1 21.0 PART C: Airspace Protection

2 PART C: ISSUES MANAgEMENT 21 AIRSPAce PROTEcTION 21.1 AIRSPAce PROTEcTION OVERVIEW The protection of the airspace surrounding airports is a critical component of maintaining a safe operating environment for both current traffic types and levels as well as for future traffic types and levels. Consequently, it is necessary to restrict some types of development and land uses in the vicinity of airports. This ensures that airspace required to facilitate aircraft operations remain obstacle free and hence contribute to the safety and efficiency of those operations. In order to facilitate broad community understanding of these restrictions, the following aspects are provided below: description of the regional airspace and operating procedures; prescribed airspace (OLS and PANS-OPS); external lighting limitations; and stack and vent efflux limitations RegIONAL AIRSPAce Overview Airservices Australia is responsible for airspace management within the Sydney Basin, as well as elsewhere in Australia. The airspace within the Sydney Basin is dominated by the Sydney Airport Control Zone (CTR) and the requirement to efficiently manage the large volume of domestic and international aircraft movements into and out of that airport. The Sydney Airport Control Area (CTA) is comprised of a series of controlled airspace blocks, ascending in vertical steps, and extending out to a maximum radius of 45 nautical miles (NM) at its greatest dimension. The Airservices Australia Sydney Terminal Control Unit (TCU) provides traffic management and separation within the airport CTA and CTR. Aircraft take off and landing clearances, as well as ground movements, are handled by the Sydney Control Tower. The Bankstown Airport CTR extends out 3 NM from the airport, except where it would otherwise overlap the Sydney Airport CTR to the east. To prevent overlapping CTRs, the Bankstown Control Zone is truncated to approximately 2 NM from the airport. The ability of Bankstown and Sydney Airports to operate independently is predicated on the ability of aircraft using Bankstown to remain within the airport s CTR and to not infringe on Sydney Airport airspace. Under visual flight rule (VFR) conditions when the Air Traffic Control Tower (ATCT) is in operation, all aircraft operating at Bankstown are required to follow General Aviation Airport Procedures (GAAP) within the airport s CTR. When the ATCT is closed, pilots are required to broadcast their position in accordance with the Common Traffic Advisory Frequency (CTAF). During instrument fight rule (IFR) conditions, the Sydney TCU provides separation services for instrument arrivals and departures at Bankstown. However, IFR traffic into and out of Bankstown must be managed in association with and sequenced relative to aircraft traffic at Sydney Airport. The proximity of Bankstown Airport and Sydney Airport, combined with the orientation of runways at the two airports create the potential for airspace conflicts under certain combinations of conditions and flight operations. In 1998, the Minister of Transport and Regional Development advised Airservices Australia that Sydney International Airport operations should be given priority over those at Bankstown Airport, as well as other airports in the Sydney Basin. Since that time, airspace and air traffic management procedures have given precedence to accommodating traffic at Sydney International Airport. Of the remaining airports in the Sydney Basin, Camden Airport has CTR and GAAP procedures, which are used to maintain traffic separation during the hours the control tower is in operation. When the control tower is closed, CTAF are in effect. Hoxton Park Airport closed in December 2008 and a number of aviation businesses transferred their operations to Camden, Bankstown Airport or to other locations. RAAF Richmond has a control tower and CTR. In its south east quadrant, the Richmond CTR abuts portions of the Sydney CTR. 148

