BOBASIO/7. Preliminary RVSM Airspace Safety Assessment

Size: px
Start display at page:

Download "BOBASIO/7. Preliminary RVSM Airspace Safety Assessment"

Transcription

1 BOBASIO/7 Preliminary RVSM Airspace Safety Assessment

2 Outline Background Data used in the analysis BOBASIO RVSM Airspace Risk Hotspot in Mumbai FIR TCPs along Kolkata-Chennai FIR and Yangon-Kuala Lumpur FIR 2

3 1. Background 3

4 Risk Risk : risk is expected number of accident per flight hour Risk of 5 x 10-9 means that there are 5 accidents in a thousand million flight hours. The x 10-9 means in a thousand million flight hours To bring a thousand million flight hours into perspective. Let s compare it with 2016 annual BOB flight hours which is approximately 2.87 million hours. Risk of 5x 10-9 means that there are approximately 5 accidents in a thousand million flight hours (not taking into account the effect of TCAS). This means in BOB there are roughly 5 accidents in 350 years. Target Level of Safety (TLS) - acceptable risk level. TLS is 5 x

5 Risk Technical Risk Normal Case Risk : risk when there is no operational error (all agreement, procedures, separation, are followed correctly) Factors influencing technical risk : traffic pattern in a given airspace structure (FLAS/FLOS) etc. Operational Risk Failure Case Risk : risk when there is an error (LHDs) Ex. ATC forgets to transfer A/C, transfer with wrong level Factor influencing operational risk : duration of LHD (main driver), traffic pattern in a given airspace structure (FLAS/FLOS) etc. 5

6 LHD Categories LHD Category A Flight crew fails to climb or descend the aircraft as cleared B Flight crew climbing or descending without ATC clearance C Incorrect operation or interpretation of airborne equipment D ATC system loop error E ATC transfer of control coordination errors due to human factors F ATC transfer of control coordination errors due to technical issues 6

7 LHD Categories LHD Category G Aircraft contingency leading to sudden inability to maintain level H Airborne equipment failure and unintentional or undetected level change I Turbulence or other weather related cause J TCAS resolution advisory and flight crew correctly responds K TCAS resolution advisory and flight crew incorrectly responds L Non-approved aircraft is provided with RVSM separation M Other 7

8 LHDs Not all LHDs creates risk (based on the current assumptions and application of the Collision Risk Model). Risk-bearing LHD - LHD whose risk is not zero Non risk-bearing LHD - LHD whose risk is zero For each report submitted to the MAAR, The MAAR analyzes to see if the LHD is risk-bearing. The MAAR removes duplicate reports, if any. Unless specified otherwise, the number of LHDs in this presentation refers to number of risk-bearing LHDs. 8

9 2. Data used in the analysis 9

10 Data used in the analysis Scope - This analysis covers the first 6 months of 2017 (Jan-June 2017) Traffic sample data (TSD) 2016 TSD was used to approximate 2017 TSD. In the analysis, TSD was used to derive many parameters including occupancy, average aircraft dimension, annual flight hours etc. Typically, these parameters, except annual flight hours, do not change significantly over years. Large Height Deviation (LHD) Reports LHDs occurring during Jan-June 2017 LHD data is a major driver of operational and total risk 10

11 Data used in the analysis Typically, annual risk is calculated at the end of the year by using LHD data collected over the period of 12 months and annual flight hours. In this interim analysis, we used LHDs data collected over the period of 6 months and annual flight hours. In this analysis, there are comparisons in term of number of LHD reports between LHDs data in Jan-Jun 2016 and Jan-Jun Please note that since the introduction of the online LHD reporting system in Oct 2016, the MAAR has observed an increasing trend of number of reports received in both BOBASIO region and other regions. This is a factor to keep in mind when comparing number of reports from the two periods. 11

12 3. BOBASIO Airspace Risk 12

13 Risk BOBASIO (Jan - Jun 2017) Source of Risk 2016 (Jan- Jun) 2017 Annual Target Level of (Jan - Jun) Safety (TLS) Technical Risk* 0.87x x 10-9 Operational Risk 9.94x x 10-9 Total Risk 10.81x x 10-9 *Use 2016 TSD to approximate 2017 TSD. 2.5x x

