ALBERT WHITTED AIRPORT. Richard Lesniak, Airport Manager
|
|
- Felix Shepherd
- 5 years ago
- Views:
Transcription
1 Richard Lesniak, Airport Manager
2 RUNWAY 7/25 PROJECT ABM PRESENTATION ALBERT WHITTED AIRPORT LOCATED IN DOWNTOWN ST. PETERSBURG PROPERTY USED AN AIRFIELD SINCE 1917; NAMED IN 1928 GENERAL AVIATION AIRPORT ±90,000 OPERATIONS; ±185 BASED AIRCRAFT ±$52M ANNUAL ECOMONIC IMPACT (FDOT 2014) OWNED BY THE CITY OF ST. PETERSBURG
3 ABM PRESENTATION Starting an Airport Master Plan (Nov/Dec 2018) retaining ESA An FAA-prescribed planning process that provides a 20-year plan for the airport facility. Done about every 10 years; AWA was last done in 2005 ±18 24 months to complete An Airport Layout Plan ( ALP ) document is created
4 ABM PRESENTATION Goals of today s presentation: Awareness of improvements that will be studied as part of the MP process Feedback from the ABM.
5 ABM PRESENTATION Recently completed a Feasibility Study and Economic Impact Analysis of potential improvements to Runway 7/25. The Study is preliminary in nature. It was not completed through any formal Federal and/or State process. FAA will not consider anything recommended within the study until it is vetted through a full master plan process. Results recently presented to City Council PS&I Committee
6 RUNWAY 7/25 (current): 3,674 ft x 75 ft NE/SW oriented runway Longest runway at AWA Designated as the Primary runway Handles ±70% of the air traffic
7 WHY SHOULD WE PURSUE RUNWAY IMPROVEMENTS? 1. SAFETY ENHANCEMENTS 2. OPERATIONAL ENHANCEMENTS 3. ECONOMIC IMPACT
8 THE CASE FOR ALBERT WHITTED: 1. SAFETY ENHANCEMENT Airport is safe, but continued risk reduction is always a goal 2. OPERATIONAL ENHANCEMENT Airport is limited for the corporate aircraft fleet 3. ECONOMIC IMPACT Increase revenues/selfsufficiency; Job creation; Competitive advantage
9 LIMITATIONS 1. AIRPORT VISION 2. NEIGHBORHOOD COMPATIBILITY 3. SPACE LIMITATIONS
10 STUDY GOALS: 1. Explore the ability to enhance the runway configuration 2. Identify potential environmental implications 3. Determine costs
11 STUDY COLLABORATION ALBERT WHITTED AIRPORT Albert Whitted Airport Advisory Committee
12 *PRIMARY RECOMMENDATION - SHIFT THE RUNWAY TO THE EAST *Determined by: Two (2) sub-recommendations from the study Using standard FAA polices and design methodologies
13
14
15 ENVIRONMENTAL IMPLICATIONS: Shift/Extension into Tampa Bay Bay Impacts: Tampa Bay Estuary?; Benthic Habitat?, etc. NEPA Process Triggered Environmental Assessment Permits required FDEP being delegated primary permitting authority
16 FUNDING PLAN: FAA (90%) $11,340,000 FDOT (8%) $ 1,008,000 City (2%) $ 252,000 Total $12,600,000
17 Realized Growth Opportunities: On the Airport (Section 1) Revenue Generation Job Creation Competitive Advantage Off the Airport Runway 7 Landing Threshold shifted eastward Opportunity for vertical development
18 ECONOMIC IMPACT ANALYSIS (February 2018): One-time economic impacts from construction On-going operational impacts to Airport On-going economic impacts through enhanced development opportunities
19
20
21
22 Feasibility Study is a preliminary analysis. Results must be vetted through the full Airport Master Plan process. The Airport Layout Plan ( ALP ) must include any future changes and be approved by the FAA. A full environmental assessment would have to be done.
