1 SINTAKOTE STEEL PIPELINE SYSTEMS PROJECT EXPERIENCE Steel Mains and its antecedents have participated in most of the major water supply pipelines constructed in Australia since the early 1900 s. A summary of some of those Steel Mains SINTAKOTE Steel Pipeline Systems projects undertaken in recent years is given below. Principal Project Year/s Length Diameters Variations* Time* (km) (mm) Extensions 1 Woleebee Creek to /960/ Glebe Weir Pipeline 1067/1404 Project 2 Queensland Curtis 2012/ /508/ LNG Project - Water 559/660/ Trunklines 762/960 3 Melbourne Desalination Plant- Transfer Pipeline 4 Adelaide Desalination Plant- Transfer Pipeline 5 Sugarloaf Interconnector Pipeline 2009/ / / Wimmera-Mallee Pipeline Project 2007/2008/ / South East 2006/2007/ / Queensland /1085/ Water Grid 1290/ Bayswater Power Station 9 Ballarat Link of the Goldfields Superpipe / Goulburn to Campaspe Link Superpipe Project Page 1
2 11 Torrens System Upgrade Project Liverpool to Ashfield 2006/ /1067/ Pipeline Burdekin to Moranbah Pipeline Kwinana Desalination Connection 2005/ / Stag Creek Pipeline / Clarence Valley RWSS Stage 1B 2003/ Mt Miller Pipeline Clarence Valley RWSS Stage 1A Stirling Trunk Main 2000/ * There were no variations or time extensions attributable to Tyco Water s failure to perform. 1. Project Name: Woleebee Creek to Glebe Weir Pipeline Project Supply of a pressure pipeline from Woleebee Creel to Glebe Weir. 120km of 914/960/1067/1404mm SINTAKOTE RRJ MSCL pipe. April 2013 to September SunWater to date. Pipe deliveries completed to date on time with no problems. Mr Russell Paton SunWater Tel: (07) Page 2
3 2. Project Name: Queensland Curtis LNG Project - Water Trunklines Supply of a pressure pipeline for the QCLNG Upstream Project. 140km of 406/508/559/660/762/960mm SINTAKOTE RRJ MSCL pipe. April 2012 to June Queensland Gas Company (QGC) Pipe deliveries completed on time with no problems. Henro Van Wyk EPcm Contract Manager) Tel: Project Name: Victorian Desalination Project-Transfer Pipeline Supply of a pressure pipeline from Wonthaggi Desalination Plant Wonthaggi to Cardinia Reservoir. 84km of 1930mm SINTAKOTE Ball & Socket Joint MSCL pipe. December 2009 to December Aquasure Consortium (Thiess, Degremont Capital) to date (May 2011). Pipe deliveries completed on time with no problems. (Suez Environment) and Macquarie Jason Spears (Project Director Aquasure Pipeline Joint Venture) Tel: Page 3
4 4. Project Name: Adelaide Desalination Plant-Transfer Pipeline Supply of a pressure pipeline from Port Stanvac S.A. to Happy Valley Water Treatment Plant and Reservoir. 12km of 1575mm SINTAJOINT RRJ MSCL pipe. February 2009 to November SA Water. Pipe deliveries all on time with no problems. Andrew Gambling (Project Director McConnell Dowell-Built Environs Joint Venture) Tel: Project Name: Sugarloaf Interconnector Pipeline Supply of a pressure pipeline from Eildon Reservoir to Sugarloaf Reservoir. 50km of 1750mm and 20km of 1404mm SINTAKOTE Ball and Socket Joint MSCL pipe. May 2008 to August Melbourne Water. Pipe deliveries were on or before time with no problems. Rod Clifford (Project Director Sugarloaf Interconnector Project-Melbourne Water) Tel: (03) Mob: Page 4
5 6. Project Name: Wimmera-Mallee Pipeline Project Supply of a new pressurised pipeline water supply system to replace the existing channel delivery system. 64km of 1016 outside diameter SINTAJOINT RRJ and Welded steel pipe and 30km of 711 outside diameter SINTAJOINT RRJ and Welded steel pipe. December 2007 to October Grampians Wimmera-Mallee Water. Pipe deliveries were on time with no problems. Mr Jeff Rigby (Managing Director) GWMWater Tel: (03) Page 5
6 7. Project Name: South East Queensland Water Grid The South East Queensland Water Grid consists of the Northern Interconnector Pipeline, the Southern Regional Water Pipeline, the Eastern Interconnector Pipeline and the Western Corridor Recycled Water Scheme. 334km of SINTAKOTE steel pipe in sizes ranging from 800 to 1451 outside diameter. November 2006 to July The Queensland Government. Tyco Water met all supply deadlines for each of these significant projects. Mr Nigel Deacon Infrastructure Delivery Group Department of Infrastructure and Planning Tel: (07) Project Name: Bayswater Power Station Constructed by Eire Contractors at Bayswater Power Station Muswellbrook in order to supply additional water to the Power Station. Approximately 4km of 1451 outside diameter SINTAJOINT RRJ steel pipe and fittings. Period of 8 weeks from February 2008 to May Macquarie Generation. All pipe deliveries were on time. Mr Gavin Heydon (Project Manager) Macquarie Generation Mob: Page 6
