1 General Report of the Non-profit Organisation The Great Baikal Trail Summer Projects 2006 (compiled by Elena Lagutina from the reports of crew-leaders and project leaders) Dates Area of Work June June June June 4 20 June 5 July Park, Bolshoe Goloustnoe village Zaigraevski region, Atsagat village, Atsagat Datsan Angarsk town, Bolshoi Island, river Kitoi; the southern section of the island Park, Circular-Baikal Rail Road 110km Muiski region, Taksimo village. 18km along the Bodaibinski track on the bank of the river Total Local Russian Foreign volunteers people Main Work Conducted The principal aim of this project was the development of cross cultural communication between local residents and the international volunteer group. Tasks jointly carried out were; - clearing of litter from the lake shoreline. - cultural education lessons for volunteers (including needle-work, wood carvings, learning folk songs). - preparing papers on various topics relating to ecology and the preservation of the local natural environment km of trail completed in the local area Work carried out included; - ground and concrete foundation work for the continuing construction of a Buddhist stupa Project summary; - new trail built: 1 st section 50metres, 2 nd section 30m. - installed 2 wooden benches (height 70cm, length 2m, width 30cm). - toilet constructed. - cleared litter. 2 - set up a small rest area at 110km. - prepared an area for a campfire. - cleared litter Completed in the project was; - the building of a serpentine trail, 300m long. - the construction of 2 wooden and 9 stone stairways. - research and planning completed for future works essential for completion of Following the Sun trail. Note: The project was conducted with local children from
2 July July July July July July Aikta, a tributary of the river Kilyana. Park, Chivirkuiski bay, Monakhovo village Zmeevaya cove Severobaikalsk Region, Children s Camp Ekho on the Sludyanskie Lakes; 16km from Baikal skoe village. Severobaikalsk area, northeast shore of Baikal around Khakusi spa resort. Park, Listvyanka Bolshie Koti, in area around Srednyaya Valley Visiting group from Tahoe-Baikal Institute. the area Turka village, trail from Turka village to Goryachinsk village. The Centre for Youth Tourism & Excursions Project summary: - trail cleared of obstructions (trees & shrubs), 20km. - the upper section of trail marked. - raised walkways constructed in boggy areas. - sign boards put up. - litter collected from the beach In this project: - the volunteers successfully carried out transportation and erecting of 4 information posts (constructed from tree stumps) and 3 sign boards on a steep serpentine trail near the area of disused mine entrances. - 15km of trail (from the Ekho holiday camp Baikal skoe village) cleared of obstructive vegetation. - the trail bed was widened in several areas. - 7 information boards prepared for Ekho holiday camp. - work carried out with children at Ekho children s camp: 4 small trails set out, with total length of 250m Completed in this project was the construction of a suspension bridge over the mountain river Khakusi (bridge length 11m + additional 2.5m at the foundations, width 90cm, height of supports 5m) Project summary: - cleared and constructed 630m of trail. - rest area set up with 2 benches, table and awning. - essential structures completed (stone & wooden steps, small bridge, stairs to descend to the water). - litter collected m of trail built Project summary: - work carried out on 2.5km of trail, including construction of new trail bed (500m). - stairway of 9 stone steps built, 6 large stepping stones laid out in boggy section, 24 litter bins made from fencing wood, 3 rest areas set up. - litter cleared from all areas of the trail.
3 July July July 4 25 July 7 25 July 1 29 July 7 Barguzin Biosphere Nature Reserve, Davsha village. Park, Krokholinaya Bay Bolshoi Chivirkui river. Kabanski region, Tankhoi village, Baikal Biosphere Reserve, Osinovka river Park, Listvyanka to Bolshie Koti, in the area Visiting group Ust -Barguzin Forest Service, in the area Maksimikha village Project summary: - approximately 1km of trail cleared and repaired. - 1 table and 5 benches built. - dismantled and cleared dilapidated buildings within the grounds of the nature reserve. - cleared 12 carloads tree-cuttings & 10 carloads litter Work completed: - obstructive vegetation cleared from the trail path in areas that required such work (20km in total). - fallen trees cleared from trail path. - marked the entire trail. - sign boards made and erected. - raised walking platforms installed in boggy areas. - litter cleared from the beach The following work was completed: - more the 800m of new trail built. - obstructive vegetation cleared from trail path (700m). - trail re-routing which involved a high level of demanding ground work (200m). - various essential structures built, including: stair way, gutters and stone steps. - 2km of trail marked. - information board prepared and set up Project summary: - 750m of trail built. - essential structures were built including: - 4 stone stairways and 6m bridge m of trail built. - 5m stair way built, descending to the water. - obstructive vegetation cleared from trail path (400m) Project summary: - viewing area laid out. - obstructive vegetation cleared from trail path (150m). - new trail built leading to viewing area (10m and 5 stone steps). - table and benches installed. - information board prepared and erected.
