FILE COPY FOR OFFICIAL USE ONLY. Public Disclosure Authorized. Report No ECT Appraisal of the Alexandria Water Supply Project Egypt

Size: px
Start display at page:

Download "FILE COPY FOR OFFICIAL USE ONLY. Public Disclosure Authorized. Report No ECT Appraisal of the Alexandria Water Supply Project Egypt"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No ECT Appraisal of the Alexandria Water Supply Project Egypt February 8, 1977 Water Supply and Sewerage Division Europe, Middle East and North Africa Regional Office FOR OFFICIAL USE ONLY U Document of the World Bank FILE COPY This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 APPRAISAL OF THE ALEXANDRIA WATER SUPPLY PROJECT EGYPT CURRENCY 1 Egyptian Pound (LE) = 100 piastres =.1000 millimes EQUIVALENTS Official Rate 1 Egyptian Pound (LE) US$2.56 or SDR US Dollar = LE Parallel Market Rate Until February 1976: 1 Egyptian Pound (LE) US$ US Dollar = LE 0.59 From February to May 1976: 1 Egyptian Pound (LE) = US$ US Dollar LE 0.64 From May 21, 1976: 1 Egyptian Pound (LE) US$ US Dollar = LE 0.68 From December 1, 1976: 1 Egyptian Pound (LE) US$ US Dollar LE O.70 WEIGHTS AND MEASURES = millimeter (1 millimeter = inches) cm = centimeter (1 centimeter = 0.39 inches) m = meter (1 meter = 3.28 feet) km km 2 - kilometer (lkilometer = 0.62 miles) - square kilometer (1 km acres) m3 = cubic meter (1 m 3 = US gallons) m 3 /day - cubic meter per day (1 m 3 /day = US gallons per day) i/hr = meter per hour (m/hr feet per hour) lcd = liters per capita per day (1 lcd US gallons per capita per day) lbs/in 2 = pounds per square inch 1 lb/sq in = kilograms per square centimeter)

3 FOR OFFICIAL USE ONLY Glossary of Abbreviations AWA - The Alexandria Water General Authority USAID - United States Agency for International Development WHO - World Health Organization MHR - Ministry of Housing and Reconstruction GOSSD - General Organisation for Sewerage and Sanitary Drainage GOPW - General Organisation for Potable Water AWA's Fiscal Year January 1 to December 31 This document has a rtricted distribution sd my be ud by ri#nu o* it the pfiorman of their omcial duties. Its contnts may not otlmwwu be discioed without World Dak authiotion.

4

5 APPRAISAL OF THE ALEXANDRIA WATER SUPPLY PROJECT EGYPT TABLE OF CONTENTS Page No. SUMMARY AND CONCLUSIONS... i-.. I. INTRODUCTION.... I II. SECTOR... I A. Background... 1 B. Water Resources I C. Water Supply D. Sewerage E. Constraints and Sector Policies... 3 III. THE PROJECT AREA... 3 A. General... 3 B. Existing Water Supply Facilities C. Studies of Future Requirements and Operations... 5 D. Wastewater Disposal IV. THE PROJECT... 6 A. Objectives of the Project B. Project Description C. Cost Estimates D. Loan Amount... 9 E. Implementation F. Disbursements V. THE BORROWER A. General B. Management, Organization Structure and Staffing C. Accounts D. Audit E. Insurance This report was prepared and written by Mr. R.G. MacWilliam (Sanitary Engineer), Mr. G. Heyland (Financial Analyst), and Mr. K. Thomas (Financial Analyst), with the assistance of Mr. V. Nwaneri (Economist) and Mr. A. Banerjee (Technical Assistant).

6 TABLE OF CONTENTS (Continued) Page No. VI. FINANCE... o. ***** **** * * **... *.* A. Present Financial Position...* B. Financing Plan C. Tariffs D. Future Performance VII. JUSTIFICATION... o A. Environmental Impact and Health Benefits B. General Objectives * C. Demand D. Least Cost Solution E. Economic Analysis oo.o * F. Risks... o VIII. RECOMMENDATIONS LIST OF ANNEXES 1. Sector Organization 2- Description of Alexandria Water Supply Facilities 3. Forecast of Population, Connections, Consumption and Production 4. Project Description 5. Construction Schedule 6. Key Indicators 7. Schedule of Disbursements 8. Cost Estimates 9. AWA - Organization 10. Suggested Terms of Reference for a Management Systems Study 11. Tariffs 12. AWA: Financial Statements, Assumptions for Financial Projections 14. Incremental Economic Cost of Water in Alexandria LIST OF MAPS IBRD IBRD Alexandria Water Supply Alexandria Water Supply Project

