeling cyclone technology Further information is available from the following web site < mining (assessment of reserves, equipment and automation, productivity improvement and mine-site rehabilitation) coal preparation (slurry splitting, beneficiation and dewatering) coal utilisation, efficient energy use and energy storage sustainable mining, and environmental effects associated with the coal industry. Further information is available from the following web site < Julius Kruttschnitt Mineral Research Centre The Julius Kruttschnitt Mineral Research Centre (JKMRC) is an internationally renowned postgraduate research and technology transfer centre within the Sustainable Minerals Institute at The University of Queensland. The centre aims to develop solutions to technical problems facing the mineral industry, working on projects in partnership with mining and service providers. The JKMRC has undertaken applied research in coal preparation and processing since the mid 1970s. Coal research activities 31

38 Health and safety Overview During financial year , there was a continuation in the improvement in mine safety that has been achieved over recent years with lost time injuries decreasing by 19 per cent, and the lost time injury frequency rate (LTIFR) decreasing by 20 per cent compared with Safety performance (as measured by LTIFR) of Queensland s coal mines has continued to be significantly better than the performance measured at comparable mines in NSW and overseas. There were no fatalities at coal mines during Over the five-year period from to for the Queensland coal industry, there were a total of four fatalities: two in underground mines and two in open-cut mines. This compares with 17 fatalities for the previous five-year period. As recommended in the mining warden s report on the inquiry into the Moura No. 2 explosion in 1994, the Mines Inspectorate was reviewed in The review examined the professional skills and qualifications required by inspectorate officers, the appropriate location and skills distribution of officers, and the role of the Mines Inspectorate under legislation. Implementation of the recommendations from the review have been completed. A major annual simulated mine emergency evacuation exercise was held at the North Goonyella underground coal mine in November The exercise tested the emergency response capabilities of the mine workforce, the Mines Inspectorate, Mines Rescue and industry, as well as focusing on changeover protocols, data collection and recording, communication channels, and the mines unaided response system support from adjacent mines. A detailed report was prepared and widely distributed throughout the Queensland coal mining industry in December The Queensland Government continued implementation of the Coal Mine Workers Health Scheme, a health surveillance scheme for coal industry workers, which provides for preemployment and periodic five-yearly health assessments of all workers, transportability of health assessments between sites, and the storage of health data on a centralised health database managed by the Health Surveillance Unit of the Department of Natural Resources, Mines and Energy. Under the duty of care style legislation, site health surveillance is necessary to ensure that statutory obligations are met where persons are exposed to serious health hazards. Statistical summary 1 Fatalities No fatalities occurred in coal mines in Queensland during Permanent incapacity injuries A permanent incapacity injury is any work-related injury or disease that leads to one or more of the following outcomes: the complete loss, or permanent loss of use of any member or part of the body any permanent impairment of any member or part of the body, regardless of any pre-existing disability of that member or part any permanent impairment of physical/mental 1 These data were extracted from Queensland mines and quarries safety performance and health report, 1 July 2002 to 30 June The full report may be accessed on the Department of Natural Resources, Mines and Energy web site < 32 Health and safety Top: Inspection of dragline buckets, Moura Mine (Photograph courtesy of Anglo Coal Australia Pty Ltd)

Gladstone. RG Tanna and Coal Terminals.

Gladstone. RG Tanna and Coal Terminals. Gladstone RG Tanna and Barney Point Coal Terminals www.gpcl.com.au Location WORLD Gladstone Port One of the world s top-five coal export ports Exports coal to over 30 countries worldwide Only 10-15 days

More information

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments Department of Employment, Economic Development and Innovation Current Queensland coal infrastructure developments Historical Coal Production and Exports Queensland exported 159.5 million tonnes of coal

More information

An Update on Coal for the Bowen Basin

An Update on Coal for the Bowen Basin An Update on Coal for the Bowen Basin Presented by Celeste Cronin-Stacey Regional Geologist Department of Natural Resources and Mines 26 September 2013 Photo courtesy of AngloAmerican Coal Disclaimer Based

