Prioritization BICYCLE PEDESTRIAN Project Data and Final Scores January 31, 2012

Size: px
Start display at page:

Download "Prioritization BICYCLE PEDESTRIAN Project Data and Final Scores January 31, 2012"

Transcription

1 Right-of-W Construct a multi-use path along 17th South 17th Multi- Independence Mobility Subregional Wilmington Hospital Plaza from Hospital Plaza to 03 New Hanover $1,079,544 $0 $1,079, % Use Path Independence Approximately 6,500 linear feet of ten (10') foot wide multi-use path designed Business 40 Multi-Use Mobility Subregional Winston-Salem Liberty Lockland as part of the Business 40 redesign and 09 Forsyth $3,000,000 $0 $3,000, % Path reconstruction project scheduled for 2018 In / System of /Pedestr /Pedestiran? / Facilities? / Facilities Other Direct connection to WAVE Transit bus routes 105,105,202 & 205. Also connects to the New Connects to the Gary Shell Cross- Walk Wilmington: A Hanover Regional Medical Center which is the City Trail (crosscitytrail.com) at ve Commutes largest employer in the Wilmington n Independence. Metropolitan Urban Area (over 4700 employees) pedestrian connectivity through Will connect with the Downtown the heart of downtown Winston-Salem Strollw and proposed bike lanes on WS Greenw connecting Wake Forest Baptist Hospital, Liberty and Main, as (pending N/A BB&T Ballpark, residential areas, downtown well as sidewalks throughout the adoption) businesses, and transit. neighborhoods it connects 2050 Mobility Subregional Winston-Salem University Parkw Wake Forest Mercantile Approximately 16,000 linear feet of five (5') foot wide sidewalk along one side of the road to be located within the existing right-of-w connecting existing sidewalk segments 09 Forsyth $700,000 $0 $700, % University Parkw is one of the most heavily traveled roadws in Winston-Salem, serving high density residential areas, commercial areas, parks, and Wake Forest University, while also serving as a primary transit corridor into, and out of, downtown Winston-Salem Connects to sidewalks along many of the side streets leading to University Parkw. Winston-Salem Urban Area Sidewalk ve and Facilities rth Suburban Area Mobility Subregional Fetteville Cliffdale Reilly Raeford Construct sidewalk on north side of Cliffdale Fetteville 06 Cumberland $500,000 $0 $500, % Along transit line. Along dense neighborhoods. Connects residential and commercial properties to existing pedestrian facilities Connectivity Report n FA Mobility Subregional Asheville Patton Ave - Ashevillepedestrian improvements Westgate Parkw Asheville-Patton Ave pedestrian crossing improvements from Westgate Old Hwood Rd Pkwy to Old Hwood Rd, sidewalks gap closure where needed 13 Buncombe $740,000 $0 $740, % This is a high priority transit corridor; GoodWill at Old Hwood Rd serves as a job training center; a variety of grocery stores and other retail along Patton Ave; safe crossings would ensure access to Hwood -West Asheville commercial corridor; etc. Existing network of sidewalks in West Asheville-has gaps; the stretch from Regents Dr to New Leicester Hwy has sidewalks installed on one side; the segment west of Hwood Rd has sidewalks on both sides; planned sidewalks on New Leicester Hwy (in the STIP) Asheville Ped 2005 n FBR (Tier I Bike Ped projects) Mobility Subregional Western Huff Lejeune Sidewalks (west side) and crosswalks 03 Onslow $96,840 $0 $96, % connectivity among high-density housing, commercial areas, Coastal Carolina Community College and Onslow Memorial Hospital This is a primary bicycle and pedestrian corridor for connecting to other existing/planned facilities and n Long- n Mobility Subregional Davidson Exit 30 Bike/Ped s Exit 30 s at Griffith St Bridge Exit 30 (I-77) in Davidson to Griffith Bridge over I Mecklenburg $500,000 $0 $500, % Griffith (Exit 30-I 77 overpass) is the only access connecting a high-density residential neighborhood on Lake Davidson to the downtown and other commercial centers in the town; 2 large schools are located on Griffith less than 1/2 mile from the Exit 30 interchange; etc. Griffith has bike lanes and sidewalks along the length of the corridor with the exception fo the Exit 30/I-77 crossing; portions of Davidson-Gatew and Jetton which intersect with Griffith via roundabouts within 1/2 mile of I-77 have bike lanes and sidewalks Davidson Master ve ve Mobility Subregional Greensboro Hill Connector Battleground Mendenhall diet from 4 lanes with turn lanes to 2 lanes with turn lanes and sidepath on north side. 07 Guilford $190,000 $0 $190, % provides primary connection between Latham Park and Lake Daniel Park Provides primary connection between Latham Greenw and Area, Lake Daniel Greenw. Will provide and primary connection between the Greenw Master future A&Y Greenw extension and the future Downtown Greenw ve n Mobility Subregional Charlotte Matheson Av Conversion & Route 10 Extension Statesville Parkwood Extension of signed Route 10 from Statesville to Pinckney, with a street conversion to include bicycle lanes from Tryon to Parkwood Provide countdown signals and/or high-visibility crosswalks at the following intersections: Evans St/Arlington Blvd 10 Mecklenburg $400,000 $0 $400, % Project connects existing neighborhoods, including multi family, to commercial areas and parks. Extenstion of existing local Route 10 with connections to existing local Route 7 Charlotte th St/Charles Blvd Greenville Blvd/Arlington Blvd 10th St/Greenville Blvd 1714 Mobility Subregional Greenville Countdown Signal Heads and high visibility crosswalk markings at 15 intersections Greenville Blvd/Charles Blvd Greenville Blvd/Elm St 14th St/Evans St 14th St/Dickinson Ave NC 43/Arlington Blvd Greenville Urban Area 02 Pitt $650,000 $650, % Safe crossing of these major intersections will allow and encourage pedestrian use. Countdown pedestrian signals will be located along heavily developed corridors with direct access to commercial, transit facilities, schools, parks, and residential areas. countdown signals will provide connection across major intersections with heavy vehicular traffic. All intersections and movements have existing sidewalk. Installation of pedestrian signals will encourage use of existing infrastructure. Master for the Greenville Urban NC 43/Moye Blvd Greenville/Evans Greenville/Landmark Greenville/Bismark Memorial/Arlington Dickinson/Arlington Connects directly to Tower Park. Direct Construct a Sidewalk along Wooster 2025 Mobility Subregional Wilmington Wooster Sidewalk 8th Oleander 03 New Hanover $159,793 $0 $159, % connection to WAVE Transit bus routes 106 & from 8th to Oleander 205 State St (SR Ford W (SR Make improvements to newly created 1730 Mobility Subregional Marion Peavine Rail Trail Isothermal 13 McDowell $1,000,000 $0 $1,000, % Links two neighborhoods with Marion CBD 1700) 1735) rail to trail (pave, landscape) Railroad Ave/Brevard 1757 Mobility Subregional Brevard West Loop Multi-Use McLean West Main Construct Multiuse path Land of Sky 14 Transylvania $550,000 $0 $550, % In CBD and connects to middle school Path Construct wide outside lanes with Primary connection between CBDs of bicycle shared lane markings. 1' to 2' 1866 Mobility Subregional Southern Pines NC 2 (Midland ) US 1 US Triangle Area 08 Moore $581,766 $0 $581, % Southern Pines and Pinehurst. Travels additional pavement needed in each through developed residential area. direction, plus restriping. Connects to existing sidewalks along Walk Wilmington: A Wooster & larger, mature grid ve Commutes sidewalk system in the historic n downtown First Phase of interconnected Regional Trails yes Rutherford/McDowell Trail. completes linkage of Pisgah Transylvania Forest community to downtown City of Brevard ve County Brevard. Portion of broader MUP ve n system that will exceed 12 miles in. ve length upon completion. Southern Pines Would connect to bicycle lane (also on project on Midland (above). NCDOT Moore N/A Also a state bicycle route. County bicycle map as a connector route) 1548 Mobility Subregional Asheville McDowell Southside Ave US 25/Biltmore Ave Asheville-McDowell bike improvements, sharrows and striped shoulder, Southside to US 25/Hendersonville Rd (including and All Souls Crescent) 13 Buncombe $216,000 $0 $216, % Biltmore Village commercial district; health/hospital district along McDowell St; AB Tech Comm College connection to existing bike lanes on Asheland Ave/McDowell north of Southside Ave; planned Swannanoa River Greenw and planned Downtown-AB Tech Connector; Asheville Bike Mobility Subregional Durham US 501 Bypass (Duke Murr US 501 Business Duke (Murr Ave. to Roxboro (Roxboro ) Rd.) Sidewalks Carrboro 05 Durham $1,080,000 $70,000 $1,150,000 95% high density residential, shopping centers, grocery, DATA routes, park, stadium connects to existing greenw trail, 9 sidewalks DurhamWalks! n DCHC rth Second Connect residential to commercial and Mobility Subregional Albemarle Salisbury US Highw 52 Bike lanes with road diet. Rocky River 10 Stanly $258,640 $0 $258, % hospital medical area. Western Mobility Subregional Gatew rth NC 24 Off-road multi-use path 03 Onslow $950,313 $50,119 $1,000,432 90% connectivity between high-density housing, /Liberty commercial areas and Camp Lejeune Tilgnman Rd. to ACC : Paint Mobility Subregional Corbett Ave (D) Tilgnman Rd. Acc 04 $0 100% Residential Area (?) sharrows and install sidewalks Construct Landis Spur of the Grants Will connect Downtown District and Corriher- West Ryder West of Kimball Mobility Subregional Landis Landis Spur Creek Greenw (US 29 and Grants 09 Rowan $200,000 $200, % Lipe Middle to the South Rowan Urban Creek) YMCA & Library. Connects to existing greenw and Albemarle Comp.Bike sidewalk system. Connected to Rails-to- Long- Trails multi-use path, part of the East and n Coast Greenw n All Connected to City of ve ve CTP Network n Livable Connects to existing sidewalk which Landis Master Parks ve Community connects to Central Business District & Rec. n Blueprint 1657 Mobility Subregional Cramerton Cramer Mountain Town of Cramerton Cramerton Town Middle Center 10' paved asphalt trail project along Cramer Mountain. This project will link the Town of Cramerton Town Center to Cramerton Middle and South New Hope.Sidewalk project has already been engineered and is ready to constuct with an encroachment agreement from NCDOT. 12 Gaston $680,000 $0 $680, % Links Town Center with middle school, CBD, and High Residential Town of Cramerton Connects to current sidwalk system Greenw and Trails Master NA

