1 RESTRICTED TAR:CAM ASIAN DEVELOPMENT BANK This Report has been prepared for the exclusive use of the Bank TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR ThE AIRPORTS IMPROVEMENT PROJECT November 1994

2 CURRENCY EQUIVALENTS (as of 26 October 1994) Currency Unit = Riel (KR) KR 1.00 = $ $1.00 = KR ABBREVIATIONS AMP CAAKC ICAO MPST SEC TA UN UNDP - Airport Master Plan - Civil Aviation Authority of the Kingdom of Cambodia - International Civil Aviation Organization - Ministry of Public Services and Transport - Subregional Economic Cooperation - Technical Assistance - United Nations - United Nations Development Programme NOTES (i) (ii) The fiscal year (FY) of the Government ends on 31 December. In this Report, $ refers to US dollars.

3 SI I. INTRODUCTION 1. During the Country Programming Mission in January 1994, the Government requested the Bank to provide technical assistance (TA) to prepare a project to improve facilities at Siem Reap Airport and Kang Keng Airport (formerly Sihanoukville). A Bank Mission visited Cambodia from 7-20 June 1994 and reached an understanding with the Government on the scope of the TA for the feasibility study for the project.1 II. BACKGROUND AND RATIONALE 2. The Kingdom of Cambodia has a land area of approximately 181,000 square kilometers and an estimated population of 12 million. The country has been troubled by internal strife for many decades. This environment of political unrest has restricted the development of basic infrastructure in many areas such as water supply, electricity supply, sewerage, roads, and transport. The civil aviation sector has been hampered by the lack of funds for development work and a serious shortage of trained personnel. In Cambodia, land transport is unreliable, tedious and slow because of the poor road conditions and is sometimes dangerous. An alternative that has high priority is reliable and safe air transport and facilities that can be provided relatively quickly and at a minimum cost. These facilities are needed to support the re-establishment of Government administrative services, the promotion of regional economic integration and political stability and the ongoing and planned initiatives in urban development, and tourism. In addition, the Third Conference on Subregional Economic Cooperation (SEC)2, agreed on the importance of maintaining a continuous exchange of information on airport and civil aviation projects in the light of subregional and global systems. One of the projects selected as having significant subregional importance and in need of immediate study is Kang Keng Airport. The Siem Reap Airport is also important because it is the main domestic airport in the northwest part of the country. 3. The country's air transport network comprises an international airport (Pochentong International Airport), in Phnom Penh; two major domestic airports, Siem Reap and Kang Keng; and six minor airports Stung Treng, Rattanak Kin, Preah Vihear, Koh Kong, Mondol Kin and Battambang. Presently, air travel to Siem Reap and Kang Keng is quite risky because of the limited landing and navigational facilities available. The existing equipment at these airports is old and not reliable and spare parts are difficult to obtain. In addition, the existing parking aprons, fire services, and runways are in need of urgent repairs. With the expected rise in air travel, the demand on these airports will increase and the probability of a serious accident also increases. An immediate concern of the Government is to improve the operating safety levels and to ensure compliance with the operational standards set by the International Civil Aviation Organization (ICAO). The two major domestic airports, Siem Reap and Kang Keng are also major gateways to recognized international tourist destinations. The Siem Reap Airport serves as the entry point by air for Angkor Wat (a historical site included in the World Heritage List) and the Kang Keng Airport supports trade and commercial development and the recreational seaside resorts in the sourthwest part of the country. Both sites served by the two airports are considered to be major tourist destinations and the improved accessibility provided by the This TA first appeared in ADB Business Opportunities in August RETA No 5535: Promoting Subregional Cooperation Among Cambodia, the Peoples's Republic of China, Lao People's Democratic Republic, Myanmar, Thailand, and Viet Nam, for $600,000, approved on 1 June 1993.