More information

Queensland coal mines and advanced projects

Queensland coal mines and advanced projects Department of Natural Resources and Mines Queensland coal mines and advanced projects Industry update Queensland has a rich endowment of high-quality coal, with an inventory estimated in 2010 at approximately

More information

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine ASX Announcement December 13, 2010 Appointment of Preferred Contractor for CHPP Construction at Colton Coal Mine and further Progress on Surat Basin Rail support NEC s Timetable for Coal Production Northern

More information

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area

More information

Uniquely positioned to be Australia s next coal producer

Uniquely positioned to be Australia s next coal producer Uniquely positioned to be Australia s next coal producer March 2013 Key investment highlights Asian demand for coal forecast to continue growing - limited new supply from key global markets Attractive

More information

Jellinbah Mine COAL SEAM GAS STATEMENT. For. Plains Extension MLAs. Jellinbah East Joint Venture. 31 March 2015

Jellinbah Mine COAL SEAM GAS STATEMENT. For. Plains Extension MLAs. Jellinbah East Joint Venture. 31 March 2015 Jellinbah Mine COAL SEAM GAS STATEMENT For Plains Extension MLAs Jellinbah East Joint Venture 31 March 2015 1 J e l l i n b a h R e s o u r c e s P t y L t d A B N 6 0 0 1 0 8 2 5 2 1 5 L e v e l 7, 1

More information

Queensland s Exploration and Resource Investment Opportunities

Queensland s Exploration and Resource Investment Opportunities logo Japan-Australia Minerals Investment Seminar 2012 Queensland s Exploration and Resource Investment Opportunities Brad John Chief Government Geologist Geological Survey of Queensland Tokyo 12 November

More information

For personal use only

For personal use only APRIL TO JUNE 2013 Australian Pacific Coal ASX: AQC Australian Pacific Coal (AQC) is an emerging ASX coal explorer focused on the Bowen Basin, Queensland. Through a series of acquisitions, AQC has positioned

More information

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017)

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017) Queensland - 11 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines. ...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting

More information

The Changing Face of Australian Export Coal Industry

The Changing Face of Australian Export Coal Industry The Changing Face of Australian Export Coal Industry The divestment of coal assets by Rio Tinto, Vale and Anglo American is creating a new industry dynamic enabling Yancoal, Glencore and Whitehaven Coal

More information

Curragh Operational Tour

Curragh Operational Tour Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May

More information

For personal use only

For personal use only MEDIA/ASX RELEASE 31 AUGUST 2011 CHINESE EXPLORATION BUREAU SIGNS MOU WITH AMMG ON ITS CANNING BASIN COAL PROJECT HIGHLIGHTS Memorandum of Understanding (MOU) signed by AMMG subsidiary, Canning Coal Pty

More information

Altera Resources Ltd

Altera Resources Ltd 31 January 2011 QUARTERLY REPORT FOR THE 3 MONTHS ENDED 31 December 2010 HIGHLIGHTS Completed the acquisition of JDC and coal projects in Kalimantan, Indonesia New board and management of highly experienced

More information

Restructuring of the Coal Industry in Australia 1

Restructuring of the Coal Industry in Australia 1 Restructuring of the Coal Industry in Australia 1 Yoshimitsu MIMUROTO, Deputy General Manager Toru KIMURA, Guest Researcher Koichi KOIZUMI, Senior Engineer International Cooperation Department Introduction

More information

JUNE 2017 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the

More information

QUARTERLY ACTIVITIES REPORT. For three months ended 31 March Highlights. 2. Operating Summary

QUARTERLY ACTIVITIES REPORT. For three months ended 31 March Highlights. 2. Operating Summary ASX & NZX Release 29 April 2015 BATHURST RESOURCES LIMITED Level 12 1 Willeston Street Wellington 6011 New Zealand Tel: +64 4 499 6830 Fax: +64 4 974 5218 RICHARD TACON Chief Executive Officer rtacon@bathurstresources.co.nz

More information

After the deluge. Michael Roche. Chief Executive AusIMM Southern Queensland Branch 17 February 2011

