1 Appendix D Explanation of Route Changes Prepared by: Idaho Power Company W Idaho Street Boise, ID 80

2

3 Map Label ID 6 Route Reference Added November 0 Horn Butte Substation Added November 0 Horn Butte Eliminated June 00 Northern Approach to Grassland Map Number Reference from Appendix D Map Map Map Map Map Map - Map - Approximate Milepost Location relative to Nov. 0 and Routes Grassland Substation Route MP 9 Route MP 6.8 Route MP 6.8. Route MP - 8 Route MP 0- Route MP 6-8 Grassland Substation - Route MP IPC Route Change Description Route shifted north to follow Boardman to Slatt Existing Line Potential Project termination and interconnection to Boardman to Slatt existing transmission line Added Stay closer to Property Boundary/TNC Boundary Stay on Property Boundary Centerline Adjustment Eliminated Segment of June 00 POD IPC Basis for Route Change Avoids crossing north edge of The Nature Conservancy with Washington Ground Squirrel (WAGS) colonies Shortens overall length of transmission line and avoids WAGS colonies Connect to Substation Adjusted route per landowner discussion Adjusted route per landowner discussion Pivot irrigation, property line offsets and building offset distances, tower spotting analysis 0 surveys identified potential effects to WAGS colonies; alternative Longhorn Substation would preclude need to have a northern route to the proposed Grassland Substation

4 Map Label ID Route Reference Added November 0 Longhorn Substation Added November 0 Longhorn Map Number Reference from Appendix D Map Map Map Map Map Map Map - Map Approximate Milepost Location relative to Nov. 0 and Routes NA Longhorn MP 0-9 Route MP 0-6 Route MP Route MP 6-69 Route MP - Route MP - Route MP 8-90 IPC Route Change Description Potential Project termination and interconnection to Slatt to McNary existing transmission line Added Stay on north side of Slusher Canyon Shifted route north Remove angles in route Remove angles in route Shifted route south Shifted route north IPC Basis for Route Change Longhorn Substation would preclude need to have a northern route to the proposed Grassland Substation Connect to Substation Avoids crossing Slusher Canyon twice and stream crossings Engineering assessment to improve constructability Engineering assessment to improve constructability Engineering assessment to improve constructability Landowner request to avoid homes, avoids difficult terrain, less access roads, avoids access off of Indian Reservation Adjusted route to avoid canyon crossings

5 Map Label ID Route Reference Adjusted June 00/November 0 Glass Hill Map Number Reference from Appendix D Map Map Map Map Map - Map Map - Approximate Milepost Location relative to Nov. 0 and Routes Route MP 9-9. Route MP 99-0 Route MP 0-0. Route MP 08- Glass Hill MP MP Route MP - 8 Route MP 8- IPC Route Change Description Centerline Adjustment Centerline Adjustment Centerline Adjustment Route shifted east ~ miles Eliminated portion of Glass Hill Route shifted south Route shifted west IPC Basis for Route Change Better use of existing access roads, engineering assessment to improve constructability Avoid State Park, engineering assessment to improve tower locations Adjust alignment to follow WECC offset criteria from existing lines Adjusted line route to follow existing BPA line route and utilize existing access roads per landowner request, avoid adding access roads in timbered areas Difficult terrain forced alternative to tie back into at earlier point Avoid OSU Research Forest, adjusted per landowner discussion Difficult terrain, engineering assessment to improve constructability

6 Map Label ID Route Reference Eliminated June 00 Clover Creek Valley Eliminated June 00 Virtue Flat Eliminated June 00 Weatherby Map Number Reference from Appendix D Map Map Map Map Map Map Map 6 Map 6 Map 6 Approximate Milepost Location relative to Nov. 0 and Routes Route MP - 9 Route MP 9-. Route MP - Route MP.-68. Route MP - 6 Route MP 6-6 Route MP 8-8 Route MP.-8 Route MP.-90 IPC Route Change Description Eliminated Route Shifted route north Shifted route east Eliminated Route Centerline Adjustment Shift route north Shifted route west Centerline Adjustment Eliminated Route IPC Basis for Route Change No environmental advantage to alternative which also requires crossings of existing 0-kV line Difficult terrain, engineering assessment to improve constructability, follow WECC offset criteria from existing lines Adjusted route to reduce visibility from NHOTIC could not be sited to avoid occupied Sage-grouse lek -mile buffers Engineering assessment to improve constructability Improve crossing of and better utilize existing 8kV corridor Adjusted route per landowner discussion concerning avoidance of natural amphitheater Adjusted route per landowner discussion Difficult terrain, Rebuild a better option