2 Right-of-W / Facilities? System of / Facilities /Pedestr /Pedestiran? Other In / 1720 Mobility Subregional Boone Boone Greenw South side of US rth side of US Construct an underpass of US at the New 421 at the New along the western bank of the New River River River High Country 11 Watauga $598,895 $598, % Within 1500ft of Mountaineer Village (ASU student housing), Watauga High is 3000 ft aw, Brookshire Park is 600 ft aw and will be connected by a future greenw, Boone of New River Paddle Trail is on site. To the south, the underpass begins at the Boone of New River Paddle Trail, which is located off of New River Hills. New River Hills, a low traffic road, is used as part of the Boone Greenw, which includes five miles. Etc Boone ve Boone Mobility Subregional Royall 1286 (William 1565 (Spence ) Construct New Sidewalk on rth Side Urban Area of Royall 04 Wne $297,500 $0 $297, % Will enhance direct access to s, Commerical Areas, High Residential and Transit. The two mile segment would allow for connection to the existing Stoney Creek Trail. n Urban Area Mobility Subregional Western Marine Huff Sidewalks (west side) and crosswalks 03 Onslow $110,000 $0 $110, % connectivity among high-density housing, commercial areas, Coastal Carolina Community College and Onslow Memorial Hospital This is a primary bicycle and pedestrian corridor for connecting to other existing/planned facilities and n Long- n Mobility Subregional EB-5101 Kinston Kinston Waterfront Bridge W Caswell St N Herritage St Kinston Waterfront Initiative: Bridge Over Neuse River. Eastern Carolina 02 Lenoir $0 $0 100% would connect large area park to downtown commerical district and planned waterfront greenw. would connect to "planned" greenw system. City of Kinston Provides direct connection between Empie 2029 Mobility Subregional Wilmington Park Multi-Use Path Independence S Kerr Construct multi-use path on Park between Hawthorne and South Kerr (River to Sea bikew) 03 New Hanover $593,130 $0 $593, % Park, Independence Mall, and Winter Park Elementary. Direct transit connection to WAVE Transit Bus Routes 102, 104,105,106, and 202 at Independence On NC Highw 1 - "River to the Sea Bikew" - the premier bike route in Wilmington (rivertotheseabikew.com) Walk Wilmington: A ve n Commutes & Park. Piedmont Triad Martin Luther Mobility Subregional Winston-Salem Research Park Rail with King Jr. Trail Phase I Third Approximately 3,200 linear feet of ten (10') foot wide urban bicycle/pedestrian path within the of the unused NCDOT rail corridor through the Piedmont Triad Research Park. 09 Forsyth $3,255,026 $0 $3,255, % The trail provides bicycle and pedestrian access along the spine of the emerging Piedmont Triad Research Park in downtown Winston-Salem. The trail is near Salem College and Winston-Salem State University and provides access to downtown's highdensity residential areas. The trail will be connected to sidewalk facilities throughout the Piedmont Triad Research Park, as WS Greenw well as on-street bicycle facilities on (pending 5th. In addition, future phases adoption) of the trail to the north and south will provide connectivity to existing greenws. ve n Winston- Salem Urban Area ve n Mobility Subregional Durham Rocky Creek Greenw Trail Extension Current trail terminus at NC 55 Kelly Bryant Bridge over NC 147 (Durham Freew) Rocky Creek Trail (NC 55 to Kelly Bryant Bridge) Shared Use Path Carrboro 05 Durham $1,610,000 $175,000 $1,785,000 65% DATA and TTA routes, apartments, high density residential, elementary school, NCCU, future rail station connects to bike/ped bridge over NC Durham Trails and 147 and existing greenw trail, 13 Greenws Master sidewalks n DCHC The project would connect the Town s historic The project is a continuation of the 1483 Mobility Subregional Swansboro Gatew To Swansboro, Phase 2 Leslie Rd. Lisk Dr. The project consists of 11,200 linear feet of five foot wide sidewalk to be installed on both sides of NC 24 in Swansboro. Down East 03 Onslow $620,000 $620, % downtown waterfront areas, five public park sites, public accommodations, the centers of local government services, and a central- Swansboro commercial services district to previous TEP-funded Gatew to Swansboro sidewalks project and of Town-funded efforts to extend pedestrian walkws along NC Town of Swansboro Gatew to Swansboro multiple residential neighborhoods, etc. Highw 24. From existing sidewalks on 2nd 1687 Mobility Subregional Longview 2nd Extension 2nd at 27th NW Long View Recreation Center NW at 27th NW west along 2nd to Long View Recreation Center Greater Hickory 12, 13 Catawba, Burke $160,000 $40,000 $200, % at nd NW in the Burke Connects recreation center with high density residential Long View sidewalk system and City of Hickory sidewalk system Long View Sidewalk n GH County Portion of Long View..5 miles GTA Routes 6, 15 and 21 use this corridor Some sections of Summit already 1700 Mobility Subregional Greensboro Summit south of Sixteenth Rankin Rd Construct sidewalk 07 Guilford $300,000 $30,000 $330,000 80% which connects to Rankin Elementary, the Walmart shopping center, Pyramids Village and mulitiple high density residential have sidewalk but is not continuous. Sidewalk is in design on Cone, Sixteenth and Rankin and is under Area, and Greenw Master ve properties construction on Spry. to Central business 1751 Mobility Subregional Butner C Central 29th Construct 1.38 miles of sidewalk on C in downtown Butner. Kerr Tar 05 Granville $434,700 $0 $434, % district from residential neighborhood, the Murdock Employment Center and new Town Creates link to Butner's existing pedestrian network. Butner Park Mobility subregional Sylva Mill Spring Keener Fill sidewalk gaps and upgrade existing sidewalks Southwestern 14 Jackson $130,000 $0 $130, % Provides access within CBD and to new library Provides missing connections within CBD Sylva Mobility Subregional Pittsboro US (Hillsboro Launis Powell Place Lane/Lowes Hillsboro St (15-501) in Pittsboro New Sidewalk & Crosswalks 2.8 miles from Powell Place/Lowes to Launis. Triangle Area 08 Chatham $1,093,152 $0 $1,093, % Would provide connection between central developed portions of Pittsboro and new commercial and residential development near US 64 bypass planned sidewalks in Pittsboro on both ends Pittsboro N/A MLK Jr. Blvd path. A multi-use path 1489 Mobility Subregional New Bern MLK Jr. Blvd path NC 55 Trent Creek Rd. that will provide pedestrian and bike access along the city primary Down East 02 Craven $2,090,000 $0 $2,090, % Connects downtown CBD and schools with commercial corridor area. New Bern commercial corridor. FA 1537 Mobility Subregional Fetteville Cliffdale Skibo Libeth Place Construct sidewalk on north side of Cliffdale Fetteville 06 Cumberland $125,000 $0 $125, % Close to Transit Route. Will complete sidewalk along entire north side of road. ve Connectivity Report FA 1540 Mobility Subregional Fetteville Raeford Robeson Dobbin Construct sidewalk on both sides Fetteville 06 Cumberland $275,000 $0 $275, % Connects residential to high density commercial Connects existing facilities in residential areas to existing facilities on US 401 BUS ve Connectivity Report 2052 Mobility Subregional Winston-Salem Peters Creek Parkw Business 40 Interstate 40 Approximately 9,000 linear feet of five (5') foot wide sidewalk along one side of the road to be located within the existing right-of-w connecting existing sidewalk segments 09 Forsyth $500,000 $0 $500, % Peters Creek Parkw is one of the most heavily traveled roadws in Winston-Salem, serving high density residential areas, commercial areas, and parks, while also serving as a primary transit corridor for the Winston-Salem Transit Authority Connects to sidewalks along many of the side streets leading to Peters Creek Parkw and will eventually connect to the proposed extension to the existing Salem Creek Greenw N/A ve n Winston- Salem Urban Area ve n Mobility Subregional Albemarle West Main US Highw 52 South Depot Bike lanes with road diet. Rocky River 10 Stanly $201,300 $0 $201, % Connect residential areas to central business district Connects to existing greenw and sidewalk system. Albemarle Comp.Bike Mobility Subregional Wne Memorial US 70 Bypass 1560 (Royal ) Construct New Sidewalk both sides Urban Area 04 Wne $210,000 $0 $210, % Will enhance direct access to Commerical Areas and Transit. The proposed improvement provides a connection to an existing sidewalk on Wne Memorial futher expanding the connected network. n Urban Area Mobility Subregional ACC Dr. (A) Corbett Rd. Nash St. Corbett to Nash Rd.:restripe for bike lane 04 $0 100% Residential Area (?) All Connected to City of Network ve ve n CTP Mobility Subregional Durham US 501 Business (Roxboro ) Murr Pacific Roxboro (Pacific Ave. to Murr Ave.) Sidewalks Carrboro 05 Durham $275,000 $75,000 $350,000 95% high density residential, shopping centers, grocery, DATA routes connects to 9 sidewalks DurhamWalks! n DCHC Project connects downtown commerical 1532 Mobility Subregional Kinston Vernon Ave Queen US 70 Install 1.26 miles of sidewalks along the north side of Vernon Ave. Eastern Carolina 02 Lenoir $157,500 $157,500 52% district with Fairfeild Park, Shopping Center, Caswell Center, Woodemen Community Project provides infill sidewalks to larger downtown sidewalk system City of Kinston Center, and Caswell Memorial Park 1460 Mobility Subregional China Grove China Grove Spur East of Kimball NC 152 West Construct China Grove Spur - Grants Creek greenw (NC 152 to east of Kimball ). Urban 09 Rowan $713,319 $713, % Will connect to China Grove Elementary Connects to Grants Creek Greenw Liveable Community countywide system Blueprint ve n Reduce number of lanes from 4 to 3 and add striped bicycle lanes from Fetteville to Cottage Grove Would connect with each of the 1867 Mobility Subregional Siler City SR 1006/2113/2208 (Second ) SR 2110 (Alston Siler Business Bridge ). Widen pavement to construct bicycle lanes from Cottage Grove to Siler Business. Add Triangle Area 08 Chatham $353,000 $0 $353, % Major north-south route through the Siler City CBD other three proposed bicycle projects in Siler City. This is also signed as part of " Route 4" in Chatham Chatham County N/A "share the road" signage between County. Fetteville and Alston Bridge. Part of the Gary Shell Cross-City Trail (a 2030 Mobility Subregional Wilmington Eastwood Multiuse path Military Cutoff Heide-Trask drawbridge Construct a multi-use path on Eastwood from Military Cutoff to the Heide-Trask drawbridge at Wrightsville Beach (UNCW Connector) 03 New Hanover $544,500 $0 $544, % missing connection) - a Parks Department Greenw facility. Provides a direct connection to a WAVE Transit stop for route 103- Central (at 1981 Eastwood ). Also Part of the Gary Shell Cross-City Trail (a missing connection) crosscitytrail.com Walk Wilmington: A ve n Commutes connects to Progress Energy. 2