14 By month 14

15 Risk Total and operational risks in the first 6 months of 2017 exceed the annual target levels of safety. Both total and operational risks increased 50% from the risks of the same period last year 98% of risk was caused by cat E LHD (breakdown in ATC-ATC transfer of control due to human factors) 15

16 Risk of each LHD The chart depicts operational risk. Each block represents each LHD event and the height of each block represents risk associated with each event. There are 448 LHDs but only 121 LHDs caused risk.total operational risk is x 10-9 Risk in BOBASIO in the first 6 months of 2017 was dominated by a few long duration occurrences. There were 5 LHDs whose duration exceeded 30 mins and 6 LHDs whose duration was between 20 to 30 mins. 16

17 Risk location 17

18 3. Hotspot Western Boundary of Mumbai 18

19 Risk location 19

20 Risk Western Boundary of Mumbai (Jan - Jun 2017) Source of Risk 2016 (Jan- Jun) 2017 Annual Target Level of (Jan - Jun) Safety (TLS) Technical Risk* 0.87x x 10-9 Operational Risk 4.96x x 10-9 Total Risk 5.83x x 10-9 *Use 2016 TSD to approximate 2017 TSD. 2.5x x

21 Hotspot : Western boundary of Mumbai FIR 79% of operational risk in the first 6 months of 2017 rose from LHDs along western boundary of Mumbai FIR. Most LHDs in this region are category E LHDs All risk presented in this section is accident per [BOBASIO] flight hours 21

22 Mumbai Boundary : Operational Risk The chart depicts operational risk. Each block represents each LHD occurrence and the height of each block represents risk associated with each occurrence. There are 48 LHDs which result in the operational risk of 11.60x 10-9 Out of 48 LHDs, there were 4 LHDs whose duration exceeds 30 mins, and these 4 LHD accounts for the risk of 4.29x 10-9 or 36.98% of total operation risk in Mumbai FIR 22

23 Analysis of 4 Long Duration LHDs (>30 mins) 4 Cat E LHDs LHD Category ATS Unit originating the error 3 Muscat 2 Negative Transfer 1 Sana 1 Incorrect FL Nature of LHDs 1 Incorrect Route 23

24 Breakdown of Risk by Interface 24

25 Breakdown of LHDs by Interfaces Interface 2016* 2017* Muscat - Mumbai Number of reports received : 9 Number of risk-bearing LHD : 4 Risk : 2.33 x 10-9 *Number of reports received : 76 Number of risk-bearing LHD : 36 Risk : 8.85 x 10-9 Sana - Mumbai Number of reports received : 7 Number of risk-bearing LHD : 1 Risk : 1.03 x 10-9 Number of reports received : 7 Number of risk-bearing LHD : 3 Risk : 1.38 x 10-9 Mogadishu -Mumbai Number of reports received : 8 Number of risk-bearing LHD : 3 Risk : 1.68 x 10-9 Number of reports received : 16 Number of risk-bearing LHD : 8 Risk : 1.16 x 10-9 *The first 6 months of 2016 and 2017 ** Regarding the increase in number of reports along Mumbai-Muscat boundary, the MAAR has observed the increasing trend since Aug of

26 LHDs along Muscat-Mumbai Interface *Only Jan-Jun of that year 26

27 LHDs along Sana-Mumbai Interface *Only Jan-Jun of that year 27

28 LHDs along Mogadishu-Mumbai Interface *Only Jan-Jun of that year 28

29 Contributing Factors Poor surveillance Poor communication 29

30 Recent Developments A meeting between Oman and Mumbai held in June 2017 to address LHD problems Install direct lines between the two units for communication Plan to install and connect OLDI and AIDC to facilitate transfer of control and reduce error Consider sharing surveillance data between Muscat and Mumbai Monthly coordination meeting 30

