Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

Size: px
Start display at page:

Download "Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting"

Transcription

1 Chorley Park Trail Connection New Design Options Information Booklet Prepared for June 9, 2014 Public Meeting Chorley Park Trail Booklet June 9, 2014 Page 1 of 12

2 Our Goals for the Chorley Park Trail Connection The City of Toronto, in partnership with the Toronto and Region Conservation Authority (TRCA), is working towards the construction of a new multi-use trail to connect Chorley Park to the Beltline Trail, Moore Park Ravine and the Don Valley Brick Works Park. Build a trail that is safe for a variety of users with differing abilities Protect existing butternut trees and minimize impact on other native trees Provide for natural environment protection and restoration planting Address erosion and stability of the slope Establish a long term and low maintenance solution This project is part of a larger plan to improve the Beltline Line Trail in terms of safety, protection and restoration of the natural environment, accessibility, connectivity and user experience. Chorley Park Trail Booklet June 9, 2014 Page 2 of 12

3 Context Map Chorley Park as it exists today (June 2014) North Benches Lookout Chorley Park Previously Disturbed Areas Tree Removal Area (completed winter 2014) Existing Footpaths (to be removed) Access to Don Valley Brick Works Park Flagstone Stairway Bridge Timber Stairs (to be removed) Existing Asphalt Trail (to be removed) * Tree Protection Zones for Butternut trees are normally required to be 25m, but we have obtained permission from the Ministry of Natural Resources to reduce this to 15m for this project. Chorley Park Trail Booklet June 9, 2014 Page 3 of 12

4 Timber Staircase and Footpaths to be Removed The existing footpaths, broken asphalt trail and deteriorating timber staircase at Chorley Park are not safe for public use and will be removed and converted to a natural forest condition. Rehabilitation of this existing infrastructure to bring it to up to standard and safe for public use is not possible at its current location because of the potential construction impact on the endangered butternut trees (which are Erosion on steep footpath Deteriorating timber staircase protected under the Ontario Endangered Species Act) as well as other important native trees. The existing network of numerous informal footpaths is harming the quality of the local forest environment, inhibiting healthy ground cover and contributing to erosion of the hillside. Effective forest restoration is achieved by concentrating users on a formal trail, keeping vegetation from being trampled. Old asphalt trail next to butternut trees Chorley Park Trail Booklet June 9, 2014 Page 4 of 12

5 What We Have Heard from the Community Over the past couple of months the City has received a high volume of passionate and concerned comments covering a range of opinions on this project: Cutting down trees was unnecessary destruction Asphalt is not appropriate We don t like stone retaining walls or wood fencing We don t want more strangers coming to our park We don t want more cars parking in this area We don t want to lose our toboggan run Use fewer switchbacks 3m is too wide for the path Make it a rustic, woodland pedestrian trail Hurry up with the native plantings Don t delay this project because of the negative reaction to tree removal An accessible connection to the Brick Works and ravine trail will clearly benefit the vast majority We look forward to easy bike access We are always glad to hear from residents who care about public parks and trails, and we will do our best to address concerns in this civic engagement process. Toronto Makes Trails for Everyone Diversity Our Strength Rain or shine, we want everyone to feel comfortable and safe using this trail connection: Walkers, hikers, joggers and runners Nature enthusiasts of all ages Child guardians with strollers Cyclists (walking their bikes) Dog owners People with physical disabilities (e.g. who use walkers, wheelchairs or canes) photo credit Lynn Friedman Chorley Park Trail Booklet June 9, 2014 Page 5 of 12

6 Asphalt is the Recommended Trail Surface While we appreciate many people have requested the trail be a more natural or granular surface, asphalt remains the recommended solution. Asphalt is a stable and firm surface that has some flexibility before cracking. It is also much less susceptible to rutting from storm water, or being slippery after rain, both of which are serious concerns on the Chorley slope. Although not obvious, many of the existing trails on Chorley slope are constructed of asphalt. Even now in disrepair, the asphalt is still protecting soils and tree roots in places. A reliably safe trail for all users on this slope requires a paved surface like asphalt. Wide Enough for Comfortable Passing We are not expecting crowds of users on this trail connection, but we do want to allow for comfortable two-way travel, passing, and people to easily walk side-by-side without going off-trail and thus harming the surrounding restored natural areas. A three meter width is recommended, which again is best served with paving to avoid puddles and rutting and to prevent widening of the trail into the natural environment caused by people walking around wet/damaged areas that occur more commonly on non-paved surfaces. Severe rutting in granular surface at Milkman's Lane (which is approx. 12% slope at its steepest) Example 2.5m wide trail Chorley Park Hillside Options We Want Your Feedback! On the following pages are summary descriptions of the main options for Chorley Park Hillside that the City and TRCA consider to be acceptable. We invite your feedback, in particular: 1. What features do you like or dislike about each option? 2. Are the options presented fairly? If not, what should be changed? 3. What other design possibilities would you suggest? All Options Include Restoration Consistent to all the options, each plan would include: Remove existing footpaths, broken asphalt trail and deteriorating timber staircase and convert those areas to a natural forest condition Plant slope with native trees and shrubs around any proposed infrastructure Implementation of a broader ravine management plan to address current hazards and target improvements to biodiversity and ecological integrity Chorley Park Trail Booklet June 9, 2014 Page 6 of 12

