Citrus County, FL Map Modernization Scoping Meeting
|
|
- Phoebe Craig
- 5 years ago
- Views:
Transcription
1 Citrus County, FL Map Modernization Scoping Meeting Lecanto Government Complex April 26, 2007
2 Definition Flood A general and temporary condition of partial or complete inundation of two or more acres of normally dry land areas or of two or more properties from (1) overflow of inland or tidal waters (2) unusual and rapid accumulation or runoff of surface waters (3) mudflows caused by flooding
3 National Flood Insurance Program (NFIP) Reduce loss of life and property caused by flooding; Reduce rising disaster relief costs caused by flooding, and; Make Federally-backed flood insurance coverage available to property owners
4 1968 National Flood Insurance Program Three basic components Hazard I.D. Flood Insurance FPM educate
5 Flood Maps Allow You to: Identify the Special Flood Hazard Area; Identify the location of specific property; Identify the magnitude of flood hazard, and; Locate regulatory floodway
6 Who Uses Flood Maps? Private citizens; Insurance Agents; Real Estate Professionals; Lending Institutions; and Government Officials.
7 Importance of Flood Hazard Information With a Flood Insurance Rate Map: Map users can make prudent siting, design, and flood insurance purchase decisions, and; Communities can administer sound floodplain management programs.
8 Effective Studies Citrus County (unincorporated areas) FIS Report dated Feb 15, panels Most FIRM panels dated Aug 15, 1984, with 3 panels revised Nov 6, 1998 City of Crystal River FIS Report dated Feb 15, FIRM panels dated Aug 15, 1984 City of Inverness FIS Report dated May 17, FIRM panels dated May 17, 1982
9 Background SWFWMD is a FEMA CTP SWFWMD presents projects to FEMA for joint funding of new FIS in Mapping Activities Statement If project helps meet FEMA goals - FEMA funding approved
10 Benefits of Combined Watershed/FEMA Studies SWFWMD and Community can determine study methods Combining funds from multiple sources produces more studies covering more areas SWFWMD and Community have input into Map format Flood Elevations and models used by SWFWMD will match FEMA maps & models
11 Flood Insurance Study Process Pre-Scoping & Information Search Scoping Meeting Topo Development & Field Survey Watershed Study Quality Control Reviews Floodplain Mapping Quality Control &Technical Support Data Notebook Preliminary DFIRMs Review Period Final DFIRMs Become Effective
12 Scoping Meeting Gather Community Data Present Summary of Information Search Assess Flood Mapping Needs Identify study needs Problems with effective flood maps Flooding problems on unstudied streams High water mark information Existing or planned projects (flood control) Other flood studies performed New or planned major development
13 Results of Scoping Process List of watersheds to be studied Types of studies to be performed List of available data sets Permit locations LOMR locations GIS Data
14 Team Members Citrus County City of Inverness City of Crystal River Southwest Florida Water Management District (SWFWMD) Federal Emergency Management Agency (FEMA) National Service Provider (Michael Baker, Jr., Inc.) SWFWMD Consultants Watershed Concepts DRMP EDT Taylor Engineering Jones Edmunds & Associates Brown & Caldwell
15 Current Study Projections
16 Base Map Countywide Digital FIRM Production will be based on the following: Based on the best available digital orthophotography Local GIS data for streams, political boundaries, and roads may be used to supplement the DOQs
17 Current FIRM Base Data Standards
18 New DFIRM Base Data Standards Ortho Base Map The New DFIRM Standard 2 Color Map B&W orthos only No Street Centerlines Based on new imagery
19 Example Florida-modified DFIRM
20 Map Body Junctions & Reaches Junctions Reaches
21 Map Body Watershed Boundaries Watershed Labels Watershed Boundary
22 Map Body Stillwaters to 0.1 ft
23 Example Florida-modified DFIRM
24 Legend Additions
25 Example Florida-modified DFIRM
26 CTP Note
27 Panel Locator Information Panel Locator Diagram Watershed Information
28 Panel Locator Diagram
29 Watershed Information
30 DATUM CONVERSION SCHEMATIC Assuming Sample -1.2 datum shift from NGVD 29 to NAVD 88 NGVD 29 NAVD NGVD NGVD NGVD NGVD 29 1 NAVD 88 0 NAVD 88-1 NAVD 88-2 NAVD 88 Lowest Floor 1.2 NGVD 29 = Lowest Floor 0 NAVD 88
31 Preliminary FIS Distribution Preliminary DFIRM and FIS Preliminary Transmittal Letter Preliminary SOMA
32 Sample SOMA
33 Post-preliminary Processing (PPP)