4 Kabanski region, Tankhoi village, Baikal Biosphere Reserve, Osinovka river Pribaikal skij National Park, Listvyanka village Bolshie Koti, in the area Pribaikal skij National Park, Listvyanka village Bolshie Koti, in the area Srednyaya and Chernaya valley Baikalo-Lenaj reserve, Solntsepad valley the area Turka village, trail from Turka village to Goryachinsk village Project summary: - obstructive vegetation cleared from the trail path between the log cabin and the beach (2km) wooden and 30 stone steps prepared. - 2 bridges of 3m each built. - trail bed widened in those areas where such work was deemed necessary. - hazardous stones removed from trail path. - trail approach built leading to the bridges Project summary: - 750m of trail built. - obstructive vegetation cleared from the trail path leading to Chernaya Valley (4km). - essential structures built: a bridge, wooden stair way) Project summary: - In this project work was carried out on 2500m of trail of which 500m was newly built trail bed. - bridge constructed to Chernaya Valley. - litter cleared from all areas of the trail Project summary: - obstructive vegetation and fallen trees cleared from the trail path between Pokoinij cape and Solntsepad valley up to the crossing (7km). - 3 rest areas set up (including small tables, benches and areas for campfires). - trail marked (5km) Project summary: - 300m of trail built. - 5 stone structures built. - lake shore and embankment cleared of branches. - rest area set out Project summary (the children completed all of the planned work):
5 September Park, Listvyanka to Bolshie Koti, in the area (children between 6-14 years participated in this project). Severobaikal ski Region, the northeastern shore of Lake Baikal, 11km from the Khakusi spa resort, Cape Samdaki. Park, Barguzin village Chivirkuiski bay Total: - laid out stone crossings in boggy areas of the trail. - set up a rest area. - cleared litter from the area entire Srednyaya Valley - lessons and seminars were held with the children on subjects of ecology and conservation Project summary: - intrusive vegetation and other obstructions cleared from trail path. - trial bed widened where required. - existing trail cleared and extended leading to the caves along the shore line (650m). - clearing of existing trail along the shore line from the caves near Turali cape (150m). - steps built in areas of steep ascent/descent (55m). - railings installed at dangerous sections. - information boards prepared Project summary: - intrusive vegetation and other obstructions cleared from the trail path (3.5km) - 1 bridge built and 1 bridge repaired. - prepared firewood for forestry workers of Zabaikal ski National Park. - trail marked and cleared of fallen trees Cleared, constructed, repaired and marked approximately 90km of trail. The majority of this year s work focussed on constructing major structures (bridges and crossings, stone and wood stair ways, serpentines, etc). In addition rest areas were set up and information boards erected. Several projects were conducted jointly with groups of children. Litter was cleared and removed from the trail area during the course of most projects. In all projects, all volunteers (foreign, Russian and local) were taught and instructed on various topics regarding ecology and environmental conservation.
Path Warden Team Task Final Morham Bank Path Clearance Thursday April 16th Introduction
Path Warden Team Task Final Morham Bank Path Clearance p1 of 8 Path Warden Team Task Final Morham Bank Path Clearance Thursday April 16th 2015 Introduction The Path Warden Team Task for this month was
More informationReport on the Status of Conservation Actions at the UNESCO World Heritage Property around Lake Baikal (Russian Federation, 754) for 2015 SUMMARY
REPORT ON THE CURRENT STATE OF CONSERVATION OF THE WORLD HERITAGE PROPERTIES VOLCANOES OF KAMCHATKA, GOLDEN MOUNTAINS OF ALTAI, LAKE BAIKAL, VIRGIN KOMI FORESTS, WRANGEL ISLAND IN 2015 Report on the Status
More informationGBT Newsletter #4. In this edition: Summer The Great Baikal Trail the first system of nature trails in Russia built to international standards.