4 2 airport is in line with the recommendations made for promoting the subregion as a tourist destination in the SEC study. 4. In Cambodia, several international agencies have been active in the development of civil aviation. In the past, technical assistance has been provided by the United Nations (UN), the United Nations Development Programme (UNDP), ICAO, and the Governments of France, Malaysia, the People's Republic of China (PRC) and the former Soviet Union. The UN supplied navigational and communication equipment that was used during its peacekeeping mission associated with the 1993 UN sponsored elections. The UNDP and ICAO have provided assistance to airport operation training subsequent to the withdrawal of the UN peacekeeping forces. The Governments of France and Malaysia have provided navigational, communication and fire fighting equipment. The PRC and the former Soviet Union have provided assistance in the construction of airport infrastructure. In addition, to the assistance already provided by the various aid agencies, the Government of France is currently in the process of providing assistance for the preparation of a feasibility study for Pochentong International Airport. The proposed TA will be coordinated with the French assistance through liaison by the Bank, the Ministry of Public Transport (MPST) and potential co-financiers. 5. The civil aviation sector is managed by the Civil Aviation Authority of the Kingdom of Cambodia (CAAKC), which is temporarily a line agency in the Secretariat of the Prime Minister's Office. However, MPST is responsible for all Government civil engineering construction works including airports. CAAKC concentrates on the operations of the airports and regulatory requirements of the civil aviation sector. 6. Air transportation is a key component in the development of the country's economy and is closely linked to the development of the tourism industry. The project is justified because of the urgent requirement (i) to improve the conditions of the existing civil aviation facilities and to establish safe operating procedures that conform with ICAO standards, (ii) to provide a safe and reliable mode of transport, and (iii) to support the Government's strategy to stimulate the country's economic growth by providing air transportation to facilitate the mobilization of social, economic, and administrative resources. 7. The volume of air traffic through Siem Reap and Kang Keng airports is low, not because of the lack of demand, but because the two airports are not safe. With minimal improvements to bring them up to basic ICAO standards, it is expected that traffic will increase significantly. Nevertheless, the viability of the proposed projects need to be carefully assessed. Accordingly, the TA is designed to produce a staged development plan that will be implemented over time and in line with the project's revenue generating capacity. The principal outputs of the TA will be detailed airport master plans (AMPs) for physical infrastructure for for the Siem Reap Airprrarrd the Kang Keng Airport, with a prioritized schedule of suitable developments, outline designs and feasibility studies for the more urgent of these, and the development of a suitable financing and implementation plan. A. Objectives Ill. TECHNICAL ASSISTANCE 8. The project preparatory technical assistance (PPTA) will address the priority of infrastructure development for Siem Reap Airport and Kang Keng Airport and will review

5 ciration n1 nni,tii iit, I _TTT.TZT ml 3 institutional and policy issues associated with the civil aviation sector. The PPTA will assist the Government and CAAKC to identify priority areas for further investment and to prepare one or more project(s) suitable for Bank assistance. In doing this, it will address the feasibility and immediate requirements for upgrading the airports to ICAO appropriate Code C operational standards and produce an AMP for the staging of development in line with forecast demand up to the airports' ultimate capacity. B. Scope 9. Specifically, the objectives of the PPTA are to assist CAAKC to: develop AMPs that will provide a sound basis for the future development and investment in airport related facilities. The AMPs will include a costed and staged development plan which will be consistent with ICAO Annex 14 standards. The AMPs will cover airspace and navigation facilities; ii. iii. iv. develop a time-based schedule of development in line with forecast demand and at an appropriate level of service to operators and users; prepare detailed feasibility plans including broad designs (which would take into consideration among others, environmental and social issues), for the proposed airport improvements and from them develop estimates of cost; prepare a feasibility analysis for the proposed airport improvements in a manner and form suitable for assessment by the Bank and other external agencies, v. make recommendations on institutional and policy matters, including among others, operations and maintenance procedures, pricing policies, cost recovery; and, vi. develop suitable procurement procedures to facilitate project implementation. C. Cost Estimate and Financing Plan 10. The total cost of the TA is estimated to be $520,000 (see Appendix 1). The Bank will provide $500,000 initially as a grant. The TA will be charged to the Bank-funded technical assistance program. The Government will provide the remaining $20,000 in the form of counterpart staff, office space, some local transportation, and administrative support. The Government has been informed that approval of the TA does not necessarily commit the Bank to finance any ensuing project. D. Implementation Arrangements 11. The services under the TA are scheduled to commence in February 1995 and expected to be completed by May The principal output will be a prioritized schedule of infrastructure improvements and a recommendation on a staged development plan. Prior to the formulation of the staged development plan, a tripartite meeting of staff from the Bank, CAAKC