7 9. Project Name: Ballarat Link of the Goldfields Superpipe Supply of a pressure pipeline from Sandhurst Reservoir (approx. 10km SW of Bendigo) to the White Swan Reservoir (approx. 10km NE of Ballarat). 47km of 800 outside diameter SINTAJOINT RRJ steel pipe. March 2007 to December Central Highlands Water. Pipe deliveries were on time with no problems. Mr Tony Wright (Project Director) Central Highlands Water Tel: (03) Project Name: Goulburn to Campaspe Link Superpipe Project Supply of a pressure transfer pipeline from the Waranga Western Channel near Colbinabbin to connect with Coliban Water s system at Lake Eppalock. 47km of 1124 outside diameter SINTAJOINT RRJ steel pipe. February 2007 to July Coliban Water. Pipe deliveries were supplied from Melbourne and Perth on time with no problems. Mr Rick Jackel (Project Director Infrastructure Services) Coliban Water Tel: (03) Page 7
8 11. Project Name: Torrens System Upgrade Project Supply of a pipeline within the Torrens Linear Park, between the Torrens Gorge Weir (off Gorge Road, Athelstone) and Gallery Road Highbury. The sites are located in Adelaide s north-eastern suburbs, South Australia. 3.4km of 1829 outside diameter SINTAJOINT RRJ and Welded steel pipe. May 2007 to September South Australian Water Corporation. First ever supply of 1800 nominal bore SINTAJOINT RRJ steel pipe into South Australia. Mr Milind Kumar (General Manager Engineering and Projects) SA Water Tel: (08) Project Name: Liverpool to Ashfield Pipeline Recycled water main to provide irrigation to local parks and industry. Also used as a diversion from the George s River sub-main while renewals took place. 20km of 988/1067/1124 outside diameter SINTAKOTE steel pipe and fittings. October 2006 to August Sydney Water. Tyco Water Services were able to slip line 6km of 980 internal diameter SINTAKOTE steel pipe for this project. Mr Adam Binning (Project Manager) Leighton Contractors Tel: (02) Page 8
9 13. Project Name: Burdekin to Moranbah Pipeline Water supply pipeline from Burdekin to Moranbah. 172km of 813 outside diameter SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. Over 10 months finishing October SunWater. Tyco Water was able to supply 5.5km of pipe per week. Mr Tim Donaghy (Senior Project Manager) SunWater Tel: (07) Project Name: Kwinana Desalination Connection Pipework connecting the Desalination plant into the IWSS. 23km of DN1200/DN1400 outside diameter SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. October 2005 to March Western Australia Water Corporation. No project problems, completed on time. Mr Mark Oliver Western Australia Water Corporation Tel: (08) Page 9
10 15. Project Name: Stag Creek Pipeline Raw Water supply pipeline for Callide Power Station. 8km of 800 outside diameter and 7km of 960 outside diameter SINTAKOTE steel pipe. April 2005 to July SunWater. Pipe delivered on time with no issues. Mr Russell Paton SunWater Tel: (07) Page 10
11 16. Project Name: Clarence Valley & Coffs Harbour Regional Water Supply Scheme Stage 1B Water supply pipeline for Clarence Valley & Coffs Harbour NSW. 15.6km of 960 outside diameter SINTAKOTE steel pipe. November 2003 to July Clarence Valley Council. Pipe delivered on time with no issues. Referees: Mr Jim Fear North Coast Water Tel: (02) Mr David Tarrant Dept. of Commerce Tel: (02) Project Name: Mt Miller Pipeline Gladstone Area Water Board Raw Water supply pipeline. 17km of DN900 SINTAKOTE steel pipe. July 2003 to September Gladstone Area Water Board. Pipe delivered on time with no issues. Mr Alan Edgerton Tel: (07) \ Page 11
12 18. Project Name: Clarence Valley & Coffs Harbour Regional Water Supply Scheme Stage 1A Water supply pipeline from Clarence Valley to Coffs Harbour NSW. 34.5km of 660 outside diameter SINTAKOTE steel pipe. April 2002 to September Clarence Valley Council. Contract period was only 21 weeks and Tyco Water supplied all pipes within the specified period with no time extensions required. Referees: Mr Jim Fear North Coast Water Tel: (02) Mr David Tarrant Dept. of Commerce Tel: (02) Project Name: Stirling Trunk Main Water supply pipeline from Stirling Dam to Tamworth Reservoir. 106km of DN1400 SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe. Over 18 months finishing January Western Australia Water Corporation. A jointly funded investigation was conducted into the friction effects on buried SINTAKOTE steel pipelines and resulted in a significant reduction in the number of welded joints required for thrust restraint. Mr John Wallis Western Australian Water Corporation Tel: (08) Page 12
13 Page 13
Australian Accommodation Monitor Summary. Financial-year performance:
Australian Accommodation Monitor Summary Financial-year performance: 2016-17 Australian Accommodation Monitor (AAM) Northern Territory Click on each territory to view detailed report. 68.3 143.10-2.5 Queensland
More informationRoss Young Executive Director Water Services Association of Australia
72 nd Annual Victorian Water Industry Engineers and Operators Conference Bendigo Ross Young Executive Director Water Services Association of Australia Current Storage Levels Adelaide 79.0% Canberra 45.5%
More informationThe SBEnrc. Three Research Programs.