7 Map Label ID 6 8 Route Reference Added November 0 Rebuild Added November 0 Malheur S Map Number Reference from Appendix D Map 6 Map Map -8 Map 8 Map 8 Map 8-9 Map 8-9 Approximate Milepost Location relative to Nov. 0 and Routes Route MP Route MP 0.- Route MP - Route MP - Route MP - 8. Route MP 8- Route MP - IPC Route Change Description 00kV line to be built within existing 8kV ROW; existing 8kV and lines to be rebuilt as double circuit structures in existing ROW Shifted route north and west Shifted route west Shifted route west Realignment across Malheur River Relocated Route to the east Added IPC Basis for Route Change Difficult terrain Avoid crossing occupied Sagegrouse lek -mile buffers, adjusted per landowner discussions, engineering assessment to improve constructability across canyon Avoid crossing occupied Sagegrouse lek -mile buffer identified in 0 survey season Engineering assessment to improve constructability Avoid sensitive resource areas Avoid areas inventoried as having wilderness characteristics, avoid ACEC, follow Vale District Utility Corridor Avoid areas inventoried as having wilderness characteristics, minimizes ACEC crossing

8 Map Label ID 9 0 Route Reference Added November 0 Double Mountain Eliminated June 00 Owyhee River Below Dam Map Number Reference from Appendix D Map 8 Map 9 Approximate Milepost Location relative to Nov. 0 and Routes MP - South of Malheur S MP 9- IPC Route Change Description Added Eliminated Route Map 0 MP -6 Shift route south Map 0 MP 80- Shift route south IPC Basis for Route Change Avoid private land/stay on BLMmanaged land Relocation of no need for alternative Avoid crossing EFU zoned land Avoid private land, follow WECC offset criteria from existing lines

9 KLICKITAT COUNTY 0kV 0kV kv kv BENTON COUNTY 00kV 00kV 0kV BOARDMAN 00kV ID 8 LONGHORN SUBSTATION 0 00kV Umatilla Army Depot kV kV 00kV ID 6 00kV 0kV Naval Weapons System Training Facility 8 9 MP 0 UMATILLA COUNTY ID ID 00kV 6 HORN BUTTE SUBSTATION GRASSLAND SUBSTATION MORROW COUNTY ID ID 9 ID MP 0 CECIL 6 ID 8 9 MP 0 ID 6 kv 8 9 MP 0 ID MP 0 ID 6 OCTOBER 0 POD PROPOSED ROUTE \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

10

11 PENDLETON 0 ID 6 ID 0kV 0kV MP 0 UMATILLA COUNTY ID 0 ID MP ID MP 0 Confederated Tribes of the Umatilla Indian Reservation ID PILOT ROCK ID 8 MP MORROW COUNTY 9 \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

12

13 8 8 ID MP 90 ID 9 9 UMATILLA COUNTY 9 ID kV Wallowa-Whitman National Forest MP 00 8 ID Wallowa-Whitman National Forest UNION COUNTY ID MP 0 8 LA GRANDE 0 ID 9 6 ID ID kV 0 \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

14

15 8 9 ID ID 0 MP 0 6 ID Wallowa-Whitman National Forest UNION COUNTY 0 Wallowa-Whitman National Forest 8 9 MP 0 ID 0kV NORTH POWDER 6 BAKER COUNTY MP 0 GRANT COUNTY \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

16

17 0kV KEATING 0 BAKER COUNTY 9 MP 0 0kV ID 86 NATIONAL HISTORIC OREGON TRAIL INTERPRETIVE CENTER Wallowa-Whitman National Forest BAKER CITY 0kV ID ID MP kV 8kV 8kV ID \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