7 APPRAISAL OF THE ALEXANDRIA WATER SUPPLY PROJECT EGYPT SUMMARY AND CONCLUSIONS i. Alexandria is Egypt's second largest city with a population of 2.4 million and an expected future growth rate of 2.7% per annum. It is a highly commercial and industrialized city and a major tourist resort. Alexandria's water supply facilities, using Nile water supplied by Canals, were operated and administered by a local private company, founded in 1879; in 1968 it was converted into the "Alexandria Water General Authority" (AWA), a public sector organization. In recent years AWA also assumed responsibility for water supply to the coastal western desert about 300 km from Alexandria. AWA's treatment capacity has been unable to keep pace with demand, and currently, facilities are operating at about 30% above their design capacity. This continuous and growing overload carries considerable risks for the maintenance of a safe and reliable service at optimum water quality. Furthermore, essential maintenance of the installations cannot be carried out owing to the need for uninterrupted production from the overloaded plants. ii. To help alleviate Alexandria's increasing water requirement until about 1990, a project is proposed for partial Bank financing representing the first Bank group assistance to Egypt in this sector. The main component of the project would add 350,000 m 3 /day of treatment capacity to help eventually raise AWA's combined production capacity to 1,150,000 m 3 /day. A long term (to year 2000) Master Plan for Water and Sewerage in Alexandria has also been initiated by the Government with aid from USAID and studies will begin soon. iii. The proposed investments would include (i) the extension of three existing treatment plants; (ii) the construction of a new one; (iii) installation of trunk water mains and booster stations; (iv) renewals of operational equipment; (v) the purchase of self propelled water barges to supply ships in Alexandria port; and (vi) procurement of trucks and operational vehicles, and water meters. The co-ordination and implementation of the project and the whole AWA program would be the responsibility of a project unit assisted by consulting engineers for final design and preparation of tender documents. Consultant services for training AWA's staff in operational techniques will also be provided. iv. The total cost of the Bank assisted project is assessed at LE 47.5 million (US$121.7 million) with an estimated foreign exchange component of LE 21.9 million (US$56 million). The proposed loan of US$56 million would cover 100% of this foreign exchange cost (46% of the total cost). The remainder would be financed by Government loans and AWA's internal cash generation.

8 - ii - v. Goods and services to be financed under the project would be procured through international competitive bidding in accordance with the Bank Group's guidelines. Domestic manufacturers would be allowed a preference of 15% or the actual customs duty, whichever is lower. First equipment and materials deliveries are expected in 1978 and the bulk of construction works would occur during 1979 and Project completion is scheduled for vi. The proposed loan would be made to AWA with the guarantee of the Arab Republic of Egypt. AWA's management is experienced and dedicated, although it has some difficulties in promoting and rewarding suitable staff to improve its overall performance. Measures to help correct this constraint are proposed in the project. vii. AWA's financial performance was sound until 1971 but from 1972 the low tariffs established in 1963 could no longer cover increasing costs. Partial rises in tariffs for some groups of customers in 1976 were insufficient to bridge the gap. Immediate further increases in tariffs are, therefore, required for AWA to regain its financial viability. Further gradual adjustments to achieve an average revenue at the level of the long-term average incremental costs would be required, while maintaining a progressive rate structure, which enables poorer citizens to obtain a piped water supply. viii. Agreement having been reached during negotiations-on the principal issues, the project is suitable for a Bank loan of US$56 million to AWA for 20 years including a 4-1/2 years grace period.

9 APPRAISAL OF THE ALEXANDRIA W4ATER SUPPLY PROJECT EGYPT I. INTRODUCTION 1.01 The Alexandria Water General Authority (AWA) has requested Bank financing for foreign exchange expenditures of a project designed to help expand and improve the Alexandria water supply system. The proposed works, estimated to cost US$121.7 million, include the provision of additional treatment plant capacity, the replacement of obsolete equipment and the provision of essential maintenance equipment to improve operations. The proposed loan of US$56 million would finance 100% of the estimated foreign exchange requirement and would be made to AWA with the guarantee of the Arab Republic of Egypt. This would be the first Bank Group lending to Egypt in this sector Following a Bank identification mission in November 1975, AWA prepared a Feasibility Study reviewing the existing water supply situation and outlining the need for future expansion The feasibility study was reviewed in March 1976 and the project was appraised in May 1976 by a mission consisting of Messrs. R. MacWilliam, Sanitary Engineer, (Chief of Mission) and G. Heyland, Financial Analyst. II. SECTOR A. Background 2.01 Most of Egypt's population of about 37 million, which is estimated to grow at 2.5% per annum, and most of the country's economic activity, is concentrated from Cairo to the Delta, an area which accounts for less than 4% of the country's land area of 1 million km 2. Cairo, Egypt's capital, is the largest city of the country with a population of about 7.5 million. Alexandria, the second largest city, has 2.4 million inhabitants. B. Water Resources 2.02 The predominant source of water to Egypt is the Nile River, which provides an assured supply of some 55 billion m3 of water each year. Increasing use of water by different sectors of the economy is, however, moving

