A303 Stonehenge Amesbury to Berwick Down
|
|
- Liliana Elliott
- 5 years ago
- Views:
Transcription
1 Amesbury to Berwick Down Preliminary Local Traffic Information February 2018
2 Preliminary Local Traffic Information The following diagrams give a preliminary indication of how local traffic flows are forecast to change. The diagrams compare forecasts of traffic flow with and without the scheme during an average spring weekday in the scheme opening year (2026). The journey time between Amesbury and the to the West of Winterborne Stoke would be reduced by about 5 minutes (on a spring weekday) as a result of the scheme. Some of the traffic that currently uses the Packway and the /B390 through Larkhill and Shrewton would divert to the to benefit from this time saving. Traffic volumes along these parallel roads would reduce. Similarly more traffic is forecast to use the corridor between Salisbury and Longbarrow roundabout. During the summer school holiday period there are substantial delays of up to an hour for traffic travelling along the on Fridays, Saturdays and Sundays. These delays are the congestion caused by traffic volumes exceeding the capacity of the existing. About 20% of the traffic divert from the onto the adjacent local roads to try to avoid the queues, increasing traffic volumes and spreading the congestion onto these roads. The scheme would remove the capacity issue on the and hence remove this summer rat-running traffic from local roads. 2 Public Consultation - Preliminary Local Traffic Information
3 The following diagrams give a preliminary indication of how local traffic flows are forecast to change. Figure 1 shows the preliminary indication of changes in local traffic flows in opening year Figure 2 gives a description of the preliminary indication of changes in local traffic flows in opening year Public Consultation - Preliminary Local Traffic Information
4 Figure 1 Preliminary indication of changes in local traffic flows in opening year Tilshead Yarnbury Castle B Berwick Down Orcheston Shrewton Parsonage Down National Nature Reserve Winterbourne Stoke bypass Berwick St James B3086 River Till River Till viaduct Longbarrow junction Winterbourne Stoke Rollestone Camp Rollestone Crossroads Visitor Centre The Packway Western Larkhill Eastern Netheravon Figheldean Countess junction 1200 Durrington River Avon Amesbury -200 TRAFFIC FLOW Change in 2026 traffic flow forecast as a result of the scheme (two-way annual average daily traffic to the nearest 100 vehicles) < to to to to to 1000 > 1,000 Bulford -400 Solstice Park Bulford Camp A Deptford Contains Ordnance Survey data Crown copyright and database right 2018 A36 Little Langford Stapleford Stoford 2500 Great Durnford KEY Proposed route Proposed tunnel River crossing Junction location Tunnel entrance World Heritage Site Public Consultation - Preliminary Local Traffic Information
5 Figure 2 Description of preliminary indications of changes in local traffic flows in opening year Netheravon Deptford Tilshead / routes Summer rat-running reduced. 15% reduction in traffic north of the. Yarnbury Castle B390 Berwick Down Orcheston Shrewton Parsonage Down National Nature Reserve Detrunked /Winterbourne Stoke Through traffic removed from Winterbourne Stoke. Contains Ordnance Survey data Crown copyright and database right 2017 Winterbourne Stoke bypass Berwick St James A36 Little Langford Section of B3086 from Shrewton to Rollestone Traffic flows will reduce by up to half. Summer rat-running and congestion removed. Rollestone junction will prioritise movement between the south (Visitor centre/) and West (Larkhill). Stapleford River Till River Till viaduct B3086 Longbarrow junction Winterbourne Stoke Potential 20% increase in traffic south of. Stoford Rollestone Camp Rollestone Crossroads Visitor Centre Section of The Packway from Rollestone to Bulford Normal traffic levels will reduce by nearly 20%. Summer congestion will reduce by approximately 25%. Additional 25% summer peak traffic will remain on. The Packway Western Larkhill Eastern Great Durnford route Encourage more traffic to use the. Remove current hour long congestion delay during summer. Journey times 5 minutes quicker on a typical day. Cause of summer rat-running removed. Figheldean Countess junction Durrington River Avon Solstice Park Avenue, East of Meridian Way Summer rat-running removed. Bulford Solstice Park Amesbury Bulford Camp through Countess Junction Summer congestion at Countess junction removed. Negligible change in traffic volume on. A338 KEY Proposed route Proposed tunnel River crossing Junction location Tunnel entrance World Heritage Site 5 Public Consultation - Preliminary Local Traffic Information