7 Chorley Park Trail Hillside Option 1 - No Formal Trails, Forest In this option the entire hillside would be converted back to a forest condition. Signs would be installed to indicate existing trails are closed. No infrastructure would be installed on the slope: complete area would be planted with native species trees and shrubs. Fences may be required to protect newly planted areas. Pros Cons Potential for improving the ravine environment Lowest cost and quickest implementation Some of the tree removals already completed would have been un-necessary No formal connection provided from Chorley Park to the Beltline Trail and the Brick Works Park. A network of informal footpaths will certainly be recreated, due to lack of formal trail and the desire of many park users to access the area. These footpaths will disturb the natural environment, including newly restored areas, and may be unsafe. Chorley Park Trail Booklet June 9, 2014 Page 7 of 12

8 Chorley Park Trail Hillside Option 2 Original Switchback Proposal A typical muti-use asphalt trail that traverses the slope in a zig-zag pattern at a moderate grade with many convenient connections and accessible and comfortable for a variety of users with differing abilities. Natural limestone retaining walls (up to 1.8m high (6ft) in some sections) and wood fencing used along the complete length. Trail Width: 3.0 meters Slope: moderate 6.8% grade. # of switchbacks: Five Connections from Chorley Park: Three 1. Path from Douglas Dr. to existing northern lookout 2. A new central steel staircase from the top of the slop to the first switchback 3. Existing south western limestone staircase from heritage driveway) Connections to the Beltline Tail: Two (north & south located close to existing foot trail connections) Pros 6.8% grade is a more reasonable than the alternative % as it will allow access for a variety of users with differing abilities Convenient south and north direct connections to the Beltline Trail 3m provide comfortable passing on the trail Cons Extensive retaining walls and fences may feel "overengineered" Planting space is limited to areas beside the trail and between switchbacks More switchbacks result in longer distance traveled Chorley Park Trail Booklet June 9, 2014 Page 8 of 12

9 Chorley Park Trail Hillside Options 3, 4 and 5 Modified Switchback These options also propose a typical muti-use asphalt trail that traverses the slope in a zig-zag pattern with natural lime stone retaining walls (up to 1.8m high (6ft) in some sections) and wood fencing used along the complete length. The key modifications between these and the original switchback proposal include: Eliminates proposed formalized path through upper park from Douglas Dr. at Astley Ave. 1. Removes proposed staircase from central area of park Reduced trail width from original 3.0 metres down to 2.5 metres Variations on the design of the switchbacks Trail Width: 2.5 meters Slope: Moderate 6.8% to steeper 8% grade. # of switchbacks: Three to five Option 3 shown here (4 & 5 are on the following page) Connections from Chorley Park: Two 1. Existing northern lookout 2. Existing southwestern limestone staircase from heritage driveway. Connections to the Beltline Tail: One - north direction (location varies) 2. Pros Reduction in trail surface width provides marginally more space for plantings Removing steel staircase reduces construction costs Cons Common to all three Modified Switchback options Narrower trail width is less comfortable for passing Less convenient connections at Chorley Park Less direct connection if going south on the Beltline Trail e.g. to Brick Works Not including the proposed staircase removes an entry point that is currently used Extensive retaining walls and fences may feel "over-engineered" Chorley Park Trail Booklet June 9, 2014 Page 9 of 12

