Advanced Technology Development & Prototyping Group

Size: px
Start display at page:

Download "Advanced Technology Development & Prototyping Group"

Transcription

1 Advanced Technology Development & Prototyping Group Low Cost Ground Surveillance Program Status Briefing Presented by: Rob Higginbotham Date:

2 Program Description / Purpose Low Cost Ground Surveillance The program will provide basic ground surveillance capability to improve situational awareness at airports where deployment of surface surveillance equipment is not currently planned. By improving surface situational awareness for controllers, LCGS systems will reduce the risk of ground traffic incidents, incursions, and accidents. Partners / Stakeholders Air Traffic Controllers ATO-S ATO-T NATCA Airport Authorities Vendors (System, tower, site prep) Local and Service Area FAA General Aviation community 2

3 Project Status Contract Awards: January-September 2009 IARR: May 26, 2009 EC approval for 4 pilot sites IA to start after pilot site evaluations Prototype Site/Test Bed: Spokane, WA (GEG) ParkAir Nova 9000 System Pilot Sites: Manchester, NH (MHT): Awarded to Thales ATM San Jose, CA (SJC): Awarded to SRA International Reno, NV (RNO): Awarded to Northrop Grumman Long Beach, CA (LGB): Awarded to Sensis Site Preparation: 4Q CY2009 3Q CY2010 Site Installations: 2Q CY2010 4Q CY2011 System Test and Evaluation: 3Q CY2010 4Q CY2012 IARD 3Q 2011 Final Investment Decision: ? 3

4 Project Schedule (FY 2010) 4

5 Spokane Prototype System / Test Bed 5

6 Spokane Initial User Tech Evaluation Status SRMD submittal & approval: 4Q CY2009-1Q CY2010 User technical evaluation: Phase 1: June-Sep 2010, Phase 2: Oct 2010 Mar 2011 Recent / Current Activities: Installed LCDs in the tower cab April 2 Frequency Transmit Authorization received April 26 Test NCP extension approved May 21 Finalized user (ATC) evaluation plan Conducted ATC evaluation training April Begin ATC technical evaluation early June Release ATC initial evaluation report NLT September 30 6

7 LCGS Training Program Overview Evaluation Objectives and Requirements System Performance User Display Functions and Use Evaluation Procedure 7 7

8 High-Level Operational Concept 8 8

9 General LCGS Abilities* Primary RADAR, does not require transponder equipment. Provide surveillance coverage that is scalable and adaptable from a single runway to an entire airport movement area. Operate in all-weather low visibility conditions. Wind loading 85 knots Provide future interface to other automation and surveillance platforms (e.g. ARTS-2E, STARS) * Detailed requirements can be found in applicable LCGS Program Requirements Documents 9 9

10 General LCGS Abilities (cont d) Operate with an update rate once every second Track from the surface to a minimum of 50 feet above ground level (AGL) not to exceed a maximum tracking height of 500 feet AGL. Overflights are not tracked Comply with applicable sections of FAAO , noncontrol system only, no new procedures required

11 Operational Eval Purpose Evaluate the real-time daily performance and usability from an operational ATC user perspective. Assess technical performance against system requirements

12 LCGS Participation Used as a tool only on a voluntary basis Submittal of evaluation forms is voluntary User feedback is voluntary The system is not to be used for control purposes. LCGS Prototype is not a NAS certified piece of equipment 6/1/

13 What am I asked to do? Use LCGS daily (as required) Observe LCGS following evaluation procedures Complete questionnaires Provide feedback to evaluators 13 13

14 What am I Evaluating? Display usability and data entry devices Menus and windows Track data and quality Keyboard and mouse/trackball Correlation between displayed tracks and actual aircraft/vehicle positions (stationary and moving) Update rate Dropped, missed, false targets and track anomalies Weather affects on system and user performance IFR, VFR, MVFR, Daytime, Nighttime, Low Visibility 14 14