6 4 and the consultants will be held to review the schedule of improvements and to finalize the immediate infrastructure improvements before the preparation of the staged development plan. The consultant will produce an inception report within one month of commencing the services, an interim report prior to the preparation of the staged development plan and a draft final report at the end of the study. A final report will be prepared within one month of receiving comments from CAAKC and the Bank on the draft final report. The terms of reference for consulting services are given in Appendix It is envisaged that international staffing inputs will be about 16 person months of international specialists with expertise in airport planning, civil engineering, communication and navigational aids, environment, transport economics, and financial analysis. The domestic consultant input will be about three person months in the fields of civil engineering and cost estimating. The consultants will be recruited by the Bank in accordance with the Guidelines on the Use of Consultants. 13. The Executing Agency for the proposed TA will be MPST. The Minister of MPST will appoint the Under Secretary of State for CAAKC to have overall responsibility for the TA and to provide day-to-day coordination. A steering committee comprising representatives from MPST, CAAKC, users and operators, and the consultant will be established. The steering committee will coordinate discussions with interested organizations, including CAAKC's other operational divisions, airline operators, customs, and concessionaires. This committee will also review the plans and other documents prepared by the consultants and provide comments and inputs as necessary. IV. THE PRESIDENT'S DECISION 14. The President, acting under the authority delegated to him by the Board, has approved the provision of technical assistance to the Government of the Kingdom of Cambodia in an amount not exceeding the equivalent of $500,000 for the purpose of the Airports Improvement Project, and hereby reports his action to the Board. This technical assistance will be made available initially as a grant, but will be subject to the reimbursement arrangements set forth in the relevant Board papers on Technical Assistance Operations (DOC. R51-77, dated 20 May 1977 and Streamlining of Technical Assistance Operations Doc R44-8, dated 21 March 1988) including the provision that in the event of the technical assistance resulting in a loan from the Bank, the Bank may charge against, and recover from, such portion of the grant that exceeds $250,000.

7 .. II ILdLALJI.r.t.%IIafl t..e.tti.t I Appendix 1 ESTIMATED COST OF THE TECHNICAL ASSISTANCE FOR THE PREPARATION OF THE AIRPORTS IMPROVEMENT PROJECT FOR THE KINGDOM OF CAMBODIA Financed by the Bank Amount in US$ A. Foreign Exchange Costs International Consultants Equipment Studies, Surveys and Reports Contract Negotiations Contingencies 375,000 11,000 9,000 5,000 60,000 Sub Total (A) 460,000 B. Local Currency Costs Domestic Consultants Surveys, Studies and Reports Miscellaneous TA Administration and Support Costs Contingencies 6,000 6,000 22,000 6,000 Sub Total (B) Total (I) 40, ,000 Financed by Government (Local Currency Costs) Office accommodation and utilities Counterpart Staff (salary and per diem) Contingencies 8,000 10,000 2,000 Total (II) 20,000 Grand Total (1+11) 520OOO (Reference in text: page 3; para. 10)

8 Appendix 2 Page 1 CAMBODIA : AIRPORTS IMPROVEMENT PROJECT TERMS OF REFERENCE FOR CONSULTING SERVICES A. Tasks The proposed study phases and tasks to be undertaken are as follows: 1. Siem Reap and Kang Keng Airports 2. The specific tasks are as follows; Phase 1 (I) Assess the availability of topographic survey information and prepare survey and geotechnical investigation briefs for the Ministry of Public Services and Transport survey and geotechnical departments to carry out any additional work as required. (ii) (iii) (iv) (v) (vi) Review all existing data, plans, documentation and reports relating to Kang Keng Airport (KKA) and for Siem Reap Airport (SRA) it's impact on the Angkor Wat's archaeological sites; Review the traffic forecasts prepared as part of the Siem Reap Tourism Development Plan (which is proposed to commence August,1994), the Pochentong International Airport feasibility study (proposed to commence in September, 1994) and determine appropriate planning horizons for the existing SRA; Review existing and develop traffic forecasts for KKA taking into consideration the Pochentong International Airport feasibility study (proposed to commence in September, 1994), the UNDP Civil Aviation Master Plan (proposed commencement date is not established because funding approval is being processed at UNDP Headquarters) and determine appropriate planning horizons. Prepare a brief geotechnical report covering construction and strength of existing pavements, sources and quality of select fill, pavement materials in the region and assessment of the costs of the various construction materials required for the upgrading works; For SRA, investigate the feasibility of extending the existing runway by some 1000 meters (m) to the southwest at the 05 end to displace the existing Runway 23 threshold further from the archaeological sites, and any other methods to mitigate the impact of aircraft operations on Angkor (Reference in text: page 4, para. 11)

