1 Coziron Resources Limited ABN: Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: Facsimile: Website: The Company Announcements Office ASX Limited Via E Lodgement 5 February 2013 Yarraloola Project Preliminary Scoping Study on Direct-Shipping Iron-ore and Magnetite Transport Options Delivers Low Operating and Capital Cost Options. HIGHLIGHTS - Preliminary scoping study into potential lumpy DSO iron-ore and magnetite transportation options and costs from Yarraloola Project identifies low-cost alternatives. - Preferred option is for DSO-style ore is trucking to and shipping from the proposed Cape Preston East (CPE) port extension. - Estimated DSO trucking transport cost of $24.33/tonne based on a 3.7Mtpa operation. BACKGROUND In late 2012, Coziron Resources Limited (Coziron) engaged the engineering company Engenium Pty Ltd (Engenium) to conduct a preliminary scoping study on a variety of mine to port options that would quantify transport costs and preferred transport options to allow Coziron to export iron-ore (either lumpy direct shipping or magnetite) from its 85% owned Yarraloola Project. The Yarraloola Project covers 1450km 2 and spans the North West Coastal Highway and Pannawonica Road in the western part of the Pilbara s Hamersley Basin. It is located approximately 120 km southwest of Karratha and 50km south of the Sino magnetite project being developed by CITIC Pacific. Coziron has focussed on investigating and quantifying transport options and costs as these significantly impact the economics of developing iron-ore exploration targets in Australia. In contrast, iron-ore mining and processing costs at Yarraloola can be readily established as exploration progresses. 1
2 Fig 1. Location of Coziron Resources Ltd s Yarraloola Iron-ore Project in the West Pilbara of Western Australia. SCOPING STUDY OBJECTIVES The assessment of potential transport options were based on the following objectives: 1. Identify and investigate the possible mine to port paths to export iron-ore product including direct-shipping lumpy ore (DSO) and/or finer grained magnetite from Yarraloola; 2. Determine the limitations, constraints and high-level capital expenditure requirements, within 35% accuracy, of the most suitable mine to port transport options; and 3. Determine the operational expenditure requirements of the most suitable mine to port transport options. The parameters used in the assessment of these objectives are contained in Appendix 1. SCOPING STUDY RESULTS A total of eleven potential transport scenarios were initially examined, of which four were deemed to be realistic options based on costs and infrastructure. While Engenium were conducting the scoping study, Iron Ore Holdings (ASX: IOH) announced the results of its Buckland Project pre-feasibility study. The IOH study advocates the establishment of a 2
3 new transhipment facility at Cape Preston East (CPE). IOH have subsequently entered into a nonbinding Memorandum of Understanding with the Dampier Port Authority which defines the principles for the location and potential development of a small scale multi-user, barge-loading facility at CPE. The proposed private haul road linking the IOH project with CPE is to be developed by IOH through the Yarraloola Project. Engenium have identified that Coziron could potentially truck DSO ore to CPE, or alternatively construct a slurry pipeline for the transport of magnetite to CPE. Detailed breakdowns of the capital expenditure required and forecast operating-costs under both these options are contained in Appendix 2. Engenium subsequently identified the preferred option for the Yarraloola project was the new CPE extension, where CITIC Pacific have completed all the requisite environmental, heritage and social impact studies and the Government has granted approval for development. PREFERRED OPTION CAPE PRESTON EAST a) Road transport option This proposal involves the engagement of a road-haul contractor to load, haul and unload ore between a mine-site and stockpile at CPE over a proposed distance of 135km. This option assumes the use of 110 tonne road-trains, which are permitted under Main Roads WA s Restricted Access Vehicle classification system on Permit Network 9 roads and above. These road-trains would consist of a prime mover, semi-trailer and two additional trailers. A maximum of 4 trucks per hour would