2018 Transit Summit. Board Room, First Floor, Government Center June 25, :00 PM

Size: px
Start display at page:

Download "2018 Transit Summit. Board Room, First Floor, Government Center June 25, :00 PM"

Transcription

1 2018 Transit Summit Board Room, First Floor, Government Center June 25, :00 PM 1

2 Agenda 1. Advisory Board Comments 2. Bus Stop Inventory and ADA Compliance Transition Plan Briefing 3. Dulles North Transit Center Parking Alternatives 4. Process for Soliciting, Receiving and Evaluating Stakeholder Requests for Transit Services 5. Transit Services Overview 2

3 Item #1 Commission on Aging Bob Dale 3

4 Item #1 Disability Services Board Jennifer Alves 4

5 Item #1 Health Council Representative 5

6 Item #1 Transit Advisory Board Phil McNutt, Chair 6

7 Item #2 Americans with Disabilities Act Bus Stop Compliance Study/ADA Transition Plan 7

8 What authority requires public agencies to make public right-of-way accessible for all pedestrians with disabilities? Section 504 of the Rehabilitation Act of 1973 (Section 504) (29 U.S.C. 794) Title II of the Americans with Disabilities Act of 1990 (ADA) (42 U.S.C ). 8

9 Bus boarding and alighting areas (landing pads) shall meet the following requirements: The landing pad shall have a firm, stable surface. The landing pad shall have a minimum length of eight feet (measured perpendicular to the roadway) and a minimum width of five feet (measured parallel to the roadway). The landing pad shall connect to a street, sidewalk, or pedestrian path via an accessible route. Parallel to the roadway, the slope of the landing pad shall be the same as the roadway. Perpendicular to the roadway, the landing pad shall not be steeper than 1:48 (2.08 percent). 9

10 For a bus shelter to be ADA-compliant, it must contain a clear area that meets the following requirements: The clear area within the bus shelter must be at least 30 inches by 48 inches. Where the clear area is confined on all or part of three sides, the clear area must be at least 36 inches by 48 inches. The slope of the clear area shall not be steeper than 1:48 (2.08 percent). The bus shelter must connect to a landing pad via an accessible route 10

11 ADA Transition Plan 1. ADA Transition Plan is required by the FTA stops reviewed stops out of ADA Compliance (Not uncommon, especially in jurisdictions with older neighborhoods) 4. Study shows the estimated funding needed to bring stops into compliance is $2,834,200 11

12 Stakeholders Working Group DTCI Transit, Construction and Transportation Planning Staff Towns of Purcellville and Leesburg Disability Services Board Virginia Regional Transit RK&K Consulting team 12

13 Priorities 1 and 2 and one version of Priority 3 are bus stops that are located on public property and are not ADA compliant or accessible; and hence have the highest priorities. 13

14 Priorities 4 and 5 and one version of Priority 3 are also located on public property and are not compliant but are accessible; therefore, they are of a lower priority. The iteration of Priority 3 in this group (i.e., located on the left side of the upcoming flowchart), are those bus stops that are accessible but also have a low cost of improvements 14

15 Priorities 6A through 6C are bus stops located on private property and are not ADA compliant. The bus stops may or may not be accessible. Priority 7 are bus stops that are ADA compliant but may still be in need of improvements like signage or lighting. Additionally, some may not be accessible 15

16 16

17 Bu s S t o p I n v e n tor y a n d ADA Co m p lia n c e P lan Figure 4: Prioritization Methodology Is the bus stop ADA-compliant? Yes No Priority 7 Is the bus stop located on a private development? Yes No Is the bus stop accessible? Yes No No Does the stop have 3 daily boardings and alightings? Does the stop have 3 daily boardings and alightings? Does the stop have 3 daily boardings and alightings? Yes Yes No Yes Yes No Yes No Do the improvements cost < $4,000? Do the improvements cost < $4,000? Do the improvements cost < $4,000? Do the improvements cost < $4,000? Do the improvements cost < $4,000? Do the improvements cost < $4,000? Yes No Yes No Yes No Yes No Yes No Yes Yes No Priority 6A Priority 6B Priority 6B Priority 6C Priority 3 Priority 4 Priority 4 Priority 5 Priority 1 Priority 2 Priority 2 Priority 3 March

18 Item #3 Dulles North Transit Center 18

19 Dulles North Transit Center (DNTC): Located at the Greenway and Route 606 Interchange Provides 750 parking spaces Commuter bus user parking Vanpooling/Carpooling parking Consistent utilization percent No charge for use 19

20 20

21 21

22 Problem Statement: The DNTC is located such that the walk to the Loudoun Gateway Metrorail Station is approximately ½ mile. It is perceived that once Metrorail opens; Metrorail users will park at the DNTC and walk to the Metrorail Station to avoid paying the parking garage fee. 22

23 23

24 Development of Alternatives: Study commissioned (Attachment 2) Study identified five (5) potential alternatives Alternative 1: No Action with monitoring Alternative 2: Discourage Metrorail Parking at DNTC Alternative 3: Restrict DNTC Parking to Bus Riders Only Alternative 4: Implement Parking Charge for Non-Loudoun County Transit Users Alternative 5: Implement Parking Charge for all DNTC Users 24

25 Alternative 1: No Action with Monitoring No physical changes Impose no parking restrictions Parking activity will be monitored after opening of Metrorail Adverse impacts will be documented 25