9 Appendix 2 Page 2 Wat. In addressing this aspect of the study, consideration may need to be given to the diversion of portion of Highway 6 adjacent to the airport (vii) Prepare AMP to establish airport land use requirements and capacity constraints for the development of airport capacity in line with the forecast traffic and the requirements of ICAO Annex 14. The planning horizon for AMP should be for the period The AMP should determine the optimum sites and respective site area requirements for all significant airport functions including among others, runway lengths, taxiway and apron configurations, terminals, navigation aids, control tower and fire/rescue services, aircraft maintenance facilities, air freight facilities, flight catering, airline support facilities, airport administration and maintenance, commercial development, carparking, and road layout. For KKA, the AMP in addition should address the approach constraints of the existing runway and investigate the requirement for reorientation of the runway for future development. Phase 2 (viii) (ix) (x) (xi) Prepare designs for the rehabilitation and upgrading development works in sufficient detail to allow costs to be estimated to within 20 per cent accuracy. The details to be provided will include functional descriptions, floor areas of major facilities, standard busy hour rates (SBR5) and peak hour passenger rates (PHPs) or other design criteria, facility requirements and limitations. Customs and airline requirements, operational procedures, aircraft operations and concession areas should also be taken into account. In preparing the designs, the consultants will take into account the need to maximize the use of local materials and skilled and unskilled labor, minimum future maintenance requirements to the extent possible, and to keep the cost of the proposed development to a level commensurate with the available finance; For KKA, undertake a preliminary hydrological assessment of the airport site to assess any flood-related problems which may need to be addressed at the detail design stage. Establish design criteria and a concept plan for the airport drainage system; Prepare a preliminary drainage study to establish design criteria and a concept plan for the airport drainage system; Prepare an airways facilities plan that establishes the sites and development programme for airport air traffic control systems, including communication systems, navigation aids, meteorological equipment, and any other significant facility.

10 Appendix 2 Page 3 (xii) (xiii) (xiv) (xv) (xvi) (xvii) (xviii) Prepare an airport services plan that establishes the requirements and conceptual design of potable water, sewerage, and electricity supply systems for airport development, Based on the above designs, prepare cost estimates for the upgrading works broken down into foreign exchange cost, local currency cost, and tax; Undertake an environmental impact assessment (EIA) of the upgrading of SRA and KKA with respect to the physical and social environment of the area in accordance with the Bank's Environmental Guidelines for Selected Infrastructure Projects. This assessment should address all significant impacts of the development, assess their relative impact with respect to established assessment criteria and propose any environmental safeguards and mitigation measures necessary to reduce the impact of the development. The EIA should take into consideration, among others, the impact of noise, vibration and air pollutants on the Angkor 'A'at archeological ruins; Prepare a detailed feasibility report, to include economic and financial analysis for the project. The economic internal rate of Return (EiRR) and the financial internal rate of return (FIRR) to be calculated taking into account capital, operating, periodic and routine maintenance costs, etc. Traffic forecast are to be based on appropriate market research in addition to those developed under the tourism study. The economic feasibiity study is to include among others: (a) an analysis of the expected travel cost savings in relation to the impact of the airports on the economies of their influence areas, (b) pricing of airport services, and (c) an analysis of the effect of service pricing on the distribution of project benefits between the Government, nationals, and nonnationals. The financial analysis to include, among others, projected income and expenditure statement (in current prices), balance sheet and funds flow statement for Civil Aviation Authority of the Kingdom of Cambodia (CAAKC) for the duration of the project implementation period and three years after project completion; Within the context of the Bank's Guidelines on Procurement, study alternative approaches to detailed design and construction of the selected improvements. Approaches to be studied will include (a) an initial detailed design process prior to selection of contractors; and (b) design/construct contract based on outline designs and specifications. Prepare sample commercial contract documentation (specifications and other technical documentation are not required), based on the Bank's sample bidding documents; Prepare draft terms of reference for subsequent project management consulting services which will implement the design and construction of ri - ;JI -u-,