18

19 8kV MP 0 8kV 6 8 DURKEE 9 MP 80 ID MINERAL 8kV 8 BAKER COUNTY 8 86 WEATHERBY ID 0 ID 8 88 ID WASHINGTON COUNTY MP 90 MALHEUR COUNTY 9 9 LIME 0 \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map 6 of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map 6 of 0

20

21 9 9 LIME 96 9 BAKER COUNTY 98 0 HUNTINGTON 99 8kV MP 00 0 WASHINGTON COUNTY 0 MALHEUR COUNTY MP 0 09 ID BROGAN MP 0 ID \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map of 0

22

23 6 ID MP 0 WESTFALL ID MALHEUR COUNTY 6 0 VALE ID MP 0 HARPER ID ID 8 6 ID MP 0 0 \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map 8 of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map 8 of 0

24

25 0 ID 9 6 MP 0 PAYETTE COUNTY PARMA MP 0 8 CANYON COUNTY 0 0 MALHEUR COUNTY ID 8 9 MP ADRIAN MP kV ID MP 0 69 MP 0 9 HOMEDALE OWYHEE COUNTY APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map 9 of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd ID National Park Service Other Federal Private State 6 U.S. Fish and Wildlife Service 8 U.S. Forest Service 9 0 Map 9 of 0

26

27 8kV 8kV ID 6 8 MARSING NAMPA 8kV 8kV 8kV 8kV 9 MP 80 6kV ID MALHEUR COUNTY MP 90 00kV 9 CANYON COUNTY 8kV 8kV OWYHEE COUNTY MELBA HEMINGWAY SUBSTATION \Spatial\MXD\0_0_POD\AppendixD_RouteChanges_0600_00.mxd APPENDIX D ROUTE & SUBSTATION CHANGES JUNE 00 POD vs OCTOBER 0 POD Map 0 of 0 BOARDMAN TO HEMINGWAY 00kV TRANSMISSION LINE PROJECT OREGON-IDAHO NOVEMBER 0 0 Miles October 0 POD Routes 8/68kV Rebuild Route June 00 POD Routes June 00 POD June 00 POD Route Substation Substation October 0 Ten Mile Marker October 0 Mile Marker Existing Transmission Line City/Town State Boundary County Boundary Bureau of Land Management Bureau of Reclamation Department of Defense Indian Reservation National Park Service Other Federal Private State U.S. Fish and Wildlife Service U.S. Forest Service Map 0 of 0

28

Boardman to Hemingway Transmission Line Project Supplemental Siting Study

Boardman to Hemingway Transmission Line Project Supplemental Siting Study Boardman to Hemingway Transmission Line Project Supplemental Siting Study Prepared By Idaho Power Company 1221 West Idaho Street Boise, ID 83702 June 2012 Table of Contents 1 INTRODUCTION... 1 2 PUBLIC

More information

ROUTE ANALYSIS PROCESS

ROUTE ANALYSIS PROCESS ROUTE ANALYSIS PROCESS Progress to Date: 1. Recorded and labeled all routes received from PAT Meetings. 2. Determined opportunity, avoidance and exclusion areas crossed by PAT proposed routes. 3. Routes

More information

2.5.4 A L T E R N A T I V E S C O N S I D E R E D B U T ELIMINATED F R O M D E T A I L E D ANALYS I S

2.5.4 A L T E R N A T I V E S C O N S I D E R E D B U T ELIMINATED F R O M D E T A I L E D ANALYS I S 2.5.4 A L T E R N A T I V E S C O N S I D E R E D B U T ELIMINATED F R O M D E T A I L E D ANALYS I S Section 6.6.3 of BLM NEPA Handbook H-1790-1 (BLM 2008) provides that a suggested alternative to a proposed

More information

Boardman to Hemingway Transmission Line Project

Boardman to Hemingway Transmission Line Project Project Location Boardman to Hemingway Transmission Line Project West Idaho Street Boise, Idaho 0 Todd Adams, Project Leader Zach Funkhouser, Permitting (0) -0 (0) - tadams@idahopower.com zfunkhouser@idahopower.com

