1 Community Outreach Report This Community Outreach Project was made possible by a Caltrans Community-Based Transportation Planning Grant. March 2010
2
3 Introduction The ultimate goal of the Brea Trails project is to create a 50-acre linear park, which will include a dual-tread bicycle trail and separate pedestrian path that will traverse the City from east to west for over 4 miles utilizing abandoned railroad rights of way, flood control channels, city property and easements. Purpose The purpose of the Community Outreach project was to conduct planning-related activities that encouraged community-based collaboration and consensus building through active public engagement. This project was funded by an $80,150 grant from Caltrans, under the Community Based Transportation Planning program. Methods Trails Task Force A Trails Task Force, reporting to the City s Parks, Recreation and Human Services Commission, was established to create awareness of the trail project and spearhead public participation in the trail planning and design process. The Task Force has held monthly meetings beginning in May 2009, and will continue to meet through May A total of 22 citizens attended the first meeting and the group soon jelled into a body of 13 dedicated participants. The members worked actively and enthusiastically to develop and implement three outreach activities. Community Outreach Report Page 1
4 Community Presentations First, ten group presentations were made by the Trails Task Force members to a variety of community organizations to provide information and build awareness, as well as to develop interest in the surveys. The following table shows the locations and audiences for these community presentations. Community Group/Event Date Location Attendance Rotary Club July 28, 2009 Community Center 30 Farmer s Market July 28, 2009 Brea Downtown 100 Senior Leadership Council August 10, 2009 Senior Center 8 Brea Fest August 14, 2009 Civic & Cultural Center 40 Pop Warner Grand Opening August 15, 2009 Sports Park 50 North O.C. Bicycle Coalition August 26, 2009 Fullerton Chamber of 12 Commerce Board Room Brea Community Services September 24, 2009 Community Center 30 Meeting Wellness Festival September 26, 2009 Community Center 80 City Council meeting presentation October 20, 2009 Brea Council Chambers Televised to all Brea residents Brea Business Expo October 9, 2009 Brea Downtown 50 Community Vision Workshops The Community Vision Workshops consisted of in-depth, planned activities designed to solicit participation and suggestions from the attendees. In order to be convenient to the most citizens, one workshop was held on a weekend (Saturday morning) and two others were held on a weekday evenings (Wednesday and Thursday). A total of 100 people attended the three workshops. The Community Vision Workshops were conducted by a professional facilitator funded by the grant, who planned and directed the activities. Trails Task Force members served as table captains to ensure that everyone had a chance to be heard. A representative from the National Park Service Rivers, Trails & Conservation Assistance Program presented a PowerPoint on successful trails around Southern California, which provided background and inspiration for the attendees. Next, the facilitator led three Community Outreach Report Page 2
5 hands-on open-ended exercises. At the conclusion of each exercise, a participant from each group shared the group s thoughts with the entire audience. Participants were asked to identify their top three priorities for the design of the trail. Workshop participants represented a diverse group of potential trail users including: Brea residents, residents of neighboring cities, avid bike riders, cyclist organizations, joggers, frequent walkers, hikers, high school cross country coach and alumni, teens and young adults, running club representatives, seniors, and an advocate for disability access. Different income levels and ethnicities were also represented. Community Outreach Report Page 3
6 The workshops included hands-on exercises where participants were able to specify amenities and design features that are important to them. Community Survey The Task Force helped develop a written survey consisting of 23 questions to gather community input about the trial and then personally helped distribute and collect completed surveys. The community surveys were distributed to Brea residents, businesses, organizations, homeowners associations and City employees residing in Brea. The surveys were also circulated through the Brea Family Resource Center, the Brea Senior Center, a local bike shop, as well as at several large community events such as Brea Fest. Task Force Front cover of 6-page Trails Survey Community Outreach Report Page 4
7 members also took them door to door in several neighborhoods near the trail route. The number of completed surveys received (220) was more than double the original goal (100). The data collected at the Workshops and from the surveys was tabulated and analyzed and is described in this report. These results will be presented to the Trails Task Force; the Parks, Recreation, and Human Services Commission; and ultimately to the City Council. The report and data are also being shared with the landscape architects to be utilized in the planning and design of the trail. Results Trail Safety Trail safety was expressed as a top concern in both the surveys and the Community Vision Workshops. At the Community Vision Workshops, public safety was listed at the number one concern of the participants. Strategies: a. As with all Brea parks, the Brea Police Department will patrol the new park. b. Provide emergency vehicle access by taking into account the width and weight of emergency vehicles. c. A Friends of the Trail group could conduct regular patrols and report maintenance or safety issues to the City Maintenance Services Department. d. Use of benches with dividers on the seats will prevent the trail from becoming a draw for homeless persons by limiting places to sleep along the trail. e. Direct architects accordingly. f. Conduct additional research. Community Outreach Report Page 5