operate 24hrs a day, with two drivers taking shifts on each truck and residing at a Coziron mine camp. The proposed maximum of 4 trucks per hour is based on the assumption that other mining companies may be using the same route. Under these assumptions, the maximum annual output for the mine would be 3.7Mtpa. The total transport cost under this option which cover items such as truck lease fees, fuel, driver salaries and accommodation is $24.33/tonne, while the estimated capital expenditure is $35.1M. The capital expenditure estimate provides for the construction of a proposed 5km long, 20m wide, unsealed access road to the mine to be constructed from local gravel and the installation of a certified weighbridge at the loading point. However, if there was exclusive use of private roads rather than Main Roads, mine output could increase to 5.5Mtpa by reducing the loading interval to 10 minutes. b) Slurry pipeline option The Yarraloola Project hosts significant outcrop of the Brockman Iron Formation and more recently identified magnetite schists in the Ashburton Trough, both of which are being considered as potential development targets for magnetite production. In response, the transport study also focussed on assessing the costs of an initial development on magnetite mineralization close to the North West Coastal Highway. Engenium have considered costs for the transport of magnetite concentrate from the central part of the Yarraloola project over a distance of about 82km via a slurry pipeline to a dewatering plant at CPE. The potential route of the slurry pipeline is shown on Fig 2. 3
4 Fig 2. A Google-earth image of the Yarraloola area with the trace of a slurry pipeline to schistose magnetite iron-formations identified in the Ashburton Trough. Slurry pipelines offer relatively low operating costs compared to the operating costs of alternative transport options, however such an option would be quite capital intensive and design critical. The study determined that a potential Coziron pipeline would require three 1500 kw pumps to feed the polyethylene lined steel pipeline. Assuming typical dewatering facility costs, the anticipated transport cost, based on a 5Mtpa concentrate operation was estimated to be $10.73/tonne concentrate and the estimated capital cost of the slurry pipeline, dewatering facility and port facility is $298M. These costs assume that there is sufficient ground-water at the mine site to negate a requirement to return the water extracted at the port to the mine-site along a second pipeline. Exploration drilling at Yarraloola appears to support this assumption. SUMMARY In summary, the Engenium study established a preliminary basis to identify total transport operating costs for a variety of mining options should mining ever be determined as feasible. The study also established that due to the Company's favourable location, being adjacent to existing and emerging transport infrastructure and ports, the Company has the potential to be in the lowest transport cost 4
5 quartile amongst leading Pilbara iron ore producing operations. This in turn enhances commercial returns should mining operations commence. The study also provides economic guidance to exploration which is focussed on the selection of targets with the potential to yield deposits that can be developed into commercial mining operations. 5
6 APPENDIX 1: TRUCKING PARAMETERS Parameter Days available for operation Value 350/annum (includes 15 days cyclone closure) 24 hrs/day Truck payload Trucking avg speed (incl. driver breaks) Daily maximum number of truck loads Mine stockpile reclaim capacity Ship capacity Ship Length 110 tonnes (road train) 70 km/hr 96 on main public roads (15 minute intervals) (FEL s) 660 tph / 5.5 Mtpa (10 minute intervals) 55,000 80,000 DWT (Panamax) m Ship draft (max) 12.0m Ship loading duration Barge capacity Barge loader capacity Barge docking / undocking duration Barge sailing speed (with tug) Trans-shipment capacity 4 8 days (dependant on tides) 5,000 DWT 1,250 tph (10 hrs/day, high tide only) 2 x 0.5 hr 3 knots (5.5 km/hr) 500 tph (ship clam shells) 6
7 APPENDIX 2: CPE COST ESTIMATES Capital Expenditure Costs ($M) Transport Mine Site Road/Pipe Port Contingency Total Road (1) 35.1 (2) Slurry Pipeline (4) 298 (3) (1) 35% (2) Based on 3.7Mtpa (3) Based on 5Mtpa (4) 20% Operating Costs ($/tonne) Transport Mine Site Haulage Port Contingency (1) Total Road (2) Slurry Pipeline (4) (3) (1) 20% (2) Based on 3.7Mtpa (3) Based on 5Mtpa (4) Fine ore has more handling charge 7