The SBEnrc The Sustainable Built Environment National Research Centre (SBEnrc) offers a unique industry-government-research collaboration to improve Australia s built environment industry. The SBEnrc has
More informationInfrastructure Priority List. Infrastructure Priority List Printed as at 28 April
Infrastructure Priority List Infrastructure Priority List Printed as at 28 April 2018 1 High Priority Projects High Priority Projects are potential infrastructure solutions for which a full business case
More informationDepartment of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments
Department of Employment, Economic Development and Innovation Current Queensland coal infrastructure developments Historical Coal Production and Exports Queensland exported 159.5 million tonnes of coal
More informationFor personal use only
ASX ANNOUNCEMENT 26 March 2015 APA Group (ASX: APA) (also for release to APT Pipelines Limited (ASX: AQH)) APA Group Presentation The APA Group Australian Domestic Gas Outlook Conference presentation is
More informationAustralian Statistical Geography Standard (ASGS): Volume 5 - Remoteness Structure
1270.0.55.005 Australian Statistical Geography Standard (ASGS): Volume 5 - Remoteness Structure Maps Australia July 2011 Remoteness Area Boundaries 0 500 1000 New South Wales Remoteness Area boundaries
More informationTreasury Circular Industrial Relations NSWTC August 2015
Treasury Circular Industrial Relations NSWTC15-17 28 August 2015 Review of Meal, Travelling and other Allowances Various expense and work related allowances in the Crown Employees (Public Service Conditions
More informationGreg Steinepreis EXECUTIVE SUMMARY. Partner, Perth T
Greg Steinepreis Partner, Perth T +61 8 9429 7505 greg.steinepreis@squirepb.com Practice Focus Construction, engineering & infrastructure Services International and domestic dispute resolution Litigation
More informationICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015
ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion
More informationHistorical Disaster Statistics
Historical Disaster Statistics Event NSW & VIC Flooding CAT 122 SW QLD Border Flooding CAT 121 24/2/12-16/03/12 24/01/12-15/02/12 NSW Riverina, NSW Central West and northern Victoria Cost NSW & VIC 108,212,000
More informationGLADSTONE. Australia s premier manufacturing and industrial location
GLADSTONE Australia s premier manufacturing and industrial location Preamble Gladstone is home to major industry including three LNG export facilities, an aluminium smelter, two alumina refineries, chemical
More informationSTEVE ABSON SENIOR ASSOCIATE
QUALIFICATIONS HNC Civil Engineering, Sheffield Hallam University (UK) HND Engineering Technology, Rotherham Technical College (UK) PROFESSIONAL AFFILIATIONS Member of the Australian Institute of Company
More informationListing Rule 3.17 Shareholder Update for the 9 months to 30 September 2012
6 December 2012 Richard Willcock Group Company Secretary Leighton Holdings Limited ABN 57 004 482 982 472 Pacific Highway St Leonards NSW 2065 Australia PO Box 1002 Crows Nest NSW 1585, Australia www.leighton.com.au
More informationHALF YEAR REPORT February Leighton Holdings Limited
HALF YEAR REPORT February 2009 PRESENTATION OUTLINE Results highlights Operational update Financial statements Strategy and outlook 2 Half Year Report I 12 February 2009 I RESULTS HIGHLIGHTS 3 Half Year
More informationShaping the Future of Railway Institute of Railway Technology
Shaping the Future of Railway Institute of Railway Technology 21 st September 2016 Adams Williams Manufacturing Lead Major Bids Team Rail Relationships creating success Opportunities in Rail Page 2 Trains,
More informationCORROSION PREVENTION. Leaders in Corrosion Prevention and Sealing Technology.