8 Note: Other cities have experienced that the development of a trail correlates to a decrease in incidents of crime in the area. Recreational Facilities The recreational facilities provided by a trail were listed as high priority by survey respondents. Recreational facilities were also ranked as the 2 nd highest priority at the Community Vision Workshops. Residents believe it is very important to separate bicyclists from pedestrians. 25 Survey Responses Separate Trail Surfaces Benches Rest Areas Mileage Markers Workout Stations Strategies: a. Direct architects accordingly. b. Conduct additional research. c. Research grant opportunities to fund recreational facilities. Community Outreach Report Page 6
9 Landscape The third highest priority identified at the Community Vision Workshops was the landscaping of the trail. Residents expressed a desire to see native vegetation in the landscaping. Drought tolerant landscaping was also suggested as many people supported water conservation. Many expressed interest in keeping portions of the trail natural or as is. In fact, there was some concern expressed that the trail not be overlandscaped or over-designed. Strategies: a. Pursue native and drought tolerant landscaping. b. Direct architects accordingly. California poppy and sky lupine c. Conduct additional research. 25 Survey Responses Trees Native Plants Landscaping on Trail Shady Areas Flowers Community Outreach Report Page 7
10 Environmental Conservation Environmental conservation was listed as high priority at the three workshops, and mentioned frequently in survey responses. Comments included practicing water conservation, using solar-powered lighting, and making the trail low impact for the natural plant and animal habitats. There was a strong preference for environmentally responsible practices, where applicable. Strategies: a. Use solar lighting or other energy efficient technologies. b. Use recycled materials for benches and other features when possible. c. Implement sustainable design features. d. Direct architects accordingly. e. Conduct additional research. Public Art The residents discussed a desire to integrate public art into the trail. Strategies: a. The central section of the trail, where a plaza or Urban Hub may be located, has been identified as a desirable place for public art. This plaza could serve as a venue for outdoor art exhibits and art Art in Public Places gate on the LA River Trail classes also attracting new users to the trail. Community Outreach Report Page 8
11 b. Gates into the flood control channels could be replaced with gates made by artists, as has been done at the Los Angeles River Trail. c. Direct architects accordingly. d. Conduct additional research. e. Research grant opportunities for potential funding. Inspiration for rails and public art Trail Amenities Desired amenities include: shade, drinking fountains, rest and gathering areas, doggie stations (with pick-up bags and drinking fountains) and benches. Strategies: a. Direct architects accordingly. b. Conduct additional research. ADA Access Workshop attendees discussed the desire for handicap access to the trail and trail amenities (restroom, benches, drinking fountains). Pet drinking fountain Strategies: a. Direct architects accordingly. b. Conduct additional research. c. Research grant opportunities for funding sources. ADA accessible picnic table Community Outreach Report Page 9
12 Trail Connections Connections to other trails in the region, and neighborhood and school connections to the trail were frequently mentioned. There was a general desire to make the trail a viable method of transportation and commuting to both school and work destinations. Connectivity to Downtown Brea, Civic & Cultural Center and other City parks was also mentioned. Strategies: a. Direct architects accordingly. b. Conduct additional research, including communicating with the County and neighboring cities regarding their current and planned trails. c. Research grant opportunities for to fund various amenities. Lighting There were mixed responses on the topic of lighting for the trail. Some survey respondents mentioned that they wanted the trail lit at night for safety reasons. Some mentioned that the lighting should be low-level, so as not to enter the backyards of those living adjacent to the trail. Several people mentioned the use of solarpowered lighting as a means of saving energy. Strategies: a. Direct architects accordingly. b. Conduct additional research. Solar lighting option Community Outreach Report Page 10
13 Conclusion Nearly 750 people participated in the outreach project in some way- 400 attended community presentations, 100 attended workshops, 220 filled out surveys and 25 signed up for the task force. Community outreach is vital to the success of the trail, because it provides the opportunity for residents and other potential trail users to share their ideas and concerns on the trail design. This allows the architects to incorporate the desires of the community into the design. It also helps guide decisions on priorities for the trail and identifies potential challenges. The Caltrans Community Outreach Planning grant provided funding to conduct outreach activities, so no City General Fund was expended in implementing the project. Next Steps Encourage a two-way line of communication with the community Methods to encourage this open line of communication include: Brea Line Press releases Direct mail brochure to workshop participants and survey respondents Presentation to City Council Presentation to Parks, Recreation & Human Services Commission City Website Facebook and Twitter Note: The costs of these items will be covered by the grant. Community Outreach Report Page 11
14 Apply for a second Caltrans Community Outreach grant The City is applying for a second grant to continue outreach through the future phases of the trail project. This second grant could provide an opportunity for the Trails Task Force to transition into a Friends of the Trail group. Goals of the second grant funded project could be to build partnerships with local businesses and community groups, organize an opening ceremony for the first segment of the trail to be constructed, provide feedback on site plans as the trail develops in phases, and research innovate solutions to potential design challenges. Implementing Strategies Identified in Results Section City staff will work with the architects to ensure that the priorities identified in the outreach project are fully accounted for in the trail design. Additional research will be conducted to determine the best way to incorporate the identified priorities. Attachments Trails Task Force Roster Community Survey Survey Results Summary Community Outreach Report Page 12