3 Right-of-W / Facilities? System of / Facilities /Pedestr /Pedestiran? Other In / 1715 Mobility Subregional Ayden NC102 NC11 Lee St. Construct new handicapped-accessible curb ramps near Ayden Middle drivew, replace existing crosswalk across NC102 with high-visibility crosswalk, install high-visibility pedestrian warning signs on NC102, install HAWK pedestrian signal to provide connection between Ayden Middle and Ayden Elementary s. NC102/NC11: Construct sidewalk from end of existing sidewalk near schools on Greenville Urban Area NC102 westward to NC11 intersection. Construct the following intersection improvements: High-visibility crosswalk, advanced stop lines, median pedestrian refuge island, pedestrian countdown signals, and curb radius reduction. NC102/Lee St: Construct / provide: curb extensions, pedestrian countdown signals, pedestrian crossing signage, drivew access management at SE Corner. 02 Pitt $92,000 $92, % Provides strategic crossing location between two school facilities, connecting business located As shown on page 5-42 of the Master, Master the improvements provide critical for the safety enhancements and a Greenville Urban connection between major area facilities Old Hwy 74 (W Mobility Subregional Marshville Hwy 74 Main St.) 1008 (Mount Carmel 1524 Mobility Subregional Chapel Hill US Church ) Piedmont Triad 2036 Mobility Subregional Winston-Salem Research Park Third Greenw Phase II 1919 (Greensboro 1501 Mobility Subregional Carrboro Weaver 1535 Mobility Subregional Fetteville Big Cross Creek Trail Smith Lake Connell 1750 Mobility Subregional Warrenton Connell Dale Earnhardt Blvd 1449 Mobility Subregional Kannapolis Hudson sidewalk Unarco Food Lion Shop. Center 1913 (Bennett ) Salem Creek Greenw Shelton Washington Warren County High S. Cannon it is a part of the Marshville Marshville ve n Chapel Hill connects to 3 sidewalks, existing greenw n Action The trail will extend Phase I of the WS Greenw Piedmont Triad Research Park Trail (pending ve to the south to provide connectivity to adoption) the existing Salem Creek Greenw. Carrboro connects to 4 sidewalks and Weaver ve bicycle lanes n n Will connect to River ve Trail, Fetteville State University. Connects Warrenton to Warren Safe Routes to Warren County Safe ve County High. Routes to n Connect to existing sidewalk leading COK Walkable ve to Central Business District Community n New sidewalks along Hwy 74 to accomodate and connect pedestrian Rocky River 10 Union $0 100% Connect low-income apt to commercial moveement between commercial areas along Hwy 74 SR 1008 (Mount Carmel Church Rd) (US to Bennett Rd) sidewalks 07 Orange $375,000 $0 $375, % CHT route Carrboro and bicycle lanes. The trail provides bicycle and pedestrian Approximately 5,300 linear feet of ten access along the spine of the emerging (10') foot wide greenw connecting the Piedmont Triad Research Park in downtown southern end of the proposed Piedmont 09 Forsyth $1,000,000 $0 $1,000, % Winston-Salem. The trail is near Salem Triad Research Park Trail Phase I College and Winston-Salem State University project to the Salem Creek Greenw and provides access to downtown's highdensity residential areas. N. Greensboro St. corridor from Weaver shopping center/grocery, CBD, high density St. to Shelton St. widen for bike lanes, 07 Orange $200,000 $0 $200,000 95% Carrboro residential area, library, CHT routes add bicycle signal detection, and median Will connect Smith Lake Recreation Area to Construct multiuse trail Fetteville 06 Cumberland $2,500,000 $500,000 $3,000,000 50% neighborhoods along corridor. Will connect with Fetteville State university. Construct.5 miles of off-road multi-use Completes link from Connell to school path in Warren County from the school Kerr Tar 05 Warrem $80,000 $0 $80, % site via school property. to Connell. Construct Dale Earnhardt Blvd sidewalk, Connect High Residential Area to Phase I (Hudson and S. Cannon 10 Cabarrus $340,000 $50,000 $390,000 0% Urban Commercial Area Blvd) Union County CTP DCHC South Central Area DCHC Fetteville- Cumberland Parks and recreation Master Warren County CTP COK Capital Mobility Subregional Bessemer City Yellow Jacket Lane rth 12th rth 12th Yellow Jacket Lane Bess Town Sidewalk (5ft) on 12 and Yellow with Jacket Lane connecting neighborhoods Sidewalk on to existing sidewalk and three schools rth 12th 12 Gaston $398,046 $398, % Connects high density neighborhoods to three schools Would connect to an existing sidewalk Bessemer City ve Bessemer City Mobility Subregional Greensboro Sixteenth Yanceyville Cone Blvd. Construct sidewalk 07 Guilford $450,000 $45,000 $495,000 80% GTA Routes 6 and 21 use this corridor which connects to the Walmart shopping center, Pyramids Village and mulitiple high density residential properties There is existing sidewalk on the shopping center property and on the southeast section of Summit Ave. Sidewalk on the rest of Summit is to be built with a different project. Area, and Greenw Master ve Mobility Subregional Indian Trail Highw 74 Multi-Use Path West Town Limit Wesley Chapel Stouts Rd 10' Multiuse path 10 Union $1,210,000 $0 $1,210, % Project is along HWY 74 with approximately 45,000-5,000 cars a d. Project will connect all the uses along this roadw. t at this time, system in planned Indina Trail Ped ve n Indian Trail Comp Mobility Subregional Gastonia Thread Trail South Marietta Linwood On- Thread Trail link from Marietta to Linwood, urban trail system using sidewalk, on and offstreet trails to connect two National Register Districts and Historic Lor Mill 12 Gaston $425,000 $0 $425, % Connects to current transit system. to High Residential Area Connects to current sidwalk system NA NA Mobility Subregional EB 5104 Rocky Mount Rail to Trail Franklin Falls construct Rail to Trail Rocky Mount 04 Nash $1,000,000 $1,000,000 75% the trail will begin and end at park areas the trail intersections with existing sidewalks Rocky Mount n Rocky Mount Mobility Subregional Elon East Haggard East Haggard / Elon University NC 87 Install sidewalks on East Haggard Burlington-Graham from Daniely Center to Phoenix Urban Arms Apts and extend to NC Alamance $100,000 $100,000 $200,000 50% Elon University to the commercial and surrounding residentail areas. Elon University, the Town of Elon have allocated funds and to this project. Pedestrain facilities in area for citizens and students - Town and Campus transportation connections Elon & Pedestrain ve n (Junction 1520 Mobility Subregional Durham NC 98 (Hollow ) 1919 (Chandler ) NC 98 (Hollow St) (SR 1838 (Junction Rd) to SR 1919 (Chandler Carrboro )) sidewalk and wide outside lanes. 05 Durham $590,000 $220,000 $810,000 90% elementary school. Park, high density residential, DATA route connects to 8 sidewalks DurhamWalks! n DCHC Mobility subregional Bryson City Big Cove Rd/Acquoni Rd existing sidewalk existing sidewalk sidewalks/curb cuts/signalized Intersection on US441 on Acquoni crosswalks Southwestern 14 Jackson $0 $0 $0 100%, CBD, and GSMNP Provides missing link and connects to multi-use path, park, CBD EBCI Pedestrain n EBCI Mobility Subregional Albemarle South Second South First NC Bike lanes with road diet. Rocky River 10 Stanly $4,260 $0 $4, % Install 4000 linear feet of sidewalk along north side of Arendell (Highw 1484 Mobility Subregional Morehead City Tlor St. to 26th St. Tlor St. 26th St. Down East 02 Carteret $430,000 $0 $430, % 70) from Tlor east to N. 26th. bridge across South Fork Lakewood 1632 Mobility Subregional Cramerton Bridge Goat Island River connecting Cramerton Town 12 Gaston $500,000 $500, % neighborhood Center to Goat Island West McDowell Construct sidewalk connecting 1725 Mobility Subregional Marion US-70/US221B Logan Junior High downtown with major shopping center Isothermal 13 McDowell $3,750,000 $250,000 $4,000,000 50% and junior/senior high school Approximately 1,100 linear feet of 5' Sidewalk along both sides of the road Century Lake South Main within existing right-of-w connecting 2045 Mobility Subregional Kernersville Century Place 09 Forsyth $79,583 $0 $79, % Park area Century Lake Park and residential neighborhoods with the South Main commercial area Connect central business district to City park and residential areas. This project would complete a connection between three schools, the post office, the hospital, recreation areas, shopping centers and downtown to multiple neighborhoods. Would allow any resident from central Cramerton to access town center and new high school by walking and thus cut down on traffic in town Links CBD to Commercial Strips in rth Marion and West McDowell Junior/senior high Connects Residential area around Century Lake Park to South Main Shopping area, particularly the Harris Teeter shopping center Connects to existing greenw and Albemarle Comp.Bike sidewalk system. This project would complete a connection between three schools, the post office, the hospital, Morehead City recreation areas, shopping centers and downtown to multiple neighborhoods. N/A ve Major connection between CBD and Safe Routes to Marion SRTS Action Regional ve greenw network Trails Winston- Salem Urban Ties to existing sidewalk in the Town of Kernersville Area Century Lake Park area and will tie ve & to S Main Sidewalk that is proposed n ve along the commercial corridor n 1680 Mobility Subregional Morganton Downtown Greenw Connector (Morganton Greenw) N. College Catawba River Greenw Downtown Greenw Connector along N. Green St. from intersection of N. Greater Hickory 13 Burke $880,000 $220,000 $1,100,000 90% College and N. Green St. connect to Catawba River Greenw 1 mile Connects recreation center with Catawba River Greenw / Morganton Housing Authority and Mtn. View Elem. Catawba River Greenw / Morganton Downtown Bike System rth Green Greenw n GH Downing to Ward Blvd.: Shared lane/ All Connected to City of 1999 Mobility Subregional St. (A) Downing St. Ward Blvd. 04 $0 100% Residential Area (?) ve signage treatment Network Sensitize Traffic Signal Detectors for Locations would be chosen based on proximity Locations would be chosen based on 1462 Mobility Subregional Cary Various Various Capital 05 Wake $120,000 $0 $120, % s to existing bicycle routes proximity to existing bicycle routes The two mile route would link US 13 (Berkeley 1003 (New Hope Urban Area Will enhance direct access to s, 1664 Mobility Subregional Central Heights Construct Paved Shoulder 04 Wne $704,000 $0 $704, % designated future bicycle routes and ) ) Commercial Areas and Transit. future multi-use paths. Connects to the following greenws Intersection with Master Greenw provides direct access to CBD, identified within the Greenws Harris Mill Trail for the South Tar River Western Edge of Construct multiuse path (3,600ft of Greenville Urban Area residential, school, and provides connection to master plan: Town Common 1710 Mobility Subregional Greenville (as identified in 02 Pitt $383,584 $2,131,020 $2,514,604 35% Greenville Urban Greenw, Phase 3 Town Common paved trail, 6,030 ft of boardwalk) East Carolina University Health Sciences Trails/South Tar River Greenw Greenws also: Campus Phase 1, Third Connector, Master ) Greenws Master and house Branch Greenw Connects existing facilities on George Owen 1541 Mobility Subregional Fetteville Cumberland Southern Construct sidewalks on both sides Fetteville 06 Cumberland $1,100,000 $0 $1,100, % Two elementary schools along the road George Owen to residential and commercial areas Conover Blvd E From Thornburg YMCA / Fire Department / Residential / /NC 16 west along Conover Blvd Conover 1690 Mobility Subregional Conover Conover Blvd East Thornburg Conover Station Greater Hickory 12 Catawba $180,100 $45,000 $225, % Industrial / Retail / Conover Multi-modal Conover sidewalk system E/US 70 to Conover Station property Station 1.0 Mile ve CTP n Town of Cary ve ve Varies n n Urban Area n FA ve Connectivity Report GH n 3

