FAST ACT (Fixing America s Surface Transportation Act), the federal transportation bill approved

Size: px
Start display at page:

Download "FAST ACT (Fixing America s Surface Transportation Act), the federal transportation bill approved"

Transcription

1 FAST ACT (Fixing America s Surface Transportation Act), the federal transportation bill approved December 3rd, 2015, requires all metropolitan planning organizations (MPO), state transportation departments, and public transportation operators to cooperate in preparing a report of federal funds obligated during the immediately preceding year. The WFRC staff, with the help of UDOT and UTA, has prepared a report of obligated federal, and local and state match funding during federal fiscal year 2017 (October 1, 2016 through September 30, 2017).

2

3

4 ** Note ** Almost all Reconstruction and Capacity projects include active transportation components.

5

6 Salt Lake/ West Valley Urban Surface Transportation Program (STP) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds STP - URBAN AREA SALT LAKE (WFRC) STP_URB_SL 6621 Close Out Structures Bridge Rehabilitation 1300 SOUTH; 500 W. TO 700 W. & Cnty:FA-2290; MP SALT LAKE $414, $0.00 $30, $444, Active Signal and/or Lighting Project SR-152; MP & Cnty:FA-2082; MP & Cnty:FA-2116; MP SALT LAKE $41, $0.00 $3, $44, Close Out HIGHLAND I-215; I-215 WB ON-RAMP TO LA CRESTA SALT LAKE $289, $0.00 $0.00 $289, Awarded Cnty:FA-2123; MP & 5600 West from 7800 South to 8600 South SALT LAKE $4,283, $0.00 $311, $4,595, Closed Other Study Cnty:FA-2104; MP SALT LAKE ($8,864.71) $0.00 ($643.72) ($9,508.43) Close Out Other U of U Central Campus Electrified Shuttle Route SALT LAKE $44, $0.00 $3, $47, Closed Funding Pass Through Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($391,536.51) $0.00 $0.00 ($391,536.51) Scoping Porter Rockwell Blvd (Fifth Segment); Redwood Road to 0.46 miles east SALT LAKE $468, $0.00 $33, $502, Closed Roadway Reconstruct - Without 9000 South; 4800 West to 5300 West SALT LAKE ($602,785.10) $0.00 ($43,771.91) ($646,557.01) Scoping Roadway Minor Rehab - Purple Book 3200 West; South to South SALT LAKE $111, $0.00 $8, $120, Close Out Structures Bridge Rehabilitation Cnty:FA-2238; MP SALT LAKE $0.00 $0.00 $0.01 $ Scoping Roadway Reconstruct - Without Cnty:FA-2172; MP & Cnty FA-2172; MP SALT LAKE $699, $0.00 $0.00 $699, /6/2018

7 Salt Lake/ West Valley Urban Surface Transportation Program (STP) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds STP - URBAN AREA SALT LAKE (WFRC) STP_URB_SL Active Other N/A Annual Work Program SALT LAKE $585, $0.00 $0.00 $585, Closed ATMS Project ATMS / ITS IN SALT LAKE CITY AND SALT LAKE COUNTY SALT LAKE $0.00 $0.00 ($173.94) ($173.94) Signal and/or Lighting Project 138TH SO; BANERTER TO 3RD EAST & Cnty:FA- 2044; MP & update route SALT LAKE $1,835, $0.00 $0.00 $1,835, Active Funding Pass Through Project Planning Support - Salt Lake County SALT LAKE $400, $0.00 $0.00 $400, Scoping Porter Rockwell Blvd (Fifth Segment); Redwood Road to 0.46 miles east SALT LAKE $3,882, $0.00 ($64,450.40) $3,817, Totals $ 12,052,047 $ - $ 280,494 $ 12,332,541 2/6/2018

8 Ogden/ Layton Urban Surface Transportation Program (STP) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds STP - URBAN AREA Ogden / Layton (WFRC) STP_URB_O/L 8551 Closed Signal and/or Lighting Project 200 NORTH; 900 WEST TO FLINT STREET DAVIS ($172,618.22) $0.00 ($3,837.59) ($176,455.81) 8559 Contract ADAMS AVENUE; CITY LIMITS TO US-89 WEBER ($233,522.53) $0.00 ($16,957.49) ($250,480.02) Contract Spot Improvement - Operational SR-103; MP & SR-103; MP DAVIS $1,235, $89, $0.00 $1,325, Closed Funding Pass Through Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($247,750.44) $0.00 $0.00 ($247,750.44) Active Funding Pass Through Project Planning Support -Weber & Davis County DAVIS $300, $0.00 $21, $321, Contract Roadway Minor Rehab - Purple Book SR-232; MP & SR-232; MP DAVIS $1,398, $101, $0.00 $1,500, Roadway Minor Rehab - Purple Book SR-193; MP & SR-193; MP DAVIS $3,230, $234, $0.00 $3,464, Cnty:FA-1392; MP & Center Street; Legacy Parkway to Redwood Road DAVIS $1,171, $0.00 $85, $1,257, Roadway Preventative Maintenance SR-204; MP & SR-204; MP WEBER $1,184, $86, $0.00 $1,270, Substantially Compl Roadway Minor Rehab - Purple Book I-15; MP VARIOUS $3,729, $270, $0.00 $4,000, Advertised Cnty:FA-1410; MP & 1500 South Phase 3; 1350 West to 1100 West DAVIS $331, $0.00 $24, $356, Scoping Bluff Road; 550 West (on Gentile) to 1000 West DAVIS $9, $0.00 $ $10, Active Other N/A Annual Work Program SALT LAKE $315, $0.00 $0.00 $315, Totals $ 12,252,983 $ 782,657 $ 110,921 $ 13,146,561

9 Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC Contract Spot Improvement - Operational SR-103; MP & SR-103; MP DAVIS $936, $68, $0.00 $1,004, Awarded Intersection Improvements 7800 South & 1300 West SALT LAKE $310, $0.00 $22, $332, Active Intersection Improvements 9000 South & 4000 West SALT LAKE $46, $0.00 $3, $50, Scoping Trails and Bikepaths Jordan River Trail - Gardner Village TRAX Station SALT LAKE $74, $0.00 $5, $80, Closed Intersection Improvements Little Cottonwood Canyon Intersection - Snowbird Entry 1 SALT LAKE ($54,556.06) ($3,961.65) $0.00 ($58,517.71) Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $0.00 $0.00 ($10,892.39) ($10,892.39) 7194 Closed Intersection Improvements SR-106: MAIN STREET & PARRISH LANE DAVIS $0.00 $0.00 ($6,214.62) ($6,214.62) Intersection Improvements 500 W at 700 S. and Forest St., Brigham City BOX ELDER $517, $0.00 $37, $555, Scoping Intersection Improvements SR-102; MP BOX ELDER $139, $0.00 $10, $150, Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $149, $0.00 $10, $160, Scoping Transit Service Tooele County TOOELE $150, $0.00 $0.00 $150, /6/2018

10 Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC 7947 Active ATMS Project TRAFFIC ADAPIVE CONTROL SYSTEM SALT LAKE ($46,615.00) ($3,385.00) $0.00 ($50,000.00) 8241 Closed ATMS Project VARIABLE MESSAGE SIGN OPTIMIZATION SALT LAKE ($56,048.66) ($4,070.04) $0.00 ($60,118.70) 8242 Closed ATMS Project SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT SALT LAKE ($6,638.53) ($482.07) $0.00 ($7,120.60) Active ATMS Project various locations along the Wasatch Front VARIOUS $279, $20, $0.00 $300, Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $102, $0.00 $0.00 $102, ATMS Project SR-97; MP & Cnty:FA-3308; MP & SR-37; MP & SR-107; MP & Cnty:FA-1456; MP & SR-106; MP & SR-106; MP & SR-106; MP & Cnty:FA-1404; MP & Cnty:FA-1 VARIOUS $559, $40, $0.00 $599, Closed ATMS Project SR-209; MP & Cnty:FA-2044; MP & Cnty:FA-2062; MP & SR-209; MP SALT LAKE $46, $3, $0.00 $50, Scoping ATMS Project Cnty:FA-2061; MP & Cnty:FA-2080; MP & SR- 282; MP & SR-282; MP & SR-68; MP & SR-111; MP & SR-175; MP & SR-171; MP SALT LAKE $111, $8, $0.00 $120, ATMS Project SR-201; MP & I-215; MP & I-15; MP & SR-201; MP & I-215; MP & I-15; MP SALT LAKE $1,701, $123, $0.00 $1,824, Awarded ATMS Project I-215; MP & I-215; MP & I-215; MP & SR-68; MP VARIOUS $932, $67, $0.00 $1,000, /6/2018