More information

comment@boardmantohemingway.com From: Sent: To: Subject: Attachments: Bill Thursday, March 12, 2015 9:32 PM comment@boardmantohemingway.com B2H Comments B to H Response.doc Hello, I am

More information

2018 MEDIA KIT CAPITAL PRESS. Frequency Weekly (Friday) Circulation 27,479. In-State Editors 2. ROP Splits Pre-Set Zones Pacific Inland

2018 MEDIA KIT CAPITAL PRESS. Frequency Weekly (Friday) Circulation 27,479. In-State Editors 2. ROP Splits Pre-Set Zones Pacific Inland 2018 MEDIA KIT CAPITAL PRESS Frequency Weekly (Friday) Circulation In-State Editors 2 ROP Splits Pre-Set Zones Pacific Inland Insert Splits Pre-Set Zones County Adams Clackamas Lane Douglas Curry Coos

More information

Appendix 5 Route Record Form Transcriptions

Appendix 5 Route Record Form Transcriptions Appendix 5 Route Record Form Transcriptions 80 Boardman to Hemingway Transmission Line Project South Project Advisory Team Mapping Session October 1, 2009 Route Record Form Name: Which mapping session

More information

Special Recreation Management Areas Extensive Recreation Management Areas Public Lands Not Designated as Recreation Management Areas

Special Recreation Management Areas Extensive Recreation Management Areas Public Lands Not Designated as Recreation Management Areas From the Proposed RMP: Special Recreation Management Areas SRMAs are an administrative unit where the existing or proposed recreation opportunities and recreation setting characteristics are recognized

More information

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose 1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose 1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

AREA OF CRITICAL ENVIRONMENTAL CONCERN RESPONSES TO COMMENTS ATTACHMENT 1. COMMENT LETTER INDEX

AREA OF CRITICAL ENVIRONMENTAL CONCERN RESPONSES TO COMMENTS ATTACHMENT 1. COMMENT LETTER INDEX COMMENT LETTER INDEX This appendix provides a list of each entity or individual who provided comments on the Federal Register Notice for the Bureau of Land Management s (BLM s) Areas of Critical Environmental

More information

Oregon Enterprise Zones

Oregon Enterprise Zones Oregon Enterprise Zones July 2011 Lincoln Florence* Lower Umpqua* Tillamook* String of Pearls S. Columbia Forest Grove/ Cornelius* Hillsboro North Urban Clackamas Co. Woodburn* Dallas/ Independence/ Monmouth*

More information

2015 BMIFC Annual Report

2015 BMIFC Annual Report Inside this issue: BLUE MOUNTAIN INTERAGENCY FIRE CENTER BMIDC 2 LA GRANDE AIR TANKER BASE 3 LA GRANDE FIRE CACHE 3 WASHINGTON DNR 4 BUREAU OF INDIAN AFFAIRS 4 OREGON DEPARTMENT OF FORESTRY 5 UMATILLA

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Small Business Earthquake CAT Document

Small Business Earthquake CAT Document Small Business Earthquake CAT Document The below guidelines are coded in the system. If you have any questions specific to earthquake during the application, please contact your Small Business Underwriter.

More information

2013 W-W Frequency Plan

2013 W-W Frequency Plan Group Name 1 Wallowa Whitman/ ODF Admin ( Selectable) 2 Umatilla Admin ( Selectable) 3 Wallowa WhitmanNorth End NEW ( Selectable) 4 Wallowa Fire Zone ( Selectable) 5 Snake River Corridor ( Selectable)

More information

Wilderness Areas Designated by the White Pine County bill

Wilderness Areas Designated by the White Pine County bill Wilderness Areas Designated by the White Pine County bill SEC. 321. SHORT TITLE. This subtitle may be cited as the `Pam White Wilderness Act of 2006'. SEC. 322. FINDINGS. Congress finds that-- The White

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Frizzell Creek Ranch Summerville, OR $1,400, ± Acres