4 Right-of-W / Facilities? System of / Facilities /Pedestr /Pedestiran? Other In / 1461 Mobility Subregional Creedmoor Hawley NC 56 Brassfield Rd Hawley Rd b/t NC 56 and Brassfield Rd-Add Sidewalks and Bike Lanes Capital 05 Granville $0 50% This project is part of an ultimate 3 mile wide system access the entire City of Creedmoor and connect towards Butner - our neighboring jurisdiction. This section would connect that main system to the residential area south of the City and to Hawley Middle. yes This project is part of an ultimate 3 mile wide system for City of Creedmoor and connect towards Butner. This section would connect that main system to the residential area south of the City and to Hawley Middle. CA, City of Creedmoor Bike, ve Ped, Greenw Master City of Creedmoor Strategic Master Mobility Subregional Charlotte Walkers Branch Greenw RiverGate Smith Shopping Center Approx 0.75 miles of multi-use greenw trail 10 Mecklenburg $600,000 $0 $600, % Greenw trail will connect large shopping center, active recreational complex and extensive residential areas in SW Mecklenburg County Proposed trail will tie into existing Walker Branch Greenw which continues to S Tryon St. and connects to the shopping center 2008 Mecklenburg County Greenw Master ; Charlotte Master ve n 2011 Steele Creek Area Mobility subregional Webster Tuckaseegee River Greenw Painter NC 107 Construct greenw along Tuckaseegee Southwestern 14 Jackson $1,100,000 $250,000 $1,350,000 55% River from WCU to Cullowhee business district Connects bike lanes on NC 107 to Cullowhee and WCU Jackson County Greenw ve n Jackson County CTP Piedmont Triad Mobility Subregional Winston-Salem Research Park Greenw Phase III Martin Luther King Jr. Twenty-Seventh Approximately 6,200 linear feet of ten (10') foot wide greenw along an abandoned rail corridor connecting the northern end of the proposed Piedmont Triad Research park Trail Phase I project to Twenty-Seventh 09 Forsyth $1,500,000 $0 $1,500, % The trail provides bicycle and pedestrian access along the spine of the emerging Piedmont Triad Research Park in downtown Winston-Salem. The trail is near Salem College and Winston-Salem State University and provides access to downtown's highdensity residential areas. The trail will extend Phase I of the Piedmont Triad Research Park Trail WS Greenw to the north to provide connectivity to (pending additional residential streets with adoption) sidewalks. N/A Mobility Subregional Reidsville South Park Existing Sidewalk Cypress Construct 6' wide concrete sidewalk for 4,070' between existing sidewalk and Cypress Piedmont Triad 07 Rockingham $334,000 $50,000 $384, % Will provide connectivity to Reidsville High Connects to Reidsville sidewalk system and proposed Jcee Park Greenw extension Mobility Subregional EB-5102 Emerald Isle NC 58 - Emerald Isle to Indian Beach Bike Path Mile Marker 15 Indian Beach Extend muti-use trail along Hwy 58 to the Indian Beach town limits. Down East 02 Carteret $420,000 $0 $420, % Connects residential neighborhoods to each other and the commercial center of Emerald Isle. Will connect to and extend exsisting muti-use trail. Emerald Isle and n Construct.7 miles of wide shoulders on 1749 Mobility Subregional Warrenton Connell Connell Property Warren Plains Connell in Warren County from the school property line to Warren Kerr Tar 05 Warren $109,000 $0 $109, % Links route from Warrenton (Warren Plains ) to Warren County High. Connects Warrenton to Warren County High. Safe Routes to Warren County Safe ve Routes to n Warren County CTP Plains Mobility Subregional Reidsville Jcee Park Greenw Extension Jcee Park Dr S. Park Extend existing greenw 1900 between JCee Park and South Park Piedmont Triad 07 Rockingham $209,000 $15,000 $224,000 0% in Reidsville. Design and construct 10 wide Asphalt multiuse trail. Will provide access to Jcee Park and extends existing Reidsville High access closer to more residential Piedmont Triad Reg Lengthens existing trail that connects Trail 2011 and with Reidsville High school Reidsville Greenw 1999 ve n CTP County Home Mid-Block Crossing and sidewalk construction: Construct 1716 Mobility Subregional Greenville SR 1724 (County Home Elementary Rd) Park facility sidewalk parallel to County Home to connect end of existing trail to proposed mid-block crossing location Greenville Urban Area (both sides of roadw). Installation of high visibility pedestrian warning signs with flashing beacon on County Home. of handicapped- 02 Pitt $7,500 $75,000 $82, % Provides direct connection between Elementary, Middle, and farmer's market facility to park and recreation facility. As shown on page 4-16 of the Master, Master the improvements connect to existing for the sidewalk infrastructure and provide Greenville Urban vital intersection and crossing safety enhancements accessible ramps. Installation of HAWK pedestrian signal 1745 Mobility Subregional Gum Branch Henderson - Crosswalks 03 Onslow $300,000 $100,000 $400,000 75% connectivity among high-density housing, commercial areas, High and a major multi-purpose park This section is a major spine section of the trail system identified in the and Bike/Ped plan n Long- n Mobility Subregional Charlotte Tom Short Rd Sidewalks Ardrey Kell Rd Haddonfield Pl A sidewalk gap that would connect everal neighborhoods to retail, parks, and a school. 10 Mecklenburg $269,000 $29,000 $298,000 90% The project is within 1/8 mile of a school, 2 parks, and commercial shopping center This project will complete sidewalks along the west side of Tom Short Rd City of Charlotte Sidewalk retrofit Policy ve n n Action (2006) This is a joint project with Virginia to link the existing Dismal Swamp trail in rth Carolina to the existing Dismal Swamp trail in Virginia. It will result in over 20 miles of trails from South Mills in Camden, NC to Deep Creek in 1430 Mobility Regional Elizabeth City NC17 Virginia Line Chesapeake VA. The rth Carolina Dismal Swamp portion of the project is a traffic free 10 Albemarle 01 Camden $1,590,000 $0 $1,590,000 0% Welcome Center foot wide trail 3.3 miles in length running between US 17 and the historic to South Mills, to Great Dismal Swamp, and Virginia trails Connects to 13 miles to the north and 3 miles to the south Camden Greenws Study and engineering studies Dismal Swamp Canal. Most of this section of the trail will be buffered from US 17, however due to proximity of the highw to the canal, approximately 10,000 linear feet will be 12 foot from the highw and separated by guard rail. This is a continuation of the A&Y Greenw that extends south 1695 Mobility Subregional Summerfield A&Y Greenw (Summerfield South) US220 Centerfield Rd. Construct shared use path (paved) with accompanying equestrian trail 07 Guilford $900,000 $50,000 $950,000 78% Greenw will go through Summerfield Park off Centerfield Rd using existing trail. through Greensboro. It also shares the alignment from US220 to Pleasant Ridge Rd. with the Area, and Greenw Master ve n Piedmont Greenw which will extend to Winston-Salem Mobility Subregional Greenville Tar River to Hardee Creek South Tar River NC33 Trail (as identified intersection with in Greenws Bell's Branch Master ) Construct multiuse path (650ft of paved Greenville Urban Area trail, 3,400 ft of boardwalk) 02 Pitt $199,890 $1,110,500 $1,310, % Greenw provides necessary connection to residential and student housing development along 10th St (NC33). Provides access to transit facilities along 10th St (NC33). Provides necessary connection to South Tar River Phase 2 greenw. Also provides connection to Hardee Creek Greenw and Bells Branch Greenw Master for the Greenville Urban also: Greenws Master Mobility Subregional Harris Slocumb 2046 (Stoney Creek Parkw) Construct New Sidewalk on South Side Urban Area of Harris 04 Wne $140,000 $0 $140, % Will enhance direct access to High Residential and Transit. The proposed improvement provides a connection to the exsiting Stoney Creek Trail. n Urban Area Mobility Subregional ACC Dr. (B) Hines St. Vance Rd. Hines to Vance Rd.: connect existing sidewalks (west side) 04 $0 0% Residential Area (?) All Connected to City of Network ve ve n CTP Mobility Subregional Fetteville Little Cross Creek Greenw Bragg, H, Outer Loop/I295 Robeson intersection intersection Construct multiuse trail Fetteville 06 Cumberland $3,500,000 $50,000 $3,550,000 90% Trail would bisect northern Fetteville between Bragg Blvd and Murchison Rd., both transit routes, and pass elementary school. Would continue to CBD. A small portion of this trail is complete around Mazerick Park, the trail would continue to Veteran's Park trail, linear trail, and the Cape Fear River Trail, which is part of the East Coast Greenw. ve Fetteville- Cumberland Parks and recreation Master Mobility Subregional Hendersonville Oklawaha Greenw Phase 3, Patton Park to Main St near Berkeley Ball Park, 1.4 Ochlawaha Dr mi. multi-use path, $1 million estimated cost Hendersonville-Oklawaha Greenw Berkeley Mills Phase 3-Patton Park to Berkley Ball Park off Balfour Park, $1 million; 8100 ft; following Mud Rd near Carter St Creek 14 Henderson $1,000,000 $0 $1,000,000 60% Berkeley Mills Park, Patton Park, multi-family residential along Eastbury Dr; Existing Oklawaha Greenw segment; planned and existing sidewalks Hendersonville 2007 n FBR Mobility Subregional EB 5510 Rocky Mount Tar River Trail Talbot Park (trail head) Springfield extend Tar River Trail Rocky Mount 04 Edgecombe $1,400,000 $1,400,000 25% the trail is extended deeper into residential area existing trail will be extended 1.5 miles Rocky Mount n Rocky Mount Mobility Subregional Durham 1443 (Horton ) NC 157 (Guess ) US 501 (Roxboro Horton (Guess Rd. to Roxboro ) Rd.) Sidewalks Carrboro 05 Durham $445,000 $80,000 $525,000 90% DATA routes, shopping center/grocery, apartments connects to existing greenw trail, 7 sidewalks DurhamWalks! n DCHC Mobility Subregional Greensboro Battleground (US220) Old Battleground Benjamin Pkwy Construct sidewalk 07 Guilford $586,000 $58,000 $644,000 75% GTA Route 8 uses this corridor Battleground has a lot of discontinous sidewalk that will be connected with this project. Cone sidewalk is under design. This is also less than a block from the A&Y Greenw. Area, and Greenw Master ve Mobility Subregional Nashville Nashville Sixth Sidewalk Brake Alston north side from Brake to Alston (1500') Rocky Mount 04 Nash $55,000 $7,000 $62,000 0% Project provides missing sidewalk link in residential area near the central business district. The additional sidewalk contributes to the continuity of the town wide walking network. Nashville n Rocky Mount n Mobility Subregional Elon South Williamson Elon Town Hall US 70 / South Church Install sidewalks on South Williamson Burlington-Graham from Elon Town Hall to US 70 / Urban Church 07 Alamance $350,000 $150,000 $500,000 0% Provide pedestrian access and connection to residential neighborhoods, Town Hall and to school and commercial areas. Improves pedestrain network in downtown areas and provides walkable link to Town facilities Elon & Pedestrain ve n Sidewalk on the north side of NC 58 from Atlantic Beach to Bogue Banks 1486 Mobility Subregional Pine Knoll Shores PKS sidewalks/crosswalks Pine Knoll Blvd. Oakleaf Dr. Library including crosswalks at beach access near Oakleaf, Juniper Down East 02 Carteret $321,550 $0 $321, % Connects residenst to a library, provides connection to multiple neighborhoods. Pine Knoll Shore , Mimosa and Pine Knoll Construct 1.85 miles of sidewalk to connect existing network of sidewalks in the CBD with neighborhood shopping 1752 Mobility Subregional Oxford Williamsboro Us158 near Military center, residential and employment areas. The project is an extension of Kerr Tar 05 Granville $582,750 $0 $582, % the existing pedestrian fabic of the town activity nodes along the corridor to existing sidewalk network in CBD. Creates link to Oxford's town center, parks, schools, shopping, employment centers, library, etc center to older neighborhoods in the immeidate vicinity of the center of Oxford. 4

