1 Camborne, Pool, Redruth East West link road key messages An overview of the project proposals Revision 1 May 2013
2 Introduction The aim of the new east west link now under construction is to improve accessibility, facilitate regeneration and growth and remove commercial and through traffic from the existing A3047 (Camborne to Redruth) reducing community severance and improving the environment for residents adjoining the road. Redruth East Hill Junction Cornwall Camborne Location plan: Camborne, Pool, Redruth The Camborne, Pool, Redruth (CPR) area was formerly an important centre for tin mining. With the closure of the mines there was a downturn in the local economy and the last mine, South Crofty, closed in The area has a high level of deprivation with 15% unemployment and 25% of households dependant to some extent on state benefits. Recognising the need for regeneration the Government established the CPR Urban Regeneration Company in 2002 to help bring prosperity back to the five mile corridor from Camborne to Redruth. Regeneration will provide jobs, housing, amenities and mobility but is constrained by the extent and capacity of the existing road network. In 2006 the Highways Agency (HA) served an Article 14 Notice stopping any new developments due to concerns of traffic queuing back onto the A30 Trunk Road. To remove this Notice the 5m East Hill Junction project was completed (2010) and prioritises the North-South traffic flow to the detriment of the local East-West network. The east west link will provide access to new development areas and relieve the existing East Hill junction allowing capacity for a number of other developments to go ahead. This will lead to the creation of up to 5,500 new jobs and associated new homes over the next 20 years largely on contaminated former mining brownfield sites showing the extensive mining in the South Crofty area. The ground is highly disturbed by surface and near surface workings and contamination with heavy metals and arsenic. 2 Camborne, Pool, Redruth major scheme - key messages
3 Current highway network and transport strategy R Dual Carriageway access to/from A30 A30(T) Public Transport and cycle access to/from Redruth Access to employment sites Pool Bus Interchange Public Transport access to Pool Pool Access to housing regeneration development Public Transport and cycle access to/from Camborne Camborne Access to housing regeneration development Access to housing regeneration development Reduced journey times for through traffic Increased economic linkage between Camborne Pool and Redruth New bus route and better cyclist and pedestrian provisions. The Barncoose link road opened in 2008 and has already led to the creation of 4000m 2 of employment space plus a further 11,500m 2 consented. 440 jobs can be directly attributed to this road. The existing East Hill junction is under stress at peak times on the Dudnance Lane northbound (to A30) arm. Traffic on the existing East Hill approach to the junction queues back to Roskear in peak periods (and Sunday market days) CCTV image of Queues on the Trevenson Road arm at East Hill. These can be long even in off-peak periods. Proposed route of major scheme, west of Dudnance Lane Dudnance Lane A30 The former South Crofty mine site has been indentified for development either side of the line of the major scheme. 3
4 4 Camborne, Pool, Redruth major scheme - key messages
5 5
6 Camborne, Pool, Redruth regeneration Aerial view 6 Camborne, Pool, Redruth major scheme - key messages
7 A3047 Tolgus highway alterations 7
8 Project costs and funding The forecast cost of the Camborne, Pool, Redruth east - west link road is 27.04m (2013) The project is funded by The Department for Transport (DfT) 16.1m, ERDF Convergence 5.303m, Cornwall Council Local Transport Plan (LTP) 2.46m, Housing Growth Point 1.2m, Developer Contributions (DC) 1.98m DfT ERDF CC LTP 2.46m 5.303m 16.1m The direct transport benefits of the project have been determined to result in a benefit cost ration (BCR) of 2.8. HGP 1.2m DC 1.98m 0 5 Funding split Camborne, Pool, Redruth East West Link Completion expected Spring Camborne, Pool, Redruth major scheme - key messages
9 Strategic case Cornwall s priority growth point and largest business district supported by the Government promoted URC. As a direct consequence of the investment in the Barncoose link road and the East Hill junction improvement, the delivery of the 11m Pool Innovation Centre (completed 2010) together with other developments completed or currently on site, will lead to over 800 jobs. To achieve the wider regeneration potential there needs to be Government investment to provide the strategic lead infrastructure which is beyond the funding capabilities of future developer and local contributions. The local development growth forecasts for the CPR area compared to DfT s natural (TEMPRO) growth are shown below emphasising the importance of developing appropriate infrastructure to support economic growth. Using the local growth forecast figures the BCR is enhanced to 