After the deluge. Michael Roche. Chief Executive AusIMM Southern Queensland Branch 17 February 2011 After the deluge Michael Roche Chief Executive AusIMM Southern Queensland Branch 17 February 2011 Today s key messages > Floods causing significant disruptions and production losses > Global demand fundamentals

More information

ASX Announcement. Company Update

ASX Announcement. Company Update 4 September 2017 ASX Announcement Company Update TerraCom Limited (TerraCom or the Company) (ASX: TER) is pleased to provide an update on the restructuring of the Board and positive progress at Blair Athol

More information

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE The world s 5 th largest gold producer, Harmony Gold Mining Company Limited ( Harmony ) and Australasia s largest gold company, Newcrest

More information

Land area 1.73 million km 2 Queensland population (as at December 2016) Brisbane population* (preliminary estimate as at 30 June 2016)

Land area 1.73 million km 2 Queensland population (as at December 2016) Brisbane population* (preliminary estimate as at 30 June 2016) Queensland - 11 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015)

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015) Queensland - 18 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

Australian Mines increases Marymia ground holding

Australian Mines increases Marymia ground holding 11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint

More information

WICET WIGGINS ISLAND COAL EXPORT TERMINAL

WICET WIGGINS ISLAND COAL EXPORT TERMINAL WICET WIGGINS ISLAND COAL EXPORT TERMINAL WICET Wiggins Island Coal Export Terminal (WICET) is Queensland s newest, state-of-the-art coal export facility, which is a $2.6 billion industry-owned and privately

More information

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp=== OMNR ^ååì~ä=déåéê~ä=jééíáåö OT=klsbj_bo=OMNR=== ^puw=cjp=== 2 `çêéçê~íé=pìãã~êó Board & Management Capital Structure Robert Kennedy Non-Executive Chairman A Chartered Accountant and a Director since 14

More information

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019 NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019 18 February 2019 Quarter Ended 6 Months Ended Jan-19 Jan-18 Change Jan-19 Jan-18 Change ( 000t) ( 000t) (%)

More information

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION Regulatory Announcement Go to market news section Company TIDM Headline Released Number CHL Spitfire Resources Update 07:00 23-May-08 1434V07 RNS Number : 1434V 23 May 2008 Spitfire Resources Limited Update

More information

QUARTERLY ACTIVITIES REPORT 31 OCTOBER 2018

QUARTERLY ACTIVITIES REPORT 31 OCTOBER 2018 NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 OCTOBER 2018 20 November 2018 Quarter Ended Oct - 18 ( 000t) Oct -17 ( 000t) Change (%) Saleable Coal Production QLD 100%

More information

Native title notification for EPC 1559 (AEL)

Native title notification for EPC 1559 (AEL) Native title notification for EPC 1559 (AEL) : 26.09.2014 Queensland South Native Title Services PO Box 10832, Adelaide Street BRISBANE QLD 4000 Reference: EPC 1559 EPC 1559 will now progress through the

More information

For personal use only

For personal use only NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JANUARY 2015 25 February 2015 Quarter Ended 6 Months Ended Jan 15 ( 000t) Jan 14 ( 000t) Change (%) Jan 15 ( 000t) Jan 14

More information

Overview. Mining projects map

Overview. Mining projects map Mine As one of Australia s leading contract mining companies, BGC Contracting has been successfully delivering contract mining and infrastructure projects to an impressive list of resources clients for

More information

December 2017 Quarterly Report

December 2017 Quarterly Report ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work

More information

Queensland Treasury s primary role is to advance the performance of Queensland s economy and to manage the State s finances.

Queensland Treasury s primary role is to advance the performance of Queensland s economy and to manage the State s finances. Public Service Commission Queensland Treasury Department role Queensland Treasury s primary role is to advance the performance of Queensland s economy and to manage the State s finances. It does this by:

More information

MARCH 2018 QUARTERLY ACTIVITIES REPORT

MARCH 2018 QUARTERLY ACTIVITIES REPORT X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April

More information

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5 29 December 2014 BHP Billition Canada Inc. 130 3rd Avenue South Saskatoon SK S7K 1L Canada Tel +1 306 385 8400 www bhpbilliton.com Canada Transportation Act Review Secretariat 350 Albert Street Ottawa