10 Differences Between Options 3, 4 and 5 Op Description # of Switch backs Same design as original, but without south direction connection to Beltline Trail or connection to Douglas Dr. Extend 2nd last switchback from the bottom of the slope at the same grade (6.8%) and connect to Beltline trail further north Steeper switchback at 8% grade, with additional landings and extend 2nd last switchback Connections to the Beltline Tail 5 North-only, located near existing foot trail 3 North-only, located further north 3 North-only, located further north Slope Pros Cons Moderate at 6.8% Moderate at 6.8% Steeper at 8% Does not increase the requirement for additional tree removals More direct connection if going north on Beltline Trail More direct connection if going north on Beltline Trail Additional landings provide for rest stops. (see common "cons" on previous page) More tree removals may be required to extend 2 nd last switchback (species and health unknown) This area at the base of the mature native forest could otherwise be planted (e.g. hemlock, ferns). May be too steep for some users Option 4 Option 5 Chorley Park Trail Booklet June 9, 2014 Page 10 of 12

11 Chorley Park Trail Hillside Options 6 Staircase with Bike Trough In this option we aim to provide a reliable and safe trail connection without the need for a switchback by installing a staircase structure down entire slope. The design would include a bicycle trough on at least one side of the stairs to make it easier for cyclists to roll their bikes up and down. Staircase location and recommended materials to be determined Tread Width: 2.1m Slope: standard stairs # of switchbacks: None Connections from Chorley Park: One Connections to the Beltline Tail: One? Location of potential stairs and connecting trail to be determined Pros Provides a direct trail connection Staircase minimizes the size of the impacted area of the slope and provides additional area for tree and shrub planting Cons Limits accessibility for all but most able-bodied users Not accessible for strollers or wheelchairs Not as pet friendly (many dogs do not like walking on open-riser or metal stairs) Vegetation under the stairs would have to be managed Structure requires higher maintenance than an asphalt trail May require additional tree removals Will require additional geotechnical analysis and completely new design and tendering process Will likely eliminate connection to existing trail under bridge Steel and wood stairs may feel "over-engineered" Chorley Park Trail Booklet June 9, 2014 Page 11 of 12

12 Next Steps Following the June 9, 2014 public meeting, staff will use the feedback provided during the workshop to inform the finalizing of the trail design options in preparation for an online survey. Online Survey to Follow The online survey would include the updated and refined information presented in this booklet and a finalized set of options, which may include new designs suggested by you today. For each option the key question will be: On scale of 1-5, how acceptable is this option for Chorley Park Hillside? We will also ask participants to prioritize the options and provide additional feedback. The survey will be will be open to anyone. Participants will be asked questions about where they live in relationship to the park and measures will be taken to validate this information. We will also ask questions about trail user types and some very basic demographics. Measures will be taken in order to reduce the chance of repeat submissions. Survey results will be published as anonymous aggregated data. Interpretation of the survey results will be weighted to give priority to: those who live closer to the trail e.g. within a 15 minute walk those who use the trail most often e.g. more than once a week in warmer weather Weighting may also be adjusted to represent a fair balance of various types of Toronto trail users. We request your suggestions on what approaches you would recommend to make this proposed online survey and its interpretation as fair and transparent as possible. Time Line Going Forward* June 9, 2014 Public meeting Mid-June Staff review and publish results Mid-June Further consultation with Resident Associations on options and survey approach July 2014 Online Survey August 2014 City announces design decision Early 2015 Begin Implementation of design *dates subject to change We Would Like To Hear From You Public engagement is an important part of this project. You are invited to learn more and to share your insights and opinions at any time. For more information, please contact: Jason Diceman, Public Consultation Unit, City of Toronto Tel: Fax: jdicema@toronto.ca Wendy Strickland Natural Environment Specialist Urban Forestry, City of Toronto Tel: Fax: wstrick@toronto.ca Chorley Park Trail Booklet June 9, 2014 Page 12 of 12

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

March 25, 1994 To: Re: MEMO TO FILE MINOR AMENDMENT - PINERY PROVINCIAL PARK MANAGEMENT PLAN The following paragraph from page 5 of the Pinery Provincial Park Management Plan (ISBN 0-7729-0290-9) lnsects

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Brampton, Ontario REQ. no.: PLANNING, DESIGN & DEVELOPMENT COMMITTEE

Brampton, Ontario REQ. no.: PLANNING, DESIGN & DEVELOPMENT COMMITTEE ftorontoand REGION rv~ Conservation for The Living City May 22,2009 2I22V,5L CFN 42397 CLERK S DEPT. Mr. Peter Fay City Clerk, City of Brampton MAY 2 7 2008 2 Wellington Street West Brampton, Ontario REQ.

