1 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT December 8, 2016 Northern Virginia District

2 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Jeff Southard, Esq. VTCA Executive Vice President

3 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT William C. Cuttler, P.E. Northern Virginia District Construction Engineer Virginia Department of Transportation

4 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Monica Backmon Executive Director Northern Virginia Transportation Authority

5 Investing Wisely Delivering Results 2016 DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Monica Backmon, Executive Director Northern Virginia Transportation Authority December 8, 2016

6 NVTA Regional Revenue HB 2313 revenues generate approximately $340 million annually for transportation projects. 70% Regional Revenue provided to the NVTA and utilized for: Regional projects included in TransAction 2040, or updates, that have been evaluated by VDOT (in coordination with the CTB, DRPT and NVTA) for congestion reduction and emergency evacuation mobility (HB 599); The Authority gives priority to selecting projects that are expected to provide the greatest congestion reduction relative to the cost of the project. 6

7 NVTA Local Revenues 30% (Local funds) will be distributed to the individual localities and utilized for their transportation needs: Uses additional urban or secondary road construction; for other capital improvements that reduce congestion; for other transportation capital improvements which have been approved by the most recent long range transportation plan adopted by the Authority; or for public transportation purposes. 7

8 NVTA Revenues *Revenues received through FYE June 30,

9 Regional Transportation Investments Funded in Three Years 79 Projects $990 million Total 9 Completed 9

10 FY2017 Program Agency Project Title FY2017 NVTA Funding Project Cost Phase Funded Arlington Lee Highway Corridor Intelligent Transportation System Enhancements $3,000,000 $3,000,000 Des, Eng, ROW, Con Arlington Crystal City Streets: 12th Street Transitway, Clark/Bell Realignment & Intersection Improvements $11,600,000 $11,600,000 Des, Eng, Env, Con Fairfax I-66/Route 28 Interchange Improvements $300,000,000 $385,000,000 Des, Eng, Env, ROW, Con Fairfax Route 7 Widening: Colvin Forest Drive to Jarrett Valley Drive $10,000,000 $135,900,000 ROW Fairfax Route 28 Widening: Prince William County Line to Route 29 $5,000,000 $68,910,000 Des, Eng, Env, ROW, Con Fairfax Route 286 Fairfax County Parkway Widening: Route 123 to Route 29 $10,000,000 $82,400,000 ROW Prince William Route 1 Widening: Featherstone Road to Marys Way $11,000,000 $85,725,114 Con Prince William Route 28 Widening: Route 234 Bypass to Linton Hall Road $10,000,000 $28,774,000 Con Alexandria Potomac Yard Metrorail Station $66,000,000 $287,484,000 Des, Con (Design- Build) Leesburg Route 7 (East Market Street)/Battlefield Parkway Interchange $20,000,000 $58,000,000 Con VRE Manassas Park Station Parking Expansion $2,000,000 $19,600,000 Eng, Env, Des WMATA Blue Line Traction Power Upgrades $17,443,951 $88,625,564 Eng, Con NVTA Funding Total: $466,043,951

11 Example of NVTA Regional Investments (1 of 2) I-66/Route 28 Interchange Improvements Route 28 Widening in Fairfax, Loudoun and Prince William Counties, and the Cities of Manassas and Manassas Park Route 1 Widening in Fairfax and Prince William Counties Route 7 Widening in Fairfax County and the Town of Leesburg Loudoun County Parkway Widening Fairfax County Parkway Widening Columbia Pike Multimodal Improvements Belmont Ridge Road Widening 11

12 Example of NVTA Regional Investments (2 of 2) 34 New Bus Purchases 2 Bus Garage Facilities New 300 Space Park & Ride Facility 2 New Metro Stations (Innovation & Potomac Yard) New Crystal City Multimodal Center Metrorail Traction Power Upgrades (Orange & Blue Lines) 8 VRE System/Infrastructure Expansion Projects 12

13 30% Local Revenue Projects (1 of 3) Jurisdiction Project Name Phases Funded 30% Local Fund Arlington County Arlington Transit Vehicle Facility and Satellite Parking Design, CN $ 2,199,582 Capital Bikeshare (multiple locations) Operations, Expansion $ 1,499,442 Old Dominion Dr, Phase II (Rt 309 from 38th St N to Glebe Rd) Design, CN $ 1,193,732 Traffic Signal Rebuilds, Infrastructure Upgrades, Facilities (multiple locations) CN $ 879,451 Walter Reed Dr (5 th Street to Columbia Pike) Design, CN $ 356,000 Washington Blvd Signal Rebuilds CN $ 350,000 Traffic Counts (multiple locations) Other $ 304,857 Five Points Intersection CN $ 300,000 Arterial Street Safety Improvements (multiple locations) Design, CN $ 208,199 ART Bus Procurement CN $ 139,504 McKinley Rd Safe Routes to School Accessibility Design, CN $ 127,301 Transit Development Plan & ART Asset Management Plan Study $ 125,613 Bus Stops and Shelters (Clarendon, Courthouse, Shirlington) Design, CN $ 119,458 Program Administration Other $ 63,140 Carlin Springs Rd Signal Rebuilds CN $ 50,000 Old Dominion Dr Missing Link Design $ 44,703 Arlington Blvd and Manchester St Intersection Design $ 32,360 Ballston-MU Metrorail Station West Entrance Design $ 12,512 N Glebe Rd (Carling Springs Rd to Pershing Dr) Design $ 3,920 Walter Reed Dr (Arlington Mill and Four Mile Run) Design $ 3,650 Courth House Metrorail Station Second Elevator Design $ 1,723 Fairfax County Fairfax Connector Service Operations $ 8,483,924 Frontier Dr Extension PE, Design $ 3,000,000 Town Center Pkwy DTR Underpass Rail Support PE, Design $ 2,104,067 Various Project Implementation Works N/A $ 1,245,168 Braddock Rd Multimodal Study PE, Design $ 1,017,971 Herndon Metrorail Station Parking Garage PE, Design $ 552,725 Studies/Planning (Traffic Counts) N/A $ 505,563 Innovation Center Metrorail Station Parking Garage PE, Design $ 347,600 Spot Roadway Program All $ 299,908 Soapstone Dr DTR Overpass PE, Design $ 200,127 Shirley Gate Extn/Fairfax County Pkwy/Popes Head Interchange PE, Design $ 136,237 Shirley Gate Extn (Planning) N/A $ 122,605 Rt 1 Bus Rapid Transit Study $ 121,449 Seven Corners Interchange Improvements PE, Design $ 113,885 Tysons Projects (Boone Blvd/Gosnell Feasibility Study) Study $ 66,587 Rt 1 Study (Pohick to Occoquan) N/A $ 33,940 13