More information

Whitehaven Coal Limited

Whitehaven Coal Limited Whitehaven Coal Limited AUSTMINE Presentation by Paul Flynn, Managing Director and CEO SYDNEY, AUSTRALIA 1 OCTOBER 2015 Our goal To become Australia s leading independent coal company 2 // AUSTMINE - 1

More information

For personal use only

For personal use only ASX Announcement 15 May 2012 ARTEMIS ACQUIRES STRATEGIC WEST PILBARA GOLD AND BASE METALS ASSETS About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold:

More information

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW 2000 Dear Sir Demerger of BHP Steel At the time of the announcement of the creation of the DLC between BHP Limited and Billiton

More information

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) BEN HAVELBERG PROPHECY WARRAMBOO SAGA Also to cause him much ridicule was his ability of prophesying the weather by the moon and the stars. The Polda water

More information

For personal use only

For personal use only ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: Current CSD Share Price: $0.10 Current LME Tin Price: $24,475 Key Points Snow Peak Mining Pty Ltd acquisition of Kagara s Central

More information

2016 Full-year Results Supplementary Information

2016 Full-year Results Supplementary Information 206 Full-year Results Supplementary Information Wednesday, 24 August 206 (to be read in conjunction with the 206 Full-year Results Briefing Presentation) Presentation outline Item Presenter Page Group

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating

More information

Correction to Quarterly Report for quarter ending June 2016

Correction to Quarterly Report for quarter ending June 2016 YANCOAL AUSTRALIA LTD ADDRESS: Level 26, 363 George Street Sydney NSW 2000 PHONE: 61 2 8583 5300 FAX: 61 2 8583 5399 WEBSITE: www.yancoal.com.au 26 July 2016 Correction to Quarterly Report for quarter

More information

Australian Resource Reviews Gold 2016

Australian Resource Reviews Gold 2016 Australian Resource Reviews Gold 2016 Anthony Senior, Geoscience Australia Resource figures are current as at 31 December 2015. The principal uses for gold (Au) are as an investment instrument for governments,

More information

Presentation to Melbourne Mining Club. 23 April 2015 Mitsui & Co., Ltd.

Presentation to Melbourne Mining Club. 23 April 2015 Mitsui & Co., Ltd. Presentation to Melbourne Mining Club 23 April 2015 Mitsui & Co., Ltd. Total Assets: US$ 106.8 billion Shareholder Equity: US$ 34.8 billion Revenue: US$ 55.7 billion EBITDA: US$ 7.8 billion Net Income:

More information

RESTRUCTURING OF AUSTRALIAN EXPORT COAL INDUSTRY IMPACT OF CHINA AND INDIA. Bede Boyle and George Edwards. Coal Ventures Limited

RESTRUCTURING OF AUSTRALIAN EXPORT COAL INDUSTRY IMPACT OF CHINA AND INDIA. Bede Boyle and George Edwards. Coal Ventures Limited Australian Coal Conference 25&26 July 2017 RESTRUCTURING OF AUSTRALIAN EXPORT COAL INDUSTRY IMPACT OF CHINA AND INDIA Bede Boyle and George Edwards Coal Ventures Limited Contents Restructuring of Australian

More information

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected ASX CODE PEA ISSUED CAPITAL Ordinary Shares 360.8M Options 10.7M KPS CONTRACTED CAPACITY 240MW HYDRO CONTRACTED CAPACITY 6MW 14 February 2013 STRONG ORGANIC GROWTH UNDERPINS RECORD PACIFIC ENERGY RESULT

More information

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business NEWS RELEASE 8 NOVEMBER 2007 Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business The Company s directors are pleased to attach a copy of Arrow Energy NL s (Arrow)

More information

Australian banks financing coal and renewable energy. A research paper prepared for Greenpeace Australia Pacific

Australian banks financing coal and renewable energy. A research paper prepared for Greenpeace Australia Pacific Australian banks financing coal and renewable energy A research paper prepared for Greenpeace Australia Pacific Australian banks financing coal and renewable energy A research paper prepared for Greenpeace