10 -2- Egypt towards a situation where a lack of adequate water supply will not only inhibit economic growth but, if allowed to continue, will also endanger the health of the population. The Government has therefore requested the Bank to act as executing agency for a UNDP-financed Master Plan for Water Resource Development in Egypt. This Master Plan will be prepared within the long-term perspective of Egypt's social and economic development over the next 25 years, but will be designed also to give recommendations on short-term policy and investment issues. C. Water Supply 2.03 Treated and filtered water is estimated by Government sources to be available to approximately 80% of the urban population and 20% - 25% of the rural population. Potable water is drawn from two sources; either artesian wells. or directly from the Nile and irrigation canals. South of Cairo, artesian water is usually of good quality although sometimes containing iron and manganese salts. To the north of Cairo artesian water is characteristically brackish and requires blending with sweeter surface water. Artesian water in the coastal areas of the Delta is generally not suitable for human consumption, and communities depend entirely on surface water Provision of drinking water in Egypt is the responsibility of four public institutions. In Cairo and Alexandria separate Authorities, which commenced operations as private utility companies in the last century, are now responsible to the local Governors. The Canal Zone cities are served by the Suez Canal Authority. Water in all other Governorates, both urban and rural, is the responsibility of the General Organisation for Potable Water (GOPW). (For further details see Annex 1). The provision of additional water to Alexandria is recognized as urgent and was included in Egypt's five-year plan. Other cities face similar needs but Alexandria is the only one, at present, with a feasible project in a sufficiently advanced state of preparation. D. Sewerage 2.05 The responsibility for the provision of sewerage services throughout Egypt lies with the General Organisation for Sewerage and Sanitary Drainage (GOSSD). The GOSSD designs and constructs sewerage and drainage facilities in all Egyptian towns and carries out the maintenance of the Alexandria and Cairo sewerage systems. Its technical services are made available to the Governorates which operate and maintain provincial sewerage and drainage systems. In addition to Cairo, Alexandria and the Canal Zone cities, 10 major cities in Lower Egypt and four major cities in Upper Egypt have sewerage systems. Wastewater systems without any form of treatment facilities exist in a further 12 major Delta towns.

11 - 3 - E. Constraints and Sector Policies 2.06 The preliminary findings of a joint IBRD/WHO Water Supply and Sewerage Sector Survey, undertaken in July 1976, are that central government planning and program implementation has largely stifled local accountability and initiative. Water tariffs are low and the revenues generated in any case revert to the central budget from which funds for new construction and operating costs must in turn be obtained. As a result of this approach staff morale is low, there is no premium on efficiency, little incentive for financial discipline and steady decline in service. The Government's target of providing a comprehensive social water service remains unrealized while the poor use polluted water, buy expensive water from vendors or make large investments in handpumps and storage. In the sewerage service similar constraints apply The Bank's objective, in dealing with present constraints, should be to promote autonomy in the funding, management and operations of the water and sewerage facilities. The proposed project in Alexandria would demonstrate the advantages accruing to the introduction of improved management and operating techniques, better financial planning and the development of an organizational structure responsive to acute service needs of local inhabitants and would encourage the establishment of further autonomous public utilities in Egypt. III. THE PROJECT AREA A. General 3.01 The area to benefit from the proposed project includes the City of Alexandria as well as the adjacent Governorates of Behera and Mersa Matruh. Alexandria, founded by Alexander the Great in 332 BC., is the second largest city in Egypt. It is the nation's principal seaport and a most important industrial center. Strung out 25 kilometers along a narrow strip of Mediterranean coastline., it is the country's busiest and most popular holiday resort with excellent road and rail connections to Cairo, 180 kilometers distant. The climate is equable with a temperature variation of 150C - 250C and an annual rainfall of only 150 mm mm. The city is heavily residential, houses a university with all major faculties, supports important industrial activity and is a hive of business and commercial life The present population served by AWA is approximately 2,600,000 and is expected to increase by 2.7% per annum in Alexandria and by 2.5% per annum in the areas of the adjacent governorates supplied. Population is accommodated mostly in large apartment dwellings with a small, but increasing, percentage in low-cost housing in new development areas. It is estimated that one million people visit the city during the summer season for a stay of