34 Post-Preliminary Preliminary Process Time frames may vary from study to study 1.0 Preliminary FIS/FIRM 2.0 Preliminary DFIRM Community Coordination Meeting 3.0 Appeals Period (90 days) 4.0 Letter of Final Determination 5.0 Compliance Period (6 Months) 6.0 Effective FIS/FIRM Distribution X OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
35 Map Modernization and the Post-Preliminary Preliminary Process 1.0 PRELIMINARY FIS/FIRM 1.1 OUTREACH/COMPLIANCE PLAN 1.2 PRELIMINARY SOMA 1.3 SUBMIT PRELIMINARY DFIRM Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
36 Map Modernization and the Post-Preliminary Preliminary Process 2.0 DFIRM COMMUNITY COORDINATION MEETING 2.1 ARRANGE MEETING(S) 2.2 PROVIDE OUTREACH MATERIALS 2.3 CONDUCT MEETING Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
37 Map Modernization and the Post-Preliminary Preliminary Process 3.0 APPEAL PERIOD 3.1 PUBLISH BFE NOTICE 3.2 PROCESS APPEALS 3.3 RESOLUTION OF APPEALS/PROTESTS 3.4 SCHEDULE REVISED PRELIMINARY Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
38 Definitions of Appeals and Protests Appeal - refuting the proposed BFEs by submitting data to show that the BFEs are scientifically or technically incorrect (submission of a new hydrologic or hydraulic model). Protest - an objection to the Preliminary DFIRM and FIS that does not involve the proposed BFEs; protests will generally involve changes to floodplain boundary delineations, corporate limits, and roads.
39 Submitting Appeals and Protests All appeals and protests should be submitted to the community. The community should review each appeal/protest to determine if they support the information being submitted. The community will then forward all appeals/protests to the SWFWMD or District Consultant
40 Appeal and Protest Resolution Schedule Initial processing and acknowledgment of the appeal or protest submittal Perform technical review of the submittal Request additional data if necessary Prepare resolution letter and/or revised DFIRM and FIS Report
41 Acknowledging Appeals and Protests After the initial review of all appeal and protests: prepare and send acknowledgement letters to the CEO (copy the appellant/protestor) verifying that an appeal/protest has been received and is being reviewed. If the submittal can be considered an appeal, then an appeal acknowledgment letter (175 A) is prepared. If the submittal does not qualify as an appeal, then a protest acknowledgment (175 P) letter is prepared.
42 Technical Review of Appeals and Protests After a technical review of the submittal it may be determined that additional supporting data is required. If additional supporting data is required, a letter requesting additional data is prepared and sent. The letter specifies a 30 day period to submit the data. If the data is not received within 30 days, then the appeal or protest will be resolved on the basis of data already received.
43 Appeal Analyses If an appeal resolution results in changes to the DFIRM and FIS Report, then an appeal resolution letter and revised DFIRM and FIS Report are prepared and sent to the CEO and all appellants. If the appeal resolution does not result in changes to the DFIRM and FIS Report, then, the appeal resolution letter informs the CEO and all appellants that the DFIRM and FIS Report will not be changed and the reasons why no changes will be made. The appeal resolution letter enumerates the issues raised by the appeal and discusses the procedures used to evaluate and resolve the issues. All resolutions should be reviewed by FEMA prior to being issued. The community will have 30 days to review and comment on the appeal resolution.
44 Protest Analyses If a protest resolution results in changes to the DFIRM and FIS Report, then a protest resolution letter and revised DFIRM and FIS Report are prepared and sent to the CEO and all protesters. If the requested changes can be incorporated during the final printing processing or no changes are made, the Letter of Final Determination (LFD) can be revised to include a brief description of the changes made or the reasons that no changes were made. The community will have 30 days to review and comment on the protest resolution.
45 Resolution of Appeals and Protests FEMA will provide the community with a 30-day review period of the resolution letter and revised DFIRM and FIS Report If no comments are received during the comment period and all appeals and protests have been resolved, the Letter of Final Determination (LFD) is issued.