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Ammonite Falls Descent

Ammonite Falls Descent Trail Benson Creek Falls ABOUT THE SITE Today, people descend a steep ravine to reach the base of Ammonite Falls, which is one of the most soughtafter views in the park. Over the past several years, awareness

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

Attendance Presentation

Attendance Presentation TO The Community of Saanich FROM District of Saanich DATE January 30, 2017 RE Meeting Notes Haro Woods Jan 28th Community Engagement Goward House, 2495 Arbutus Road, Victoria BC Attendance In total, 18

More information

Permeable RECREATIONAL TRAILS

Permeable RECREATIONAL TRAILS SMART EARTH SOLUTIONS Permeable RECREATIONAL TRAILS GEOWEB GEOPAVE GEOTERRA Innovative Solutions for Designing & Building Trails. Trail Surface Stabilization The key to planning and building trails into

More information

FINCH HYDRO CORRIDOR TRAIL PROJECT

FINCH HYDRO CORRIDOR TRAIL PROJECT FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Walking Track Classification System Parks and Wildlife Service

Walking Track Classification System Parks and Wildlife Service Appendix A Walking Track Classification Specifications Walking Track Classification System Parks and Wildlife Service This Walking Track Classification System is the outcome of a review of the track classifications

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Peter Axelson. Beneficial Designs, Inc. Minden, NV Peter Axelson Beneficial Designs, Inc. Minden, NV Arroya Sit Ski Mono Ski Dynamic Seating Spring Assist Cross Country Ski Hand Bike Adaptive Canoe Seating Available from Chosen Valley Canoe Accessories

More information

Taylor Creek Park Management Plan Online Engagement - Summary

Taylor Creek Park Management Plan Online Engagement - Summary Objectives of Online Engagement Taylor Creek Park Management Plan Online Engagement - Summary Spread awareness of the creation of the Taylor Creek Park Management Plan. Provide an overview of the project.

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Kit Carson-Challenger Ridge Trail Project

Kit Carson-Challenger Ridge Trail Project Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

Mechanized River Valley Access Public Engagement Report. April 2015

Mechanized River Valley Access Public Engagement Report. April 2015 Mechanized River Valley Access Public Engagement Report April 2015 Table of Contents Background... 1 Stakeholder Consultation... 3 What We Heard... 4 Conclusion... 7 Background The North Saskatchewan River

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Form for Project Descriptions - December 2013 version! 1. Stone Valley Cooperative Recreation Area (SVCRA) Project Description

Form for Project Descriptions - December 2013 version! 1. Stone Valley Cooperative Recreation Area (SVCRA) Project Description Form for Project Descriptions - December 2013 version 1 Stone Valley Cooperative Recreation Area (SVCRA) Project Description The Stone Valley partners request that proposed work on land within the SVCRA

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017 Survey Summary Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017 1. Overview Between September 30 and November 6, 2017, the City of Toronto

More information

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report

More information

TOWPATH MOWING GUIDELINES

TOWPATH MOWING GUIDELINES TOWPATH MOWING GUIDELINES 24 September 2007 CONTENTS Introduction Scope and Status of Guidelines Influences on the Guidelines Health and Safety Biodiversity INTRODUCTION Towpath management is a key issue

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3 -- WORKSHOP REPORT -- Project: Client: Event: South Beach Basketball Court City of Fremantle Community Consultation Forum Date: 12 th November 2015 6:00pm 8:00pm Author: Joel Levin, Aha! Consulting Contents:

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

If we make accessibility an up-front consideration that guides our planning & design efforts.

If we make accessibility an up-front consideration that guides our planning & design efforts. Cindy Burkhour, MA, CTRS, CPRP AccessRecreationGroup@juno.com 616-560-2378 Accessibility invites more trail users & their $$ to your community! If we make accessibility an up-front consideration that guides

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s Recreation News O S U C o l l e ge F o r e s t s In this Issue: Welcome New tree identification posts... New Arboretum Trails New Interpretive Signs Ridge Trail Seasonal Closures Leave No Trace reminder

More information

Nature Track. 900m. 789m. 2 hrs 3.1 km Circuit. Hard track 238m. Blue Mountains National Park

Nature Track. 900m. 789m. 2 hrs 3.1 km Circuit. Hard track 238m. Blue Mountains National Park Nature Track 2 hrs 3.1 km Circuit Hard track 238m Largely following the ridges around the top edge of Wentworth Falls, this track is incredibly beautiful. After taking in the great views at Edinburgh Castle