14 30% Local Revenue Projects (2 of 3) Jurisdiction Project Name Phases Funded 30% Local Fund Loudoun County Sterling Blvd Extended (Pacific Blvd to Moran Rd) Design, ROW, Utility, CN $ 7,316,000 Riverside Pkwy (Lexington Dr to Loudoun County Pkwy) ROW, Utility, CN $ 6,000,000 Prince William County Minnieville Rd (Dumfries Rd to Spriggs Rd) CN $ 21,700,000 Minnieville Rd (Spriggs Rd to Rt 234) ROW, CN, Project Mgmt $ 19,950,000 Rt 1 Jefferson Davis Hwy (Neabsco Mills Rd to Featherstone Rd) ROW $ 1,200,000 Prince William Pkwy (Old Bridge Rd to Minnieville Rd) ROW, CN, Project Mgmt $ 1,750,000 Neabsco Mills Rd Widening (Rt 1 to Smoke Ct) * Subject to VDOT agreement ROW $ 1,000,000 City of Alexandria DASH Bus Fleet Replacement Bus Procurement $ 7,800,000 WMATA Capital Contribution Design, CN $ 3,100,000 Rt 1 Transitway Operations Operations $ 1,800,000 Bus Shelters and Benches CN $ 1,100,000 Seminary Rd at Beauregard St Ellipse Design $ 425,000 Rt 1 at E Reed Intersection Improvements CN $ 350,000 Cameron & Prince Pedestrian and Bicycle Facilities CN $ 300,000 Access to Transit - City Sidewalk Connections CN $ 60,000 City of Fairfax CUE Operations Operations $ 3,101,752 Jermantown Rd CN $ 869,302 Roadbed Reconstruction (Rt 50 Kamp Washington to Fairchester Dr) CN $ 264,760 Traffic Signal Preemption CN $ 100,188 George Snyder Trail CN $ 93,329 Traffic Signal Upgrades CN $ 35,214 Old Town Sidewalk Spot Widening Study and Preliminary Engineering Study, Engineering $ 34,976 Burke Station Rd Sidewalk PE, ROW $ 32,259 Old Town Traffic Study Study $ 14,841 Orchard Dr Sidewalk Design PE $ 14,775 Government Center Pkwy Extension PE $ 12,715 Orchard St/CBR Intersection Evaluation PE $ 11,517 University Dr Road Diet PE $ 6,618 University Dr Extension PE $ 3,014 Northfax West Planning PE $ 2,258 Emergency Power Battery Backup CN $

15 30% Local Revenue Projects (3 of 3) Jurisdiction Project Name Phases Funded 30% Local Fund City of Falls Church Pedestrian Access to Transit (Rt 29 S Washington St) PE, ROW, CN, Inspection $ 2,603,520 WMATA Capital Contribution (Citywide) Operations $ 700,000 Bus Stop Changes Shelters and Wayfinding (Rt 7, various locations) PE, ROW, CN $ 475,739 Pedestrian Access Program (Citywide) PE, ROW, CN $ 195,000 Bridges (Citywide) PE, ROW, CN $ 125,000 City of Manassas Prince William St (Grant Ave to Wellington Rd) ROW, CN $ 1,259,000 Dean Dr Extended (Rt 28 to existing Dean Drive) PE, ROW, CN $ 1,219,000 Battle St (Portner St to Quarry Rd) PE, ROW, CN $ 280,000 Grant Ave (Lee Ave to Wellington Rd) PE, ROW, CN $ 135,000 Mathis Ave Sidewalk (Maple St to Sudley St) CN $ 135,000 Citywide Traffic Improvements CN $ 19,620 City of Manassas Park No projects Town of Dumfries Sidewalk along Possum Point Rd CN $ 97,289 Town of Herndon Elden St and Center St Intersection Improvements PE, Eng, ROW, Utility, CN $ 850,000 Van Buren St Improvements (Old Spring St to Herndon Pkwy) ROW, Utility $ 778,000 Town of Leesburg Evergreen Mill Rd Widening (Leesburg S Corporate Limits to S King St) Design, ROW, CN $ 3,783,037 Town of Purcellville Nursery Ave Improvements Design, CN $ 792,323 Town of Vienna Follin Ln SE Reconstruction (Echols St SE to Maple Ave) PE, ROW, CN $ 1,300,000 TOTAL $ 14,747,528 Note: This list was generated on October 5, 2016 based on responses from jurisdictions to an NVTA staff request for a Local Distribution Funds project list PE: Preliminary Enginerring; ROW: Right of Way; CN: Construction 15

16 Investments Throughout the Region Route 28 Groundbreaking Belmont Ridge Road Groundbreaking West Ox Road Bus Garage Groundbreaking 16