CORROSION PREVENTION Leaders in Corrosion Prevention and Sealing Technology www.densoaustralia.com.au About Denso Australia Denso (Australia) Pty Ltd a subsidiary of Winn & Coales (International) Ltd founded
More informationAppendix 2. Advertised Call for Submission No Description of catchments and services by catchment
Appendix 2 Advertised Call for Submission No.2148 Description of s and services by Contents Introduction 1 Overview of Department of Health Regions 1 s 2 profile by region and 4 Region-based services Catchment-based
More informationMedicare Local Offices at July 2013 Listed by State/Territory
ACT ACT Medicare Local Unit 20, 41 Liardet Street Weston ACT PO Box 3571 Weston ACT 2611 Phone: 02 6287 8099 reception@actml.com.au www.actml.com.au NEW SOUTH WALES Central Coast NSW Medicare Local Suite
More informationFUJITSU SERVICE COVERAGE
FUJITSU SERVICE COVERAGE Note: This Fujitsu Service Coverage matrix applies for maintenance, warranty and extended warranty services on Fujitsu products sold by Fujitsu Australia. Service Coverage is within
More informationJOHN McMULLAN CURRICULUM VITAE. EDUCATION: Bachelor of Engineering (Civil) University of Melbourne 1976
JOHN McMULLAN CURRICULUM VITAE EDUCATION: Bachelor of Engineering (Civil) University of Melbourne 1976 Bachelor of Laws Monash University 1982 Post-graduate Diploma of Legal Studies Monash University 1987
More informationHome About us Contact
Page 1 of 5 Home About us Contact IN THIS EDITION 1. A message from IPA s Chief Executive Brendan Lyon 2. Added 3. Status Changes 4. Updates 1. A message from IPA s Chief Executive Brendan Lyon I am delighted
More informationAustralian Program Guide
Australian Program Guide 2018 Geospatial Imagery Redefined 2018 Spookfish Australia Pty Ltd Introducing Spookfish s Australian Capture Program. Spookfish s ability to quickly capture, process and publish
More informationHY 2016 Results February 2016
HY 2016 Results February 2016 Disclaimer This presentation contains a summary of information of Decmil Group Limited and is dated February 2016. The information in this presentation does not purport to
More informationFUJITSU SERVICE COVERAGE
FUJITSU SERVICE COVERAGE Note: This Fujitsu Service Coverage matrix applies for maintenance, warranty and extended warranty services on Fujitsu products sold by Fujitsu Australia. Service Coverage is within
More informationCapability. icn.org.au. Chairman s message. ICN puts Australian firms on track for Waratah rail AUTUMN2012
Latest updates from ICN, Australia and New Zealand s industry matchmaker icn.org.au ICN puts Australian firms on track for Waratah rail 626 new Waratah carriages will soon change the face of Sydney s rail
More informationMildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC
Mildura Passenger Train Talk to Mildura Rural City Council 10 August 2017 DR BILL RUSSELL HON SECRETARY, THE RAIL FUTURES INSTITUTE INC Strong Arguments for the Mildura Passenger Train Large population
More informationORGANISATIONS (DEFINITION OF FAMILY COUNSELLOR) DESIGNATION 2012
ORGANISATIONS (DEFINITION OF FAMILY COUNSELLOR) DESIGNATION 2012 Item no Name of Organisations ABN Trading Name 1 Agencies for South West Accommodation 29 138 143 911 Agencies for South West Accommodation
More informationIs uneven economic growth dividing Australian society? 14 March 2017
Is uneven economic growth dividing Australian society? 14 March 2017 Outline Growing national economy hides a concerning spatial distribution. The big cities and mineral production are driving the national
More informationMAPPING YOUTH UNEMPLOYMENT HOTSPOTS
AN UNFAIR AUSTRALIA? MAPPING YOUTH UNEMPLOYMENT HOTSPOTS MARCH 2018 Australians all let us rejoice, For we are young and free; We ve golden soil and wealth for toil The first lines of the national anthem,
More informationCity of Sydney (COS) Bridges - an Overview & Current Asset Management Practices
City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices Nasser Hossain Senior Engineer, Roads & Structural Assets, City of Sydney City of Sydney (COS) LGA The City of Sydney LGA
More informationStakeholder Briefing The Bays Precint Urban Transformation Program
Stakeholder Briefing The Bays Precint Urban Transformation Program November 2014 Our Lifecycle Approach 3 Our Ambition & Narrative Our Ambition Statement for UrbanGrowth NSW is - Transforming City Living
More informationIBM ServicePac Location Guide
IBM ServicePac Location Guide: 2011 IBM ServicePac Location Guide & 2011 Rely on IBM expertise to increase system availability for a more efficient business. To locate your nearest IBM Business Partner*