3 Airservices Australia has established a Lane of Entry (LOE) to the Bankstown CTR, which allows aircraft access to and from Bankstown without needing to enter the Control Zones surrounding RAAF Richmond and Sydney Airport. The LOE is a corridor of airspace 8 to 10 NM in width and a ceiling height of 2,000 to 2,500 feet. Additionally, the LOE may also be used by smaller aircraft wishing to transit from north of Sydney to areas south and south west of the city. There are six flying training areas within the Sydney Basin. The areas are encompassed by a line extending from the western boundary of the Bankstown CTR to the Richmond CTR then to the Blue Mountains, Camden, and back to the Bankstown CTR. The training areas are designated (Class G) uncontrolled airspace which extends from the surface up to the base of the overlying CTA step at 4,500 feet. Bankstown and Camden Airports are reported to be the predominant source of flying training activity using this area. Regional airspace allocations within the Sydney Airport CTR are depicted in Figure Local Airspace and Air Traffic Control As discussed above, Bankstown is a GAAP CTR with a vertical limit of 1,500 feet and a nominal radius of 3 nautical miles. To avoid overlapping CTRs, the Bankstown CTR is truncated to 2 NM where it abuts the Sydney International Airport CTR. Flight procedures at Bankstown are normally conducted so as to avoid aircraft entry into the Sydney International CTR unless specific clearances have been received to do so from the Sydney TCU. When the Bankstown CTR is active, i.e. when the ATCT is in operation, aircraft are not authorised to enter the CTR without a clearance from the tower. There are two designated GAAP approach points and associated routes identified in the Airservices Australia Enroute Supplement for Bankstown: Prospect Reservoir to the north-west, on a track of 136 degrees M; and abeam the 2RN radio transmitter to the southwest, on a track of 057 degrees M. The GAAP Prospect approach route serves as an entry for aircraft arriving from the north west, including those returning from the designated flying training areas. The GAAP 2RN approach route is the entry point for traffic arriving from the south and west. A Bankstown Lane of Entry (LOE) has been established to create a corridor for light aircraft access to and from the Bankstown CTR without entering the adjacent controlled airspace for Sydney Airport and RAAF Richmond. In addition, the Bankstown LOE provides a corridor outside controlled airspace for light aircraft transiting between areas north of Sydney and areas to the south and south west of Sydney. The LOE specifies vertical limits on operating altitude to ensure adequate aircraft separation from overlying controlled and restricted airspace. When using the LOE, pilots must operate VFR and comply with general flight rules regarding terrain clearance, and flights over populated and low-level restricted areas. As already noted in the discussion of regional airspace above, the area west of Bankstown to the Warragamba Dam/Lake Burragorang and bounded by the Great Western and Hume Highways is a designated flying training area. This flying training area is reported to be heavily used by aircraft from Bankstown Airport. Technologies such as area navigation (RNAV) using the Global Navigation Satellite System (GNSS) may eventually create long-term solutions by allowing curved approaches, which could offer air traffic management procedures not presently available. On 15 July 2009 CASA released the final report into the Utility of General Aviation Aerodrome Procedures (GAAP) to Australian Administered Airspace. The study was commissioned to review airspace management in relation to GAAP as used at Bankstown and other capital city secondary aerodromes. This and other studies into airspace management and ATS at GAAP aerodromes resulted in CASA directing Airservices 149