Summer 2005 GBT Newsletter #4 The Great Baikal Trail the first system of nature trails in Russia built to international standards. In this edition: Results and Possibilities for the Future: GBT 2005 Pg.2
More informationDraft Length 10 Thorness Bay to Cowes Chain Ferry
Draft Length 10 Thorness Bay to Cowes Chain Ferry Introduction The southern section of this length of coast is largely (mud and sand) beach edged with landslip. Landward of this is agricultural land with
More informationA link to heritage by connecting the community to its history.
In March 2015 the Board of Sentiers Chelsea Trails asked Chelsea Council to explore the feasibility of converting the winter rail corridor trail into a 4 season, non-motorized, multi-purpose trail. To
More informationLake Wissota Access Locations within the LaFayette Township. By Chad Martin
Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road
More informationDocument Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail
Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary for this Rule... 4... 6... 6... 6... 6... 8... 8... 8... 9... 10... 10 Glossary
More informationMP : Snowy Range Road and the Hoop Creek Bridge
MP 246 247: Snowy Range Road and the Hoop Creek Bridge This section of U. S. Highway 40 contains a Colorado treasure, a great photo op, and a historical landmark all at one stop. It s the Hoop Creek Stone
More informationWater quality management in the Lake Baikal region of Russia
Lomonosov Moscow State University Faculty of Geography Department of Environmental Management Water quality management in the Lake Baikal region of Russia Dr., Prof. Sergey Kirillov Dr., Prof. Mikhail
More informationTOWPATH MOWING GUIDELINES
TOWPATH MOWING GUIDELINES 24 September 2007 CONTENTS Introduction Scope and Status of Guidelines Influences on the Guidelines Health and Safety Biodiversity INTRODUCTION Towpath management is a key issue
More informationHead Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan
Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH 03588 Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan
More informationSUMMERCAMPSTAFF JOB DESCRIPTIONS
SUMMERCAMPSTAFF JOB DESCRIPTIONS 2018 Job Descriptions Camp Director Reports to: Scout Executive, Council Program Specialist. Responsible adult over 25, previous camp staff experience, National Camp School
More informationHOME OWNER PRE- DELIVERY INSTRUCTIONS
Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions
More informationTRAILS WHERE TO FIND TRAILS IN NOVA SCOTIA
TRAILs SIGNAGE Know the Signs............................ 44 WHERE YOU CAN RIDE Roads and Highways........................ 46 Designated Trails........................... 47 Established Trails...........................
More informationClearwater Lake Provincial Park. Draft Management Plan
Clearwater Lake Provincial Park Draft Management Plan Clearwater Lake Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 4 3. Park Attributes... 4 3.1 Location/Access...4
More informationAstoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019
Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform
More informationBibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring
Trail revitalising Western Australia Bibbulmun Track 973 km Cape to Cape Track 135 km Two of the world s great long distance walking tracks 1062 km Off-road cycle touring Trail revitalising 1. Framework
More informationNo 30 x 48 space is provided for a wheelchair under the picnic table.
ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:
More informationAccess Statement for Birling Gap
This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors.
