BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016
|
|
- Austen Matthews
- 5 years ago
- Views:
Transcription
1 BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: E: ABN: PO Box 2233 South Hedland WA 6722
2 Binbirri Contracting was established in 2010 and provides safe and efficient earthmoving services and skilled Operators. Our goal is to create employment and training opportunities for local Indigenous people and establish relationships with other Pilbara based Indigenous businesses. Binbirri has entered into joint venture with Cross Verwijmeren Pty Ltd to broaden our capabilities. Capability We are a Pilbara owned local Indigenous Earthmoving Company whose owner is from the Banjima Language Group who has over 20 years experience within the industry. Binbirri s ambition is to create a sustainable business and to increase Indigenous participation in capital development and employment within North West Australia. We are experienced in achieving and maintaining a zero harm safety culture, by increasing education of our workforce and promoting positive interaction by all employees, and through partnering our own and Clients Safety and Training Programs. We have been able to attract and retain a skilled and proactive workforce who possesses the knowledge and experience crucial to completing work of the highest possible standard throughout our operations.
3 Type of Work We are a Category 3 Contractor with Rio Tinto, and a preferred supplier within Rio Tinto s Contractor Management System and have our own Vendor number. We are an approved vendor to BHPB Iron Ore. We perform a wide range of works including but not limited to: Earthworks Bulk Haulage Rehabilitation Haul / Access Road Construction & Maintenance Road / Rail Maintenance Drill Pads and Exploration Work Roadwork s Drainage Dust suppression Bitumen work Site Clean ups Demolition Pipelines Mulching / Chipping Landscaping and maintenance Plant Hire Yard clean ups Concreting Lawn mowing Bricklaying Licensed weed spraying Stone pitching Fencing Paving High pressure water blasting / sand blasting Litter clean up Supply and Deliver M.R.W.A. specification Aggregate Sand Pindan Bulk Water Potable, Dust Suppression Labour Hire All types of Engineered materials e.g. road base, cracker dust Labour/Trades Assistants Operators Our Fleet Road Trains up to Triple Side Tipper Trailers 12 Ton 6 Wheel Tip Truck 6 Ton Tip Truck Semi Water Tanker x 2 Fully Mine Specification 6 Wheel Water Truck x 1 Excavator Caterpillar 329DL x 1 Excavator Caterpillar 320CL x 1 Excavator attachments: Batter bucket, General purpose bucket, Rock Bucket, Trenching Bucket, 14 ton Compactor, 14 foot grader blade Bobcats x 2 Bobcat attachments: 4 in 1 bucket, General Purpose bucket, Skeleton bucket, Trencher, 1 ton compactor, Broom (sweeps into own hopper), Augers 100mm to 600mm, Screw Pile Attachment Caterpillar Grader 140H Caterpillar Rollers 18 Ton x 2 - Padfoot and Smooth Drum Light Vehicles (Fully mine spec d) x 2 Case Backhoe x 1 Tandem Trailer fitted with 2,000 Litre potable water tank and high pressure pump capable of water blasting / sand blasting
4 Clients and Projects Description of the Work Client Completion Karijini Civil & Mining Drill pads, track maintenance and miscellaneous earth works RIO TINTO 1 year contract Mia - Mia Camp Miscellaneous earth works Mia - Mia Camp Minor earthworks, bitumen road patching, resealing AUZCORP Clean out of waste water ponds Orica Services Bulk Earthworks & Pad Construction Ongoing bulk water supply contract Access road construction Piacentini & Son Rock Haulage Finicane Island Rio Tinto Mine Rehabilitation Pannawonica Mesa K & Mesa J Pit 10 Cross Verijemeren Binbirri Joint Venture Mine rehabilitation, exploration, drill pads. Road Construction & Maintenance Grading. Various Pilbara Sites. ORICA October 2011 June Year Contract BHP Sept Dec 2013 RIO TINTO Nov 2013 Feb 2014 RIO TINTO March 2014 March 2017