46 Map Modernization and the Post-Preliminary Preliminary Process 4.0 LETTER OF FINAL DETERMINATION 4.1 LFD VERIFICATION 4.2 FINAL SOMA 4.3 PREPARE LFD 4.4 NOTIFY LOMA/LOMR STAFF 4.5 PUBLISH FINAL RULING Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
47 Processing the LFD FEMA issues the LFD when the 90-day appeal period ends, all appeals and protests have been resolved, and all follow-up actions are taken. There are two LFD dates per month except for March in which there are three. FEMA schedules these dates in advance. If a RMC or mapping partner is funded through post preliminary processing for a study they will be responsible for preparing the LFD and Final Summary of Map Actions (SOMA) for the affected communities. The NSP will be responsible for reviewing and distributing all LFDs and Final SOMAs
48 Final SOMA The SOMA is a list that contains all LOMCs that are affected by the reprinting of the DFIRM for a specific community. If a SOMA is required for a community, it is sent with the LFD to inform the community and local citizens of the status of each LOMC. The final SOMA is prepared by following the same steps used to prepare the preliminary SOMA. Unlike the preliminary SOMA the final SOMA will show the date that the DFIRM becomes effective.
49 Distribution of the LFD The LFD is sent to the community CEO, floodplain administrator, the State NFIP coordinator, and the FEMA Regional office. The LFD notifies all users that the BFEs are considered final. The compliance period (6 months) is also initiated when the LFD is issued. The Effective date of the DFIRM is set by the LFD.
50 Distribution of the LFD, cont. The LFD letter will inform the community what level of regulations are required under 60.3 of the NFIP The NSP has an outreach team to help communities update their ordinances early in the study process
51 Regulation Levels a) When the Administrator has not defined the special flood hazard areas within a community, has not provided water surface elevation data, and has not provided sufficient data to identify the floodway or coastal high hazard area, but the community has indicated the presence of such hazards by submitting an application to participate in the Program (b) When the Administrator has designated areas of special flood hazards (A zones) by the publication of a community's FHBM or FIRM, but has neither produced water surface elevation data nor identified a floodway or coastal high hazard area
52 Regulation Levels, cont. (c) When the Administrator has provided a notice of final flood elevations for one or more special flood hazard areas on the community's FIRM and, if appropriate, has designated other special flood hazard areas without base flood elevations on the community's FIRM, but has not identified a regulatory floodway or coastal high hazard area (d) When the Administrator has provided a notice of final base flood elevations within Zones A1-30 and/or AE on the community's FIRM and, if appropriate, has designated AO zones, AH zones, A99 zones, and A zones on the community's FIRM, and has provided data from which the community shall designate its regulatory floodway
53 Regulation Levels, cont. (e) When the Administrator has provided a notice of final base flood elevations within Zones A1-30 and/or AE on the community's FIRM and, if appropriate, has designated AH zones, AO zones, A99 zones, and A zones on the community's FIRM, and has identified on the community's FIRM coastal high hazard areas by designating Zones V1-30, VE, and/or V (f) When the Administrator has provided a notice of final base flood elevations within Zones A1-30 or AE on the community's FIRM, and, if appropriate, has designated AH zones, AO zones, A99 zones, and A ones on the community's FIRM, and has identified flood protection restoration areas by designating Zones AR, AR/A1-30, AR/AE, AR/AH, AR/AO, or AR/A
54 Final Rule The Final Rule is the detailed list of the existing and modified BFEs that were made final when the LFD was issued. The Final Rule is published in the Federal Register approximately one month after the LFD is issued. The NSP will coordinate all Final Rule publications.
55 Map Modernization and the Post-Preliminary Preliminary Process 5.0 COMPLIANCE PERIOD 5.1 INITIAL COMPLIANCE CONTACT 5.2 PROVIDE MATERIAL / ASSISTANCE IN ORDINANCE REVISON / ADOPTION 5.3 REVIEW ADOPTED ORDINANCE FOR COMPLIANCE Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
56 Compliance and Map Adoption Period The compliance and map adoption period begins at the LFD date and ends at the effective date. During the compliance and map adoption period, community officials review and, if appropriate, revise the community s floodplain ordinances to ensure they are compliant with NFIP regulations. To avoid suspension from the NFIP, the community must adopt a compliant floodplain management ordinance and submit its ordinance to the FEMA Regional office for approval prior to the end of the compliance and map adoption period.
57 90- and 30-Day Suspension Letters NSP HQ will send 90- and 30-day suspension letters to remind the affected community of the upcoming effective date. These letters are sent to the community CEO, Floodplain Administrator, State NFIP Coordinator, and FEMA Region.