Frizzell Creek Ranch Summerville, OR $1,400, ± Acres Frizzell Creek Ranch Summerville, OR $1,400,000 165± Acres 1 Introduction The Frizzell Creek Ranch is a beautiful 165± acre ranch located in northeast Oregon at the base of the Wallowa Whitman National

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Appendix D Airfield Ongoing Projects Alternatives

Appendix D Airfield Ongoing Projects Alternatives Appendix D Appendix D D.1 Introduction The set of alternatives for each of the airfield facilities was compared with respect to each other and the existing condition. 1 The screening and evaluation process

More information

AGENCY SCOPING MEETING

AGENCY SCOPING MEETING AGENCY SCOPING MEETING Environmental Impact Statement (EIS) Conducted for the Friedman Memorial Replacement Airport in the Wood River Region of South Central Idaho December 4, 2007 1:00 p.m. 4:00 p.m.

More information

Oregon Department of Education Office of School Finance August 5, Report: Edu Jobs Estimated Impact on State School Fund and District Detail

Oregon Department of Education Office of School Finance August 5, Report: Edu Jobs Estimated Impact on State School Fund and District Detail Oregon Department of Education Office of School Finance August 5, 2010 Report: Edu Jobs Estimated Impact on State School Fund and District Detail Assumptions: Edu Jobs award: $116,770,000 School district

More information

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011 Wallowa Falls Hydroelectric Project FERC Project No. P-308 August 2011 Prepared by: PacifiCorp Energy Hydro Resources 825 NE Multnomah, Suite 1500 Portland, OR 97232 For Public Review Wallowa Falls Hydroelectric

More information

PAD-US 1.1 (CBI Edition) Management Designations. National Parks (NPS) and National Park

PAD-US 1.1 (CBI Edition) Management Designations. National Parks (NPS) and National Park Noise Sensitive Areas Avoidance Criteria & Source PAD-US 1.1 (CBI Edition) Management Designations Falcon View "DESGINATE" Field Terminology Falcon View Display Category Boundary Waters Canoe Wilderness

More information

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. RECREATION Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. OPPORTUNITIES FOR SOLITUDE / QUIET TRAILS. One attraction

More information

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by

More information

Existing Resource Information

Existing Resource Information Botanical and Wildlife Vegetation alliances/wildlife habitats Grasslands annual/perennial Chaparral mixed/montane/chamise-redshank Riparian montane/valley foothill riparian Sierran mixed conifer Montane

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

Oregon s State Transient Lodging Tax

Oregon s State Transient Lodging Tax Oregon s State Transient Lodging Tax Program Description, Revenue, and Characteristics of Taxpayers Calendar Years 2004-2013 150-604-005 (Rev. 4-14) Cover Photo Credits: Multnomah Falls lavenderviolettes,

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

GRAIN BELT EXPRESS CLEAN LINE

GRAIN BELT EXPRESS CLEAN LINE GRAIN BELT EXPRESS CLEAN LINE ROUTE SELECTION STUDY Prepared For Clean Line Energy Partners LLC Prepared By Louis Berger 201 TABLE OF CONTENTS List of Figures... v List of Tables... vi Acronyms and Abbreviations...

More information

Dumont Dunes Special Recreation Management Area (SRMA)

Dumont Dunes Special Recreation Management Area (SRMA) Dumont Dunes Special Recreation Management Area (SRMA) RMA/RECREATION MANAGEMENT ZONE (RMZ) OBJECTIVE(S) DECISIONS Objective Statement: Designate this area as a Special Recreation Management Area. To manage

More information

Santa Cruz North Interior

Santa Cruz North Interior Santa Cruz North Interior The Santa Cruz North Interior planning area includes the area commonly referred to as the San Lorenzo Valley. The greatest amount of development occurs in the communities of Boulder

More information

DIGITAL TERRAIN AND VIEWSHED ANALYSIS CRATER LAKE NATIONAL PARK

DIGITAL TERRAIN AND VIEWSHED ANALYSIS CRATER LAKE NATIONAL PARK DIGITAL TERRAIN AND VIEWSHED ANALYSIS OF FINDING THE IDEAL CAMPSITE ALONG THE PACIFIC CREST TRAIL Source: Outdoor Travel Blog DON RYAN DIGITAL TERRAIN ANALYSIS GEOG 593 PROJECT OVERVIEW LOCATION HISTORY