26 Alternative 2: Discourage Metrorail Parking at DNTC Allow continued access to all users Discourage Metrorail riders from using the DNTC Highly-visible signing will be added Close NW access driveway Fence the DNTC Enforcement 26

27 Alternative 2 Fence, Close NW Driveway 27

28 Alternative 3: Restrict DNTC Parking to Bus Riders Only Limit DNTC parking to bus riders only Kiss and ride commuter option remains Remove/Relocate Ridesharing Program Install gate access system 28

29 Alternative 3 Access changes to DNTC 29

30 Alternative 4: Implement Parking Charge for Non-Loudoun County Transit Users Continue to allow all users access to the DNTC Fee would be charged Bus riders would be reimbursed value of parking Entry/Exit gate system would be installed Close NW driveway access Charging a fee violates VDOT policy; Loudoun would need to assume the VDOT lease and operating and maintenance costs for the DNTC 30

31 Alternative 4: Charge for Parking 31

32 Alternative 5: Implement Parking Charge for All DNTC Users All who enter DNTC, pay fee for parking Fee would be charged Entry/Exit gate system would be installed Close NW driveway access Charging a fee violates VDOT policy; Loudoun would need to assume the VDOT lease and operating and maintenance costs for the DNTC 32

33 33

34 FUTURE RT. 606 SHARED USE PATH 34

35 Alternative 6: Staff suggested alternative not in the study Relocate DNTC facility to MWAA property located at southern terminus of Pacific Blvd Preliminary communications with MWAA Parking facility on MWAA property at Pacific Blvd 1,016 spaces, 18 HC Accessible spaces (1,034 total) Will accommodate all commuter users 35

36 EXISTING DNTC SITE POTENTIAL DNTC SITE 36

37 Existing MWAA parking 1,016 spaces 18 HC accessible spaces 1,034 spaces total 37

38 Existing DNTC canopy potentially could be relocated to new site 38

39 Item #4 Process for Soliciting, Receiving and Evaluating Stakeholder Requests for Transit Services 39

40 Loudoun County Stakeholders Citizens Supervisors Employers Boards/Committees (Disabilities Services Board, Economic Development Advisory Committee, etc) Towns of Leesburg, Purcellville, Lovettsville, Hamilton Contracted Transit Providers (MV Transportation and Transdev) 40

41 Transit Development Plan (TDP): Foundation document Recommends: routes, hours of operation, and other service changes provide more efficient & cost effective transit services Board endorsed in June 2016, updated annually 41

42 Stakeholder Input/Request Timeline 1. Solicit transit requests/comments from Stakeholders(on-going thru January 1) 2. Analyze requests and Develop service plan recommendations (January) 3. Receive stakeholder input/comments on staff recommended additions/changes (February March) 42

43 Stakeholder Input/Request Timeline 4. Finalize Schedules (February March) 5. Title VI Analysis (March April) 6. Notify Stakeholders of finalized Schedules (May) 7. Title VI Analysis presented to the Board (May) 8. Implement new/modified transit service for fiscal year (July 1) 43

44 Stakeholder Input/Request Timeline 9. Incorporate recommended service changes into DTCI budget. (August - September) 10.Update Transit Development Plan (TDP) and submit to DRPT (December) 11.Submit grant applications for DRPT State Capital/Operating Assistance (February) 12.Approval of DTCI Budget (March-April) 44

45 January February March April May June July August September October November December 2018 FY Staff recommended changes Public Comment Title VI Analysis, Finalize Service Changes BOS FY 2019 Service Transit Budget Development - FY 2020 TDP Annual Update Grants Receive Stakeholder Input for FY 2020 (Ongoing) 2019 FY Staff recommended changes Public Comment Grants Title VI Analysis, Finalize Service Changes BOS FY 2020 Service Transit Budget Development - FY 2021 TDP Annual Update Receive Stakeholder Input for FY 2021 (Ongoing) 2020 FY Staff recommended changes Public Comment Grants Title VI Analysis, Finalize Service Changes BOS FY 2021 Service Transit Budget Development - FY 2022 TDP Annual Update Receive Stakeholder Input for FY 2022 (Ongoing) ATTACHMENT 1

46 Item #5 Transit Services Overview Premium Commuter Bus Services Metro Connection and Local Fixed Route Services Transition to a Combined System 46

47 Board Policy Direction Establish a fare structure that will bring the commuter (premium) bus service to a fare neutral state by the time Metrorail revenue service starts in Loudoun County; Make transit capital investments and operating expense and route configuration decisions that incentivize commuter traffic to use the Metrorail system; and Provide ADA/Paratransit service that is consistent with the minimum federal requirements, which is to provide ADA/Paratransit services within a three-quarters of a mile distance from any local fixed transit route. 47

48 Pre-Metrorail Premium Commuter Bus (Long Haul) Service: 2010 Countywide Transportation Plan Demonstrated the market for the Premium Commuter Bus Service is distinct from the market for Metrorail Not price/fare sensitive Identified justifications for continuing the Premium service Fare Analysis Report, April 2014 Fare increases of $1.00 in FY 2015, FY 2017 and FY

49 State Operating Assistance State Funding for Operating 2 Grant Programs: Traditional Operating Assistance-funds allocated based on total operating cost relative to the total operating costs statewide for all transit providers that receive State Operating Assistance. FY Loudoun County allocation is $2,011, 315 (1.8% of statewide total allocated) Performance Based Operating Assistance-funds allocated based on scoring system using 3 performance metrics: Net cost per passenger (50%); Customers per Revenue Hour (25%); Customers per Revenue Mile (25%) FY 2018-Loudoun County allocation is $954,503 (1.2% of the statewide total allocated) 49