5 Koodiaderi - Viento Group Dust suppression at Namuldi Mine Site RIO TINTO March 2014 March Mitie Construction Port Hedland Site clearing, haulage, labour hire, scaffolding, general clean ups, frame construction & constructing house pads. Site clearing, Pad construction, Walkways and Carpark construction Formaction Earth works Ore Body 25 Excavation Talga Creek Crossing Earth works Sino Project Town of Port Hedland Pre-cyclone clean-up in all suburbs. Fire control, fire breaks & water delivery. Street Verge clean up Port and South Hedland Yandeyarra Community - 42km access road maintenance, sheeting, river crossings, maintenance grading and major repairs Haulage of materials, Water truck hire, concreting, paving Car park at Depot consisting of 2,151sqm earthworks, bitumen & kerbing FMG PARK AVENUE TRUST BHP EPS TOPH July August - Present July 2014 Dec 2014 July / Sept 2014 Sept Ongoing Mar June April - Ongoing July - Ongoing January 2016 Town of Port Hedland Airport Resurface carpark and access road Infratech Port Hedland Excavation, labour hire, water supply & delivery. Pindan Construction Port Hedland Bulk haul material to site. Desert Concreting House pad construction. Northwest Crane Hire Construct new yard 12,500sqm Rio Tinto Dampier Salt Port Hedland Repair levy banks, repair,clean out and excavate drains Supply and haul quarry materials, construct pathways Watpac Demolition & backfill of old sewage farm Labour & Operator hire, Semi water truck hire, temporary fence erection/ disassemble, tree removal BGC Bulk haul material, Wilga Quarry to Roy Hill Project & Onsite bulk haulage TOPH June 2105 ROY HILL Sept 2014 Nov 2014 ROY HILL Sept 2014 Nov 2014 HOMESWEST Aug 2014 April NORTH WEST CRANE HIRE Nov 2014 & February (Completed in two sections) RIO TINTO - DSL Dec 2014 Jan April - Ongoing WATER CORP June - Sept BGC February Ongoing Boral Bulk haulage of quarry materials to various sites throughout the Pilbara BHPIO West End Cleaning Program Water Pressure cleaning of Pt Hedland CBD Streets, parks, buildings and infrastructure J&K Civil Bulk haulage of gravel for tailings dam wall extension at Marandoo Mine site BORAL BHPBIO RIO TINTO IRON ORE February - Ongoing November - Ongoing June December For further information on Binbirri Contracting Pty Ltd please contact: Kevin Eckerman - Director Office: Mobile: noeleen@binbirri.com
Capability Statement
Capability Statement 1 Introduction and Company Overview DeGrey Civil has a proud history in the Pilbara region dating back to the early nineties. The business has evolved through a variety of different
More informationOverview. Mining projects map
Mine As one of Australia s leading contract mining companies, BGC Contracting has been successfully delivering contract mining and infrastructure projects to an impressive list of resources clients for
More informationOriginal artwork commissioned by DeGrey Civil and completed by employee Carl Garlett. Boodarie Contracting.
Original artwork commissioned by DeGrey Civil and completed by employee Carl Garlett Boodarie Contracting www.degreycivil.com.au Marapikurrinya This country is the traditional land of the Kariyarra people.
