Outer Banks Bridges Update:
|
|
- Amber Shaw
- 5 years ago
- Views:
Transcription
1 Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018
2 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator River (Lindsay C. Warren Bridge) Oregon Inlet (Herbert C. Bonner Bridge) Pea Island (Captain Richard Etheridge Bridge) Rodanthe Bridge 2
3 Alligator River Bridge 3
4 Alligator River Bridge Preservation project Mechanical/electrical rehab of swing span Concrete and pile repairs Contract awarded to Flatiron Constructors Contract amount of $16,676,729 Contract completion September 17,
5 Wright Memorial Bridge 5
6 Wright Memorial Bridge Preservation project of Eastbound Bridge Deck overlay, concrete and pile repairs Contract awarded to Flatiron Constructors Contract amount is $21,072,992 Bridge scheduled to reopen by May 14, 2018 Contract completion November 1,
7 Mid-Currituck Bridge 7
8 Ongoing Activities Mid-Currituck Bridge Interagency coordination meeting held in March Completing Reevaluation Report with FHWA Continuing traffic and revenue studies Traffic and revenue studies will be used to develop Plan of Finance Plan of Finance will inform project delivery (construction contract) 8
9 Mid-Currituck Bridge Current Schedule Draft EIS Completed Final EIS Completed Reevaluation April 2018 Record of Decision Spring/Summer 2018 Begin Construction To be determined Open to Traffic To be determined *Schedule is preliminary and subject to change 9
10 Rodanthe Bridge Historical hot spot Breach formed during Hurricane Irene in August 2011 Further damage from Hurricane Sandy in October 2012 Beach nourishment completed September 2014 as an interim approach Extensive over wash during recent nor easters 10
11 Rodanthe Bridge 11
12 Rodanthe Bridge Planning for long term solution has been underway for several years Record of Decision approved in December 2015 Includes 2.4 mile long jug handle design 12
13 Rodanthe Bridge 13
14 Rodanthe Bridge Design-build contract awarded to Flatiron Constructors in January 2017 RK&K is the lead design firm Contract amount of $145 million Design and permitting underway Right of way acquisition underway Onsite construction to begin Summer 2018 Completion in
15 Rodanthe Bridge 15
16 Pea Island Bridge Historical area of New Inlet Breach formed during Hurricane Irene in August ft. temporary steel bridge constructed Planning underway for longer term solution 16
17 Pea Island Bridge 17
18 Pea Island Bridge Contract awarded to T. A. Loving Co. in November 2015 Contract amount of $14.3 million Includes 1/2 mile long concrete structure Onsite construction began in March
19 Pea Island Bridge 19
20 Pea Island Bridge 20
21 Pea Island Bridge Opened to Traffic Nov. 14, 2017 Named Captain Richard Etheridge Bridge 21
22 Pea Island Bridge 22
23 Bonner Bridge Replacement 23
24 Bonner Bridge Replacement Existing Bonner Bridge opened in 1963 Planning began for replacement in 1990 Settlement agreement reached to replace bridge in 2015 Construction began in March
25 Bonner Bridge Replacement Prime contractor is PCL Civil Constructors, Inc. HDR Engineering, Inc. is the lead design firm Contract amount of about $250 million 25
26 Bonner Bridge Replacement Old New Bridge length (miles) Number of bents Number of navigation spans 1 9 Navigation opening width (feet) /- Design lifespan (years)
27 Bonner Bridge Replacement Many precast concrete elements used Stainless reinforcing steel and high durability concrete used to protect against corrosion 6,300 ft. work trestle used on north end Bridge demolition material to be placed in offshore reef sites Portion of existing bridge to be retained at south end 27
28 Bonner Bridge Replacement 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 ~80 ft. ~70 ft. ~300 ft. 44
45 45
46 46
47 47
48 48
49 Bonner Bridge Replacement Status Contract completion is about 79% (includes design, mobilization, materials fabrication) Onsite construction is about 68% complete Multiple operations ongoing concurrently 24 hours/day for some activities Scheduled bridge opening late 2018 Contract completion Fall
50 Questions? Jerry D. Jennings, PE Division Engineer (252)
January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions
House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary
More informationA Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.
A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.
More informationMcCORMICK QUARRY BRIDGE EAST SHORE EXPRESSWAY BRIDGE WITOLD H. KLOCZKOWSKI, P.E. PROJECT MANAGER COMMONWEALTH ENGINEERS & CONSULTANTS, INC.
Rhode Island DOT Replaces Bridges Over Extended Weekends Using PBES and SPMTs DAVID W. FISH, P.E. ADMINISTRATOR OF PROJECT MANAGEMENT RI DEPARTMENT OF TRANSPORTATION WITOLD H. KLOCZKOWSKI, P.E. PROJECT
More informationCOMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE
COMMUNICATION BY THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE ON THE GRAND BAHAMA (PORT AREA) INVESTMENT INVENTIVES (AMENDMENT) BILL, 2016 MONDAY, 7 TH NOVEMBER
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More informationSR 520 Program. The road to the world s longest floating bridge. August 2015
SR 520 Program The road to the world s longest floating bridge August 2015 Chris Christopher, P.E. Director of Construction - WSDOT AASHTO Subcommittee on Construction August 2015 Little Rock, Arkansas
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationManhattan Project National Historical Park. Tracy D. Atkins Principal Representative
Manhattan Project National Historical Park Tracy D. Atkins Principal Representative Park Establishment 2015 NDAA passed December 2014 authorizing the park in three locations with joint management with
More informationP3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.