31 4. TCPs along Kolkata-Chennai FIR and Yangon-Kuala Lumpur FIR 31

32 Risk TCPs along Kolkata-Chennai FIR and Yangon-Kuala Lumpur FIR Source of Risk 2016 (Jan- Jun) 2017 Annual Target Level of (Jan - Jun) Safety (TLS) Technical Risk* 0.87x x 10-9 Operational Risk 2.23x x 10-9 Total Risk 3.10x x 10-9 *Use 2016 TSD to approximate 2017 TSD. 2.5x x

33 LHDs Higher risk in 2016 was the result of three moderate duration LHDs in the first 6 months of 2016 (10 mins, 10 mins, 26 mins). *Only Jan-Jun of that year 33

34 Corner near Yangon, Dhaka, Kolkata Waypoints - APAGO, AVLED, CHILA, ANSOS, TEBOV Year Number of LHD reported Total LHD duration 14 mins 27.5 mins 34

35 Recent Developments BIMT/4 - August 2016 India, Myanmar and Bangladesh agreed on coordination procedures designed to reduce coordination error India, Myanmar and Bangladesh agreed to initiate the process for surveillance data sharing and report the progress to BIMT/5 Regarding LHD coordination between States, Bangladesh, India and Myanmar agreed to initiate contact within 3 days from the date of occurrence, and the contracted unit to respond within 7 days 35

36 Recent Developments BIMT/4 - August 2016 (cont d) Bangladesh, India and Myanmar also agreed to hold periodic teleconference to discuss LHD occurrences and mitigation issues. According to information obtained from States, it was proposed that, in the first phase, bilateral teleconferences between Kolkata ACC and Dhaka ACC should be conducted ATS Interfacility Data Communication (AIDC) between Kolkata ACC and Yangon ACC will be implemented in the fourth quarter of

37 Recent Developments AIDC between Yangon ACC and Chennai ACC will be implemented in the fourth quarter of 2017 [Info updated in June 2017 ] - Standard operating procedures for AIDC messages exchange between the Chennai ACC and Kuala Lumpur ACC was effective in May 2017, and the phased AIDC implementation would follow. Coordination would be carried out by voice at least until August 2017, when the exchange of CDN message via AIDC on a trial basis would be reviewed 37

38 Contact Us Monitoring Agency for Asia Region (MAAR) Website : Phone : maar@aerothai.co.th 38

Agenda. What is a Large Height Deviation (LHD)? Why is it important to report LHDs? Understanding LHDs. LHD Reporting Category E LHDs

Agenda. What is a Large Height Deviation (LHD)? Why is it important to report LHDs? Understanding LHDs. LHD Reporting Category E LHDs Agenda What is a Large Height Deviation (LHD)? Why is it important to report LHDs? Understanding LHDs Taxonomy Examples LHD FAQs LHD Reporting Category E LHDs What is a Large Height Deviation (LHD)? Formal

More information

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016 International Civil Aviation Organization Seventeenth meeting of the GREPECAS Scrutiny Working Group (GTE/17) Lima, Peru, 30 October to 03 November 2017 GTE/17-WP/07 23/10/17 Agenda Item 4: Large Height

More information

1 st Bangladesh India Myanmar Thailand ATM Coordination Meeting (BIMT/1) August 2014 ICAO Asia-Pacific Regional Office Bangkok, Thailand

1 st Bangladesh India Myanmar Thailand ATM Coordination Meeting (BIMT/1) August 2014 ICAO Asia-Pacific Regional Office Bangkok, Thailand 1 st Bangladesh India Myanmar Thailand ATM Coordination Meeting (BIMT/1) 18 19 August 2014 ICAO Asia-Pacific Regional Office Bangkok, Thailand Presentations & Documents :

More information

International Civil Aviation Organization CHINA RMA REPORT. (Presented by the China RMA) SUMMARY

International Civil Aviation Organization CHINA RMA REPORT. (Presented by the China RMA) SUMMARY International Civil Aviation Organization RASMAG/17 WP15 28-31/8/2012 The 17 th Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/17) Bangkok, Thailand, 28 31 August 2012 Agenda