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 8-83 Date Subject 8353 Trail Management Areas Secretarially Designated (Public)

More information

Aboriginal Traditional Knowledge

Aboriginal Traditional Knowledge Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use and is appreciative to all the communities who took time to share

More information

S Central Coast Heritage Protection Act APRIL 21, 2016

S Central Coast Heritage Protection Act APRIL 21, 2016 STATEMENT OF GLENN CASAMASSA ASSOCIATE DEPUTY CHIEF, NATIONAL FOREST SYSTEM U.S. FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE BEFORE THE UNITED STATES SENATE COMMITTEE ON ENERGY AND NATURAL RESOURCES

More information

Sudbury to Hudson Transmission Reliability Project

Sudbury to Hudson Transmission Reliability Project An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Back Country Horsemen of Idaho. Squaw Butte Chapter Emmett Idaho. Summary of Activities February Celebration Park Snake River Birds of Prey

Back Country Horsemen of Idaho. Squaw Butte Chapter Emmett Idaho. Summary of Activities February Celebration Park Snake River Birds of Prey Back Country Horsemen of Idaho Squaw Butte Chapter Emmett Idaho Summary of Activities 2016 Fun Rides & Membership Recruitment February Celebration Park Snake River Birds of Prey March Diamond Basin Silver

More information

Boardman to Hemingway Transmission Line Project

Boardman to Hemingway Transmission Line Project Recreation Boardman to Hemingway Transmission Line Project West Idaho Street Boise, Idaho 0 Todd Adams, Project Leader Zach Funkhouser, Permitting (0) -0 (0) - tadams@idahopower.com zfunkhouser@idahopower.com

More information

APPENDIX G. The WAP Conservation Landscape and Focal Areas

APPENDIX G. The WAP Conservation Landscape and Focal Areas APPENDIX G The WAP Conservation Landscape and Focal Areas Focal areas were identified as discrete landscape units using the natural basin and range geography of the Nevada landscape. These units were prioritized

More information

Appendix F Environmental Data for Alternative Route Evaluation

Appendix F Environmental Data for Alternative Route Evaluation Appendix F Environmental Data for Alternative Route Evaluation (This page intentionally left blank) Cooks Point 138-kV Transmission Line Project Appendix F Index to Appendix F Environmental Data by Alternative

More information

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions. ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current

More information

ARNOT - GUMENI CORRIDOR SELECTION REPORT

ARNOT - GUMENI CORRIDOR SELECTION REPORT ARNOT - GUMENI CORRIDOR SELECTION REPORT Compiled By: Tinny Makaringe Verified By: Route Selection Team Date: 24 October 2011 ARNOT - GUMENI PROPOSED 400KV POWELINE CORRIDORS Planning requires a 400kv

More information

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event Decision Memo 2015 Sun Valley Super Enduro & Cross-Country Mountain Bike Race Recreation Event USDA Forest Service Ketchum Ranger District, Sawtooth National Forest Blaine County, Idaho Background The

More information

A Brief Overview of the Rio Grande Compact 04/26/06

A Brief Overview of the Rio Grande Compact 04/26/06 A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer

More information

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report (FERC No. 14241) Recreation Resources Study Study Plan Section 12.5 2014 Study Implementation Report Prepared for Prepared by AECOM November 2015 TABLE OF CONTENTS 1. Introduction... 4 2. Study Objectives...