50 Issue: State Operating Assistance Premium Commuter Bus (Long Haul Service) This service performs the best of all Loudoun Transit Services with regard to the State Operating Assistance Criteria. Reducing, or eliminating Premium Commuter Bus Service will disproportionately reduce the State Operating Assistance allocated to the County. 50

51 Premium Commuter Bus Revenue/Expense Comparison $10,000, $8,000, $6,000, $4,000, $2,000, $- Expenses Revenues Expenses Revenues Expenses Revenues FY 2017 FY 2018 FY 2019 Expenses Fares Advertising State Capital State Operating 51

52 Premium Commuter Bus Service FY 2018 YTD Metrics through 05/31/18 Revenue Hours 41, Revenue Miles 1,067, Ridership Fares Collected $8,322,591 Daily Ridership 3,839 Service Cost ($207.88/hour) $8,658,277 Subsidy per Passenger $

53 Premium Commuter Bus Service FY 2019 Metrics, $10 Fare, -5% ridership Revenue Hours 41, Revenue Miles 1,067, Ridership 831,108 Fares Collected $8,311, Daily Ridership 4,244 Service Cost (214.94/hour) $8,952,441 Subsidy per Passenger $

54 FY 2019 Service Changes Premium Commuter CFC closing on July 13 th Routes split between Loudoun Station and the Dulles North Transit Center $1.00 Fare increase for Premium Commuter Bus Service takes effect on July 23 rd New Purcellville park & ride lot opens July 16th 54

55 Post-Metrorail Premium Commuter Bus (Long Haul) Service: WMATA system has experienced operational issues and incidents impacting safety and reliability. It is undetermined how long it may take for WMATA ridership to rebound. Premium Bus Fleet is well positioned to respond to changes in ridership in response to Metrorail usage. Level of service remains constant, operating at revenue neutral status. 55

56 Local Fixed Route Service 56

57 Neighborhood focused. Local Fixed Route Services: All-day service to attractions and employment centers primarily located in the greater Leesburg vicinity and eastern Loudoun County. Libraries, senior centers, higher education centers, hospitals and retail centers e.g., Dulles Town Center and Leesburg Outlet Mall. Limited connections to Metrorail stations. Riders are predominantly transit dependent riders. 57

58 How Do We Judge Performance? Route Performance Criteria definitions: Revenue Hour: Time from first scheduled pickup location to last scheduled drop off location. Riders per Revenue Hour: Total passengers who board the bus divided by the total revenue hours Cost Per Boarding: Total passengers divided by the total cost of operating each route. For example: Route 999 which travels from Point A to the Point B: $1,000,000 in operating costs divided by 100,000 riders equals $10.00 cost per boarding 58

59 Route Performance Criteria (Per Transit Development Plan): Any route that performs less than 50% of the average for that type of service - a candidate for adjustment or elimination. For example: Any local route with less than 50% of the average boardings per revenue hour of all local service (taken as a whole), or More than two (2) times the average net cost per boarding, May require some type of intervention 59

60 FY 2017 ridership and cost data From Through To Year to Date Ridership (May) Time Served # of Buses on route Daily Revenue Service Hours Frequency Transit Bus in Minutes Time Type Service Hour Rate Annual Cost Fare Riders Per Rev Hour Cost per Boardng RT 55 Leesburg Exeter/Tuscarora Leesburg 9,220 7A-7P BOC $ $ 196,848 $ $ Dulles Town Dulles Town RT 83 Center Wiehle-Reston East Center 6,292 7A-7P BOC $ $ 198,502 $ $ RT 85 Dulles South East Gate Dulles South 2,844 5A - 8P BOC $ $ 140,606 $ $ RT 86 Ashburn Dulles North Transit Center Ashburn 5,479 Peak AM & PM BOC $ $ 148,877 $ $ Inova RT 89X Loudoun Telos Wiehle- Reston East 11,959 Peak AM & PM BOC $ $ 293,949 $ $ System Averages 7.02 $

61 Local Fixed Route (all day) transit Services, Monday Friday FY 2018 YTD ridership and cost data thru 04/30/2018 From Through To Year to Date Ridership (May) FY 2018 ridership and cost data thru 04/30/18 Time Served # of Buses on route Daily Revenue Service Hours Frequency in Minutes Bus Type Service Hour Rate Annual Cost Fare Riders Per Revenue Hour Cost per Boarding RT 55 Leesburg Exeter/Tuscarora Leesburg 8,278 7A-7P BOC $ $ 165,684 $ $ RT 56 Leesburg Rust Library/County Complex Leesburg 12,125 7A-7P BOC $ $ 167,076 $ $ RT 57 Leesburg Villages of Leesburg Leesburg 14,990 7A-7P BOC $ $ 167,076 $ $ RT 62 Ashburn One Loudoun Dulles Town Center 9,834 7A-7P BOC $ $ 167,076 $ $ RT 70 Leesburg Dulles Town Center NVCC 116,749 7A-10P BOC $ $ 751,842 $ $ 5.44 Wiehle-Reston RT 72 East One Loudoun GW University 19,670 6A-8P BOC $ $ 301,266 $ $ RT 80 NVCC Dranesville NVCC 23,030 7A-7P BOC $ $ 167,076 $ $ 6.25 RT 81 Broad Run Dulles Town Center Broad Run 14,454 7A-7P BOC $ $ 167,076 $ $ RT 82 Sterling Park Dulles Town Center Sterling Park 29,935 7A-10P BOC $ $ 208,845 $ $ 5.98 RT 83 Dulles Town Center Wiehle-Reston East Dulles Town Center 6,076 7A-7P BOC $ $ 167,076 $ $ RT 84 Dulles Town Center Wiehle-Reston East Dulles Town Center 13,449 7A-7P BOC $ $ 167,076 $ $ RT 990 Wiehle-Reston East Loudoun Employment SItes Loudoun Employment SItes 6,152 Peak AM & PM BOC $ $ 143,825 $ $ Total System 14 Routes (excluding eliminations) 297, $ 2,908, $ 8.79 FY 2017 System Averages 7.02 $ 9.65 Paid for by Town of Leesburg Route operated by Virginia Regional Transit Routes will serve Customs and Border Patrol at Quantum Park Route is a candidate for adjustment or elimination 61 Private Public Partnership with George Washington University. GW pays for 37.5% of these costs and their students and employees ride for free.