More information2018 Extended Stay Camping RESERVATION REQUEST
2018 Extended Stay Camping RESERVATION REQUEST LOT # Confirm your reservation request by completing this form and returning it with a deposit in the amount of $600.00 ($250.00 lot deposit and $350.00 hydro
More information4. Improvement Plan Elements
4. Improvement Plan Elements Detailed description of all elements Leigh Creekside Park Improvement Plan Preliminary Conceptual Time Zone Layout Caveat: in the following plans and descriptions, specific
More informationDAY 1: Circular Quay to Greenwich Wharf
DAY 1: Circular Quay to Greenwich Wharf Total Distance: 14km Time: Approximately 5 hours Walk Notes in Six Sections Section Name Length Time 1:1 Circular Quay to Milsons Point Station 2.5km 50mins 1:2
More informationAPPENDIX 19-II. Ontario Trail Network Trailheads EAST-WEST TIE TRANSMISSION PROJECT AMENDED ENVIRONMENTAL ASSESSMENT REPORT
EAST-WEST TIE TRANSMISSION PROJECT AMENDED ENVIRONMENTAL ASSESSMENT REPORT APPENDIX 19-II Ontario Network heads Report. 1536607/2000/2219 Ontario Network heads in the n-commercial Land and Resource Use
More informationREGISTRATION PURSUANT TO SECTION 6 OF THE ENVIRONMENTAL ACT
REGISTRATION PURSUANT TO SECTION 6 OF THE ENVIRONMENTAL ACT NAME OF UNDERTAKING: The Long Range Riders Snowmobile Club proposes to undertake the following: Completion of a secondary snowmobile trail system
More informationWelcome to the Pacific Spas family!
Welcome to the Pacific Spas family! Your Pacific Spa has been engineered and built to the highest standards. Enjoy it regularly and experience the serenity and satisfaction that you ve wanted. The information
More information2017 Extended Stay Camping RESERVATION REQUEST
2017 Extended Stay Camping RESERVATION REQUEST Confirm your reservation request by completing this form and returning it with a deposit in the amount of $600.00 to the office of the Raisin Region Conservation
More information(/ 12 (/ 18 (/ 18 (/ 12 (/ 51 (/ 14 Æ%106 Æ% 106 Æ% 213 Æ% 104 Æ% 89 Æ% 26 Æ% 73 Æ% 59 Æ% 138 Æ% 92 Æ% 26 Æ% 67 Æ% 11 Æ% 11 Æ% 11. Æÿ H Æÿ Z.
WAUKESHA Existing Ice Age Trail, subject to change as it evolves toward completion Glacial Drumlin Rail-Trail 94 Ice Age Trail Rock, Walworth and Jefferson Counties Other Trail Unofficial Connecting Route
More informationAppendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan
Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the
More informationPARK HOST RESPONSIBILITIES
PARK HOST RESPONSIBILITIES Cedar Point Recreation Area, Gloster Recreation Area, Grelle Recreation Area, Jessica Hollis Park, Muleshoe Bend Recreation Area, Shaffer Bend Recreation Area and Turkey Bend
More informationMott Canyon Hazard Tree Incident
Mott Canyon Hazard Tree Incident Lake Tahoe Basin Management Unit August 25, 2016 On August 25, 2016 while constructing a trail, John, a member of the Tahoe Rim Trail Association (TRTA) working under a
More informationMount Adams gets ready for the world
Mount Adams gets ready for the world Words and pictures by Lee Manchester, Lake Placid News, October 7, 2005 NEWCOMB TWP. The best southern view of the High Peaks has gotten a whole lot more accessible
More informationMorning Copse near Maidstone, Kent acres of Ancient Woodland with a pond, bluebells and mature oak. 26,500 (freehold)
WOODS 4 SALE Phone: 01248 364 362 www.woods4sale.co.uk UK Woodland & Woods For Sale: Specialising in the Sales of Small Woodlands in England, Scotland and Wales for Recreation, Wildlife Conservation and
More informationNEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections
NEIGHBOURHOOD INSPECTIONS A pictorial guide for neighbourhood inspections A PICTORIAL GUIDE FOR NEIGHBOURHOOD INSPECTIONS CONTENTS Introduction 4 EXTERNAL AREAS Descriptions of estate standards Car parks
More informationBinley Woods Parish Plan - Analysis of Main Survey Responses Section D1 Sports Activities & Play Equipment
Binley Woods Parish Plan - Analysis of Main Survey Responses Section D1 Sports Activities & Play Equipment Question D1: How often do you use the following? Binley Woods Parish Plan Main Questionnaire 1
More informationChorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting
Chorley Park Trail Connection New Design Options Information Booklet Prepared for June 9, 2014 Public Meeting Chorley Park Trail Booklet June 9, 2014 Page 1 of 12 Our Goals for the Chorley Park Trail Connection
More informationAstoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019
Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two
More informationNature Track. 900m. 789m. 2 hrs 3.1 km Circuit. Hard track 238m. Blue Mountains National Park
Nature Track 2 hrs 3.1 km Circuit Hard track 238m Largely following the ridges around the top edge of Wentworth Falls, this track is incredibly beautiful. After taking in the great views at Edinburgh Castle
More informationIn the 1860s, with a movement to
Trains Railway crew on hand car, 1888. In the 1860s, with a movement to push for Canadian independence gaining ground, the British government passed legislation establishing the Dominion of Canada. At
More informationStudy module. East Skaftafell County Upper Secondary School in Skaftafell
Study module East Skaftafell County Upper Secondary School in Skaftafell Summary: In this project a group of people at the age 16 20 from East Skaftafell County Upper Secondary School (FAS) went together
More informationKielder Camping and Caravanning Site
Kielder Camping and Caravanning Site Introduction We strive to ensure that all visitors can enjoy our accommodation, facilities within Kielder Village Campsite. Our aim is to assist as best we can before,
More informationBOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010
BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010 Prepared for the: FISH & WILDLIFE COMPENSATION PROGRAM, NELSON, B.C. Prepared by: Marc André Beaucher CRESTON VALLEY WILDLIFE MANAGEMENT
More informationTwin Rivers Annual Report 2017
Twin Rivers Annual Report 2017 Summary of our volunteer efforts for 2017 Volunteer Hours 2249 hours Trail Miles Cleared 37 miles Vehicle Miles Driven 10198 miles Equipment Hours 79 hours Stock Days 193
More informationLeura Cascades to Gordon Falls Reserve
Leura Cascades to Gordon Falls Reserve 1 hr 15 mins 1.8 km One way Moderate track 200m From Leura Park to Gordon Falls Park, this diverse walk offers fantastic views of the Jamison Valley, as well as two
More informationAbbotts Falls Walking Track
Abbotts Falls Walking Track 3 hrs 7.3 km Circuit Hard track 329m This circuit takes you through both dry and moist forest, using a combination of walking trails and wider tracks. The side trip to the dammed
More informationGolden Hind Ship, The Quayside, Brixham Harbour, Devon TQ5 8AW
GOLDEN HIND MUSEUM SHIP BRIXHAM SCHOOL VISITS - FREQUENTLY ASKED QUESTIONS These FAQs will complement organiser s knowledge/established procedures and help them to plan a smooth visit. What should I do
More informationUNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level
UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS General Certificate of Education Advanced Level TRAVEL AND TOURISM 9395/32 Paper 3 International Business & Leisure Travel Services October/November 2013
More informationHMS Unicorn. Unique Ship / Remarkable History. Access Guide for HMS Unicorn HMS Unicorn Victoria Dock Dundee DD1 3BP
HMS Unicorn Unique Ship / Remarkable History Access Guide for HMS Unicorn 2018 HMS Unicorn Victoria Dock Dundee DD1 3BP www.frigateunicorn.org For SAT NAV directions please use our postcode 01382 200900
More informationLavenham Guildhall Access Statement
Lavenham Guildhall Access Statement The Guildhall of Corpus Christi, Market Place, Lavenham Suffolk CO10 9QZ T: 01787 247646 E: lavenhamguildhall@nationaltrust.org.uk Introduction The Guildhall is an early
More informationLocation Hazard Description Our Controls What you and your party need to do Outside
The following information is provided to assist visiting teachers and group leaders in completing their own risk assessment prior to their visit. It is not intended to be a replacement for a group leader-conducted
More informationA journey on the legendary Trans Siberian Railroad is one of the last great travel adventures in our world.