More informationBHP Billiton Iron Ore Western Australia. Iron Ore. Presentation to Analysts June Ian Ashby, President and COO BHP Billiton Iron Ore
BHP Billiton Western Australia Presentation to Analysts June 2005 Ian Ashby, President and COO BHP Billiton BHP Billiton Overview Record 53.6Mt of iron ore produced in the first half of FY2005 On target
More informationFor personal use only
Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in
More informationSECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY
WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new
More informationGreg Steinepreis EXECUTIVE SUMMARY. Partner, Perth T
Greg Steinepreis Partner, Perth T +61 8 9429 7505 greg.steinepreis@squirepb.com Practice Focus Construction, engineering & infrastructure Services International and domestic dispute resolution Litigation
More informationContact Details. Russell Hall Managing Director Indus Civil and Mining. Unit 5/166 Stirling Highway Nedlands WA 6009
2 Capability Statement Contact Details Russell Hall Managing Director Indus Civil and Mining Unit 5/166 Stirling Highway Nedlands WA 6009 Tel: +61 8 6272 7555 Fax: +61 8 6389 0176 Email: rhall@induscm.com.au
More informationCurragh Operational Tour
Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May
More informationBHP Billiton Iron Ore. Asset Development Projects
BHP Billiton Iron Ore Asset Development Projects September 2003 Agenda Mining Area C Project Area C to Yandi Rail Project Products and Capacity Expansion (PACE) Project System Capacity Increases to 100Mtpa
More informationOTOC Limited (ASX:OTC) Investor Update Annual General Meeting 2012
OTOC Limited (ASX:OTC) Investor Update Annual General Meeting 2012 Disclaimer This Document should not be considered as an offer or invitation to subscribe for or purchase any securities in OTOC Limited
More informationBHP Billiton Iron Ore Western Australia. Iron Ore. Port & Rail Operations. Mick Evans Vice President Port & Rail
BHP Billiton Iron Ore Western Australia Port & Rail Operations Mick Evans Vice President Port & Rail Iron Ore Continuous Improvement in Safety Performance Continued development of One Business approach
More informationBASELINE GROUP (PERSONNEL) PTY LTD
Capability Statement 28 Jun 2016 BASELINE GROUP (PERSONNEL) PTY LTD INDUSTRIES SERVED RAIL HEALTH PROFESSIONAL SERVICES OIL, GAS & ENERGY ABN: 84 129 658 975 www.baselinegroup.com.au Company Details Address:
More informationBRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION
BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area
More informationPILBRA S PREMIUM SCRAP METAL RECYCLERS
PILBRA S PREMIUM SCRAP METAL RECYCLERS OVERVIEW WE ARE THE LARGEST SCRAP METAL RECYCLER IN THE PILBARA REGION. Metalcom is a business unit of McMahon Services Australia. Formed in 2006, Metalcom sources,
More informationContact Details. Unit 5/166 Stirling Highway Nedlands WA 6009
2 Capability Statement Contact Details Unit 5/166 Stirling Highway Nedlands WA 6009 Tel: +61 8 6272 7555 Fax: +61 8 6389 0176 Email: info@induscm.com.au Web: www.induscm.com.au 3 2018 Capability Statement
More informationPorts WA Forum Best practice environmental initiatives CEO Roger Johnston
Ports WA Forum Best practice environmental initiatives CEO Roger Johnston PPA at a Glance World s largest bulk export port authority PPA accounts for approximately 50% of world s seaborne iron ore exports
More informationMining. Capability brochure
Mining Capability brochure 1 Specialists in civil infrastructure We ve built more than 80 years of experience in the transport, mining, energy and water sectors. It s what we re good at. 2 We construct
More informationCAPABILITY STATEMENT
CAPABILITY STATEMENT Alliance Surveying is a Western Australian based surveying firm with one single aim of delivering accurate surveying results and survey support to its valued clients. A History of
More informationBHP Billiton Base Metals
BHP Billiton Base Metals BHP Billiton Tintaya S.A. Tintaya Located at SE Peru At 4100 meters 270 Km from Arequipa and Cusco BHP Billiton Tintaya SA Our Charter. WE ARE BHP BILLITON, A LEADING GLOBAL RESOURCES
More informationTHE GO2 PEOPLE AUSTRALIA PTY LTD
Capability Statement 13 Mar 2018 THE GO2 PEOPLE AUSTRALIA PTY LTD INDUSTRIES SERVED CONSTRUCTION & ENGINEERING RETAIL, TRADE AND OTHER SERVICES PROFESSIONAL SERVICES MINING OIL, GAS & ENERGY AUTOMOTIVE
More informationFIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,
FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000
More informationLOCAL BUYING. Supporting Western Australia through local buying. PROGRAM BUILDING OUR FUTURE TOGETHER
LOCAL BUYING PROGRAM BUILDING OUR FUTURE TOGETHER Supporting Western Australia through local buying. National delivery partner of BHP s Local Buying Program Our Commitment The Pilbara is the heart of our