12 -4- several weeks. The city and governorate area is 2,680 km2 with a density of 896 persons/km2; the adjacent Governorates of Behera and Mersa Matruh, in contrast, have densities of 244 and 0.5 respectively Industries settled in the area include cotton ginning, cotton seed oil, leather tanning, metal works, paper, soap, textile manufacture, footware, cigarettes, brewing, soft drinks and foodstuffs. Future expansion allows for oil refining, tire production, iron making, port developmet and the establishment of a free trade zone. Physical planning of all development is ostensibly under the aegis of the Governor but policy and much of the thrust comes from Government's central planners concerned with the promotion of economic growth Efforts are now being made to develop the tourist potential to the west of Alexandria where there are many attractive beaches. Also rural growth continues in the area with the development of irrigated land fed by the extension of the El Nasr canal from the Noubaria canal. In this respect a Bank financed project for fruit and vegetables development approved in 1976 (LN 1181-EGT) is of importance because water for this and the proposed project is drawn from the El Nasr canal. These developments in the adjacent Governorates of Behera and Mersa Matruh are integrated with the provision of water from the Alexandria water supply system. B. Existing Water Supply Facilities 3.05 The existing water supply facilities are detailed in Annex 1 and shown on Maps IBRD and The AWA's source water is obtained from the Mamoudia and Noubaria Canals fed from the Rosetta branch of the Nile. It supplies treated potable water to some 2.6 million inhabitants and also meets the requirements of industry and shipping. The Authority's area of supply includes the Governorate and City of Alexandria and extends 300 km west to Mersa Matruh and 70 km south into the adjacent Governorate of Behera. In Behera 4% of the population is served and in Mersa Matruh Governorate 80% The AWA delivers water by pumping through about 2000 km of water mains from five treatment plants with a combined rated capacity of 550,000 m 3 /day. These plants, however, are consistently overloaded by as much as 32%, on average, and their general appearance is poor. They suffer from a chronic lack of maintenance, the control displays and recorders are inoperative, flow regulators are disconnected and much equipment is obsolete and long overdue for replacement. Despite these defects, drinking water of acceptable, but declining quality is being produced daily to meet demand. The distribution system is being extended at the rate of km each year An unusual feature of the AWA's operations is the supply of water to Mersa Matruh (estimated population 75,000) 300 kilometers to the west of Alexandria and the coastal western desert area. The original supply line was provided during World War II to the historic battle site at El Alamein

13 and thereafter extended to Mersa Matruh. This is now being augmented by a 250 mm mm pipeline with 12 pumping stations running parallel and crossconnected at El Alamein The AWA has been labouring under increasing difficulty to meet rising water demand due to economic expansion and population growth in the service area. Inability to generate more revenues from its customers and increasing dependence on Government-allocated funds for operations have further crippled its effectiveness. Insufficient funds have been made available for the timely construction of new treatment capacity or refurbishing the old. Some of the more elderly filter units should have been retired but are still at work as they must contribute to total production. Water plants cannot be adequately maintained because there is no spare capacity when units are taken out of service for any length of time. To remedy this situation the AWA has developed a renewal and expansion program aimed at raising water production by 600,000 m3/day to a total of 1,150,000 m3/day. This, on projected water demand, would meet needs to about As part of this program AWA is carrying out a wholly Governmentfinanced project which would add 250,000 m3/day. This includes the extension of three existing plants at Rond Point, Manshia and Mariout. It would also include renewing parts of the old desert pipeline and makce overdue structural repairs Present consumption of water averages about 110 lcd for domestic consumers and 50 lcd equivalent used by industry and other large consumers, such as Goverrment institutions; details of consumption are in Annex 2. It is estimated however that about 38% of total water production is unaccounted for mainly due to inaccurate or inoperative meters, theft and unquantified system loss. Water meters of up to 1-1/2" diameter of Egyptian manufacture have been installed in recent years, but are of poor quality. During negotiations agreement was reached with AWA that a leak detection and waste reduction study will be undertaken and that the findings will be reviewed with the Government and the Bank within twelve months of loan signing The AWA agreed during appraisal to make an immediate start on a study of the adequacy of the existing metering and further agreed during negotiations that this would be completed and reported upon to the Government and the Bank not later than June 30, C. Studies of Future Requirements and Operations 3.13 The Feasibility Report prepared by AWA for the proposed project focused on providing water for the short term needs (up to 1990) by raising production capacity and renewing obsolete equipment. A USAID financed study will, however, review Alexandria's water needs in the period beyond that catered for by the project and help prepare a Master Plan formulating these requirements to the year 2000.

14

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Trade Policy Review Body RESTRICTED 1 October 2007 (07-3988) Original: English TRADE POLICY REVIEW Report by SAINT KITTS AND NEVIS Pursuant to the Agreement Establishing the Trade

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Net Income of US$6.2 Million and EPS of US$0.14 for the Third Quarter of 2015 Excluding special items, adjusted net income came in at $37.4 million, or EPS of $0.85 per share Panama

More information

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9 + The National Water and Sewerage Commission(NWSC) through the power vested by the Water and Sewerage Act of 2005, as amended in 2008 section 37 ( C ), hereby makes the final determination for the new

More information

Social Housing Report 2016

Social Housing Report 2016 Social Housing Report 2016 25 th of June 2016 Tahya Masr Social Housing Fund The Social Housing Fund Breakdown by City Information in this report is based on official announcements by both developers and

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Financial Results for the Third Quarter of 2016 Excluding special items, adjusted net income came in at $55.3 million, or adjusted EPS of $1.30 per share Panama City, Panama --- November

More information

Module 1 Educator s Guide: Representative Discussion Points Investigation 3

Module 1 Educator s Guide: Representative Discussion Points Investigation 3 Module 1 Educator s Guide: Representative Discussion Points Investigation 3 Ethiopia and Eritrea Our combined population is 59,578,171 people. We have just emerged from a long period of civil war and famine.

