Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)

Size: px
Start display at page:

Download "Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)"

Transcription

1 BOBASIO/6 IP/02 The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/6) Eden Island, Seychelles, 2 nd November -4 th November Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT (Presented by Airports Authority of India) SUMMARY This paper presents the status of enhancement of airspace capacity through Collaborative airspace design and management. This paper relates to: Relevant Strategic Objectives: A: Safety Enhance global civil aviation safety B: Air Navigation Capacity and Efficiency Increase the capacity and improve the efficiency of the global aviation system C: Environmental Protection and Sustainable Development of Air Transport Foster harmonized and economically viable development of international civil aviation that does not unduly harm the environment Global Plan Initiatives: GPI-5 RNAV and RNP (Performance-based navigation) GPI-7 Dynamic and flexible ATS route management GPI-8 Collaborative airspace design and management 1. INTRODUCTION 1.1 Asia and Pacific region has been registering consistent growth in aviation in the past five years and all the industry projections indicate sustained growth in the coming years. To meet the demands of the aviation growth in the region India has taken notable initiatives for enhancing airspace capacity and route optimization within its airspace by providing efficient and environmentally sustainable air space management solutions DISCUSSION 2.1 In line with the ICAO recommendation for States to work cooperatively either through bilateral or multilateral agreements to ensure regional and sub-regional harmonization of en-route PBN implementation, in BOBASIO/5 India proposed to establish new ATS routes in Kolkata-Dhaka FIR, Northern Bay of Bengal and over Arabian Sea for capacity enhancement and route optimization. Page 1 of 5

2 2.2 In July, 2016 India had a bilateral meeting with Srilanka wherein it was agreed to establish a new unidirectional ATS route between Colombo and Trichy via ATETA. 2.3 The status of the proposals is annexed to this paper. 3. ACTION BY THE MEETING 3.1 The meeting is invited to: a) note the information contained in this paper; and b) discuss any relevant matters as appropriate.. Page 2 of 5

3 A) In Kolkata-Dhaka FIR Proposal to establish eight new ATS routes were made. Bangladesh has agreed to five proposals and the status is given below- 1) Proposal 2 - Uni-directional (EB) ATS Route - Kolkata-Barisal-Comilla-Lengpui. It is proposed to extend ATS Route A791 2) Proposal 3 - Uni-directional (EB) ATS Route - Guwahati-Sylhet-Agartala It is proposed to extend ATS route R472 3) Proposal 4 - Bi-directional ATS Route - Bagdogra Saidpur. New ATS Route designator request has been placed to ICAO-APAC 4) Proposal 5 - Jamshedpur-Durgapur-Rajsahi (Bidirectional) It is proposed to extend ATS Route B209 5) Proposal 8 - Bi-directional ATS Route - Katihar Saidpur Guwahati India Airforce has suggested the route to be realigned as Kathar VENAD ATOGA - Guwahati Under Process. Comments and concurrence of Bangladesh is requested. Page 3 of 5

4 B) In Mumbai-Sanaa-Mogadishu-Seychelles FIR PfA to BANP submitted to ICAO-APAC. ICAO APAC has intimated that they are in correspondence with the ICAO Middle East (MID) and East Africa (ESAF) Regional Offices in order to coordinate matters related to the Sanaa, Mogadishu and Seychelles FIRs. ICAO APAC has also proposed: a) that ATS route M507 ends at waypoint NABIL, there to join a proposed ATS route UT381. It should be noted that ATS route designators Q, T, Y and Z may only be used for area navigation routes which do not form part of the regional networks of ATS routes (i.e. may only be used for domestic routes). In terms of the regional networks of ATS routes, the current proposal would result in the ending of the route at NABIL, which may not be supported in the ANP. We will advise the outcomes of our consultation with the ICAO MID and ESAF offices. b) Mogadishu and Seychelles may care to consider extending N634 and P759 to overlay UG450 and UG424 respectively, in their FIRs. Page 4 of 5