11 Appendix 2 Page 4 the proposed improvement works to be procured under the Bank's international competitive bidding procedures. (xix) If Phase 1 of the study has identified a requirement for additional land acquisition, and if this will require resettlement of existing occupants, prepare a resettlement plan (incorporating time bound actions and payment schedule) in accordance with the guidelines set out in the World Bank's Operational Directive Phase 3 (xx) (xxi) For SRA, prepare a preliminary site evaluation of the identified alternative site 30 km to the west of the existing airport to determine the feasibility of developing the site. The investigation should make a preliminary evaluation of at least the following aspects, among others, runway alignment, length requirements, approach gradients and an assessment of any operational constraints on the site, physical conditions on the site which may effect the cost of development such as landform, flood mitigation or drainage measures, geotechnical conditions, road access and resident resettlement requirements. For SRA, preparation of a preliminary staged development plan to assess the airport development requirements of the Siem Reap region over the next 15 years ( ) in line with forecast demand. 2. Civil Aviation Sector Institutional Analysis 3. Analyze the role played by domestic air transport in the development of the country's civil aviation sector. Specifically, (i) (ii) evaluate operations and maintenance (O&M) procedures and budgets in CAAKC and determine weaknesses that undermine the growth of domestic air transport, establish principles for assessing O&M needs on a full cost recovery basis, and recommend modified O&M arrangements to sustain the proposed investments in airport improvements, review current civil aviation pricing policies and practices, including the formulation of landing charges, parking, maintenance and terminal charges and determine their adequacy; assess revised types and levels of charges needed to fully recover costs of improvement and to provide for periodic overhaul and renewal of equipment and other airport facilities; recommend a revised airport tariff policy for time bound adoption by the Government in the context of the proposed project, review the current legal framework and institutional arrangements under which the civil aviation authority is operating, and

12 B. Outputs Appendix 2 Page 5 (iii) review current policies for determining air passenger fares and identify problems including subsidies; indicate the principles on which passenger fares should be developed and regulated to ensure a viable domestic air service program, and recommend options for relaxing Government control on fares; review the case for subsidies and indicate how affordable air transport services could be provided without abandoning market mechanisms; develop a timetable for introducing a modified system of passenger fares, and reducing Government intervention in the context of the proposed investments. 4 The outputs of the study for each airport will include: (i) (ii) (iii) (iv) (v) (vi) an airport master plan incorporating staged development requirements for the period reflecting capacity growth in line with forecast demand. The development plan shall identify predetermined "trigger points" for initiating each stage of development and shall present a folio of drawings representing each stage as well as ultimate development. Recommendations on the scope and extent of improvement works to be addressed in Phase 2 of the study. This is to be provided as part of the interim report. an environmental impact assessment for Siem Reap and initial environmental examination for Kang Keng identifying the direct and indirect impacts of the proposed airport improvements and measures required to mitigate such impacts with cost estimates and recommended implementation arrangements; economic and financial feasibility studies for the proposed airport improvements identified under AMP; a land use and zoning plan with a folio of drawings for the airport environs illustrating land requirements to support future development and a schedule of additional land acquisition requirements a report on alternative procurement procedures for a subsequent investment project, to include the required sample contract documentation, and terms of reference, manpower requirement and costs for subsequent project management, design and supervision consulting services. C. Reporting 5. The following reports, all in the English language, will be submitted by the consultants to CAAKC (ten copies) and the Bank (five copies) at least two working weeks prior fl.-r II