4 Figure 32: Regional Airspace

5 Australia to implement changes to air traffic services and airspace management as described in , including implementation of full Class D airspace air traffic services. The directions form part of CASA s ongoing efforts to improve safety at GAAP aerodromes and will affect the level of aviation activity at Bankstown but it was not possible to estimate their impact when this PDMP was prepared Air Traffic Control The air traffic control tower operates generally from 6:00am until 9:00pm Monday through Friday, and 6:00am to 8:00pm Saturday and Sunday. Aircraft wishing to enter the Bankstown CTR must obtain a clearance from the tower prior to entry. Outside tower hours the GAAP CTR reverts to a CTAF. Essentially there are three parallel runways which operate as a single entity. Under visual conditions, the outer runways are operated simultaneously with contrarotating circuits. One runway, typically Runway 11L/29R, provides for arrival and departures while the other runway, Runway 11R/29L, is used for circuit training or touch and go operations. Circuit training, which involves repetitious operations, is directed to runway 11R/29L for noise abatement reasons. This allows the aircraft to overfly primarily open space and commercial/industrial properties. Arrivals and departures are managed on runway 11L/29R with aircraft departing from or joining circuits to the north of the airport. Circuits are conducted at 1,000 feet. Aircraft departing Bankstown do so by extending the upwind, crosswind or downwind leg of the circuit, tracking clear of the GA approach points and the associated inbound routes. Departures from runway 11 leave the CTR on climb to 1,500 feet, and departures from runway 29 maintain 1,000 feet until clear of the CTR. When runway 29 is in use, arriving aircraft enter the CTR at 1,500 feet and maintain this altitude until on the downwind leg of the circuit abeam the upwind end of the runway. When runway 11 is in use, aircraft arriving from Prospect or 2RN enter the CTR at 1,000 feet. This guarantees vertical separation of conflicting traffic. At night or in instrument conditions, all operations are confined to the central runway (Runway 11C/29C). On 21 July 2009, based on the findings of a recently commissioned review of airspace management, CASA issued a direction to Airservices Australia for the staged implementation of revised procedures at GAAP aerodromes, including Bankstown Airport. Changes introduced on 21 July were: An immediate limitation on the number of aeroplanes in the circuit for one runway, controlled by one Air Traffic Controller, to six. If two runways and two controllers are available then the total number of aeroplanes in the circuit would be limited to 12. An additional departure may be permitted at the discretion of the controller having given due consideration to all relevant safety factors; An immediate requirement for all aircraft to obtain an Air Traffic Control clearance to enter, cross or taxi along any runway, and The provision (within 9 months) of aerodrome ATS daily for the hours of daylight without any reduction in the service currently provided during the hours of darkness. It is presently not possible to anticipate how or when the recommendations in the reports leading to the CASA direction will be implemented. This PDMP has been prepared on the basis of the current GAAP procedures, being the best available information at the present time. The changes directed by CASA will reduce the level of aviation activity in comparison to that forecast in this PDMP but the way in which the airspace around Bankstown Airport will operate in the future will not become clear for the next 3 to 5 years. These airspace changes will therefore be incorporated into the next five-year Master Plan in

6 PART C: ISSUES MANAgEMENT Available Approaches All instrument approach procedures to Bankstown Airport are non-precision approaches. As a result, the minimum pilot decision heights are relatively high compared to precision instrument approaches. The lowest classification of precision instrument approach is Category I, which provides a minimum decision height of 200 feet. Published Approach Type Minimum Decision Table 13 - Available Approaches at Bankstown Airport Height (in Feet AGL) Runway 11C NDB/ SY DME In addition to the published non-precision approaches, there are two Standard Arrival Routes (STARs) for Bankstown. The WATLE Four Arrival is for aircraft arriving from the west and the Richmond Four Arrival is for aircraft arriving from the north to north west. Standard Instrument Departure procedures (SIDs) are published for Bankstown runways 11C and 29C Flightpaths NDB (Note: GPS may be used in lieu of SY DME) Flight paths were not required to be, and were not, depicted in the2005 MP. However, when the Airports Act 1996 was amended in May 2007, a new provision was added which requires flight paths to be set in draft and final master plans (but not in a proposed variation to an existing MP). See Section PREScRIBED AIRSPAce Code A, B, C aircraft 651 feet Radar One/ BK NDB Circling Approach Code A, B 881 feet Code C Radar Two/ BK NDB/ SY VOR Circling Approach Code A, B 881 feet Code C Runway 11C GPS GPS Code A, B, C aircraft 651 feet Sydney VOR/ BK NDB Circling Approach Code A, B 881 feet Code C The Airports Act 1996 requires the production of prescribed airspace plans for airports. Under the Airports (Protection of Airspace) Regulations, prescribed airspace is defined as airspace above any part of the OLS or PANS-OPS surfaces, whichever represents the lower airspace surface. The object of prescribed airspace is to ensure that the airport is not adversely affected by the building of structures in the area used by arriving and departing aircraft. The prescribed airspace plan which represents the OLS and PANS-OPS surfaces gives airport operators guidance in protecting critical surfaces that affect instrument approach minimum altitudes OLS The OLS at Bankstown Airport are defined under the CASA MOS Part 139 Aerodromes, Section 7.3 and they are established in accordance with International Civil Aviation Organization (ICAO) specifications. The OLS comprise a series of imaginary planes surrounding an airport which must be kept free and clear of obstructions that could be hazardous to aircraft taking off or landing at the facility. The surfaces are intended to prevent development of airspace obstructions that could adversely impact air navigation or the usability of the facility. The height restrictions imposed by the OLS are determined based on the following factors: the intended use of the runway, i.e. for take-off, landing or both; the runway code as determined by the runway length and type of aircraft using the runway; and type of approach, i.e. non-instrument, nonprecision or precision instrument. Extending off the end of each runway, the OLS standards define both a take-off climb surface and an approach surface for landing. Where take-offs and landings may occur in either direction along a runway, the more restrictive approach surfaces for landings should be used in determining obstacle height restrictions. At Bankstown Airport, it is assumed that take-offs and landings may occur in either of the runway directions and therefore the landing approach surfaces are used in this analysis. Surrounding the runway pavement is the Runway Strip. 152