More informationSTEVE ABSON SENIOR ASSOCIATE
QUALIFICATIONS HNC Civil Engineering, Sheffield Hallam University (UK) HND Engineering Technology, Rotherham Technical College (UK) PROFESSIONAL AFFILIATIONS Member of the Australian Institute of Company
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More information2016 Communities Review
2016 Communities Review Front cover: Paraburdoo Skatepark is an exciting community facility for the young people of Paraburdoo. Our long-term partnership with Scitech provides positive outcomes for many
More informationOur local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across
Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across Australia. www.ale-ecr.com.au OVERVIEW ALE ECR Heavylift is
More informationNetworker. Media Kit 2015 CONNECTING THE WA MINING INDUSTRY
Networker Media Kit 2015 CONNECTING THE WA MINING INDUSTRY There has been a 300 per cent increase in membership to the WA Mining Club during the past decade, with more than 700 active members today. To
More informationFor personal use only
Coziron Resources Limited ABN: 91 112 866 869 Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile:+61 8 9218 8875 Website: www.coziron.com
More informationHaoma Mining NL A.B.N
A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250 Email:
More informationMining and Resources Jobs and Opportunities in South Australia
Mining and Resources Jobs and Opportunities in South Australia 25 October 2017 Phil de Courcey, CEO Jodie Badcock, Workforce Development Manager Disclaimer The information in this webinar and related reports
More informationProjectConnect News Update
www.projectconnect.com.au ProjectConnect News Update 18 July 2011 This Fortnight s Topics WA Mining and Energy Infrastructure Conference 2011 Workforce Strategies in the Resources Sector Dates for your
More informationWorsley Alumina. Julius Matthys, General Manager
Worsley Alumina Julius Matthys, General Manager Disclaimer By viewing this presentation you agree to be bound by the following conditions. Certain statements in this presentation are forward-looking statements
More information3 Provide all-important brand experiences 3 Build relationships face-to-face 3 Australian mining industry capital expenditure will
Delivering high quality, business to business trade exhibitions that translate into return on investment for mining industry buyers and suppliers 2012 2012 2012 2013 WESTERN AUSTRALIA MINING & ENGINEERING
More informationDredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015
Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our
More informationPREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018)
PREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018) NORTH QUEENSLAND REGION - NORTHERN DISTRICT, PAVEMENT STRENGTHENING AND REHABILITATION ON THE FLINDERS HIGHWAY
More informationBHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning
BHP Billiton Iron Ore Western Australia Mining Operations Phil Price Vice President Integrated Planning Iron Ore Visitors Safety Induction Office Area 1. In an emergency - a siren will sound 2. Stay with
More informationDevelopment Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.
...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting
More informationGruyere Gold Project Development Update
ASX Announcement 18 January 2018 Highlights Gruyere Gold Project Development Update Construction on schedule and budget engineering and construction 72% and 32% complete respectively Mining contract awarded
More informationERA overview. Dan Janney General Manager, Operations
ERA overview Dan Janney General Manager, Operations 1 2 Welcome to Ranger mine Acknowledge Traditional Owners The mining operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal
More informationMt Arthur Coal. Investor/Analyst Presentation September 2003
Mt Arthur Coal Investor/Analyst Presentation September 2003 Agenda Energy Coal Overview Mt Arthur Coal Project Q&A David Lamont, Chief Financial Officer BHPB Billiton Energy Coal Stephen David, General
More informationTNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August
TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation
More informationCAPABILITY STATEMENT TRANSPORT
CAPABILITY STATEMENT TRANSPORT Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of design, construction and maintenance services
More informationSection 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)
Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows
More informationJD F1445 Mower / cab E-Z-Go Work Horse 11HP
Equipment Description City Department Contact Ford F600 w/pump Belle Plaine Fire Dept Fire Truck Belle Plaine Fire Dept Sterling Truck with plow Belle Plaine Public Works Chipper Belle Plaine Public Works