17 Investments Throughout the Region Ribbon Cuttings for New Buses 17

18 Looking Ahead Continued Transparency and Collaboration Update of TransAction First update since the passage of HB 2313 Incorporation of HB 599 Scenario Planning (Land Use/Alternative Future Scenarios) Guide the Region s first Six Year Program (FY ) $1.7 billion in anticipated Revenues for the Six Year Program Synchrony with the Commonwealth s Six Year Improvement Program Continue to Focus on Regional Projects and Priorities, not different Local Interests 18

19 TransAction Update Schedule NOVEMBER 2015 TransAction Kickoff SPRING 2016 Confirming Objectives and Needs Public Outreach FALL 2016 Developing Scenarios Public Outreach WINTER Identifying Regional Priorities SPRING 2017 Draft Report and Public Hearings SUMMER/FALL 2017 Anticipated Adoption by NVTA Public Outreach As part of our Fall Public Outreach, the NVTA is conducting a brief survey to learn how the public thinks we should prioritize different approaches to addressing a broad range of transportation needs. The survey can be found at: 19

20 The Authority: Working Regionally 20

21 How You Can Get Involved? Visit our websites: and Engage with your local governments (counties, cities and towns) and attend NVTA public meetings. Join our list: Like us on Facebook. Follow us on Watch us on YouTube. 21

22 Consulting & Contracting Opportunities Nicholas J. Roper, P.E. District Project Development Engineer December 8, 2016

23 Agenda Dashboard Projects Under Development New Designs VDOT Advertisement List LAP Advertisement List High Value Projects 23

24 Percentage of Green Projects 120% 100% 80% 60% Dashboard Results for Advertisements 92% 88% 74% 86% 83% 92% 87% 40% 51% 53% 20% VDOT ad 41% 43% 24% Local ad Historic Goal 0% FY12 FY13 FY14 FY15 FY16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Percentage of Green Projects 100% 90% 80% 70% Dashboard Results for Estimates 83% 64% 60% 80% 79% 84% 89% 50% 50% 77% 40% VDOT Estimate 41% 65% 55% 53% Local Estimate Historic 30% Goal 20% FY12 FY13 FY14 FY15 FY16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 24

25 Advertisement Summary for Projects in Development Administration VDOT 29% Projects 73% Value Non-VDOT 71% Projects 27% Value Calendar Year for Advertisement Projects Construction Estimate Total Project Estimate Dec $25M $25M $282M $352M $4.8M $7.9M $493M $782M Total 61 $806M $1.1B 15 VDOT Projects (Paving and Bridge) Added since Oct 16 Dec $6.8M $9.4M $89M $118M $177M $305M Total 146 $272.8 $432M Grand Total 207 $1.08B $1.5B 25

26 New Projects for Design UPC Location Description Total Project Estimate Herndon #HB2.FY17 Widen East Spring St from Herndon Pkwy to Rte 286 (0.19 Miles) TBD Fairfax Rte 29 Widening from Union Mill To Buckley s Gate (1.7 miles) $6.7M ±$40M RFP Feb-Mar 2017 Spring 2017? PE Start $6.7M Winter 2017? 26

27 VDOT Project Advertisements Dec 2016-CY2018 > $5M or Significant UPC Locality Project Description Method Adv. Date Constr Est Loudoun PM-9K-17 (Secondary Plant Mix) D-B-B 13-Dec-16 $7.7M DW PM-9T-17(Wide Primary Plant Mix) D-B-B 13-Dec-16 $6.4M Fairfax PM-9B-17 (Secondary Plant Mix) D-B-B 13-Dec-16 $5.6M Fairfax Rte 286 & Terminal Road D-B-B 27-Dec-16 $3M Fairfax PM-9V-17 (Secondary Plant Mix) D-B-B 10-Jan-17 $5.3M Fairfax PM-9U-17 (Secondary Plant Mix) D-B-B 10-Jan-17 $6.0M DW PM-9I-17 (Interstate Plant Mix) D-B-B 10-Jan-17 $7.4M Fairfax PM-9F-17 (Primary Plant Mix) D-B-B 10-Jan-17 $6.5M Fairfax PM-9S-17 (Secondary Plant Mix) D-B-B 10-Jan-17 $8.1M Fairfax PM-9J-17 (Secondary Plant Mix) D-B-B 10-Jan-17 $5.9M Fairfax PM-9G-17 (Secondary Plant Mix) D-B-B 10-Jan-17 $8.1M Fairfax 2 Bridge Rehab I-495 Ramps E/G & E D-B-B 24-Jan-17 $6.7M Fairfax Rte 7 Corridor Improvements D-B Apr-17 $233.8M Fairfax Bridge Replacement Backlick Rd/CSX D-B-B 9-May-17 $5.7M Alexandria Bridge Rehab Rte 7 / King St & I-395 D-B-B 12-Sept-17 $10.4M 27 Majority of high value projects are paving or bridge

28 LAP Project Advertisements CY > $5M or Significant UPC Locality Project Description Method Adv. Date Constr Est Alexandria Eisenhower Ave Widening Aug-17 D-B-B $4.0 M City of Route 28 Widening - Manassas Manassas Apr-18 D-B-B $9.6 M Loudoun Claiborne Parkway - 4 lane on new alignment Jun-18 D-B-B $5.4 M Leesburg Sycolin Road - Widen to four lanes (Ph IV) Jun-18 D-B-B $13.0 M Loudoun Sterling Boulevard - 4 lane construction on new alignment Jul-18 D-B-B $16.2 M Loudoun Rte 625 Waxpool Pacific Oct-18 D-B-B $4.3 M #HB2.FY17 TRAFFIC ADAPTIVE Alexandria SIGNAL CONTROL Oct-18 D-B-B $6.0 M Rte 7 - intersection improvements Alexandria Dec-18 D-B-B $4.8 M City of Fairfax at Beauregard, Phase II #HB2.FY17 GOVERNMENT CENTER PARKWAY EXTENSION Dec-18 D-B-B $2.3 M 28