5 C) BIMT Route Design over Bay of Bengal 1) ICAO - APAC has circulated the PfA to BANP 2) The Danger Areas of Bangladesh, VGD31/32/34 are within Kolkata FIR and are active for 19hrs per day throughout the year. They are in close proximity of L507 & P646. Considering the increase in hours of activity and proximity to high density International ATS Routes India has requested Bangladesh for a meeting at Kolkata or Dhaka to develop a Standard Operating Procedure and execute a Letter of Agreement between the controlling authorities of the Danger Areas and ATS unit responsible for providing Air Traffic Services in that airspace. Annex Coordination between military authorities and air traffic services Air traffic services authorities shall establish and maintain close cooperation with military authorities responsible for activities that may affect flights of civil aircraft Coordination of activities potentially hazardous to civil aircraft shall be effected in accordance with Coordination of activities potentially hazardous to civil aircraft The arrangements for activities potentially hazardous to civil aircraft, whether over the territory of a State or over the high seas, shall be coordinated with the appropriate air traffic services authorities. The coordination shall be effected early enough to permit timely promulgation of information regarding the activities in accordance with the provisions of Annex Recommendation. If the appropriate ATS authority is not that of the State where the organization planning the activities is located, initial coordination should be effected through the ATS authority responsible for the airspace over the State where the organization is located The objective of the coordination shall be to achieve the best arrangements which will avoid hazards to civil aircraft and minimize interference with the normal operations of such aircraft. 3) Planned from 08 th, December, Page 5 of 5

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. BOBASIO 3-WP/09 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda Item 7: Green Initiatives

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013 BOBASIO 3-WP/15 22-24//13 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 13 Agenda Item 4: BOBASIO Region Seamless

More information

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014. The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Upper

More information

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2) The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/6) Eden Island, Seychelles, 2 nd November -4 th November 2016. Agenda Item 6-ATM Coordination (ATM Contingency

More information

1.3 Thirteen (13) Working Papers (WPs) and Seven (7) Information Papers (IPs) were presented to the meeting

1.3 Thirteen (13) Working Papers (WPs) and Seven (7) Information Papers (IPs) were presented to the meeting The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea and n Ocean Region (/6) Eden Island, Seychelles, 2 nd November -4 th November 2016. Agenda Item 2-Review of progress on action Items of

More information

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Traffic

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Asia/Pacific Air Traffic Management Perspectives

Asia/Pacific Air Traffic Management Perspectives Asia/Pacific Air Traffic Management Perspectives Len Wicks Regional Officer, Air Traffic Management, International Civil Aviation Organization (ICAO) MID ATMSG/4, Amman, April 2018 Contents Asia/Pacific

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. BOBASIO 3-WP/10 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda 7: Green Initiatives

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

Information Paper 2 SUMMARY

Information Paper 2 SUMMARY COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

DRAFT REPORT THE 4TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/4)

DRAFT REPORT THE 4TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/4) DRAFT REPORT THE 4 TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING () 17-19 August 2016, Thailand ------------------------------------------------- Introduction 1 The Fourth Bangladesh

More information

The Combined ASIOACG INSPIRE Working Group Meeting

The Combined ASIOACG INSPIRE Working Group Meeting REPORT The Combined ASIOACG INSPIRE Working Group Meeting 29 th & 30 th May 2013 Dubai, UAE TABLE OF CONTENT Page History of the Meeting Introduction...1 Attendance...1 Officers and Secretariat...1 Opening

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018 MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018 Republic of Yemen Presented by YEMEN ATM SG/4, Amman, Jordan 29 April-3 May 2018 1 Presentation Outline ATS Routes improvements implemented

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Yoshiki Imawaka Deputy Director - ICAO Asia and Pacific Office Global Ministerial Conference Riyadh, Saudi Arabia, 29 31 August

More information

Civil/Military Cooperation Regulations in India

Civil/Military Cooperation Regulations in India Civil/Military Cooperation Regulations in India AIRSPACE AND ITS USE CIVIL USE: Commercial aircraft for transportation of passengers & Cargo Government owned aircraft for transportation Aircraft engaged

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014 The list of action items UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November Number Action Item Action Officer(s) Current Status Action Pending Target Date 1. Phased approach A04-02 Introduction

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Proposal for the updating of the FASID ATM Evolution Tables