15 Trails Task Force Roster 1. Alfonso Esparza, Brea resident 2. Jim Grosse, Planning Commission 3. Brett Whitaker, Two Wheeler Bike Shop Assistant Manager 4. Gilbert Arriola, City staff 5. Vance Bjorkland, Brea resident 6. Vince Buck, North OC Bike Coalition 7. Cecelia McLaughlin, TransVironmental Solutions 8. Michael Uyeno, Traffic Committee 9. Barbara Gossett, Caltrans 10. Larry Fleming, Brea resident 11. Stuart McFeely, Trails Manager for City of Whitter, Brea resident 12. Bill McMillan, PRHS Commission 13. Jim Donovan, National Park Service
16 City of Brea Trails Survey We need your help! The City of Brea is exploring a multiuse trail that could travel through the City, conveniently connecting people to neighborhoods, shopping, recreational, cultural and employment sites. The public is invited to share their ideas about such a trail via this survey. The City has received an $80,150 planning grant from Caltrans to fund a Trails Task Force to spearhead community involvement in the trail planning process, including this survey. The Task Force is hosted by the Parks, Recreation & Human Services Commission and includes representatives from City commissions, Two Wheeler Bike Shop, National Park Service, North Orange County Bike Coalition, St. Jude Medical Center, Brea MOM s Club and Brea residents. Additional grants toward acquisition and construction have been received and more applications are being submitted. Redevelopment Agency funds are also allocated to this project. These funds are separate from the City s General Fund, and legally cannot be used for City operations or ongoing services. The results of this survey will be used to assist with planning and designing the trail. Please answer all questions completely and check only one answer unless otherwise indicated. Your cooperation in completing this survey is greatly appreciated!
17 1. Please identify your age group. 15 and under or older What is your gender? Male Female 3. Do you have children under 18 in your household and if so, what are their ages? 5 years or younger 6 12 years years No children/not applicable 4. If trails existed in Brea, would you use them? Yes No Would others in your household use them? Yes No 5. How close would the trail have to be to your home/work for you to use it walking? Less than ¼ mile Less than ½ mile Less than ¾ mile Less than 1 mile Less than 2 miles I would use a trail in Brea regardless of the distance 6. How close would the trail have to be to your home/work for you to use it bicycling? Less than half a mile Less than one mile Less than two miles I would use a trail in Brea regardless of the distance 7. For which purposes would you use the trail? (Check all that apply) Recreation Fitness and exercise Commuting to work Commuting to school or children s school activities Commuting to shopping or errands Other (specify): 8. What would your primary activity be on the trail? Please rank in order of use (1 most frequent, 7 least frequent) Self: Walking/hiking Jogging/running Walking pet(s) Walking with small children in strollers Rollerblading Biking Other activity (specify): Other Adult in Household: Walking/hiking Jogging/running Walking pet(s) Walking with small children in strollers Rollerblading Biking Other activity (specify): Children in Household: Walking/hiking Jogging/running Walking pet(s) Rollerblading Biking Other activity: 9. How far would you bike on a trail each visit? ¼ mile ½ mile ¾ mile 1 mile 2 miles or more I would not bike on the trail. 10. How far would you walk on a trail each visit? ¼ mile ½ mile ¾ mile 1 mile 2 miles or more I would not walk on the trail. 11. If you used the trail to commute, what would be the approximate total round trip mileage? 12. When would you use the trail? (Check all that apply) Weekdays Weeknights Weekend days Weekend evenings 13. One idea is to have educational panels along the trail. Which would you prefer to see? Suggested topics include the following: (Check all that apply) Transportation history in Brea Native plants and animals along the trail Health and fitness Brea history Other suggestions:
18 14. Do you use trails outside of the City of Brea? If so, where? No Yes: 15. How often do you use trails? Daily 3 5 times a week 1 or 2 times a week A couple times a month Once a month A few times a year Never 16. What would you like to see along a trail? (Check all that apply) Benches Drinking fountains Pet friendly trails Lighting Landscaping Shade Agricultural fields Workout stations Minimal number of street crossings Native, drought-tolerant or California-friendly plants No added trees or plants; keep the maintenance and construction costs low Other (specify): 17. What type of surface(s) do you prefer when walking/running on a trail? (Check all that apply) Organic mulch (wood chips, etc.) Natural Dirt Decomposed granite (DG) Concrete Asphalt Crushed gravel Other (specify): 20. What suggestions do you have for a trail in Brea? What would you like to see on a trail in Brea? 21. Do you have any concerns about a trail in Brea? 22. Help us name a trail in Brea. The City is collecting your ideas. What is your idea for a name? 22. If you would like more information on upcoming Community Vision Workshops, please provide your first and last name and telephone number, address or street address. Thank you for your participation! 18. What type of surface(s) do you prefer when biking on a trail? (Check all that apply) Organic mulch (wood chips, etc.) Natural Dirt Decomposed granite (DG) Concrete Asphalt Crushed gravel Other (specify): 19. What is your general attitude toward trails in Brea? Please score based on the degree to which you agree (1 Strongly agree; 6 Strongly disagree) Trails do not add value to the community. Trails add value to the community as parks, open space and scenic breaks in the urban landscape. Trails provide opportunities for physical fitness and recreation. Trails provide mobility and are an alternative to streets. I would like to live near or next to a trail. I would not like to live near or next to a trail. If you have any questions or any ideas about the trail, please contact Emily Kuhn at (714) or emilyku@cityofbrea.net Please return your survey by November 30, 2009 via mail or drop off to: Economic Development Department Civic & Cultural Center 1 Civic Center Circle, 2 nd Floor Brea, CA 92821