29 VDOT Administered Projects Route 7 Corridor Improvements Richmond Highway Corridor Improvements Fairfax County Parkway Widening Route 7/Battlefield Parkway Interchange Route 15/Edwards Ferry Interchange 29

30 Route 7 Corridor Improvements 6.9 miles From Reston Ave to Jarrett Valley Dr PE: ROW/Utilities: CN: Total: $3.4 Million $62 Million $168.4 Million $233.8 million Project Location Map Design-Build candidate Public Hearing scheduled for 15 Nov 2016 Displaced Left at Relocated Lewinsville Rd Popes Head Rd & Shirley Gate Rd Interchange Concept

31 Phase Estimate PE $12.5M RW $142.3M CN $60M Total $214.8M Richmond Highway Corridor Improvements from Jeff Todd Way to Napper Road Widen Richmond Highway (Route 1) from four to six lanes for 2.9 mi. Provide separate bicycle and pedestrian accommodations on both sides of the roadway Preserve the median for future BRT (dedicated bus-only lanes) Typical Section per Fairfax County s Comprehensive Plan (One of the Considered Alternatives - Project in Early Conceptual Design) Median preserved for Fairfax County s BRT project

32 Rte 286 (Fairfax County Parkway) Widening From Us 29 (Lee Highway) to Rte 123 (Ox Road) NVTA Funding Current Estimate PE $11.2 Million $11.2 Million RW $8.8 Million $21.0 Million CN $0 $132.3 Million Total $20 Million $164.5 Million Phase I design consultant procurement in progress Design approval scheduled for Nov Project Location Map Popes Head Rd & Shirley Gate Rd Interchange Concept

33 Route 7 (East Market Street) Interchange At Battlefield Parkway Project Limits Route 7 PE: ROW/Utilities: CN: Total: $4 M $9 M $45 M $58 M NVTA Funding - $33 M Funding shortfall - $25 M Applied for SmartScale funding Assumed design build project PIM Early 2017 Hybrid Project Location Popes Head Rd & Shirley Gate Rd Interchange Concept Diverging Diamond

34 Rte. 15 By Pass Interchange at Edwards Ferry Road and Fort Evans Road VDOT Project ,P101 Project will construct grade-separated interchange along US Route 15 at Edwards Ferry Road to replace the two signalized at-grade intersections at Edwards Ferry Road and Fort Evans Road. Phase Estimate PE $8M RW $7M CN $55M Total $70M

35 Locally Administered Projects Route 1 Widening from 4 to 6 Lanes Prince William County Route 28 Widening from 4 to 6 Lanes Fairfax County I-395 & Boundary Channel Interchange Arlington County 35

36 Rte 1 (Jefferson Davis Highway) Widening From Featherstone Rd to Marys Way Funding Current Estimate PE $4.4 Million $4.4 Million RW CN Total: $64.4 Million $64.4 Million $27.6 Million $27.6 Million $96.4 Million $96.4 Million Fully funded through Smart Scale, NVTA, RSTP Begin construction Jan 2019 Project Location Map Popes Head Rd & Shirley Gate Rd Interchange Concept

37 Route 28 Widening from Prince William County line to Old Centreville Road Widen Route 28 from four to six lanes for a distance of 2.3 miles Design-Build project delivery, administered by Fairfax County Dept. of Transportation Provide intersection, pedestrian and bicycle improvements Phase PE RW CN Total Estimate $7.5M $10.8M $50.5M $68.8M Existing four lane section Conceptual Typical Section in Bifurcated Areas

38 UPC Boundary Channel Drive at I-395 Interchange Locally Administered Project - Arlington County DES Project Location Scope: Improve Traffic Flow on Boundary Channel Drive at I-395 Interchange Preliminary Cost Estimate: PE: $ 1,440,000 Preferred Conceptual Design: RW: $ 900,000 CN: $ 6,995,000 TOTAL: $ 9,335,000 Status: Scoping Phase IMR Process Funding: Fully Funded Anticipated CN Adv. Date: Winter

39 Nicholas J. Roper, P.E. Office: (703) Cell: (703)

40 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Lauren Mollerup, P.E., CCM Assistant District Administrator, Maintenance Northern Virginia District

41 2016 Dashboard Pavement Condition Status 2016 Pavement Condition Percent sufficient Goal Interstate 92.3% 82% Primary 86.3% 82% Secondary 36.0% 63% 41

42 2016 Interstate System Summary: 679 Lane Miles Rated (92.3% are Non-deficient) Target = 82% 42 County Rated Lane Miles Non-deficient Lane Miles Percent Non-deficient Arlington % Fairfax % Prince Willam % Total %

43 2016 Primary System Summary: 1726 Lane Miles Rated (86.3% are Non-deficient) Target = 82% County Rated Lane Miles Non-deficient Lane Miles Percent Non-deficient Arlington % Fairfax % Loudoun % Prince Willam % Total % 43

44 2016 Secondary System Target = 63% County Rated Lane Miles Non-deficient Lane Miles Percent Non-deficient Fairfax % Loudoun % Prince Willam % Total % 44

45 2016 Paving Program 21 Plant Mix Schedules (781,978 Tons of Asphalt) 5 Preventive Maintenance Schedules 8784 Tons of Slurry 13,722 Tons of Latex 7,752 Tons of Asphalt (Patching) 45

46 2016 Schedules Carryover System Est. Total Carryover Asphalt (Tons) Est. Total Carryover Lane Miles Interstate 0 0 Primary 0 0 Secondary (2 Projects) 89,

47 2017 Paving Program 19 Plant Mix Schedules (903,304 Tons of Asphalt) 3 Preventive Schedules 17,160 Tons of Slurry 7,008 Tons of Latex 10,882 Tons of Asphalt (Patching)