3.3. Forecast homes Forecast jobs TEMPRO Local TEMPRO Local 2015 forecasts 2030 forecasts 0 TEMPRO Local TEMPRO Local 2015 forecasts 2030 forecasts The cost of remediation and development of contaminated brownfield sites is expensive and with relatively low capital and rental values makes developments less viable. Public sector support is therefore critical to progress the next stage of regeneration for CPR to realise its potential. The Cornwall and Isles of Scilly Local Enterprise Partnership (LEP) has identified the existing CPR road network as a barrier to growth and have identified the existing CPR road network as a barrier to growth and have identified traffic delays as a detriment to future business investment. The scheme has the widespread support of the local community, local MP, Local Enterprise Partnership (LEP), Homes and Communities Agency (HCA) and businesses. The project will deliver the key aims of the transport strategy and lever in 300m of private investment to the CPR area. Peak time forecast queue length (2015) on the A3047 compared to the new Dolcoath to Dudnance. The delay to road users is 5 minutes and is not acceptable to the local community or the Transport Authority. 9
10 Programme This scheme is critical for the Council s regeneration development plans in the Camborne, Pool and Reduth corridor. The new highway infrastructure is an integral part of the developments, bringing the benefits of quick, safe access to key areas and relief to the existing road and its junctions. Compulsory Purchase and Side Roads Orders were confirmed by the Secretary of State in November Funding has been secured from the DfT and from ERDF Convergence programme. A construction contract has been awarded to Carillion and the works are now underway. Completiton of the works is planned for early Preliminary design, consultations and Exhibitions Planning consents Dec 2008 and Jan 2010 Design revised following Government s spending review June 2010 to Jan 2011 CPO and SRO made Sept Public Inquiry June 2012 Orders confirmed by Secretary of State 2013 DfT and funding approval Feb 2013 November 2012 ERDF funding approved Mar 2013 Start of construction May End of construction works and road open Dec Camborne, Pool, Redruth major scheme - key messages
11 Key outcomes Delivery of the East West link road as part of the approved transport strategy is an integral and essential part of the planned economic growth of Camborne, Pool and Redruth. It will: Provide the necessary transport infrastructure to enable planned, sustainable, economic growth to take place in the Camborne, Pool, Redruth corridor; the key element of the infrastructure is the creation of a new East-West link to relieve the A3047. Establish new highway infrastructure that cannot be afforded solely by developer s contributions; Provide improved access from industrial areas to the A30 Trunk Road and release development potential; Encourage private sector investment of up to 300m to the Camborne, Pool, Redruth area Facilitating the creation of up to 5,500 jobs, many high skilled (by 2030) Facilitating the creation of up to 7,700 homes (by 2030) Having a road delivery programme which meets the deadline to comply with ERDF Convergence funding criteria. Facilitate improvements to public transport and the urban environment along the A3047. make provision for cyclists and pedestrians. The major scheme will help achieve the key aims of the transport strategy and will encourage growth industries, generating high skill jobs and transforming the Camborne, Pool, Redruth area to the Business Heart of Cornwall. 11
12 References 1 Camborne-Pool-Redruth Transport Strategy 2005 For more information please contact: Dave Simpson, Construction Manager Tel: Moblie: dsimpson@cornwall.gov.uk Red River Valley 1890s If you would like this information in another format or language please contact: Cornwall Council, County Hall, Treyew Road, Truro TR1 3AY or telephone: enquiries@cornwall.gov.uk Follow us on Printed on recycled paper. Jb /13
Deliverability Capability Statement
REPORT 13 DELIVERY CAPABILITY STATEMENT Cornwall Strategic Economic Plan Growth Deal Infrastructure Project Delivery Deliverability Capability Statement Document Ref: SEP- DCS Rev 0.3 Prepared by Transportation
More informationMajor Schemes and the wider Strategic Network
Major Schemes and the wider Strategic Network This Chapter details the County Council s priorities for taking forward Major Scheme projects between 2006 and 2011. It also reviews longer-term major scheme
More informationA140 study and Major Road Network
A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationA Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures
West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued
More informationA30 Chiverton to Carland Cross Statement of Community Consultation
A30 Chiverton to Carland Cross Statement of Community Consultation Table of contents 1 Introduction... 3 2 The application... 4 3 The scheme... 5 4 Early stages of consultation... 7 5 Statutory consultation...