More information

RIVER ACCESS STRATEGY

RIVER ACCESS STRATEGY RIVER ACCESS STRATEGY The River Access Strategy is a 10-year plan the City of Edmonton is developing to inform future programming, operations and infrastructure improvements that support access to the

More information

Supplemental No. 8 AGENDA ITEM #6.B Distributed 9/19/17

Supplemental No. 8 AGENDA ITEM #6.B Distributed 9/19/17 Supplemental No. 8 AGENDA ITEM #6.B Distributed 9/19/17 18 Sept, 2017 To: Los Altos Hills Mayor Waldeck and Members of the Los Altos Hills City Council Re: 27333 Ursula Lane request for pathway removal

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Waterfront Concept Plan: Community Survey Summary

Waterfront Concept Plan: Community Survey Summary Waterfront Concept Plan: Community Survey Summary Published April 20, 2016 #1100085 Introduction The survey was one component of the public consultation process endorsed by Council in October, 2015. This

More information

Terwillegar Park Footbridge and West End Trails Public Engagement Progress Report. August 2014

Terwillegar Park Footbridge and West End Trails Public Engagement Progress Report. August 2014 Terwillegar Park Footbridge and West End Trails Public Engagement Progress Report August 2014 BACKGROUND The Capital Region River Valley Park is North America s largest urban park, with a total area of

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: A1 Cambridge to Royston June 17 cambridgeshire.gov.uk Contents 1. Introduction... 3. About you... 3.1 Age... 3. What is your gender?... 3.3 Do

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES LEAVE NO TRACE PURPOSE Americans love the outdoors. Today, more than 300 million people visit America s national parks and another 150 million

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

Leura Cascades to Gordon Falls Reserve

Leura Cascades to Gordon Falls Reserve Leura Cascades to Gordon Falls Reserve 1 hr 15 mins 1.8 km One way Moderate track 200m From Leura Park to Gordon Falls Park, this diverse walk offers fantastic views of the Jamison Valley, as well as two

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan

Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan 2014 Review Our goal for 2014 had been to complete construction of a 2.5km loop trail (Figure 1) with scouting and possibly layout for the remainder

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

Recreational Carrying Capacity

Recreational Carrying Capacity 9 th Annual Caribbean Sustainable Tourism Conference Recreational Carrying Capacity Graham C Barrow What is Recreational Carrying Capacity? It s not about fixing absolute numbers of visitors/tourists that

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Access Guide for the Old Grammar School 2017

Access Guide for the Old Grammar School 2017 Access Guide for the Old Grammar School 2017 Manx National Heritage recognises that historic properties can present difficulties for people with disabilities. We have prepared an access guide for the Old

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

Table 3-7: Recreation opportunity spectrum class range by prescription. Recreation Opportunity Spectrum (ROS) Classes

Table 3-7: Recreation opportunity spectrum class range by prescription. Recreation Opportunity Spectrum (ROS) Classes Appendix F Table -7: Recreation opportunity spectrum class range by prescription. Recreation Opportunity Spectrum (ROS) Classes Prescription Primitive Primitive II Roaded Modified Rural Urban 111 - Primitive

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1 Introduction After the Love the Bay community-based

More information

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail

More information

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16

More information

Merritts Traverse. 1928m

Merritts Traverse. 1928m Merritts Traverse 3 hrs Hard track 5.8 km Circuit 4 167m This walk starts with a scenic journey to the top of the hill on the chairlift. Starting along Merritts Nature walk, this walk soon detours down

More information

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE 65-13-1 Use of Other Power-Driven Mobility Devices by Persons with Mobility Disabilities at State Park Facilities See Also: 28 CFR 35 Title

More information

Land Management Summary

Land Management Summary photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the

More information

Discussion Paper: Development of a Plan for Trails on Public Land

Discussion Paper: Development of a Plan for Trails on Public Land Discussion Paper: Development of a Plan for Trails on Public Land APRIL 2017 The purpose of this Discussion Paper is to summarize the status & issues relating to District trails and feedback to date, and

More information

PICTURE THE FUTURE. of Odell and Killarney Lake Parks! PUBLIC CONSULTATION SUMMARY. July 2017