11 Salt Lake/ West Valley the Ogden/ Layton Urban Area Congestion Mitigation/ Air Quality (CMAQ) Funds Obligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds CMAQ - URBAN AREA Salt Lake/ West Valley & Ogden/ Layton (WFRC) CMAQ_WFRC Scoping ATMS Project Cnty:FA-2326; MP & SR-282; MP SALT LAKE $46, $3, $0.00 $50, ATMS Project Various signalized intersections throughout SL County SALT LAKE $472, $34, $0.00 $507, Totals $ 6,415,128 $ 357,518 $ 72,877 $ 6,845,523 2/6/2018

12 Salt Lake/ West Valley the Ogden/ Layton Transportation Alternatives Program (TAP) Funds Oblligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds TAP - URBAN AREA Salt Lake/ West Valley & the Ogden / Layton (WFRC) TAP_URB_WFRC Closed Trails and Bikepaths Cnty:FA-2105; MP & 700 West; 7200 South to 7800 South, Midvale City SALT LAKE ($23,039.54) $0.00 $0.00 ($23,039.54) Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $107, $0.00 $7, $115, Cnty:FA-1392; MP & Center Street; Legacy Parkway to Redwood Road DAVIS $81, $0.00 $0.00 $81, Closed Trails and Bikepaths Dry Creek Trail; South to South SALT LAKE $1, $0.00 $ $1, Closed Trails and Bikepaths Pedestrian Crossing on Fort Union SALT LAKE $6, $0.00 $ $6, Scoping Trails and Bikepaths Grant Promenade; 22nd Street to 2250 Street WEBER ($34,799.96) $0.00 ($2,527.04) ($37,327.00) Close Out Trails and Bikepaths Non-construction project SALT LAKE $26, $0.00 $0.00 $26, Close Out Trails and Bikepaths D&RGW Crossing at 200 North Kaysville DAVIS $107, $0.00 $7, $115, Active Trails and Bikepaths SR-210; MP SALT LAKE $67, $0.00 $0.00 $67, Scoping Trails and Bikepaths Sec 1 completes a gap, Sec 2 Bridge over Welby Jacobs Canal, Sec 3 will extend trail to 4000 West SALT LAKE $23, $0.00 $0.00 $23, Scoping Trails and Bikepaths Smith Fields Park to Willow Creek Trail & Stokes Ave SALT LAKE $10, $0.00 $0.00 $10, Scoping Trails and Bikepaths Cnty:FA-2105; MP SALT LAKE $32, $0.00 $0.00 $32, /6/2018

13 Salt Lake/ West Valley the Ogden/ Layton Transportation Alternatives Program (TAP) Funds Oblligated FY2017 PIN PIN Status Category Description County Federal Funds State Funds Local Funds Total Funds TAP - URBAN AREA Salt Lake/ West Valley & the Ogden / Layton (WFRC) TAP_URB_WFRC Scoping Trails and Bikepaths SR-171; MP SALT LAKE $10, $0.00 $0.00 $10, Scoping Trails and Bikepaths East-west route across I-215, the City desires to modify the underpass at 5400 S. SALT LAKE $28, $0.00 $0.00 $28, Scoping Trails and Bikepaths Cnty:FA-2060; MP & Cnty:FA-2060; MP SALT LAKE $10, $0.00 $0.00 $10, Scoping Trails and Bikepaths Cnty:FA-2148; MP SALT LAKE $18, $0.00 $0.00 $18, Totals $ 474,421 $ - $ 13,677 $ 488,098 2/6/2018

14 UTA FY 2017 GRANTS OVERVIEW Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16-09/30/2017) Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date Status Approx % Comp FTA Grants UT $ 400,000 $ 100,000 $ 500,000 VTCLI UTA One-Call/One-Click Ready to close 100 UT $ 177,230 $ 44,308 $ 221,538 VTCLI Tooele Computer Aided Sched. and Disp Active 99 UT-16-X $ 1,159,485 $ 467,630 $ 1,627, Large Urbanized Areas FY Active 71 UT $ 50,000 $ - $ 50,000 VTCLI UTA Marketing/Outreach Ready to close 100 UT $ 50,000 $ - $ 50,000 VTCLI Tooele Marketing/Outreach Ready to close 100 UT-90-X $ 40,604,545 $ 10,151,137 $ 50,775, : PM, ADA ops, security, enhancements, planning Ready to close 100 UT-90-X $ 40,810,152 $ 10,202,538 $ 51,012, : PM, ADA ops, security, enhancements, planning Active 99 UT-90-X $ 45,067,852 $ 11,266,964 $ 56,334,816 FY PM Planning ADA Secure En Ready to close 100 UT $ 250,500 $ 62,625 $ 313,125 TOD Planning Grant P/O BRT Active 40 UT D $ 661,632 $ 198,640 $ 860,272 Sec 5310 Large UZA Area FY 2014 and FY 2015 O/L Active 71 UT S $ 958,581 $ 352,340 $ 1,310,921 Sec 5310 Large UZA Area FY 2014 and FY 2015 SL/WV Active 28 UT U $ 350,245 $ 75,760 $ 426,005 Sec 5310 Large UZA Area FY 2014 and FY 2015 P/O Active 13 UT $ 70,981,999 $ 70,982,001 $ 141,964,000 UTA Provo-Orem Bus Rapid Transit - Small Starts Active 84 UT $ 5,899,741 $ 1,474,935 $ 7,374,676 FY Depot District, Riverside, Provo Intermodal Active 90 UT $ 4,273,770 $ 754,195 $ 5,027,965 FY Discretionary for Replacement Buses Active 96 UT $ 7,318,340 $ 1,829,585 $ 9,147,925 FY Fixed Guideway Preventative Maintenance (7/12) Awaiting final apptn 177 UT $ 250,000 $ 62,500 $ 312,500 FY Ogden TOD Planning Active 0 UT $ 26,201,312 $ 6,550,328 $ 32,751,640 FY Formula PM Planning ADA Secur Enh (7/12) Awaiting final apptn 118 2/8/2018

15 UTA FY 2017 GRANTS OVERVIEW Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16-09/30/2017) Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date Status UT D $ 661,632 $ 198,640 $ 860,272 FY Sec 5310 Large Urbanized Area (Ogden/Layton UZA) Approx % Comp Active 71 UT S $ 958,581 $ 352,340 $ 1,310,921 FY Sec 5310 Large Urbanized Area (SLC/WV UZA) Active 28 UT U $ 350,245 $ 75,760 $ 426,005 FY Sec 5310 Large Urbanized Area (Provo Orem UZA) Active 13 UT $ 678,381 $ 267,921 $ 946,302 FY Ogden/Layton Active 0 UT $ 437,819 $ 101,515 $ 539,334 FY Provo/Orem Active 0 UT $ 1,588,868 $ 786,774 $ 2,375,642 FY Salt Lake/West Valley Active 0 UT $ 5,427,100 $ 891,400 $ 6,318,500 FY LoNo Electric Buses Active 0 UT $ 3,520,000 $ 880,000 $ 4,400,000 FY 17 Section 3028 Positive Train Control Active 27 UT $ 2,848,793 $ 502,728 $ 3,351,521 FY Formula Bus & Bus Facilities (Full Appt) Active 0 Other Agency Grants EMW-2015-RA-0035 $ 100,000 $ - $ 100,000 Homeland Security -- Multi-Agency Exercise Ready to close 100 EMW-2016-RA $ 182,500 $ - $ 182,500 Homeland Security -- Awareness Campaign Active JH $ 50,000 $ 244,000 $ 294,000 SLCo CDBG Rt 200 ADA Bus Stop Improvements Active JH $ 68,366 $ - $ 68,366 SLCo CDBG S ADA Bus Stop Improvements Active 0 Non Federal Grants $ 980,318 $ 245,080 $ 1,225,398 JARC/New Freedom old UDOT Active $ 794,042 $ 794,042 $ 1,588,084 All UZA Operating -Flex Routes Active TP $ 25,000 $ - $ 25,000 UCAIR - Ski Bus Marketing Ready to close 100 2/8/2018