62 FY 2017 Weekend Service Metrics From Through To Ridership Time Served # of Buses on route Daily Revenue Frequency Service Hours in Minutes Transit Time Bus Type Service Annual Hour Rate Cost Fare Riders Per Rev Hour Cost per Boardi ng RT 54 Leesburg RT 15 Leesburg A - 6P BOC $ $ 22,632 $ $ 8.70 Village of RT 57 Leesburg Leesburg Leesburg A - 9P BOC $ $ 36,425 $ Lansdown/On RT 70 Leesburg e Loudoun Dulles Town Center A-10P BOC $ $ 88,413 $ $ 7.86 $ RT 82 Dulles Town Center William Dulles Town Waters House Center A - 10P BOC $ $ 45,631 $ $ 8.75 RT 84 Dulles Town Center Atlantic Blvd/Wiehle- Reston East Dulles Town Center A-9P BOC $ $ 42,783 $ Total System 5 Routes 24, $ 235, $ $

63 From Through To FY 2018 Weekend Service Metrics thru April 30, 2018 Year to Date Ridership (march) Time Served # of Buses on route Daily Revenue Service Hours Frequency in Minutes Bus Type Service Hour Rate Annual Cost Fare Riders Per Rev Hour Cost per Boarding RT 54 Leesburg RT 15 Leesburg 3,575 9A - 6P BOC $ $25, $ $ 6.01 Village of RT 57 Leesburg Leesburg Leesburg 2,126 10A - 9P BOC $ $30, $ $ Lansdown/One Dulles Town RT 70 Loudoun Center 7,549 8A-10P BOC $ $74, $ $ 8.85 Leesburg Dulles Town RT 82 Center Dulles Town RT 84 Center William Waters House Atlantic Blvd/Wiehle- Reston East Dulles Town Center 3,859 8A - 10P BOC $ $38, $ $ 8.94 Dulles Town Center 2,047 8A-9P BOC $ $35, $ $ $ 204, $ 9.67 FY 2017 System Averages 6.62 $ Total System 5 Routes 19,

64 FY 2019 Service Changes RT 83 and RT 990 Combined RT 985 added (Sterling Park to Wiehle-Reston East) 64

65 ADA Paratransit Service: Federal Transit Administration (FTA) Mandate 49 CFR : The entity shall provide complementary paratransit service to origins and destinations with a width of three-fourths of a mile on each side of a fixed route. The corridor shall include an area with a three-fourths of a mile radius at the ends of each fixed route. Federal Mandate: Designed to create equity between able bodied riders and disabled riders. Requires a public transit route that provides service from Point A to Point B to include ADA Paratransit service within ¾ of that same route. 65

66 ATTACHMENT 3 66

67 Metro Connection Service 67

68 Metro Connection Services: Provides peak period transit service from park and ride lots to/from Metrorail stations. Riders of the Metro Connection services are predominantly choice riders. 68

69 Metro Connection (peak period) transit Services, Monday - Friday FY 2017 ridership and cost data Route From Through To Dulles Town RT 87X Center Wiehle-Reston East Year to Date # of Ridershi Buses p on (march) Time Servedroute Dulles Town Peak AM & Center Peak AM & Daily Reven ue Service Hours Freque ncy in Minut es Transit Bus Time Type Service Hour Rate Annual Contractor Cost * Fare Riders Per Reven ue Hour Cost per Boardi ng PM Transit $ $ 524,987 $ $27.82 RT 88X East Gate Wiehle-Reston East East Gate PM Transit $ $ 534,892 $ $13.74 RT West Falls Peak AM & 901/902 Potomac Falls Church Metro PM Transit $ $ 802,833 $ $13.64 RT Wiehle-Reston Peak AM & 921/922 Harmony Leesburg East PM Transit $ $ 492,092 $ $16.75 RT Goose Creek Wiehle-Reston Peak AM & 923/234 Village Broadlands East PM Transit $ 3.38 $ 457,680 $ $ 8.84 RT Loudoun Dulles North Transit Wiehle-Reston Peak AM & 925/926 Station Center East PM Transit $ $ 578,122 $ $ 8.42 Wiehle-Reston most park & ride RT 927 East lots Purcellville 6353 Peak PM Transit $ $ 293,535 $ $56.16 $ Total System 7 Routes ,684, $12.02 Route is a candidate for adjustment or elimination *Annual Contractor Costs does not include fuel, fleet replacement, and miscellaneous operating costs. 69