15 Spokane ATCT Displays 15

16 Spokane NOVA 9000 Surface Management System 16

17 LCGS Pilot Program Sites 17

18 Manchester, NH (MHT) Sensor Location Possible Display Location Telco Room 18

19 Manchester Site Status Contract Award: January 2009 to Thales ATM Site Preparation: 4Q CY2009 2Q CY2010 Site Installation: 2Q CY2010 3Q CY2010 System Test and Evaluation: 4Q CY2010 2Q CY2012 Accomplishments 7460 Approval Airspace evaluation complete, 93 tower approved Terma Radar equipment delivery 01/06/2010 ATCT Site Prep of Power/Comm (except Fiber) completed December 2009 Geotech complete; All engineering drawings complete Finalized construction bid package, including fencing, building foundation, and electrical work 19

20 Manchester Site Status Recent / Current Activities: Awarded tower & shelter contract delivery Mid-May 2010 Finalized foundation drawings for shelter Modify Thales contract & delivery order (cost proposal for Italia) Submitted NCP (SMRD Approved) Submitted Stage 3 Developmental Certification to NTIA for FTA Selected site prep vendor Preconstruction meeting June 7,

21 San Jose, CA (SJC) Equipment Room Sensor Location Possible Display Location 21

22 San Jose, CA (SJC) Selected Site Site 191 Footprint Site 191 Probability of Detection 22

23 San Jose Site Status Contract Award: April 2009 to SRA International Site Preparation: 2Q CY2010-3Q CY2010 Site Installation: 3Q CY2010-4Q CY2010 System Test and Evaluation: 4Q CY2010-2Q CY2012 Accomplishments: Terma Radar Equipment FAT completed 10/20/2009 Radiation Hazard study conducted GEG 10/20/ Approved 12/01/2009 for 90 tower HITT processing equipment FAT completed 12/03/2009 Geotechnical Survey at SJC completed 12/09/

24 San Jose Site Status Recent / Current Activities: Awarded tower & shelter contract delivery scheduled mid-june Conducted soil analysis clean report received Conducted Power Analysis Finalized foundation drawings Submitted NCP (SRMD Approved) ARTS interface testing at WJHTC week of April 5 (Successful) Submitted Stage 3 Developmental Certification to NTIA for FTA Site Lease delivered to SJC Airport Authority for signature April 28 Preconstruction meeting scheduled for May Reconfigure ATCT Equipment room for LCGS rack installation 24

25 Long Beach, CA (LGB) Proposed Sensor Location near ATCT 25

26 Long Beach Site Status Contract Award: September 2009 to Sensis Site Engineering: 4Q CY2009-2Q CY2010 Site Preparation: 3Q CY2010-4Q CY2010 Site Installation: 1Q CY2011-2Q CY2011 System Test and Evaluation: 2Q CY2011-2Q CY2012 Recent / Current Activities: Re-analyzing SMR site after LGB Airport Authority rejected best alternative will delay engineering (~1-2 months) Working on Lease agreement with WSA Real Estate Submitted SRMD for review and comments ARTS Interface testing delayed due to Sensis contract issue 26

27 Sensis LGB Radar Group Terma Antenna Waveguide Compressor/Dehydrator Motor Controller Preliminary Transceiver Cabinet Radar Data Processor 27

28 Sensis LGB Processor and Display Group ATC Keyboard Sample ATC Display window ATC Trackball Processor Cabinet MDT Main GUI 28

29 Reno, NV (RNO) 29

30 View From the Cab of Recommended LCGS Sensor location 30

31 Reno Site Status Contract Award: September 2009 to Northrop Grumman Site Engineering: 4Q CY2009-2Q CY2010 Site Preparation: 3Q CY2010-4Q CY2010 Site Installation: 4Q CY2010-1Q CY2011 System Test and Evaluation: 1Q CY2011-4Q CY2012 Recent / Current Activities: SMR site selection finalized after SRMP - March 2010 Submitted SRMD for review and comment Draft 7460 in progress Begin geotechnical survey May Commence engineering study to include utility locations - We have contacted the ATCT builder for detailed site engineering drawings 31

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services NextGen's ADS-B - the FAA's Plan to Modernize our National Air Transportation System, and What It Means to You To: Texas General Aviation Summit By: Tim Schroeder, SBS

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

Runway Status Lights (RWSL) in Japan. July 2015

Runway Status Lights (RWSL) in Japan. July 2015 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background