More information

Lewis and Clark National Historic Trail

Lewis and Clark National Historic Trail National Trails System Land and Water Conservation Fund FY2014 Lewis and Clark National Historic Trail Total LWCF Request: $ 3,130,000 Project Name Agency District # Tracts Acres Total Cost Columbia River

More information

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves

APPENDIX 3-I-B. Alternative Route Assessment Around Provincial Parks and Conservation Reserves EAST-WEST TIE TRANSMISSION PROJECT ENVIRONMENTAL ASSESSMENT REPORT APPENDIX 3-I-B Alternative Route Assessment Around Provincial Parks and Conservation Reserves Report No. 1536607/2000/2018 TABLE OF CONTENTS

More information

Nez Perce National Historic Trail. Land and Water Conservation Fund FY2014 Request

Nez Perce National Historic Trail. Land and Water Conservation Fund FY2014 Request FY2014 Request National Trails System FY2014 Total LWCF Request: $2,840,000 Project Name Agency District # Tracts Acres Total Cost Cow Island and Cow Creek BLM MT-1 2 779 $1,600,000 (in conjunction with

More information

±158 INDUSTRIAL ACRES

±158 INDUSTRIAL ACRES ±158 INDUSTRIAL ACRES EXCLUSIVE LISTING WEST CALDWELL, IDAHO wy 30 LOCATION The Property is located north of Simplot Boulevard at the corner of Roedel Avenue and Riverside Street in West Caldwell, Idaho.

More information

Rockin River Ranch State Park

Rockin River Ranch State Park Rockin River Ranch State Park Public Meeting No. 3 August 16 th, 2017 Arizona State Parks and Trails (ASPT) Welcome Executive Director Sue Black Park budget = $4 million Balance of recreation uses, environment,

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

2.0 Physical Characteristics

2.0 Physical Characteristics _ 2.0 Physical Characteristics 2.1 Existing Land Use for the Project The site is comprised of approximately 114 acres bounded by Highway 101 to the north, the existing town of Los Alamos to the east, State

More information

Santa Cruz North Interior

Santa Cruz North Interior Santa Cruz North Interior The Santa Cruz North Interior planning area includes the area commonly referred to as the San Lorenzo Valley. The greatest amount of development occurs in the communities of Boulder

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Table of Contents List of Figures...3 List of Tables...4 Introduction...5 Geographic Overview...5 Emergency Response Analysis...

Table of Contents List of Figures...3 List of Tables...4 Introduction...5 Geographic Overview...5 Emergency Response Analysis... D a m B r e a k A n a l y s i s o f E m m e t t, I d a h o F o r F e d e r a l E m e r g e n c y M a n a g e m e n t P l a n n i n g Prepared for: FEMA, Office of Response Planning (Professor Guth) Prepared

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

Twin Rivers Annual Report 2017

Twin Rivers Annual Report 2017 Twin Rivers Annual Report 2017 Summary of our volunteer efforts for 2017 Volunteer Hours 2249 hours Trail Miles Cleared 37 miles Vehicle Miles Driven 10198 miles Equipment Hours 79 hours Stock Days 193

More information

EMERY COUNTY PUBLIC LAND MANAGEMENT ACT OF 2018 S. 2809/H.R. 5727

EMERY COUNTY PUBLIC LAND MANAGEMENT ACT OF 2018 S. 2809/H.R. 5727 EMERY COUNTY PUBLIC LAND MANAGEMENT ACT OF 2018 S. 2809/H.R. 5727 September 25, 2018 OVERVIEW The Emery County Public Land Management Act of 2018 is a significant step backwards for wilderness and conservation

More information

Labrador - Island Transmission Link Target Rare Plant Survey Locations

Labrador - Island Transmission Link Target Rare Plant Survey Locations 27-28- Figure: 36 of 55 29-28- Figure: 37 of 55 29- Figure: 38 of 55 #* Figure: 39 of 55 30- - east side Figure: 40 of 55 31- Figure: 41 of 55 31- Figure: 42 of 55 32- - secondary Figure: 43 of 55 32-

More information

Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands

Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands Introductory Note: This application is filed by PATH Allegheny Transmission Company, LLC

More information

12. Summary and Comparison of Impacts among Routes

12. Summary and Comparison of Impacts among Routes 12. Summary and Comparison of Impacts among Routes PSC REF#:155569 CHAPTER 12 This chapter provides a summary and comparison of various potential natural resource and social impacts for the three utility-proposed

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN Central Oregon Regional Transit Master Plan Volume II: Surveys and Market Research CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN Volume IV: Service Plan Appendices A-B July 213 Nelson\Nygaard Consulting