16 UTA FY 2017 GRANTS OVERVIEW Funds Allocated (awarded and executed) in Fed. FY 2017 (10/01/16-09/30/2017) Grant Number Fed. Amt Local Amt. Tot. Amt. Brief Description Award Date Status Approx % Comp Grants Closed Since Last Year-End Report UT-90-X $ 41,588,702 $ 10,397,176 $ 51,985, : PM, ADA ops, security, enhancements, planning Closed 100 UT-95-X $ 4,072,028 $ 295,695 $ 4,367,723 Rideshare, Vans, Operating, Rehab LRVs CMAQ/STP Closed 100 UT $ 46,141,985 $ 11,535,497 $ 57,677,482 FY PM Planning ADA Secure En Closed 100 UT $ 12,868,500 $ 3,217,125 $ 16,085, FY16 Fixed Guideway Prev Maint Active 95 $ 368,808,244 $ 145,361,179 $ 514,189,423 Federal Amount Local Amount Total Amount Total Amounts $ 98,904,780 $ 77,979,839 $ 176,884,619 Capital Improvements 27% 54% 34% $ 269,903,464 $ 64,164,215 $ 321,219,179 Operation/ Planning and Maintenance (O & M) 73% 44% 62% 2/8/2018

17 BRIDGE REHAB/REPLACEMENT (ON/OFF) BR_ON/OFF Active Structures Bridge Rehabilitation Cnty:FA-2040; MP & Statewide SALT LAKE $55, $55, $13, $0.00 $69, CMAQ REDUCE PM 2.5 EMISSIONS CMAQ_PM Contract Spot Improvement - Operational SR-103; MP & SR-103; MP DAVIS $936, $936, $68, $0.00 $1,004, Awarded Intersection Improvements 7800 South & 1300 West SALT LAKE $310, $310, $0.00 $22, $332, Active Intersection Improvements 9000 South & 4000 West SALT LAKE $46, $46, $0.00 $3, $50, Scoping Trails and Bikepaths Jordan River Trail - Gardner Village TRAX Station SALT LAKE $74, $74, $0.00 $5, $80, Closed Intersection Improvements Little Cottonwood Canyon Intersection - Snowbird Entry 1 SALT LAKE ($54,556.06) ($54,556.06) ($3,961.65) $0.00 ($58,517.71) CMAQ 100 % CMAQ_TOOELE Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $0.00 $0.00 $0.00 ($10,892.39) ($10,892.39) CMAQ 100 % PRO-RATA CMAQ_WFRC_ Closed Intersection Improvements SR-106: MAIN STREET & PARRISH LANE DAVIS $0.00 $0.00 $0.00 ($6,214.62) ($6,214.62) CONGESTION MITIGATION / AIR (BOX ELDER) CMAQ_BOX_ELD Intersection Improvements 500 W at 700 S. and Forest St., Brigham City BOX ELDER $517, $517, $0.00 $37, $555, Scoping Intersection Improvements SR-102; MP BOX ELDER $139, $139, $0.00 $10, $150, CONGESTION MITIGATION/AIR QUALITY (TOOEL CMAQ_TOOELE Active Transit Service Tooele Flex Route Transit service in Tooele County TOOELE $149, $149, $0.00 $10, $160, Scoping Transit Service Tooele County TOOELE $150, $150, $0.00 $0.00 $150, CONGESTION MITIGATION/AIR QUALITY (WFRC) CMAQ_WFRC 7947 Active ATMS Project TRAFFIC ADAPIVE CONTROL SYSTEM SALT LAKE ($46,615.00) ($46,615.00) ($3,385.00) $0.00 ($50,000.00) 8241 Closed ATMS Project VARIABLE MESSAGE SIGN OPTIMIZATION SALT LAKE ($56,048.66) ($56,048.66) ($4,070.04) $0.00 ($60,118.70) 8242 Closed ATMS Project SALT LAKE COUNTY TRAFFIC SIGNAL INTERCONNECT SALT LAKE ($6,638.53) ($6,638.53) ($482.07) $0.00 ($7,120.60) Active ATMS Project various locations along the Wasatch Front VARIOUS $279, $279, $20, $0.00 $300, Scoping Trails and Bikepaths West Haven; D&RGW Rail to Ogden River Trail WEBER $102, $102, $0.00 $0.00 $102, ATMS Project SR-97; MP & Cnty:FA-3308; MP & SR-37; MP & SR-107; MP & Cnty:FA-1456; MP & SR-106; MP & SR-106; MP & SR-106; MP & Cnty:FA-1404; MP & Cnty:FA-1 VARIOUS $559, $559, $40, $0.00 $599, Closed ATMS Project Scoping ATMS Project SR-209; MP & Cnty:FA-2044; MP & Cnty:FA-2062; MP & SR-209; MP Cnty:FA-2061; MP & Cnty:FA-2080; MP & SR- 282; MP & SR-282; MP & SR-68; MP & SR-111; MP & SR-175; MP & SR- 171; MP SALT LAKE $46, $46, $3, $0.00 $50, SALT LAKE $111, $111, $8, $0.00 $120, /14/2018

18 12640 ATMS Project SR-201; MP & I-215; MP & I-15; MP & SR-201; MP & I-215; MP & I-15; MP SALT LAKE $1,701, $1,701, $123, $0.00 $1,824, Awarded ATMS Project I-215; MP & I-215; MP & I-215; MP & SR-68; MP VARIOUS $932, $932, $67, $0.00 $1,000, Scoping ATMS Project Cnty:FA-2326; MP & SR-282; MP SALT LAKE $46, $46, $3, $0.00 $50, ATMS Project Various signalized intersections throughout SL County SALT LAKE $472, $472, $34, $0.00 $507, CONVERTED TAP FUNDS TO STP STP_TAP_ST Closed Signal and/or Lighting Project SR-68; MP SALT LAKE ($16,189.30) ($16,189.30) $0.00 $0.00 ($16,189.30) EQUITY BONUS / MINIMUM GUARANTY EQ_BONUS(MG) Abandoned Roadway Minor Rehab - Purple Book SR-108; MP DAVIS ($51,276.50) ($51,276.50) ($3,723.50) $0.00 ($55,000.00) Closed Roadway Minor Rehab - Purple Book SR-126; MP & SR-126; MP VARIOUS ($353,624.11) ($353,624.11) ($25,678.80) $0.00 ($379,302.91) Closed Roadway Minor Rehab - Purple Book SR-235; MP & US-89; MP WEBER ($49,204.68) ($49,204.68) ($3,573.06) $0.00 ($52,777.74) Closed Roadway Minor Rehab - Purple Book SR-203; MP WEBER ($85,080.47) ($85,080.47) ($6,178.21) $0.00 ($91,258.68) Closed Roadway Minor Rehab - Purple Book SR-25; MP VARIOUS ($555,012.80) ($555,012.80) ($40,302.87) $0.00 ($595,315.67) Closed Other This is for epm programming enhancements. STATEWIDE ($14,693.06) ($14,693.06) ($1,066.95) $0.00 ($15,760.01) Roadway Preventative Maintenance US-89; MP & US-89; MP WEBER ($27,779.02) ($27,779.02) ($2,017.20) $0.00 ($29,796.22) FA LTAP Program Active Other N/A Fiscal Year 2018 LTAP Program STATEWIDE $155, $155, $155, $0.00 $310, FEDERAL AID MISCELLANEOUS FA_MISC Closed Funding Pass Through Ferry Boat Discretionary Funds VARIOUS $36, $36, $9, $0.00 $45, Scoping Transit Service Lake Powell Ferry VARIOUS $2, $2, $ $0.00 $3, Scoping Other Statewide training STATEWIDE $6, $6, $1, $0.00 $7, FEDERAL AID WITH 50% PRO-RATA FA_MISC_50% Closed Other PILOT TEST - INVEST VARIOUS ($214.62) ($214.62) ($214.62) $0.00 ($429.24) FERRY BOAT DISC FUNDS EM_2016_FBD Close Out Transit Service Cnty:FA-2464; MP & Cnty:FA-1878; MP & Cnty:FA-1878; MP & Cnty:FA-2464; MP VARIOUS $100, $100, $25, $0.00 $125, FERRY BOAT DISCR FUND 2015 EM_2015_FBD Close Out Transit Service Cnty:FA-2464; MP & Cnty:FA-1878; MP & Cnty:FA-1878; MP & Cnty:FA-2464; MP VARIOUS $38, $38, $9, $0.00 $48, FTA SEC_ % FTA_5304_80% Closed Other Various Locations in State of Utah STATEWIDE ($605,648.65) ($605,648.65) $0.00 $0.00 ($605,648.65) Active Other Statewide Rural Transit Planning STATEWIDE $825, $825, $0.00 $0.00 $825, /14/2018