More information

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Market Announcements Office ASX Ltd 4 th Floor, 20 Bridge Street, Sydney NSW 25 May 2015 ASX code: MUX Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Agreement

More information

For personal use only

For personal use only Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in

More information

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter 18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS INVESTOR PRESENTATION March 2012 1 Forward Looking and Competent Persons Statements Forward looking statements This presentation contains certain forward looking statements

More information

For personal use only

For personal use only Aspire Mining Limited ABN: 46 122 417 243 Suite B3, 431-435 Roberts Road Subiaco WA 6008 PO Box 1918 Subiaco WA 6904 Tel: (08) 9287 4555 Fax: (08) 9388 1980 Web: www.aspiremininglimited.com Email: info@aspiremininglimited.com

More information

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development Port Hedland, Iron Ore, Australia Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development Economic and Social Outlook Conference 1 November 2012 Disclaimer Forward

More information

CROWN ANNOUNCES 2017 FULL YEAR RESULTS

CROWN ANNOUNCES 2017 FULL YEAR RESULTS ASX / MEDIA RELEASE FOR IMMEDIATE RELEASE 4 August 2017 CROWN ANNOUNCES 2017 FULL YEAR RESULTS MELBOURNE: Crown Resorts Limited (ASX: CWN) ( Crown ) today announced its results for the full year 30 June

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250 Email:

More information

QUARTERLY ACTIVITIES REPORT 31 JULY 2017

QUARTERLY ACTIVITIES REPORT 31 JULY 2017 NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JULY 2017 29 August 2017 * Coal sold includes traded coal sales Quarter Ended 12 Months Ended Jul-17 Jul-16 Change Jul-17

More information

THE HIGHLIGHTS OF THE SHAREHOLDERS REVIEW

THE HIGHLIGHTS OF THE SHAREHOLDERS REVIEW ASX Release - 30 September 2011 ENDOCOAL LIMITED 2011 SHAREHOLDERS REVIEW 30 JUNE 2011 THE HIGHLIGHTS OF THE SHAREHOLDERS REVIEW }Australian coal exploration and development company focused on the Bowen

More information

For personal use only

For personal use only 22 November 2018 ASX : ARV FRANKFURT : ATY US OTCQB : ARTTF GOLD, COBALT AND COPPER IN THE WEST PILBARA ARTEMIS RESOURCES LIMITED IS AN AUSTRALIAN MINERAL DEVELOPER ADVANCING ITS WEST PILBARA BASE, BATTERY

More information

PORT WARATAH COAL SERVICES

PORT WARATAH COAL SERVICES PORT WARATAH COAL SERVICES Visitor Presentation 2008 PWCS SITES CARRINGTON KOORAGANG 1 PWCS AT A GLANCE PWCS owns and operates the two export coal terminals in Newcastle - at Carrington and Kooragang.

More information

Native title notification for EPC 838 (AEL)

Native title notification for EPC 838 (AEL) Native title notification for EPC 838 (AEL) : 26.09.2014 Reference: EPC 838 Queensland South Native Title Services PO Box 10832, Adelaide Street BRISBANE QLD 4000 EPC 838 will now progress through the

More information

Mine Production and Shipping

Mine Production and Shipping Mine Production and Shipping Ore production has grown significantly over the 12 months, as the Company continued to expand its Pardoo mine and commenced development of its Wodgina DSO Project. All of the

More information

QEC s budget submission (attached) focuses on these problems and outlines a number of recommendations for funding in your upcoming budget.

QEC s budget submission (attached) focuses on these problems and outlines a number of recommendations for funding in your upcoming budget. An initiative of the Queensland Resources Council 11 May 2018 The Honourable Jackie Trad Deputy Premier, Treasurer and Minister for Aboriginal and Torres Strait Islander Partnerships PO Box 15009 City

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS PROJECTS Over 2,000m of RC drilling planned at SA Titan Gold & IOCG Project Drilling planned to test strong EM conductor for high grade

More information

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Market Announcement ASX:NTL, NZX:NTL For Immediate Release Market Announcement ASX:NTL, NZX:NTL For Immediate Release Commodity Exposure GOLD and SILVER Board and Management Charbel Nader Chairman/Independent Director Quarterly Activities Report to 30 September