58 90-Day Letter NSP HQ will prepare and issue the 90-day letter two months after the LFD date if the appropriate ordinance has not been adopted by the community The 90-day letter notifies the community that there are four months left to update or adopt new ordinances before the effective date of the DFIRM and FIS. If the appropriate ordinance is not adopted within 60 days, a 30 day letter will be issued and a notice will be placed in the Federal Register that the community will be suspended from the NFIP on the effective date of the FIRM.
59 30-Day Letter NSP HQ will prepare and issue the 30-day letter two months after the 90-day letter is issued if the appropriate ordinance has not been adopted by the community. Advise the community that a notification is being placed in the Federal Register and that the community could be suspended from the NFIP if the appropriate ordinance is not adopted. To avoid suspension, the community must provide a certified copy of the adopted ordinance.
60 Compliance Period Elapses The Compliance Period ends on the same date the DFIRM and FIS Report become effective. By this date, the affected communities must have updated their floodplain management ordinances and received approval from the FEMA Regional office. The Compliance and Map Adoption staff at NSP HQ rely on the RMCs to provide community adoption/compliance updates.
61 Map Modernization and the Post-Preliminary Preliminary Process 6.0 EFFECTIVE FIS / FIRM DISTRIBUTION 6.1 REVALIDATION OF LOMA / LOMRs 6.2 DISTRIBUTE EFFECTIVE FIS /FIRM Preliminary FIS/FIRM Preliminary DFIRM Community Coordination Meeting Appeals Period Letter of Final Determination Compliance Period Effective FIS/FIRM Distribution
62 Prepare Revalidation Letter Approximately one month before the effective date of the DFIRM and FIS Report the Revalidation Letter will be prepared. The Revalidation Letter revalidates the determinations described in LOMCs previously issued. The effective date of the Revalidation Letter is one day after the effective date of the DFIRM and FIS. If a community has any LOMCs that were part of Category 2 on the Final SOMA or if any LOMCs have been completed since the LFD was mailed, then a Revalidation Letter must be completed. All Revalidation Letters will be sent to the NSP Post Preliminary Coordinator for review prior to being issued.
63 Outreach
64 Outreach Types Informational Mailing Community Meetings Website Posting Multi-Media Promotional Activities
65 Outreach Informational Mailings Identify recipients of mass mailing Procure brochures from FEMA (assumes one existing tri-fold brochure in selfmailing format; no envelopes required) Print mailing labels; affix proper postage
66 Outreach Community Meetings Determine time and place for meeting on-site logistics and meeting support Identify staff roles and responsibilities Advertise meeting Prepare agenda and other handout and presentation materials to explain the purpose of the mapping project, opportunities for involvement, and how to provide comments Provide opportunity for the public to submit comments Develop evaluation form; Distribute and assess results
67 Outreach Website Posting Develop website to provide information geared towards the general public, technical audiences, and other stakeholder groups (such as the FEMA website which guides users based on their interest in the maps - such as one button for property owners, one for lenders, insurers, etc.) Provide an overview of the mapping project Access to preliminary and final DFIRMs Contacts and links for further information on FEMA, State, WMD, and other local websites
68 Outreach Multimedia Promotional Activities Develop press release using template provided by FEMA Contact local media and place press release Follow up with media contacts periodically to encourage them to use press releases in articles, cover key events through live footage of community meetings or other key events Contact radio and television stations to request announcements to advertise meeting
69 Outreach Multimedia Promotional Activities Offer to provide knowledgeable officials for interview on radio and/or television talk shows Write articles and publish in trade journals, newsletters, or other existing publications that are available to the public Develop fact sheets, announcements, or brochures, and distribute through public libraries, schools, and/or locally-sponsored public events
70
71
72
73
74
EXECUTIVE SUMMARY COMMONWEALTH OF PUERTO RICO FY 2004-FY2009 MAP MODERNIZATION BUSINESS PLAN. Page i
EXECUTIVE SUMMARY I. Introduction The Commonwealth of Puerto Rico will support the Federal Emergency Management Agency s (FEMA s) Multi-Hazard Flood Map Modernization Program (MHFMMP) by contributing to
More informationHILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS
VOLUME 2 OF 5 HILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS Hillsborough County COMMUNITY NAME COMMUNITY NUMBER HILLSBOROUGH COUNTY (UNINCORPORATED AREAS) 120112 PLANT CITY, CITY OF 120113 TAMPA,
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationPRELIMINARY APR COMMUNITY NAME COMMUNITY NUMBER COMMUNITY NAME
COMMUNITY NAME COMMUNITY NUMBER COMMUNITY NAME COMMUNITY NUMBER BOONTON, TOWN OF 340335 MINE HILL, TOWNSHIP OF 340556 BOONTON, TOWNSHIP OF 340336 MONTVILLE, TOWNSHIP OF 340349 BUTLER, BOROUGH OF 340337
More informationAGENCY: Federal Emergency Management Agency, DHS. SUMMARY: Flood hazard determinations, which may include additions or
This document is scheduled to be published in the Federal Register on 08/01/2014 and available online at http://federalregister.gov/a/2014-18229, and on FDsys.gov 1 Billing Code 9110-12-P DEPARTMENT OF
More informationFront Carport Design Standards, Requirements & Application
Front Carport Design Standards, Requirements & Application THIS PAGE INTENTIONALLY LEFT BLANK. Carport: A structure designed or used to shelter vehicles that is open on at least two sides. Carport shall
More informationVillage of Glenview Appearance Commission
STAFF REPORT December 5, 2012 Village of Glenview Appearance Commission TO: Chairman and Appearance Commissioners FROM: Planning and Economic Development Department CASE MANAGER: Tony Repp, Planner SUBJECT:
More informationKANE COUNTY, ILLINOIS Volume 1 of 4 AND INCORPORATED AREAS Kane County
KANE COUNTY, ILLINOIS Volume 1 of 4 AND INCORPORATED AREAS Kane County COMMUNITY COMMUNITY NAME NUMBER ALGONQUIN, VILLAGE OF 170474 AURORA, CITY OF 170320 BARRINGTON HILLS, VILLAGE OF 170058 BARTLETT,
More informationAdvisory Circular. File No.: Z U Issue No.: 01
Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5
More informationMassachusetts Health Care Training Forum. April 2014
Massachusetts Health Care Training Forum April 2014 Agenda 1. Welcome 2. Revalidation 3. ICD-10 Implementation Project: Update 4. Questions and Answers 1. MassHealth Resources REMINDER: KEEP YOUR PROVIDER
More informationSTRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION
More informationProgram Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA
Program Manual EarthCraft House Single Family Program January 1, 2017 Viridiant 1431 West Main Street Richmond, VA 23220 804.225.9843 EarthCraft House Project Process Process Overview All EarthCraft Builders
More informationT H E VILLAGE OF P h i l m o n t, N Y
T H E VILLAGE OF P h i l m o n t, N Y Summit Reservoir Area Plan November 17, 2014 Executive Steering Committee Meeting 2 Agenda 1:00 1. Welcome 2. Housekeeping & updates i. Committee contact list review
More informationCity of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance
City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale
More informationLOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS
LOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS VOLUME 4 OF 4 Community Name Community Community Name Number Community Community Number Number Community Community Number Name Community Number LOS
More informationAGENCY: Federal Emergency Management Agency, DHS. SUMMARY: New or modified Base (1% annual-chance) Flood Elevations (BFEs), base
This document is scheduled to be published in the Federal Register on 09/23/2013 and available online at http://federalregister.gov/a/2013-23069, and on FDsys.gov 1 Billing Code 9110-12-P DEPARTMENT OF
More informationNATIONAL ASSOCIATION OF UNCLAIMED PROPERTY ADMINISTRATORS (NAUPA) NETWORK STRATEGIC PLAN ( )
PURPOSE/MISSION To promote and strengthen unclaimed property administration and interstate cooperation in order to enhance States return of unclaimed property to rightful owners and provide a forum for
More informationCAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE)
CAPACITY PLANNING CALENDAR OF MILESTONE DATES DECEMBER 2019 and MAY 2020 TIMETABLES (PRODUCTION SCHEDULE) Published on behalf of:- Capacity Planning Quadrant: MK Elder Gate Milton Keynes Central MK9 1EN
More information(i) Adopted or adapted airworthiness and environmental standards;
TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN
More informationCAPACITY PLANNING. CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE)
CAPACITY PLANNING CALENDAR OF MILESTONE DATES DECEMBER 2018 and MAY 2019 TIMETABLES (PRODUCTION SCHEDULE) Published on behalf of:- Capacity Planning Quadrant: MK Elder Gate Milton Keynes Central MK9 1EN
More informationCARICOM Single ICT Space Digital Transformation is a Journey
CARICOM Single ICT Space Digital Transformation is a Journey CARICOM ICT Cluster of Agencies The Agenda Ecosystem & Characteristics Req of the Single ICT Space Caribbean Competitiveness Progress Major
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...