19 FTA-MPO (CPG) % PRORATA FTA_ Active Other N/A Annual Work Program SALT LAKE $642, $642, $0.00 $0.00 $642, FY17 STIC INCENTIVE PROGRAM FA_STIC_ Active Other Central GIS Development VARIOUS $100, $100, $0.00 $0.00 $100, FY17 STIC INCENTIVE PROGRAM FA_STIC_ Scoping Other Create RFP Template for Progressive Design Build VARIOUS $100, $100, $0.00 $0.00 $100, HIGH RISK RURAL ROADS HSIP_HRRR Awarded Spot Improvement - Safety SR-92; MP & SR-178; MP & SR-147; MP & SR-115; MP & SR-86; MP & SR-65; MP VARIOUS $1, $1, $ $0.00 $1, HIGHWAY SAFETY IMPROVEMENT PROGAM HSIP 9691 Closed Roadway Preventative Maintenance SR-186; MP SALT LAKE ($25,290.26) ($25,290.26) ($1,836.47) $0.00 ($27,126.73) Closed Roadway Preventative Maintenance US-189; MP VARIOUS ($2,643.45) ($2,643.45) ($191.96) $0.00 ($2,835.41) Closed Roadway New (New Alignment) SR-202; MP & SR-201; MP SALT LAKE ($38,263.83) ($38,263.83) ($2,778.57) $0.00 ($41,042.40) Closed Spot Improvement - Safety I-15; MP VARIOUS ($198,678.46) ($198,678.46) ($14,427.25) $0.00 ($213,105.71) Closed Spot Improvement - Safety SR-67; MP & SR-67; MP DAVIS ($82,644.54) ($82,644.54) ($6,001.33) $0.00 ($88,645.87) Central Review Spot Improvement - Safety SR-71; MP SALT LAKE $ $ $48.71 $0.00 $ Closed Spot Improvement - Safety SR-266; MP SALT LAKE ($12,094.02) ($12,094.02) ($878.22) $0.00 ($12,972.24) Closed Spot Improvement - Safety SR-266; MP SALT LAKE ($88,127.63) ($88,127.63) ($6,399.50) $0.00 ($94,527.13) Closed Spot Improvement - Safety SR-266; MP SALT LAKE ($310,501.84) ($310,501.84) ($22,547.44) $0.00 ($333,049.28) Closed ATMS Project US-189; MP VARIOUS ($218,089.04) ($218,089.04) ($15,836.78) $0.00 ($233,925.82) Spot Improvement - Safety SR-111; MP SALT LAKE ($0.02) ($0.02) $0.00 $0.00 ($0.02) Closed Spot Improvement - Safety I-84; MP & I-84; MP & I-84; MP & I-84; MP VARIOUS ($119,943.13) ($119,943.13) ($8,709.82) $0.00 ($128,652.95) Closed Spot Improvement - Safety SR-12; MP VARIOUS ($71,356.75) ($71,356.75) ($5,181.65) $0.00 ($76,538.40) Closed Spot Improvement - Safety I-15; MP & I-15; MP & I-15; MP & I-15; MP & I-15; MP & I-15; MP & I-15; MP & I- 15; MP & I-15; MP & I-15; M VARIOUS ($178,449.50) ($178,449.50) ($12,958.70) $0.00 ($191,408.20) Closed Spot Improvement - Safety Various locations to be determined by Project Manager VARIOUS ($548,385.14) ($548,385.14) ($39,821.59) $0.00 ($588,206.73) Closed Spot Improvement - Safety Staffing Support STATEWIDE ($88,307.04) ($88,307.04) ($6,412.51) $0.00 ($94,719.55) Active Spot Improvement - Safety Staffing Support STATEWIDE $93, $93, $6, $0.00 $100, /14/2018

20 12217 Active Spot Improvement - Safety Staffing Support STATEWIDE $2,051, $2,051, $148, $0.00 $2,200, Closed Spot Improvement - Safety Cnty:FA-2118; MP SALT LAKE ($1,223.09) ($1,223.09) $0.00 ($88.82) ($1,311.91) Closed Spot Improvement - Safety I-80; MP VARIOUS ($590,603.84) ($590,603.84) ($42,887.36) $0.00 ($633,491.20) Spot Improvement - Safety SR-201; MP & I-215; MP & I-15; MP & SR-201; MP & I-215; MP & I-15; MP SALT LAKE $72, $72, $5, $0.00 $78, Closed Spot Improvement - Safety US-89; MP & US-89; MP VARIOUS ($57,228.98) ($57,228.98) ($4,155.74) $0.00 ($61,384.72) Closed Spot Improvement - Safety I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & I-70; MP & VARIOUS ($119,330.30) ($119,330.30) ($8,665.30) $0.00 ($127,995.60) Closed Other Study Study with statewide application STATEWIDE ($594.59) ($594.59) ($43.18) $0.00 ($637.77) Active Spot Improvement - Safety Statewide study STATEWIDE $86, $86, $6, $0.00 $92, Awarded Spot Improvement - Safety SR-20; MP VARIOUS $590, $590, $42, $0.00 $633, Substantially Compl Spot Improvement - Safety SR-71; MP & SR-71; MP SALT LAKE $195, $195, $14, $0.00 $209, Spot Improvement - Safety I-15; MP & I-215; MP & I-15; MP & I-80; MP & I-80; MP & I-215; MP & SR-201; MP & SR- 201; MP & SR-201; MP & SR-201; MP 10 SALT LAKE $2,521, $2,521, $183, $0.00 $2,705, Spot Improvement - Safety US-91; MP & US-91; MP BOX ELDER $932, $932, $67, $0.00 $1,000, Awarded Spot Improvement - Safety I-15; MP & I-15; MP & I-84; MP & I-84; MP & I-84; MP & I-84; MP VARIOUS $139, $139, $10, $0.00 $150, Close Out Spot Improvement - Safety Specific route segments TBD as part of the project VARIOUS $191, $191, $13, $0.00 $205, Spot Improvement - Safety SR-95; MP VARIOUS $151, $151, $11, $0.00 $162, Closed Spot Improvement - Safety I-80; MP VARIOUS ($416,751.22) ($416,751.22) ($30,262.86) $0.00 ($447,014.08) Awarded Spot Improvement - Safety SR-114; MP & SR-113; MP VARIOUS $95, $95, $6, $0.00 $102, Awarded Spot Improvement - Safety Various locations TBD VARIOUS $46, $46, $3, $0.00 $50, Active Spot Improvement - Safety Various locations TBD VARIOUS $23, $23, $1, $0.00 $25, Spot Improvement - Safety SR-201; MP SALT LAKE $524, $524, $38, $0.00 $562, Spot Improvement - Safety SR-201; MP & SR-201; MP SALT LAKE $1,478, $1,478, $107, $0.00 $1,585, /14/2018

21 14457 Awarded Spot Improvement - Safety Intersection of 4100 S and 3200 W SALT LAKE $579, $579, $0.00 $42, $621, Spot Improvement - Safety SR-36; MP & SR-36; MP & SR-36; MP TOOELE $1,309, $1,309, $95, $0.00 $1,404, Spot Improvement - Safety I-84; MP & I-80; MP & I-80; MP & Various freeway routes in R2 VARIOUS $2,423, $2,423, $176, $0.00 $2,599, Active Spot Improvement - Safety statewide studies STATEWIDE $130, $130, $9, $0.00 $140, Active Spot Improvement - Safety statewide STATEWIDE $209, $209, $15, $0.00 $225, Active Spot Improvement - Safety This is a system evaluation and (potentially) a software modification; no specific routes are involved VARIOUS $46, $46, $3, $0.00 $50, Awarded Spot Improvement - Safety SR-173; MP SALT LAKE $368, $368, $26, $0.00 $394, Awarded Spot Improvement - Safety SR-92; MP & SR-178; MP & SR-147; MP & SR-115; MP & SR-86; MP & SR-65; MP VARIOUS $158, $158, $11, $0.00 $170, Awarded Spot Improvement - Safety I-84; MP BOX ELDER $1,859, $1,859, $135, $0.00 $1,994, Spot Improvement - Safety Various locations in R2 SALT LAKE $801, $801, $58, $0.00 $860, Active Spot Improvement - Safety Data Collection No Mappable Route STATEWIDE $372, $372, $27, $0.00 $400, Spot Improvement - Safety SR-30; MP BOX ELDER $326, $326, $23, $0.00 $350, Active Spot Improvement - Safety Statewide projects STATEWIDE $95, $95, $6, $0.00 $101, Active Spot Improvement - Safety Statewide non-construction project STATEWIDE $55, $55, $4, $0.00 $60, Active Spot Improvement - Safety non-construction study SALT LAKE $41, $41, $3, $0.00 $45, Closed Spot Improvement - Safety I-15; MP SALT LAKE $18, $18, $1, $0.00 $20, HIGHWAY SAFETY 100 % FA HSIP_100% Awarded Spot Improvement - Safety SR-114; MP & SR-113; MP VARIOUS $277, $277, $0.00 $0.00 $277, HSIP HIGH RISK RURAL ROAD - SPECIAL RULE HSIP_HRRR_SR Awarded Spot Improvement - Safety SR-92; MP & SR-178; MP & SR-147; MP & SR-115; MP & SR-86; MP & SR-65; MP VARIOUS $366, $366, $26, $0.00 $393, LOCAL TRANSPORTATION ASSISTANCE PRGM FA_LTAP Closed Other Study Fiscal Year 2015 LTAP Program STATEWIDE ($5,139.81) ($5,139.81) ($5,139.81) $0.00 ($10,279.62) NATIONAL HIGHWAY SYSTEM NHS 9990 Closed Roadway New or Reconstruct Interchange State Route: US-89 from: to: for: 1.40 DAVIS ($6.77) ($6.77) ($0.49) $0.00 ($7.26) Closed Roadway Minor Rehab - Purple Book SR-71; MP SALT LAKE $0.00 $0.00 $0.01 $0.00 $ Closed Roadway Minor Rehab - Purple Book SR-186; MP SALT LAKE $0.00 $0.00 ($0.01) $0.00 ($0.01) 5 2/14/2018