7 The Runway Strip is defined as an area including the runway and stopway, if any, intended to reduce the risk of damage to aircraft running off the runway surface, and to protect aircraft flying over it during take-off or landing. The dimensions of the Runway Strip determine where the OLS surfaces begin and are defined based on the width of the runway pavement, type of aircraft using the runway and approach capability available. A future OLS protection of a runway 11C/29C approach surface with inner edge width of 300 metres is under review. The OLS for Bankstown Airport are depicted in Figure PANS-OPS The PANS OPS surfaces cover all current approaches based on conventional radar navigation aids at Bankstown. Future procedures for the airport have been considered and consequently, to preserve future options, GNSS RNAV precision & non-precision approach surfaces have been identified for protection. Any precision approach will need to be determined by Airservices Australia taking into consideration the interface with Sydney Airport airspace and the schedule, fleet mix and aircraft type of any future RPT operator. The PANS-OPS surfaces for Bankstown Airport are presented in Figure Changes to the OLS and PANS-OPS The proposed aviation development concept contained in this PDMP for the 2029/30 period is identical to the 2005 MP (for the 2024/30 period) and take into consideration: extension of the OLS for runway 11C/29C by 220m and widening of the runway strip from 150m to 300m; flattening of the take-off and approach surfaces to reflect a Code 3 Category 1 precision approach, and changes to the transitional surfaces to reflect the 11C/29C runway extension and strip widening, and introduction of conical and outer horizontal surfaces associated with a Code 3 Category 1 precision approach. The existing PANS-OPS surfaces have been identified for each of the instrument procedures currently published by Air Services Australia. The surfaces for the parallel runway complex were also amended in the 2024/25 MP to account for the future extension of Runway 11C/29C and the future use of a precision approach RESTRIcTIONS TO ExTERNAL LigHTINg CASA provides airport operators with guidance on protecting aircraft operations from adverse impacts resulting from ground lighting, particularly during the landing phase of flight. Furthermore, under Regulation 94 of the Civil Aviation Regulations 1988 (CAR 1988), CASA has the authority to require lights which may cause confusion, distraction or glare to pilots in the air to be extinguished or modified. Pilot confusion or distraction may be the result of lighting colour, position, pattern or intensity of emission above the horizontal plane. Should the owner of property creating a lighting hazard fail to take remedial action once they have been notified, CASA is authorised under the regulations to make modifications to remove the hazard at the property owner s expense. General guidance is provided for situations where lights are to be installed within a 6 km radius of the airport as lights within this area are considered most likely to fall under the provisions of Regulation 94 of CAR Further guidance is provided as to allowable light levels, as measured 3 degrees above the horizontal, in four zones surrounding the runway and extending out a total distance of 4,500 metres from the runway threshold. The zones become narrower and shorter the closer to the runway threshold. The maximum allowable lighting intensity in each zone decreases the closer to the runway. The most critical area is the inner zone (Zone A), which extends 1000 metres beyond the runway threshold and 300 metres to each side of the runway centre line. 153