More informationMine Production and Shipping
Mine Production and Shipping Ore production has grown significantly over the 12 months, as the Company continued to expand its Pardoo mine and commenced development of its Wodgina DSO Project. All of the
More informationThe Holes Creek Bridge Replacement By Bradley McClelland
The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 SEPTEMBER 4 TH - SEPTEMBER 8 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationGruyere Gold Project Update
ASX Announcement 30 July 2018 Gruyere Gold Project Update First gold remains scheduled for the June quarter 2019 Revised Project Final Forecast Capital cost estimate of $621 million (level of accuracy
More informationShaping the Future of Railway Institute of Railway Technology
Shaping the Future of Railway Institute of Railway Technology 21 st September 2016 Adams Williams Manufacturing Lead Major Bids Team Rail Relationships creating success Opportunities in Rail Page 2 Trains,
More informationFor personal use only
ASX RELEASE 19 February 2013 MONADELPHOUS DELIVERS RECORD 2013 FIRST HALF PROFIT AND REVENUE Leading engineering group Monadelphous Group Limited (ASX: MND) has delivered a record net profit after tax
More informationINVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI
INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published
More informationLincoln, NE November 9, 2018 (Friday)
Lincoln, NE November 9, 2018 (Friday) Unreserved public auction Caterpillar D6N XL 1 of 2 John Deere 770D Caterpillar 627F 2011 Case 550 QuadTrac Caterpillar 963D 2016 Smithco SX3-46-36 46 Ft ACCEPTING
More informationhighlights Record Results Over $500m new contracts won since December 2005 Capacity increased; workforce over 3,000 >50%
annual results highlights Record Results Sales over $500m Net Profit After Tax (NPAT) 76% Earnings Per Share (EPS) 72% Dividends 71% Over $500m new contracts won since December Capacity increased; workforce
More informationJUSTIN JONES CURRICULUM VITAE
JUSTIN JONES CURRICULUM VITAE ADDRESS: PO Box 499 PROSPECT TAS 7250 TELEPHONE: Mobile 0418 311 033 EMAIL ADDRESS: justin@justwaste.com.au www.justwaste.com.au LICENCES: Heavy Combination; Forklift; Wheel
More informationLocal Buying Program. Supplier Information Sessions: Port Hedland 19 September September 2017
Local Buying Program Supplier Information Sessions: Port Hedland 19 September 2017 1Newman 20 September 2017 Agenda WHAT: WHY: HOW : WHEN: WHO: Is the Local Buying Program? Value and benefit to BHP / Community
More informationFile of the company PEDRO ESTÉVEZ, S.L.
File of the company PEDRO ESTÉVEZ, S.L. www.pestevez.com/english C/ Lomo la Plana, 41, bajo Izq. 35019 Las Palmas. SPAIN Phone number: +34 928415771 Fax: +34 928415092 Who whe are? The company was founded
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More informationAtlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter
18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationAbout BGC Contracting
COMPANY OVERVIEW About BGC Contracting With a track record spanning 40 years, an annual turnover in excess of $1 billion and employing more than 3,000 staff and contractors nationwide, BGC Contracting
More informationBOOMING LABRADOR NEIA October 28, 2011
BOOMING LABRADOR NEIA October 28, 2011 AGENDA Labrador City Infrastructure & Facilities The Iron Ore Boom Expansion & Economic Activity Impacts on Labrador West Opportunities for the Environmental Sector
More informationDecember 2018 Quarterly Production Report
31 January 2019 December 2018 Quarterly Production Report Fortescue Metals Group Limited (ASX: FMG, Fortescue) Fortescue has released its December 2018 quarterly production results, reporting total shipments
More informationInvestor Update April 2009
I t U d t Investor Update April 2009 Strong First Half Performance Revenue $78.9 million, 26% pcp Pre-tax profit $15.5m, 45% pcp Net profit after tax $12.2m, 63% 2m pcp Earnings per share of 6.7c, 31%
More informationDEFENCE. we see things differently
CAPABILITY STATEMENT 2014 DEFENCE we see things differently 1st Aviation Regiment Robertson Barracks, NT specialist expertise in defence facilities national company 34 Years in business 1,700 employees
More informationRegional and Remote Communities. Capability
Regional and Remote Communities Capability why BMD Consulting? As part of the BMD Group - a unique and integrated design, construction and development group - BMD Consulting provides consulting engineering
More informationMEYA MINING DEVELOPMENT TIMELINE 03 OCTOBER 2017
MEYA MINING DEVELOPMENT TIMELINE 03 OCTOBER 2017 !"#$%&'()"*+,%%&-$."%/%0123('$+4(5%6%7('8%&'(9'$: &'()"*+%;*-"
More informationFor personal use only
QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.