22 12363 Closed Awarded Roadway Minor Rehab - NOT Purple Book SR-36; MP TOOELE $0.00 $0.00 ($0.01) $0.00 ($0.01) US-89; MP SALT LAKE $30, $30, $2, $0.00 $33, Awarded I-215; MP & I-215; MP & I-215; MP & SR-68; MP VARIOUS $119, $119, $8, $0.00 $128, NATIONAL SUMMER TRANSPORTATION INSTITUTE NSTI Active Other Study No Mappable Location at the University of Utah VARIOUS $20, $20, $0.00 $0.00 $20, NAT'L HIGHWAY PERFORM PROG. BRIDGE ON NHPP_BR 9807 Closed Roadway Minor Rehab - NOT Purple Book SR-68; MP SALT LAKE $18, $18, $0.00 $0.00 $18, Closed Structures Preventative Maintenance VARIOUS, STATEWIDE VARIOUS $37, $37, $2, $0.00 $40, Substantially Compl Structures Bridge Rehabilitation TO UTILITY; MP & RANCH EXIT OVERPASS; MP & QUARRY OVERPASS; MP & I-215 BELT ROUTE; MP & FROM I-80N TO I-215P; MP & FROM I- 215N TO SR-186; MP & FROM SR-186 TO I-215; MP & FROM I-215 SALT LAKE $6,740, $6,740, $489, $0.00 $7,229, Close Out Structures Bridge Rehabilitation FROM US-89; MP SALT LAKE $1,075, $1,075, $78, $0.00 $1,153, Contract Structures Preventative Maintenance I-215; MP & I-215; MP & TO SR SOUTH; MP & FROM SR SOUTH; MP & SR-190; MP SALT LAKE ($72,823.09) ($72,823.09) ($5,288.13) $0.00 ($78,111.22) Scoping Structures Bridge Replacement I-80; MP & I-80; MP & SR-36; MP VARIOUS $1,864, $1,864, $135, $0.00 $2,000, Structures Bridge Replacement SR-151; MP SALT LAKE $82, $82, $5, $0.00 $88, Active Structures Preventative Maintenance FROM SR-71; MP & I-80; MP & TO SR TH EAST; MP & TO SR-71; MP & I-80; MP SALT LAKE $74, $74, $5, $0.00 $80, Scoping Structures Preventative Maintenance Various locations throughout the state STATEWIDE $372, $372, $27, $0.00 $400, NAT'L HIGHWAY PERFORM PROG. NHS ROUTES NHPP_NHS 8828 Close Out out SR-201; MP & SR-201; MP SALT LAKE $86, $86, $6, $0.00 $93, Closed Roadway Preventative Maintenance SR-186; MP SALT LAKE ($536.07) ($536.07) ($38.93) $0.00 ($575.00) 9807 Closed Closed Roadway Minor Rehab - NOT Purple Book SR-68; MP SALT LAKE ($18,646.00) ($18,646.00) $0.00 $0.00 ($18,646.00) US-89 Passing Lanes & Alton Intersection Improvements VARIOUS ($307,394.32) ($307,394.32) ($22,321.78) $0.00 ($329,716.10) Closed Roadway Minor Rehab - Purple Book SR-71; MP SALT LAKE ($106,484.54) ($106,484.54) ($7,732.50) $0.00 ($114,217.04) Closed Roadway Minor Rehab - Purple Book SR-186; MP SALT LAKE ($8,666.03) ($8,666.03) ($629.29) $0.00 ($9,295.32) Closed Roadway Preventative Maintenance US-189; MP VARIOUS ($189,773.91) ($189,773.91) ($13,780.63) $0.00 ($203,554.54) Closed Roadway Minor Rehab - Purple Book SR-193; MP DAVIS $0.00 $0.00 ($0.01) $0.00 ($0.01) 6 2/14/2018

23 11685 Closed Roadway Minor Rehab - Purple Book SR-203; MP WEBER ($206,409.64) ($206,409.64) ($14,988.67) $0.00 ($221,398.31) Closed Roadway Preventative Maintenance SR-235; MP & US-89; MP WEBER ($121,673.25) ($121,673.25) ($8,835.44) $0.00 ($130,508.69) Closed Roadway Minor Rehab - NOT Purple Book SR-36; MP TOOELE ($576,462.55) ($576,462.55) ($41,860.47) $0.00 ($618,323.02) Roadway Minor Rehab - Purple Book SR-201; MP SALT LAKE $2,133, $2,133, $154, $0.00 $2,288, Awarded Roadway Minor Rehab - Purple Book US-89; MP SALT LAKE $2,174, $2,174, $157, $0.00 $2,331, Closed Roadway Minor Rehab - Purple Book SR-273; MP & SR-273; MP DAVIS ($231,384.43) ($231,384.43) ($16,802.24) $0.00 ($248,186.67) Awarded Intersection Improvements I-215; MP & I-215; MP & I-215; MP & SR-68; MP VARIOUS $2,672, $2,672, $194, $0.00 $2,866, Contract Closed Out Intersection Improvements SR-193; MP DAVIS $247, $247, $18, $0.00 $265, Roadway Preventative Maintenance US-91; MP & US-91; MP BOX ELDER $1,216, $1,216, $88, $0.00 $1,305, Roadway Preventative Maintenance SR-68; MP SALT LAKE $2,097, $2,097, $152, $0.00 $2,250, SR-151; MP SALT LAKE $12,520, $12,520, $909, $0.00 $13,430, Contract Closed Out Roadway Preventative Maintenance US-89; MP DAVIS $1,165, $1,165, $84, $0.00 $1,250, Active Roadway Preventative Maintenance SR-13; MP & US-89; MP BOX ELDER $18, $18, $1, $0.00 $20, Substantially Compl Roadway Minor Rehab - Purple Book US-6; MP & US-6; MP VARIOUS $3,826, $3,826, $277, $0.00 $4,104, Close Out Asset Management I-15; MP & I-15; MP VARIOUS $361, $361, $26, $0.00 $388, Asset Management US-89; MP BOX ELDER $2,342, $2,342, $170, $0.00 $2,512, Awarded US-6; MP & US-6; MP & US-6; MP & US-6; MP & US-6; MP & US-6; MP & US-6; MP VARIOUS $419, $419, $30, $0.00 $450, Active Roadway Minor Rehab - Purple Book US-89; MP VARIOUS $46, $46, $3, $0.00 $50, Close Out US-91; MP BOX ELDER $121, $121, $8, $0.00 $130, Close Out Roadway Minor Rehab - Purple Book SR-68; MP VARIOUS $1, $1, $ $0.00 $2, Advertised Roadway Minor Rehab - Purple Book US-89; MP VARIOUS $55, $55, $4, $0.00 $60, Roadway Minor Rehab - Purple Book SR-104; MP & SR-79; MP & SR-204; MP WEBER $1,398, $1,398, $101, $0.00 $1,500, /14/2018