More information

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES ASX ANNOUNCEMENT 21 April 2015 FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES The new Four Eagles Gold Project Joint Venture with GEV and Providence has commenced after the renewal

More information

December 2017 Quarterly Activities Report

December 2017 Quarterly Activities Report 31 January 2018 December 2017 Quarterly Activities Report Mira 6 horizontal well successfully drilled through nearly 1 km of coal Mira field work completed below budget Mira 6 / 2 horizontal-vertical well

More information

WHITEHAVEN COAL LIMITED (ASX:WHC) AMENDED INVESTOR PRESENTATION

WHITEHAVEN COAL LIMITED (ASX:WHC) AMENDED INVESTOR PRESENTATION WHITEHAVEN COAL LIMITED ABN 68 124 425 396 Ground Floor, Ann Place 895 Ann Street Fortitude Valley QLD 4006 PO Box 2440 Fortitude Valley BC QLD 4006 Ph: 07 3000 5690 Fax: 07 3000 5699 Web: www.whitehaven.net.au

More information

For personal use only

For personal use only 5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is

More information

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. EXPLORATION ACTIVITIES Orion s efforts towards project growth, evaluation, and rationalisation have been the focus

More information

Annual Earnings Report 30 June 2002

Annual Earnings Report 30 June 2002 BHP STEEL LIMITED A.B.N. 16 000 011 058 Level 11, 120 Collins Street Melbourne, Victoria 3001 Ph: +61 3 9666 4000 Fax: +61 3 9666 4111 Website: www.bhpsteel.com 7 th August 2002 PLEASE NOTE Annual Earnings

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

2008 INTERIM ANNOUNCEMENT

2008 INTERIM ANNOUNCEMENT (Stock Code: 78) 2008 INTERIM ANNOUNCEMENT FINANCIAL HIGHLIGHTS Six months ended 30th June, 2008 (Unaudited) Six months ended 30th June, 2007 (Unaudited) HK$ M HK$ M Revenue 750.8 622.0 Operating profit

More information

Number 1 Gross Regional Product per capita in Queensland

Number 1 Gross Regional Product per capita in Queensland Number 1 Gross Regional Product per capita in Queensland Whitsunday Region is the nation building region of Australia providing over $22 billion of economic value to the Australian economy. Our region

More information

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 Wednesday 12 March 2008 Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 FOGL, the oil and gas exploration company focused on its extensive licence

More information

Lorena Gold Project Malachite AGM 29 November 2017

Lorena Gold Project Malachite AGM 29 November 2017 Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated

More information

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002 NEWS RELEASE Release Time IMMEDIATE Date 24 October 2002 Number 55/02 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES July 2002 September 2002 This report covers exploration and

More information

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT ASX ANNOUNCEMENT 30 August 2016 RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT Financial Highlights Core net profit after tax 1 (Core NPAT) up 16.8% to $481.4

More information

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. September 2002 December 2002

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. September 2002 December 2002 NEWS RELEASE Release Time IMMEDIATE Date 29 January 2003 Number 03/03 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES September 2002 December 2002 This report covers exploration

More information

ASX ANNOUNCEMENT. Blackwood Coal Announces Intersects with its Initial Drilling Campaign at its Galilee Project

ASX ANNOUNCEMENT. Blackwood Coal Announces Intersects with its Initial Drilling Campaign at its Galilee Project 5 September 2011 ASX ANNOUNCEMENT Blackwood Coal Announces Intersects with its Initial Drillg Campaign at its Galilee Project Argonaut Resources NL is pleased to announce that Blackwood Coal Pty Ltd ("Blackwood"),

More information

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Inca de Oro Copper-Gold Project and Carmen deposit sale process PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:

More information

Caval Ridge Mine Operational Workforce Change Request 4 14 JUNE 2011

Caval Ridge Mine Operational Workforce Change Request 4 14 JUNE 2011 Caval Ridge Mine Operational Workforce Change Request 4 14 JUNE 2011 Contents 1. Executive summary... 1 1.1 Introduction... 1 1.2 Change requested to operational workforce arrangements... 1 1.3 Reasons

