US Operations Overview. Shane Tilka General Manager US Operations May 2014

Size: px
Start display at page:

Download "US Operations Overview. Shane Tilka General Manager US Operations May 2014"

Transcription

1 US Operations Overview Shane Tilka General Manager US Operations May 2014

2 Structure 1. US Operations Overview 2. Current Operations and Assets 3. Hickory & Aurelian Springs Project Update 4. US Exploration 2

3 US Current Operational Overview Concord Mine Site (Sussex and Dinwiddie Counties) Commissioned in 1997 Current ore reserves 3.3mt of ore mined per annum Idled in April 2014, with ore remaining to be mined Brink Operations (Greensville County) Commissioned in 2009 Current ore reserves 5%HM 3.3Mt of ore mined per annum Current ore reserves forecast to be exhausted in 2016 Mineral Separation Plant at Stony Creek (Sussex County) Capacity to treat ~450kt of HMC Capacity to produce ~300kt ilmenite and ~45kt zircon Centre of US operational support and US Laboratory 3

4 Human Resources Human Resources 158 US employees in total (including marketing and exploration) 142 US employees directly associated with US Operations 51% of employees are from within local counties (Sussex, Greensville, Dinwiddie) 11% female diversity Operational and technical competency are the key areas of focus for 2014 Supervisor development program established GM US Operations US Production Manager Environmental Superintendent H&S Specialist Rehabilitation Superintendent Human Resources Manager VP Finance Planning & Development Manager 4

5 Safety Performance (USA) LTIFR is 0 TRIFR reduction of 62% since March 2013 SPL roll out planned for 2014 to improve safety culture & competency 5

6 US Geological Overview Geological formation & history: All deposits located within the Fall Zone from central Virginia to North Carolina C.R Berquist Jr, of Virginia Division of Mineral Resources published discovery of HM concentrations in the area in 1987 Report is credited with attracting industry interest to explore the area 1989 Discovery of the Old Hickory deposit N 6

7 US Operations Overview Distance from Stony Creek: Richmond ~50 miles Concord Mine ~14 miles Brink Mine ~31 miles Hickory Mine ~12 miles Aurelian Springs Mine ~55 miles Hickory Stony Creek Concord Brink Aurelian Springs N Key Active Mine Site Mineral Processing Plant Reclamation Site Proposed Site 7

8 US Operations Sales & Production History 8

9 Mining Process Mining Summary Mining Unit (MU) capacity of ~ 500tph Unit designed around ease of mobility Innovative shredder concept utilized Low cost mining method Minimal overburden removal Concentrating Summary Concentrator capacity of ~260tph RHF 4 stage spiral separation circuit with Attritioner & Hydrosizer circuit to complete upgrade process Current focus areas Runtime improvement +90% target Brink recovery improvement program Mining contract productivity review 9

10 Brink Mine Plan Overview 2014 key attributes: Currently mining Plum Creek mining field Kline property move Independence Church Road 10

11 Concord Mine Plan Overview 2014 key attributes: Operation was idled on the 11 th April Key personnel retained for re-start Remaining 8 months of ore to be rescheduled Minor capex to access remaining ore 12 week restart timeframe if required 11

12 MSP MSP Summary Feed rate of ~55tph Feed capacity ~450kt HMC pa Ilmenite production ~300kt pa Zircon Production ~45kt pa Current focus areas Recovery improvement program targeting zircon wet circuit and hydrosizers 12

13 Virginia Rehabilitation ~1,600 acres of reclamation completed over the life of Virginia Operations ~2,000 acres of disturbed open area requiring rehabilitation Long term partnership with Virginia Tech, with annual funding provided focus on improving rehabilitation methods to improve cropping productivity 90 acre research farm established in 2004 pine reforestation study topsoil study 13

14 Mineral Sands Operational Overview Market and operational flexibility created through integration across regions Successful trials of VA ilmenite in both Mid West and South West WA kilns in 2013 produced commercial quantities of high quality SR (TiO2 > 94%, U+Th < 45ppm) 14

15 Hickory - Project Overview Known deposit - mined since 1997 Mined until 2009 Securing of leases - mostly farmland Construction of new concentrator and mine infrastructure 60% capacity increase on current assets 6-10 year mine life Hickory Concentrator Site 15