24 NAT'L HIGHWAY PERFORM PROGRAM - IM NHPP_IM 9419 I-215; MP & TO SR SOUTH EB; MP & TO SR SOUTH; MP & FROM SR SOUTH; MP & FROM SR SOUTH; MP & TO SR SOUTH; MP & FROM SR SOUTH; MP.13 - SALT LAKE $393, $393, $24, $0.00 $417, Asset Management I-15; MP & I-15; MP SALT LAKE $1,596, $1,596, $98, $0.00 $1,695, Closed Roadway Preventative Maintenance I-80; MP & I-80; MP TOOELE ($173,922.83) ($173,922.83) ($10,747.83) $0.00 ($184,670.66) Closed Roadway Preventative Maintenance I-15; MP VARIOUS ($127,098.01) ($127,098.01) ($7,854.22) $0.00 ($134,952.23) Closed Roadway Minor Rehab - Purple Book I-80; MP & I-80; MP TOOELE ($2,268,257.96) ($2,268,257.96) ($140,170.54) $0.00 ($2,408,428.50) Spot Improvement - Operational TO SR SOUTH; MP & Reference I 15 MP SALT LAKE $3,030, $3,030, $187, $0.00 $3,217, Closed Roadway Preventative Maintenance I-84; MP & I-84; MP BOX ELDER ($133,798.49) ($133,798.49) ($8,268.28) $0.00 ($142,066.77) Roadway Minor Rehab - Purple Book I-15; MP BOX ELDER $753, $753, $46, $0.00 $800, Closed Roadway Minor Rehab - NOT Purple Book I-80; MP & I-80; MP TOOELE ($509,315.73) ($509,315.73) ($31,473.96) $0.00 ($540,789.69) Closed Roadway Preventative Maintenance I-15; MP VARIOUS ($108,650.68) ($108,650.68) ($6,714.23) $0.00 ($115,364.91) Closed Roadway Preventative Maintenance TO US-89 STATE STREET; MP & TO I-15N FROM I- 215N; MP & TO I-15P FROM I-215N; MP & I- 215; MP & I-215; MP & FROM SR-68 REDWOOD ROAD; MP & FROM 280 EAST; MP & TO I-215P FROM I SALT LAKE ($659,260.00) ($659,260.00) ($40,740.00) $0.00 ($700,000.00) Substantially Compl Contract Closed Out Intersection Improvements SR-209; MP SALT LAKE $3,712, $3,712, $229, $0.00 $3,942, Asset Management I-215; MP & I-215; MP SALT LAKE $3,287, $3,287, $203, $0.00 $3,490, Active Roadway Minor Rehab - Purple Book I-215; MP & I-215; MP & I-215; MP & I-215; MP VARIOUS $164, $164, $10, $0.00 $175, Scoping Asset Management I-215; MP SALT LAKE $470, $470, $29, $0.00 $500, PLANNING MPO (WFRC) PL_WFRC Closed Other Various Locations in Salt Lake/Ogden/Layton Urban Areas SALT LAKE ($431,184.67) ($431,184.67) $0.00 $0.00 ($431,184.67) Active Other N/A Annual Work Program SALT LAKE $2,138, $2,138, $0.00 $0.00 $2,138, RAIL / HWY R/H_HZ_ELM Active Railroad Statewide study STATEWIDE $72, $72, $8, $0.00 $80, RAIL / HWY R/H_HZ_ELM Active Railroad Weber, Davis, & SL Co Commuter Rail Line VARIOUS $40, $40, $4, $0.00 $45, Closed Railroad Statewide non-construction project VARIOUS ($6,058.83) ($6,058.83) ($673.20) $0.00 ($6,732.03) 8 2/14/2018

25 12987 Awarded Railroad Cnty:FA-2644; MP TOOELE $87, $87, $9, $0.00 $97, Active Railroad Statewide inventory STATEWIDE $126, $126, $14, $0.00 $140, Railroad 3 locations on Salt Lake City's road network SALT LAKE $216, $216, $0.00 $24, $240, Closed Railroad Various locations in Region 3 VARIOUS ($93,353.06) ($93,353.06) ($10,372.56) $0.00 ($103,725.62) Active Railroad Consultant contract STATEWIDE $126, $126, $14, $0.00 $140, Closed Railroad Locations in R4 TBD VARIOUS ($12,550.27) ($12,550.27) ($1,394.48) $0.00 ($13,944.75) RAIL/HIGHWAY R/H_DEVICS Closed Railroad SR-36; MP TOOELE ($469,737.63) ($469,737.63) ($52,193.07) $0.00 ($521,930.70) Scoping Railroad Cnty:FA-1392; MP DAVIS $31, $31, $0.00 $3, $35, Railroad 3 locations on Salt Lake City's road network SALT LAKE $112, $112, $0.00 $12, $125, Active Railroad Spot location of crossing on Foothill Dr TOOELE $9, $9, $1, $0.00 $10, Scoping Railroad SR-171; MP & SR-48; MP SALT LAKE $73, $73, $8, $0.00 $82, Scoping Railroad Cnty:FA-2080; MP SALT LAKE $45, $45, $0.00 $5, $50, Scoping Railroad Cnty:FA-1386; MP DAVIS $18, $18, $2, $0.00 $20, Awarded Railroad Cnty:FA-2644; MP TOOELE $610, $610, $0.00 $0.00 $610, REPURPOSED EM_RPF9@ Awarded I-80; MP & I-80; MP VARIOUS $548, $548, $39, $0.00 $588, Close Out Roadway Preventative Maintenance SR-67; MP & SR-67; MP DAVIS $208, $208, $15, $0.00 $223, REPURPOSED 80 EM_RPF9@ Awarded I-80; MP & I-80; MP VARIOUS $1, $1, $ $0.00 $2, REPURPOSED 80% EM_RPS9@ Awarded I-80; MP & I-80; MP VARIOUS $1, $1, $ $0.00 $2, REPURPOSED EM_RPS9@ Awarded I-80; MP & I-80; MP VARIOUS $188, $188, $13, $0.00 $202, Close Out Roadway Preventative Maintenance SR-67; MP & SR-67; MP DAVIS $2,439, $2,439, $177, $0.00 $2,616, SAFE ROUTES TO SCHOOLS - INFRASTRUCTURE SR2S_INFR Awarded Safe Sidewalk/ADA Cnty:FA-3455; MP WEBER $41, $41, $0.00 $0.00 $41, /14/2018

26 SECTION 164 PENALTIES-FOR HSIP SEC164_HSIP Closed Roadway New (New Alignment) SR-202; MP & SR-201; MP SALT LAKE ($505,843.96) ($505,843.96) ($36,732.42) $0.00 ($542,576.38) Closed Spot Improvement - Safety I-15; MP VARIOUS $0.00 $0.00 ($0.01) $0.00 ($0.01) Closed Spot Improvement - Safety Cnty:FA-2118; MP SALT LAKE $0.00 $0.00 $0.00 ($0.01) ($0.01) Closed Spot Improvement - Safety Non-construction STATEWIDE $ $ $8.31 $0.00 $ Closed Spot Improvement - Safety I-80; MP VARIOUS $0.00 $0.00 ($0.01) $0.00 ($0.01) Awarded Spot Improvement - Safety Intersection of 4100 S and 3200 W SALT LAKE $201, $201, $0.00 $14, $215, Awarded Spot Improvement - Safety SR-173; MP SALT LAKE $186, $186, $13, $0.00 $199, Active Spot Improvement - Safety Statewide projects STATEWIDE $93, $93, $6, $0.00 $100, Active Spot Improvement - Safety Statewide non-construction project STATEWIDE $55, $55, $4, $0.00 $60, SHRP2 IMPLEMENTATION ASSISTANCE FA_SHRP Scoping Other N/A VARIOUS $100, $100, $0.00 $0.00 $100, Scoping Other N/A VARIOUS $200, $200, $0.00 $0.00 $200, SPR PLANNING 100% SPR_P_100% Closed Other Various Locations STATEWIDE $0.00 $0.00 ($10,000.00) $0.00 ($10,000.00) SPR POOLED FUND 100% SPR_R_100% Scoping Spot Improvement - Safety Passive Force-Displacement Relationships for Skewed Abutments STATEWIDE $100, $100, $0.00 $0.00 $100, Active Trails and Bikepaths Statewide study VARIOUS $12, $12, $0.00 $0.00 $12, Active Other Meetings with Western Maintenance Partnership (WMP) STATEWIDE $15, $15, $0.00 $0.00 $15, Active Other Study Research Study VARIOUS $54, $54, $0.00 $0.00 $54, Active Other Pooled Fund Study, Western Alliance QTC STATEWIDE $36, $36, $0.00 $0.00 $36, Scoping Other Research STATEWIDE $80, $80, $0.00 $0.00 $80, STATEWIDE PLANNING & RESEARCH (PLANNING) SPR_P Closed Other Statewide STATEWIDE ($37,613.20) ($37,613.20) ($9,403.30) $0.00 ($47,016.50) Closed Other Study Data is collected at various locations in the state, these locations are not known at this time and can change throughout the duratin of the contract STATEWIDE ($118,856.71) ($118,856.71) ($29,714.18) $0.00 ($148,570.89) Active Other SHRP2 Implementation VARIOUS $71, $71, $17, $0.00 $89, Scoping Other Develop Long Range Plan Framework Using SHRP2 C01 STATEWIDE $240, $240, $60, $0.00 $300, /14/2018