8 Figure 33: Obstacle Limitation Surfaces

9 Figure 34: PANS-OPS

10 PART C: ISSUES MANAgEMENT Potential conflicts or distractions caused by lighting colour are noted as independent from lighting intensity as some colours may cause confusion with airport lighting. Adverse impacts from ground lighting can often be associated with outdoor advertising displays, sports field lighting and street lighting. At present, no adverse impacts from ground light emissions are known to exist at the airport. Lighting associated with future development in the airport vicinity should conform to the provisions of regulation 94 of the CAR. To assist developers, lighting designers and installation contractors in the vicinity of airports, BAL has prepared a plan highlighting maximum lighting intensities in areas surrounding Bankstown Airport. This is presented in Figure 35. External advertising, sports field floodlighting and street lighting are some of the more likely lighting sources requiring consideration. BAL will consult and liaise with Bankstown City Council, and other Councils as appropriate, on the most appropriate mechanism for ensuring that external lighting does not adversely impact on Airport operations STAck AND VENT EffLUx CASA has identified the need to assess the potential hazard to aviation where the vertical velocity from gas efflux may cause airframe damage and/or affect the handling characteristics of an aircraft in flight. This is especially critical during periods of high pilot workload or when the aircraft is being manoeuvered at low altitudes, particularly with flaps extended and/or gear down. in other phases of flight. The draft CASA Advisory Circular AC (0) provides airport operators with guidance for assessing possible adverse impacts of gas efflux on aircraft operations in the vicinity of the airport. Plumes with a vertical velocity greater than 4.3 metres/second may cause airframe damage to aircraft during critical stages of flight, such as landing with full flaps extended. Proponents of a facility to be located within 15 kilometres of an airport are to consult the airport operator if that facility includes a combustion source which generates an exhaust plume which has a vertical velocity greater than 4.3 metres/second at the OLS. The Advisory Circular notes that plumes exceeding 4.3 metres/second vertical velocity at the Obstacle Limitation Surface, or 360 feet above ground level (AGL) should be deemed a potential hazard to aircraft and identified as an obstacle in accordance with the provisions of CASR Part 139. The hazards addressed in the Advisory Circular are typically associated with industrial processes. At Bankstown Airport, there are no known sources of gas efflux or plumes that would constitute a hazard to aircraft operating at the airport. The Airports Act 1996 also provides for protection of airspace against stack and vent efflux. BAL will consult and liaise with Bankstown City Council, and other Councils as appropriate, on the most appropriate mechanism so that stack and vent efflux does not adversely impact on Airport operations. Typically this includes the initial take-off climb or approach to land, when the aircraft is in the vicinity of an airport. In some cases the high efflux temperature or velocity may cause air disturbance at higher altitudes. If so, CASA also requires an assessment of the potential for the exhaust plume to affect the safe handling of aircraft 156