48 48 Asphalt Tonnage

49 49 Latex Tonnage

50 50 Comparison of FY13-FY17 Schedules Lane Miles Paved per System Last Four Years

51 NoVA Bridge Projects Currently In Construction (Excluding Counting Locality Projects) Project Est. Cost Estimated Completion 1 Rt. 27 over Rt. 110 $33M Rt. 7 over the DTR $44M Rt. 28 over Rt.267 Joint Closures $2.3M Aden Road over NSRR Rehabilitation $5.8M Joint closures bridges over the DTR (Herndon Monroe, Park and Ride, Reston Parkway) $2.3M Old Centerville Road over Bull Run $3.9M I-395 over Glebe Road $4.7M Army Navy Drive Overpasses over I-395 $2.2M

52 NoVA Bridge Projects Preliminary Engineering (Design Phase) Project Est. Cost Advertisement Date 1 Rt. 681 (Walker Road) over Piney Run $5M TBD 2 I-395 over Four Mile Run $6.5M Jan Rt. 727 (Forest Mills Rd) over Tributary Catoctin Creek $1.5M Dec Rt. 7 over Sugarland Run $10M TBD 5 Rt. 50 over Goose Creek (Fauquier Co.) $3.5M TBD 6 Rt. 673 (Featherbed Ln) over Catoctin Cr $5M TBD 7 Rt. 674 (Hunter Mill Rd) over Colvin Run $2.2M TBD 8 I95 over Neabsco Creek Rehabilitation Study Phase $500K TBD 52

53 NoVA Bridge Projects Preliminary Engineering (Design Phase) Continued Project Est. Cost Advertisement Date 9 King Street over I-395 $11M Duke Street over I-395 $11M I-66 over Ramps B&F $5M I-495 Ramp E over I-495 (inner loop) $4.5M I-495 Ramps E&G over Norfolk Southern Railroad $4.5M Backlick Road over CSX $5.7M Gallows Road over Route 50 $5M Dec Transform 66 Inside and Outside the Beltway Projects 53

54 NoVA Bridge Projects Future Possible Projects (Currently Unfunded) Project Est. Cost 1 W&OD Trail under Dry Mill Rd $5M 2 Dunlop Mill Road over Sycolin Creek $1M 3 Soapstone Culvert Near Fair Lakes $1M 4 Ketoctin Church Road Bridge $500K 5 Van Buren Road Bridge over Quantico Creek TBD 6 I66 EB and WB Bridges over NSRR TBD 7 Allder School Road Culvert $500K 8 Glebe Road Bridge over Pimmet Run TBD 54

55 55

56 A Dialogue with the Northern Virginia District A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Hari K. Sripathi, PE Northern Region Operations

57 Northern Operations Region Five Operations Regions MPSTOC Fairfax Prince William Loudoun Stafford Spotsylvania Caroline 57

58 58

59 Northern Virginia District Action Plan (Operations) Measure Target FY16 (July 1-Sept 28) FY17 (July 1-Sept 28) Travel Time Reliability Index Vehicle Hours of Delay Median Incident Duration TBD 3,289,422 3,823, HOV Performance 90% for each corridor 6 of 8 10 of 12 Vehicle Hours of Delay data source = RITIS Vehicle Probe Project Incident data source = VaTraffic: Disabled Vehicles, Vehicle Crashes and Tractor-Trailer Crashes on Interstates and at Special Facilities on Interstates HOV Performance = HOV operating at speeds of 45mph or greater 90% of the time. 59

60 NRO Strategic Focus Lane Closure management Transform 66 East-West Integrated (Multimodal) Corridor Management Disseminating Signal data to support Connected Vehicle application development Express Lanes and Toll Facilities Management (Integration / Oversight / Support) TOC Transportation Management System and Signal System Development and Transition Improve / Maintain Existing Assets Pavement Marking, Signal Rebuild/Modification, Lighting, etc. 60

61 NRO Contract Opportunities Near-Term Contract Opportunities Statewide TOC Contract ITS Maintenance TOC / SSP $43M (3-yr) $212M (5-yr) December, 2016 January, 2017 Statewide Traffic Signal System 2017 On-Call TE/ITS Professional Services $3M Spring, 2017 Roadway Departure Crash Mititgation (UPC ) $600K May, 2017 Roadway Lighting and Utility Maintenance $1M May/June, 2017 VA-289 Bridge Over Accotink Creek: Concrete Barrier (UPC ) $300K July,

62 A Dialogue with the Northern Virginia District A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Michelle Holland Megaprojects Communications Manager Northern Virginia District

63 By 2021, a 90+ mile seamless network of express lanes will provide faster and more reliable trips for drivers, carpoolers, and transit users in Northern Virginia. Northern Virginia Express Lanes Network

64 Multimodal Solutions for Network Funding for Multimodal Solutions from toll revenues is a Commonwealth priority for projects that will expand the Regional Express Lane Network in Northern Virginia I-395 Express Lanes Northern Extension Transform 66: Inside the Beltway Transform 66: Outside the Beltway Commonwealth goal is to maximize person throughput, not vehicle throughput Benefits of Multimodal Improvements include: Improved mobility along the project corridors New, diverse travel choices Enhanced transportation safety and travel reliability Make the best use of the current infrastructure within constrained urban corridors

65 Transform 66 Outside the Beltway Project

66 Transform 66 Outside the Beltway Project Scope Multimodal improvements to 22.5 miles of the I-66 Corridor 2 express lanes in each direction from I-495 (Capital Beltway) to Gainesville (University Boulevard) 3 general purpose lanes in each direction New transit service and park-and-ride lots Safety and operational improvements at key interchanges