13 Appendix 2 Page 6 to the meetings convened to discuss them. In addition, the consultant will submit brief monthly reports to CAAKC (five copies) and Bank (two copies). (i) (ii) (iii) (iv) (v) Inception Report: To be submitted within one month of commencing the services. This report will be brief and will be based on the methodology and implementation schedule set out in the consultant's technical proposal. It will set out initial findings and will identify any changes in approach, scheduling or staffing which the consultant's work over the first month indicate are necessary or desirable to achieve the objectives of the project; Interim Report: To be submitted at the end of Phase 1 of the assignment, around two months after commencement; Draft Final Report: To be submitted on completion of the study, around three months after commencement. This report will incorporate all specified outputs including PEE and EIA reports in Bank format; Summary lee and EIA Reports: To be submitted on completion of the study and the reports to be in accordance with Bank format and requirements; and Final Report: To be submitted within one month of receiving comments on the draft final report from CAAKC. The final report is to reflect these comments. 6. The draft final report will require briefings and presentations to a steering committee which will be established by CAAKC to monitor and provide support to the consultants. The steering committee will be chaired by the Under Secretary of State in charge of Civil Aviation and will consist of representatives from CAAKC, the airline industry and other relevant groups. In addition, a tripartite meeting at which the Bank, CAAKC and the consultants will be held to discuss the draft final report. D. Implementation Schedule and Staffing 7. It is anticipated that the services will commence in February 1995 and be completed by May The consultant will propose a schedule to suit his approach to the assignment, but the overall duration should not be significantly longer than four months. 8. International staffing inputs will be around 16 person months of international specialists, with expertise in airport planning and civil engineering, communication and navigational aids, environmental, transport economics and financial analysis, Domestic consultant input will be around 5 person months in the fields of civil engineering and cost estimating. In preparing their proposals, consultants may offer alternative arrangements of staffing and expertise types, without significant variation in international and domestic inputs.

14 Appendix 2 Page 7 E. Support 9. CAAKC will provide office space, telephone facilities (but not the cost of communications), basic furniture and general administrative support. The consultants will include in their proposals a list of additional equipment and facilities that they consider necessary to undertake the assignment. 10. CAAKC will allocate counterpart staff to work with the consultants throughout the study. The consultants will include in their proposals an indication of the types and numbers of counterparts that will be necessary to facilitate the implementation of the assignment.

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:MON 36240 TECHNICAL ASSISTANCE TO MONGOLIA FOR CIVIL AVIATION POLICY DEVELOPMENT October 2002 CURRENCY EQUIVALENTS (as of 14 September 2002) Currency Unit tugrik (Tug) Tug1.00

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC ICAO Universal Safety Oversight Audit Programme ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC (Vientiane, 22 to 30 April 1999) INTERNATIONAL CIVIL

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United

More information

International Civil Aviation Organization HIGH-LEVEL CONFERENCE ON AVIATION SECURITY (HLCAS) Montréal, 12 to 14 September 2012

International Civil Aviation Organization HIGH-LEVEL CONFERENCE ON AVIATION SECURITY (HLCAS) Montréal, 12 to 14 September 2012 International Civil Aviation Organization HLCAS-IP/17 2/9/12 INFORMATION PAPER HIGH-LEVEL CONFERENCE ON AVIATION SECURITY (HLCAS) Montréal, 12 to 14 September 2012 Agenda Item 9: Any other business PACIFIC

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING International Civil Aviation Organization 18/8/08 WORKING PAPER SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING Durban, South Africa, 24 to 29 November 2008 Agenda Item 6: Development

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

EXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU)

EXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU) February 2003 English and French only EXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU) (Presented by Economic and Monetary

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

12 TH COSCAP-SEA STEERING COMMITTEE MEETING

12 TH COSCAP-SEA STEERING COMMITTEE MEETING 12 TH COSCAP-SEA STEERING COMMITTEE MEETING 1. Introduction DP2: Progrramme Progress Repot Discussion Paper The purpose of this paper is to outline the progress made toward achieving programme objectives