More information

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima Manual on Monitoring the Application of Performance-based Horizontal Separation Minima (PBHSM Manual) Presented to: 2 nd NAT PBCS Workshop By: Christine Falk Date: 17-19 June 2015 Overview Why a PBHSM

More information

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) 22/04/2018 International Civil Aviation Organization MIDANPIRG Air Traffic Management Sub-Group Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) Agenda Item 6: ATM Safety Matters MID RVSM

More information

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers ARMA forms for use in obtaining information from a State authorities and/or Service Providers NOTES TO AID COMPLETION OF ARMA FORMS 1. Please read these notes before attempting to complete forms for the

More information

1.3 Thirteen (13) Working Papers (WPs) and Seven (7) Information Papers (IPs) were presented to the meeting

1.3 Thirteen (13) Working Papers (WPs) and Seven (7) Information Papers (IPs) were presented to the meeting The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea and n Ocean Region (/6) Eden Island, Seychelles, 2 nd November -4 th November 2016. Agenda Item 2-Review of progress on action Items of

More information

Challenges in the Airspace Safety Monitoring

Challenges in the Airspace Safety Monitoring Challenges in the Airspace Safety Monitoring Antar Bandyopadhyay (Based on joint project with BOBASMA, AAI & ISI) Theoretical Statistics and Mathematics Unit Indian Statistical Institute, New Delhi and

More information

34th ATS/Airline Safety Forum Health Check. Simon McDonald Safety Assurance

34th ATS/Airline Safety Forum Health Check. Simon McDonald Safety Assurance 34th ATS/Airline Safety Forum Health Check Simon McDonald Safety Assurance The Health Check May 2016 April 2017 Includes scheduled, non-scheduled and military operations Review of Airservices and pilot

More information

DIRECTORATE OF AIR TRAFFIC MANAGEMENT. RAJIV GANDHI BHAWAN, NEW DELHI [File No. AAI/ATM/SQMS/31-16/2016] ATMC

DIRECTORATE OF AIR TRAFFIC MANAGEMENT. RAJIV GANDHI BHAWAN, NEW DELHI [File No. AAI/ATM/SQMS/31-16/2016] ATMC DIRECTORATE OF AIR TRAFFIC MANAGEMENT RAJIV GANDHI BHAWAN, NEW DELHI-110003 [File No. AAI/ATM/SQMS/31-16/2016] Doc. Id: ED/ATM/2016/311603/ATMC/SAFE ATMC Air Traffic Management Circular No. 03 of 2016

More information

NETWORK MANAGER - SISG SAFETY STUDY

NETWORK MANAGER - SISG SAFETY STUDY NETWORK MANAGER - SISG SAFETY STUDY "Runway Incursion Serious Incidents & Accidents - SAFMAP analysis of - data sample" Edition Number Edition Validity Date :. : APRIL 7 Runway Incursion Serious Incidents

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

DRAFT REPORT THE 4TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/4)

DRAFT REPORT THE 4TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING (BIMT/4) DRAFT REPORT THE 4 TH BANGLADESH INDIA MYANMAR THAILAND ATM COORDINATION GROUP MEETING () 17-19 August 2016, Thailand ------------------------------------------------- Introduction 1 The Fourth Bangladesh

More information

Agenda Item 5: Airspace Safety Monitoring Activities/Requirements in the Asia/Pacific Region

Agenda Item 5: Airspace Safety Monitoring Activities/Requirements in the Asia/Pacific Region International Civil Aviation Organization The Twenty-First Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/21) Bangkok, Thailand, 14-17 June 2016 Agenda Item 5: Airspace Safety

More information

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014. The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Upper

More information

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers

AFI REGIONAL MONITORING AGENCY (ARMA) ARMA forms for use in obtaining information from a State authorities and/or Service Providers ARMA forms for use in obtaining information from a State authorities and/or Service Providers NOTES TO AID COMPLETION OF ARMA FORMS 1. Please read these notes before attempting to complete forms for the

More information

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY (DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI

More information

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review

Traffic flow in oceanic airspace of Mumbai FIR, evaluation of FLAS and its Review The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Traffic

More information

Safety Brief. 21st March Operations in Somali Airspace

Safety Brief. 21st March Operations in Somali Airspace Safety Brief 21st March 2017 Operations in Somali Airspace Background IATA is aware of safety reports detailing various high risk events related to operations within the Mogadishu (Somalia) FIR (HCSM).