More informationThe Coalition s Policy to Build Melbourne s East West Link
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan
More informationAnthony Wood. Associate tirector. Experience Overview
Experience Overview Anthony has over 20 years engineering experience covering: Planning, Feasibility, Concept, tetailed tesign and telivery of Highway and Civil Infrastructure Projects. He has extensive
More informationThe Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid
The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid Craig Clarke, Manager Construction Engineering APGA Annual Convention, Gold
More informationGTO SCENariOS TO 2020
D 10. The market for apprentices by region 1998 to 2020 92 10.1 The base case projections 92 11. Regional apprentice markets: The risks to growth 101 12. GTO industry scenarios: Constant market share 104
More informationSTATISTICAL REPORT. Aviation
STATISTICAL REPORT Aviation Domestic airline on time performance April 2017 Commonwealth of Australia 2017 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise
More informationINTERIM REVIEW OF AUSTRALIAN CONSTRUCTION MARKET CONDITIONS JULY 2015
INTERIM REVIEW OF AUSTRALIAN CONSTRUCTION MARKET CONDITIONS JULY 2015 2 Review of Australian Construction Market Conditions July 2015 Trade bottlenecks continue in New South Wales, Victoria and Queensland
More informationThe Coalition s Policy
The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.
More informationAmalgamated Pest Control Pty Ltd ABN
This is to certify that: APC Corporate Office 504 Boundary Road Archerfield QLD 4108 AUSTRALIA (Refer to Attachment to Certificate of Registration dated 12 August 2013 for additional certified sites) operates
More informationINVESTOR ROADSHOW MAY/JUNE 2003
INVESTOR ROADSHOW MAY/JUNE 2003 GROUP PROFILE! Largest contracting and project development group in Australia! Employs over 15,000 people throughout Australia, Asia and Pacific! Annual revenue this year
More informationSTATISTICAL REPORT. Aviation
STATISTICAL REPORT Aviation Domestic airline on time performance March 2017 Commonwealth of Australia 2017 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise
More informationNEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business
NEWS RELEASE 8 NOVEMBER 2007 Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business The Company s directors are pleased to attach a copy of Arrow Energy NL s (Arrow)
More informationMONADELPHOUS REPORTS FY 2017 SALES AND EARNINGS. Performance Highlights
22 August 2017 MONADELPHOUS REPORTS FY 2017 SALES AND EARNINGS Performance Highlights Sales revenue $1.265 billion*, in line with guidance provided Net profit after tax (NPAT) attributable to equity holders
More informationGruyere Gold Project Development Update
ASX Announcement 18 January 2018 Highlights Gruyere Gold Project Development Update Construction on schedule and budget engineering and construction 72% and 32% complete respectively Mining contract awarded
More informationRegional and Remote Communities. Capability
Regional and Remote Communities Capability why BMD Consulting? As part of the BMD Group - a unique and integrated design, construction and development group - BMD Consulting provides consulting engineering
More informationNation-wide roll out of Energy Efficient Street Lighting. South West Group/WALGA Climate Change Forum September 2016
Nation-wide roll out of Energy Efficient Street Lighting South West Group/WALGA Climate Change Forum September 2016 This is Ironbark Councils only Real Action only The Ironbark mission is to facilitate
More informationRegional Public Sector Employment and Investing Expenditure
Regional Public Sector Employment and 2016-17 Investing Expenditure Adelaide Hills Brukunga Mine 7 099 Hahndorf Wastewater Treatment Plant Inlet Screen Upgrade 2 000 Kangaroo Creek Dam Safety 42 679 Mount
More informationclubmini Vic 2018 Calendar v1.0 JANUARY 2018 FEBRUARY D E C 2 9 J A N S C H O O L H O L I D A Y S
Monthly cruises are generally on the 3rd Saturday or 3rd Sunday of each month We need members to volunteer to run and support drive events e.g. Lead, TEC, 2 nd group, etc. We anticipate joining with VMCI
More informationINLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au
INLAND RAIL Connecting Australia RICHARD WANKMULLER - CHIEF EXECUTIVE OFFICER INLAND RAIL 5 June 2018 National Infrastructure Summit 2018 inlandrail.com.au The Australian Government is delivering Inland
More informationThe ITGI Project Gas Corridor through Turkey, Greece and Italy
ITALIAN REPUBLIC HELLENIC REPUBLIC TURKISH REPUBLIC The ITGI Project Gas Corridor through Turkey, Greece and Italy Rome, 26th July 2007 Umberto Quadrino, CEO, Edison 1 Gas demand/supply balance in Europe