67 Project Recap November 2013 FHWA approves Tier 1 EIS with Record of Decision July 2014 Launch Tier 2 Environmental Assessment (EA) and Transform 66 Outside the Beltway May/June 2015 NEPA Public Hearings for EA August 2015 Commissioner s Finding of Public Interest September 2015 Announce Preferred Alternative and Phasing Approach; post RFQ October 2015 Inclusion in regional TPB CLRP; CTB approves Preferred Alternative and Phased Approach December 2015 Decision on procurement: Toll concession May 2016 Public hearings for procurement and HOV conversion June 2016 FHWA issues Finding of No Significant Impact on EA July 2016 Issue final Request for Proposals November 2016 Selection of Preferred Proposer

68 Concession Term: 50 years Financing: Key Business Terms Developer to finance the Project at its own cost and risk VDOT to provide up to $600 million public contribution Permits: VDOT to obtain required NEPA approvals, CTB approvals, and approvals by FHWA Developer responsible for all other permits and government approvals, and any required reevaluation of NEPA approvals as a result of ATCs Design and Construction Fixed priced contract Operation and Maintenance (O&M) Developer responsible for O&M of the express lanes, except for snow and ice removal, which will be done by VDOT VDOT responsible for operation and maintenance of GP lanes

69 Competitive Process Offered private sector opportunity to compete against the public statefinanced option Public option will remain on the table until deal is signed with private partner Final RFP issued July 29, 2016 Two teams submitted compliant bids Transurban/Skanska Cintra/Meridiam/Ferrovial

70 Other Benefits to the Commonwealth $500M now available for additional improvements to the I-66 Corridor subject to VA Code requirements ( ) $300M will return to the Northern Virginia Transportation Authority for other key regional projects $300M will return to the High Priority Project Program in SMART SCALE for statewide competition

71 Future Milestones Milestone Dates and Schedule Begin Final Design January 2017 Design Public Hearing September 2017 Begin Construction Fall 2017 Right of Way Acquisition Offers, etc. October 2017 December 2018 Park and Ride Milestone Date (960 Parking Spaces near Gainesville) Route 28 Signalization Date (Remove 4 Traffic Signals from Route 28) March 2019 Subject to NTP for Construction February 2020 Subject to NTP for Construction Begin Tolling (Service Commencement Date) July 2022 Subject to Liquidated Damages Project Completion Date August 2022 Subject to Liquidated Damages

72 Transform 66 Inside the Beltway Project

73 Program Area Map

74 Program Scope Tolling during weekdays, peak hours, peak directions Eastbound: 5:30 a.m. 9:30 a.m. Westbound: 3:00 p.m. 7:00 p.m. HOV2+ toll free in 2017, HOV3+ toll free when Express Lanes open on I-66 outside the Beltway All vehicles using the lanes during tolling periods must have an E- ZPass or E-ZPass Flex, if they are HOV, mounted in vehicle Multimodal improvements benefitting the I-66 Corridor funded by toll revenue Widening of I-66 eastbound between the Dulles Connector Road and Fairfax Drive - Exit 71 (approximately 4 miles) Preparing an Environmental Assessment Conducting a Noise Analysis to determine locations of noise walls Tolling will continue through construction

75 Tolling Infrastructure Construction Update Construction kicked off with groundbreaking in August 2016 Construction activity includes: Eight overhead electronic toll collection gantries on I-66 Approximately 125 signs along I-66 and local roads approaching I-66 Potential traffic impacts Periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries Construction will conclude in 2017

76 Multimodal Components Update Commonwealth Transportation Board approved 10 projects totaling $9.8 million in July 2016 Projects are expected to be operational by the time tolling begins in 2017 Approved projects include:

77 Eastbound Widening Widening of I-66 eastbound from two to three lanes from the Dulles Connector Road to Fairfax Drive (Exit 71) Approximately 4 miles Environmental analysis and construction to be funded with revenues from recently enacted FAST Act and state revenues Analysis of noise walls (potential new/replacement) Landscaping Widening to be completed largely within existing right of way Tolling will continue through construction

78 Eastbound Widening Map

79 Key Project Features Third travel lane eastbound between Dulles Connector Road and Fairfax Drive (Exit 71) Trail Improvements Washington and Old Dominion Trail at Lee Highway Custis Trail Realignment in Bon Air Park Replacement and New Construction of Noise Walls along eastbound and westbound travel lanes Off-ramp Intersection Improvements Exit 69 East Falls Church Exit 71 Ballston Stormwater Management

80 Eastbound Widening Project Schedule Activities Revised Environmental Assessment and Federal Highway Administration Decision Begin Tolling and Implement Initial Multimodal Projects Dates Early 2017 Mid 2017 Award Design-Build Contract Late 2017 Begin Construction Early 2018 Open New Eastbound Lane Late 2020

81 I-395 Express Lanes Northern Extension

82 Project Background Comprehensive Agreement executed in 2012 with 95 Express Lanes, LLC (95 Express) for 95 Express Lanes contemplated potential future development of the Northern Express Lanes in the I-395 corridor In November 2015, VDOT and 95 Express signed a Development Framework Agreement outlining roles and responsibilities The toll project will provide a long-term transit investment through an annual transit payment from toll revenues (at $15 Million minimum, escalated annually)

83 Project Scope Expand and convert the two existing reversible High Occupancy Vehicle (HOV) lanes to three managed High Occupancy Toll (HOT) or Express Lanes for approximately eight miles from Edsall Road to the vicinity of Eads Street near the Pentagon Provide improved connections between the proposed I-395 Express Lanes and Eads Street Install signage, toll systems, and an Active Traffic Management System Provide sound walls

84 Typical Section

85 Express Lanes Access All existing access points to remain the same except for Eads Street Interchange Capacity and operational improvements at Eads Street Interchange under evaluation Seminary Road South facing ramp remains limited to HOV-only at all times