More information

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY International Civil Aviation Organization 23/02/12 North American, Central American and Caribbean Office (NACC) Seventh Central American Air Navigation Experts Working Group Meeting (CA/ANE/WG/7) Ninth

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

Airport Safety Management Systems: Integrating Planning Into the Process

Airport Safety Management Systems: Integrating Planning Into the Process Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for

More information

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute Updated: March 2016 2 12 How can safety be improved in an environment of near-zero

More information

Airport Surface Detection. ASDE-X and Data Distribution System Overview. Presented to the Tarmac. Federal Aviation Administration

Airport Surface Detection. ASDE-X and Data Distribution System Overview. Presented to the Tarmac. Federal Aviation Administration Airport Surface Detection Equipment, Model X ASDE-X and Data Distribution System Overview Presented to the Tarmac Delay National Task Force Presented by: Scott Schlegel, ASDE-X Project Lead Date: ASDE-X

More information

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force ADS-B-SITF/IP/6 International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force Brisbane, Australia, 24-26 March 2003 Agenda Item 3: Evaluate

More information

AIRFIELD SAFETY IN THE UNITED STATES

AIRFIELD SAFETY IN THE UNITED STATES International Civil Aviation Organization 24/11/09 North American, Central American and Caribbean Office (NACC) Twenty Second Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/22)

More information

OVERVIEW OF THE FAA ADS-B LINK DECISION

OVERVIEW OF THE FAA ADS-B LINK DECISION June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the

More information

SAAB REMOTE TOWER. 37th Annual Pennsylvania Aviation Conference 28 September Matt Massiano

SAAB REMOTE TOWER. 37th Annual Pennsylvania Aviation Conference 28 September Matt Massiano 1 SAAB REMOTE TOWER 37th Annual Pennsylvania Aviation Conference 28 September 2017 Matt Massiano matt.massiano@saabsensis.com 2 AGENDA Concept U.S. launch project Updates on the international front CONCEPT:

More information

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth

More information

National Transportation Safety Board Aviation Incident Final Report

National Transportation Safety Board Aviation Incident Final Report National Transportation Safety Board Aviation Incident Final Report Location: Los Angeles, CA Incident Number: Date & Time: 08/16/2007, 1257 PDT Registration: Aircraft: Boeing 737-700 Aircraft Damage:

More information

FAA s Modernization Plans

FAA s Modernization Plans FAA s Modernization Plans Ron Stroup Chief System Engineer for Airborne and Ground System Integration Phone: 202 385-7186 Email: ronald.l.stroup@faa.gov Agenda Introduction My background Overview of the

More information

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019 OVERVIEW OF PERMANENT SPECIAL USE AIRSPACE ESTABLISHMENT AND MODIFICATIONS AT MARINE AIR GROUND TASK FORCE TRAINING COMMAND, TWENTYNINE PALMS, CA 1. What is Special Use Airspace (SUA)? Special Use Airspace

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

National Airspace System Infrastructure Management Conference

National Airspace System Infrastructure Management Conference The National Center of Excellence Transportation Research Board Federal Aviation Administration For Aviation Operations Research National Airspace System Infrastructure Management Conference Economic Realities

More information

Maximum Visibility. airportops. Voluntary use of ADS-B transmitters on U.S. airport ground vehicles will reduce risks. By Wayne Rosenkrans

Maximum Visibility. airportops. Voluntary use of ADS-B transmitters on U.S. airport ground vehicles will reduce risks. By Wayne Rosenkrans airportops Voluntary use of ADS-B transmitters on U.S. airport ground vehicles will reduce risks. Maximum Visibility By Wayne Rosenkrans DeRonn Smith/Wikimedia 34 flight safety foundation AeroSafetyWorld

More information

Wake Turbulence Evolution in the United States

Wake Turbulence Evolution in the United States Wake Turbulence Evolution in the United States Briefing to WakeNet Europe Paris May 15, 2013 Wake Turbulence Program ATO Terminal Services May 2013 Outline Operational overview of wake turbulence effect