16 Hickory Engineering Progress Conditional Use Permit approved County Site Plan approval due 30 May State Mining Permit amendment due 30 June Process optimized with Iluka MTF Team Design complete: - P&IDs - general arrangement drawings - detailed engineering drawings - equipment lists - civil and storm water drawings - initial vendor bids received 16

17 Hickory Looking Forward Secure appropriate commercial arrangements Construction timeframe 15 months 17

18 Aurelian Springs Deposit Deposit is southwest of Roanoke Rapids 55 miles south of the MSP in Stony Creek Halifax County, North Carolina in the area of Aurelian Springs Phase I Relocation of Concord to Aurelian Springs North PFS concluded in 2013 DFS scheduled completion 2014 relocation timing TBD tentatively 2016 Phase II Relocation of Brink to Aurelian Springs South leasing activities included in Phase I scope relocation timing TBD Brink is currently scheduled to exhaust deposit in

19 Aurelian Springs North DFS Components of the DFS scope: Metallurgical testing MSP upgrade engineering Permitting Exploration Community relations Securing mineral and access leases for Auerilian Springs North and South Developing a process water supply Relocation engineering and mine establishment design 19

20 Aurelian Springs - Status Update Securing mineral and access leases for AS North and South 85% of HM secured by mining leases for AS North concentrator site and connectivity secured for AS North Permitting county permit secured finalizing permit packages for mining, and water quality permits no wetland impacts proposed for first 3+ years of mining permitting for future wetland impacts will continue with no impact to schedule DFS to be completed

21 US Exploration Update US Exploration Office Nashville Pipeline of good quality exploration targets ranging from: early stage generative activities working with the Project Generation team in Perth to more advance stage activities involving land agreements and drilling Exploration drilling in the Camden region of western Tennessee 4,880m Aircore (Q1) following up on encouraging results from 2013 drilling assays, mineral test work, resource modeling and financial studies (Q2/Q3-2014) samples processed at Stony Creek laboratory, mineral quality in Western Australia Generative program yielded targets in North and South Carolina currently securing land for drilling to start mid year new untested, targets currently being worked up in other states 21

22 Community Relations Sussex, Dinwiddie and Greensville Counties ~60,000 residents ~60% African American Median household income $32,000 12% of families living below the poverty line Out of 132 localities ranked in bottom 4 in health outcomes Iluka s community presence Partnership established with Greenville YMCA Partnership with Jackson-Field Homes mission to treat children mental illness Landowner mineral royalties have increased the wealth of the region Halifax County Adopt-A-School program Community College Partnership Career Studies Certification in Mineral Mining 22

23 Iluka Resources Limited For more information, contact: Robert Porter, General Manager Investor Relations / +61 (0)

Iluka Resources Limited. Jacinth-Ambrosia Site Visit Eucla Basin, South Australia July 2014

Iluka Resources Limited. Jacinth-Ambrosia Site Visit Eucla Basin, South Australia July 2014 Iluka Resources Limited Jacinth-Ambrosia Site Visit Eucla Basin, South Australia July 2014 Disclaimer Forward Looking Statements Forward Looking Statements This presentation contains certain statements

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 12 December 2017 ASX: ILU CATABY PROJECT APPROVED WITH OFFTAKE AGREEMENTS SECURED FOR 85 OF SYNTHETIC RUTILE PRODUCTION Cataby mineral sands project approved; with

More information

For personal use only

For personal use only Iluka Resources Limited Acquisition of Sierra Rutile Limited Information for Iluka Shareholders 1 August 2016 To be read in association with AIM Joint Announcement and Iluka ASX Announcement Recommended

More information

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines. ...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting

More information

Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009

Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009 31 July 2009 Companies Announcements Office ASX Limited Level 6, 20 Bridge Street Sydney NSW 2000 By E-Lodgement Highlights Corporate Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd)

More information

Bank of America Merrill Lynch Conference Iluka Resources Limited. Alan Tate, Chief Financial Officer New York September 2010

Bank of America Merrill Lynch Conference Iluka Resources Limited. Alan Tate, Chief Financial Officer New York September 2010 Bank of America Merrill Lynch Conference Iluka Resources Limited Alan Tate, Chief Financial Officer New York September 2010 Disclaimer Forward Looking Statements This presentation contains information

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 8 December 2016 ILUKA COMPLETES MERGER WITH SIERRA RUTILE LIMITED Transaction Details Iluka Resources Limited (Iluka) advises that following German regulatory approval