More information

APPENDIX 'A' Summary of Sage Grouse Petitions Submitted to the U.S. Fish and Wildlife Service (USFWS) 1 (As of January 8, 2004)

APPENDIX 'A' Summary of Sage Grouse Petitions Submitted to the U.S. Fish and Wildlife Service (USFWS) 1 (As of January 8, 2004) APPENDIX 'A' Summary of Sage Grouse Petitions Submitted to the U.S. Fish and Wildlife Service (USFWS) 1 (As of January 8, 2004) Petition Date: May 14, 1999 (74 pages) Species: Washington population of

More information

Maryland Transit Administration. Master Plan Alignment Trail

Maryland Transit Administration. Master Plan Alignment Trail Maryland Transit Administration Master Plan Alignment Trail Master Plan Alignment Byrne Kelly Concept Trail Analysis - North vs. South Trail Access & Crossings Aesthetics Master Plan Alignment Description

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

The Western Whitewater Association's. run at Pittsburgh landing has come and gone. Thanks to everyone

The Western Whitewater Association's. run at Pittsburgh landing has come and gone. Thanks to everyone W E S T E R N W H I T E W A T E R A S S O C I A T I O N RAPIDS OCTOBER 2016 2016 Confluence Run The Western Whitewater Association's 2016 confluence run at Pittsburgh landing has come and gone. Thanks

More information

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs What happened at this meeting? - Identified conservation easements - Discussed In-stream Flows -

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

MP : Blue Hill and the Disney Avalanche Path

MP : Blue Hill and the Disney Avalanche Path MP 252-253: Blue Hill and the Disney Avalanche Path This section of the Auto Tour includes a portion of the wagon road, one of Colorado s most famous avalanches and the remains of an old dam. Route Mile

More information

Federal Land and Resource Management: A Primer 1

Federal Land and Resource Management: A Primer 1 Federal Land and Resource Management: A Primer 1 RS20002 Coordinated by Ross W. Gorte Natural Resource Economist and Policy Specialist Environment and Natural Resources Policy Division December 22, 1998

More information

Cherokee And The Concow Dam

Cherokee And The Concow Dam Cherokee And The Concow Dam In 1853 Sol Potter, a school teacher from the Cherokee Nation in Oklahoma along with several students discovered gold in Butte County and named the area Cherokee. Others soon

More information

APPENDIX G - ARIZONA TRAIL RELOCATION ANALYSIS

APPENDIX G - ARIZONA TRAIL RELOCATION ANALYSIS APPENDIX G - ARIZONA TRAIL RELOCATION ANALYSIS TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 MANAGEMENT FRAMEWORK... 1 3.0 EXISTING TRAIL DESCRIPTION... 3 4.0 EVALUATION PROCESS AND CRITERIA... 4 5.0 ALTERNATIVE

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

@ 44 EXCLUSIVE LISTING BOISE COUNTY, IDAHO. Subject. Boise. Placerville. Horseshoe 52 Bend. Emmett. City. Star. Eagle. Garden.

@  44 EXCLUSIVE LISTING BOISE COUNTY, IDAHO. Subject. Boise. Placerville. Horseshoe 52 Bend. Emmett. City. Star. Eagle. Garden. Placerville HARRIS Horseshoe @ CREEK RANCH 52 Bend BLM EXCLUSIVE LISTING BOISE COUNTY, IDAHO Emmett Gem County Boise County Canyon County Ada County @ 16 Star Gem County Ada County Spring Valley @ 44 26

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE. (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014)

LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE. (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014) LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014) The Appalachian Trail is a way, continuous from Katahdin in Maine to

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

White Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas

White Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas White Oak Creek Recreational Use Attainability Analysis Summary of Findings Texas Institute for Applied Environmental Research Stephenville, Texas August 8, 2016 Sulphur Springs, Texas August 9, 2016 Mount

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information

11. Recreational Trails and Pathways Needs

11. Recreational Trails and Pathways Needs 11. Recreational Trails and Pathways Needs Background Walking, biking, hiking, in-line skating, canoeing, and other trail- and pathway-related activities are important to Boiseans. This importance is demonstrated

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information