PICTURE THE FUTURE. of Odell and Killarney Lake Parks! PUBLIC CONSULTATION SUMMARY. July 2017 PICTURE THE FUTURE of Odell and Killarney Lake Parks! PUBLIC CONSULTATION SUMMARY July 2017 TOP ACTIVITIES RECREATION MOUNTAIN SOCIAL WALKING ACTIVITIES CYCLING SNOWSHOEING BIKING SWIMMING GATHERINGS DOG

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

A summary of Draft Makara Peak Mountain Bike Park Master Plan

A summary of Draft Makara Peak Mountain Bike Park Master Plan A summary of Draft Makara Peak Mountain Bike Park Master Plan OVEMBER 216 Image: Peter Marshall 2 3 Introduction Since it was established in 1998, the Makara Peak Mountain Bike Park (Makara Peak) has grown

More information

Stainforth & Keadby Canal Installation of Multiuser Path

Stainforth & Keadby Canal Installation of Multiuser Path Stainforth & Keadby Canal Installation of Multiuser Path Introduction North Lincolnshire Council has entered into an agreement with Canal & River Trust to develop proposals to introduce a multiuser path

More information

Trail Use in the N.C. Museum of Art Park:

Trail Use in the N.C. Museum of Art Park: Trail Use in the N.C. Museum of Art Park: New Connections, New Visitors Jacqueline MacDonald Gibson, PhD Daniel Rodriguez, PhD Taylor Dennerlein, MSEE, MCRP, EIT Jill Mead, MPH Evan Comen University of

More information

Property access tracks

Property access tracks Property access tracks Planning, location, construction and maintenance The need for farm roads and tracks The efficient running of a property depends on, among other things, ready access to various locations

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

USDA TRAILS STRATEGY PROGRAM

USDA TRAILS STRATEGY PROGRAM USDA TRAILS STRATEGY PROGRAM WRPI Program: English Peak Survey Jorge D. Briceño Southwestern Community College Internship Time Period: June 6, 2016 August 8, 2016 Advisor: Sam Commarto Recreation Officer

More information

1. Study the Ordnance Survey Map of Brodick, Isle of Arran.

1. Study the Ordnance Survey Map of Brodick, Isle of Arran. 1. Study the Ordnance Survey Map of Brodick, Isle of Arran. To find the map go to: > http://www.bing.com/maps/ > change maps type to Ordnance Survey Map from Road. > search for Glenrosa Water (it is near

More information

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals Introduction New rules under the Americans with Disabilities Act (ADA), Titles II and III, went into effect

More information

Nov. 19 th Public Workshop Summary

Nov. 19 th Public Workshop Summary On November 19 th, more than 60 community members attended an Open Space Matters workshop at the Linen Building in downtown Boise for over two hours. Participants learned about reserves, discussed the

More information

Rating: 5.0 (scale of 1-10)

Rating: 5.0 (scale of 1-10) 95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear

More information

River Parks Trail: Tulsa, Oklahoma

River Parks Trail: Tulsa, Oklahoma River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.

More information

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Summary Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Managed by the BLM Royal Gorge Field Office, Shelf

More information

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary Conservation Volunteers International Program 120 Village Square #9, Orinda, California 94563 USA www.conservationvip.org info@conservationvip.org Tel: (925) 228-5946 A Non-Profit 501c3 Tax Exempt Organization

More information

PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013

PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013 PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013 Venture Richmond proposes to develop a new main stage venue for the Richmond Folk Festival on property

More information

West Orange Trail. Clean, Green, Fun!

West Orange Trail. Clean, Green, Fun! West Orange Trail Clean, Green, Fun! The West Orange Trail - when completed - will be a 36-mile, multipurpose recreational greenway containing a 14-foot wide paved surface to be enjoyed by walkers, joggers,

More information

RECREATIONAL TRAILS MASTER PLAN

RECREATIONAL TRAILS MASTER PLAN District of West Kelowna RECREATIONAL TRAILS MASTER PLAN November 2013 This page is intentionally blank to support double-sided printing. Acknowledgements District of West Kelowna Staff Team Mark Roberts,

More information

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project R-16-26 Meeting 16-06 March 9, 2016 AGENDA ITEM AGENDA ITEM 6 Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project GENERAL MANAGER S RECOMMENDATIONS 1. Direct

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

Draft Strategic Plans for Coillte s eight Business Area Units ( )

Draft Strategic Plans for Coillte s eight Business Area Units ( ) Draft Strategic Plans for Coillte s eight Business Area Units (2011-2015) Response to Public Consultation from Mountaineering Ireland April 2013 1 Introduction Mountaineering Ireland welcomes this opportunity

More information