More information

Quarterly Report Egypt Hotels Q Egypt Quarterly Review & Forecast 4 Key Cities

Quarterly Report Egypt Hotels Q Egypt Quarterly Review & Forecast 4 Key Cities Quarterly Report Egypt Hotels Q1 2016 Egypt Quarterly Review & Forecast 4 Key Cities Contents Cairo... 3 Sharm El Sheikh... 4 Hurghada... 5 Alexandria... 6 2 Cairo SUPPLY Forthcoming pipeline in Cairo

More information

Contents. A TSA Implementation Project: Main aspects of Egypt s Experience. Introduction. Share in the World Market Tourism Statistics

Contents. A TSA Implementation Project: Main aspects of Egypt s Experience. Introduction. Share in the World Market Tourism Statistics Ministry of Tourism A TSA Implementation Project: Main aspects of Egypt s Experience March 2008 Contents I - Introduction II - III - Share in the World Market Tourism Statistics IV - Main Elements in TSA

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Financial Results for the First Quarter of 2016 Excluding special items, adjusted net income came in at US$69.9 million, or EPS of US$1.66 per share Panama City, Panama --- May 5,

More information

Israeli-Egyptian Trade: In-Depth Analysis

Israeli-Egyptian Trade: In-Depth Analysis Israeli-Egyptian Trade: In-Depth Analysis YITZHAK GAL BADER ROCK MIDDLE EAST Contents Israeli-Egyptian Economic Relations 3 Israel s Trade With Egypt 6 Egypt s Trade With Israel in Context 10 The Israeli-Egyptian

More information

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI PPCR/SC.4/5 October 9, 2009 Meeting of the PPCR Sub-Committee Washington, D.C. October 28, 2009 REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI Proposed Sub-Committee Decision The Sub-Committee reviewed

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Net Income of US$32.0 Million and EPS of US$0.72 for the Second Quarter of 2012 Excluding special items, adjusted net income came in at $58.6 million, or EPS of $1.32 per share Panama

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June

More information

06.09 Lubelskie: SME development in Janow Lubelski

06.09 Lubelskie: SME development in Janow Lubelski 06.09 Lubelskie: SME development in Janow Lubelski 1. BASIC INFORMATION 1.1. CRIS Number: 2002/000-580-06.09 1.2. Title: SME development in Janów Lubelski 1.3. Sector: 1.4. Location: Town and Gmina of

More information

PPP Projects. Ministry of Finance. PPP Central Unit

PPP Projects. Ministry of Finance. PPP Central Unit PPP Projects Ministry of Finance PPP Central Unit Tendered Projects (2013) 1- Abu Rawash wastewater plant Upgrading level of treatment from primary to secondary treatment for Abu Rawash Wastewater plant

More information

COUNTRY CASE STUDIES: OVERVIEW

COUNTRY CASE STUDIES: OVERVIEW APPENDIX C: COUNTRY CASE STUDIES: OVERVIEW The countries selected as cases for this evaluation include some of the Bank Group s oldest (Brazil and India) and largest clients in terms of both territory

More information

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS PERTH AND KINROSS COUNCIL 8 16/278 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS Report by Senior Depute Chief Executive (Equality, Community Planning & Public Service

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Net Income of US$113.1 Million and EPS of US$2.57 for the First Quarter of 2015 Excluding special items, adjusted net income came in at US$106.0 million, or EPS of US$2.41 per share

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION

INTERNATIONAL DEVELOPMENT ASSOCIATION This report was prepared for use within the Association. It may not be published nor may it be quoted as representing the Association's views. The Association accepts no responsibility for the accuracy

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

Farm-level Irrigation Modernization Project - FIMP

Farm-level Irrigation Modernization Project - FIMP Farm-level Irrigation Modernization Project - FIMP Improved Agriculture Water Use Workshop Mediterranean Agronomic Institute CIHEAM 28 to 31 Aug 2017 Presentation Outline Background of Water Resources

More information

GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES

GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES PRESENTED BY LEROY ADOLPHUS, MA FOREIGN TRADE OFFICER,

More information

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience ASIAWATER CONFERENCE 2012 KUALA LUMPUR CONVENTION CENTRE MALAYSIA 27 th 29 th March 2012 PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win

More information

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation Rebuilding Puerto Rico Mr. Omar J. Marrero, Esq. Executive Director Puerto Rico Public-Private Partnerships Authority & Central

More information

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW 2000 Dear Sir Demerger of BHP Steel At the time of the announcement of the creation of the DLC between BHP Limited and Billiton

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Concrete Visions for a Multi-Level Governance, 7-8 December Paper for the Workshop Local Governance in a Global Era In Search of

Concrete Visions for a Multi-Level Governance, 7-8 December Paper for the Workshop Local Governance in a Global Era In Search of Paper for the Workshop Local Governance in a Global Era In Search of Concrete Visions for a Multi-Level Governance, 7-8 December 2001 None of these papers should be cited without the author s permission.