6 If you need help accessing this or any other Highways England information, please call and we will help you. Crown copyright and database rights 2018 OS You may re-use this information (not including logos) free of charge in any format or medium,under the terms of the Open Government Licence. To view this licence: visit write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or This document is also available on our website at If you have any enquiries about this publication or call *. Please quote the Highways England publications code PR184/17 Highways England creative job number BED *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored. Printed on paper from well-managed forests and other controlled sources. Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number
A303 Stonehenge Amesbury to Berwick Down
A303 Stonehenge Amesbury to Berwick Down The case for the scheme Contents The A303 Corridor 4 Amesbury to Berwick Down 5 The case for the scheme 5 Map of the area 6 Objective 1: Transport 7 Objective 2:
More informationM56. New Junction 11a Preferred route announcement
New Junction 11a Preferred route announcement August 2017 New Junction 11a Preferred route announcement Introduction The New Junction 11A scheme introduces a new motorway junction to the motorway between
More informationA12 Chelmsford to A120 widening Have your say
A12 Chelmsford to A120 widening Have your say Contents Why do we need to improve the A12? 4 The options for improvement 6 Juctions 7 The options 8 How to respond 12 Public information events 13 We re developing
More informationM56. New Junction 11a Summary of the consultation report
M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme
More informationM2 Junction 5. improvements scheme. Preferred route announcement
M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More informationA30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement
A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement Introduction The Government s Road Investment Strategy, published in 2014, sets out the vision for the strategic road network
More informationin Northumberland Preferred Route Announcement September 2017
in Northumberland Preferred Route Announcement September 201 Why do we need this scheme? Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of
More informationTrans-Pennine Upgrade Programme. Preferred route announcement
Trans-Pennine Upgrade Programme Preferred route announcement Crown copyright and database rights 2016 Ordnance Survey 100030649 Trans-Pennine Upgrade Programme Preferred route announcement Introduction
More informationA303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement
A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationNorth West smart motorways 100 miles of extra lanes
North West smart motorways 100 miles of extra lanes September 2018 North West smart motorways 100 miles of extra lanes At Highways England we believe in a connected country and our network makes these
More informationM20 junction 10a improvement scheme. We want to hear your views
M20 junction 10a improvement scheme We want to hear your views March 2016 2 About us Highways England, formerly the Highways Agency, is a government run company. We are responsible for operation, maintenance
More informationM54 to M6/M6 Toll Link Road Public consultation
to M6/M6 Toll Link Road Public consultation 15 September 2017 to 13 October 2017 Contents Introduction 4 5 Why do we need this scheme? 6 Previous consultation 7 8 Modified options 9 Option B West 10 Option
More informationA358. Taunton to Southfields Dualling Scheme Public consultation
5 Taunton to Southfields Dualling Scheme Public consultation 1 31 3 61 5 0 3 3 43 5 3 50 5 M27 0 57 10 A2 7 54 23 054 Bo ISLE OF WIGHT ne ur 51 th ou m Weymouth 3 11 Fareham 3 4 Southampton 04 56 5 3 61
More informationToday we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.
Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear
More informationM56. New Junction 11a. Public consultation. January March If you need help accessing this or any other Highways England information,
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 Printed on paper from well-managed forests and other
More informationImproving the A47 Great Yarmouth junction improvements. Public consultation
Improving the Great Yarmouth junction improvements Public consultation March 2017 2 Improving the corridor: We are improving the around Peterborough, Norwich and Great Yarmouth to create better, safer
More informationDishforth to Barton Improvement Made Order The A66 Trunk Road (Scotch Corner Junction to Violet Grange Farm) Order 2014
Dishforth to Barton Improvement Made Order The A66 Trunk Road (Scotch Corner Junction to Violet Grange Farm) Order 2014 August 2014 An executive agency of the Department for Transport Contents The A66
More informationDishforth to Barton Improvement Made Scheme The A1 Motorway (Scotch Corner to Barton Connecting Roads) Scheme 2014
Dishforth to Barton Improvement Made Scheme The A1 Motorway (Scotch Corner to Barton Connecting Roads) Scheme 2014 August 2014 An executive agency of the Department for Transport Contents The A1 Motorway
More informationLeeming to Barton improvement scheme. Open for traffic
A1 Leeming to Barton improvement scheme Open for traffic Contents 4 Upgrading to motorway standard 6 Improving safety 7 Supporting economic growth 8 Connecting communities 10 The making of a road 12 Uncovering
More informationA303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016
Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities
More informationTrans-Pennine Upgrade Public consultation. Share your views
Trans-Pennine Upgrade Public consultation Share your views February 2018 Investing in your roads At Highways England we believe in a connected country and our network makes these connections happen. We
More informationM3 junction 9 improvements scheme
M3 junction 9 improvements scheme Have your say January to February 2018 M3 junction 9 improvement scheme Have your say Have your say M3 junction 9 scheme map This brochure provides a summary of the proposal
More informationAs part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is
As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity
More informationA63 Preferred Route Announcement
Safe roads, Reliable journeys, Informed travellers Castle Street Improvements A63 Preferred Route Announcement Preferred Route Announcement i An Executive Agency of the Introduction During Spring 2009,
More informationSaighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network
Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY
More informationStatement of Community Consultation (SoCC)
Statement of Community Consultation (SoCC) December 2017 Introduction 1. is inviting your feedback on its planned scheme to build a new 1.5 mile (2.4 km) dual carriageway link road, between the A45 Clock
More informationM4 Junctions 3 to 12 Smart motorway
Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic
More informationPublic consultation exhibition
Public consultation exhibition 2018 Welcome Improving reliability, safety, local life and regional growth Welcome to the A30 Chiverton to Carland Cross consultation, and thank you for your interest in
More information07/08 08/09 09/10 Total Carisbrooke Rest of Newport
1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the
More informationStonehenge World Heritage Site Committee Meeting Thursday 17 th March 2016 Antrobus House, Amesbury Meeting Minutes
Stonehenge World Heritage Site Committee Meeting Thursday 17 th March 2016 Antrobus House, Amesbury Meeting Minutes In attendance: Roger Fisher (Chair/Amesbury Town Council), Grant Lock (ICOMOS UK), John
More informationMEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.
MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for
More informationWhy build a third runway, when you can build a longer runway?
Why build a third runway, when you can build a longer runway? Cheaper. Simpler. Politically Realistic. Cheaper. Simpler. Politically Realistic. We recommend that the Government selects our extended runway
More informationTransport Assessment Appendix L: Match Day Impacts
Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix L: Match Day Impacts Prepared for West of England Councils September 2017 1 The Square Temple Quay
More informationProposed M9 Spur Extension. Kirkliston
Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced
More informationGuildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017
Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.
More informationThe Geography of Tourism Employment
The Geography of Tourism Employment Coverage: UK Date: 23 November 2012 Geographical Area: European (NUTS) Theme: People and Places Theme: Labour Market Key Points There were 2.7 million persons with jobs
More informationCouncillor Briefing on Elvetham Chase
Councillor Briefing on Elvetham Chase In partnership with the Calthorpe Estate, Wates Developments vision for Elvetham Chase is to provide an outstanding new community for Hart District that will become
More informationCapital & Counties. October 2007
Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing
More informationTHE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road
THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The A19 Trunk Road The A19 tends to live in the shadow of the more well known A1 it runs more or less parallel with. However, it is no less important
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationChapter 21 Route window W6 West Ealing station. Transport for London
Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationINFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES
Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion
More informationA5-M1 Link (Dunstable Northern Bypass) Explanatory Statement
A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More informationMemorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility
Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,
More informationSUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor
Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 2 For a local inquiry into: SUMMARY PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More information4 Are you responding on your own behalf or on behalf of an organisation or group?