70 Metro Connection (peak period) transit Services, Monday - Friday FY 2018 ridership annualized Route From Through To Dulles Town RT 87X Center Wiehle-Reston East Year to Date # of Ridershi Buses p on (march) Time Servedroute Dulles Town Peak AM & Center Peak AM & Daily Reven ue Service Hours Freque ncy in Minut es Transit Bus Time Type Annual Service Contractor Hour Rate Cost * Fare Riders Per Reven ue Hour Cost per Boardi ng PM Transit $ $544,544 $ $20.74 RT 88X East Gate Wiehle-Reston East East Gate PM Transit $ $554,818 $1 13 $ 9.96 RT West Falls Peak AM & 901/902 Potomac Falls Church Metro PM Transit $ $799,006 $1 13 $ 9.66 RT Wiehle-Reston Peak AM & 921/922 Harmony Leesburg East PM Transit $ $478,747 $ $12.14 RT Goose Creek Wiehle-Reston Peak AM & 923/234 Village Broadlands East PM Transit $ $455,499 $ $ 5.55 RT Loudoun Dulles North Transit Wiehle-Reston Peak AM & 925/926 Station Center East PM Transit $ $575,367 $ $ 6.86 Wiehle-Reston most park & ride RT 927 East lots Purcellville 6379 Peak PM Transit $ $292,136 $ $44.80 $ Total System 7 Routes ,700, $15.67 Route is a candidate for adjustment or elimination *Annual Contractor Costs does not include fuel, fleet replacement, and miscellaneous operating costs. 70

71 FY 2019 Service Changes Metro Connection RT 87X reduced to one bus RT 88X extended to Stone Ridge and added a bus New Metro Connection service from Purcellville to Wiehle- Reston East 71

72 Local Fixed Route Service Metro Connection Service Transition Post Metrorail Combined Transit Service PRE-METRO TO LOUDOUN POST-METRO TO LOUDOUN 72

73 Benefits of a Combined Transit Service Neighborhood connectivity to the Metropolitan region via the Metrorail system Enhanced connectivity leading to increased system ridership Economic development connecting Loudoun residents with regional jobs and regional workers with Loudoun employment centers Integration of services using technology 73

74 Post Metrorail New Routes Neighborhood level service from Ashburn Village to Metro Neighborhood level service from Ashburn Farm to Metro Neighborhood level service from Brambleton to Metro Neighborhood level service from Broadlands to Metro Neighborhood level service from Leesburg to Metro 74

75 Map of future Transit see pdf 75

76 FY 2019 buses/costs Route # of Buses Daily Revenue Service Hours Bus Type Service Hour Rate Annual Contractor Cost * Local Body on Chassis $ $ 4,419, Metro Connection Transit $ $ 3,807, Totals $ 8,227, ` FY 2020/FY2021 buses/costs Route # of Buses Daily Revenue Service Hours Bus Type Service Hour Rate Annual Contractor Cost * Local Body on Chassis $ $ 4,576, Metro Connection Transit $ $ 4,649, Totals $ 9,226,

77 Average Annual operating cost per bus type, per route Transit Bus Contract Bus Type # of seats Average Service hour per day Service Type FY 2019 Service Hour Rate Average operating days in a year Average Yearly Operating Cost Average Local Tax Funding Needed Local Tax Fund as a % of Operatin g Cost Local Fixed Route Contract Body on Chassis 12 to All Day $ $ 207, $163, % Local Fixed Route Contract - Paratransit Body on Chassis/Van All Day $ $ 241, $190, % Commuter Bus Contract - Premium (long haul) Coach Bus 55 6 Peak Period $ $ 218, $ - 0% Commuter Bus Contract - Metro Connection Transit Bus 40 8 Peak Period $ $ 291, $215, % ** Operating costs in this table do not include first year s replacement cost which is contributed to the equipment replacement fund. 77

78 Fleet Purchasing Plan Use of Body on Chassis (BOC) Buses will save approximately $278,000 annually in operating/maintenance cost and approximately $1,750,000 in capital cost. Purchase BOC Buses to transition the service through the opening of Metrorail. 5-year equipment life cycle will allow ridership on multi-modal system (Metrorail, transit, Premium Commuter Bus, passenger car) to normalize. Transition to Gillig Transit buses when ridership levels warrant the use of larger buses. 78

79 Discussion Staff Recommendation: The County should purchase 34 new BOC buses including fareboxes and real-time technology to replace the BOC buses currently leased on the Local Fixed Route contract, 28 of which are intended for use in post- Metrorail service plan. Staff to bring this item to a future FGOEDC meeting. 79

80 Discussion Staff Recommendation: To continue operating the Premium Commuter Bus Service under the current Board directive that this service remains revenue neutral. Question: Is it the Board s desire to continue operating the Premium Commuter Bus Service under the current Board directive that this service remain revenue neutral? 80

81 81

BOARD OF SUPERVISORS 2018 TRANSIT SUMMIT INFORMATION ITEM. Transit Service Overview, Pre and Post Metrorail Revenue Service in Loudoun County

BOARD OF SUPERVISORS 2018 TRANSIT SUMMIT INFORMATION ITEM. Transit Service Overview, Pre and Post Metrorail Revenue Service in Loudoun County BOARD OF SUPERVISORS 2018 TRANSIT SUMMIT INFORMATION ITEM Date of Meeting: # I-5 SUBJECT: ELECTION DISTRICT(S): STAFF CONTACTS: Transit Service Overview, Pre and Post Metrorail Revenue Service in Loudoun