5 Right-of-W In / System of /Pedestr /Pedestiran? / Facilities? / Facilities Other Approximately 1,100 linear feet of 5' Winston- Sidewalk along one side of the road Ties to existing and planned Salem Urban within existing right-of-w connecting Connects multifamily residential area at corner expansion of sidewalk 4th of July Town of Kernersville Area Bodenhamer (NC West Mountain ve 2044 Mobility Subregional Kernersville Dobson Wynnfield Court to Fourth of July Park 09 Forsyth $91,293 $0 $91, % of Bodenhamer and Dobson to 4th of July Park area which leads to Kernersville & ) n and Kernersville Elementary Park area Elementary and eventually a ve beyond it via an existing sidewalk connection to downtown network n Herring to Black Creek Rd.: Paint All Connected to City of ve 2002 Mobility Subregional Pender St. Herring Blvd. Black Creek Rd. sharrows or shared lane/signage 04 $0 100% Residential Area (?) ve CTP Network n treatment To install Rapid Flashing Beacons at The beacons are located at The beacons would be strategically located to intersections near local schools or on crossings where sidewalks or improve pedestrian access to local schools; Safe Routes to routes frequently taken by local students greenws lead to both sides of the 1786 Mobility Subregional Davidson Various locations Various locations 10 Mecklenburg $90,000 $0 $90, % the beacons also improve access and safety Beacons walking or biking to schools; to be intersection and facilitate travel on between neighborhoods and to nearby placed at crossings of high-traffic low-traffic residential streets where commercial centers thoroughfares possible Seymour Will enhance direct acess to s, Parks, The three mile segment would link US 70 Business Urban Area 1663 Mobility Subregional Slocumb Johnson Air Stripe for Bike Lane 04 Wne $54,000 $0 $54, % CBD, Commerical Areas, High existing facilities from SJAFB to Urban Area (Ash n Force Base Residential and Transit. existing facilities in downtown. Connects to the following greenws Master house Branch South Tar River Greenw provides direct connection to East identified within the Greenws for the Greenw and Trail (as identified Medical Complex Construct multiuse path (3,275ft of Greenville Urban Area Carolina University Health Sciences Campus, 1711 Mobility Subregional Greenville 02 Pitt $208,467 $1,158,150 $1,366,617 0% Master : South Tar River Greenville Urban Completion of 3rd in Greenws Area paved trail, 3,000 ft of boardwalk) Pitt County Memorial Hospital, and transit Greenw Phase 3, Third also: Connector Master ) routes on Fifth St (NC43). Connedtor, Harris Mill Run South. Greenws Master Extension of the Rails-to- Long Mobility Subregional Marine Rails-to-Trails Empire Off-road multi-use path 03 Onslow $628,586 $331,514 $960,100 10% connectivity between high-density housing and Trails multi-use path, part of the East and n commercial areas Coast Greenw n connectivity between high-density housing and Extension of the Rails-to- Long- Holcomb Piney Green 1734 Mobility Subregional NC 24 Off-road multi-use path 03 Onslow $349,770 $0 $349, % commercial areas, connects to the major multipurpose park in and Camp Coast Greenw Trails multi-use path, part of the East and n Lejeune n Rock Spring Connect residential areas to central business Connects to existing greenw and Albemarle Comp.Bike 1849 Mobility Subregional Albemarle NC 73 Bluff Grinding, Bike lane striping Rocky River 10 Stanly $12,000 $0 $12, % district sidewalk system. Sidewalk, Bikew, US 321 From US 70 north along US Connects office buildings and industry with Connects to Hickory sidewalk GH 1689 Mobility Subregional Hickory US 321 US 70 Catawba River Greater Hickory 12, 13 Catawba $354,800 $88,700 $443, % Greenw, and Trail to the Catawba River. 2.8 miles retail and residential system n Master As shown on page 4-14, of the Master, the proposed improvements provide Provides direct connection to Town of Master SR 1130 (Vernon SR 1133 (Main Construct Sidewalk on both sides of Mill Greenville Urban Area connection to other planned 1717 Mobility Subregional Winterville SR 1149 (Old NC 11) 02 Pitt $25,920 $432,000 $457, % Winterville CBD, residential, and commercial for the White Rd) St) St / Old NC 11. infrastructure. Provides connection land uses. Greenville Urban to existing sidewalk on Main further expanding the connected network. The Colington Multi-use Path will follow SR 1217 right of w and along Connects residential to commercial areas on Currently, already a multi-use path KDH 1427 Mobility Subregional Kill Devil Hills SR 1217 End of US158 subdivision lines for approximately 4 Albemarle 01 Dare $5,000,000 $2,000,000 $7,000,000 30% 158, also connects the middle school and high thru part of the area, would connect (still finishing up) miles where it will join existing multi-use school the town path in Kill Devil Hills Mobility Regional Forest City Isothermal Rail Trail Ledbetter Rd (SR Forrest Hunt 1104) Extend current rail trail to town of Forest City and Alexander Mills Isothermal 13 Rutherford $2,000,000 $0 $2,000,000 25% Downtown Forest City, Forrest Hunt Elementary Main link between three towns and future connections out of region Regional Trails Mobility subregional Bryson City Fontana Downtown Swain County High Construct multi-use path from Downtown Bryson City to SwainCounty High along Fontana. Southwestern 14 Swain $120,000 $0 $120,000 90% Provides access to/from school and downtown business district Connects high school to downtown district (?) Bryson City ve n Swain County CTP Mobility Subregional Catawba Lake rman Bike Route Hudson Chapel Mombo Add wide outside shoulders for bicycles. Long Island From the intersection of Kale and Long Island Unifour 12 Catawba $362,100 $90,500 $452,600 0% then west on Long Island to the intersection of Long Island and Monbo. 1 mile Long Island Marina. Part of the larger Lake rman Bike Route that connects schools/commerical/parks and residential Lake rman Bike Route Lake rman Regional Route ve n Unifour CTP / Sherrills Ford SAP Mobility Subregional Hertford Harvey Poiny Rd NC17 Skinner Rd 5 ft sidewalk along eastern side of Harvey Point Rd Albemarle 01 Perquimans $500,000 $0 $500,000 0% CONNECTION TO THE TOWN of hertford, the counties rec center hertford sidewalk system Hertford Mobility Subregional Carrboro Campus to Campus Connector Broad 1843 (Seawell ) Campus to Campus Connector (Broad St. to Seawell Rd.) Construct a multi-use path between Broad St. and Village Dr. and between Village Dr. and Carrboro Seawell Rd.; install on-street bicycle facilities on Village Dr. 07 Orange $850,000 $50,000 $900,000 95% CHT routes, apartments, CBD, park connects to 2 sidewalks Carolina rth Development Mobility Regional Gastonia Mobility Subregional Greenville Part of Carolina Thread Trail South Tar River Greenw, Phase 2 South Marietta Golf Course Catawba Creek Greenw Extension. East Ferguson Park to Marietta. Garrison Osceola Boundary for the Trail head for the City's ETJ and connector trail new city-owned Construct multiuse path (2,400ft of running south to recreational lands paved trail, 6,400 ft of boardwalk) the Green Mill near the Run Greenw cemetary Greenville Urban Area 12 Gaston $543,000 $0 $543, % 02 Pitt $390,240 $2,168,000 $2,558,240 69% Connects to current transit system, High Residential Area, and Fergusion Park Greenw connects parks, residential, and university student housing development to existing greenw, expanding the interconnected greenw system. Connects to current sidwalk system NA NA Connects to the following greenws Master identified within the Greenws for the Master : South Tar River Greenville Urban Greenw Phase 1, Green Mill -- also: South Tar connector, Tar River to Greenws Master Hardee Creek Conneector 1643 Mobility Subregional Gastonia Sherwood Elem/Grier MS Sidewalks Churchill Timberlane Put sidewalks on : Churchill - Sidewalk on E side from Laurel Lane to Dixon Circle to Hudson Laurel Lane - Sidewalk on N Side from Timberlane to Laurel Lane Timberlane. - Sidewalk on E side from Laurel Lane to Holly Holly - Sidewalk on N side from Timberlane to deadened. 12 Gaston $273,060 $0 $273, % Located near Grier Middle and Sherwood Elemantary. High Residential Area. Connects to current sidwalk system NA NA McDonald Parkw 1688 Mobility Subregional Hickory Springs NC 127 Extension 1771 Mobility Subregional Brevard Probart Pisgah Lane Holcumbe Rd Wicker Civic SR 1514 (Bragg 1877 Mobility Subregional Sanford SR 1519 (Nash Center (east of Kelly ) Lake Park 2023 Mobility Subregional Carolina Beach Fourth Sidewalk Cunningham 1481 Mobility Subregional Havelock Havelock Multi-use Trail Recreation Dr. Blvd. Mt Holly- Ramah Church 1794 Mobility Subregional Huntersville NC 115 Bikew Huntersville Rd Connects high density residential to shopping From Springs northeast along 29th NE to NC miles Greater Hickory 12 Catawba $405,400 $101,400 $506,800 0% centers and medical facilities and assisted Construct sidewalks, meeting ADA compliance Land of Sky 14 Transylvania $92,000 $92,000 0% Located within CBD/high density area Construct sidewalk Triangle Area 08 Lee $121,350 $0 $121, % Serves Lee County High Construct a sidewalk along in the Town of Carolina Beach from Second to Fourth rth The Projects is a request for a multi-use trail along Highw 101 from Cunningham Blvd. to the Recreation complex. Resurface NC 115 and stripe Bike Lanes from Mt. Holly-Huntersville to Ramah Church. 03 New Hanover $54,924 $0 $54, % Down East 02 Craven $470,000 $470, % 10 Mecklenburg $25,000 $0 $25, % living facility The project is located in the downtown commercial core of the Town of Carolina Beach This project will connect a middle school, high school, and recreation complex with multiple residential areas. Direct to CBD, one quarter mile to transit station, one quarter mile to elementary school Connects to Hickory sidewalk system segment is included in larger New Brevard Sidewalk Prioritization Would connect with planned sidewalks on Bragg and Kelly Connected to existing sidewalks in the downtown core of the Town of Carolina Beach Sidewalk, Bikew, Greenw, and Trail Master City of Brevard ve Sanford n GH N/A Continuation of project Parks and Recreation Master Huntersville Greenw, Trail, and Master ve ve ve Land Use Huntersville 2030 Community Mobility Subregional Raleigh Blue Ridge Hillsborough St Wade Ave to Wade Ave. improvements Capital 05 Wake $1,100,000 $0 $1,100,000 0% hotel, office parks, and regional transit park Provides access to State Fairgrounds, NCSU, Blue Ridge - Hillsborough and ride lot Provides a connection to bicycle route #1 and will provide a connection to planned sidewalk on Blue Ridge north of Wade to Reedy Creek which will provide connections to the Reedy Creek Greenw and the NC Art Museum. N/A ve n 2030 ve : Arena Area (Cornwallis 1512 Mobility Subregional Durham 1118 (Fetteville ) Nelson ) Food 1821 Safety Subregional Biscoe NC 24/27 Town Hall Lion/Foundary SR 1848 (Pennsylvania NC 2 (Midland 1938 Mobility Subregional Southern Pines Glover ) ) Saint Marks 2024 Mobility Subregional Wilmington Market Sidewalk 21st Place SR 1118 (Fetteville Rd) (SR 1158 (W NCCU, 2 elementary schools, apartments, Cornwallis Rd) to Nelson St) bike lanes 05 Durham $385,000 $5,000 $390, % Carrboro grocery, DATA and TTA routes and sidewalks. Crosswalk and Refuge Safety improvements at popular crossing Island s in conjunction with Piedmont Triad 08 Montgomery $40,000 $0 $40, % areas NC 24/27 improvements PENNSYLVANIA St., Southern Pines, Connects several neighborhoods to north with Sidewalk, 0.69 miles from GLOVER to the older gridded section of town. Potential Triangle Area 08 Moore $152,290 $0 $152, % MIDLAND access route to Southern Pines Primary (nearby). Construct a missing sidewalk link along Market (US 17) from Saint Marks 03 New Hanover $6,262 $0 $6, % Connects to Wallace Park & Bullock Park Place to 21st connects to 12 sidewalks, American Tobacco Trail Connects sidewalks on a widened highw Provides missing connection along Market (US17) DurhamWalks! DCHC n N/A N/A Walk Wilmington: A ve