RHA response to Highways England Lower Thames Crossing Consultation About you The following questions will help us to understand the range of people and organisations who have responded to this consultation
More informationEstimates of the Economic Importance of Tourism
Estimates of the Economic Importance of Tourism 2008-2013 Coverage: UK Date: 03 December 2014 Geographical Area: UK Theme: People and Places Theme: Economy Theme: Travel and Transport Key Points This article
More informationNew electoral arrangements for Wiltshire Council. Draft recommendations
New electoral arrangements for Wiltshire Council Draft recommendations February 2019 Translations and other formats: To get this report in another language or in a large-print or Braille version, please
More informationStonehenge World Heritage Site Committee
Present: Stonehenge World Heritage Site Committee Meeting on Tuesday 19 November 2013 10.30am at Antrobus House, Amesbury FINAL MINUTES Lady Elizabeth Gass (Chair), Beth Thomas (Stonehenge WHS Coordinator),
More informationEXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report
II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three
More informationNon-technical summary
Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationEmployment Characteristics of Tourism Industries, 2011
Employment Characteristics of Tourism Industries, 2011 Coverage: UK Date: 22 March 2013 Geographical Area: UK Theme: Labour Market Theme: People and Places Theme: Travel and Transport Theme: Economy Key
More informationA27 WORTHING/LANCING IMPROVEMENTS STAKEHOLDER MEETING JULY 2015
A27 WORTHING/LANCING IMPROVEMENTS STAKEHOLDER MEETING JULY 2015 Highways England 3511134AIK PTG / PIN - 551524 Draft 3511134AIK PTG / PIN - 551524 Prepared for Highways England Bridge House Walnut Tree
More informationStonehenge World Heritage Site Committee
Stonehenge World Heritage Site Committee Meeting on Tuesday 18 March 2014 10.30am at Antrobus House, Amesbury FINAL MINUTES Present: Lady Elizabeth Gass (Chairman), Beth Thomas (Stonehenge WHS Coordinator),
More informationProposed Lidl Food store West Hendford, Yeovil
Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location
More informationA140 study and Major Road Network
A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationBoxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure
Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction
More informationRail Sta s cs Compendium Great Britain Annual
Rail Stascs Compendium Great Britain 2017-18 Annual Publicaon Date: 4th December 2018 Next release: November 2019 Background This annual compendium publication contains a summary of the statistical releases
More informationIntegration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems
Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive
More informationEast Midlands Rail Franchise Public Consultation
Scarborough Leeds York Manchester Liverpool Doncaster Sheffield Barton-on -Humber Crewe Chesterfield Matlock Worksop Lincoln Mansfield Grimsby Cleethorpes Skegness Stoke-on-Trent Derby ottingham Grantham
More informationPARKING ENFORCEMENT IS NOW IN PLACE USE THE DESIGNATED CAR PARKS.
Wycombe Leisure Centre Address: Handy Cross, Off Marlow Hill, High Wycombe, Buckinghamshire, HP11 1UP, For Sat Nav: please enter HP11 1TJ M40 Roadworks: We regret to say that we have been informed that
More informationSky Temporary Car Park Transport Statement
001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility
More informationChapter 25 Route Window SE6 Plumstead portal. Transport for London
Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a
More informationRegional Investment Programme
Regional Investment Programme A27 Worthing and Lancing improvements Report on Public Consultation April 2018 Registered office Bridge House, 1 Walnut Tree Close, Guildford, GU1 4LZ Highways England Company
More informationSummary Proof of Evidence Traffic
Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction
More informationStonehenge World Heritage Site Committee
Stonehenge World Heritage Site Committee Meeting on 13 March 2012 10.30.30am at Antrobus House, Amesbury MINUTES Present: Lady Elizabeth Gass (Chair), Beth Thomas (Stonehenge WHS Coordinator), Amanda Chadburn
More informationBoard meeting
Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To
More informationWelcome. Great Yarmouth Third River Crossing. Norfolk County Council
Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage
More informationChapter 7 Route Window C6 Farringdon station. Transport for London
Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular
More information1. Summary of key points 2
Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).