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013 BOBASIO 3-WP/15 22-24//13 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 13 Agenda Item 4: BOBASIO Region Seamless

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

RLatSM. Reduced Lateral Separation Trial. FAQs. 4 September 15

RLatSM. Reduced Lateral Separation Trial. FAQs. 4 September 15 RLatSM Reduced Lateral Separation Trial FAQs 4 September 15 Purpose of this presentation: To give you access to answers to commonly asked questions relating to the Reduced Lateral Separation Trial (RLAT).

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC)

AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC) SAFETY IMPROVEMENTS FROM ANS IMPLEMENTATION AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC) Mayda Ávila CNS Regional Officer RASG-PA ESC/29 Meeting ICAO NACC Regional Office, Mexico

More information

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016) AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, 18 21 April 2016) CONTENTS BACKGROUND SAT FANS 1/A INTEROPERABILITY TEAM FANS

More information

NM Top 5 Safety Priorities. Tzvetomir BLAJEV

NM Top 5 Safety Priorities. Tzvetomir BLAJEV NM Top 5 Safety Priorities Tzvetomir BLAJEV A Serious Incident Analysis A conditional clearance Behind next landing short final, line up 07 behind. Correct readback. No reference that A321 to take-off

More information

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL INFORMATION CIRCULAR 33/17 NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL

More information

Using PBN for Terminal and Extended Terminal Operations

Using PBN for Terminal and Extended Terminal Operations Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data

More information

ATM Collaboration & Data Sharing

ATM Collaboration & Data Sharing ATM Collaboration & Data Sharing ATFM Steering Group 1 Tokyo, Japan 8-10 December 2010 Piyawut Tantimekabut (Toon) Executive Officer, Systems Engineering Airspace Management Centre AEROTHAI 1 Pre-2005

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE REPORT OF THE TWENTIETH MEETING OF THE ICAO REDUCED VERTICAL SEPARATION MINIMUM IMPLEMENTATION TASK FORCE (RVSM/TF/20) NEW DELHI, INDIA

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010 ATM/AIS/SAR/SG/20 WP/20 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 6: Review

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123 INTRODUCTION The procedures for and VFR are mostly identical but some words and procedures are generally only used by large commercial aircraft; hence they appear in this section. In this chapter we will

More information

AIRCRAFT INCIDENT REPORT

AIRCRAFT INCIDENT REPORT AIRCRAFT INCIDENT REPORT (cf. Aircraft Accident Investigation Act, No. 35/2004) M-04303/AIG-26 OY-RCA / N46PW BAe-146 / Piper PA46T 63 N, 028 W 1 August 2003 This investigation was carried out in accordance

More information

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

The NAT OPS Bulletin Checklist is available at  & NAT Documents, NAT Documents, then NAT Ops Bulletins. Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance

More information

Notice of Requirement

Notice of Requirement Notice of Requirement NTC 91.258 Automatic Dependent Surveillance- Broadcast (ADS-B) systems Revision 1 20 July 2018 Preliminary The Director of Civil Aviation issues the following requirements ( the requirements

More information

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Acknowledgments Sherry Borener, FAA Alan Durston, Brian Hjelle, Saab Sensis Seungwon

More information

North Atlantic Initiatives

North Atlantic Initiatives North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives

More information

The Fifteenth Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/15)

The Fifteenth Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/15) RASMAG/15 WP/14 01-05/08/2011 International Civil Aviation Organization The Fifteenth Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/15) Bangkok, Thailand, 1-5 August 2011 Agenda