27 14965 Close Out Other FY 2017 Statewide Planning Work Program VARIOUS ($151,600.00) ($151,600.00) ($37,900.00) $0.00 ($189,500.00) Scoping Trails and Bikepaths SR-68; MP VARIOUS $48, $48, $12, $0.00 $60, Active Other N/A Annual Work Program VARIOUS $5,272, $5,272, $1,318, $0.00 $6,591, STATEWIDE PLANNING & RESEARCH (RESEARCH) SPR_R Closed Other Statewide STATEWIDE ($1,379,024.75) ($1,379,024.75) ($341,783.55) $0.00 ($1,720,808.30) Closed Other Statewide STATEWIDE ($903,177.14) ($903,177.14) ($225,794.29) $0.00 ($1,128,971.43) Active Other N/A Annual Work Program VARIOUS $1,287, $1,287, $321, $0.00 $1,609, Active Other Statewide project - no distinct locations STATEWIDE $32, $32, $8, $0.00 $40, STP - BRIDGE FUNDS FOR STATE PROJECTS STP_BRIDGE 9419 I-215; MP & TO SR SOUTH EB; MP & TO SR SOUTH; MP & FROM SR SOUTH; MP & FROM SR SOUTH; MP & TO SR SOUTH; MP & FROM SR SOUTH; MP.13 - SALT LAKE $1,959, $1,959, $142, $0.00 $2,102, Closed Structures Preventative Maintenance Cnty:FA-2124; MP SALT LAKE ($91,172.68) ($91,172.68) ($6,620.61) $0.00 ($97,793.29) Spot Improvement - Safety I-84; MP & I-80; MP & I-80; MP & Various freeway routes in R2 VARIOUS $234, $234, $17, $0.00 $251, Active Structures Preventative Maintenance Cnty:FA-2040; MP & Statewide SALT LAKE $1,723, $1,723, $125, $0.00 $1,848, Awarded Asset Management I-215; MP & I-215; MP & I-215; MP & mile post change SALT LAKE $1,575, $1,575, $114, $0.00 $1,690, STP - ENHANCEMENT - STATE STP_ENH_ST 9938 Enhancement Project on State System I-15; MP & SR-171; MP SALT LAKE $ $ $ $0.00 $ Intersection Improvements SR-193; MP DAVIS ($80,000.00) ($80,000.00) ($20,000.00) $0.00 ($100,000.00) Close Out transit Service Cnty:FA-2464; MP & Cnty:FA-1878; MP & Cnty:FA-1878; MP & Cnty:FA-2464; MP VARIOUS $1,561, $1,561, $390, $0.00 $1,951, Scoping transit Service Lake Powell Ferry VARIOUS $80, $80, $20, $0.00 $100, STP - FLEXIBLE (ANY AREA) STATEWIDE STP_FLX_ST 4675 Closed Other Study UDOT Wetland Mitigation Sites Federal Projects STATEWIDE ($5,623.56) ($5,623.56) ($408.37) $0.00 ($6,031.93) 9440 Awarded Asset Management I-80; MP & I-80; MP SALT LAKE $119, $119, $8, $0.00 $128, Roadway Preventative Maintenance SR-209; MP SALT LAKE $848, $848, $61, $0.00 $910, Closed Roadway Preventative Maintenance SR-186; MP SALT LAKE $13, $13, $ $0.00 $14, Asset Management SR-248; MP VARIOUS $7,147, $7,147, $519, $0.00 $7,666, /14/2018

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Project Title/Location Project Sponsor Improvement Type Source of Funds HIGHWAYS

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Title/Location HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout

More information

2040 RTP TRANSIT PROJECT LIST

2040 RTP TRANSIT PROJECT LIST 2040 RTP TRANSIT LIST Phase 1 North Ogden - Salt Lake Corridor (North) -- First of Three Phases North Ogden - Ogden Intermodal Center - Ogden CBD - Newgate Mall - Riverdale - Clearfield - Hill Air Force

More information

Changes in TIP projects Draft vs. Final Draft

Changes in TIP projects Draft vs. Final Draft Attachment 2 Dollars in $1,000 Key 08698 Franklin Road and Cloverdale Road Intersection Changes in TIP projects Draft vs. Final Draft RW - $1,314 UT - $1,000 CE - $341 CN - $3,675 CN - $499 09438 Caldwell

More information

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel

More information

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

Santa Fe Metropolitan Planning Organization

Santa Fe Metropolitan Planning Organization Santa Fe Metropolitan Planning Organization TRANSPORTATION IMPROVEMENT PROGRAM Federal Fiscal Years 2014 2017 Amendment 6 Approved by the Transportation Policy Board on November 20 th, 2014 Approved by

More information

UTA Ski Service Redesign. Christopher Chesnut Sr. Manager of Integrated Service Planning Utah Transit Authority Salt Lake City, UT

UTA Ski Service Redesign. Christopher Chesnut Sr. Manager of Integrated Service Planning Utah Transit Authority Salt Lake City, UT UTA Ski Service Redesign Christopher Chesnut Sr. Manager of Integrated Service Planning Utah Transit Authority Salt Lake City, UT Stephanie McVey Regional Planning & Environmental Manager WSP USA Tempe,

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973

More information

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

Bridge - Off State System

Bridge - Off State System ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal NHPP 5,519 2,344 4,227 600 24 7,195 - - Funding amounts allocated for the North Front Range

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Bispham Street Bridge over Rancocas Creek (DB # D0806) OTHER CON $1.000 $1.000 $0.000 N/A $1.000 Hanover Street Bridge over Rancocas Creek, CR 616 (DB # D9902) STP-STU CON $3.240 $0.000 $0.000

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ALACHUA COUNTY Highways: Interstate 4230716 I-75(SR121)WILLISTON RD SR222(NW

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 Project Description Phase Milwaukee Milwaukee 24 2016307 2200-13-70 WEST HIGHLAND AVENUE, CITY OF

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA

More information

Bridge - Off State System

Bridge - Off State System ID HIGHWAYS Bridge - On State System Programmed/Budgeted in Pool SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal NHPP 5,519 2,344 4,251 600-7,195 - - Funding amounts allocated

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

Chapter 6 Existing and Proposed Transportation Facilities

Chapter 6 Existing and Proposed Transportation Facilities Chapter 6 Existing and Proposed Transportation Facilities Methodology As discussed in Chapter 4, the Dixie MPO s CUBE modeling platform was used to analyze future traffic demand. The CUBE Model applied

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

2007 FFY OBLIGATED AND GRANTED PROJECTS LIST FEDERAL REGION PROJECT PHASE

2007 FFY OBLIGATED AND GRANTED PROJECTS LIST FEDERAL REGION PROJECT PHASE CAPITOL REGION SHARE 1001-0105 ROW OFF - SYSTEM BRIDGE TIMES FARM ANDOVER BR 04581 O/ HOP RIVER 26 21 1039-0088 CON HIGH RISK RURAL ROAD CT 20 EAST GRANBY WIDENING OF CT 20, VIC OF HOLCOMB ST/NEWGATE RD

More information

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6 STAFF REPORT SUBJECT: RSTP& LSTP Fund Balances MEETING DATE: February 7, 2008 AGENDA ITEM: 6 RECOMMENDATION: STAFF CONTACT: Receive an update on programmed funds from the Regional Surface Transportation

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION FY 20162025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM DVRPC FY 2017 Authorized and Unauthorized Projects (All funds $ millions) Burlington Arney's Mount Trail, Phase 1 (DB #D1713) TAP CON $3.000 $3.000

More information

Table 1. TOTAL FOUR-YEAR PROGRAM SUMMARY AMATS FFY PC Approved(November 19, 2009)