More information

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area

More information

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager Australian Site Tour Mt Keith Operation Jaco Harwig General Manager 28 October 2008 Important notices Reliance on third party information The views expressed here contain information that have been derived

More information

BHP Billiton Base Metals

BHP Billiton Base Metals BHP Billiton Base Metals BHP Billiton Tintaya S.A. Tintaya Located at SE Peru At 4100 meters 270 Km from Arequipa and Cusco BHP Billiton Tintaya SA Our Charter. WE ARE BHP BILLITON, A LEADING GLOBAL RESOURCES

More information

December 2017 Quarterly Report

December 2017 Quarterly Report ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work

More information

For personal use only

For personal use only 22 March 2016 MINING ACTIVITIES COMMENCE AT BAOBAB PHOSPHATE PROJECT, SENEGAL PROJECT ON TRACK FOR 2016 PRODUCTION Highlights Site and pit access roads complete, mining workshop concrete works complete,

More information

For personal use only

For personal use only Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 04 July 2012 Completion of Asset Sale Agreement

More information

Australian Site Tour Ravensthorpe Nickel Operation. Isak Buitendag General Manager

Australian Site Tour Ravensthorpe Nickel Operation. Isak Buitendag General Manager Australian Site Tour Ravensthorpe Nickel Operation Isak Buitendag General Manager 29 October 2008 Important notices Reliance on third party information The views expressed here contain information that

More information

Quarterly Activities Report For The Period Ending 31 March 2018

Quarterly Activities Report For The Period Ending 31 March 2018 Quarterly Activities Report For The Period Ending 31 March 2018 Highlights for the quarter ending 31 March 2018 Accent Resources have completed one Diamond drill hole (DD03) on the Magnetite Range Project

More information

Crown Resorts Limited

Crown Resorts Limited Crown Resorts Limited Annual General Meeting 20 October 2016 1 Presentation Outline F16 Year in Review 2 Crown Resorts Limited Group Result F16 Normalised $m F15 Normalised $m Variance F/(U) F16 Actual

More information

MARCH 2018 QUARTERLY ACTIVITIES REPORT

MARCH 2018 QUARTERLY ACTIVITIES REPORT X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April

More information

PROJECTS & TECHNICAL SERVICES

PROJECTS & TECHNICAL SERVICES PROJECTS & TECHNICAL SERVICES 1.0 2.0 3.0 4.0 5.0 JOHN NITSCHKE EGM Projects & Technical Services 6.0 7.0 8.0 9.0 OZ MINERALS NOVEMBER 2009 PAGE 40 STRATEGY SUPERIOR TOTAL SHAREHOLDER RETURNS ZERO HARM

More information

For personal use only

For personal use only HIGHLIGHTS Mount Bundy Gold Project Drill results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold with other broad intercepts - Drill program highlights potential to further

More information

PART D: Stakeholder consultation

PART D: Stakeholder consultation PART D: Stakeholder consultation 4. Stakeholder consultation Iluka is committed to ongoing consultation with its stakeholders to achieve sustained mutual benefits for the life of the project. Ongoing

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED ASX ANNOUNCEMENT 16 MARCH 2017 CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED St Barbara Limited (SBM) commits $1.5 million placement at 50 cents per share for 5% stake Funding will allow

More information

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited,

More information

Lorena Gold Project Malachite AGM 29 November 2017

Lorena Gold Project Malachite AGM 29 November 2017 Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated

More information

Overview. Mining projects map

Overview. Mining projects map Mine As one of Australia s leading contract mining companies, BGC Contracting has been successfully delivering contract mining and infrastructure projects to an impressive list of resources clients for

More information

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre

More information

CONCISE ANNUAL REPORT 2002

CONCISE ANNUAL REPORT 2002 CONCISE ANNUAL REPORT 2002 Contents Chairman s Overview 4 Managing Director s Report 8 Operations Overview 16 Environment, Health and Safety 20 Community Relations 22 Exploration 24 Corporate Information

More information

Caroona Coal Project. Gunnedah Coal Conference 20 September 2006

Caroona Coal Project. Gunnedah Coal Conference 20 September 2006 Caroona Coal Project Gunnedah Coal Conference 20 September 2006 Exploration Licence History Authorisation 216 was originally granted on 9 May 1980. Expressions of Interest sort for a portion of A216 on