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015

REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015 REPORT ON THE FIFTH ATS COORDINATION MEETING OF THE BAY OF BENGAL, ARABIAN SEA AND INDIAN OCEAN BOBASIO/5 31 ST AUGUST-2 ND SEPTEMBER 2015 AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT

More information

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2 Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)

More information

OPERATIONS MANUAL PART A

OPERATIONS MANUAL PART A PAGE: 1 Table of Contents A.GENERAL /CHAPTER 32. -...3 32. OF THE AIRBORNE COLLISION AVOIDANCE... 3 32.1 ACAS Training Requirements... 3 32.2 Policy and Procedures for the use of ACAS or TCAS (as applicable)...

More information

Calendar 2017 Q1 Runway Safety Report

Calendar 2017 Q1 Runway Safety Report Calendar 217 Q1 Runway Safety Report Reporting Period 1 Apr 214-31 Mar 217 Prepared by Operational Analysis Table of Contents Page Runway Incursions Dashboard................... 2 Total by Classification

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

Development of the Safety Case for LPV at Monastir

Development of the Safety Case for LPV at Monastir Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final

More information

Sector Complexity and safety. Dr. Arnab Majumdar 26 OCTOBER, 2006

Sector Complexity and safety. Dr. Arnab Majumdar 26 OCTOBER, 2006 Sector Complexity and safety Dr. Arnab Majumdar 26 OCTOBER, 2006 Plan Motivation Previous studies Controller interview methodology Tokyo ACC example Taxonomy Ratings Interactions Further research Why a

More information

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010 ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any

More information

Implementation of the new CNS/ATM systems in the region

Implementation of the new CNS/ATM systems in the region SEACG/12 WP/9 03/05/05 International Civil Aviation Organization The Twelfth Meeting of the South East Asia ATS Coordination Group (SEACG/12) Bangkok, Thailand, 3 6 May 2005 Agenda Item 5: Implementation

More information

Runway Safety Programme Global Runway Safety Action Plan

Runway Safety Programme Global Runway Safety Action Plan Runway Safety Programme Global Runway Safety Action Plan Brian DeCouto ICAO Air Navigation Bureau Implementation Support Officer - Safety 2 nd Global Runway Safety Symposium Lima, Peru, 20-22 November

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

Data link Implementation in Singapore FIR Kwek Chin Lin

Data link Implementation in Singapore FIR Kwek Chin Lin Data link Implementation in Singapore FIR Kwek Chin Lin Operational Data Link Seminar 2-4 May 2016 Scope Brief introduction to CAAS and Singapore FIR LORADS III ATM system History of data link in Singapore

More information

Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)

Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India) BOBASIO/6 IP/02 The Sixth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/6) Eden Island, Seychelles, 2 nd November -4 th November 2016. Agenda Item 6-ATM Coordination

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

North Atlantic Central Monitoring Agency David Nicholas 16 th May 2016

North Atlantic Central Monitoring Agency David Nicholas 16 th May 2016 North Atlantic Central Monitoring Agency David Nicholas 16 th May 2016 Background North Atlantic Region What we do and how it evolved In the beginning (i.e. in preparation for the introduction of RVSM

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

OPERATIONAL SAFETY STUDY

OPERATIONAL SAFETY STUDY OPERATIONAL SAFETY STUDY MAC TMA & CTR Incidents in Europe Edition No : 1.0 Edition Validity Date : 11.10.2018 MAC TMA & CTR Incidents in Europe Safety Functions Maps Analysis 2014 2016 data sample Edition

More information

SUMMARY. of the North. Reference: A B

SUMMARY. of the North. Reference: A B International Civil Aviation Organization South American Regional Office 10/ /10/17 Twentieth Workshop/Meeting of the SAM Implementation Group (SAM/IG/20) - Regional Project RLA/06/901 (Lima, Peru, 16

More information

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G)

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G) AIRPROX REPORT No 2013123 Date/Time: 27 Aug 2013 1452Z Position: 5225N 00122W (5nm NE Coventry Airport) Airspace: London FIR (Class: G) Reporting Ac Type: ATP C172 Reported Ac Operator: CAT Civ Pte Alt/FL:

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

CASCADE OPERATIONAL FOCUS GROUP (OFG)

CASCADE OPERATIONAL FOCUS GROUP (OFG) CASCADE OPERATIONAL FOCUS GROUP (OFG) Use of ADS-B for Enhanced Traffic Situational Awareness by Flight Crew During Flight Operations Airborne Surveillance (ATSA-AIRB) 1. INTRODUCTION TO ATSA-AIRB In today

More information

NOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE

NOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE Publication Information. The FAA Notice below will be published in the 11 December 2014 edition of FAA Notices To Airmen, Domestic/International. It will be located in Part 3, Section 2 (International

More information

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09

More information

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014 The list of action items UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November Number Action Item Action Officer(s) Current Status Action Pending Target Date 1. Phased approach A04-02 Introduction

More information

Excerpt from AIP CHINA published by CAAC version (EFF ) ENR L888, Y1, Y2

Excerpt from AIP CHINA published by CAAC version (EFF ) ENR L888, Y1, Y2 ENR 3.3.2.4 L888, Y1, Y2 L888, Y1, Y2 1. Introduction 1.1 These rules describe the airspace within which data-link- based ATS will be available, and prescribe procedures for data- link service. 2. Background

More information

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE HINDSIGHT SITUATIONAL EXAMPLE Fixed wing or helicopter? Editorial note: Situational examples are based on the experience of the authors and do not represent either a particular historical event or a full

More information

NBAA IOC Oceanic Operations

NBAA IOC Oceanic Operations Oceanic Operations By: David Maloy, Operations AEA-220 NEXTGen Branch Date: So This Is Why They Paint A Centerline 2 NAT/HLA 27 o N 17 o N 3 Question 1 Approximately how many times a year does your company

More information

EUROCONTROL AVAL Project. AVAL Phase 1 findings (presented by Thierry Arino)

EUROCONTROL AVAL Project. AVAL Phase 1 findings (presented by Thierry Arino) EUROCONTROL AVAL Project AVAL Phase 1 findings (presented by Thierry Arino) Slide 1 Presentation content Introduction Safety benefits of ACAS VLJs and LJs below 5,700 kg: what are they? What are the safety

More information

TCAS Pilot training issues

TCAS Pilot training issues November 2011 TCAS Pilot training issues This Briefing Leaflet is based in the main on the ACAS bulletin issued by Eurocontrol in February of 2011. This Bulletin focuses on pilot training, featuring a

More information

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

CIVIL AVIATION PUBLICATION CAP 10 CPDLC CAP 10 CPDLC INDEX This Page Intentionally Left Blank CAP 10 CPDLC INDEX Section Title Page No. 1. INTRODUCTION... 1 1.1 General... 1 1.2 Applicability... 1 1.3 Terminology... 1 1.4 References... 2 2.

More information

Separation Methods and Minima

Separation Methods and Minima Section 6 Chapter 1 Separation Methods and Minima General 1 Introduction 1.1 This chapter contains procedures and procedural separation minima for use in the separation of aircraft in the en route phase

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.1 of 12 Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.2 of 12

More information

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended

More information

REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES

REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES TABLE OF CONTENTS 1. STRATEGIC PHASE 2. PRETACTICAL PHASE 3. TACTICAL PHASE 4. AIR TRAFFIC FLOW MANAGEMENT PROCEDURES 5. AIR TRAFFIC CONTROL PROCEDURES

More information

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows) TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

LETTER OF AGREEMENT. between. and

LETTER OF AGREEMENT. between. and LETTER OF AGREEMENT between and Effective: 15 th June 2017 Version: 0.1 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the co-ordination procedures to be applied between

More information

Safety Enhancement 186R3.2 TCAS-Sensitivity Level Command

Safety Enhancement 186R3.2 TCAS-Sensitivity Level Command Safety Enhancement Action: Statement of Work: Total Relation to Current Aviation Community Initiatives: Performance Goal Indicators: Key Milestones: Safety Enhancement 186R3.2 TCAS-Sensitivity Level Command