19
20 CITY OF BREA Brea Trails Project Survey Comments Assessment Landscaping and Vegetation 18 respondents made comments that they would like the trail to be landscaped or decorative 19 respondents were interested in having the trail landscaped in native plants There were 7 respondents who thought the landscaping should be low-maintenance or who were concerned about the cost of maintenance 4 respondents were in favor of drought-resistant plantings 6 respondents wanted flowers in the landscaping 3 respondents wanted grassy areas 1 thought shrubbery would be good; 1 thought shrubbery could invite criminal activity 21 respondents wanted trees and 12 wanted shady areas Communal gardens were mentioned by 2 respondents Water and Facilities 9 respondents mentioned water fountains (for humans?) and 2 wanted water fountains for dogs or other pets Ponds and other decorative uses of water were mentioned by 2 respondents 5 respondents wanted rest rooms along the trail and 7 wanted trash cans Vending machines were recommended by 1 respondent 7 respondents wanted rest areas or pocket parks Work-out stations were mentioned by 3 respondents Mileage markers along the trail were suggested by 4 respondents 6 respondents were concerned about noise abatement, either for the homes along the trail or for the trail users (blocking traffic noise) Easy access, parking and playgrounds were mentioned by 1 or 2 respondents each There were at least 20 suggestions that the trail provide separation of paths for bikers from the walkers and runners
21 CITY OF BREA Brea Trails Project Survey Comments Assessment 10 respondents wanted benches and 2 thought that benches were an invitation for the homeless, vagrants and loitering 18 respondents want the trail to be lit at night, and 1 thought the lighting should be solar-powered 8 respondents wanted lighting for safety reasons Low-level lighting was suggested by 2 respondents 7 respondents want crosswalks at the intersection of the trail and streets 4 respondents want to walk their dogs on the trail while 6 respondents want dogs kept off the trail Doggie stations (pick-up bags and trash boxes) were suggested by 9 respondents 5 respondents want the trail opened to horses 5 respondents mentioned bringing animals or pets on the trail 5 respondents want to see native animals on the trail and 1 respondent wants native animals kept away from the trail Surfaces and Trails 3 respondents want soft surfaces for runners, and 4 respondents specifically mentioned decomposed granite 1 respondent voted for dirt and 1 for natural surfaces Concrete and asphalt were each mentioned by 1 respondent Mulch received 1 yes vote and 1 no vote 1 respondent wants a smooth trail surface Security and Emergency Response 35 respondents want to feel safe on the trail or were concerned about security for the homeowners along the trail 37 respondents were concerned about the trail attracting criminal behavior and how crime could be controlled
22 CITY OF BREA Brea Trails Project Survey Comments Assessment 4 respondents would like the Brea Police to patrol the trail and 3 respondents would like a security patrol from other sources 4 respondents thought that there should be a Police bike patrol Blue lights and/or call boxes (such as those on college campuses) were suggested by 8 respondents 2 respondents recommended closed circuit cameras on the trail 1 respondent thought there should be emergency signage with contact numbers along the trail Emergency vehicle access was mentioned by 1 respondent Links and Other Trails I love the Aliso Creek trail in Aliso Viejo. Something like that would be great. A loop would be nice if it is around 4 miles or so. The trail should connect to the Carbon Canyon Regional Park so that hikers can then go through to the (Chino Hills) State Park. Connection to other City trails Connection to the planned trail between Puente Street (Fullerton) and Puente Street (Brea) in 2010 Tie-ins to other local trails Rail trail, Union Pacific to La Habra, Whittier, San Gabriel River It would be nice if the trails connected so that you could travel from one end of the City to the other (north, south, east, and west) Trail (could) go anywhere The commuting between home, school, work and shopping is the most value Connect to Carbon Canyon Regional Park, Chino Hills State Park, Yorba Linda trails network, and Fullerton s 10 mile loop Similar to the trail at Fullerton Laguna Lake Park For it to connect with other city trails Make it feel like you re getting away from the city but make it connect to downtown Birch Street Currently, I run/walk Craig Park 2-3 times a week
23 CITY OF BREA Brea Trails Project Survey Comments Assessment Make it like the Fullerton Loop trail with large trees. Make it feel like you are not in the middle of suburbia. Native plants and trails that go up into the oil fields Connectivity to Downtown, Civic Center, Craig Park, Carbon Canyon, Chino Hills State Park, Brea Canyon and Tonner Canyon Somehow incorporate Brea Downtown at the beginning or end of trail to encourage business in that area Connecting to other trails would increase my usage. Extend existing proposal plan west to La Habra city limits [along Union Pacific rail line (old Red Car)] Other Comments (Quotes) In Favor of a Trail: I ve been waiting for the City to develop the railroad area. A peaceful walking area with flowers and benches and doggy bag dispensers would be great! It doesn t need to be fancy; just get vegetation and bike and separate walking trails in and go from there. Great idea can t wait! With the state of the economy in California and Brea, I would be pleased to have basic safe surfaces to walk on and take my dog. Can we have it soon? I want one. The more, the merrier. No (no concerns) very happy to have it and can t wait. Only that we work to have a trail and make it happen. None (no concerns) - I think this is an outstanding idea and the best use of this land Railroad right-ofway and existing maintenance roads along channels. No (concerns), excited for this to happen. Cost is always a concern though.