More information

dedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer

dedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer dedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer Forward Looking Statement Certain statements set forth in this presentation constitute

More information

Quarterly Activities Report For The Period Ending 30 June 2018

Quarterly Activities Report For The Period Ending 30 June 2018 Quarterly Activities Report For The Period Ending 30 June 2018 Highlights for the quarter ending 30 June 2018 Accent Resources completed one Diamond drill hole on the Magnetite Range Project E59/875 during

More information

For personal use only

For personal use only Coziron Resources Limited ABN: 91 112 866 869 Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile:+61 8 9218 8875 Website: www.coziron.com

More information

Curragh Operational Tour

Curragh Operational Tour Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May

More information

Investor Briefings First-Half FY2016 Financial Results

Investor Briefings First-Half FY2016 Financial Results Cedar Woods Properties Limited Investor Briefings First-Half FY2016 Financial Results 26 February 2016 Cedar Woods Presentation 2 Snapshot of Achievements in FY2016 Extensive portfolio of residential estates

More information

LAS OPEÑAS DRILLING COMMENCED

LAS OPEÑAS DRILLING COMMENCED ASX Announcement 17 October 2012 LAS OPEÑAS DRILLING COMMENCED LAS OPEÑAS, ARGENTINA Diamond drilling program commenced Targeting both high-grade epithermal veins and breccia bodies CERRO VERDE, CHILE

More information

For personal use only

For personal use only ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: Current CSD Share Price: $0.10 Current LME Tin Price: $24,475 Key Points Snow Peak Mining Pty Ltd acquisition of Kagara s Central

More information

JUNE 2017 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250 Email:

More information

Corporate Presentation March 2015

Corporate Presentation March 2015 Corporate Presentation March 2015 March 2015 Serabi Gold and Brazil Serabi Gold plc is dual listed (TSX:SBI, AIM:SRB), gold mining and development company with operations in Northern Brazil. The Company

More information

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019 NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019 18 February 2019 Quarter Ended 6 Months Ended Jan-19 Jan-18 Change Jan-19 Jan-18 Change ( 000t) ( 000t) (%)

More information

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and

More information

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA QUARTERLY OPERATIONS REPORT 30 JUNE 2016 Highlights: YAMARNA Geochemical blade-refusal aircore programme confirms the extent of the Jatz basement gold anomaly at over 1.5 km in strike. Multiple RC drilling

More information

709 & 711 ADMIRAL CALLAGHAN LANE

709 & 711 ADMIRAL CALLAGHAN LANE RETAIL HIGH VISIBILITY SPACE FOR FREEWAY LEASE 2220 DEVELOPMENT RAILROAD AVE ON ±1.8 ACRES 2220 Railroad Avenue, Pittsburg, CA Proposed Mixed Use Development (51 Acres) ±139,000 ±2,000 ±32,000 709 & 711

More information

Shaping the Future of Railway Institute of Railway Technology

Shaping the Future of Railway Institute of Railway Technology Shaping the Future of Railway Institute of Railway Technology 21 st September 2016 Adams Williams Manufacturing Lead Major Bids Team Rail Relationships creating success Opportunities in Rail Page 2 Trains,

More information

Downer Rail. Monash University, Institute of Railway Technology Shaping the Future of Railway

Downer Rail. Monash University, Institute of Railway Technology Shaping the Future of Railway Downer Rail Monash University, Institute of Railway Technology Shaping the Future of Railway Andrew Spink Executive General Manager Business Development Rail Downer Who are we Revenue (FY 2017) $7.8 billion

More information

Concise Annual Report Iluka Resources Limited

Concise Annual Report Iluka Resources Limited Concise Annual Report 2005 Iluka Resources Limited Contents Global Supplier Global Resources and Production 6 From the Chairman 10 From the Managing Director and Chief Executive Officer 12 Financial Overview

More information

Performance Clackamas Clackamas County Strategic Plan

Performance Clackamas Clackamas County Strategic Plan June 2017 update Performance Clackamas Clackamas County Strategic Plan Strategic Goals and Milestones This is the June 2017 update to Performance Clackamas, the Clackamas County Strategic Plan. The plan

More information

CREATING AND DELIVERING SHAREHOLDER VALUE

CREATING AND DELIVERING SHAREHOLDER VALUE 20 16 ILUKA REVIEW CREATING AND DELIVERING SHAREHOLDER VALUE 2016 ATTRIBUTES Disappointing financial performance Mineral sands revenues declined by 11.4 per cent to $726.3 million Total reported loss of