8 ABOUT COZIRON RESOURCES LIMITED Yarraloola Project Coziron Resources Ltd is exploring seven exploration leases and two prospecting licences with an area of 1450km 2 on the Yarraloola Project, located 150km south-west of Karratha (Fig 3). The tenements cover part of the iron-ore rich Hamersley Basin, as well as part of the iron-ore, gold and base-metal bearing Ashburton Trough. Activities are focused on assessing haematite and magnetite mineralization in Hamersley Group sediments (Marra Mamba and Brockman Iron Formations) which outcrop over a strike length of approximately 50km, as well as younger channel-iron deposits. In addition to the work on iron-ore, exploration is identifying prospectivity for gold, copper and associated base-metals. Fig 3. Location and geotectonic setting of the Yarraloola Iron-Ore Project in the West Pilbara, Western Australia. 8
9 OTHER PROJECTS In addition to the Yarraloola Project, Coziron is exploring for manganese on the KingX (859km 2 granted and 2127km 2 under application) and titaniferous and vanadiferous magnetite on the Buddadoo (210km 2 granted) Projects (Fig 4). Fig 4. Location of the Coziron Resources Ltd projects in Western Australia. For further information regarding this announcement please contact Adam Sierakowski on COMPETENT PERSONS STATEMENT The information in this report that relates to mineral resources and exploration results is based on information compiled by Rob Ramsay (BSc Hons, MSc, PhD) who is a Member of the Australian Institute of Geoscientists. Rob Ramsay is a full-time Consultant Geologist for Coziron and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Rob Ramsay has given his consent to the inclusion in this report of the matters based on the information in the form and context in which it appears. 9
JUNE 2017 QUARTERLY ACTIVITIES REPORT
ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the
More informationFor personal use only
Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in
More informationFor personal use only
Coziron Resources Ltd: ASX - CZR Pilbara Iron-Ore Maiden JORC Resource & New Volcanic Hosted Magnetite Discovery February 2015 www.coziron.com Disclaimer & Competent Persons Statement 2 Disclaimer This
More informationFor personal use only
ASX Announcement 15 May 2012 ARTEMIS ACQUIRES STRATEGIC WEST PILBARA GOLD AND BASE METALS ASSETS About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold:
More informationDecember 2017 Quarterly Report
ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work
More informationFor personal use only
ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,
More informationMine Production and Shipping
Mine Production and Shipping Ore production has grown significantly over the 12 months, as the Company continued to expand its Pardoo mine and commenced development of its Wodgina DSO Project. All of the
More informationQuarterly Activities Report Period Ended 31 March 2018
23 April 2018 Quarterly Activities Report Period Ended 31 March 2018 ASX Code: EXG Key Points During the March 2018 Quarter, Kalgoorlie North Gold Project (KNGP) activities predominantly involved resource
More informationFor personal use only
AMEX RESOURCES LIMITED (ASX: AXZ) For personal use only 31 July 2012 QUARTERLY REPORT For the period ended 30 June 2012 The Manager Company Announcements Office Australian Securities Exchange Exchange
More informationBRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION
BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area
More informationFor personal use only
5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is
More informationFor personal use only
ABN 52 007 626 575 Date 23 rd May 2016 The Manager Market Announcements Office ASX Ltd 4th Floor, 20 Bridge Street Sydney NSW 2000 ASX Code: JRV JOINT VENTURE WITH AUSTRALIAN MINES LIMITED (ASX: AUZ) The
More informationFOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES
ASX ANNOUNCEMENT 21 April 2015 FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES The new Four Eagles Gold Project Joint Venture with GEV and Providence has commenced after the renewal
More informationFor personal use only
QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.
More informationOMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===
OMNR ^ååì~ä=déåéê~ä=jééíáåö OT=klsbj_bo=OMNR=== ^puw=cjp=== 2 `çêéçê~íé=pìãã~êó Board & Management Capital Structure Robert Kennedy Non-Executive Chairman A Chartered Accountant and a Director since 14
More informationAustralian Mines increases Marymia ground holding
11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint
More informationDevelopment Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.
...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting
More informationCATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED
ASX ANNOUNCEMENT 16 MARCH 2017 CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED St Barbara Limited (SBM) commits $1.5 million placement at 50 cents per share for 5% stake Funding will allow
More informationFor personal use only
ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: Current CSD Share Price: $0.10 Current LME Tin Price: $24,475 Key Points Snow Peak Mining Pty Ltd acquisition of Kagara s Central
More informationAustralian Securities Exchange Notice
Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating
More informationFor personal use only
Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 04 July 2012 Completion of Asset Sale Agreement
More informationFor personal use only
INDOCHINE MINING LIMITED ACN 141 677 385 ASX: IDC 29 July 2011 Company Announcements Office Australian Securities Exchange 8 Pages Quarterly Activities Report For Quarter ended 30 June 2011 Highlights
More informationQuarterly Activities Report Period Ended 31 December 2017
24 January 2018 ASX Code: EXG Quarterly Activities Report Period Ended 31 December 2017 Key Points Successful completion of the Zoroastrian open pit ore treatment campaign. Cash balance peaks at $8.1M
More informationFor personal use only
ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS PROJECTS Over 2,000m of RC drilling planned at SA Titan Gold & IOCG Project Drilling planned to test strong EM conductor for high grade
More informationASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso
ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to draw the attention of shareholders to
More informationQUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA
QUARTERLY OPERATIONS REPORT 30 JUNE 2016 Highlights: YAMARNA Geochemical blade-refusal aircore programme confirms the extent of the Jatz basement gold anomaly at over 1.5 km in strike. Multiple RC drilling
More informationJUNE 2012 QUARTERLY REPORT
43 Outram St West Perth WA 6005 Phone: (08) 9321 8845 Fax: (03) 9321 8854 Email info@baru.com.au 26 July 2012 JUNE 2012 QUARTERLY REPORT Board of Directors Richard Anthon (Chairman) Kevin Nichol (Executive
More informationFocus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation
Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre
More informationLAS OPEÑAS DRILLING COMMENCED
ASX Announcement 17 October 2012 LAS OPEÑAS DRILLING COMMENCED LAS OPEÑAS, ARGENTINA Diamond drilling program commenced Targeting both high-grade epithermal veins and breccia bodies CERRO VERDE, CHILE
More informationGruyere Project Development Update
ASX Announcement 21 June 2017 Gruyere Project Development Update Highlights Project Capital budget revised to A$532 1 million (3.5% increase) following engineering, procurement and construction review
More informationFor personal use only
HIGHLIGHTS Mount Bundy Gold Project Drill results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold with other broad intercepts - Drill program highlights potential to further
More informationHighlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project
Quarterly Activities Report: September 2018 KalNorth Gold Mines Limited Date: 31 October 2018 ASX Code: KGM Issued Capital 894.24 million Ordinary shares Current Share Price $0.006 Market tfollo Capitalisation
More informationKidman agrees to acquire 1Moz Mt Holland gold field in WA
December 18th, 2015 Kidman Resources Limited ABN 88 143 526 096 Corporate Details: ASX Code: KDR Issued capital: 142.3M ordinary shares Substantial Shareholders: Capri 22.7m (15.97%) Holdex Nominees 11.3m
More informationASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA
ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited,
More informationFor personal use only
ASX Release 24 April 2012 Westgold secures the High Grade Great Fingall Gold Mine Westgold Resources (ASX:WGR) is pleased to advise that it has acquired the 49% relevant interest in the Great Fingall Deeps
More informationMungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe
Market Announcements Office ASX Ltd 4 th Floor, 20 Bridge Street, Sydney NSW 25 May 2015 ASX code: MUX Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Agreement
More informationORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.
ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. EXPLORATION ACTIVITIES Orion s efforts towards project growth, evaluation, and rationalisation have been the focus
More informationAltera Resources Ltd
31 January 2011 QUARTERLY REPORT FOR THE 3 MONTHS ENDED 31 December 2010 HIGHLIGHTS Completed the acquisition of JDC and coal projects in Kalimantan, Indonesia New board and management of highly experienced
More informationFor personal use only
22 November 2018 ASX : ARV FRANKFURT : ATY US OTCQB : ARTTF GOLD, COBALT AND COPPER IN THE WEST PILBARA ARTEMIS RESOURCES LIMITED IS AN AUSTRALIAN MINERAL DEVELOPER ADVANCING ITS WEST PILBARA BASE, BATTERY
More informationFor personal use only
Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia, 1225 Phone: +61 2 9078 7670 Facsimile: +61
More informationFor personal use only
MEDIA/ASX RELEASE 31 AUGUST 2011 CHINESE EXPLORATION BUREAU SIGNS MOU WITH AMMG ON ITS CANNING BASIN COAL PROJECT HIGHLIGHTS Memorandum of Understanding (MOU) signed by AMMG subsidiary, Canning Coal Pty
More informationFor personal use only
31 January 2012 DIRECTORS Michael Fry Chairman Ian Prentice Managing Director Darren Misquitta Executive Director Robert Kipp Non Executive Director Matthew Driscoll Non Executive Director Suzie Foreman
More informationDecember Quarterly Report 17 February 2014
December Quarterly Report 17 February 2014 Highlights Tshipi Borwa manganese ore being mined, railed, exported and sold Mount Mason Project approvals continue Directors Brian Gilbertson Paul Murray Priyank
More informationQuarterly Activities Report For The Period Ending 31 March 2018
Quarterly Activities Report For The Period Ending 31 March 2018 Highlights for the quarter ending 31 March 2018 Accent Resources have completed one Diamond drill hole (DD03) on the Magnetite Range Project
More informationOverview. Mining projects map
Mine As one of Australia s leading contract mining companies, BGC Contracting has been successfully delivering contract mining and infrastructure projects to an impressive list of resources clients for
More informationFOR THE THREE MONTHS ENDED 31 MARCH 2012
FOR THE THREE MONTHS ENDED 31 MARCH 2012 PROMINENT HILL CONTAINED METAL PRODUCTION MARCH 2012 QUARTER TOTAL COPPER (TONNES) 27,182 TOTAL GOLD (OUNCES) 38,887 OZMINERALS.COM C1 CASH COSTS US96.9c/lb HIGHLIGHTS
More information3 Pilbara ports provide gateways
COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial
More informationMatilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009
31 July 2009 Companies Announcements Office ASX Limited Level 6, 20 Bridge Street Sydney NSW 2000 By E-Lodgement Highlights Corporate Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd)
More informationMarket Announcement ASX:NTL, NZX:NTL For Immediate Release
Market Announcement ASX:NTL, NZX:NTL For Immediate Release Commodity Exposure GOLD and SILVER Board and Management Charbel Nader Chairman/Independent Director Quarterly Activities Report to 30 September
More informationHISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)
HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) BEN HAVELBERG PROPHECY WARRAMBOO SAGA Also to cause him much ridicule was his ability of prophesying the weather by the moon and the stars. The Polda water
More informationConference Presentation
Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 9 April 2013 Conference Presentation In accordance with the requirements of Listing Rule 3.1 we submit
More informationAtlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter
18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes
More informationJUPITER MINES LIMITED Q4 FY2019 QUARTERLY ACTIVITIES REPORT
JUPITER MINES LIMITED ABN 51 105 991 740 ASX: JMS 28 March 2019 Registered Office: Level 10 16 St Georges Terrace Perth WA 6000 Tel: +61 8 9346 5500 Fax: +61 8 9481 5933 Email: info@jupitermines.com Website:
More informationFor personal use only
QUARTERLY REPORT For the period ending 31 December 2013 Record operational results and demand for Fortescue products has generated strong cashflows allowing Fortescue to accelerate its debt reduction programme.