24 CITY OF BREA Brea Trails Project Survey Comments Assessment Against a Trail: Save the money for important things. Do we (Brea) need one more park! Now a trail come on! Ideally, yes; however, every day I see local businesses closing and wonder if funds could be used more effectively elsewhere for the city. My only concern is that some people will use the trail other than for recreation or exercise. Teenagers hanging out at night causing problems. Yes (has concerns), too much foot traffic behind my house. It s a waste of money and a white elephant. Security, graffiti, homeless, not enough lighting; should be no industrial access; high walls a must. I am concerned about negative activity. Noise, litter, graffiti, lack of security. That not enough people would use it.
Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights
September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles
More informationPublic Workshop #1 Results Report. October 31, 2017
Public Workshop # Results Report October 3, 07 Table of Contents Section : Introduction... 3 Section : Comment Card Responses... 4 Section 3: Additional Comments... 3 Section 4: Full Comment Summary...
More informationMEETING MINUTES District 1 Trail Planning Meeting 1
MEETING MINUTES District 1 Trail Planning Meeting 1 June 1, 2017 2:00 PM 3:30 PM City of Two Harbors 2:00 Introductions Attendees: Lisa Austin, MnDOT Bryan Anderson, MnDOT Jasna Hadzic-Stanek, MnDOT Justin
More informationState Park Visitor Survey
State Park Visitor Survey Methods, Findings and Conclusions State s Department of Recreation, Park and Tourism Management surveyed state park visitor and trip characteristics, and collected evaluations
More informationCity of Galion Park Satisfaction Survey Results
City of Galion Park Satisfaction Survey Results Dec. 5, 2016 Goal: To get feedback from the community on: 1. General satisfaction of city-owned parks 2. How to improve park facilities and recreation opportunities
More informationTrail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding
I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes
More informationTrail Feasibility Study
VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way
More informationIntroduction. Project Overview
Washington Blvd./Andora Widening Project Community Open House & Public Scoping Meeting Summary Wednesday, September 21, 2016 6:00 7:30 p.m. Vencil Brown Elementary School, Roseville Introduction On Wednesday,
More informationSevierville, TN. Technical Appendices
Sevierville, TN Technical Appendices 2017 2955 Valmont Road Suite 300 777 North Capitol Street NE Suite 500 Boulder, Colorado 80301 Washington, DC 20002 n-r-c.com 303-444-7863 icma.org 800-745-8780 Contents
More informationVillages at Buffalo Run East
Villages at Buffalo Run East Neighborhood Park Subhead to title page goes here. Public Design Meeting April 9, 2015 Capital Improvement Program Commerce City s $137 million CIP is the result of a 2013
More informationPOLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.
September 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Brewers Park and Clinton Park Renewal Concept Plans RECOMMENDATION THAT the
More informationChapter 6: POLICY AND PROCEDURE RECOMMENDATIONS
Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies
More informationSilver Lake Park An Environmental Jewel for the Citizens of Prince William County
Silver Lake Park An Environmental Jewel for the Citizens of Prince William County The Prince William Park Authority Mission Statement states: The Prince William County Park Authority will create quality
More informationIL 390 Station. Wood Dale Open House Summary 5/18/17
Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216
More informationRating: 5.0 (scale of 1-10)
95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear
More informationHudson Highlands Fjord Trail Draft Master Plan. April 29, 2015
Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation
More informationThe Future of the Road to Revolutions. A Battle Road Scenic Byway Public Forum November 9, 2010
The Future of the Road to Revolutions A Battle Road Scenic Byway Public Forum November 9, 2010 Who is the Battle Road Scenic Byway? Four Towns: Arlington, Lexington, Lincoln, Concord Minute Man National
More informationGreat Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17
WHAT? Great Wolf Resorts has identified Gilroy, California as a potential location for a new Great Wolf Lodge family resort and has entered into a 60-day period of exclusivity with the City and community
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationMVT Neighborhood Perception Survey Summary Results Covering Calendar Year 2017
MVT Neighborhood Perception Survey Summary Results Covering Calendar Year 2017 Survey Overview Launched January 2018 Circulated electronically and by hard copy via: MVT CID s Triangle Times newsletter
More informationTrail Use in the N.C. Museum of Art Park:
Trail Use in the N.C. Museum of Art Park: New Connections, New Visitors Jacqueline MacDonald Gibson, PhD Daniel Rodriguez, PhD Taylor Dennerlein, MSEE, MCRP, EIT Jill Mead, MPH Evan Comen University of
More informationMember-led Review of Cycling Infrastructure
Member-led Review of Cycling Infrastructure Survey Results: A1 Cambridge to Royston June 17 cambridgeshire.gov.uk Contents 1. Introduction... 3. About you... 3.1 Age... 3. What is your gender?... 3.3 Do
More informationCITY OF NEW HOPE 4401 XYLON AVENUE NORTH NEW HOPE, MINNESOTA Chair Wills called the meeting to order at 7 p.m.