More information

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT ASX ANNOUNCEMENT 30 August 2016 RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT Financial Highlights Core net profit after tax 1 (Core NPAT) up 16.8% to $481.4

More information

FOR SALE FOR SALE PRICE REDUCED SUBJECT SITE

FOR SALE FOR SALE PRICE REDUCED SUBJECT SITE STAND ALONE SHOPPERS DRUG MART INVESTMENT OPPORTUNITY WITH FUTURE DRIVE-THRU PAD POTENTIAL PRICE REDUCED SUBJECT SITE Parkwood Place Highway 16 Spruceland Mall PRINCE GEORGE To Alberta Pine Centre Mall

More information

BALL MILL COMPLETED AHEAD OF SCHEDULE

BALL MILL COMPLETED AHEAD OF SCHEDULE ASX Announcement 3 September 2018 BALL MILL COMPLETED AHEAD OF SCHEDULE U&M MOBILISATION ON TRACK AND MINING COSTS DECREASED Beadell Resources Limited (Beadell or Company) is pleased to advise that installation

More information

Mozambique My Country, My Life. Gaspar Buque. SARA International Mobility Group June 2014

Mozambique My Country, My Life. Gaspar Buque. SARA International Mobility Group June 2014 Mozambique My Country, My Life Gaspar Buque SARA International Mobility Group June 2014 This Presentation will cover My Profile Mozambique at a glance Fast growing economy Doing Business rank Employment

More information

Investor Presentation February Richard Hill Managing Director

Investor Presentation February Richard Hill Managing Director Investor Presentation February 2015 Richard Hill Managing Director Disclaimer Disclaimer & Forward Looking Statements This presentation has been prepared by Strandline Resources (the Company ). It should

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 132 EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 B2Gold Employees Direct 552 Nicaraguans 548 Expats 4 Unionized 494 Men 499 Women 53 Contractors Employees 570 Men 529 Women 41 EL LIMON MINE: NICARAGUA OPEN

More information

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

2011 Annual General Meeting. Greg Robinson Managing Director & CEO 2011 Annual General Meeting Greg Robinson Managing Director & CEO Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve

More information

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form PROPOSED FARE CHANGES Welcome Sign in Pick up comment form Visit stations to learn more Submit your comment form We re considering a new fare policy The Sound Transit Board of Directors is considering

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to draw the attention of shareholders to

More information

GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST

GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST ANNUAL REPORT 2006 1 2 3 4 1 2 181 Miller Street, North Sydney, NSW 150 170 Leichhardt Street, Spring Hill, Brisbane, QLD 3 4 38 Akuna Street, Canberra,

More information

Innovative, Long Term Copper Producer in Chile

Innovative, Long Term Copper Producer in Chile Innovative, Long Term Copper Producer in Chile Producing copper by processing fresh and historic tailings from Codelco s El Teniente mine Q4-2017 Forward-Looking Statements This presentation may include

More information

Network of International Business Schools

Network of International Business Schools Network of International Business Schools WORLDWIDE CASE COMPETITION Sample Case Analysis #1 Qualification Round submission from the 2015 NIBS Worldwide Case Competition, Ottawa, Canada Case: Ethiopian

More information

Mineral Sands Mining in Victoria

Mineral Sands Mining in Victoria Mineral Sands Mining in Victoria Iluka Douglas Mine Radon Monitoring and Community Engagement Morrie Facci Radiation Team Victorian Department of Health and Human Services Presentation Outline Iluka Resources

More information

For personal use only

For personal use only QUARTERLY REPORT For the period ending 31 December 2013 Record operational results and demand for Fortescue products has generated strong cashflows allowing Fortescue to accelerate its debt reduction programme.

More information

Location. Location. Location. just one of many reasons that keeps Chesapeake, VA, Always Prepared to Do Business.