Proposal for the updating of the FASID ATM Evolution Tables WP/24 22/09/03 International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions Sixth Meeting/workshop of Air Traffic Management

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING International Civil Aviation Organization FIT-Asia/5 WP/02 05-06/05/2016 The Fifth Meeting of the Future Air Navigation Systems Interoperability Team- Asia (FIT-Asia/5) Bangkok, Thailand, 05 06 May 2016

More information

Many Nations through Civil Aviation. China Civil Aviation Development Forum Beijing June 2015

Many Nations through Civil Aviation. China Civil Aviation Development Forum Beijing June 2015 Promote Opening and Cooperation Among Many Nations through Civil Aviation China Civil Aviation Development Forum Beijing 24 25 June 2015 Arun Mishra Regional Director, Asia and Pacific ICAO Regional Office

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE FOURTEENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT/15) Lisbon, Portugal, 19 to 20 May

More information

FIFTH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/5)

FIFTH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/5) FIFTH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/5) 19 September 2017, New Delhi, India ------------------------------------------------- Table of Contents Introduction... 2

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/19 WP16D INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP NINETEENTH MEETING (APIRG/19) (Dakar, Senegal (28 to 31 October 2013) Agenda Item 3 Performance Framework

More information

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010 ATM/AIS/SAR/SG/20 WP/20 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 6: Review

More information

REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015

REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015 REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015 AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT

More information

STATUS OF IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN INDIA

STATUS OF IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN INDIA STATUS OF IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN INDIA Presented by Airports Authority of India BOBASIO/6 Seychelles November 2016 Summary This paper provides information about India

More information

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris International Civil Aviation Organization EUR Civil/Military Cooperation Seminar/Workshop Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management Sven Halle ICAO- Paris Kyiv, Ukraine 28

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

NATIONAL SAR COORDINATION COMMITTEE MEETING. August 16 1

NATIONAL SAR COORDINATION COMMITTEE MEETING. August 16 1 NATIONAL SAR COORDINATION COMMITTEE MEETING August 16 1 PAKISTAN CIVIL AVIATION AUTHORITY PLAN ON AFGHANISTAN ATS CONTINGENCY 29 August, 2016 SEQUENCE Introduction ICAO APAC office initiatives Contingency

More information

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY CNS/ATM/SG/2-WP/28 11/10/10 International Civil Aviation Organization CAR/SAM Regional Planning Implementation Group (GREPECAS) Second Meeting of the Communications, Navigation and Surveillance / Air Traffic

More information

ICAO ASIA AND PACIFIC OFFICE

ICAO ASIA AND PACIFIC OFFICE ICAO ASIA AND PACIFIC OFFICE SUMMARY REPORT OF THE CIVIL/MILITARY COORDINATION SEMINAR BANGKOK, THAILAND, 14-17 December 2004 1. Introduction 1.1 Mr. Lalit B Shah, Regional Director of the ICAO Asia and

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES GEN 3.1-1 1. RESPONSIBLE SERVICE GEN 3. SERVICES GEN 3.1 - AERONAUTICAL INFORMATION SERVICES 1.1 The object of the aeronautical information service (AIS) is to ensure the flow of aeronautical data and

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE NPF/SIP/2010-WP/22 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10

More information

THE REPORT. The Combined ASIOACG 9 - INSPIRE 5 Meeting. 12 th TO 14 th November 2014 Dubai,UAE

THE REPORT. The Combined ASIOACG 9 - INSPIRE 5 Meeting. 12 th TO 14 th November 2014 Dubai,UAE THE REPORT The Combined ASIOACG 9 - INSPIRE 5 Meeting 12 th TO 14 th November 2014 Dubai,UAE COMBINED ASIOACG 9 INSPIRE 5 MEETING TABLE OF CONTENTS History of the Meeting Introduction Attendance Officers

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

BOBASIO/7. Preliminary RVSM Airspace Safety Assessment

BOBASIO/7. Preliminary RVSM Airspace Safety Assessment BOBASIO/7 Preliminary RVSM Airspace Safety Assessment Outline Background Data used in the analysis BOBASIO RVSM Airspace Risk Hotspot in Mumbai FIR TCPs along Kolkata-Chennai FIR and Yangon-Kuala Lumpur