More informationAgenda Item 5: Rail East Midlands Rail Franchise Consultation
Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by
More informationEAST WEST RAIL EASTERN SECTION. prospectus for growth
EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote
More informationBrinckerhoff (March 2014) 1 Transport Annex, Report 5, A30 Carland Cross to Chiverton Cross Business Case: Parsons
Scheme/Package A30 Carland Cross to Chiverton Cross 1 The Challenge Journey time reliability of the A30 strategic route Journey time increases and variability are constraining economic growth to the west
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationWest of England. Priority Places Requiring Public Investment
West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips
More informationWolverhampton City Council
Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION
More informationA TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES
THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationEconomic Development Sub- Committee
Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and
More informationLlandudno Junction. Regeneration Proposals for the Future. December 2009
Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration
More informationBusiness Case Approved. Under Construction. Business Case Approved. Under Construction
Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations
More informationM2 Junction 5. improvements scheme. Preferred route announcement
M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these
More informationGuildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017
Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.
More informationSection A: Scheme Summary
Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054
More informationN4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction
Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National
More informationA47 Business Case. Gateway to Growth ALLIANCE
Business Case Gateway to Growth ALLIANCE September 2017 3 By planning for the longer term we can ensure that we maximise the resulting economic benefits for our communities. Cllr William Nunn, Leader of
More informationStrategic Cross Border Planning in the West Midlands
Strategic Cross Border Planning in the West Midlands RTPI Planners, Birmingham 21/02/2018 Adam Harrison, TfWM Transport Governance and WMCA Renaissance: Why the West Midlands? Transforming our place? Challenges
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More information33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,
East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33
More informationInfrastructure for Growth
A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has
More informationTourism 201 CHAPTER 10
Tourism 201 CHAPTER 10 202 Doncaster Unitary Development Plan Tourism 203 Tourism INTRODUCTION 10.1 The increasing importance of tourism is recognised in the UDP by having its own chapter. The benefits
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationCBD Rail Link Business Case
CBD Rail Link Business Case Executive Summary: CBD Link Business Case (Nov 2010) Background The CBD Rail Link will be the most significant improvement to Auckland s transport network since the opening
More informationSouth of England north-south connectivity
South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare
More informationCity Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL
City Deal City Centre Enabling Infrastructure Public Realm Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL Strategic Context National Planning Framework 3 Glasgow Economic Leadership
More informationStrategic Transport Forum
Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH
More informationACTIVITY & ACHIEVEMENT FOR DORSET
ACTIVITY & ACHIEVEMENT FOR DORSET Dorset Local Enterprise Partnership (LEP) is a business-led private and public sector partnership that aims to promote local economic growth and prosperity. Acting as
More informationInside Government Conference Case Study: Norwich Northern Distributor Road
Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What
More informationan engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as
Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationM6 CORRIDOR. Strategic Infrastructure Prospectus
CORRIDOR Strategic Infrastructure Prospectus May 2017 IntRODuCtIOn cumbria has real potential. We have a strong economy with major capability in energy, advanced manufacturing, logistics, agri-food and
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationStrategic Transport Forum 21 st September 2018
Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by
More informationAs at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council
Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool
More information.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership
South West of Scotland Transport Partnership.org.uk Regional Transport Strategy Revised June 2008 Serving Dumfries and Galloway South West of Scotland Transport Partnership.org.uk SOUTH WEST OF SCOTLAND
More informationWest Midlands Sustainable Urban
West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence
More informationA30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement
A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement Introduction The Government s Road Investment Strategy, published in 2014, sets out the vision for the strategic road network
More informationEast Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)
Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and
More informationCreating a High Quality Business District
Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall
More informationBus Priority Package. Presentation to Leigh Business Forum. 11 December 2015
Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual
More informationDraft City Centre Transport Proposals
Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport
More informationWelcome. Great Yarmouth Third River Crossing. Norfolk County Council
Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage
More informationTHE GATWICK DIAMOND INITIATIVE BUSINESS PLAN
THE GATWICK DIAMOND INITIATIVE BUSINESS PLAN 2018-2021 Our Vision is: To be an internationally recognised, world-class, business location achieving sustainable prosperity' What does this look like? By
More informationA30 Carland Cross to Chiverton Cross Project Development Team EDG0769_PA_PE01
Planning Act 2008 Infrastructure Planning The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Regulation Number: Author: Document Reference: PI Reference 37(3)(c)
More information1. Summary of key points 2
Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).