Location. Location. Location. just one of many reasons that keeps Chesapeake, VA, Always Prepared to Do Business. Location. Location. Location. just one of many reasons that keeps Chesapeake, VA, Always Prepared to Do Business. w w w. c h e s a p e a k e v a. b i z IL IN MI OH WVA PA VA NY MD MA CT RI NJ DE Chesapeake

More information

31 MARCH 2018 QUARTERLY REPORT

31 MARCH 2018 QUARTERLY REPORT ASX ANNOUNCEMENT 31 MARCH 2018 QUARTERLY REPORT ASX: BOE HIGHLIGHTS Boss completes $8m capital raise and mandates Tribeca to arrange project finance facilities to fund Honeymoon development and restart:

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

Australian Resource Reviews Gold 2016

Australian Resource Reviews Gold 2016 Australian Resource Reviews Gold 2016 Anthony Senior, Geoscience Australia Resource figures are current as at 31 December 2015. The principal uses for gold (Au) are as an investment instrument for governments,

More information

Orocobre Limited. The next low cost lithium producer

Orocobre Limited. The next low cost lithium producer Orocobre Limited The next low cost lithium producer Overview Low cost, near-term production of lithium carbonate and potash Projects located in renowned lithium triangle in Argentina Toyota Tsusho strategic

More information

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009

The St. Joe Company. Raymond James Institutional Investors Conference March 10, 2009 The St. Joe Company Raymond James Institutional Investors Conference March 10, 2009 Forward Looking Statements This presentation contains forward-looking statements about future events that are subject

More information

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) BEN HAVELBERG PROPHECY WARRAMBOO SAGA Also to cause him much ridicule was his ability of prophesying the weather by the moon and the stars. The Polda water

More information

ERA overview. Dan Janney General Manager, Operations

ERA overview. Dan Janney General Manager, Operations ERA overview Dan Janney General Manager, Operations 1 2 Welcome to Ranger mine Acknowledge Traditional Owners The mining operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal

More information

Developing Papua New Guinea s first diversified world-class resources platform. UK PNG Trade and Investment Conference London 16 June 2015

Developing Papua New Guinea s first diversified world-class resources platform. UK PNG Trade and Investment Conference London 16 June 2015 Developing Papua New Guinea s first diversified world-class resources platform UK PNG Trade and Investment Conference London 16 June 2015 Mayur Resources Presentation CONTENTS 1. Mayur Resources Overview

More information

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1 Gold Mining an Industry in Transition Melbourne Mining Club 7 June 2007 Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1 Gold Production ('000 t) Cumulative Gold Production Since

More information

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning BHP Billiton Iron Ore Western Australia Mining Operations Phil Price Vice President Integrated Planning Iron Ore Visitors Safety Induction Office Area 1. In an emergency - a siren will sound 2. Stay with

More information

December 2018 Quarterly Production Report

December 2018 Quarterly Production Report 31 January 2019 December 2018 Quarterly Production Report Fortescue Metals Group Limited (ASX: FMG, Fortescue) Fortescue has released its December 2018 quarterly production results, reporting total shipments

More information

Virginia Association of Railway Patrons 2008 Annual Meeting March 1, 2008

Virginia Association of Railway Patrons 2008 Annual Meeting March 1, 2008 Virginia Association of Railway Patrons 2008 Annual Meeting March 1, 2008 Areas Served Chesapeake Hampton Newport News Norfolk Portsmouth Suffolk Virginia Beach Current Services 47 Fixed Regular Service

More information

ADVENT ENERGY UNCONVENTIONAL SHALE GAS AND CONVENTIONAL GAS PROSPECTIVITY IN ONSHORE BONAPARTE BASIN

ADVENT ENERGY UNCONVENTIONAL SHALE GAS AND CONVENTIONAL GAS PROSPECTIVITY IN ONSHORE BONAPARTE BASIN 23 August 2012 Companies Announcement Office Australian Securities Exchange Limited 10th Floor, 20 Bond Street SYDNEY NSW 2000 ADVENT ENERGY UNCONVENTIONAL SHALE GAS AND CONVENTIONAL GAS PROSPECTIVITY

More information

Knoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results J U LY 1 5,

Knoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results J U LY 1 5, Knoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results PREPARED FOR: KNOXVILLE CHAMBER THE DEVELOPMENT CORPORATION OF KNOX COUNTY J U LY 1 5,

More information

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter 18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes

More information

Ravinia. Row. STAN WILLIAMS / M c NEILL STOKES /

Ravinia. Row. STAN WILLIAMS / M c NEILL STOKES / I. EXECUTIVE SUMMARY NAI Brannen Goddard is pleased to present, a 3.43-acre generational property in Central Perimeter. The property is strategically located on Ashford Dunwoody Road with billboard visibility