A journey on the legendary Trans Siberian Railroad is one of the last great travel adventures in our world. Beijing to Moscow, via Ulaan Baatar, the Mongolian capital, to Lake Baikal, Irkutsk,Novosibirsk,Yekaterinburg
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationBritain s oldest surviving water-balanced cliff lift
44 3.6 Saltburn by the Sea to Sandsend Map panels 3 and 4 Distance 17 miles (27½ km) Terrain mostly grass and field paths which can be muddy; some pavement, beach and shore Grade undulating route, with
More informationGOLDEN EARS PROVINCIAL PARK
GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing
More informationTHE CATEGORIES OF YOUR SPECIAL TRAIN ZARENGOLD
THE CATEGORIES OF YOUR SPECIAL TRAIN ZARENGOLD CATEGORY CLASSIC In the CLASSIC CATEGORY, there are 9 compartments per car. A compartment is shared by two guests. Berths are sized app. 70 190 cm and arranged
More informationDiscover. Ashhurst Domain. Nature s Playground
Discover Ashhurst Domain Nature s Playground Discover Step back into New Zealand, Aotearoa, of generations long gone. Discover lush natural surrounds echoing with rich birdsong in one of the Manawatu s
More informationMountain Peak Platform Top of Tyrol
Project Mountain Peak Platform Top of Tyrol Site Mount Isidor Stubai glacier in Tirol, Austria. 3200m. Accessible by cable car [8h 16h] Client Wintersport Tirol AG & Co, Stubaier Bergbahnen KG CEO Reinhard
More informatione-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY.
e-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY. By the project coordinator, Matt Barnes, Public Relations Officer for the Land Rover Owners Club of Australia (Sydney Branch) Inc One of the
More informationBuilding Permit Application
Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium
More informationJerusalem Bay Track (Cowan to Brooklyn)
Jerusalem Bay Track (Cowan to Brooklyn) 5 hrs 30 mins 13.4 km One way Hard track 4 654m This Cowan to Brooklyn Station walk is a popular section of the Great North Walk, with scenery ranging from foreshore
More informationMORAY COAST TRAIL - Notes on multi-use access
MORAY COAST TRAIL - Notes on multi-use access The Moray Coast Trail in the north-east of Scotland is one of Scotland s Great Trails. Approximately 50 miles long, the route links settlements between Findhorn
More informationSTRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall
East Dean & Friston PC Clerk Katrina Larkin Councillor Stephen Shing Councillor Daniel Shing Ian Johnson Principal Traffic and Safety Officer Kevin Morris Highway Steward STRENGTHENING LOCAL RELATIONSHIPS
More informationRoyal Burgh of Crail and District Community Council
Royal Burgh of Crail and District Community Council Minutes of Meeting held Monday, 30th March 2015 7:15pm. Crail Town Hall Welcome: Present: Jack Jarvis in the chair welcomed all present Jack Jarvis,
More informationISLAND PARK MANAGEMENT PLAN AND GUIDELINES
ISLAND PARK MANAGEMENT PLAN AND GUIDELINES - 2015 Introduction Island Park was a sand dune on the edge of Lake Huron 12,000 years ago. As the lake receded, it left a river channel, the Thunder Bay River.
More informationTRANS-SIBERIAN RAILWAY
PREMIUM 5D3N TRANS-SIBERIAN RAILWAY TOUR CODE: ENTSRS (Validity: Apr to 3 Oct 208) The unique Trans-Siberian journey from Moscow to Beijing on the Grand Trans-Siberian Express combines the most fascinating
More informationImmediately inform a member of staff or Event Team. They will initiate the appropriate procedures.
GROUP LEADERS Welcome to Wintercamp The Staff and Service Team welcome you to Wintercamp, and hope that you will have an enjoyable weekend. In the interests of safety please ensure that everyone in your
More informationYoung State Park. Charlevoix County, Michigan
Young State Park Charlevoix County, Michigan 1920 2010 Young State Park, on Lake Charlevoix (previously called Pine Lake) originated in 1920 when 100+ acres of land was donated to the State by Boyne City.
More informationThe Vyne Group Booking Information 2016
The Vyne Group Booking Information 2016 Follow in the footsteps of King Henry VIII, Catherine of Aragon, Jane Austen and Anne Boleyn. Visit the restored walled garden now a working kitchen garden providing
More informationTONGUE COMMUNITY COUNCIL INCORPORATING THE VILLAGES OF MELNESS, TONGUE & SKERRAY
TONGUE COMMUNITY COUNCIL INCORPORATING THE VILLAGES OF MELNESS, TONGUE & SKERRAY A meeting of the above was held on Tuesday, 17 th Connection, Tongue. September 2013 in North Coast Present Attending Patrick
More informationCitizens in Action is a non-profit, non-governmental, voluntary youth organisation based in Athens.