86 I-95/I-395 Transit and TDM Study DRPT is leading the development of a new I-95/I-395 Transit/Transportation Demand Management (TDM) Study in coordination with key stakeholders including: Cities of Alexandria and Fredericksburg Arlington, Fairfax, Prince William, Spotsylvania and Stafford Counties Northern Virginia Transportation Commission (NVTC) Potomac and Rappahannock Transportation Commission (PRTC) VRE and WMATA

87 I-95/I-395 Transit/TDM Study Area and Markets Project study area extends from the southern terminus of the I-95 Express Lanes (at Garrisonville Road) north to the Potomac River and includes: Parallel commuting corridors Alternative modes of travel Transit/TDM services, programs, or facilities that are being studied include those that: Use I-95 and/or I-395 and serve work destinations within the study area inside the Beltway (including downtown DC) Increase person throughput but do not use I-95 or I-395 Provide direct access to services in the corridor that increase person throughput or travel choices in the study area

88 Key Milestones Key Milestones Begin Dates Public Outreach and Technical Coordination Ongoing Begin NEPA Environmental Assessment January 2016 Begin Transit/TDM Study April 2016 Public Information Meetings April 11 and 13, 2016 Public Meetings and Hearings October 24 and 26, 2016 October 27 (395 Widening) November 30, 2016 December 1, 2016 Regional Long-Range Plan Decision November 2016 Final Transit/TDM Study December 2016 Final NEPA Decision January 2017 Begin Construction 2017 Project Completion 2019

89 I-395 South Widening Duke Street to Edsall Road I-395 Widen Southbound I-395 from 3 lanes to 4 lanes between Duke Street and Edsall Road Edsall Road Interchange Replace existing Edsall Westbound to I-395 Southbound Loop Ramp with new signalized intersection Duke Street Interchange Replace existing I-395 Southbound to Duke Eastbound Loop Ramp with new signalized intersection

90 I-95 Express Lanes Southern Extension

91 Project Scope Building 2.2-mile reversible lane to extend I-95 Express Lanes toward the south near Garrisonville Road Interchange in Stafford County Creating new northbound and southbound ramps between the Express Lanes and general lanes Installing traffic devices (dynamic message signs, cameras, gates) for express lanes reversible operation Partnership between VDOT s Fredericksburg and Northern Virginia Districts, and 95 Express Lanes partner, Transurban

92 New Express Lanes Access Northbound Traffic Traffic will be able to enter express lanes sooner (south of Garrisonville Road) with new ramp Existing left-side entrance ramp north of Garrisonville will remain as an alternative Southbound Traffic Express lanes traffic heading toward Fredericksburg and points south will be able to continue on 2.2 mile extension past Garrisonville Road Existing flyover ramp will remain for motorists heading toward westbound or eastbound Garrisonville Road Project Schedule Open Southbound Ramp: Winter 2017/2018 Open Northbound Ramp: Summer 2018

93 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Leslie Martin Civil Rights Northern Virginia District

94 All Projects DBE Payments Made Calendar Year st quarter: 361payments, $31.11 M 2 nd quarter: 264 payments, $23.98 M 3 rd quarter: 176 payments, $25.21 M Total: 801 payments (2 more than 2015) $80,313, ($15.44 M less) 94

95 25 Contracts Professional Services DBE Participation $ M Value DBE Payments (reported): $11,232, DBE % participation: 7% 2015: $16.6 M more reported; 35% participation

96 DBE Compliance DBE reviews completed; 25 ongoing Sixty-one in-compliance determinations Zero partial compliance determinations Six non-compliance determinations Red Flags DBE must be certified in the commodity/service being performed DBEs must perform! DBEs must have signed contracts or PO s with all lower-tiered companies working for them DBEs must have written quotes w/manufacturers/suppliers 96

97 Future Outlook 2017 Projects for Planned Advertisement 41 Projects Total: $431.2 million VDOT 19 projects $11 million CN Locally Administered 51 projects $106.3 million CN Potential DBE and/or SWaM Opportunities $ 43.1 million + 97

98 Mega Projects Transform 66 Outside the Beltway $2.33 B 15% or $350 M+ potential DBE 27% or $629 M+ potential SWaM I-395 Express Lanes $270 M 10% or $27 M+ potential DBE 19% or $51 M+ potential SWaM Transform 66 Inside the Beltway $125 M 15% or $1.9 M+ potential DBE 98

99 DBE Support Services DBE/SWaM vendor search Promote information flow Identify firms eligible as DBE/SWaM firms Assist with certification & prequalification processes Provide business management guidance Provide field and administrative technical assistance Provide legal assistance Conflict resolution! 99

100 Lessons Learned As the Prime, you should: Provide outreach/networking events Crucial to success Vet firms to match size and complexity Allow flexibility for continued success Communicate & Document Invite DBEs to the table for plan and schedule change decisions 100

101 Labor Compliance General issues for Davis Bacon and Related Acts covered projects: Proper classification Based on work performed Working supervisors Request additional classification with wage rate Payments Weekly, overtime, fringe benefits, no 1099 On-site hauling vs. off-site hauling Covered employees, owner-operators Civil Rights Labor and Management System electronic submittals!! 101

102 On the Job Training Program active projects with trainee goals 49 trainees enrolled 32 minority / 17 non-minority 46 male / 3 female 14,448 recorded training hours! 28 have completed to date 7 quit 14 currently active 102

103

104 12 th Transportation Career Fair 2016 Held 1st Thursday (usually) of October Prince William County Fairgrounds 104

105 1,300+ high school students 114 chaperones

106 100 Exhibitors

107 Future Equipment Operators

108 Future Bridge Engineers

109 29 High Schools

110 Future Smart Transportation Planners & Builders

111 10 School Jurisdictions

112 175 pieces of equipment

113 More Future Equipment Operators!!

114 Industry Sponsors (Thank you to The Lane Construction, VA Paving, Morgan Oil, Jacobs Engineering, & Collins Engineering)