More information

Att. A, AI 46, 11/9/17

Att. A, AI 46, 11/9/17 Total s San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 Date: 11/8/17 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity

More information

Silver Line Operating Plan

Silver Line Operating Plan Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

FY Transit Needs Assessment. Ventura County Transportation Commission

FY Transit Needs Assessment. Ventura County Transportation Commission FY 18-19 Transit Needs Assessment Ventura County Transportation Commission Contents List of Figures and Appendices.. 2 Appendices... 1 Chapter 1: Introduction What is the Ventura County Transportation

More information

Date: 11/6/15. Total Passengers

Date: 11/6/15. Total Passengers Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service

More information

Ozaukee County Transit Development Plan

Ozaukee County Transit Development Plan Ozaukee County Transit Development Plan Record of Public Comments and Recommended Transit Service Plan June 5, 2018 Kevin Muhs Deputy Director #242846 Status of the Transit Development Plan Existing Conditions

More information

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance Committee (B) 07-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201753 Resolution: Yes No TITLE: National Harbor

More information

METROBUS SERVICE GUIDELINES

METROBUS SERVICE GUIDELINES METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures

More information

Bristol Virginia Transit

Bristol Virginia Transit Bristol Virginia Transit 1 Transit Overview Bristol Virginia Transit (BVT) is a Federally Funded and certified urban area transit system. BVT began operation in its current form in 1982. In Fiscal Year

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 22, 2014

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 22, 2014 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 22, 2014 DATE: January 23, 2014 SUBJECT: Request to authorize advertisement of a public hearing to consider an ordinance amending

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

Dulles Toll Road Rate Setting Process

Dulles Toll Road Rate Setting Process Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR Quarterly Report Transit Bureau, Local Transit Operations First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR A Arlington Transit ART 1) Introduction The purpose of ART is to provide

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California LA Metro Rapid - Considerations in Identifying BRT Corridors Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California LA Metro Transportation planner/coordinator, designer, builder

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

Proposed Dulles Toll Road Rate Adjustments

Proposed Dulles Toll Road Rate Adjustments Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Dulles Corridor Improvements. Drive to Ride

Dulles Corridor Improvements. Drive to Ride Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

CHAPTER 5: Operations Plan

CHAPTER 5: Operations Plan CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...

More information

TRANSPORTATION SERVICE Actual

TRANSPORTATION SERVICE Actual PERFORMANCE REPORT-THIRD QUARTER VISION TO DELIVER REGIONAL MULTI-MODAL TRANSPORTATION SERVICES AND INFRASTRUCTURE IMPROVEMENTS THAT SIGNIFICANTLY AND CONTINUALLY INCREASE TRANSIT MARKET SHARE. MISSION

More information

STEP ALTERNATIVES RANKING TABLE

STEP ALTERNATIVES RANKING TABLE ALTERNATIVES RANKING TABLE Priority Ranking 0 = Lowest Priority 1 2 3 4 5 = Highest Priority Abbreviations TD = Transportation Disadvantaged PWD = People with Disabilities I. Existing Enhancements Increase

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor

More information

Table of Contents. List of Tables

Table of Contents. List of Tables Table of Contents 1. Introduction... 1 2. Service Recommendations... 1 A. Extend Service on Fort Belvoir to New Post Exchange/Commissary Complex... 1 B. Improve Service Frequencies on Sunday from Current

More information

Design Public Hearing

Design Public Hearing Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,

More information

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer) CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

Title VI Service Equity Analysis

Title VI Service Equity Analysis Pierce Transit Title VI Service Equity Analysis Pursuant to FTA Circular 4702.1B NE Tacoma Service May 2016 Pierce Transit Transit Development Dept. PIERCE TRANSIT TITLE VI SERVICE EQUITY ANALYSIS TABLE

More information

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION Washington Metropolitan Area Transit Authority Board Action/Information Summary @Action O Information

More information

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW The following pages are excerpts from a DRAFT-version Fare Analysis report conducted by Nelson\Nygaard

More information

All Door Boarding Title VI Service Fare Analysis. Appendix P.3

All Door Boarding Title VI Service Fare Analysis. Appendix P.3 All Door Boarding Title VI Service Fare Analysis Appendix P.3 Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles,

More information

DRAFT Service Implementation Plan

DRAFT Service Implementation Plan 2017 Service Implementation Plan October 2016 SECTION NAME 2017 Service Implementation Plan October 2016 2017 SERVICE IMPLEMENTATION PLAN TABLE OF CONTENTS Table of Contents... I List of Tables... III

More information

Silver Line Rail Project Update

Silver Line Rail Project Update Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project

More information

Washington Metropolitan Area Transit Authority Services Utilization Study

Washington Metropolitan Area Transit Authority Services Utilization Study Washington Metropolitan Area Transit Authority Services Utilization Study Maryland House Bill 300 Table of Contents Page 2 Executive Summary Slide 3 Notes Slide 4 Metro Systemwide Fact Sheet Slide 5 How

More information

Executive Summary. Introduction. Community Assessment

Executive Summary. Introduction. Community Assessment Executive Summary Introduction The Red Rose Transit Authority (RRTA) Transit Development Plan provides an evaluation of existing RRTA fixed route services, with the outcome being practical recommendations

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM Wednesday, August 17, 211 6: p.m. Guemes Island Community Hall ~ 7549 Guemes Island Road Thank you for attending the second Annual Public Forum in 211.