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

DEPARTMENT OF CIVIL AVIATION

DEPARTMENT OF CIVIL AVIATION DEPARTMENT OF CIVIL AVIATION MISSION The Mission of the Department of Civil Aviation is to ensure safety of civil air navigation, to develop and operate a national civil air infrastructure and services,

More information

CERTIFICATE OF AIRWORTHINESS ISSUE

CERTIFICATE OF AIRWORTHINESS ISSUE AIRWORTHINESS Civil Aviation Authority of Botswana ADVISORY CIRCULAR CAAB Document AAC-007 CERTIFICATE OF AIRWORTHINESS ISSUE AAC-007 Revision: Original March 2013 Page 1 of 13 Intentionally left blank

More information

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY 1. INTRODUCTION (22 July 2015) 1.1 These administrative

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Sub-regional cooperation on air transport among Cambodia, Lao PDR, Myanmar and Viet Nam

Sub-regional cooperation on air transport among Cambodia, Lao PDR, Myanmar and Viet Nam Seminar prior to the ICAO Worldwide Air Transport Conference Aviation in Transition: Challenges & Opportunities of Liberalization Session 1: The Liberalization Experience Sub-regional cooperation on air

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY (DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding In Accordance with Section V of the U.S./Canada Bilateral Aviation Safety Agreement Implementation Procedures for Design Approval, Production Activities, Export Airworthiness

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Decision Strategic Plan Commission Paper 5/ th May 2017

Decision Strategic Plan Commission Paper 5/ th May 2017 Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1

More information

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Preparatory Course in Business (RMIT) SIM Global Education Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Brief Outline of Modules (Updated 18 September 2018) BUS005 MANAGING

More information

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 145 CAA Consolidation 10 March 2017 Aircraft Maintenance Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 145 prescribes rules governing the certification

More information

Port of Friday Harbor

Port of Friday Harbor REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) TO PROVIDE ENGINEERING / CONSULTANT SERVICES AT FRIDAY HARBOR AIRPORT Dated: February 15, 2018 Pursuant to RCW, Chapter 39.80 and FAA AC 150/5100-14E, the

More information

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES SECTION 1 - CONTACT AND BACKGROUND INFORMATION 1.1 Contact Information Name of the Authority : Ghana Civil Aviation Authority Point of Contact

More information

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank Financing of Aviation Development Projects by the Asian Development Bank Presentation by Marcelo J. Minc Asian Development Bank ICAO and the World Bank Development Forum Maximizing Civil Aviation s s Contribution

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel: Sub:Selection of Consultants for preparation of eco-tourism management plan forvedaranyam area in Tamil Nadu. ICZMP (Integrated Coastal Zone Management Project) Credit No. 4765 0 IN Amendment #1 The TOR

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Aerodrome Certification Applicable provisions

Aerodrome Certification Applicable provisions Aerodrome Certification Applicable provisions ICAO CAR/SAM Seminar on Aerodrome Certification October 2017 Avner Shilo Technical Officer, Airport Operations and Infrastructure, ICAO Agenda The Chicago

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

Attachment 001 to Appendix R: Airport Security audit Report Checklist. Airport Security audit Report Checklist

Attachment 001 to Appendix R: Airport Security audit Report Checklist. Airport Security audit Report Checklist Attachment 00 to Appendix R: Airport Security audit Report Checklist (CASSOA LOGO) CASSOA MODEL CHECKLIST: Airport Security audit Report Checklist CASSOA- CL- 00 Revision: 0 Document No: CL/00/07 NAME

More information

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA 1. Background Information Tanzania Meteorological Agency

More information

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization WORKING PAPER 5/3/13 English only WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key issues

More information

18 th STEERING COMMITTEE MEETING Discussion Paper 2 Programme Progress Report (Presented by Wayne Chapin) SUMMARY

18 th STEERING COMMITTEE MEETING Discussion Paper 2 Programme Progress Report (Presented by Wayne Chapin) SUMMARY COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 18 th STEERING COMMITTEE MEETING Discussion Paper 2 Programme Progress Report (Presented by Wayne Chapin)