More informationCentenary House, St Mary s Street, Huntingdon, Cambridgeshire, PE29 3PE. All main services provided Landmark building close to Huntingdon town centre
SERVICED OFFICES TO LET 01480 451578 ww.b Centenary House, St Mary s Street, Huntingdon, Cambridgeshire, PE29 3PE Rent: From 3,600 p.a. Size: From 11.19 sq m (120 sq ft) Serviced offices All main services
More informationWatts St westbound thru
Executive Summary At the request of the Hudson Square Business Improvement District, Sam Schwartz Engineering, DPC (Sam Schwartz) has completed a technical analysis of various congestion pricing and/or
More information2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007
June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:
More information15.0 TRAFFIC AND TRANSPORTATION
15.0 TRAFFIC AND TRANSPORTATION 15.1 INTRODUCTION This section of the EIS has been prepared by Tom Phillips + Associates and follows on from the Traffic and Transportation sections prepared in respect
More informationBath Corridor Works. Matt Barnes FGW Regional Development Manager. Chris Prior FGW Project Manager (Major Possessions Delivery)
Bath Corridor Works Matt Barnes FGW Regional Development Manager Chris Prior FGW Project Manager (Major Possessions Delivery) Objectives To work collaboratively with Network Rail and key stakeholders such
More informationDepeaking Optimization of Air Traffic Systems
Depeaking Optimization of Air Traffic Systems B.Stolz, T. Hanschke Technische Universität Clausthal, Institut für Mathematik, Erzstr. 1, 38678 Clausthal-Zellerfeld M. Frank, M. Mederer Deutsche Lufthansa
More informationPassenger Focus Bus Punctuality Project Bus Punctuality seminar, 19 September 2013
Passenger Focus Bus Punctuality Project Bus Punctuality seminar, 19 September 2013 The project and the seminar Improving punctuality is bus passengers top priority 1. So, two years ago, Passenger Focus
More informationSainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT
Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton
More informationOverview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016
Overview of Highway 37 Project Napa County Board of Supervisors December 20, 2016 1 Project Location-Caltrans District 4 2 SR 37 Corridor Features 2 to 4 lane 21 mile corridor traversing Solano, Sonoma,
More informationThe Point Roundabout Improvement Scheme
The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the
More informationHENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report
HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,
More informationINFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES
Harmondsworth Proposed north west runway Sipson Harlington Cranford Cross Longford All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationJim O Sullivan Chief Executive
Jim O Sullivan Chief Executive Imperatives Customer Service Safety Delivery The Strategic Road Network (SRN) Connects the nation Supports the wider transport network Drives the economy 4,300 miles of SRN
More informationStill waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword
Ticket queuing times at large regional rail stations Report of Findings July 2010 Foreword Train companies are investing heavily in installing ticket machines at stations, many tickets can now be bought
More informationTraffic calming on major roads: a traffic calming scheme at Costessey, Norfolk
Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on
More informationBusiness Growth (as of mid 2002)
Page 1 of 6 Planning FHWA > HEP > Planning > Econ Dev < Previous Contents Next > Business Growth (as of mid 2002) Data from two business directories was used to analyze the change in the number of businesses
More informationLower Thames Crossing
Lower Thames Crossing Post-Consultation Scheme Assessment Report Volume 7 Volume 7: Appraisal Summary and Recommendations Lower Thames Crossing 2017 - APPRAISAL SUMMARY AND RECOMMENDATIONS Contents Section
More informationTRAFFIC ADVISORY LEAFLET
TRAFFIC ADVISORY LEAFLET 3/06 High Occupancy Vehicle Lanes December 2006 INTRODUCTION The concept of using designated lanes for buses is well understood and widely used by highway authorities in urban
More informationSITESOLUTIONS Highways
SITESOLUTIONS Highways Section 1: Roads Section 1A: Privately Maintained Roads Section 1A: Privately Maintained Footpaths Section 1A: Privately Maintained Verges Section 1B: Traffic Schemes and Orders
More informationSouth Australia Transport Infrastructure Summit Adelaide May 2009
TOWARDS 2020: RAA s vision for metropolitan adelaide Sharon Hanlon General Manager Public Affairs Royal Automobile Association (RAA) of South Australia Inc INTRODUCTION The Royal Automobile Association
More information