Summer Workcamps 20 13 TM 2013 Citizens in Action is a non-profit, non-governmental, voluntary youth organisation based in Athens. The aims of C.i.A are: To support and promote the idea of active citizenship
More informationDATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1
M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review
More informationTourism. Trends*Importance*Effects*Eco-Tourism
Tourism Trends*Importance*Effects*Eco-Tourism What is tourism? Tourism is the business of providing tours and services for tourists. Tourism is a service industry (tertiary) Growth in Tourism There are
More informationLittle Limestone Lake Provincial Park. Draft Management Plan
Little Limestone Lake Provincial Park Draft Management Plan Little Limestone Lake Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Background... 3 3. Planning context...
More informationRURAL LAND RESOURCES Case study area 1- the erosional features of the Dorset Coast.
Case study area 1- the erosional features of the Dorset Coast. Scene setting;- This area lies on the far south coast of England, between the settlements of Lyme Regis and Bournemouth, in the county of
More informationGeneral Rules for Use of Lands Managed by the. Middle Peninsula Chesapeake Bay Public Access Authority
General Rules for Use of Lands Managed by the Middle Peninsula Chesapeake Bay Public Access Authority As a visitor to lands managed by the Middle Peninsula Chesapeake Bay Public Access Authority (PAA),
More information482 :fi6 D34 --' v.i9 ~
'- SB 482 :fi6 D34 --' v.i9 ~ This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp
More informationWALTON MARSH RAILROAD TIES
WALTON MARSH RAILROAD TIES A PROJECT SURVEY BY COLIN FRYE Supervisor: Dr. Mark Holley The Walton Marsh Railroad Tie project involved the survey and study of six railroad ties discovered in and on the shoreline
More informationSection 5: Implementation
Section 5: Implementation HISTORICAL INFORMATION ON REVENUE AND EXPENDITURES PEND OREILLE COUNTY PARKS AND RECREATION The following table shows income and expenses for the Pend Oreille County Parks and
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More informationWINTERTON TOWN COUNCIL 52 West Street, Winterton, Scunthorpe, North Lincolnshire. DN15 9QF Phone: or
WINTERTON TOWN COUNCIL 52 West Street, Winterton, Scunthorpe, North Lincolnshire. DN15 9QF Phone: 01724 488085 or email clerk@wintertoncouncil.co.uk Minutes of the Meeting of Winterton Town Council held
More informationBUS 2 1. Introduction 2. Structural systems
BUS 2 1. Introduction 2. Structural systems 3. Staircases terminology, requirements 4. Staircases structures, historic review 5. Staircases 6. Expansion joints 7. Foundations terminology 8. Foundations
More informationLane Poole Reserve, Dwellingup Prospectus
Lane Poole Reserve, Dwellingup Prospectus Connecting people to parks WA Parks Foundation Lane Poole Reserve Prospectus Waking up to the sounds of the bush, the smell of the coals in the campfire and the
More informationTrans-Siberian by Private Train The Tsar s Gold Fact Sheet. Trans-Siberian by Private Train The Tsar s Gold Fact Sheet
A journey on the legendary Trans Siberian Railroad is one of the last great travel adventures in our world. Beijing to Moscow, via Ulaan Bator, the Mongolian capital, to Lake Baikal, Irkutsk,Novosibirsk,Yekaterinburg
More information1 Sycamore Adventure Risk Benefit Assessment for Sycamore Adventure
1 Sycamore Adventure 01384 813755 Risk Benefit Assessment for Sycamore Adventure Benefit of Adventure Play for Children & Young People: 1. Fun 2. Self Directed Play, opportunity to follow own interests
More informationNational Pass. 893m. 665m. 3 hrs 30 mins 4.6 km Circuit. Hard track 773m. Blue Mountains National Park
National Pass 3 hrs 3 mins 4.6 km Circuit Hard track 773m 4 This walk offers fantastic views of the Jamison Valley and the surrounding cliffs. Take time to explore the historic and very scenic ledge halfway
More informationUnlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe
Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate
More informationMaintaining beauty. Deception Pass State Park Current. Benches give way to enjoy a scenic moment, shelters host warm family gatherings, log
Deception Pass State Park The monthly e-newsletter helping keep the friends and neighbors of Deception Pass State Park in touch www.deceptionpassfoundation.org Maintaining beauty By Jackie French AmeriCorps
More informationMargaret N. Rees University of Nevada, Las Vegas,
Get Outdoors Nevada Public Lands Institute 6-30-2011 Nevada Interagency Volunteer Program: Helping Hands Across Public Lands Phase II: Quarterly Progress Report, Period Covering April 1, 2011-June 30,
More informationIs Your Campfire Safe?