More information

Christchurch, New Zealand, April 2015

Christchurch, New Zealand, April 2015 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST SEMINAR AND THIRTEENTH MEETING OF PROVISIONAL AUTOMATIC DEPENDENT AGENDA SURVEILLANCE BROADCAST (ADS-B) STUDY AND IMPLEMENTATION

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

Acknowledgements. Proprietary Information 1

Acknowledgements. Proprietary Information 1 Acknowledgements Staff and NavAid, on behalf of the Truckee Tahoe Airport District, acknowledges a few important points related to Flight Tracking at KTRK Airport Operations impact on the community The

More information

SSP progress in Latvia. Overview

SSP progress in Latvia. Overview SSP progress in Latvia CAA of Latvia: Ms. Ērika Neimane, Head of the ATM Section, ANS Division LGS: Mr. Jānis Lapiņš, Head of Safety, Quality, Security and Audit Management airbaltic: Mr. Lauris Miķelsons,

More information

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010 Massport Study Team Evaluation of CAC Noise Study Alternatives October 2010 Massport s Evaluation Team Aviation Planning Capital Programs Aviation Operations Environmental Permitting Consultation with

More information

National Transportation Safety Board Aviation Incident Final Report

National Transportation Safety Board Aviation Incident Final Report National Transportation Safety Board Aviation Incident Final Report Location: San Francisco, CA Incident Number: Date & Time: 05/26/2007, 1336 PDT Registration: Aircraft: Embraer 120 Aircraft Damage: None

More information

COLLISION AVOIDANCE FOR RPAS

COLLISION AVOIDANCE FOR RPAS COLLISION AVOIDANCE FOR RPAS Johan Pellebergs, Saab Aeronautics ICAS workshop, September 2017 This document and the information contained herein is the property of Saab AB and must not be used, disclosed

More information

National Transportation Safety Board Aviation Incident Final Report

National Transportation Safety Board Aviation Incident Final Report National Transportation Safety Board Aviation Incident Final Report Location: Cleveland, OH Incident Number: Date & Time: 06/26/2009, 0856 EDT Registration: Aircraft: BOMBARDIER INC DHC-8-202 Aircraft

More information

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30 Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster Helsinki, IST Event 2006 22/11/ 2006,16:00-17:30 Agenda 16:00 Welcome (Andrea Kurz, Airport Safety Cluster) 16:05 Setting

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009 U.S. India Aviation Cooperation Program Air Traffic Management Training Program Update March 2009 ATMTP Overall Objective This ATMTP is the first project under the U.S.-India Aviation Cooperation Program

More information

Human Factors of Remotely Piloted Aircraft. Alan Hobbs San Jose State University/NASA Ames Research Center

Human Factors of Remotely Piloted Aircraft. Alan Hobbs San Jose State University/NASA Ames Research Center Human Factors of Remotely Piloted Aircraft Alan Hobbs San Jose State University/NASA Ames Research Center Transfer of Risk UA collides with people or property on ground Other airspace user collides with

More information

Introduction to the International Standard for Business Aircraft Handling

Introduction to the International Standard for Business Aircraft Handling Introduction to the International Standard for Business Aircraft Handling Friday 06 th Feb 2015, 0830-1130hrs Presented by: Terry Yeomans Program Director IS-BAH Schedulers & Dispatchers Conference San

More information

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars NextGen and GA 2014 Presented by Thomas Gorski CFI Welcome Restrooms Exits Emergency Evacuation Sponsor Acknowledgment Interactive Presentation Style Breaks 2 Outline My Background Overview of FAASTeam

More information

Unmanned Aircraft Systems (UAS) Integration Research

Unmanned Aircraft Systems (UAS) Integration Research Unmanned Aircraft Systems (UAS) Integration Research Presented to: Presented by: UAS Midwest Kerin Olson UAS Integration Research Strategy Lead FAA UAS Integration Office Date: FAA UAS Integration Office

More information

Operational Evaluation of a Flight-deck Software Application

Operational Evaluation of a Flight-deck Software Application Operational Evaluation of a Flight-deck Software Application Sara R. Wilson National Aeronautics and Space Administration Langley Research Center DATAWorks March 21-22, 2018 Traffic Aware Strategic Aircrew

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission Access is a huge problem 2 out of 3 people in the world are not connected to the internet current solutions fail to effectively serve the needs

More information

Airports and UAS: Managing UAS Operations in the Airport Vicinity

Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Problem Statement 17-10-09 Recommended Allocation: $350,000 Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station. Glossary Part I Acronyms/Data Terminology AC -- Air Carrier. AFSS -- Automated Flight Service Station. AIFSS -- Automated International Flight Service Station. ARTCC -- Air Route Traffic Control Center.