Table 1. TOTAL FOUR-YEAR PROGRAM SUMMARY AMATS FFY PC Approved(November 19, 2009) TRANSPORTATION IMPROVEMENTS Table 1. TOTAL FOUR-YEAR PROGRAM SUMMARY AMATS FFY 2010-2013 PC Approved(November 19, 2009) 2010 2011 2012 2013 AMATS Highway Safety Improvement Prog Set Aside (Table 2) $10,586

More information

EPPERSON INDUSTRIAL PARK

EPPERSON INDUSTRIAL PARK EXCLUSIVE LISTING FUTURE INDUSTRIAL SITE ±680 ACRES SALT LAKE CITY, UTAH 3300 N Subject 40.54 acres 3200 W 550.46 acres 40.17 acres 2100 N 40.09 acres Sold Future State Prison Site ± 325 Acres Haul Road

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION ALL Counties MINUTE ORDER Page 1 of 1 ALL Districts Transportation Code, 201.991 provides that the Texas Department of Transportation (department) shall develop a Unified

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

Central Region 2013 Welcome

Central Region 2013 Welcome Central Region 2013 Welcome OHMPA Road Tour June 3, 2013 1 Presentation Overview Budget Highlights Delivery Models Innovation 2012 Year in Review 2 The 2013 Provincial Budget Ensuring the flow of people

More information

Bristol Virginia Transit

Bristol Virginia Transit Bristol Virginia Transit 1 Transit Overview Bristol Virginia Transit (BVT) is a Federally Funded and certified urban area transit system. BVT began operation in its current form in 1982. In Fiscal Year

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,486,222 Award Type 1 - Strategic Awards to Small Transit Providers 2 - RTC Has

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

FOX HOLLOW MPC EXCLUSIVE LISTING SARATOGA SPRINGS, UTAH. LOCATION Redwood Road at Village Parkway in Saratoga Springs, Utah. PRICE Submit all Offers

FOX HOLLOW MPC EXCLUSIVE LISTING SARATOGA SPRINGS, UTAH. LOCATION Redwood Road at Village Parkway in Saratoga Springs, Utah. PRICE Submit all Offers FOX HOLLOW MPC EXCLUSIVE LISTING SARATOGA SPRINGS, UTAH LOCATION Redwood Road at Village Parkway in Saratoga Springs, Utah PRICE Submit all Offers SIZE ± 360 ZONING R-10 and MF-10 UNIT COUNT Neighborhood

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

Michigan s Engineering Safety Program for Local Roadways

Michigan s Engineering Safety Program for Local Roadways Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More

More information

Broward Boulevard Transit Corridor Workshop. February 5, :00 AM 12:30 PM FDOT District IV Auditorium

Broward Boulevard Transit Corridor Workshop. February 5, :00 AM 12:30 PM FDOT District IV Auditorium Broward Boulevard Transit Corridor Workshop February 5, 2010 9:00 AM 12:30 PM FDOT District IV Auditorium Workshop Agenda 9:00 AM 9:15 AM Welcome/Introductions 9:15 AM 10:00 AM Study Background & Corridor

More information

Glacier National Park: Going-to-the-Sun Road Rehabilitation

Glacier National Park: Going-to-the-Sun Road Rehabilitation National Rural ITS Conference August 14, 2006 Gary Danczyk, P.E. Glacier National Park Glacier National Park: Going-to-the-Sun Road Rehabilitation Using ITS to stretch resources, manage congestion and

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions

More information

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee FFY 2017-2021 Transportation Improvement Program (TIP) Development March 11, 2016 Cape Cod Joint Transportation Committee Transportation Improvement Program (TIP) + The TIP is a five-year schedule of regional

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

THE RICHMOND REGION Transportation Priority Projects

THE RICHMOND REGION Transportation Priority Projects Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Current Operations CHAPTER II INTRODUCTION DESCRIPTION OF TRANSPORTATION SERVICES

Current Operations CHAPTER II INTRODUCTION DESCRIPTION OF TRANSPORTATION SERVICES Chapter II CHAPTER II Current Operations INTRODUCTION This chapter provides an overview of Centre Area Transportation Authority (CATA). CATA is a joint municipal authority formed under the Municipal Authorities

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

MEMORANDUM. DATE: February 1, 2007

MEMORANDUM. DATE: February 1, 2007 DATE: February 1, 2007 TO: FROM: SUBJECT: NW PA Regional Operations Forum (ROF) Edwards and Kelcey Inventory of Existing and Planned Regional Operations Projects (DRAFT) The Regional Operations Forum (ROF)

More information

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Project Deliverable 4.1.3f Individual City Report - City of San Dimas Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

50 Largest U.S. Metropolitan Areas

50 Largest U.S. Metropolitan Areas America s Racially : Opportunities and Challenges 50 Largest U.S. Metropolitan Areas Community types in the 50 largest metropolitan areas 39,333,003 2% 14,533,32 1,983,337 9% 10% 47,40,87 49,199,197 30,180,578

More information

Elected Officials Briefing

Elected Officials Briefing Elected Officials Briefing North Metro Rail Line February 12, 2015 1 Welcome and Introductions 2 Rick Clarke RTD Assistant General Manager Capital Programs 3 The RTD FasTracks Plan 122 miles of new light

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE

More information

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015 DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015 Existing/ RSTP Allocation Recommended Ashland 103393 Trolley line trail:ii Existing 1,100,000-500,000 600,000 - - - 1,100,000

More information

TBARTA: 2015 Master Plan and Tampa Bay Express Project

TBARTA: 2015 Master Plan and Tampa Bay Express Project TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county

More information

Transit Financial Summary Abilene MPO FY TIP

Transit Financial Summary Abilene MPO FY TIP Transit Financial Summary Abilene MPO FY 2006-2008 TIP Transit Programs FY 2006 FY 2007 FY 2008 Totals Description Federal Total Federal Total Federal Total Federal Total 1 Section 5307 - Urb >200K $0

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DOWNTOWN BRT ALTERNATIVE - 19th AVE DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing

More information

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra

More information

List of Priority Projects

List of Priority Projects 2012 List of Priority Projects Adopted August 9, 2012 TABLE OF CONTENTS LE OF CONTENTS Overview...2 List of Priority Projects Process.3 State Highway Capacity Projects...4 Mass Transit Projects Jacksonville

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2014 Through June 30, 2019

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2014 Through June 30, 2019 Tentative Work Program Fiscal Years 2015-2019 Page: 1 MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures

More information

Mission Statement. Spur 601 Project Highlights

Mission Statement. Spur 601 Project Highlights Mission Statement SPUR 601 is a TxDOT project dedicated to provide a safe, efficient, reliable new corridor to improve the mobility in east-central El Paso. The SPUR 601 team is working in partnership

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

Greater Portland Transit District

Greater Portland Transit District Greater Portland Transit District TO: FROM: Freeport Town Council Greg Jordan - Metro General Manager DATE: September 10, 2014 SUBJECT: Metro Request to Pursue Grant Funding for Trial Express Bus Service

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

STEP ALTERNATIVES RANKING TABLE

STEP ALTERNATIVES RANKING TABLE ALTERNATIVES RANKING TABLE Priority Ranking 0 = Lowest Priority 1 2 3 4 5 = Highest Priority Abbreviations TD = Transportation Disadvantaged PWD = People with Disabilities I. Existing Enhancements Increase

More information

±10.23 ACRES MOUNTAIN VIEW CORRIDOR AB 71

±10.23 ACRES MOUNTAIN VIEW CORRIDOR AB 71 Bacchus Hwy ±10.23 ACRES MOUNTAIN VIEW CORRIDOR AB 71 Riverton Towne Center 12600 S EXCLUSIVE LISTING HERRIMAN, UTAH Hwy 13100 S 4000 W 13400 S 3600 W AB 85 AB 154 13800 S 2700 W Bluffdale 1300 W 13200

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

DIRECTOR S REPORT TRANSPORTATION BOARD AUGUST 14, 2017

DIRECTOR S REPORT TRANSPORTATION BOARD AUGUST 14, 2017 DIRECTOR S REPORT TRANSPORTATION BOARD AUGUST 14, 2017 1 EMERGENCY OPERATIONS NDOT ISSUED A $360,000 EMERGENCY CONTRACT FOR REPAIR OF FLOOD DAMAGE ON SR 375 LINCOLN COUNTY 3 FT. SINK HOLE TO BE REPAIRED

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,846,222 Award Type Amount Current Allocation in 2013 in 2014 in 2015 in 2016

More information