Aviation and Forest Fire Management Is Your Campfire Safe? Main Menu The Threat of Fire Forest fires cost the people of Ontario millions of dollars. On average, about 200,000 hectares of forest lands are
More informationGuidance material for land use at or near aerodromes
Guidance material for land use at or near aerodromes Table of Contents Overview... 1 Glossary... 1 Types of Aerodromes... 1 Obstacle Limitation Surfaces... 2 Wildlife Hazard Management... 2 Notice of Intention
More informationKirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.
ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts
More informationFriends Meeting House, Hitchin. 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH. National Grid Reference: TL Statement of Significance
Friends Meeting House, Hitchin 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH National Grid Reference: TL 18282 29279 Statement of Significance A meeting house of 1957 designed by Paul V. Mauger and erected
More informationAccess Guide to Peel Castle
Access Guide to Peel Castle Manx National Heritage recognises that historic properties can present difficulties for people with disabilities. We have prepared an access guides for Peel Castle on St Patrick
More informationScenic Railway to Ruined Castle
Scenic Railway to Ruined Castle 7 hrs 30 mins 12.4 km Return Hard track 4 963m This is a very popular, full day walk, in the Katoomba Area, offering great views of the valley. The walk follows the edge
More informationCenter of Youth Voluntary Activities
Center of Youth Voluntary Activities Lithuania The organization was established in 1988 as a union of several student clubs. Deineta is an independent non-political voluntary service organization. We organize
More informationThe Clyde Walkway. Crossford to Falls of Clyde, New Lanark. Thanks to
Thanks to The Clyde Walkway is a partnership venture based on co-operation and agreement. North Lanarkshire, South Lanarkshire and Glasgow City Councils would like to acknowledge the help and support of
More informationWalking Track Classification System Parks and Wildlife Service
Appendix A Walking Track Classification Specifications Walking Track Classification System Parks and Wildlife Service This Walking Track Classification System is the outcome of a review of the track classifications
More informationRisk Assessment. This risk assessment is fully reviewed on and annual basis. Amendments and additions are incorporated as required.
KICC is a camping and activity centre located in Kingsdown, Nr Deal, Kent. Set in 40 acres of sloping open grassland the estate enjoys woodland boundaries and unparalleled sea views across the English
More informationTaiwan Vorbereitungskurs Hamburg-Berlin. Day : Arrival
1 Taiwan Vorbereitungskurs 14.08.-02.09.2017 Hamburg-Berlin Day 1 14.08.2017: Arrival After long weeks of preparation, 27 teenagers from Taiwan arrive at Hamburg. Christian went to pick the group up at
More informationGood Neighbour Guide A guide to being a good neighbour in Peachland
District of Peachland Good Neighbour Guide A guide to being a good neighbour in Peachland 1 Introduction to the Guide Good neighbours make great neighbourhoods. We each play a role in enhancing our neighbourhoods
More informationThe Swansea Canal & St Catherine s Church at Pontardawe
INSPIRING LANDSCAPES FASCINATING HISTORY & LEGEND GREAT WALKS IN THE SWANSEA VALLEY Clydach to Pontardawe along the Swansea Canal, at Pontardawe the railway that never was! Historic & Geographic Background
More information