More informationToronto Pearson February 2019 Briefing. February 19, 2019
Toronto Pearson February 2019 Briefing February 19, 2019 Noise Management Forums UPDATE: The Six Ideas Runway Selection Criteria 2019 Airfield Restoration Program Noise Management Forums Review elements
More informationOfficial Journal of the European Union L 186/27
7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose
More informationSAN JOSE CAPITAL OF SILICON VALLEY
CITY OF C2 SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 3/29/16 ITEM: t»-\ Memorandum FROM: Kimberly J. Becker SUBJECT: SEE BELOW DATE: March 16, 2016 Approved
More informationPublic Space Recycling in Dakota County
Click to edit Master title style Public Space Recycling in Dakota County Jenny Kedward Environmental Specialist Environmental Resources Department October 8, 2015 Click to edit Master title style Click
More informationEXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES
EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department
More informationEmily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY
Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY Township 137 Range 26 (Fairfield Township) sections 2 & 3 Township 138 Range 26 (City of Emily) sections 27, 34, 35, & 36 Township
More informationAGENCY: Federal Emergency Management Agency, DHS. and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as
This document is scheduled to be published in the Federal Register on 03/05/2019 and available online at https://federalregister.gov/d/2019-03863, and on govinfo.gov Billing Code 9110-12-P DEPARTMENT OF
More informationSubpart H. 2042/2003
AIRWORTHINESS NOTICE Issue of Certificate of Airworthiness No 12 Issue 3 May 2014 1 Purpose and scope The Civil Aviation Directive CAD-AIRW/8(1)-1 incorporates the Annex Part 21 to the European Commission
More informationPRELIMINARY SUMMARY OF MAP ACTIONS
To assist your community in maintaining the Flood Insurance Rate Map (FIRM), we have summarized below the previously issued Letter of Map Change () actions (i.e., Letters of Map Revision (LOMRs) and Letters
More informationREPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan
INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United
More information2015 City of Tuscaloosa Floodplain Management Plan Tuscaloosa, Alabama
2015 City of Tuscaloosa Floodplain Management Plan Tuscaloosa, Alabama Prepared under the direction of the City of Tuscaloosa Floodplain Management Planning Committee With the support of the City of Tuscaloosa
More informationNoise Oversight Committee
Noise Oversight Committee March 18, 2015 Audio recordings are made of this meeting Noise Oversight Committee March 18, 2015 Item 1 Review and Approve Draft Meeting Minutes Minutes from January 21, 2015
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in
More informationHampton Roads Express Lane Network
More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationEnhancing hydrological data management and exchange procedures
Enhancing hydrological data management and exchange procedures The Sava River Hydraulic Model Dr Mark R Jourdan, PE Research Hydraulic Engineer U.S. Army Engineer Research and Development Center Vicksburg,
More information2018 WSGC WISCONSIN COLLEGIATE ROCKET DESIGN COMPETITION
2018 WSGC WISCONSIN COLLEGIATE ROCKET DESIGN COMPETITION 11-NOV-2017 1 Welcome WSGC 2018 CRL 2 Agenda Who is competing? What is the challenge? When and where will events be taking place? When are the important
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationAIRWORTHINESS PROCEDURES MANUAL CHAPTER 26. Modifications and Repairs
November 2017 Page 1 of 10 CHAPTER 26 1. Introduction Modifications and Repairs 1.1 CAR M states that a person or organisation repairing an aircraft or component should assess the damage against published
More informationOpportunities and Challenges for an Enhanced Cooperation between Regulators and Auditors
Opportunities and Challenges for an Enhanced Cooperation between Regulators and Auditors Pascal Frèrejacque, Senior Operations Officer, Centre for Financial Reporting Reform, The World Bank Vienna, 21
More informationThe packet is available on-line by going to choosing the Monthly Calendar, and clicking on Monday, March 16, 2015.
AGENDA Ingham County Parks & Recreation Commission 121 E. Maple Street, P.O. Box 178, Mason, MI 48854 Telephone: 517.676.2233; Fax: 517.244.7190 The packet is available on-line by going to www.ingham.org,
More informationClam Harbour Provincial Park
Clam Harbour Provincial Park Public Engagement Session Thursday, September 14 th, 2017 5:30pm 7:30pm Webbers Store 11470 Nova Scotia Trunk 7 Lake Charlotte, NS Agenda Overview of the Provincial Parks System
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.
Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More informationEXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND
EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County
More informationICAO Initiatives on Global Tracking
ICAO Initiatives on Global Tracking Nancy Graham Director, Air Navigation Bureau, ICAO Expert Dialogue on Real-time Monitoring of Flight Data, including the Black Box the Need for International Standards
More informationCampus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015
Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationEQUIP General Aviation Equipage Work Group Briefing. Date: November 28, 2017
EQUIP 2020 General Aviation Equipage Work Group Briefing Presented by: Co-Chairs Bobby Nichols, FAA & Jens Hennig, GAMA with Hank Cabler, Jim Marks & Anna Allen Date: November 28, 2017 Equip 2020 Efforts
More informationCity of Port St. Lucie Planning and Zoning Department ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE SCHEDULES FOR 2018
Planning and Zoning Department ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE SCHEDULES FOR NOTE: DELIVERY DEADLINE ON ALL SUBMITTALS, INCLUDING ONLINE, IS 12:00 NOON ALL DRAWINGS SUBMITTED MUST BE BLACKLINE,
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationWORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)
More informationRecommendations for Northbound Aircraft Departure Concerns over South Minneapolis
Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011
More informationUAB Avion Express FAMILY ASSISTANCE PLAN
UAB Avion Express FAMILY ASSISTANCE PLAN 1. Overview 1.1. The purpose of the UAB Avion Express Family Assistance Plan is to provide company personnel with the guidelines, procedures and training that will
More informationNoise Oversight Committee
Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationAERODROME SAFETY COORDINATION
AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationCouncil. Summary Schedule of Meetings (Approve LTP Consultation (Adoption of Annual Report)
Summary Schedule of Meetings 2018 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 001 Council - 13 27 (Approve LTP Consultation document) Extraordinary Council (additional as required) - 8 26 (Adoption
More informationLetter of invitation for Tender. Ref. No.: T
Letter of invitation for Tender Ref. No.: T204-008 Date: To: Dear Sirs, Tender Invitation Tender for The Marketing and Production Project of Lok Sin Tong Joint School Creative Arts Exhibition 205 You are
More informationPENSACOLA SPORTS SPECIAL EVEN NT GRANT PROGRAM 2017
PENSACOLA SPORTS SPEC CIAL EVENT GRANT PRO OGRAM 2017 PENSACOLA SPORTS SPECIAL EVENT GRANT PROGRAM TABLE OF CONTENTS I. Introduction and Definitions II. III. IV. Statement of Policies Funding Eligibility
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationTERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office
TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator
More informationTHE CESSNA AIRCRAFT COMPANY
Page 1 2010-20-10 THE CESSNA AIRCRAFT COMPANY Amendment 39-16444 Docket No. FAA-2010-0380; Directorate Identifier 2009-NM-009-AD PREAMBLE Effective Date (a) This AD becomes effective November 1, 2010.
More informationAlternative Highest & Best Use Analysis Boutique Hotel
Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following
More informationRequest for Proposals
E CONOMIC DEVELOPMENT AUTHORITY of the City of Norfolk Board of Directors Officers Robert E. Garris, Jr., Chairman Executive Director Michael W. Lee, Vice Chairman Peter Chapman Jeffrey F. Brooke Kim Brown
More informationMEETING MINUTES Page 1 of 5
Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached
More informationAir Traffic Services Outside Controlled Airspace (ATSOCAS)
Air Traffic Services Outside Controlled Airspace (ATSOCAS) ATSOCAS Review Initiated due to concerns raised by AAIB, UKAB, CAA and attendees at CAA Safety Evenings 5 Phases of work 1 Establish situation
More informationPortland International Jetport Noise Advisory Committee 1001 Westbrook Street, Portland, Maine 04102
Portland International Jetport Noise Advisory Committee 1001 Westbrook Street, Portland, Maine 04102 Date Start End Next Meeting Next Time Prepared By Company 4/26/2016 6:00pm 7:15pm 10/20/16 6pm J. Dunfee
More informationNational Spatial Reference System
National Spatial Reference System NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) SEMINAR January 15, 2003 Catskill, New York Edward J. McKay OUTLINE Vertical Datums Height Systems NAVD 88 Project NAVD
More informationSUPERSEDED. [Docket No. FAA ; Directorate Identifier 2015-SW-014-AD; Amendment ; AD ]
[Federal Register Volume 80, Number 95 (Monday, May 18, 2015)] [Rules and Regulations] [Pages 28172-28175] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No:
More informationUAV Flight Services Company. What We Do. What Sets us Apart
UAV Flight Services Company A dedicated team of aviators, technologists, and engineers. What We Do UAV flight services for data collection, mapping, and inspection What Sets us Apart Extensive field experience,
More informationPerformance monitoring report for 2014/15
Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance
More informationL 342/20 Official Journal of the European Union
L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)
More informationAmendment Docket No. FAA ; Directorate Identifier 2007-NM-260-AD
Page 1 2009-20-05 AIRBUS Amendment 39-16028 Docket No. FAA-2007-0390; Directorate Identifier 2007-NM-260-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective November 3, 2009.