More information

FAA Unmanned Aircraft Systems (UAS)

FAA Unmanned Aircraft Systems (UAS) FAA Unmanned Aircraft Systems (UAS) Overview: Proposed Small UAS Rule Presented To: Small Business Aviation Safety Roundtable Presented By: Mark Bury, Assistant Chief Counsel, Regulations Division of the

More information

Roadmapping Breakout Session Overview

Roadmapping Breakout Session Overview Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames

More information

ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE

ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE T 3 CAS ADVANCED SURVEILLANCE IN ONE INTEGRATED PACKAGE TCAS TAWS ADS-B APPLICATIONS NEXTGEN TRANSPONDER ACSS 3 CAS TM T 3 CAS THE SINGLE SOLUTION TO YOUR SURVEILLANCE NEEDS T 3 CAS traffic management

More information

Air Traffic Flow & Capacity Management Frederic Cuq

Air Traffic Flow & Capacity Management Frederic Cuq Air Traffic Flow & Capacity Management Frederic Cuq www.thalesgroup.com Why Do We Need ATFM/CDM? www.thalesgroup.com OPEN Why do we need flow management? ATM Large investments in IT infrastructure by all

More information

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March

More information

1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)

1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI) SSC/14/54/5 Agenda Item 4.1 16 June 2014 54 th SINGLE SKY COMMITTEE 1/2 July 2014 Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability

More information

GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean

GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean GNSS/RNAV Non- Radar Longitudinal Separation in the Caribbean For: By: ICAO/IATA/CANSO PBN Harmonization, Modernization, and Implementation Meeting Steve Pinkerton, Oceanic/Offshore Air Traffic Standards

More information

EGOA Enhanced General Aviation Operations by ADS-B

EGOA Enhanced General Aviation Operations by ADS-B EGOA Enhanced General Aviation Operations by ADS-B Disposition Objectives Expected benefits Operational Equipment Data collection Validation Experiences Questions Objectives Project objectives A validation

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Surveillance and. Overview. Federal Aviation Administration Broadcast Services. Presented to: ADS-B Technology Forum. By: Andy Leone, FAA, SBS Program

Surveillance and. Overview. Federal Aviation Administration Broadcast Services. Presented to: ADS-B Technology Forum. By: Andy Leone, FAA, SBS Program Surveillance and Broadcast Services ADS-B Program Overview Presented to: ADS-B Technology Forum Date: 8 February 2011 By: Andy Leone, FAA, SBS Program Agenda Overview Strategy Infrastructure and Implementation

More information

Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation. Terminal Services

Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation. Terminal Services Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation Presented to: WakeNet Europe By: Joel Forrest, Human Solutions, Inc. Date: May 13, 2014 Terminal Services Overview

More information

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative

More information

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016 FAA: ASBU Deployment Status For: ASBU WS @NACC Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016 1 Delivering NextGen Improvements Legacy System Radar Inefficient Routes Voice

More information

Evolving Avionics: Meeting the Challenge of NextGen and SESAR

Evolving Avionics: Meeting the Challenge of NextGen and SESAR 1 Evolving Avionics: Meeting the Challenge of NextGen and SESAR Uma D. Ferrell Ferrell and Associates Consulting, Inc. Thomas K. Ferrell Ferrell and Associates Consulting, Inc. 1.1 Avionics: A Historical

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS)

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS) Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS) Randall Bone 6 th USA / Europe ATM 2005 R&D Seminar Baltimore, Maryland June 2005 Overview Background Automatic Dependent

More information

UAS Symposium Key Research Challenges and Opportunities

UAS Symposium Key Research Challenges and Opportunities UAS Symposium Key Research Challenges and Opportunities Sabrina Saunders-Hodge, UAS R&D Portfolio Manager, FAA/NextGen Federal Aviation Administration Date: April 20, 2016 UAS Symposium Research & Development

More information

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW!