23 NEXT STEPS: Master Plan Study (up to 2 years) Environmental Assessment (up to 2 years) Design/Permitting (1-2 years) Construction (1-2 years)
24
25 END OF PRESENTATION
26 EXTRA SLIDES FROM ORIGINAL COUNCIL PRESENTATION FOLLOW..
27 SECTION 1: BACKGROUND SECTION 2: FEASIBILITY STUDY SECTION 3: ANCILLARY BENEFITS SECTION 4: NEXT STEPS
28 SECTION 1: BACKGROUND
29 TIMELINE ALBERT WHITTED AIRPORT 1960s+ Runway improvement concepts have been around for decades 1990s Small runway improvement was completed 1999 Master Plan 2003 Airport Referendum 2004 Blue Ribbon Task Force Recommendations 2005 Master Plan Update (Since then have completed $18M in capital improvements + $9M in process) 2016 Runway Feasibility Study (Pre-cursor) 2018 Master Plan Update
30 Target Fleet Mix ALBERT WHITTED AIRPORT No vision of having large aircraft start using AWA (i.e. B-757s, B-737s, Gulfstream Vs, etc.) Implications of significantly changing the aircraft fleet mix Small/medium sized corporate aircraft Many currently already use the Airport. Accounts for ±4% of the transient traffic (3% large twin/1% jet) Corporate aircraft must operate with restrictions (i.e. short runways): Reduced loads/fuel Air Taxi/Part 135 restrictions Insurance requirements
31 Expand Revenues Competitive Advantage & Corporate Opportunity Potential ECONOMIC IMPACT Create Jobs (Grow Smarter Strategy)
32 $ =
33 Citation 525 Citation 560XL Citation 650 Mustang
34 Learjet 31 Cheyenne III Hawker 400 King Air 350
35 SHORT RUNWAYS AT AWA HAS RESULTED IN LOSS OF USE/SERVICE: 1. Air Medical Transport 2. State Jet 3. Lost opportunities? 4. Runway Length Comparison
36 TAMPA BAY AREA AIRPORTS *Runway Airport City/County Type Length Tampa Int'l Tampa/Hillsborough Commercial 11,002 St. Pete-Clearwater Int'l Clearwater/Pinellas Commercial 9,730 Brooksville-Tampa Bay Regional Brooksville/Hernando General Aviation 7,002 Zephyrhills Zephyrhills/Pasco General Aviation 5,000 (6,500) Tampa Executive Tampa/Hillsborough General Aviation 5,000 Clearwater Airpark Clearwater/Pinellas General Aviation 4,108 Plant City Plant City/Hillsborough General Aviation 3,948 Albert Whitted St. Petersburg/Pinellas General Aviation 3,674 Peter O'Knight Tampa/Hillsborough General Aviation 3,580 Note: *Longest runway available
37 SECTION 2: FEASIBILITY STUDY
38 STUDY STRATEGY Took a more global perspective Conscientious of aligning the focus with Federal/State priorities Put the local motivations (i.e. eco dev focus) into perspective with the ultimate focus Safety Enhancement.
39 STUDY FOCUS: ALBERT WHITTED AIRPORT AS THE AIRPORT OWNER, SAFETY IS THE MOST IMPORTANT FACTOR TO THE CITY. FEDERAL AVIATION ADMINISTRATION (FAA) ACCEPTANCE IS PARAMOUNT COMPETE FOR FEDERAL GRANT FUNDS. THE STUDY FOCUS WAS LIMITED STRICTLY ON SAFETY ENHANCEMENT/ OPERATIONAL IMPLICATIONS
40 SUB-RECOMMENDATION #1: Achieve operational runway length of at least 3,700 ft. Justified through the critical aircraft established for the current fleet mix at Albert Whitted. Although the runway is 3,674 ft in physical length, an aircraft cannot use the full length for specific take-offs/landings. King Air 200 An extension of 263 ft would be necessary to achieve 3,700 ft.
41 SUB-RECOMMENDATION #2: Shift Runway 7 s Runway Protection Zone (RPZ) onto the airport property (see next slide - what is an RPZ?). Moves the Runway 7 landing threshold to the east; requires an additional 1,280 ft extension to maintain the fully usable runway length of 3,700 ft. This improvement would provide about 4,950 ft of runway length for aircraft departures on Runway 7.
42 RUNWAY PROTECTION ZONE ( RPZ ) Buffer (or safety) zone established off the ends of all runways. Trapezoidal shape with the ultimate dimensions established by the type/size of aircraft the specific runway is designed for. Designed to enhance protection of persons/property on the ground. Ideally it should be cleared of any incompatible objects/activities. FAA prefers that the airport sponsor own and/or control the land.