More informationQuarterly Activities Report For The Period Ending 30 June 2018
Quarterly Activities Report For The Period Ending 30 June 2018 Highlights for the quarter ending 30 June 2018 Accent Resources completed one Diamond drill hole on the Magnetite Range Project E59/875 during
More informationMARCH 2018 QUARTERLY ACTIVITIES REPORT
X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April
More informationAn emerging Pilbara Iron Ore Company Investor Presentation March 2012
ASX CODE : WFE An emerging Pilbara Iron Ore Company Investor Presentation March 2012 1 Disclaimer The views expressed in this presentation contain information derived from publicly available sources that
More informationFor personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March
OZ MINERALS AUSTRALIAN COPPER CONFERENCE TERRY BURGESS - Managing Director & CEO 23-24 March 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More informationReport for the Quarter Ended 30 June 2007
Report for the Quarter Ended 30 June 2007 HIGHLIGHTS SOUTHDOWN MAGNETITE & KEMAMAN PELLET PROJECT A subsidiary of Japanese trading company Sojitz Corporation agrees to take a 30% equity interest in the
More informationAngas Zinc Mine From Prediction to Production
TERRAMIN AUSTRALIA LIMITED Angas Zinc Mine From Prediction to Production Bob Singer SA Explorers Conferenc ce 28 November 2008 Important information The information in this presentationn is designed as
More informationSPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION
Regulatory Announcement Go to market news section Company TIDM Headline Released Number CHL Spitfire Resources Update 07:00 23-May-08 1434V07 RNS Number : 1434V 23 May 2008 Spitfire Resources Limited Update
More informationFor personal use only
De Grey Mining Ltd A.B.N. 65 094 206 292 The Bold Explorer 14 October 2011 ASX/MEDIA RELEASE DE GREY FURTHER EXPANDS ARGENTINA HOLDINGS De Grey Mining Ltd (De Grey or the Company) is pleased to announce
More informationAustralian Securities Exchange Notice
Australian Securities Exchange Notice 12 December 2017 ASX: ILU CATABY PROJECT APPROVED WITH OFFTAKE AGREEMENTS SECURED FOR 85 OF SYNTHETIC RUTILE PRODUCTION Cataby mineral sands project approved; with
More informationHaoma Mining NL A.B.N
Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)
More informationHaoma Mining NL A.B.N
A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250 Email:
More informationRecent Exploration of the Olympic Dam
Recent Exploration of the Olympic Dam Southern Orebody DAVE THOMAS Olympic Dam Development Study SA Explorers Conference 2 December 2005 BHP Billiton profile (2005) The company BHP Billiton is the world
More informationMOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017
MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2017 20 October 2017 Key Points* Sales increased ~40% in the September quarter to 0.84 million wet metric tonnes (Mwmt) including
More information2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT
2 September 2014 The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT Please find following for shareholders information, an announcement
More informationFor personal use only
ASX ANNOUNCEMENT 31 Oct 2016 Focus Minerals Ltd Activities and Cashflow Report for September Quarter 2016 Exploration Highlights During the Quarter During the September Quarter, Focus Minerals Ltd ( Focus
More informationNewcrest Mining Limited
Newcrest Mining Limited Colin Moorhead Newcrest a portfolio of opportunities Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking
More informationFor personal use only
28 September 2018 GBM EXECUTES AGREEMENT WITH MINJAR TO ACQUIRE TWIN HILLS GOLD PROJECT IN DRUMMOND BASIN, QUEENSLAND HIGHLIGHTS Binding Sale and Purchase Agreement signed with Minjar Gold Pty Ltd 1 to
More informationFUTURE DEVELOPMENT OF THE PILBARA