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! ! Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! Maria Picardi Kuffner! September 2008, updated July

More information

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK S 2 BAS Space Services Benefits in Aviation Systems April 19 th, 2012 Harwell, UK General Aviation and Business traffic will expand in the near future (4-6% per year. Source: Eurocontrol, 2011) Regional

More information

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS 40 BEALEAFBI11-250 1 OCTOBER 2012 Chapter 8 RQ-4 OPERATIONS 8.1. CERTIFICATE OF AUTHORIZATION. Pilots will comply with each COA and LOA in effect between Beale and other Air Traffic Control (ATC) facilities.

More information

Gleim Private Pilot Syllabus Fifth Edition, 3rd Printing Updates March 2016

Gleim Private Pilot Syllabus Fifth Edition, 3rd Printing Updates March 2016 Page of Gleim Private Pilot Syllabus Fifth Edition, rd Printing Updates March 0 NOTE: Text that should be deleted is displayed with a line through it. New text is shown with a blue background. If you see

More information

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration Unmanned Aircraft Human Factors Research Program Kevin W. Williams, AAM-510 William Krebs, AAR-100 May 26, 2005 0 0 Overview The Problem Completed Human Factors Initiatives Accident Data Identification

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS

AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS 2 nd USA/EUROPE AIR TRAFFIC MANAGEMENT R&D SEMINAR Orlando,1 st - 4 th December 1998 AN INTEGRATED SAFETY AND OPERATIONAL AVAILABILITY ANALYSIS SYSTEM FOR AIR TRAFFIC SYSTEMS Peter F. Kostiuk Logistics

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation

More information

Airspace Encounter Models for Conventional and Unconventional Aircraft

Airspace Encounter Models for Conventional and Unconventional Aircraft Airspace Encounter Models for Conventional and Unconventional Aircraft Matthew W. Edwards, Mykel J. Kochenderfer, Leo P. Espindle, James K. Kuchar, and J. Daniel Griffith Eighth USA/Europe Air Traffic

More information

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014

What Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

Dynamics of Air Transportation System Transition and Implications for ADS-B Equipage

Dynamics of Air Transportation System Transition and Implications for ADS-B Equipage 7th AIAA Aviation Technology, Integration and Operations Conference (ATIO), Belfast, Northern Ireland, 18-20 September 2007 Dynamics of Air Transportation System Transition and Implications for ADS-B Equipage

More information

Operating Safely. A Fundamental Guide to FAA RADAR Operations. Federal Aviation Administration Near Airports

Operating Safely. A Fundamental Guide to FAA RADAR Operations. Federal Aviation Administration Near Airports Operating Safely Near Airports A Fundamental Guide to FAA RADAR Operations Presented to: Pacific Air Soaring Counsel - PASCO By: Donald A. Brooks, Air Traffic Manager Reno TRACON/Tower November 4 th, 2006

More information

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY

3.6 Surveillance Data Exchange Activities. (Presented by the United States of America) SUMMARY NACC/WG/2 - IP/08 International Civil Aviation Organization 22/04/08 North American, Central American and Caribbean Office Second North American, Central American and Caribbean Working Group Meeting (NACC/WG/2)

More information

F L I G H T S A F E T Y F O U N D A T I O N. For Everyone Concerned with the Safety of Flight

F L I G H T S A F E T Y F O U N D A T I O N. For Everyone Concerned with the Safety of Flight F L I G H T S A F E T Y F O U N D A T I O N Airport Operations Vol. 2 No. 1 For Everyone Concerned with the Safety of Flight January/February 1994 U.S. Federal Aviation Administration Aviation System Indicators

More information

small Unmanned Aircraft Systems Arlington Police Department June 28, 2011

small Unmanned Aircraft Systems Arlington Police Department June 28, 2011 suas small Unmanned Aircraft Systems Arlington Police Department June 28, 2011 1. Overview of APD suas program to date 2. Discuss the C.O.A. (FAA certificate of authorization to fly) and restrictions