43
44 PROJECT COST ESTIMATE: ALBERT WHITTED AIRPORT Design and Permitting $ 550,000 Admin/Inspection $ 405,000 Construction $11,567,500 Total $12,522,500
45 SECTION 3: ANCILLARY BENEFITS
46 POTENTIAL STORM PROTECTION Creates a breakwater for Marina Basin and new Pier
47
48 SECTION 4: NEXT STEPS
JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationGeneral Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport
Peter O. Knight Airport Public Meeting #1 Peter O. Knight Airport 1 Agenda Welcome and Introductions The Master Plan Update Questions and Comments 2 Hillsborough County Aviation Authority Enabling Legislation
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationAirlake Airport 2035 Long Term Comprehensive Plan (LTCP)
Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan
More informationNew Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together
Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationDallas Executive Airport Marketing Plan
Dallas Executive Airport Marketing Plan Briefing for the Transportation & Environment Committee Department of Aviation December 13, 2010 Briefing Objectives Review Executive Airport Goals Growth opportunities
More informationYolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California
Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationThursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES
SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationExisting Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276
More informationCollier County Airport Authority. Joint Automated Capital Improvement Program
Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationHILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1
HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationat: Accessed May 4, 2011.
3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationFlying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance
Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationAirport Master Plan Update
Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,
More information26 October 2017 JAZB Meeting #2. Flying Cloud Airport Joint Airport Zoning Board
26 October 2017 JAZB Meeting #2 Flying Cloud Airport Joint Airport Zoning Board Meeting Agenda Approval of Minutes from September 21, 2017 JAZB Meeting Introduction of new JAZB member (Eden Prairie representative)
More informationAirport Compliance. Common Issues
Airport Compliance Common Issues Airports must submit any proposed changes on airport property to TxDOT Aviation to update ALP and for approval. Anything required by FAA to be on the ALP shall be subject
More informationHarvey Field Airport. Planning Advisory Committee & Public Open House. April 1, Comment Responses
Harvey Field Airport Planning Advisory Committee & Public Open House April 1, 2015 Comment Responses In an effort to respond to comments received at both the Planning Advisory Committee (PAC) meeting and
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future
More informationAppendix A. Meeting Coordination. Appendix A
Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM
More informationChapter Four ALTERNATIVES
Chapter Four ALTERNATIVES Master Plan Update This chapter walks through the process of identifying and evaluating development alternatives to serve the (Airport) in the near-term to the distant future.
More informationPLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4
MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) MEETING #4 AGENDA & ACTION ITEMS Date/Time: Location: Monday, March 19, 2018 from 1:30-3:30 p.m. Thun Field Airport
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationCHAPTER 3 AIRPORT FACILITY REQUIREMENTS
CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and
More informationAirport Master Planning Process & Update
Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David
More informationKelly Field at Port San Antonio Airport Master Plan
Kelly Field at Port San Antonio Airport Master Plan Board of Directors / Steering Committee Briefing Today s Agenda What is an Airport Master Plan? Master Planning Process and Project Background Community
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationNOTICE TO PROPOSED CITY PERMITS: ZONING HEIGHT RESTRICTIONS/APPROVAL PROCESS
NOTICE TO PROPOSED CITY PERMITS: ZONING HEIGHT RESTRICTIONS/APPROVAL PROCESS Dear Prospective Permittee: The City of St Petersburg (City) issues permits for construction projects based on local and state
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationPlanning Advisory Committee Meeting #4 September 12, 2017
Planning Advisory Committee Meeting #4 September 12, 2017 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Welcome and Meeting Introduction Jerry Willey, Committee Chair Anne Pressentin, EnviroIssues 2 Agenda Welcome
More informationRevised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee
Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Presentation to: Noise Compatibility Committee October 29, 2015 Ted Baldwin What are NADPs? Departure
More informationState Aviation System Plan Technical Advisory Committee Meeting #1. Agenda. 1) Welcome. 2) SASP Technical Advisory Committee
State Aviation System Plan Technical Advisory Committee Meeting #1 November 30 th, 2017 9:00am 12:00pm Aeronautics Building 222 Plato Blvd, St Paul, MN 55107 (Join online meeting) Conference Line: 888
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationCHAPTER FOUR AIRPORT ALTERNATIVES