P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations
More informationWater Resources Update after NCGA Long Session
Water Resources Update after NCGA Long Session North Carolina Beach Inlet & Waterway Association Annual Conference November 16, 2015 Division of Water Resources Overview New Name / Reorganization Jordan
More informationConstructor: Joseph B. Fay
1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:
More informationMarch 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018
OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationTexas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge
Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov January 18, 2017 Mesa Continuous for 6 weeks The following closures started
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationRudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC
OLD MISSISSIPPI RIVER BRIDGE AT VICKSBURG Challenges Maintaining a Vital East-West Rail Corridor Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC River Crossings at Vicksburg
More informationNC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James
More informationPort of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010
Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE
More informationAstoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019
Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform
More informationDALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016
DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationBackground of the project
D runway of Tokyo International Airport DESIGN-BUILD PROCUREMENT SCHEME FOR THE EXPANSION OF THE TOKYO INTERNATIONAL AIRPORT Mitsuhiko OKADA The Overseas Coastal Area Development Institute of Japan (OCDI)
More informationCONSTRUCTION COMMITTEE MEETING AGENDA
CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, September 19, 217 TIME: 8:3 a.m. PLACE:GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL
More informationLake Manitou Dam and Spillway Upgrade
South Bend Lake Manitou Dam and Spillway Upgrade Fort Wayne Rochester Indiana 1828 to 2017 Lafayette Sky Medors, P.E., LFA David Nance, P.G., IDNR Project Background Location: Rochester Indiana, Central
More informationDAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC
OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655
More informationEXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES
EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department
More informationNortheast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015
Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest
More informationGreg Steinepreis EXECUTIVE SUMMARY. Partner, Perth T
Greg Steinepreis Partner, Perth T +61 8 9429 7505 greg.steinepreis@squirepb.com Practice Focus Construction, engineering & infrastructure Services International and domestic dispute resolution Litigation
More informationNC Dredge Studies NCBIWA Spring Conference April 23, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationCONSTRUCTION COMMITTEE MEETING AGENDA
CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, February 06, 2018 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL
More informationDufferin Jog Elimination Project
Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationGRAND OPENING OF OLD POINT NATIONAL BANK S NEW CORPORATE HEADQUARTERS
GRAND OPENING OF OLD POINT NATIONAL BANK S NEW CORPORATE HEADQUARTERS May 2, 2014, Hampton, VA Old Point National Bank is proud to announce the official grand opening of our new Corporate Headquarters
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationIRONTON-RUSSELL BRIDGE REPLACEMENT
IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing
More informationFinance and Implementation
5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter
More informationAtlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)
Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City
More informationGreat Lakes Navigation System Buffalo District
Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG Key FY16/17 Buffalo District O&M
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 9, 2012 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers 5-Year Dredging Schedule (By dredge type)
More informationThe "M.V. Fintry Queen" Executive Summary - Business Plan 2017
The "M.V. Fintry Queen" Okanagan Lake Boat Company Inc. www.fintryqueen.ca For information purposes only: DRAFT Jan 2017 Executive Summary - Business Plan 2017 The M.V. Fintry Queen is a 325 passenger
More informationDawlish & South West rail
Dawlish & South West rail restoring the railway 19 February 2014 1 Dawlish storm 5 February Dawlish sea wall breached on 5 th Feb the most destruction caused since Victorian times 19 February 2014 2 Dawlish
More informationSouthwind Marina Sinton Drive Pensacola, Florida Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential
Urban Realty Southeast is pleased to present Southwind Marina 10121 Sinton Drive Pensacola, Florida 32507 Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential Closest marina
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationPROJECT UPDATES: March 15, th Street Water Tower Painting Project:
PROJECT UPDATES: March 15, 2018 40th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting of Cherry Hill, New Jersey in the amount of $667,500
More informationWelcome & Introduction. Steve Sawyer, Executive Director Manor Royal Business District
Welcome & Introduction Steve Sawyer, Executive Director Manor Royal Business District Development & Upcoming Opportunities Lise Sorensen, Economic Development Officer Crawley Borough Council Crawley Borough
More informationAstoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019
Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two
More informationCommonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017
Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationDeterioration Factors at Girder Ends
Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of
More informationDowntown Tunnel/Midtown Tunnel/MLK Extension Project
Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented to: HRTPO Board, January 19, 2012 Presented by: Frank Fabian, P.E., Senior Project Manager, Virginia Department of Transportation 1 PROJECT
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationHarbours department Quarterly and Year End Review