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES The Canadian Airport Authority ( CAA ) shall be incorporated in a manner consistent with the following principles: 1. Not-for-profit Corporation

More information

ALC Project # 68 Liberty Park Cape Coral, Florida

ALC Project # 68 Liberty Park Cape Coral, Florida Project Proposal ALC Project # 68 Liberty Park Cape Coral, Florida PACE Loan & EB-5 1321 NE 24th Avenue Cape Coral, FL 33909 Prepared by: American Lending Center A USCIS-Designated EB-5 Regional Center

More information

Citi Industrials Conference

Citi Industrials Conference Citi Industrials Conference June 13, 2017 Andrew Levy Executive Vice President and Chief Financial Officer Safe Harbor Statement Certain statements included in this presentation are forward-looking and

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

Content. Study Results. Next Steps. Background

Content. Study Results. Next Steps. Background Content Background Study Results Next Steps 2 ICAO role and actions in previous crisis time Background October 1973 oil crisis: oil price increased by 400% and oil production decreased by 240% Early 1974:

More information

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017)

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017) Queensland - 11 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: The Republic of Peru Project: Amazonas Rural Development Project Loan Agreement: January 9, 213 Loan Amount:

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Net Income of US$18.6 Million and EPS of US$0.42 for the Second Quarter of 2010 Excluding special items, adjusted net income came in at $26.3 million, or $0.60 per share Panama City,

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Second Quarter 2016

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Transforming Intra-African Air Connectivity:

Transforming Intra-African Air Connectivity: z Transforming Intra-African Air Connectivity: The Economic Benefits of Implementing the Yamoussoukro Decision PREPARED FOR IATA in partnership with AFCAC and AFRAA PREPARED BY InterVISTAS Consulting LTD

More information

AIR CANADA REPORTS THIRD QUARTER RESULTS

AIR CANADA REPORTS THIRD QUARTER RESULTS AIR CANADA REPORTS THIRD QUARTER RESULTS THIRD QUARTER OVERVIEW Operating income of $112 million compared to operating income of $351 million in the third quarter of 2007. Fuel expense increased 49 per

More information

International Development Association

International Development Association International Development Association FOR OFFICIAL LSE O~LY IDA/R78-117 From: The President November 10~ 1978 INDONESIA Credit 479-IND - Proposed Amendment of Project Description for the Bali Tourism Pro1ect*

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

Gerry Laderman SVP Finance, Procurement and Treasurer

Gerry Laderman SVP Finance, Procurement and Treasurer Gerry Laderman SVP Finance, Procurement and Treasurer Safe Harbor Statement Certain statements included in this release are forward-looking and thus reflect our current expectations and beliefs with respect

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Financial Results for the Fourth Quarter of 2015 Excluding special items, adjusted net income came in at $31.7 million, or EPS of $0.73 per share Panama City, Panama --- February

More information

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Panama City, Panama --- March 7, 2007. Copa Holdings, S.A. (NYSE: CPA), parent company of Copa

More information

FIRST QUARTER RESULTS 2017

FIRST QUARTER RESULTS 2017 FIRST QUARTER RESULTS 2017 KEY RESULTS In the 1Q17 Interjet total revenues added $4,421.5 million pesos that represented an increase of 14.8% over the income generated in the 1Q16. In the 1Q17, operating

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

FIRST QUARTER RESULTS 2016

FIRST QUARTER RESULTS 2016 FIRST QUARTER RESULTS 2016 KEY RESULTS In 1Q16 Interjet total revenues added $3,850.8 million pesos that represented an increase of 21.9% over the income generated in the 1Q15. In 1Q16 total passengers

More information

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa Egyptian Minister of Tourism YEHIA RASHED JULY 21, 2016 International tourism highlights (2015): Introduction: Tourism

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Net Income of $103.8 million and EPS of $2.45 for the Third Quarter of 2017 Excluding special items, adjusted net income came in at $100.8 million, or EPS of $2.38 per share Panama

More information

2. Industry and Business

2. Industry and Business 72 Statistical Yearbook of Abu Dhabi 2016 2. Industry and Business Business Enviroment Manufacturing Oil and Gas Petrochemicals Electricity and Water Construction Transport Information and Communication

More information

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC)

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC) Check-List This checklist (in blue table) summarises the documentation to be provided for each mandatory criterion. The documentation described below has to be submitted to the Competent Body. Applicant