More information

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY 20 th E/CAR DCA-IP/12 International Civil Aviation Organization 21/11/06 NORTH AMERICAN, CENTRAL AMERICAN AND CARIBBEAN OFFICE Twentieth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B NSS 2018 AUCKLAND NZ Part 2 1 2 3 4 5 Sydney Lord Howe Is and Norfolk Island (Oceanic) General aviation bottom antenna only at 10,000 feet 6 Data Services Agreement Summary NAV CANADA

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING International Civil Aviation Organization 18/8/08 WORKING PAPER SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING Durban, South Africa, 24 to 29 November 2008 Agenda Item 6: Development

More information

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3 Follow-up on the NAM/CAR Regional Performance-Based Air

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

ATM Contingency Plan for Male FIR, Maldives. (Presented by MALDIVES) SUMMARY

ATM Contingency Plan for Male FIR, Maldives. (Presented by MALDIVES) SUMMARY The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 7: ATM Contingency Plan for Male FIR, Maldives (Presented

More information

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM 30/05/2014 International Civil Aviation Organization MIDANPIRG ATM Sub-Group First Meeting (ATM SG/1) (Cairo, Egypt, 9-12 June 2014) Agenda Item 3: Global and Regional Developments related to ATM GLOBAL

More information

Future ATM - from Asian operator's point of view

Future ATM - from Asian operator's point of view Future ATM - from Asian operator's point of view Martin Eran-Tasker Technical Director Association of Asia Pacific Airlines EIWAC2013 Tokyo, Japan 19-21 February 2013 Overview Global mobility Asia Pacific

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

What is safety oversight?

What is safety oversight? What is safety oversight? ATM SAFETY MANAGEMENT SYSTEM AUDITORS SEMINAR FOR CAR/SAM REGIONS Mexico City, Mexico, 05-09 December 2005 ICAO Universal Safety Oversight Audit Programme /USOAP Safety oversight

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

Overview of ICAO APAC FPP

Overview of ICAO APAC FPP Overview of ICAO APAC FPP Mr. LIU Song, ICAO APAC FPP Manager January 2018 FPP History ICAO Asia-Pacific Flight Procedure Programme 3 FPP Objectives To assist States to develop sustainable capability

More information

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC) International Civil Aviation Organization 05/02/2017 Middle East Air Navigation Planning and Implementation Regional Group Sixteenth Meeting (MIDANPIRG/16) (Kuwait, 13 16 February 2017) Agenda Item 5.2.2:

More information

Sudan PBN Implementation Plan PBN SG/3

Sudan PBN Implementation Plan PBN SG/3 Sudan PBN Implementation Plan PBN SG/3 Cairo, Egypt, 11 13 February 2018 Outline Brief of the State of SUDAN s PBN Implementation Plan Status of Implementation Sudan ATS Surveillance System Sudan ATM System.

More information

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) APIRG/21 WP5/6 AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) Agenda Item 3: Performance Framework for Regional Air Navigation Planning

More information

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions AP/ATM/4 17/01/03 International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions Fourth Meeting/Workshop of Air Traffic Management

More information

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item

More information

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap The Information Paper of the China s PBN implementation roadmap Table of Contents News Briefs Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT AIP GEN.2- SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 7 GEN.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT. GENERAL. All flights into / from or over the territory of Sri Lanka and landing in such territory

More information

DISHA NOV CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure

DISHA NOV CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure DISHA -2013 NOV 25-26 2013 CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure Developing Tomorrows Aviation system Air Traffic growth expands two folds every fifteen years. Growth

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

Airspace Organization and Management

Airspace Organization and Management Airspace Organization and Management Asia and Pacific Regional Sub Office 2014 17 November 2014 Page 1 CONTENTS Concept of Flexible Use of Airspace (FUA) Flexible and adaptable airspace structure Conditional

More information

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MID FLIGHT PROCEDURE PROGRAMME