CITY OF NEW HOPE 4401 XYLON AVENUE NORTH NEW HOPE, MINNESOTA 55428 Citizen Advisory Commission Regular Meeting CALL TO ORDER Chair Wills called the meeting to order at 7 p.m. December 13, 2016 New Hope
More informationRiver Parks Trail: Tulsa, Oklahoma
River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.
More informationAPPENDIX A: Survey Instruments
Three different surveys were conducted during the research phase of the NCHA Trails Study. One questionnaire was designed for elected officials and user groups (general public). The other two questionnaires
More informationLake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008
Lake Myra County Park Wake County, North Carolina Community Forum #2 June 12, 2008 Welcome and Introduction Meeting Agenda Welcome Introductions of Project Team Master Plan Process Community Forum #1 Updates
More information6/28/11 TELEPHONE (n=400, RDD) AND ON-LINE (n=6,294) SURVEY RESULTS
6/28/11 TELEPHONE (n=0, RDD) AND ON-LINE (n=6,294) SURVEY RESULTS Update Surveys An Institute for Consensus Building www.sri-consulting.org MASTER PLAN UPDATE 6/28/11 Quantifying the responses from the
More informationSt. John s Park Redevelopment Master Plan Public Engagement Report
St. John s Park Redevelopment Master Plan Public Engagement Report Prepared by HTFC Planning & Design October 2017 TABLE OF CONTENTS 1.0 Introduction........ 1 2.0 Stakeholder and Public Notification......
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationAlliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017
Alliant Energy Center Visioning Workshop Input Madison, WI July 2, 217 A neighborhood meeting was held on July 18 and 19 th, 217 to gather community feedback on the topics of connections, destination district,
More informationNew free City connector bus service
The Adelaide City Council invites engagement from the community about New free City connector bus service 99C City Loop and Adelaide Connector free bus services to merge: Project Summary Adelaide City
More informationROAD AND TRAIL PROJECT APPROVAL
ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:
More information5K, 10K, or Bike Ride. SPONSOR: 14th Annual PE Challenge. Central Park- Rancho Cucamonga Saturday, May 18,
: 14th Annual PE Challenge 5K, 10K, or Bike Ride -Presented by The Friends of the Pacific Electric Trail Central Park- Rancho Cucamonga Saturday, May 18, 2019 @6am Page 1 of 5 On behalf of the Friends
More informationWelcome to the future of Terwillegar Park a Unique Natural Park
Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationJefferson County Non-Motorized Transportation and Recreational Trails Plan 2010
Chapter 8: Goals and objectives Plan Update: The following update presents general principles, goals, and objectives related to non-motorized transportation facilities as a component of the overall transportation
More informationNOTE: YOU MAY COMPLETE THIS SURVEY ONLINE (USING THIS DOCUMENT TO VIEW MAPS AND GRAPHICS) AT:
for completing the Town of Beech Mountain Comprehensive Planning Survey. The information you provide in reply to the following questions will be used to help the Town develop a plan that will guide our
More informationWilds. Headwaters. Lakes. Oxbows. Falls
56 5 4 3 Wilds Headwaters Lakes Oxbows Falls 57 Zones It could be said the on-the-ground essence of this master plan appears within the next 6 pages of this report. As we learned in the preceding Cultural
More informationNational Recreation Trail Application for Designation
National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December
More informationRogue River Access and Management Plan Draft Alternatives
Rogue River Access and Management Plan Draft Alternatives The Rogue River Access and Management Plan was initiated in December, 2011 and is being led by Jackson County Parks (JCP) and Oregon Department
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationAppendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan
Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and
More informationNEW MEADOWS PARK PROPOSED MASTER PLAN
NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle
More informationWinterCityYXE Survey Report April 2018
WinterCityYXE Survey Report April 2018 Prepared for: CITY OF SASKATOON 222-3rd Avenue North Saskatoon SK S7K 0J5 Submitted by: FAST CONSULTING 117-3rd Avenue South Saskatoon, SK S7K 1L6 Contents Executive
More informationLogo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road
Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District
More informationThe Narrows Waterfront Park A Crown Jewel for Southern Brooklyn
The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn In New York, the unquestioned popularity of urban spaces such as Riverside Park, the High Line, Brooklyn Bridge Park and others has demonstrated
More informationPlaza Park, Village Park, and Community Clubhouse
Plaza Park, Village Park, and Community Clubhouse Agenda Introduction (10 minutes) Presentation (30 minutes) Project Background Master Plan Process Site History and Context Site Analysis User Group Summary
More information3.0 LEARNING FROM CHATHAM-KENT S CITIZENS
3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the
More informationNational Recreation Trail Update Form
National Recreation Trail Update Form Introduction Thank you for taking the time to complete this form. Your assistance will help ensure that the National Recreation Trail (NRT) database is complete and
More informationProject Description. Connect Cascade Locks: A Recreational Trails Plan for Economic Development. Introduction
Project Description Connect Cascade Locks: A Recreational Trails Plan for Economic Development Introduction Cascade Locks, a rural Oregon town of 1,100 residents, lies 45 miles east of the Portland metropolitan
More informationWaukee Trailhead Public Art and Amenities Project
Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection
More informationTable of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown
Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16
More informationWest Orange Trail. Clean, Green, Fun!