More information

The Challenge of Surface Conditions. AST: A New Solution to a Global Aviation Problem. Benefits and Business Value to Airports and Operators

The Challenge of Surface Conditions. AST: A New Solution to a Global Aviation Problem. Benefits and Business Value to Airports and Operators The Challenge of Surface Conditions AST: A New Solution to a Global Aviation Problem Benefits and Business Value to Airports and Operators 2 3 Runway excursions are among the most-frequently reported accidents

More information

Appendix A. Meeting Coordination. Appendix A

Appendix A. Meeting Coordination. Appendix A Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Airport SMS Requirements in the U.S. Recent Developments & Next Steps

Airport SMS Requirements in the U.S. Recent Developments & Next Steps Airport SMS Requirements in the U.S. Recent Developments & Next Steps Safety Management Systems (SMS) vs. Security Management Systems (SeMS) 2016 ACI-NA Public Safety & Security Fall Conference Arlington,

More information

Mode S & ACAS Programme Operational Introduction of SSR Mode S

Mode S & ACAS Programme Operational Introduction of SSR Mode S Mode S & ACAS Programme Operational Introduction of SSR Mode S John Law Programme Manager john.law@eurocontrol.int Tel: +32 2 729 3766 European 1 Organisation for the Safety of Air Navigation Mode S Airborne

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 6/30/2017 Approval NY ElY D 1 RW 1 AE.011, Or?" 0.1014 Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Approved by: (-F---01LA)------ Robert Falcon, Chief Airports Engineer 4/11.1"

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

The SESAR Airport Concept

The SESAR Airport Concept Peter Eriksen The SESAR Airport Concept Peter Eriksen EUROCONTROL 1 The Future Airport Operations Concept 1.1 Airports The aim of the future airport concept is to facilitate the safe and efficient movement

More information

North End: Runway Configurations at LAX in Arnold Barnett

North End: Runway Configurations at LAX in Arnold Barnett North End: Runway Configurations at LAX in 2020 Arnold Barnett Some Background: As built in the late 1950 s, the LAX airfield consisted of two pairs of parallel runways separated by 700 feet, one on the

More information

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION In the matter of the petition of the DEPARTMENT OF DEFENSE UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Exemption No. 5100C For an exemption from the provisions 25863 Of sections

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Preliminary Results and Findings Limited Deployment Cooperative Airspace Project

Preliminary Results and Findings Limited Deployment Cooperative Airspace Project Preliminary Results and Findings Limited Deployment Cooperative Airspace Project Paul J. Wehner Briefer Jonathan L. Schwartz Deihim Hashemi Todd M. Stock Presented at RTCA SC-203 Working Group 3 February

More information

Hazard Identification Questionnaire

Hazard Identification Questionnaire Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is

More information

SJC North and South Flow

SJC North and South Flow SJC North and South Flow Pre and Post OAPM Date: January 2018 Phases of Flight ATCC ARTCC ATCC 2 AviationTerms VFR- Visual Flight Rules. Pilots must maneuver to avoid clouds and are responsible for their

More information

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015 MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps

More information

A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA

A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA The 3 rd ENRI International Workshop on ATM/CNS A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA February 20, 2013 Presented by Jae-Hyun HAN Dept. of Aviation Policy and Technology

More information

APA NOISE REPORT. January 2018

APA NOISE REPORT. January 2018 January 2018 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] APA NOISE REPORT

More information

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008 Portfolio for Safety Research and Development Presented to: By: Date: EUROCONTROL Safety R&D Seminar Paul Krois October, 2008 Introduction The FAA National Aviation Research Plan (NARP) integrates and

More information

PRELIMINARY WEB DOCUMENT

PRELIMINARY WEB DOCUMENT APA NOISE REPORT May 2018 [Grab your reader s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] 1 TABLE

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

Validation Plan & Objectives. Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017

Validation Plan & Objectives. Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017 Validation Plan & Objectives Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017 Validation Plan Overview of Remote Tower Activities in SESAR 2020 2 Remote Tower PJ.05 DLR (AT-One) Remotely Provided

More information