for The Nation, North Carolina & its Neighbors NC's Regions & Counties Posted October 2, 2013

for The Nation, North Carolina & its Neighbors NC's Regions & Counties Posted October 2, 2013 s 1 Table 1 s The Nation, North Carolina & its Neighbors NC's Regions & Counties North Carolina United States South Carolina Georgia Tennessee Virginia AdvantageWest Economic Development Group Alleghany

More information

Occupancy tax collections fiscal year County collections Municipal collections

Occupancy tax collections fiscal year County collections Municipal collections Occupancy tax collections fiscal year 2013-2014 County collections Municipal collections Counties Rate Total net Amount to Amount to Amount to Municipalities Rate Total net Amount to Amount to Amount to

More information

OCCUPANCY TAX COLLECTIONS FISCAL YEAR

OCCUPANCY TAX COLLECTIONS FISCAL YEAR OCCUPANCY TAX COLLECTIONS FISCAL YEAR 2014-2015 County collections Municipal collections Counties Rate Total net Amount to Amount to Amount to Municipalities Rate Total net Amount to Amount to Amount to

More information

North Carolina County Weatherization Agencies by County Note: Some agencies serve more than one county.

North Carolina County Weatherization Agencies by County Note: Some agencies serve more than one county. Where to Apply for Weatherization Assistance Applications must be placed with the designated local service provider for the county in which you live. Start the application process by contacting the appropriate

More information

Date Day # of Mtgs Meeting Time County City Venue

Date Day # of Mtgs Meeting Time County City Venue 9/25/2018 Tues. 1 4PM-6PM Nash Rocky Mount DoubleTree by Hilton Hotel Rocky Mount at the Texas Steakhouse & Saloon 651 N Winstead Ave Rocky Mount, NC 27804 9/26/2018 Wed. 1 4PM-6PM Wilson Wilson Wilson

More information

H.B. 259 Mar 4, 2019 HOUSE PRINCIPAL CLERK

H.B. 259 Mar 4, 2019 HOUSE PRINCIPAL CLERK H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE BILL DRH0-NDa-A H.B. Mar, 0 HOUSE PRINCIPAL CLERK D Short Title: Add'l Judge and Magistrates in Union County. (Public) Sponsors: Referred to: Representatives

More information

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP Alamance Suburban 0.9631 Alamance AmeriGas, LP 1.0531 Alexander Suburban 0.9631 Alexander AmeriGas, LP 1.1021 Alleghany Suburban 0.9631 Alleghany AmeriGas, LP 1.1021 Anson Ferrellgas 0.8091 Anson AmeriGas,

More information

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP

Current Price. Alamance Suburban Propane Alamance AmeriGas Propane, LP Alamance Suburban 0.8955 Alamance AmeriGas, LP 0.9855 Alexander Suburban 0.8955 Alexander AmeriGas, LP 1.0345 Alleghany Suburban 0.8955 Alleghany AmeriGas, LP 1.0345 Anson Ferrellgas 0.7415 Anson AmeriGas,

More information

North Carolina Counties Servicing Social Security Field Office. County Servicing Office District Manager Phone Number

North Carolina Counties Servicing Social Security Field Office. County Servicing Office District Manager Phone Number North Carolina Counties Servicing Social Security Field Office County Servicing Office District Manager Phone Number Alamance Burlington Sandra Muller 336-221-8179 Alexander Hickory Debbie Dedmon 828-328-2484

More information

H.B. 35 Feb 6, 2019 HOUSE PRINCIPAL CLERK

H.B. 35 Feb 6, 2019 HOUSE PRINCIPAL CLERK H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE BILL DRH000-MMa- H.B. Feb, 0 HOUSE PRINCIPAL CLERK D Short Title: Add'l Judges/Onslow, Jones, Duplin, Sampson. (Public) Sponsors: Referred to: Representatives

More information

Shopping Center Address City St Zip County Phone

Shopping Center Address City St Zip County Phone Shopping Center Address City St Zip County Phone Berewick Town Center 4821 Berewick Town Center Dr Charlotte NC 28278- Mecklenburg (704) 587-1011 Colony Place 7823 Colony Rd Charlotte NC 28226- Mecklenburg

More information

NCHSAA Men s First Round Basketball Playoff 4A FINAL:: 02/17/18 Overall Seed School Name Game W/L/T

NCHSAA Men s First Round Basketball Playoff 4A FINAL:: 02/17/18 Overall Seed School Name Game W/L/T NCHSAA Men s First Round Basketball Playoff 4A 4A W 1 North Mecklenburg 32 Bye 16 Hough 15-12-0 17 Myers Park 8 Hopewell 19-8-0 25 Bye 9 Rocky River 24 Ronald Reagan 8-17-0 5 McDowell 28 Bye 12 Scotland

More information

BTOP - Community Anchor Institutions (CAI)

BTOP - Community Anchor Institutions (CAI) Alleghany Sparta to Henderson Alleghany County (030) 85 Peachtree Street Sparta Alleghany Sparta to Henderson Alleghany County Library 122 N Main St Sparta Alleghany Sparta to Henderson Wilkes Comm College

More information

LEA NAME SCH NAME 9 12 ADM 4A SCHOOLS

LEA NAME SCH NAME 9 12 ADM 4A SCHOOLS LEA NAME SCH NAME 9 12 ADM 4A SCHOOLS MECKLENBURG COUNTY MYERS PARK HIGH 2988 WAKE COUNTY WAKEFIELD HIGH 2797 WAKE COUNTY WILLIAM G ENLOE HIGH 2672 MECKLENBURG COUNTY INDEPENDENCE HIGH 2660 MECKLENBURG

More information

May Following is a guide to charts and graphs for this report:

May Following is a guide to charts and graphs for this report: May 212 Strategic tourism marketing and policy decisions depend on accurate, consistent tracking of business indicators such as lodging statistics, attraction and welcome center visitation, transportation

More information

2012 Year End Report

2012 Year End Report 212 Year End Report Strategic tourism marketing and policy decisions depend on accurate, consistent tracking of business indicators such as lodging statistics, attraction and welcome center visitation,

More information

503 Industrial Park Ave. 85 Tunnel Rd (Innsbruck Mall) 419 McDowell Street Wilkinson Blvd. 300 Go Pioneer Drive. 331 East High Road

503 Industrial Park Ave. 85 Tunnel Rd (Innsbruck Mall) 419 McDowell Street Wilkinson Blvd. 300 Go Pioneer Drive. 331 East High Road Mailing List Ahoskie Roanoke Chowan Comm. Albemarle Stanl Asheboro Randolph Center Asheville Carolina of Hair Design High Asheville High Asheville- Buncombe Tech Comm Baboro Pamlico Belmont Gaston Esthetics

More information

When the trail took off over ten years ago, no one could have imagined the holistic benefits across North and South Carolina since then, or the

When the trail took off over ten years ago, no one could have imagined the holistic benefits across North and South Carolina since then, or the When the trail took off over ten years ago, no one could have imagined the holistic benefits across North and South Carolina since then, or the wholehearted community engagement. It is a brilliant system

More information

2015 Average Daily Membership Numbers FOOTBALL ONLY

2015 Average Daily Membership Numbers FOOTBALL ONLY Albemarle 411 Alexander Central 1518 Alleghany 465 Andrews 280 Andrews, TW 990 Anson 1037 Apex 2273 Apex Friendship 938 Ardrey Kell 2914 Ashbrook 1413 Ashe County 959 Asheboro 1351 Asheville 1364 Ashley

More information

BEST DAY TO VISIT A LOCAL GAME LOCAL GAME BEST DAY ACTIVITY BEST DAY/DATE/TIME LOCATION OF BEST DAY ACTIVITY Who

BEST DAY TO VISIT A LOCAL GAME LOCAL GAME BEST DAY ACTIVITY BEST DAY/DATE/TIME LOCATION OF BEST DAY ACTIVITY Who BEST DAY TO VISIT A LOCAL GAME 2018 ALAMANCE BURLINGTON SR Awards Tea May 3, 2pm Kernodle Sr Center Rita ALBEMARLE SR Showcase and Performing Arts Tuesday, May 22, 2pm Edenton United Methodist Church 225