More informationOffice locations QLD NSW VIC
RESIDENTIAL Overview & background Taylor Byrne provides quality independent property advice, supported by thorough research and analysis of the property market. Founded in 1960, Taylor Byrne commenced
More informationSTATISTICAL REPORT. Aviation. Domestic airline on time performance
STATISTICAL REPORT Aviation Domestic airline on time performance 2016-17 Commonwealth of Australia 2017 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise noted,
More informationprofessional summary
Curriculum Vitae professional summary Areas of Expertise Strategic Planning and Policy Development Participation and Consultation Tourism Planning including Marketing Plans Environmental Planning Social
More informationPersonal Helpers and Mentors (PHaMS) and Mental Health Respite: Carer Support, April 2013
Personal Helpers and Menrs (PHaMS) and Mental Health Support, April 2013 State / ACT Carers ACT Inc North Canberra Belconnen Gungahlin $1,044,722 ACT worker Richmond Fellowship ACT Inc North Canberra Belconnen
More informationSTATISTICAL REPORT. Aviation
STATISTICAL REPORT Aviation Domestic airline on time performance September 2015 Commonwealth of Australia 2015 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise
More informationSTATISTICAL REPORT. Aviation
STATISTICAL REPORT Aviation Domestic airline on time performance August 2016 Commonwealth of Australia 2016 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise
More informationTechnical Design Manual
Technical Design Manual BPG.TDM.VS.03.02 - November 2015 For use in the determination, application and design of Blade Piles, Slip Joint Pile Caps, Piled Slab Systems, Lateral Bracing Piles and connections
More informationSTATISTICAL REPORT. Aviation
STATISTICAL REPORT Aviation Domestic airline on time performance December 2015 Commonwealth of Australia 2016 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise
More informationTrade services. TradeStart. About TradeStart. TradeStart office locations. For Australians. How Austrade can help. New South Wales
For Australians How Austrade can help Trade services TradeStart About TradeStart The TradeStart network is an extension to Austrade s own offices and is delivered in partnership with State, Territory and
More informationthe regional agenda in context
the regional agenda in context population change in victoria, 2006 2016 Decline 0.0% to less than 10% 10% to less than 20% 20% or more Truganina Doreen Cranbourne East Regional population growth broadly
More informationThe Cairns Property Market. Presented by Rick Carr Research Director, Herron Todd White 28 July 2015
The Cairns Property Market Presented by Rick Carr Research Director, Herron Todd White 28 July 2015 National Market Dubbo Gippsland Horsham Latrobe Valley Newcastle Sydney Tamworth Toowoomba W ollongong
More informationTHE CONSTRUCTION INDUSTRY OUTLOOK
THE CONSTRUCTION INDUSTRY OUTLOOK The resources boom and a strong programme of public works is expected to drive engineering construction activity to record levels over the next two years.. but a downturn
More informationBankwest First Time Buyer Deposit Report 2016
Bankwest First Time Buyer Deposit Report 2016 December 2016 The eighth annual Bankwest First Time Buyer Deposit Report tracks the time it would take for first time buyers to save a in 465 local government
More informationTasmania Property Report April 2015
Tasmania Property Report National Overview This quarter, we asked Herron Todd White property experts to identify the hidden gems of Australia s residential property market locations that combine affordability
More informationInvestor Briefings First-Half FY2016 Financial Results
Cedar Woods Properties Limited Investor Briefings First-Half FY2016 Financial Results 26 February 2016 Cedar Woods Presentation 2 Snapshot of Achievements in FY2016 Extensive portfolio of residential estates
More informationSTATISTICAL REPORT. Aviation. Domestic airline on time performance
STATISTICAL REPORT Aviation Domestic airline on time performance 2015-16 Commonwealth of Australia 2016 ISSN: 1832-0759 Ownership of intellectual property rights in this publication Unless otherwise noted,
More informationCENTRAL AUSTRALIA p239
2 WESTERN p273 CENTRAL p239 BRISBANE & QUEENSLAND p137 NEW SOUTH WALES p95 SYDNEY p50 MELBOURNE & VICTORIA p191 TASMANIA p305 3 DISCOVER Sydney (p50) Brash, bronzed and brimming with confidence, this city,
More informationTapping in. News about Bulk Liquids Industry Association Inc