4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationB GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:
2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate Operations 5th Working Group Briefing 9/25/18 Meeting Purpose Discuss methodology of Ultimate build scenario operations
More informationMartin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010
Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Prepared for: Federal Aviation Administration (FAA) Orlando Airport District Office
More informationHot Topics in Land Use at GA Airports. Peter J. Kirsch
2006 AAAE General Aviation Issues Conference September 19, 2006 Hot Topics in Land Use at GA Airports Peter J. Kirsch Today s Presentation 2 Focus on two hot topics : Management of lands purchased for
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationFIRST PUBLIC WORKSHOP
Lambert-St. Louis International Airport Master Plan & 14 CFR Part 150 Noise Compatibility Plan Update FIRST PUBLIC WORKSHOP February 12 th 2009 Why prepare a Master Plan Update Now? Last full Master Plan
More informationAIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION
30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationHillsborough MPO Technical Advisory Committee. Monday, February 20, 2017
Hillsborough MPO Technical Advisory Committee Monday, February 20, 2017 1 Study Purpose Support the vision for a livable, connected, and competitive downtown. Evaluate alternatives for the system s modernization
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationNantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012
Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach
More informationCOMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010
COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationAnalysis Item 71: Department of Aviation Aurora State Airport Runway Extension
Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation
More informationExisting Facilities. Current and Forecast Demand
Existing Facilities Albert Whitted Airport is owned and operated by the City of St. Petersburg ( City ). The airport property encompasses approximately 119 acres. The airport is served by two intersecting
More informationMr. Steve Domino began the meeting by introducing the RS&H team, the intent and scope of the project and the agenda for the presentation.
Meeting Minutes - Advisory Committee Start time 9:00 a.m. The Advisory Committee meeting presentation consisted of an introduction and overview of the project and a discussion of the preliminary inventory
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationPilot Focus Group. March 31, :30 AM 10:00 AM. Meeting Minutes
Pilot Focus Group March 31, 2015 8:30 AM 10:00 AM Meeting Minutes Attendees: Dennis Butterfield, Harvey Field/Based Pilot Terry Chamberlain, Harvey Field/Based Pilot Melanie Hancock, Snohomish Flying/Based
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationex) & Comple nce Avoidan 1 August 2010
23 rd Wing, Detachment 1 MacDilll Air Force Base (Deployed Fighter Unit Comple ex) & Avon Park Air Force Range (Restricted Area R-2901) Mid-Air Collision Avoidan nce ( M.A.C. A.) 1 August 2010 Purpose
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationTHE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS
THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS Capt. Denis Guindon Deputy Director, Monitoring and Oversight, Air Navigation Bureau International Civil Aviation Organization (ICAO) AFI Aviation Safety Symposium
More informationCEE 5614 and CEE Aircraft Classifications. Spring 2013
CEE 5614 and CEE 4674 Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering Spring 2013 1 Material Presented The aircraft and the airport Aircraft classifications
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationMONTROSE REGIONAL AIRPORT
MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify
More informationALBERT WHITTED AIRPORT DESIGN COMMITTEE June 1, :00 p.m., Backstage Lounge
ALBERT WHITTED AIRPORT DESIGN COMMITTEE June 1, 2004 4:00 p.m., Backstage Lounge Members Present Members Absent Don Morris, Chair Don Shea Mary Anna Murphy Mark Stroud Steve Lange Ed Montanari Henry Van
More informationBurke Lakefront Airport (BKL) Master Plan Update
Burke Lakefront Airport () Master Plan Update Public Workshop August 2, 2007 City of Cleveland Department of Port Control (DPC) City of Cleveland DPC Studies Currently In Progress Market Assessment & Feasibility
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationIDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT
IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify
More informationTechnical Advisory Committee Meeting February 29, 2016
Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements
More informationINDEPENDENCE STATE AIRPORT (7S5)
INDEPENDENCE STATE AIRPORT (7S5) Airport Master Plan Update 2018 Planning Advisory Committee PAC Meeting #3 April 11, 2018 1994-2016 AGENDA The second PAC workshop will cover the following topics: Recap
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationEXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1
Workshop Briefing Package Airport Master Plan Update, Phase I Fort Lauderdale-Hollywood International Airport October 18, 2005 Leigh Fisher Associates A Division of Jacobs Consultancy Inc. EXECUTIVE SUMMARY
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationChapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update
Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside
More information