More informationWater Storage and Distribution System (WSDS) for Temporary and/or Remote Locations
Water Storage and Distribution System (WSDS) for Temporary and/or Remote Locations Introduction Construction and infrastructure projects; mines, gas and oil sites; research camps in remote locations; agriculture
More informationADELAIDE OVAL REDEVELOPMENT
ADELAIDE OVAL REDEVELOPMENT 2015 AUSTRALIAN CONSTRUCTION ACHIEVEMENT AWARD Technical Paper Stage 2 Entry / February 2015 / ELECTRONIC COPY CONTENTS Introduction Brief Summary Scope Design Challenges &
More informationOMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===
OMNR ^ååì~ä=déåéê~ä=jééíáåö OT=klsbj_bo=OMNR=== ^puw=cjp=== 2 `çêéçê~íé=pìãã~êó Board & Management Capital Structure Robert Kennedy Non-Executive Chairman A Chartered Accountant and a Director since 14
More informationFor personal use only
22 March 2016 MINING ACTIVITIES COMMENCE AT BAOBAB PHOSPHATE PROJECT, SENEGAL PROJECT ON TRACK FOR 2016 PRODUCTION Highlights Site and pit access roads complete, mining workshop concrete works complete,
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationJUNE 2017 QUARTERLY ACTIVITIES REPORT
ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the
More informationMorgan Stanley 2011 Emerging Companies Conference 9 June 2011
Morgan Stanley 2011 Emerging Companies Conference 9 June 2011 Company Overview Mermaid Marine Australia Limited (MMA) is Australia s largest integrated marine services provider to the offshore oil and
More informationICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015
ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion
More informationFall 2015 Tender Release
Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete
More informationFor personal use only
For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED
More informationBuilding Permit Application
Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium
More informationCONSTRUCTION SERVICES FOR MINING
CONSTRUCTION SERVICES FOR MINING WWW.STRACONGYM.COM 1 LEADING WORLD CLASS MINING CONTRACTOR IN LATIN AMERICA OUR VALUES ARE THE INPUT FOR OUR ETHICS CHARTER, POLICIES, PROCESSES, LEADERSHIP STYLE, AND
More informationAN AUSTRALIAN COMPANY WITH A GLOBAL FOOTPRINT
ANNUAL REPORT 2014 Orica Annual Report 2014 AN AUSTRALIAN COMPANY WITH A GLOBAL FOOTPRINT Gibraltar, Canada Essen, Germany Würgendorf, Germany Carseland, Canada Brownsburg, Canada Geneva,USA Georgetown,USA
More informationThe Future of Aviation for Central New Mexico
The Future of Aviation for Central New Mexico MISSION STATEMENT THE WHOLE AIRPORT EXPERIENCE HISTORY SPECIFICATIONS FACILITIES SERVICES RECENT IMPROVEMENTS FUTURE DEVELOPMENT & USE USER PROFILE The mission
More informationConstruction Access Routes
Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project Feasibility Study Project No. 12 7606 00 Construction Access Routes Document No. C-EV-10-003 Rev. B 1 March 2004 Prepared by: Fluor Engineering
More informationMinara Presentation. Agenda. Peter Johnston. Achievements in 2005 Financial performance Challenges/opportunities for 2006 Growth Summary
Minara Presentation Peter Johnston Managing Director and CEO February 2006 Agenda Achievements in 2005 Financial performance Challenges/opportunities for 2006 Growth Summary 2 1 The journey 2005 A year
More informationAxiom Properties Limited
Axiom Properties Limited AGM UPDATE 23 November 2016 Axiom Overview 2 Axiom Properties Limited ( Axiom ) is an ASX listed property development and investment company (ASX code: AXI), which has developed
More informationAustralian Site Tour Ravensthorpe Nickel Operation. Isak Buitendag General Manager
Australian Site Tour Ravensthorpe Nickel Operation Isak Buitendag General Manager 29 October 2008 Important notices Reliance on third party information The views expressed here contain information that
More informationCorporate Presentation 5 March 2003
Corporate Presentation 5 March 2003 Agenda Investment Highlights Business Overview Financial Highlights Competitive Strengths Business Strategies & Future Plans Growth Prospects Corporate Presentation
More informationPlease find attached a copy of slides for a presentation which will be delivered today to potential investors in Paris.