Welcome to our Winter 2015 edition. Update message from President Gordon Lasker. It s great to have Michael Halley back on deck and keen to send out our 2 nd edition of Tappin In covering key matters that
More informationQQC LNG Community Committee Monday 6 December 2010 QGC Office, Gladstone
QQC LNG Community Committee Monday 6 December 2010 QGC Office, Gladstone 1. Opening The fifth meeting of the QGC LNG Community Committee was called to order at 2.00pm on Monday 6 December 2010 at the QGC
More information4WD & ADVENTURE SHOW OCTOBER 12-14
4WD & ADVENTURE SHOW OCTOBER 12-14 OVERVIEW 2018 The Sydney 4WD & Adventure Show is on again from October 12-14th at Eastern Creek Raceway showcasing non-stop entertainment, attractions, and a truck-load
More informationHISTORIC PICTURES RELEASED TO THE NATIONAL LIBRARY OF AUSTRALIA
Thiess Pty Ltd A.C.N. 010 221 486 A.B.N. 87 010 221 486 MEDIA RELEASE 17 November 2009 Thiess Centre 179 Grey Street South Bank QLD 4101 Locked Bag 2009 South Brisbane QLD 4101 Australia Telephone (07)
More informationCompany Brief, including valuer CV s
Company Brief, including valuer CV s Senior Valuers: McLaren Vale Tim Wilkin AAPI, 0407 194 777 Tanunda, Barossa Nigel Gibbins AAPI, 0409380 237 Naracoorte, South East Roger Eberhard AAPI For all areas
More informationChallenge us to find you a better deal. At no cost to you, we help save time and money, without the hassles and headache.
Member Benefits Challenge us to find you a better deal. Union Shopper is all about ensuring members receive great value for money on whatever you are looking to buy. At no cost to you, we help save time
More informationOutlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected
ASX CODE PEA ISSUED CAPITAL Ordinary Shares 360.8M Options 10.7M KPS CONTRACTED CAPACITY 240MW HYDRO CONTRACTED CAPACITY 6MW 14 February 2013 STRONG ORGANIC GROWTH UNDERPINS RECORD PACIFIC ENERGY RESULT
More informationMONADELPHOUS REPORTS HY 2017 REVENUE AND EARNINGS
21 February 2017 MONADELPHOUS REPORTS HY 2017 REVENUE AND EARNINGS Performance Highlights Strengthened position in Infrastructure market Maintenance services expanded New Minerals EPC business established
More informationCEREMONY REPORT STIRLING BRIDGE
ENGINEERS AUSTRALIA Western Australia Division CEREMONY REPORT STIRLING BRIDGE Heritage Recognition Ceremony Stirling Bridge, December 2, 2014 PREPARED BY ENGINEERING HERITAGE WESTERN AUSTRALIA March 2015
More informationAnaesthetic Job Vacancies
Anaesthetic Job Vacancies Registrar / Consultant / Provisional Fellow We are currently assisting several rural and regional hospitals to provide Consultant Anaesthetic cover. These contracts can be short
More informationCASE STUDY. Changing Places, May Park, Horsham, Victoria. landmarkpro.com.au BRISBANE SYDNEY MELBOURNE ADELAIDE PERTH AUCKLAND
Changing Places, May Park, Horsham, Victoria BRISBANE SYDNEY MELBOURNE ADELAIDE PERTH AUCKLAND Case study details Customer: Horsham Rural City Council Product: Location: Installer: Custom Changing Places
More informationNSW METS LEVERAGING GLOBAL ADVANTAGE SYDNEY 13 MAY 2016
NSW METS LEVERAGING GLOBAL ADVANTAGE SYDNEY 13 MAY 2016 DRIVING INNOVATION & COLLABORATION MINING EQUIPMENT TECHNOLOGY SERVICES Australian METS - Adding Value from Cradle to Cradle 3 Exploration Feasibility
More information2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining
2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining Major Projects Pipeline Report - 2017 Presentation Outline Overview and key findings of the 2017 Pipeline Report
More informationAnaesthetic Job Vacancies
Anaesthetic Job Vacancies Registrar / Consultant / Provisional Fellow We are currently assisting several rural and regional hospitals to provide Consultant Anaesthetic cover. These contracts can be short
More informationAUSTRALIAN TRAVEL TIME METRIC 2017 EDITION
AUSTRALIAN TRAVEL TIME METRIC 217 EDITION For more information please contact: Brendan Lyon Chief Executive Officer Infrastructure Partnerships Australia Suite 3.3, Level 3, 9 Pitt Street Sydney NSW 2
More informationProperty Flipping Report. Prepared by CoreLogic
Property Flipping Report Prepared by CoreLogic About CoreLogic About CoreLogic CoreLogic Australia is a wholly owned subsidiary of CoreLogic (NYSE: CLGX), which is the largest property data and analytics
More informationCommissioned by Gambling Research Australia for the Ministerial Council on Gambling. A Review of Australian Gambling Research
A Review of Australian Gambling Research Implications for inter-jurisdictional public policy and regulation 2nd Update Version January 2010 GRA Logo Commissioned by Gambling Research Australia for the
More informationPresentation to Melbourne Mining Club. 23 April 2015 Mitsui & Co., Ltd.