Page 1 of 6 Harbours department Quarterly and Year End Review 30 June 2011 Mike Pryce Manager, Harbours department Nigel Corry General Manager WGN_DOCS#961300 Page 2 of 6 1. Overview of the year 1.1 Highlights
More informationLove Field Modernization Program Bond Financing Update
Love Field Modernization Program Bond Financing Update Briefing to the Transportation and Environment Committee Department of Aviation December 14, 2009 Purpose Review LFMP background and give status update
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program
More informationWILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING JULY 26,, 2018
A regular meeting of the Wilkes-Barre/Scranton International Airport Joint Board of Control was held Thursday, July 26, 2018 in the Terminal Building Conference Room at the Airport. The meeting was called
More informationSouth Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009
South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers Chesapeake City Council Update June 23, 2009 A Private Bridge Proposal To: Restore a critical regional transportation link Reconnect
More informationDowntown Tunnel/Midtown Tunnel/MLK Extension Project
Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented to: Transportation Technical Advisory Committee, January 4, 2012 Presented by: Frank Fabian, P.E., Senior Project Manager, Virginia Department
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationNavigating Indiana Road Signage
Navigating Indiana Road Signage JOE BRUNO Traffic Administration Engineer Indiana Department of Transportation Presentation Overview Background Logo Program (Gas, Food, Lodging, & Camping Services) Attraction
More informationWork in 2015 and Annual Mobility- Management Plan
Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector
More informationLOVE FIELD MODERNIZATION PROGRAM (LFMP)
LOVE FIELD MODERNIZATION PROGRAM (LFMP) April 29, 2015 DALLAS AIRPORT SYSTEM Three Facilities Dallas Love Field Dallas Executive Airport Downtown Vertiport $90 million City of Dallas Department Operated
More informationProject Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More information8. AIRPORT UPDATES 8.1. Striping Progress 8.2. Parking Lot Repairs 8.3. Runway Closure 8.4. CIP Meeting 9. ENGINEER'S REPORT 10.
City of Huron Agenda Airport Board Meeting Wednesday, June 13, 2018 @ 4:00 PM 426 15th St. NW Huron, SD 1. CALL TO ORDER 1.1. Roll Call 2. AGENDA APPROVAL 3. MINUTES APPROVAL 3.1. Approve minutes from
More informationDIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018
DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES
More informationJason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas
Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank
More informationPROJECT UPDATES February 1, 2018
PROJECT UPDATES February 1, 2018 40 th Street Water Tower Painting Project: On September 12, 2017, City Council awarded a contract to Allied Painting, of Cherry Hill, New Jersey, in the amount of $667,500
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationPORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018
PORT OF GALVESTON PORT DIRECTOR S REPORT May 22, 2018 AT A GLANCE APRIL 2018 The Port is up 37.7% in total cargo over 2017 The Port is up 207.7% in lay vessel port calls (40-13 Y-T-D) The Port is up 30.5%
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationHow do you get two buses to pass safely on something
Everybody back on the bus The world s longest guided busway is almost ready in Cambridgeshire. Mark Smulian finds out how it was built, and why the county council didn t want a railway or road Photographer
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationCITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)
CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA 98040-3732 (206) 275-7600 www.mercergov.org August 18, 2016 Mr. Daniel M. Mathis Division Administrator Federal
More informationPublic Notice July 14, 2017
Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice
More informationExisting Annual City Program
Existing Annual City Program SUMMER 265 Light Pole Week of Memorial Day. Installation of Summer. Installation of 265 single banner poles Mixed styles of Dana Point Banner Hardware is installed on Street
More informationPanama Canal Stakeholder Working Group Meeting
Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749
More informationDesign Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia
Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia September 18, 2013 Nicholas J. Roper, P.E. District Bridge
More informationGH Group. New Aviation Leader Aircraft Sales, Acquisitions, Trades and Charter Solutions Flight Crew Resourcing Aviation PR Consultancy
GH Group New Aviation Leader Aircraft Sales, Acquisitions, Trades and Charter Solutions Flight Crew Resourcing Aviation PR Consultancy GH GROUP GH Group is a vibrant and boutique aviation experts group
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationSliplining of Lock-Bar Steel Water Mains, Wilmington Delaware
Sliplining of Lock-Bar Steel Water Mains, Wilmington Delaware Andrew Jakubowitch, PE, Hatch Mott MacDonald Who is Hatch Mott MacDonald? An award-winning, full-service North American engineering consulting
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationPre-Construction Public Meeting July 2017
Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City
More informationDepartment of Public Works P.O Box 4186, San Rafael, CA / Fax: 415/
Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/499-7877 Fax: 415/499-3724 Raul M. Rojas DIRECTOR San Antonio Road Bridge Replacement September 9, 2015 Community Meeting Summary
More informationCITY PLANNING COMMISSION June 22, 2011, Calendar No. 27
CITY PLANNING COMMISSION June 22, 2011, Calendar No. 27 IN THE MATTER OF IN THE MATTER OF an application, submitted by the Department of Transportation, pursuant to Sections 197-c and 199 of the New York
More informationDistrict 3 ITS Project Update
District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer Key ITS Projects in District 3 Bay County Advanced Traffic Management System (ATMS) Okaloosa County Computerized Traffic Control
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationPort of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management
Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes
More information