More information

REPORT TO THE DULLES CORRIDOR COMMITTEE

REPORT TO THE DULLES CORRIDOR COMMITTEE REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR ELECTRICAL POWER SERVICE FOR INTERIM TESTING, COMMISSIONING AND PRE-REVENUE OPERATIONS FOR PHASE 2 OF THE DULLES

More information

Bus Operations Report

Bus Operations Report Third Quarter FY 216 (January 1 - March 31, 216) Wednesday April 27, 216 Operations Ridership: 783,194 passengers used in the third quarter. This represents a 2% increase over the same period in FY 215.

More information

Dulles Area Association of Realtors

Dulles Area Association of Realtors Dulles Area Association of Realtors Economic Summit October 3, 2014 Housing Pipeline Transportation Economic Development 1705 - Born in Scotland 5 May 1731 Became Lord Loudoun Served in the British Army

More information

ATTACHMENT A.7. Transit Division Performance Measurements Report Fiscal Year Fourth Quarter

ATTACHMENT A.7. Transit Division Performance Measurements Report Fiscal Year Fourth Quarter TTCHMENT.7 Transit Division Performance Measurements Report Fiscal Year 2012-13 Fourth Quarter Introduction The Orange County Transportation uthority (OCT) operates a countywide network of local, community,

More information

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary Prepared for the El Dorado County Transportation Commission Prepared by The El Dorado County Transportation Commission (EDCTC)

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Creating Sustainable Communities Through Public Transportation

Creating Sustainable Communities Through Public Transportation Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg

More information

Chapter 3. Burke & Company

Chapter 3. Burke & Company Chapter 3 Burke & Company 3. WRTA RIDERSHIP AND RIDERSHIP TRENDS 3.1 Service Overview The Worcester Regional Transit Authority (WRTA) provides transit service to over half a million people. The service

More information

ADA PARATRANSIT PLAN. Twin Cities Area Transportation Authority 275 East Wall Benton Harbor, MI 49022

ADA PARATRANSIT PLAN. Twin Cities Area Transportation Authority 275 East Wall Benton Harbor, MI 49022 ADA PARATRANSIT PLAN Twin Cities Area Transportation Authority 275 East Wall Benton Harbor, MI 49022 Contact person: Veronica Burk Telephone: 269-927-2268 Fax: 269-927-2310 E Mail: Updated 09/11/12 PURPOSE

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Shared Use by Marriott of WMATA s Parking Garage at Prince George s Plaza Metrorail Station

Shared Use by Marriott of WMATA s Parking Garage at Prince George s Plaza Metrorail Station Planning, Development and Real Estate Committee Board Action Item VIII-B November 20, 2008 Shared Use by Marriott of WMATA s Parking Garage at Prince George s Plaza Metrorail Station Washington Metropolitan

More information

Public Meeting. December 19 th, 2018

Public Meeting. December 19 th, 2018 Public Meeting December 19 th, 2018 AGENDA Welcome Market Analysis Existing Services Peer Evaluation Outreach Summary Recommendations Discussion Next Steps MARKET ANALYSIS 3 Demographics 50% of population

More information

RACINE COUNTY PUBLIC TRANSIT PLAN:

RACINE COUNTY PUBLIC TRANSIT PLAN: RACINE COUNTY PUBLIC TRANSIT PLAN: 2013-2017 Recommended Transit Service Improvement Plan NEWSLETTER 3 SEPTEMBER 2013 This newsletter describes the final recommended public transit plan for the City of

More information

Regional Fare Change Overview. Nick Eull Senior Manager of Revenue Operations Metro Transit

Regional Fare Change Overview. Nick Eull Senior Manager of Revenue Operations Metro Transit Regional Fare Change Overview Nick Eull Senior Manager of Revenue Operations Metro Transit Committee of the Whole April 5 th, 2017 Today s Presentation Fare change goals and considerations Public engagement

More information

Board of Directors Information Summary

Board of Directors Information Summary Regional Public Transportation Authority 302 N. First Avenue, Suite 700, Phoenix, Arizona 85003 602-262-7433, Fax 602-495-0411 Board of Directors Information Summary Agenda Item #6 Date July 11, 2008 Subject

More information

About This Report GAUGE INDICATOR. Red. Orange. Green. Gold

About This Report GAUGE INDICATOR. Red. Orange. Green. Gold ATTACHMENT A About This Report The Orange County Transportation Authority (OCTA) operates a countywide network of local, community, rail connector, and express bus routes serving over 6, bus stops. OCTA

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

Transit Performance Report FY (JUNE 30, 2007)

Transit Performance Report FY (JUNE 30, 2007) Transit Performance Report FY 2006-2007 (JUNE 30, 2007) J ANUARY 2008 TRANSIT PERFORMANCE REPORT FY 2006 2007 (JUNE 30, 2007) Transit Performance Report I SSUED: JANUARY 2008 The Transit Performance Report

More information

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE 1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

MONTHLY OPERATIONS REPORT DECEMBER 2015

MONTHLY OPERATIONS REPORT DECEMBER 2015 MONTHLY OPERATIONS REPORT DECEMBER 215 Table of Contents DECEMBER 215 Section Page December Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