11 Figure 35: Maximum External Lighting Intensities

12

13 22.0 PART C: Implementation

14 PART C: ISSUES MANAgEMENT 22 IMPLEMENTATION 22.1 general The aviation and land development concepts outlined in this PDMP represent current views of development expected to be realised in a staged manner, largely as a result of increased aircraft movements, movement area asset management and property initiatives. As set out in the Airports Act 1996, developments as described in Section 19.6 or Major Development Plans for designated major airport developments are required for approval. Major airport developments are the subject of further community consultation, environmental assessment and Ministerial approval. This PDMP provides a 20 year strategic planning framework for the future development of the Airport. It demonstrates the necessary flexibility to ensure that future aviation and property industry trends and demands are appropriately met through the provision of new or enhanced infrastructure in a timely manner. Below is an indicative summary of the potential proposals associated within the first five years of this PDMP. The actual timing of each of the developments will depend on: the assessment of prevailing and forecast market conditions, the demand triggers, a business case or an asset management case, the carrying out of any necessary environmental assessment and approvals processes and the outcome of stakeholder consultation processes. Land is developed by BAL, by BAC Devco, or by sublessees or third party developers under commercial development agreements. All developments must be approved by BAL with building approval by the Airport Building Controller PROPOSALS TO 2015 Potential proposals within the period to 2015 are described below as: Aviation Development Concept Proposals; BAL Land Development Concept Proposals; Sub-lessee or Third Party Property Development Proposals, and Infrastructure Provisions Aviation Development Concept Proposals (see Section 11) The following aviation proposals are expected to be undertaken during the period 2010 to 2015: Aviation Precinct Runway resheet RWY Centre Mar 2010, North RWY 2011/12 Sealed RESA s FY 11/12 Aircraft washdown bay and engine run up bay Expansion of CCTV system FY 09/10 Apron Sealing FY 12/13 North-West Precinct upgrade of the existing terminal (see Section 10.2) FY 10/11 construction of at-grade car parks adjacent to the terminal FY 10/11 introduction of paid controlled car parking on the northern side of Airport FY 10/11 hangar development to the north west of the runways on grade vehicle parking to the north west of the runways Airport Avenue road layout improvement FY 11/12. North-East Precinct development of the north air site to the north of the Toll facility - aviation use including corporate activities expansion of the existing eastern fuel farm. 160

15 BAL Land Development Concept Proposals The following non-aviation proposals are expected to be undertaken during the period 2010 to 2015: (A) North-East and North-West Precincts Development and release of 4 Priority Sites (see Figure 36). These sites comprise almost 17,000 m2 of developable land area. The sites are all located within the Mixed Use Zone on either side of Airport Avenue. Site DO1 at 13 Airport Avenue has partial frontage to an Airside Tenancy Buildings & Associated Taxiways Zone and as such could accommodate an aviation-related development. The target completion of the first site is by December The proposed construction is a purpose-built concrete tilt slab or steel portal frame office/warehouse style building. (B) Annual Hangar Refurbishment Program This is a continuous improvement program for BAL owned buildings, with nominally up to 5 buildings each year with the extent of works between $50,000 and $250,000 per project. The works program is in the order of 3-6 months depending upon the nature and extent of the works being undertaken. The works are necessary to meet BAL s compliance obligations with respect to: - Heritage (where classified) - Building Code of Australia - Occupational Health and Safety - Australian Standards - such as electrical systems. (C) Consolidation of Key BAL Tenants This is an initiative for businesses with multiple tenancies, or those that have expanded by acquiring other companies, to cater for business growth of tenants beyond their existing premises. The initiative is aimed at tenant retention for growing businesses and to provide consistency with the zoning by reducing the occurrence of existing use rights, through relocation to more appropriately zoned locations. It requires a pre-lease commitment from the business prior to the expenditure of capital funding by BAL. Project timelines vary between 1 and 5 years depending upon the complexity of the deal and supplementary activities construction, lease surrender, relocation, etc. Figure 36: Priority Sites Airport Avenue 161