More informationIntegrating Unfunded Agreements (UFAs) in eresearch Proposal Management (erpm) November 22, 2013
Integrating Unfunded Agreements (UFAs) in eresearch Proposal Management (erpm) November 22, 2013 Agenda Overview: UFA defined and categories Timeline: What we ve done and where we re headed Process: How
More informationTABLE OF CONTENT LIST OF FIGURES
CIVINET POLAND TABLE OF CONTENT 1 INTRODUCTION 3 2 GENERAL INFORMATION ABOUT THE NETWORK 3 2.1. Terms of reference 3 2.2. Support funding 3 2.3. Fee structure 3 2.4. Membership 4 2.5. Financial administration
More informationCommunity Forum 17 August Resort Management Update
Community Forum 17 August 2013 Resort Management Update Topics Board Appointments Snowmaking and Water Supply Update Strategy Planning & Operational Direction 5 Year Strategic Management Plan Update 2013/14
More informationMedia Details 2016/17.
Media Details 2016/17 Your customers read Airfinance Journal FLEETS Published since 1979, Airfinance Journal is the leading financial news and analysis publication of the aviation finance sector. The journal
More informationAward of Contract for Highway 17 Wildlife Passage Structures and Bay Area Ridge Trail Crossing: Conceptual Design and Feasibility Study
R-16-18 Meeting 16-04 February 10, 2016 AGENDA ITEM AGENDA ITEM 6 Award of Contract for Highway 17 Wildlife Passage Structures and Bay Area Ridge Trail Crossing: Conceptual Design and Feasibility Study
More informationSupreme Court records, (bulk , )
Supreme Court records, 1793 1974 (bulk 1847 1862, 1870 1966) Ontario County Records and Archives Center Overview of the Records: Creator: Ontario County Court Clerk Extent: 48 volumes, 8 indexes, 25.53
More informationSOLO TRAVEL TRENDS REPORT. For more information contact Janice Waugh at or Nick Roberti at
SOLO TRAVEL TRENDS REPORT This report is based on 1,118 responses to the 2018 Reader Survey conducted by Solo Traveler, the online resource and community for those who travel alone. While most studies
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning
More informationResearch and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018
Bank of Japan Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018 Report on the Services Producer Price ( Preliminary Figures for January 2018 ) The Services Producer Price
More informationUSING SPECIAL INTERESTS TO DRIVE TRAVEL. Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am
USING SPECIAL INTERESTS TO DRIVE TRAVEL Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am Agenda 1. Introduction 2. Special Interest (SI) overview and definition 3. Recap:
More informationBusiness Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.
Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting
More informationMONTROSE REGIONAL AIRPORT
MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify
More informationFederal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013
Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.
More informationVia Only. In reply refer to/attn: Place ID:794813:ERyan
California Regional Water Quality Control Board, San Diego Region May 5, 2016 Via Email Only Mr. Richard Boon, Chief Orange County Stormwater Program OC Public Works 2301 N. Glassell Street Orange, CA
More informationDASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL
Executive Summary Per the Board s request, we have added this Executive Summary to the Monthly Dashboard. We ll be including it from now on. It will provide you with a running total of the number of tickets
More informationPerth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager
Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1
More information[Docket No. FAA ; Directorate Identifier 2013-NM-081-AD] Airworthiness Directives; The Boeing Company Airplanes
This document is scheduled to be published in the Federal Register on 08/05/2013 and available online at http://federalregister.gov/a/2013-18800, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION
More informationPreferred Alternative Summary
Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative
More information