More information

North Carolina Municipal and County Parks and Recreation Services Study

North Carolina Municipal and County Parks and Recreation Services Study North Carolina Municipal and County Parks and Recreation Services Study Fiscal Year 2007-08 Executive Report 01/08 To all Park and Recreation Agencies participating in the Municipal and County Parks and

More information

CONTINUING EDUCATION GENUP BICUP Live and Online Course Brochure. Fast, Convenient, Affordable North Carolina Continuing Education

CONTINUING EDUCATION GENUP BICUP Live and Online Course Brochure. Fast, Convenient, Affordable North Carolina Continuing Education CONTINUING EDUCATION GENUP BICUP 2019 Live and Online Course Brochure Fast, Convenient, Affordable North Carolina Continuing Education 2 2019 GENUP Course J.Y. Monk has 35 classrooms located in convenient

More information

BEST DAY TO VISIT A LOCAL GAME LOCAL GAME BEST DAY ACTIVITY BEST DAY/DATE/TIME LOCATION OF BEST DAY ACTIVITY Who

BEST DAY TO VISIT A LOCAL GAME LOCAL GAME BEST DAY ACTIVITY BEST DAY/DATE/TIME LOCATION OF BEST DAY ACTIVITY Who BEST DAY TO VISIT A LOCAL GAME 2018 LOCAL GAME BEST DAY ACTIVITY BEST DAY/DATE/TIME LOCATION OF BEST DAY ACTIVITY Who ALAMANCE BURLINGTON SR Awards Tea May 3, 2pm Kernodle Sr Center Rita ALBEMARLE SR Showcase

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

Basketball Regional Supervisor Assignments

Basketball Regional Supervisor Assignments HIGH SCHOOL REGIONAL SUPERVISOR Albemarle Alexander Central Alleghany Andrews HP Andrews Anson County Apex Ashbrook Ashe County Asheboro Asheville Ashley Athens Drive Atkins Avery County C.B. Aycock Ayden-Grifton

More information

NCHSAA Women s Lacrosse Regional Supervisor Assignments by School. Heather Cashwell Heather Cashwell Dave Balogh. John Crean Heather Cashwell

NCHSAA Women s Lacrosse Regional Supervisor Assignments by School. Heather Cashwell Heather Cashwell Dave Balogh. John Crean Heather Cashwell Albemarle Alexander Central Alleghany Andrews HP Andrews Anson County Apex Apex Friendship Ardrey Kell Ashbrook Ashe County Asheboro Asheville Ashley Athens Drive Atkins Avery County C.B. Aycock Ayden-Grifton

More information

NCHSAA Men s Lacrosse Regional Supervisor Assignments by School. Bruce Buskard. Rick Wooten Rick Wooten Bruce Buskard.

NCHSAA Men s Lacrosse Regional Supervisor Assignments by School. Bruce Buskard. Rick Wooten Rick Wooten Bruce Buskard. A.C. Reynolds A.L. Brown Albemarle Alexander Central Alleghany Andrews Anson County Apex Apex Friendship Ardrey Kell Ashbrook Ashe County Asheboro Asheville Ashley Athens Drive Atkins Avery County Ayden-Grifton

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations 2. Recommendations This chapter presents recommendations for each mode of transportation in the 2018 Lenoir County CTP as shown in Figure 1. More detailed information on each recommendation is tabulated

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

NCHSAA Volleyball Regional Supervisor Assignments by School. Dianne Atkins. Ron Edwards. Candy Albergine

NCHSAA Volleyball Regional Supervisor Assignments by School. Dianne Atkins. Ron Edwards. Candy Albergine A.C. Reynolds A.L. Brown Albemarle Alexander Central Alleghany Andrews Anson County Apex Apex Friendship Ardrey Kell Ashbrook Ashe County Asheboro Asheville Ashley Athens Drive Atkins Avery County Ayden-Grifton

More information

Basic Skills Directors North Carolina Community College System. Director Institution and Address Fax # Area Code Telephone

Basic Skills Directors North Carolina Community College System. Director Institution and Address Fax # Area Code Telephone Directors North Carolina Community College System Director Institution and Address Fax # Area Code Telephone Claire Dixon claire.dixon@alamancecc.edu Karen Pauly karenepauly@abtech.edu Tony Taylor tonyt@beaufortccc.edu

More information

North Carolina Municipal and County Parks and Recrea on Services Study

North Carolina Municipal and County Parks and Recrea on Services Study North Carolina Municipal and County Parks and Recrea on Services Study Fiscal Year 2010-11 Execu ve Report Recreation Resources Service is a technical assistance program for North Carolina park and recreation

More information

DAVIDSON RIVER VILLAGE

DAVIDSON RIVER VILLAGE ASHEVILLE HIGHWAY HENDERSONVILLE HIGHWAY DAVIDSON RIVER CONNECTOR BREVARD, NORTH CAROLINA DAVIDSON RIVER VILLAGE MIXED-USE MASTER PLANNED DEVELOPMENT ±535 ACRE DEVELOPMENT OPPORTUNITY CONTENTS 1 EXECUTIVE

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

Independence: overview

Independence: overview : overview Kentucky Ave 8: p.30 SUGAR CREEK SATA FE. OREGO, CALIFORIA 7: p.29 6: p.28 9: p.31 10: p.32 Square, Jackson County Courthouse. Photo: Vireo Trail swale area, Santa Fe Trail. Photo: Vireo HISTORIC

More information

MEN'S BASKETBALL STATE CHAMPIONSHIPS WON

MEN'S BASKETBALL STATE CHAMPIONSHIPS WON SCHOOL TITLES WON Andrews, T.W.... 2 Apex... 1 Ashe Central... 1 Asheville... 2 Ashley... 1 Atkins... 1 Ayden... 2 Ayden-Grifton... 3 Bakersville... 1 Bandys... 1 Bartlett Yancey... 1 Beaufort... 4 Bertie...

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Connect NC Bond Status Report

Connect NC Bond Status Report Attachment FC 2 Connect NC Bond Status Report April 10, 2017 Submitted by the North Carolina Community College System Office to the: Joint Legislative Oversight Committee on Capital Improvements, House

More information

OPPORTUNITY SCHOLARSHIP PROGRAM

OPPORTUNITY SCHOLARSHIP PROGRAM OPPORTUNITY SCHOLARSHIP PROGRAM Nonpublic School - number of recipients order 2014-15 Recipients Greensboro Islamic Academy - Greensboro - NC 67 Word of God Christian Academy - Raleigh - NC 47 Victory

More information

Sales per Member L 1,107 $1, $1.34 I 1,184 $0.00 O 1,222 $0.00 N 1,200 $0.00 S 1,157 $0.00 Grand Total 5,870 $1, $0.25

Sales per Member L 1,107 $1, $1.34 I 1,184 $0.00 O 1,222 $0.00 N 1,200 $0.00 S 1,157 $0.00 Grand Total 5,870 $1, $0.25 As of 8/24/2018 District Raffle District ship District Total L 1,107 $1,480.00 $1.34 I 1,184 $0.00 O 1,222 $0.00 N 1,200 $0.00 S 1,157 $0.00 Grand Total 5,870 $1,480.00 $0.25 active ship L 1107 $1,480.00

More information

As of 12/20/2018. District Total Stickleys. District Total Woolards

As of 12/20/2018. District Total Stickleys. District Total Woolards As of 12/20/2018 District District Total District Total District Total Scruggs L 1,107 $2,000.00 $500.00 $600.00 I 1,184 $600.00 $200.00 O 1,222 $108.00 $200.00 N 1,200 $500.00 $400.00 $600.00 S 1,157

More information

...STORM TOTAL RAINFALL REPORTS FROM HURRICANE FLORENCE...

...STORM TOTAL RAINFALL REPORTS FROM HURRICANE FLORENCE... PUBLIC INFORMATION STATEMENT NATIONAL WEATHER SERVICE RALEIGH NC 1047 AM EDT SAT SEP 22 2018...STORM TOTAL RAINFALL REPORTS FROM HURRICANE FLORENCE... BELOW ARE THE PRELIMINARY STORM TOTAL RAINFALL REPORTS

More information

As of 11/20/2018 District Raffle District Total Raffle Sales

As of 11/20/2018 District Raffle District Total Raffle Sales As of 11/20/2018 District Raffle District ship District Total L 1,107 $9,700.00 $8.76 I 1,184 $960.00 $0.81 O 1,222 $2,820.00 $2.31 N 1,200 $930.00 $0.78 S 1,157 $290.00 $0.25 Grand Total 5,870 $14,700.00

More information

FOR SALE OR LEASE PAGE ROAD 14,000 VPD 23,000 VPD TW ALEXANDER DRIVE ALEXANDER VILLAGE RALEIGH, NORTH CAROLINA RETAIL SPACE FOR LEASE ±1,200-16,780 SF

FOR SALE OR LEASE PAGE ROAD 14,000 VPD 23,000 VPD TW ALEXANDER DRIVE ALEXANDER VILLAGE RALEIGH, NORTH CAROLINA RETAIL SPACE FOR LEASE ±1,200-16,780 SF PAGE ROAD FOR SALE OR LEASE 4,000 VPD,000 VPD ALEXANDER VILLAGE RALEIGH, NORTH CAROLINA ±,0-6,0 SF PROPERTY FEATURES Strong daytime traffic with easy access to Research Triangle Park Great residential

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

As of 9/17/2018. District Total Clinical Eye Research. District CER per Member

As of 9/17/2018. District Total Clinical Eye Research. District CER per Member As of 9/17/2018 District Total District CER per Member District L 1,107 $0.00 $0.00 I 1,184 $0.00 $0.00 O 1,222 $0.00 $0.00 N 1,200 $0.00 $0.00 S 1,157 $0.00 $0.00 Grand Total 5,870 $0.00 $0.00 active

More information

NC Brownfields Projects (Active Eligible)

NC Brownfields Projects (Active Eligible) Page 1 of 7 20084 16 01 Franklin Baking 704 Bradley Street Burlington Alamance 20004 16 01 Alamance Foods Facility 1136 Cedar Crest Drive Burlington Alamance 20001 16 01 North Graham Hopedale N. Grahm

More information

As of 5/11/2018. District. District Total Raffle. Total Raffle. Sales per Member. District. Sales. Raffle

As of 5/11/2018. District. District Total Raffle. Total Raffle. Sales per Member. District. Sales. Raffle As of 5/11/2018 Total per Member 2016-2017 Total Membership L 1,266 $12,280.00 $9.70 $19,140.50 I 1,260 $18,990.00 $15.07 $31,541.00 O 1,239 $14,666.91 $11.84 $29,276.25 N 1,328 $17,430.00 $13.13 $24,704.55