29 May 2012 Company Announcement Office Australian Stock Exchange Level 10, 20 Bond Street SYDNEY NSW 2000 By ASX Online 2012 INVESTOR PRESENTATION Please find attached a copy of slides for a presentation
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationAuto Port Operational Strategy. Roy A. Schleicher Senior Director Trade Development & Global Marketing
Auto Port Operational Strategy Roy A. Schleicher Senior Director Trade Development & Global Marketing October 2008 Strategic location of Jacksonville, Florida 10 75 95 Jacksonville Strategic location of
More information3 Pilbara ports provide gateways
COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial
More information20 November Company Announcements Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 AUSTRALIA.
20 November 2018 Company Announcements Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 AUSTRALIA Dear Sir / Madam RE: 2018 Annual General Meeting Address to Shareholders
More informationMADE TO ORDER. selbyscanvasandshade.com.au AU ST R A L I A
TO ORDER 3/43-45 Melverton Drive, Hallam Vic 3803 0433 470 604 03 9708 6842 tracy@selbyscanvasandshade.com.au selbyscanvasandshade.com.au WHO WE ARE We are a canvas manufacturer based in the Hallam area
More informationCONSULTATIVE GROUP 11 DECEMBER Lori Keeve Communications Grangegorman Development Agency
CONSULTATIVE GROUP 11 DECEMBER 2014 Lori Keeve Communications Grangegorman Development Agency OVERVIEW Planning HSE Projects o Primary Care Centre o Community Nursing Unit DIT Projects o Public Realm /
More informationIron Ore Update. Ian Ashby President Iron Ore 6 May 2009
Iron Ore Update Ian Ashby President Iron Ore 6 May 2009 Important Notices Reliance on Third Party Information The views expressed here contain information that have been derived from publicly available
More informationDublin Airport Update Presented by Pat Molloy
Dublin Airport Update Presented by Pat Molloy daa Actions from Previous Meetings Action Item Summary 1. PM to confirm the type of fencing that will be erected around the Toberburr road site 2. daa and
More informationManitoba Infrastructure
Manitoba Infrastructure Reference No. 0000047686 SUPPLY OF THREE TRUCK TRACTORS FOR 2017/2018 SEALCOAT AND ASPHALT MIXING SEASONS Project No. X19234 Due: 1:00 PM, February 3, 2017 Owner: Manitoba Infrastructure
More informationSample Estimate Reports Estimate Reports were created in XL-Pro Software
Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum
More informationBHP BILLITON IRON ORE PTY LTD
BHP BILLITON IRON ORE PTY LTD COMPANY REPORT SUMMARY Company name: Company type: Metals/Minerals: Location: Year established: BHP Billiton Iron Ore Pty Ltd Miner Steelmaking raw materials 1968 (start of
More informationAustralian Site Tour Mt Keith Operation. Jaco Harwig General Manager
Australian Site Tour Mt Keith Operation Jaco Harwig General Manager 28 October 2008 Important notices Reliance on third party information The views expressed here contain information that have been derived
More information