115 13 th Annual Transportation Career Fair: Your Ride to the Future! Bridge building, highway design, chocolate asphalt, quizzes, obstacle courses, surveying equipment, work zone set up, crane, backhoe, dump trucks, simulators, concrete work Join Us! October 5, 2017

116 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Jeff Southard, Esq. VTCA Executive Vice President General Assembly Legislative Update

117 VDOT Panelists Bill Cuttler, P.E. Tina Briganti-Dunn, P.E. Lauren Mollerup, P.E. Nick Roper, P.E. Industry Panelists Panel Discussion Ken Betz, Tavares Concrete Co. Jon Harman, Shirley Contracting Co. John Maddox, Whitman, Requardt and Assoc. Kurt Thompson, Dewberry 117

118 A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT December 8, 2016 Northern Virginia District

A New Era of Transportation Solutions

A New Era of Transportation Solutions A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

Performance Measure Summary

Performance Measure Summary Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number

More information

Transform66 Transportation Management Plan: Transit & TDM Strategies

Transform66 Transportation Management Plan: Transit & TDM Strategies Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Design Public Hearing

Design Public Hearing Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: November

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office TECHNICAL ADVISORY COMMITTEE Wednesday, April 20, 2016, 7:00pm NVTA Office 3040 Williams Drive, Suite 200 Fairfax, Virginia 22031 AGENDA I. Call to Order/Welcome Chairman Boice II. Meeting Summary of March

More information

Our Panelists SPEAKERS MODERATOR

Our Panelists SPEAKERS MODERATOR SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City

More information

Dulles Toll Road Rate Setting Process

Dulles Toll Road Rate Setting Process Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On

More information

Understanding Your I-66 Trip

Understanding Your I-66 Trip Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

Hampton Roads Express Lane Network

Hampton Roads Express Lane Network More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles

More information

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section Leesburg Streets and Highways Tom Brandon Manager, Office of Capital Projects Potomac Section About Leesburg Accessible 35 miles from DC On the W&OD Trail On the Potomac River 15 miles from the Appalachian

More information

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004 Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 24 Potomac and Rappahannock Transportation Commission Fairfax Connector Omni Ride Omni

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: January

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Dulles Corridor Improvements. Drive to Ride

Dulles Corridor Improvements. Drive to Ride Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

The following items were handed out at the January 4, 2018 NVTC Meeting.

The following items were handed out at the January 4, 2018 NVTC Meeting. The following items were handed out at the January 4, 2018 NVTC Meeting. Blue Item #3D 2018 NVTC COMMITTEE AND BOARD APPOINTMENTS NVTC EXECUTIVE COMMITTEE Paul Smedberg, Chairman/WMATA Board* Matt Letourneau,

More information

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission is seeking an EXECUTIVE DIRECTOR ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency that

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform

More information

Update on Route 1 Efforts

Update on Route 1 Efforts County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

WAGS Tournament Field Directions (October 8-10, 2016)

WAGS Tournament Field Directions (October 8-10, 2016) WAGS Tournament Field Directions (October 8-10, 2016) Arrowbrook Park (Herndon) 2330 Centreville Rd, Herndon, VA 20171 From the Dulles Toll Road: Take the Herndon/Chantilly exit onto Centreville Road and

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%

More information

Silver Line Operating Plan

Silver Line Operating Plan Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 Subject: FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY From: VDOT-News To: Time: Tuesday, December 12, 2017 9:05:36 AM -08:00 RELEASE: IMMEDIATE Michelle Holland,

More information

Silver Line Rail Project Update

Silver Line Rail Project Update Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Transform66: Inside the Beltway

Transform66: Inside the Beltway Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Transportation Management Program Office Newsletter J A N U A R Y

Transportation Management Program Office Newsletter J A N U A R Y I N S I D E THIS I S S U E : 95 Express Lanes/ South Parking Construction Updates FSD Director s Message Transportation Management Program Office Newsletter J A N U A R Y 0 9 95 Express Lanes/South Parking

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

CHAPTER 5: Operations Plan

CHAPTER 5: Operations Plan CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...

More information

Appendix 1: Phase I Strategies

Appendix 1: Phase I Strategies Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030

More information

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION 2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION Travel Forecasting Subcommittee Friday, May 22, 2015 C. Patrick Zilliacus Figure 1 HOV System Overview Montgomery

More information

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

3 ASSESSMENT OF THE CORRIDOR

3 ASSESSMENT OF THE CORRIDOR 3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in

More information

Table of Contents. List of Tables

Table of Contents. List of Tables Table of Contents 1. Introduction... 1 2. Service Recommendations... 1 A. Extend Service on Fort Belvoir to New Post Exchange/Commissary Complex... 1 B. Improve Service Frequencies on Sunday from Current

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

SMART SCALE Round 2 Update. Nick Donohue

SMART SCALE Round 2 Update. Nick Donohue SMART SCALE Round 2 Update Nick Donohue Deputy Secretary of Transportation January 2017 Round 2 Summary 436 applications submitted 33 applications screened out $1.393 billion SMART SCALE request $1.864

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

The Dulles Loop. Route 606. Route 28. Route 50

The Dulles Loop. Route 606. Route 28. Route 50 The Dulles Loop Route 606 Route 28 Route 50 1 Rt.50/Dulles Loop: Year 2000 Signal Queues (Intermittent) Signal Queues (Continuous) 4:30 6:00 p.m. Dulles Loop Source: SkyComp Report WATF 03/07 2 Rt.50/Dulles

More information

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: March

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

95 Express Lanes: Before/After Study

95 Express Lanes: Before/After Study 95 Express Lanes: Before/After Study Exit 126 (Massaponax) to Exit 170 (Springfield) Before After 2010 2012 2015 Pictures show the Route 619 Interchange prior to the constructions of the Express Lanes,

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information