16 PART C: ISSUES MANAgEMENT (D) Partnerships with Training Providers The National Aviation Policy Green Paper identifies future aviation industry skills and productivity as a key national initiative, including forming partnerships with training and educational providers. BAL has continued to support the aviation industry including flight training, education and promoting aviation as a career to young people. In recent years the GA industry has enjoyed strong economic conditions in particular flight training which has enjoyed considerable growth. BAL has also promoted aviation education and has both the University of NSW and TAFE Padstow located on the Airport and is keen to develop a campus style facility to further enhance aviation education. BAL has also taken a leading position trying to attract young people to this industry. The Airport has hosted three successful Aviation Careers Expos promoting the many career paths available in aviation. Working with local, national and international aviation companies, thousands of senior students have attended the Expos. They may have otherwise not been given the opportunity to get close to this industry Sub-Lessee or Third Party Property Development Proposals The following non-aviation proposals are expected to be undertaken during the period 2010 to 2015: (A) North-West Precinct Within this precinct, construction has commenced on a new supermarket and three speciality shops fronting Birdwood Road. Other potential developments include: warehouse/office commercial/retail medical centre. (B) South-West Precinct A Stage 1 earthworks platform and associated drainage works have been completed. This would be followed by Stage 2 earthworks and drainage, relocation of the Aviation Museum to Camden Airport and services and roadwork to provide a business park environment, with potential developments which include: bulky goods retail DFO type retail logistics facilities warehouse/office commercial/retail. (C) South-East Precinct Earthworks, drainage and roadworks for access to Milperra Road have been undertaken for development of the former trotting track site at the south-east boundary of the Airport, with site works for the first development, a warehouse/office having started. Potential developments include: bulky goods retail logistics facilities warehouse/office commercial/retail recycling facilities. Proposals for the Environment protection zone are considered in Section 19 and in the Preliminary Draft Airport Environment Strategy Infrastructure Provision Surface traffic and utility infrastructure provision are as described in Sections 17 and 18. These developments would only be implemented on an as-needed basis and subject to market demands. Infrastructure provision would comprise reticulation of electricity, water and sewer to necessary sites, lead-in power and water and sewer network upgrades and amplifications. Implementation priorities within the period are illustrated in Figure

17 PARK CAR CAR PARK A GUARD RAIL SPEED HUMP GUARD RAIL OFFICE OFFICE HANGAR Ericafolia Various to 3-4m Casauarinas shrubs MILPERRA ROAD Acacia, 2m 7 WOORANG ST MARSHALL ST a BAL (Priority ALLINGHAM ST 625 AIRPORT AVENUE seats shed KESTREL PLACE KLEMM STREET DROVER RD 131 CAR WASH AIRPORT LIGHT ROOM 10m Assorted 5m shrub 6m tree 5m tree Ericafolia some E. Callistemon Shrubs to 2m Small shrubs to 2m Scattered E. to 1m Small E. E. to 4m some dead Scattered Some E. to 1m 3. N-W Precinct 1. Aviation 3. S-W Precinct - 24ha CAR PARKING 1. Aviation Proposals (see Section ) 2. BAL (Residual Land) (see Section ) 3. Sub-Lessee (Development Land) (see Section ) 4. Infrastructure (see Section ) - Intersections 2 and 7 - Local link road Figure 37: Proposed Development to PROPOSED Acacia Ericafolia 4. Intersection 7 Milperra Road 4. Intersection 2 Marion Street Sites) 3. S-E Precinct ha small, <2m 5trunks,5m 1.8m cyclone mesh fence TOWER ROAD

18 22.3 BeyOND 2015 For the timing of developments beyond the initial five year period there is less certainty when a specific demand, business case or compliance trigger will be reached. Further, the Act provides for the final Master Plan to remain in force for five years. Consequently, this Master Plan will again be reviewed and updated in Further development of a business park environment in the north-west and north-east precincts would be considered at that time. 164

19 165

20

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Bankstown Airport. Master Plan 2004/05

Bankstown Airport. Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 > Foreword In December 2003, the BaCH Consortium purchased the long term leases over Bankstown Airport, together with Camden