More informationEast Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure
East Sussex Strategic Partnership Transport Update 2 March 2016 Jon Wheeler Team Manager Strategic Economic Infrastructure Summary Transport and Economic Growth Strategic Transport Bexhill Hastings Link
More informationThe Government s Aviation Strategy Transport for the North (TfN) response
The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering
More informationSTRATEGIC INVESTMENT IN MANCHESTER AIRPORT
Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director
More informationMemorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area
Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area between Essex County Council Hertfordshire County Council Highways England
More informationTOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON
TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS
More informationTeam London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise
Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction
More informationDelivering and Investing in Future Infrastructure Projects
Delivering and Investing in Future Infrastructure Projects Inside Government 29 th March Ian MacLeod Assistant Director Planning and Regeneration Birmingham City Council Scale of Growth Housing 150,000
More information$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY
2015 18 National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY OVERVIEW Achieving an effective and efficient transport system is central to supporting Auckland s future. Auckland is home
More informationEnterprise and Business Scrutiny Panel
Enterprise and Business Scrutiny Panel Keren Jones, Service Director, City Economy Marie Bintley, Head of City Development 03 February 2015 Citywide Economic Context Business and enterprise: 8,065 Businesses
More informationGISBORNE DISTRICT COUNCIL BUSINESS CASE PROPOSAL. Eastland Port Access. Pedestrian Safety Rakaiatane Rd. Page 1 of 4
GISBORNE DISTRICT COUNCIL BUSINESS CASE PROPOSAL Eastland Port Access Pedestrian Safety Rakaiatane Rd Page 1 of 4 Introduction This proposal has been developed by Gisborne District Council (GDC) to provide
More informationThe Belfast Manifesto
TheBelfast Manifesto NIIRTA The Northern Ireland Independent Retail Trade Association (NIIRTA) strongly supports The Belfast Manifesto. This should be required reading for election candidates to both Belfast
More informationCalderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan
Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1
More informationEXPENDITURE IN THE WEST MIDLANDS
EXPENDITURE IN THE WEST MIDLANDS 2018-19 If you would like this leaflet in a format more suited to your needs, please call 0345 3036760 or e-mail customerservices@tfwm.org.uk For more information please
More informationReport Author: Jo Turton, Executive Director for the Environment, Lancashire County Council
Transport for Lancashire Committee 1 st July 2013 Local Major Transport Scheme Investment Programme Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Executive
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationPaul Griffiths, BEng (Hons), IENG, MCIHT
The Cheshire East Borough Council (Crewe Green Link South) Compulsory Purchase Order 2013 Public Inquiry Further Statement of Evidence Spur Roads Paul Griffiths, BEng (Hons), IENG, MCIHT June 2013 Contents
More informationCABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A
21 Agenda Item 5 CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of the Report PART A 1. To present the
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationA303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement
A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of
More informationOxfordshire Local Enterprise Partnership
LEP Name County FOI The request(s) Oxfordshire Local Enterprise Partnership Oxfordshire Transport related I would like to request information on the status of and on the appraisal of local transport schemes
More informationJim O Sullivan Chief Executive
Jim O Sullivan Chief Executive Imperatives Customer Service Safety Delivery The Strategic Road Network (SRN) Connects the nation Supports the wider transport network Drives the economy 4,300 miles of SRN
More information2. Recommendations 2.1 Board members are asked to: i. note the content of the May 2018 Renfrewshire Economic Profile.