More information

For personal use only

For personal use only ASX Release 31 July, 2012 MONTERAY MINING GROUP Tel: +61 7 5538 2558 Fax: +61 7 5526 8922 info@monteraymining.com.au www.monteraymining.com.au Contact: KEVIN DART Chairman kjdart@charpac.com.au JOHN HANNAFORD

More information

Minara Resources Limitedit Sydney February Peter Johnston

Minara Resources Limitedit Sydney February Peter Johnston Minara Resources Limitedit Sydney February 2008 y y y Peter Johnston Important t Notice This presentation contains certain statements which may constitute forward-looking statements. Such statements are

More information

One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property:

One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property: One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property: The Salar del Diablo is a 75,000 hectare lithium property

More information

PanAust Quarterly Report for the three months to 31 March 2017

PanAust Quarterly Report for the three months to 31 March 2017 PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:

More information

For personal use only

For personal use only For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 130,000-132,000 tonnes copper Cash costs of $1.35 per lb copper after by-product credits

More information

Savannah Resources Plc Rio Tinto and Savannah to establish Mutamba/Jangamo Joint Venture HIGHLIGHTS:

Savannah Resources Plc Rio Tinto and Savannah to establish Mutamba/Jangamo Joint Venture HIGHLIGHTS: 22 June 2015 Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining Savannah Resources Plc Rio Tinto and Savannah to establish Mutamba/Jangamo Joint Venture HIGHLIGHTS: Rio Tinto International

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

REDEV ECOLONIAL GAS STATION

REDEV ECOLONIAL GAS STATION REDEV ECOLONIAL GAS STATION 14266 E COLONIAL DR ORLANDO, FL 32826 Ali Mushtaq Senior Advisor 407.982.3976 ali.mushtaq@svn.com Mital Saraiya Advisor 386.566.2183 mital.saraiya@svn.com SVN FLORIDA COMMERCIAL

More information

JUNE 2012 QUARTERLY REPORT

JUNE 2012 QUARTERLY REPORT 43 Outram St West Perth WA 6005 Phone: (08) 9321 8845 Fax: (03) 9321 8854 Email info@baru.com.au 26 July 2012 JUNE 2012 QUARTERLY REPORT Board of Directors Richard Anthon (Chairman) Kevin Nichol (Executive

More information

For personal use only

For personal use only Australian Securities Exchange Notice 28 May 2014 ILUKA RESOURCES 2014 ANNUAL GENERAL MEETING Iluka Resources Limited (Iluka) today held its 59 th Perth, Western Australia. Annual General Meeting of Shareholders

More information

2009 Annual General Meeting

2009 Annual General Meeting 2009 Annual General Meeting Managing Director s Address October 2009 Steve Gostlow Agenda Contents 1 Capital Structure 2 Company Profile 3 FY09 Key Highlights 4 FY10 Operational Update 5 Gorgon Update

More information

For personal use only

For personal use only 5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is

More information

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee

More information

BHP Billiton Iron Ore. Asset Development Projects

BHP Billiton Iron Ore. Asset Development Projects BHP Billiton Iron Ore Asset Development Projects September 2003 Agenda Mining Area C Project Area C to Yandi Rail Project Products and Capacity Expansion (PACE) Project System Capacity Increases to 100Mtpa

More information

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT 26 October 2018 Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 Board of Directors: David Quinlivan Luke Tonkin

More information

INVESTMENT SUMMARY. A Compelling Lithium-in-Brine Opportunity, Mexico. A High-Grade Past-Producing Silver/Gold Mine, New Mexico

INVESTMENT SUMMARY. A Compelling Lithium-in-Brine Opportunity, Mexico. A High-Grade Past-Producing Silver/Gold Mine, New Mexico INVESTMENT SUMMARY A Compelling Lithium-in-Brine Opportunity, Mexico A High-Grade Past-Producing Silver/Gold Mine, New Mexico AUGUST 2017 INTRODUCTION One World Minerals Inc. (OWM) is a lithium exploration

More information

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE The world s 5 th largest gold producer, Harmony Gold Mining Company Limited ( Harmony ) and Australasia s largest gold company, Newcrest

More information

USA Acquisition Summary. December 2010

USA Acquisition Summary. December 2010 USA Acquisition Summary December 2010 www.roadbearrv.com Strategic Intent 1. To leverage the existing business capabilities in a significant sized and growing tourism market with a similar customer base.

More information