More information

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS TO ALL INTERESTED PERSONS IN THE PROCEDURE FOR GRANTING A CONCESSION FOR SERVICE FOR THE OBJECT CIVIL AIRPORT FOR PUBLIC

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Airport Master Planning Process & Update

Airport Master Planning Process & Update Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA N$255 GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA WINDHOEK 22 September 1998 No 1960 CONTENTS GOVERNMENT NOTICE No 240 Promulgation of Aviation Amendment Act, 1998 (Act 27 of 1998), of the Parliament

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

Recommendations on Consultation and Transparency

Recommendations on Consultation and Transparency Recommendations on Consultation and Transparency Background The goal of the Aviation Strategy is to strengthen the competitiveness and sustainability of the entire EU air transport value network. Tackling

More information

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 COUNTY OF INYO REQUEST FOR QUALIFICATIONS For Airport Environmental Services Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 County of Inyo Public Works Department P.O.

More information

INTERNAL AUDIT DIVISION REPORT 2017/147. Audit of air operations and aviation safety in the United Nations Assistance Mission for Iraq

INTERNAL AUDIT DIVISION REPORT 2017/147. Audit of air operations and aviation safety in the United Nations Assistance Mission for Iraq INTERNAL AUDIT DIVISION REPORT 2017/147 Audit of air operations and aviation safety in the United Nations Assistance Mission for Iraq The Mission implemented controls over air operations and aviation safety

More information

The Corporation of the City of Kawartha Lakes Council Report

The Corporation of the City of Kawartha Lakes Council Report The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA (Ljubljana, 7 to 8 March 2002) International Civil Aviation

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

ASSEMBLY 35TH SESSION PLENARY. Statements by delegations of Contracting States and of Observers INDONESIAN AIRWORTHINESS SYSTEMS

ASSEMBLY 35TH SESSION PLENARY. Statements by delegations of Contracting States and of Observers INDONESIAN AIRWORTHINESS SYSTEMS P/14 22/07/04 English only ASSEMBLY 35TH SESSION PLENARY Agenda Item 2: Statements by delegations of Contracting States and of Observers INDONESIAN AIRWORTHINESS SYSTEMS (Presented by Indonesia) INFORMATION

More information

ICAO ASIA AND PACIFIC OFFICE

ICAO ASIA AND PACIFIC OFFICE ICAO ASIA AND PACIFIC OFFICE SUMMARY REPORT OF THE CIVIL/MILITARY COORDINATION SEMINAR BANGKOK, THAILAND, 14-17 December 2004 1. Introduction 1.1 Mr. Lalit B Shah, Regional Director of the ICAO Asia and

More information

ASHGABAT, TURKMENISTAN

ASHGABAT, TURKMENISTAN Republic of Zambia MINISTRY OF TRANSPORT AND COMMUNICATIONS STATEMENT BY H.E. BRIAN MUSHIMBA MINISTER OF TRANSOPORT AND COMMUNICATION, REPUBLIC OF ZAMBIA AND GLOBAL CHAIR OF THE GROUP OF LLDCS Delivered

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes

More information

Sam Imperati Facilitator

Sam Imperati Facilitator Sam Imperati Facilitator 1 Introductions 1) Facilitator Introduction a) Name b) Occupation c) Role 2) Chair and Member Introductions: a) Name b) Affiliations c) Occupation 3) Project Team Introductions:

More information

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy 08/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 2: Accountability

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20 NPF/SIP/2011-WP/20 Aerodrome Safety Saulo Da Silva International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1

More information

Rodrigues Regional Assembly Chief Commissioner s Office

Rodrigues Regional Assembly Chief Commissioner s Office Ref: CCO/CAV/1/2013 Rodrigues Regional Assembly Invitation for Expressions of Interest Consultancy Services for the Design of Runway Extension & Ancillary Works at Sir Gaetan Duval Airport Plaine Corail,Rodrigues

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors COSCAP- Training of Airworthiness Inspectors Part V _ STATE SAFETY OVERSIGHT SYSTEM (ICAO Doc 9734, Part I) By Nadia Konzali COSCAP-GS Project Coordinator FLIGHT PLAN 1. Civil aviation regulations; 2.

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE 1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information