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

A i Q C a p i t a l M a n a g e m e n t L i m i t e d

A i Q C a p i t a l M a n a g e m e n t L i m i t e d A i Q C a p i t a l M a n a g e m e n t L i m i t e d NIGERIA Nigeria is a middle income, mixed economy and emerging market with expanding financial, service, communications, and entertainment sectors

More information

EASA PART 21 + AMC/GM. Syllabus

EASA PART 21 + AMC/GM. Syllabus EASA PART 21 + AMC/GM Syllabus PART 21 Certification of aircraft and related products, parts and appliances, and of design and Production Organizations Contents 21.1 General SECTION A TECHNICAL REQUIREMENTS

More information

Investor Relations Update October 25, 2018

Investor Relations Update October 25, 2018 General Overview Investor Relations Update Revenue The company expects its fourth quarter total revenue per available seat mile (TRASM) to be up approximately 1.5 to 3.5 percent year-over-year. Fuel Based

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS The Tanzania Civil Aviation Authority, (TCAA) was established by the enactment

More information

AEROFLOT ANNOUNCES FY 2017 IFRS FINANCIAL RESULTS

AEROFLOT ANNOUNCES FY 2017 IFRS FINANCIAL RESULTS AEROFLOT ANNOUNCES FY 2017 IFRS FINANCIAL RESULTS Moscow, 1 March 2018 Aeroflot Group ( the Group, Moscow Exchange ticker: AFLT) today publishes its audited financial statements in accordance with International

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

THIRD QUARTER RESULTS 2018

THIRD QUARTER RESULTS 2018 THIRD QUARTER RESULTS 2018 KEY RESULTS In the 3Q18 Interjet total revenues added $ 6,244.8 million pesos that represented an increase of 7.0% over the revenue generated in the 3Q17. In the 3Q18, operating

More information

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences Consumer Protection Group Risk Analysis Department Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences Version 10 (20 April 2010) 1 Introduction

More information

Spirit Airlines Reports First Quarter 2017 Results

Spirit Airlines Reports First Quarter 2017 Results Spirit Airlines Reports First Quarter 2017 Results MIRAMAR, Fla., April 28, 2017 - Spirit Airlines, Inc. (NASDAQ: SAVE) today reported first quarter 2017 financial results. GAAP net income for the first

More information

Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013

Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013 Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013 Panama City, Panama --- February 12, 2014. Copa Holdings, S.A. (NYSE: CPA), today announced financial results for the

More information

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income

More information

Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1

Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1 Emilio Rangel Woodyard Director General Water and Sewerage Service of Monterrey Tel: +5181-2033-7001 E-mail: erangel@sadm.gob.mx y/o cavila@sadm.gob.mx MONTERREY VI PROJECT Servicios de Agua y Drenaje

More information

1. FORECAST VISITATION FOR GREAT OCEAN ROAD

1. FORECAST VISITATION FOR GREAT OCEAN ROAD 1. FORECAST VISITATION FOR GREAT OCEAN ROAD 1.1. INTRODUCTION This section provides a 20-year forecast of visitation to the Great Ocean Road Region, modelled from Australian Tourism Forecast Committee

More information

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009 The St. Joe Company Raymond James Institutional Investors Conference March 10, 2009 Forward Looking Statements This presentation contains forward-looking statements about future events that are subject

More information

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015)

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015) Queensland - 18 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE MAY, 1993 EXECUTIVE SUMMARY - This brief is submitted by the Nunavik Constitutional Committee. The Committee was

More information

Why Namibia. Abundant Resources. Striking Opportunities. Competitive Economy. Top Quality Exports. Gateway to SADC

Why Namibia. Abundant Resources. Striking Opportunities. Competitive Economy. Top Quality Exports. Gateway to SADC Why Namibia Abundant Resources Striking Opportunities Competitive Economy Top Quality Exports Gateway to SADC Land of Contrast Sweeping Scenery Abundant Wildlife Hospitable People Modern Infrastructure

More information

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Redding. Redding Police Facility. Enough study! Just do it! City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Second Quarter 2017

More information

Copa Holdings Reports Net Income of $57.7 million and EPS of $1.36 for the Third Quarter of 2018

Copa Holdings Reports Net Income of $57.7 million and EPS of $1.36 for the Third Quarter of 2018 Copa Holdings Reports Net Income of $57.7 million and EPS of $1.36 for the Third Quarter of 2018 November 14, 2018 PANAMA CITY, Nov. 14, 2018 /PRNewswire/ -- Copa Holdings, S.A. (NYSE: CPA), today announced

More information

Northfield to Ingle Farm #2 66 kv Sub transmission line

Northfield to Ingle Farm #2 66 kv Sub transmission line Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

THE PROBLEMS AND PROSPECTS OF DOMESTIC TOURISM SECTOR IN SRI LANKA. (A Case Study on Kataragama Sacred City and Yala (Ruhuna) National Park).