To: Leadership Board On: 20 June 2018 Report by: Director of Development and Housing Services Heading: Renfrewshire Economic Profile May 2018 1. Summary 1.1 This report is the second edition of a revised
More informationENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016
CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to
More informationRail Delivery Group. Consultation on the future of the East Midlands rail franchise
Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,
More informationUrgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?
Report to: Cabinet Date: 27 November 2013 Title: Portfolio Holder(s) Divisions Affected St Mary s and Penzance Harbours Improvements Bert Biscoe CC - Transport and Waste Penzance Central Relevant Scrutiny
More informationMessage from the Managing Director... r...
Message from the Managing Director... r... Our first full trading year has been a challenging and rewarding period for the team during the early life of the Company, a year during which we have gained
More informationDELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014
DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014 Overview Our international experience is that public transport works best when it is delivered in Partnership
More informationAll reports. 1. Governance Service receive draft report Name of GSO DPR
DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following
More informationM4 Junctions 3 to 12 Smart motorway
Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic
More informationTourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)
Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:
More informationA5-M1 Link (Dunstable Northern Bypass) Explanatory Statement
A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways
More informationBetter skills, more good jobs and a growing economy
Better skills, more good jobs and a growing economy Ambition Our goal is a high-value, high-skill economy driven by innovative and productive businesses that delivers growth and opportunity for all. A
More informationFigure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.
Newtown Glebe Macdonaldtown Pyrmont Ultimo Sydney International Convention, Exhibition & Entertainment Precinct Sydney Education & Health Erskineville Figure 3: Global Sydney Waterloo Second Harbour Crossing
More informationTHE WELSH MINISTERS STATEMENT OF REASONS
THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting
More informationDEVELOPING A PLAN FOR SOUTH EAST S WATERWAYS
LOOKING FORWARD TO THE NEXT 10 YEARS DEVELOPING A PLAN FOR SOUTH EAST S WATERWAYS Oxford Canal Corridor John Best, Chair South East Waterway Partnership Welcome Banbury / Oxford Canal Programme Partnership
More informationReport of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s
More informationTransport Business Case Report Maidstone Integrated Transport Package
Transport Business Case Report Maidstone Integrated Transport Package CO04300369/013 Revision 01 January 2016 Document Control Sheet Project Name: Maidstone Integrated Transport Package Project Number:
More informationA303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016
Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities
More informationAnnex 1 Revised TEE, AMCB and Public Accounts Tables Print Version
Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version NB. The Excel file also includes the BAFB and Full approval cost tables. South Yorkshire BRT Northern Route Full Approval September 2013
More informationBoard meeting
Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationThe Challenges for the European Tourism Sustainable
The Challenges for the European Tourism Sustainable Denada Olli Lecturer at Fan S. Noli University, Faculty of Economy, Department of Marketing, Branch Korça, Albania. Doi:10.5901/mjss.2013.v4n9p464 Abstract
More informationUrban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative
Art & Lighting The contribution to economic regeneration in Weston-super-Mare : Urban Design Meets Economic Regeneration Presentation by Mark Luck Leicester 5 July 2007 Project Overview introduction Project
More informationFUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City
FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN Western Parkland City 2 Transport for NSW Future Transport Strategy and Greater Sydney Services and Infrastructure Plan Western
More informationTRANSPORT UPDATE. September/October 2018
TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention
More informationThe Point Roundabout Improvement Scheme
The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,