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

A thriving mountain city with 9.8 million visitors ASHEVILLE NORTH CAROLINA

A thriving mountain city with 9.8 million visitors ASHEVILLE NORTH CAROLINA A thriving mountain city with 9.8 million visitors ASHEVILLE NORTH CAROLINA 1.3 MILLION RESIDENTS Live within 50 miles of the site 9.8 MILLION VISITORS Annual visitors to Asheville region I- LOCATION Excellent

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

A VISION FOR EL MIRAGE

A VISION FOR EL MIRAGE el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails

More information

As of 4/11/2019. District Raffle Sales per Member. District Total Raffle Sales

As of 4/11/2019. District Raffle Sales per Member. District Total Raffle Sales As of 4/11/2019 District District Total District Raffle L 1,107 $11,650.00 $10.52 $16,960.00 I 1,184 $13,800.00 $11.66 $30,280.00 O 1,222 $14,190.00 $11.61 $20,885.91 N 1,200 $12,460.00 $10.38 $26,510.00

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

School Calendar Information

School Calendar Information 2012-2013 School Calendar Information State County First Day Spring Break Last Day Georgia Kentucky New York North Carolina Georgia Atlanta 8/6/2012 4/8/13-4/12/13 5/22/2013 Augusta 8/3/2012 4/8/13-4/12/13

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Harris Teeter Together In Education WE THINK GREEN Official Rules

Harris Teeter Together In Education WE THINK GREEN Official Rules 2008-09 Harris Teeter Together In Education WE THINK GREEN Official Rules Effective March 13, 2009 through June 1, 2009, these Official Rules govern the Harris Teeter Together In Education (TIE) We Think

More information

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM CONSTRUCTION/BRIDGE/MAINTENANCE PROJECT STATUS REPORT DATE: 9-7-17 COUNTY: Cumberland TIP # ROUTE LOCATION WORK DESCRIPTION START DATE END DATE CONTACT

More information

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Penny for Pasco Renewal. FY2014/15 thru FY2024/25 Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution

More information

STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012

STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012 Strategic Priorities (Projects 1-20) STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS VDOT's Secondary Program County's Proposed Ranking Route Number and Name Location

More information

ASHEVILLE NORTH CAROLINA

ASHEVILLE NORTH CAROLINA ASHEVILLE NORTH CAROLINA 1.3 MILLION RESIDENTS Live within 50 miles of the site 11.1 MILLION VISITORS Annual visitors to Asheville region I- LOCATION Excellent regional access and ideal location at exit

More information

North Carolina Approved Suppliers - Retailers Infant Formula, WIC- Eligible Medical Foods and Exempt Formula Updated June 2009

North Carolina Approved Suppliers - Retailers Infant Formula, WIC- Eligible Medical Foods and Exempt Formula Updated June 2009 Bi-Lo #288 210 Forest Gate Ctr Pisgah Forest NC 28768 Bi-Lo # 530 12810 S. Tryon Street Charlotte NC 28273 Bi-Lo # 547 205 NC Hwy 9 Black Mountain NC 28711 Bi-Lo # 554 145 Us Hwy Bypass 74a Rutherfordton

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

Janitorial Service Needed

Janitorial Service Needed HEPATITIS A - HAND WASHING STATIONS (HWS) - PLACEMENT LIST - OCTOBER 6, 2017 By Date and Method of Placement No. Site Address Jurisdiction 1 Balboa Park - Cabrillo Bridge / Museum of Man 1329 El Prado,

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector Back Creek Back Creek is a east-west trail corridor proposed within the East Park District. The corridor s endpoints are the Cabarrus County line to the east and Reedy Creek Park to the southwest. The

More information

The Transportation Corridor Overlay District

The Transportation Corridor Overlay District The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given

More information

Craven Thirty. Located at US 70 & the new SR 43 connector New Bern, NC. Steve Stroud, SIOR NAI Carolantic Realty, Inc.

Craven Thirty. Located at US 70 & the new SR 43 connector New Bern, NC. Steve Stroud, SIOR NAI Carolantic Realty, Inc. Craven Thirty Located at US 70 & the new SR 43 connector New Bern, NC Exclusively Represented by Scott Hadley NAI Carolantic Realty, Inc. tel +1 919 714 7134 cell +1 919 906 0524 shadley@naicarolantic.com

More information

All Participants - Alphabetical (as of March 5, 2019)

All Participants - Alphabetical (as of March 5, 2019) # Local Government Total Debt 1 Aberdeen, Town of $62,739.96 $60,853.27 11 $1,579.13 $2,819.22 $10,023.33 $14,421.68 2 Ahoskie, Town of $188,288.38 $179,808.84 15 $2,471.18 $5,726.63 $71,421.50 $79,619.31

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

NC Brownfields Projects (Active Eligible)

NC Brownfields Projects (Active Eligible) Page 1 of 8 20004 16 01 Alamance Foods Facility 1136 Cedar Crest Drive Burlington Alamance 20001 16 01 North Graham Hopedale N. Grahm Hopedale Rd. & N. Church St. Burlington Alamance 19039 15 01 Oneida

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

NC Brownfields Projects (Active Eligible)

NC Brownfields Projects (Active Eligible) Page 1 of 7 20084 16 01 Franklin Baking 704 Bradley Street Burlington Alamance 20004 16 01 Alamance Foods Facility 1136 Cedar Crest Drive Burlington Alamance 20001 16 01 North Graham Hopedale N. Grahm

More information

Pr im e lo cat ion at Ma l l a rd Cre e k R d & I C harlotte, NC

Pr im e lo cat ion at Ma l l a rd Cre e k R d & I C harlotte, NC M I X E D -U S E SI T E Pr im e lo cat ion at Ma l l a rd Cre e k R d & I -4 8 5 C harlotte, NC SUMMARY Due it s regional location just off I-85 and I-485, Concord Mills Blvd is a wellestablished retail

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Priority Trail Projects

Priority Trail Projects R I V E R P Priority Projects 2018 System Area-wide Projects 3-A: Addressing System for Emergency Responce 3-B: Anacostia Tributary System - Wayfinding Signage 3-D: Develop deploy pilot trail ranger program

More information

SURVEY OVERVIEW KEEPING IT SIMPLE

SURVEY OVERVIEW KEEPING IT SIMPLE INTRODUCTION The process for prioritizing projects in North Carolina is dictated by the Strategic Transportation Investments Act, passed into law in 2012. The law dictates a process that is transparent,

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

North Carolina Approved Sources (Suppliers) - Retailers Infant Formula, Exempt Infant Formula and WIC-Eligible Nutritionals Updated November 2018

North Carolina Approved Sources (Suppliers) - Retailers Infant Formula, Exempt Infant Formula and WIC-Eligible Nutritionals Updated November 2018 BI-LO #5011 245 MACON PLAZA DR. FRANKLIN NC 28734 BI-LO #5093 6507 WILKINSON BLVD. BELMONT NC 28012 BI-LO #5156 8620 CAMFIELD ST. CHARLOTTE NC 28277 BI-LO #5168 366 RUSS AVE WAYNESVILLE NC 28786 BI-LO

More information

UNOFFICIAL PRIMARY RESULTS

UNOFFICIAL PRIMARY RESULTS UNOFFICIAL PRIMARY RESULTS NORTH CAROLINA GENERAL ASSEMBLY SENATE CANDIDATES PRIMARY ELECTION MAY 8, 2012 SECOND PRIMARY ELECTION July 17, 2012 2013 SESSION For the latest update, go to: http://www.ncsbe.gov/

More information

North Carolina WOODALL S. North Carolina. Complete Site Listings. 66 Asheboro. Asheville. See us at woodalls.com. Asheboro

North Carolina WOODALL S. North Carolina. Complete Site Listings. 66 Asheboro. Asheville. See us at woodalls.com. Asheboro WOODALL S Complete Site Listings All privately-owned campgrounds personally inspected by Woodall Representatives Chip and Pat Dennis. Unless otherwise noted, all parks listed have flush toilets and hot

More information

Management of Cash and Taxes and Fund Balance Available Municipalities for the Fiscal Year Ended June 30, 2017

Management of Cash and Taxes and Fund Balance Available Municipalities for the Fiscal Year Ended June 30, 2017 Memorandum # 2018-11 TO: FROM: SUBJECT: Municipal Officials and Certified Public Accountants Sharon Edmundson, Director, Fiscal Management Section Management of Cash and Taxes and Balance Available Municipalities

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

Nationality(s): All Nationalities. State(s): North Carolina. From: 01 Jan To: 31 Dec Placement State. Placement City CY 2016 Total

Nationality(s): All Nationalities. State(s): North Carolina. From: 01 Jan To: 31 Dec Placement State. Placement City CY 2016 Total (s): All Nationalities State(s): North Carolina North Carolina 3,719 3,719 Afghanistan 142 142 Charlotte 17 17 Durham 43 43 Greensboro 11 11 High Point 30 30 Raleigh 39 39 Winston-Salem 2 2 Belarus 8 8

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

15A NCAC 02B.0311 has been amended with changes as published in 29:13 NCR as follows:

15A NCAC 02B.0311 has been amended with changes as published in 29:13 NCR as follows: 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0B.0 has been amended with changes as published in :1 NCR - as follows: 1A NCAC 0B.0 CAPE FEAR RIVER BASIN (a) Effective February 1, 1, the adopted classifications assigned

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Guide to. Suffolk. Walking. Trails. Lake Meade Park

Guide to. Suffolk. Walking. Trails. Lake Meade Park Walking Lake Meade Park Guide to Suffolk Trails Lake Meade Park Lonestar Lake Regional Park Walking Safety Tips Avoid walking alone on trails. Walking with friends is recommended. Tell someone where you

More information

Municipalities - Alphabetical (as of November 6, 2018)

Municipalities - Alphabetical (as of November 6, 2018) 1 Aberdeen, Town of $66,911.13 $63,945.37 27 $2,819.22 $388.23 $9,635.10 $12,842.55 2 Ahoskie, Town of $192,697.92 $176,199.10 37 $5,726.63 $9,345.94 $62,075.56 $77,148.13 3 Alamance, Village of $2,773.12

More information

Municipalities - Alphabetical (as of December 25, 2018)

Municipalities - Alphabetical (as of December 25, 2018) 1 Aberdeen, Town of $66,911.13 $62,933.24 27 $2,819.22 $388.23 $9,635.10 $12,842.55 2 Ahoskie, Town of $192,697.92 $176,199.10 37 $5,726.63 $9,345.94 $62,075.56 $77,148.13 3 Alamance, Village of $2,773.12

More information

Asheville Metro Economic Report 2014 Second Quarter

Asheville Metro Economic Report 2014 Second Quarter Asheville Metro Economic Report Johnson Price Sprinkle PA HIGHLIGHTS: ASHEVILLE METRO The Asheville metro area gained 2,400 more jobs than one year earlier, averaging a growth rate of 1.4 percent, continuing

More information