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

PLUME RISE ASSESSMENTS

PLUME RISE ASSESSMENTS Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CANBERRA AIRPORT IS THE ONLY 24 HOUR BOEING 747, B777-300 AND A340 CAPABLE AIRPORT...BETWEEN BRISBANE AND MELBOURNE. 9 Runway and airfield developments Airports

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace

Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 77 prescribes rules for persons proposing

More information

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL APRIL 2014 Report Prepared for The Minister for Health

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

AERODROME OPERATIONS 1 INTRODUCTION

AERODROME OPERATIONS 1 INTRODUCTION AIP New Zealand AD 1.5-1 AD 1.5 AERODROME OPERATIONS 1 INTRODUCTION 1.1 General 1.1.1 This section details procedures for operations on and in the vicinity of aerodromes. 1.1.2 The layout of the circuit

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL ******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Application for amendment to Tauranga control zone and control areas Consultation

Application for amendment to Tauranga control zone and control areas Consultation Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...

More information

IFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude

More information

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

6.0 AIRFIELD DEVELOPMENT PLAN

6.0 AIRFIELD DEVELOPMENT PLAN 6.0 AIRFIELD DEVELOPMENT PLAN 6.0 AIRFIELD DEVELOPMENT PLAN Key points The airfield development plan in this Master Plan is capable of meeting forecast demand to 2033 and beyond. The development plan:

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Lecture Minimum safe flight altitude

Lecture Minimum safe flight altitude Lecture Minimum safe flight altitude Calculate of minimum safe flight altitude, safe flight altitude in approach zone, in circle zone (circle altitude), minimum safe flight altitude in aerodrome area,

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE AIRCRAFT NOISE INFORMATION PACK: Table of Contents CANNING VALE 1. Aircraft movements affecting Canning Vale... 2 2. Effects of wind on runway selection... 2 3. Seasonal winds... 2 4. Flight path illustrations...

More information

PLAN Anoka County - Blaine Airport

PLAN Anoka County - Blaine Airport Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that

More information

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD

More information

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA UNITED KINGDOM AIP AD 2.EGSL-1 26 May 2016 EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL ANDREWSFIELD EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

MASTER PLAN 2010 ADDENDUM REPORT

MASTER PLAN 2010 ADDENDUM REPORT December 2013 ACKNOWLEDGEMENT This Master Plan Addendum Report has been prepared with the assistance of technical input and planning advice provided by Airport Master Planning Consultants Pty Ltd. COPYRIGHT

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

Guidance material for land use at or near aerodromes

Guidance material for land use at or near aerodromes Guidance material for land use at or near aerodromes Table of Contents Overview... 1 Glossary... 1 Types of Aerodromes... 1 Obstacle Limitation Surfaces... 2 Wildlife Hazard Management... 2 Notice of Intention

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

Electronic Terrain and Obstacle Data

Electronic Terrain and Obstacle Data International Civil Aviation Organization Electronic Terrain and Obstacle Data David Lewtas Chief, Aeronautical Information Unit (MET/AIM) 24 November 2010 ICAO CAR AIM Seminar Kingston, Jamaica 22-24

More information

MINIMUM FLIGHT ALTITUDES

MINIMUM FLIGHT ALTITUDES MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

FAA Requirements for Engine-out Procedures and Obstacle Clearance

FAA Requirements for Engine-out Procedures and Obstacle Clearance FAA Requirements for Engine-out Procedures and Obstacle Clearance Presentation to: CAAC Engine-out Procedures Seminar Name: Chuck Friesenhahn Date: 11/29/2005 Flight Standards Senior Advisor, Advanced

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

IVAO Flight Operations Department Indonesia (ID) Division Procedures

IVAO Flight Operations Department Indonesia (ID) Division Procedures IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 14 1 INTRODUCTION This guidance material has been prepared for use for the definition of protected surfaces in the vicinity of aerodromes. Survey information for an aerodrome is essential for

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

ALTIMETER SETTING PROCEDURES

ALTIMETER SETTING PROCEDURES AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information