West Orange Trail Clean, Green, Fun! The West Orange Trail - when completed - will be a 36-mile, multipurpose recreational greenway containing a 14-foot wide paved surface to be enjoyed by walkers, joggers,
More informationDover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm
Dover Park Master Plan Community Design Event Tuesday, May 22, 5 7 pm Agenda I. Introduction / Overview 20 minutes II. Small Group Design Activity 60 minutes III. Small Group Report Out IV. Conclusion
More informationA CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A
A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973
More informationGeorgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.
Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide
More informationCOASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12
COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse
More informationNortheast Quadrant Distinctive Features
NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.
More informationWEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2
WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2 MONDAY, NOVEMBER 5, 2018, 6:00 P.M.; PARKS DEPT. CONFERENCE ROOM ATTENDEES: Lisa Dean Larry Gardner Duane Harding David
More informationMercer Island Town Center Stakeholder Meeting E. June 10, 2015
Mercer Island Town Center Stakeholder Meeting E June 10, 2015 DATE Tue. June 16 (5:30 7:30 pm) Wed. June 24 (5:30-7:00 pm) Council Chambers Tue. June 30 (5:30 8:30 pm) July 11/12 Thur. July 16 (5:30 7:30
More informationMember-led Review of Cycling Infrastructure
Member-led Review of Cycling Infrastructure Survey Results: Hills Road, Cambridge June 2017 0 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...
More informationBICYCLING WITH KIDS: LONG DISTANCE RIDES FROM BELOIT TO SUPERIOR
Newsletter OVER 20 YEARS OF ROCK TRAIL ADVOCACY August 2014. Please join us for our next meeting! BICYCLING WITH KIDS: LONG DISTANCE RIDES FROM BELOIT TO SUPERIOR by Troy Knudson Thursday October 26 th
More information2015 General Trail User Survey February 2016
2015 General Trail User Survey February 2016 Table of Contents Executive Summary 2 Project Background 2 Trail Town Program Background 2 Survey Background 2 Methods: 3 2015 General Trail User Survey 3 2015
More informationEstablishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.
RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,
More informationBlueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.
Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map
More informationConexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:
Corporate Profile Saskatchewan's largest and Canada's sixth largest credit union, Conexus has been serving its members for over 80 years. Today we manage more than $7.14 billion in funds and our 900 plus
More informationPort Gamble Shoreline Area Conceptual Trail Proposal
The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port
More informationLand Management Summary
photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the
More informationThe methodology and sample surveys have been developed through a partnership of: DCNR and the Secretary's Greenways Program Advisory Committee
Trail User Survey Workbook How to conduct a survey and win support for your trail Sample Surveys and Methods 2005 Rails-to-Trails Conservancy Northeast Regional Field Office 2133 Market St, #222 Camp Hill,
More informationEstimating Tourism Expenditures for the Burlington Waterfront Path and the Island Line Trail
A report by the University of Vermont Transportation Research Center Estimating Tourism Expenditures for the Burlington Waterfront Path and the Island Line Trail Report # 10-003 February 2010 Estimating
More informationMETRO FLEET FUNDING HUMAN RESOURCES
2018 FACT SHEET METRO FLEET METRO s overall revenue-producing fleet totals 235 vehicles: 144 large buses and 91 smaller paratransit buses. Some passenger vehicles are equipped with a hydraulic lift to
More informationRoyal Parks Stakeholder Research Programme 2014
1 Royal Parks Stakeholder Research Programme 2014 Park profile: Greenwich Park (Waves 1-3) January 2015 Technical note 2 This slide deck presents findings from three waves of survey research conducted
More informationTEMPE BEACH PARK - RECOMMENDATIONS
TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.