Presentation to Melbourne Mining Club 23 April 2015 Mitsui & Co., Ltd. Total Assets: US$ 106.8 billion Shareholder Equity: US$ 34.8 billion Revenue: US$ 55.7 billion EBITDA: US$ 7.8 billion Net Income:
More informationA trusted and experienced partner
A trusted and experienced partner CPB Contractors is the Australasian construction company of the CIMIC Group. We work with clients and partners across all key sectors of the construction industry, including
More informationINSTITUTIONAL BANKING. PECC International Roundtable Financing Airport Privatisation in Australia September 2003
PECC International Roundtable Financing Airport Privatisation in Australia September 2003 or How to pay for the Wedding 2 Financing Privatisation - Why? 1. Increasing capex spend 2. Private sector efficiencies
More informationHistory of the weir. Other dams
Weir Weir Weir is not only an important source of fresh water for Western Australians, but it is also a tourist destination with educational, historical and natural attractions for all to enjoy. History
More informationPIPE Networks Limited 2008 Annual General Meeting
27 October 2008 ASX RELEASE PIPE Networks Limited 2008 Annual General Meeting In accordance with Listing Rule 3.13.3, please find attached copies of the presentations to be provided today at the third
More informationThe Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August
More informationWebsite
Elevator Management Services Pty Ltd ABN 17 125 586 745 Suite 8 82 86 Pacific Highway St Leonards NSW 2065 Telephone 02 9713 5351 Website www.elevatormanagement.com.au Company Profile 2015 Company Profile
More informationAdvertised Tenders as at 16 April, 2018
DISPOSAL OF EQUIPMENT SUPPLY OF HV SUBSEA CABLE PROVISION OF CERTIFIED ONSITE WELDING SERVICES FOR VARIOUS STRUCTURES REHAB PROJECTS ELECTRICAL DEMAND VERIFICATION 19-Apr-2018 20-Apr-2018 20-Apr-2018 30-Apr-2018
More informationStayz VIC Melbourne city VIC ocean grove
Property ID SA NSW VIC ACT QLD TAS NT WA Region Stayz 32828 NSW Illawarra Bundeena Stayz 100761 QLD Sunshine Coast Stayz 29061 NSW Cremorne Point Stayz 101249 TAS East Coast Tasmania Stayz 5396 QLD Fraser
More informationDOWNPIPE AND FITTINGS. Including Clips, Brackets and Droppers
B DOWNPIPE AND FITTINGS Including Clips, Brackets and Droppers RAINWATER SYSTEMS DOWNPIPE SIZE CODE COMMENT 65mm x 3m RP65-3mi OD = 67mm 80mm x 3m RP80-3mi OD = 81mm Note: Pipe and fittings for 90mm- 315mm
More informationPre Trip Contact: Note: To all the phone numbers in Book 2 add the number 4 after the 07.
Jan 2013 Page 1 of 7 The Bicentennial National Trail is a living trail and as such conditions and access details are continually changing. Some of the information in the update notes may have been provided
More informationOPENING UP SOUTH AUSTRALIA S RESERVOIRS PUBLIC ACCESS FOR RECREATION
OPENING UP SOUTH AUSTRALIA S RESERVOIRS 2036 WILL MARK OUR STATE S BICENTENARY By the time our State turns 200 years old, I want South Australia to be a place of prosperity. Planning and delivering on
More informationUNIVERSITY EDUCATION. A Comparative Analysis IN CAIRNS CUMMINGS ECONOMICS. 38 Grafton Street (PO Box 2148) CAIRNS QLD 4870
UNIVERSITY EDUCATION IN CAIRNS A Comparative Analysis CUMMINGS ECONOMICS 38 Grafton Street (PO Box 2148) CAIRNS QLD 4870 Contact: W S (Bill) Cummings B Econ T: 07 4031 2888 E: cummings@cummings.net.au
More informationWatpac advises that the Scheme Resolution was not passed by the requisite majorities of Watpac shareholders, with:
7 June 2018 ASX Market Announcements 20 Bridge Street SYDNEY NSW 2000 Dear Sir / Madam Shareholders vote against the Scheme of Arrangement At the Scheme Meeting of Watpac Limited (Watpac) (ASX: WTP) held
More information