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MID FLIGHT PROCEDURE PROGRAMME International Civil Aviation Organization PBN SG/1-WP/10 29/03/2014 Performance Based Navigation Sub-Group (PBN SG) First Meeting (Cairo, Egypt, 1 3 April 2014) Agenda Item 4: PBN Implementation in the

More information

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY 21/10/15 Twenty-sixth Directors of Civil Aviation of the Eastern Caribbean Meeting (E/CAR/DCA/26) New Orleans, United States, 1-3 December 2015 Agenda Item 6: Air Navigation Matters 6.1 GREPECAS Update

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

REPORTS FROM REGIONS

REPORTS FROM REGIONS REPORTS FROM REGIONS CIVIL/MILITARY COORDINATION IN THE MIDDLE EAST (MID) REGION Presented by Mohamed R.M. Khonji Regional Director ICAO Middle East (MID) Office Body of Presentation: The FIRS. Military

More information

Global Operational Data Link Doc 10037

Global Operational Data Link Doc 10037 Global Operational Data Link Doc 10037 Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017 Prepared

More information

The list of ASIOACG/INSPIRE action items. Updated in ASIOACG/12 INSPIRE/8, New Delhi, India 20 th & 21 st September 2017

The list of ASIOACG/INSPIRE action items. Updated in ASIOACG/12 INSPIRE/8, New Delhi, India 20 th & 21 st September 2017 The list of ASIOACG/INSPIRE action items Updated in ASIOACG/12 INSPIRE/8, New Delhi, India 20 th & 21 st September 2017 List of Action Items as on ASIOACG10 INSPIRE6 meeting Number Action Item Action Officer(s)

More information

Discussion Paper 3/6: Global and Regional Initiatives Related to the Provision of Meteorological Service for International Air Navigation

Discussion Paper 3/6: Global and Regional Initiatives Related to the Provision of Meteorological Service for International Air Navigation : Global and Regional Initiatives Related to the Provision of Meteorological Service for International Air Navigation 50 th Conference of Directors General of Civil Aviation Asia and Pacific Regions Bangkok,

More information

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES International Civil Aviation Organization Thirteenth Meeting of the APANPIRG ATS/AIS/SAR Sub-Group (ATS/AIS/SAR/SG/13) Bangkok, Thailand, 23-27 June 2003 ATS/AIS/SAR/SG/13 WP/30 23/6/03 Agenda Item 4:

More information

Asia/Pacific Region A-CDM Planning

Asia/Pacific Region A-CDM Planning Asia/Pacific Region A-CDM Planning Shane Sumner Regional Officer Air Traffic Management,/Aeronautical Information Management ICAO Asia/Pacific Regional Office (Bangkok) ICAO Airport CDM Seminar Kunming,

More information

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo

More information

Presented by: Trinidad and Tobago

Presented by: Trinidad and Tobago Presented by: Trinidad and Tobago November 2013 References ICAO PBN toolkit ICAO Global Air Navigation Plan (Doc 9750) ICAO PBN Manual (Doc 9613) Piarco FIR PBN Action Plan TTCAA PBN Core Implementation

More information

Montreal, 15. (Presented SUMMARY

Montreal, 15. (Presented SUMMARY DGP-WG/2011-IP/4 18/10/12 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, 15 to 19 October 2012 Agenda Item 6: Other business REGULATORY FRAMEWORK FOR REMOTELY PILOTED AIRCRAFT

More information

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September 2014 Ken Mclean Director SFO IATA Singapore mcleank@iata.org APAC Growth Outline Current Situation Airlines and ATFM Air Traffic Flow

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization

More information

LEGAL FRAMEWORK OF AIR NAVIGATION SAFETY

LEGAL FRAMEWORK OF AIR NAVIGATION SAFETY LEGAL FRAMEWORK OF AIR NAVIGATION SAFETY Mr. Benoît Verhaegen Senior External Relations and Legal Officer, ICAO ICAO Legal Seminar Incheon, 24-25 May 2018 1 Outline 1. The Chicago Conference, 1944 2. The

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

ATFM/CDM ICAO s Perspective

ATFM/CDM ICAO s Perspective ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information