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

International Tourism Snapshot

International Tourism Snapshot Australia on a high International visitors to Australia Australia welcomed 7.8m international visitors in the year ending June International visitor expenditure in Australia 2017, more than any previous

More information

For personal use only

For personal use only ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,

More information

SEQ Catalyst Projects

SEQ Catalyst Projects m3property Update SEQ Catalyst Projects Winter 2018 Since our Autumn Catalyst Projects report, several projects in South East Queensland s pipeline of major projects have progressed and several new projects

More information

GROWTH PLAN PRODUCTION FOCUS

GROWTH PLAN PRODUCTION FOCUS 2001-02 2002-03 2003-04 2004-06 2006-07 2007-08 2008-09 2009-10 2011-12 2014-15 GROWTH PLAN PRODUCTION FOCUS PRODUCTION CAPACITY (MMTPA) 5.00 4.50 4.00 4.00 3.50 3.00 2.50 2.25 2.00 1.50 1.00 0.50 0.00

More information

Mt Arthur Coal. Investor/Analyst Presentation September 2003

Mt Arthur Coal. Investor/Analyst Presentation September 2003 Mt Arthur Coal Investor/Analyst Presentation September 2003 Agenda Energy Coal Overview Mt Arthur Coal Project Q&A David Lamont, Chief Financial Officer BHPB Billiton Energy Coal Stephen David, General

More information

Quarterly Activities Report Period Ended 31 March 2018

Quarterly Activities Report Period Ended 31 March 2018 23 April 2018 Quarterly Activities Report Period Ended 31 March 2018 ASX Code: EXG Key Points During the March 2018 Quarter, Kalgoorlie North Gold Project (KNGP) activities predominantly involved resource

More information

BHP Billiton Limited (BHP) - Financial and Strategic SWOT Analysis Review

BHP Billiton Limited (BHP) - Financial and Strategic SWOT Analysis Review BHP Billiton Limited (BHP) - Financial and Strategic SWOT Analysis Review BHP Billiton Limited (BHP) - Financial and Strategic SWOT Analysis Review Sector Publishing Intelligence Limited (SPi) has been

More information

Indonesia. Market overview. Opportunities and challenges. Jakarta. Austrade in Indonesia

Indonesia. Market overview. Opportunities and challenges. Jakarta. Austrade in Indonesia INDONESIA Indonesia Market overview Indonesia is an emerging economic force. After India and China, Indonesia is the world s fastest growing consumer market. GDP reached US$1.2 trillion in 2012 and is

More information

Conference Presentation

Conference Presentation Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 9 April 2013 Conference Presentation In accordance with the requirements of Listing Rule 3.1 we submit

More information

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre

More information

For personal use only

For personal use only ABN 52 007 626 575 Date 23 rd May 2016 The Manager Market Announcements Office ASX Ltd 4th Floor, 20 Bridge Street Sydney NSW 2000 ASX Code: JRV JOINT VENTURE WITH AUSTRALIAN MINES LIMITED (ASX: AUZ) The

More information

JUNE 2012 QUARTERLY REPORT

JUNE 2012 QUARTERLY REPORT 43 Outram St West Perth WA 6005 Phone: (08) 9321 8845 Fax: (03) 9321 8854 Email info@baru.com.au 26 July 2012 JUNE 2012 QUARTERLY REPORT Board of Directors Richard Anthon (Chairman) Kevin Nichol (Executive

More information

A Producer's response to the growing metallurgical coal demand in South America. Colin Olivieri Regional Marketing Manager, Carbon Steel Materials

A Producer's response to the growing metallurgical coal demand in South America. Colin Olivieri Regional Marketing Manager, Carbon Steel Materials A Producer's response to the growing metallurgical coal demand in South America Colin Olivieri Regional Marketing Manager, Carbon Steel Materials Coaltrans Brazil, Rio de Janeiro, Brazil Tuesday, 16 May

More information

CAIRNS A STRATEGIC PORT

CAIRNS A STRATEGIC PORT CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 6 JUNE 2018 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best standards

More information