More informationTourism Impacts and Second Home Development in Coastal Counties: A Sustainable Approach
Tourism Impacts and Second Home Development in Coastal Counties: A Sustainable Approach Brunswick, Currituck and Pender Counties, North Carolina (Funded by North Carolina Sea Grant) Center for Sustainable
More informationMaking a River Segment Family and People Friendly: A Case Study of the Pemi River in the Plymouth Region
Making a River Segment Family and People Friendly: A Case Study of the Pemi River in the Plymouth Region Kenneth Evans, Plymouth Rotary Club Patrick Hummel, DIvision of Parks & Recreation; Larry Spencer,
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationTracy Ridge Shared Use Trails and Plan Amendment Project
Tracy Ridge Shared Use Trails and Plan Amendment Project Scoping Document Forest Service Allegheny National Forest Bradford Ranger District McKean, County, Pennsylvania In accordance with Federal civil
More informationNeedham Heights Neighborhood Association February Rail Trail Overview
Needham Heights Neighborhood Association February 4 2013 Rail Trail Overview Stone Dust Path, Devils River WI Needham Rail Trail Greenway: Working with the town to assist, advise and coordinate rail trail
More informationBirthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.
TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.
Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint
More informationSchoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.
COMMUNITY DESCRIPTION Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. The township is largely rural but has one main population
More informationPLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner
PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationZoPath Trail. Extreme Park. Group III. Brendan Pillar, Conor Coakley James Amendola, & Mark McDermott. May 4, 2006
ZoPath Trail & Extreme Park Group III Brendan Pillar, Conor Coakley James Amendola, & Mark McDermott May 4, 2006 HOW TO GET FROM THE TOWPATH S NORTHERN TRAILHEAD TO HERE? Bridging Two 1 st -Class Regional
More informationHemisfair Civic Park. Vision and Program Plan
Hemisfair Civic Park Vision and Program Plan OCTOBER 2013 Hemisfair Civic Park Vision and Program Plan Prepared under the direction of the Hemisfair Park Area Redevelopment Corporation. Planning assistance
More informationPark to Playa Trail. June 17, 2014
Park to Playa Trail June 17, 2014 Representatives: Park to Playa Trail Karly Katona, Deputy for Sustainability & Economic Development, Office of Supervisor Mark Ridley-Thomas David McNeill, Executive Officer,
More informationCHAPTER 1 INTRODUCTION MORENO VALLEY GENERAL PLAN 1. INTRODUCTION. 1.1 What is a General Plan?
1. INTRODUCTION 1.1 What is a General Plan? A General Plan is a comprehensive long-term strategy for the physical development of a city. It determines how land may be used and the infrastructure and public
More informationPIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION
PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with
More informationFY20 BUDGET PRESENTATION
FY20 BUDGET PRESENTATION Mission Statement: To provide for diverse recreational opportunities and amenities that enhance the quality of life for our residents and visitors to the City of Frederick through
More informationPerformance Clackamas Clackamas County Strategic Plan
June 2017 update Performance Clackamas Clackamas County Strategic Plan Strategic Goals and Milestones This is the June 2017 update to Performance Clackamas, the Clackamas County Strategic Plan. The plan
More informationTourism Impacts and Second Home Development in Pender County: A Sustainable Approach
Tourism Impacts and Second Home Development in Pender County: A Sustainable Approach (Funded by North Carolina Sea Grant) Center for Sustainable Tourism Division of Research and Graduate Studies East Carolina
More informationLangton Lake Park Implementation Planning Session One 6 June Attendees signed in
27 Attendees signed in Meeting summary Following an overview of the Parks and Recreation Renewal Program and the key directions of the Parks and Recreation System Master Plan, meeting participants were
More informationGreater Minnesota Regional Parks and Trails Commission Designation Application
Greater Minnesota Regional Parks and Trails Commission Designation Application General Section Designation Application #: 15-050D Date Submitted: 06/30/2015 Park or Trail Name: Perham to Pelican Rapids
More informationCHAPTER ONE LITERATURE REVIEW
CHAPTER ONE LITERATURE REVIEW LITERATURE REVIEW This chapter summarizes the most recently published community impact studies and articles that relate to multiuse trails. The review focuses on publications
More informationMechanized River Valley Access Public Engagement Report. April 2015
Mechanized River Valley Access Public Engagement Report April 2015 Table of Contents Background... 1 Stakeholder Consultation... 3 What We Heard... 4 Conclusion... 7 Background The North Saskatchewan River
More informationCITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES
CITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES The Parks and Recreation Commission convened in regular session on Wednesday, August 2, 2017, at 6:00 pm, in the
More information2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE
2.1 Item: VMC Sub-committee Report DATE: Tuesday, June 12, 2018 WARD: 4 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE FROM: Jason Schmidt-Shoukri, Deputy City Manager, Planning
More informationFirst Impressions. Ellinwood, Kansas. K-State Research and Extension in Partnership with The Dane G. Hansen Foundation
First Impressions Ellinwood, Kansas K-State Research and Extension in Partnership with The Dane G. Hansen Foundation Ellinwood 2010 Census Population 2,131 ( 1.5% since 2000) 13.6% college educated, 87.1%
More information