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

March 2016 Safety Meeting

March 2016 Safety Meeting March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

EUR/SAM corridor airspace concept

EUR/SAM corridor airspace concept TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

AFI RVSM POST-IMPLEMENTATION SAFETY CASE FHA REVIEW FINAL REPORT

AFI RVSM POST-IMPLEMENTATION SAFETY CASE FHA REVIEW FINAL REPORT AFI RVSM POST-IMPLEMENTATION SAFETY CASE FHA REVIEW FINAL REPORT Document à l'attention de : Immeuble SYNAPSE Parc Centreda 4, Avenue Didier Daurat 31700 Blagnac, France Tél. : 05 34 610 400 Télécopie

More information

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary Annex/FANS 17 ADS/CPDLC Report EUR/SAM Corridor: 2017 Systems Direction Navigation and Surveillance Division Index 2. Traffic Data Summary 3. Airlines Aircraft types 4. CRM 2017 results 5. Conclusions

More information

Briefing Leaflet. Recommended Procedures in the AFI Region 1. EXCERPT FROM THE IATA IN-FLIGHT BROADCAST PROCEDURE (IFBP): 17ATSBL07 07 July 2017

Briefing Leaflet. Recommended Procedures in the AFI Region 1. EXCERPT FROM THE IATA IN-FLIGHT BROADCAST PROCEDURE (IFBP): 17ATSBL07 07 July 2017 17ATSBL07 07 July 2017 Recommended Procedures in the AFI Region This has been developed as a general reminder of the procedures highly recommended for operating in the AFI Region. These procedures are

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION. AFRICA - INDIAN OCEAN REGION REDUCED VERTICAL SEPARATION MINIMUM SEMINAR: (LAGOS, July 2004)

INTERNATIONAL CIVIL AVIATION ORGANIZATION. AFRICA - INDIAN OCEAN REGION REDUCED VERTICAL SEPARATION MINIMUM SEMINAR: (LAGOS, July 2004) Attachment A: INTERNATIONAL CIVIL AVIATION ORGANIZATION AFRICA - INDIAN OCEAN REGION REDUCED VERTICAL SEPARATION MINIMUM SEMINAR: (LAGOS, 26-28 July 2004) PROGRAMME Monday, 26 July 2004 0830-1000 Registration

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE REPORT OF THE TWENTY-FIRST MEETING OF THE ICAO REDUCED VERTICAL SEPARATION MINIMUM IMPLEMENTATION TASK FORCE (RVSM/TF/21) BANGKOK, THAILAND

More information

SAT/FIT/11 South American Office Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11

SAT/FIT/11 South American Office Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11 International Civil Aviation Organization SAT/FIT/11 South American Office WP/06 Eleventh Meeting of FANS 1/A Interoperability Team SAT/FIT/11 Agenda item 4: System performance monitoring and maintenance.

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 2011 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT JULY - SEPTEMBER 211 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013

NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 2013 NOISE AND FLIGHT PATH MONITORING SYSTEM BRISBANE QUARTERLY REPORT OCTOBER - DECEMBER 213 Date Version Comments Page 2 Foreword Airservices Australia has established a Noise and Flight Path Monitoring System

More information

Federal Aviation Administration Early Implementation Experiences

Federal Aviation Administration Early Implementation Experiences Early Implementation Experiences Presented by: Don Walker Presented to: Aircraft Electronics Association Date: February 2011 Outline 1 Errors Seen In Early Implementations 1.1 Software related 1.2 GPS

More information

Air Carrier E-surance (ACE) Design of Insurance for Airline EC-261 Claims

Air Carrier E-surance (ACE) Design of Insurance for Airline EC-261 Claims Air Carrier E-surance (ACE) Design of Insurance for Airline EC-261 Claims May 06, 2016 Tommy Hertz Chris Saleh Taylor Scholz Arushi Verma Outline Background Problem Statement Related Work and Methodology

More information

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland

More information