SRTA Year End Fixed Route Ridership Analysis: FY 2018

SRTA Year End Fixed Route Ridership Analysis: FY 2018 SRTA Year End Fixed Route Ridership Analysis: FY 2018 2018 Contents Introduction... 1 A. Key Terms Used in this Report... 1 Key Findings... 2 A. Ridership... 2 B. Fare Payment... 4 Performance Analysis

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Fixed-Route Operational and Financial Review

Fixed-Route Operational and Financial Review Chapter II CHAPTER II Fixed-Route Operational and Financial Review Chapter II presents an overview of route operations and financial information for KeyLine Transit. This information will be used to develop

More information

METROLIFT RESOURCE NOTEBOOK

METROLIFT RESOURCE NOTEBOOK METROLIFT RESOURCE NOTEBOOK PREPARED FOR THE METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY BY THE TEXAS A&M TRANSPORTATION INSTITUTE (TTI) DECEMBER 2014 TABLE OF CONTENTS 1. Introduction... 1 2. ADA

More information

Public Transit Services on NH 120 Claremont - Lebanon

Public Transit Services on NH 120 Claremont - Lebanon Public Transit Services on NH 120 Claremont - Lebanon Overview of Preferred Alternative April 12, 2011 Presentation Overview Study Goals Quick Review Methodology and Approach Key Findings Results of Public

More information

Follow-up to Proposed Fare Changes for FY2013

Follow-up to Proposed Fare Changes for FY2013 Finance & Administration Committee Information Item I-A January 19, 2012 Follow-up to Proposed Fare Changes for FY2013 1 of 22 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Approval of August 2019 Service Changes

Approval of August 2019 Service Changes Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

(This page intentionally left blank.)

(This page intentionally left blank.) Executive Summary (This page intentionally left blank.) Executive Summary INTRODUCTION The Cache Valley Transit District (CVTD) contracted with the team of Transportation Consultants, Inc. () and Fehr

More information

Department of Legislative Services Maryland General Assembly 2009 Session

Department of Legislative Services Maryland General Assembly 2009 Session Department of Legislative Services Maryland General Assembly 2009 Session SB 650 FISCAL AND POLICY NOTE Senate Bill 650 (Senators Pipkin and Astle) Finance and Budget and Taxation Medevac Helicopter Improvement

More information

October REGIONAL ROUTE PERFORMANCE ANALYSIS

October REGIONAL ROUTE PERFORMANCE ANALYSIS October 2018 2017 REGIONAL ROUTE PERFORMANCE ANALYSIS The Council s mission is to foster efficient and economic growth for a prosperous metropolitan region Metropolitan Council Members Alene Tchourumoff

More information

MONTHLY OPERATIONS REPORT SEPTEMBER 2015

MONTHLY OPERATIONS REPORT SEPTEMBER 2015 MONTHLY OPERATIONS REPORT SEPTEMBER 215 Table of Contents SEPTEMBER 215 Section Page September Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

Jefferson Area Regional Transit Partnership (RTP)

Jefferson Area Regional Transit Partnership (RTP) Jefferson Area Regional Transit Partnership (RTP) AGENDA 4:00 p.m., Monday, October 30, 2017 Water Street Center, 407 E. Water Street, Charlottesville, VA 22902 Meeting Objectives: Orient RTP members,

More information

Matt Miller, Planning Manager Margaret Heath-Schoep, Paratransit & Special Projects Manager

Matt Miller, Planning Manager Margaret Heath-Schoep, Paratransit & Special Projects Manager DATE May 2, 218 Item #12 TO FROM GCTD Board of Directors Matt Miller, Planning Manager Margaret Heath-Schoep, Paratransit & Special Projects Manager MS SUBJECT I. EXECUTIVE SUMMARY This quarterly report

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Current Operations CHAPTER II INTRODUCTION DESCRIPTION OF TRANSPORTATION SERVICES

Current Operations CHAPTER II INTRODUCTION DESCRIPTION OF TRANSPORTATION SERVICES Chapter II CHAPTER II Current Operations INTRODUCTION This chapter provides an overview of Centre Area Transportation Authority (CATA). CATA is a joint municipal authority formed under the Municipal Authorities

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION th Street, Vero Beach, Florida, 32960

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION th Street, Vero Beach, Florida, 32960 Indian River County Transit Development Plan 2014 Annual Update Prepared By: INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION 1801 27th Street, Vero Beach, Florida, 32960 Tel (772)226 1672, Fax (772)

More information

A New Era of Transportation Solutions

A New Era of Transportation Solutions A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Community Feedback and Survey Participation Topic: ACCESS Paratransit Services

Community Feedback and Survey Participation Topic: ACCESS Paratransit Services Community Feedback and Survey Participation Topic: ACCESS Paratransit Services Fall 2014 Valley Regional Transit DEAR SURVEY PARTICIPANT, In summer 2014, staff from Valley Regional Transit and the transportation

More information

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES #118404v1 Regional Transit Authority June 19, 2006 1 Presentation Overview Existing Public Transit Transit System Peer Comparison Recent Transit

More information

Our Panelists SPEAKERS MODERATOR

Our Panelists SPEAKERS MODERATOR SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation

More information

Appendix A: Regional Fare Policy, SANDAG

Appendix A: Regional Fare Policy, SANDAG cover Appendix A: Regional Fare Policy, SANDAG BOARD POLICY NO. 029 REGIONAL FARE POLICY AND COMPREHENSIVE FARE ORDINANCE Purpose: To establish guidelines for setting a uniform, fair, and equitable areawide

More information