THE PROBLEMS AND PROSPECTS OF DOMESTIC TOURISM SECTOR IN SRI LANKA. (A Case Study on Kataragama Sacred City and Yala (Ruhuna) National Park). ~/ J" ~,~oo0t- ~ THE PROBLEMS AND PROSPECTS OF DOMESTIC TOURISM SECTOR IN SRI LANKA (A Case Study on Kataragama Sacred City and Yala (Ruhuna) National Park). by M. SUNIL SHANTHA A Thesis Submitted to the

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Financial Results for the Fourth Quarter of 2018 Excluding special items, adjusted net profit came in at $44.0 million, or Adjusted EPS of $1.04 Panama City, Panama --- February 13,

More information

Brevard County Utility Services Department

Brevard County Utility Services Department Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES

More information

Copyright(C) 2014 JETRO, All rights reserved. 禁無断転載. Content. Who We Are Economic Situation Dynamic Economy Foreign Direct Investment in Egypt

Copyright(C) 2014 JETRO, All rights reserved. 禁無断転載. Content. Who We Are Economic Situation Dynamic Economy Foreign Direct Investment in Egypt Content Who We Are Economic Situation Dynamic Economy Foreign Direct Investment in Egypt Asian Investments in Egypt Japanese Investment in Egypt The Way Forward Mega Projects Suez Canal Project North Coast

More information

UNWTO Commission for the Middle East Thirty-ninth meeting Cairo, Egypt, September 2014

UNWTO Commission for the Middle East Thirty-ninth meeting Cairo, Egypt, September 2014 UNWTO Commission for the Middle East Thirty-ninth meeting Cairo, Egypt, 14-15 September 2014 CME/39/Info.Note 1. Madrid, July 2014 Original: English 39 th Meeting of the UNWTO Commission for the Middle

More information

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN NHS Lothian John Jack Director of Facilities 5th June 2008 REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN 1 Purpose of the Report 1.1 The purpose of this report

More information

WORKS AND SERVICES COMMITTEE MEETING HELD ON WEDNESDAY 20 MAY 2015 AT MEMORIAL HALL SUPPER ROOM, ESPLANADE, KAIKOURA. AGENDA

WORKS AND SERVICES COMMITTEE MEETING HELD ON WEDNESDAY 20 MAY 2015 AT MEMORIAL HALL SUPPER ROOM, ESPLANADE, KAIKOURA. AGENDA WORKS AND SERVICES COMMITTEE MEETING HELD ON WEDNESDAY 20 MAY 2015 AT MEMORIAL HALL SUPPER ROOM,, KAIKOURA. AGENDA 1. Apologies 2. Matters of Importance to be raised as Urgent Business. 3. Reports: Operations

More information

WATER DESALINATION PROJECT IDENTIFICATION IN SINAI, EGYPT

WATER DESALINATION PROJECT IDENTIFICATION IN SINAI, EGYPT WATER DESALINATION PROJECT IDENTIFICATION IN SINAI, EGYPT By Magdy Abou Rayan*, Berge Djebedjian* and Ibrahim Khaled** * Faculty of Engineering, Mansoura University, El-Mansoura 35516, Egypt E-mail: mrayan@usa.com,

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Copa Holdings Reports Net Income of $49.9 million and EPS of $1.18 for the Second Quarter of 2018

Copa Holdings Reports Net Income of $49.9 million and EPS of $1.18 for the Second Quarter of 2018 Copa Holdings Reports Net Income of $49.9 million and EPS of $1.18 for the Second Quarter of 2018 Panama City, Panama --- Aug 8, 2018. Copa Holdings, S.A. (NYSE: CPA), today announced financial results

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 145 CAA Consolidation 10 March 2017 Aircraft Maintenance Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 145 prescribes rules governing the certification

More information

Investor Relations Update January 25, 2018

Investor Relations Update January 25, 2018 General Overview Investor Relations Update Accounting Changes On January 1, 2018, the company adopted two new Accounting Standard Updates: (ASUs): ASU 2014-9: Revenue from Contracts with Customers (the

More information

Managing through disruption

Managing through disruption 28 July 2016 Third quarter results for the three months ended 30 June 2016 Managing through disruption 3 months ended Like-for-like (ii) m (unless otherwise stated) Change 30 June 2016 30 June 2015 change

More information

FOURTH QUARTER RESULTS 2017

FOURTH QUARTER RESULTS 2017 FOURTH QUARTER RESULTS 2017 KEY RESULTS In the 4Q17 Interjet total revenues added $5,824.8 million pesos that represented an increase of 10.8% over the revenue generated in the 4Q16. In the 4Q17, operating

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

JUNE 2016 GLOBAL SUMMARY

JUNE 2016 GLOBAL SUMMARY JUNE 2016 GLOBAL SUMMARY FAST FACTS The world of air transport, 2014 All figures are for 2014, unless otherwise stated, to give a single set of data for one year. Where available, the latest figures are

More information

No UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959

No UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959 UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959 Official text: Arabic. Registered by the United Arab Republic on

More information