FUTURE DEVELOPMENT OF THE PILBARA June 2013 OUR MISSION The Catalyst for Regional Growth and Development. COMMISSION S ROLE ROLE Leader, Advocate, Broker, Innovator OBJECTIVES Diversity - Economic, Community
More informationDecember 2018 Quarterly Production Report
31 January 2019 December 2018 Quarterly Production Report Fortescue Metals Group Limited (ASX: FMG, Fortescue) Fortescue has released its December 2018 quarterly production results, reporting total shipments
More informationLorena Gold Project Malachite AGM 29 November 2017
Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated
More informationFor personal use only
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
More informationFor personal use only
Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 31 May 2013 Annual General Meeting Presentation In accordance with the requirements of Listing Rule
More informationFor personal use only
ASX Release 31 July, 2012 MONTERAY MINING GROUP Tel: +61 7 5538 2558 Fax: +61 7 5526 8922 info@monteraymining.com.au www.monteraymining.com.au Contact: KEVIN DART Chairman kjdart@charpac.com.au JOHN HANNAFORD
More informationRamelius Resources Limited ASX:RMS
Ramelius Resources Limited ASX:RMS INVESTOR PRESENTATION March 2012 1 Forward Looking and Competent Persons Statements Forward looking statements This presentation contains certain forward looking statements
More informationBumper Quarter for Atlas as Production Hits 10Mtpa
September 2013 ly Report 17 October 2013 Bumper for Atlas as Production Hits 10Mtpa Existing mine performance and investment at Abydos drives record production, while healthy prices and cost control drives
More informationPilbara Iron Ore Project WESTERN AUSTRALIA
Pilbara Iron Ore Project WESTERN AUSTRALIA Forging ahead UK Investor Presentation Gary Sutherland, Managing Director Flinders Mines Ltd (ASX: FMS) September 2011 UK INVESTOR PRESENTATION SEPTEMBER 2011
More informationSouth America Copper Site Visit Non-ferrous overview
Spence, Chile South America Copper Site Visit Non-ferrous overview Andrew Mackenzie Chief Executive Non-ferrous 26 September 2010 Disclaimer Reliance on Third Party Information The views expressed here
More informationCurragh Operational Tour
Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May
More informationDecember 2014 Quarterly Report
Corporate Structure Shares 35,970,000 Options 7,250,000 Perf. Rights 5,000,000 Cash $4.2m ASX Code - BBR Directors Patrick Ford Non-Executive Chairman Chris Cowan Executive Director Nelson Reynolds Non-Executive
More informationThe world s largest bulk export
The world s largest bulk export port authority AUGUST 2018 The ports of Dampier and Port Hedland are two of the world s largest bulk export ports, responsible for approximately 75 per cent of Western Australia
More informationQUARTERLY REPORT. ASX Code JRL HIGHLIGHTS FINANCIAL. Resources Limited ABN for the three months ended 30 June 2016.
Resources Limited ABN 52 064 121 133 QUARTERLY REPORT for the three months ended 30 June 2016. ASX Code JRL For further information, contact: Mr Lindsay Dudfield Jindalee Resources Limited Telephone: 61
More informationTHE EARLY MOVER IN SOUTHERN AFRICAN ONSHORE GAS
v 9/10/2013 Kinetiko Energy Limited THE EARLY MOVER IN SOUTHERN AFRICAN ONSHORE GAS www.kinetiko.com.au ASX: KKO Disclaimer This document should be read in conjunction with any other available information
More informationQuarterly Activities Report December 2018
ASX: EQE 31 January 2019 About Equus Mining: Equus Mining is an ASX listed Company focused on developing natural resource projects strategically located near existing mine and other infrastructure. Follow-up
More informationMarket Release 11 March 2019
Market Release 11 March 2019 Newcrest to acquire potential Tier 1 orebody in Canada Newcrest Mining Limited (Newcrest) has entered into an agreement with TSX-listed Imperial Metals Corporation (Imperial)
More informationArtemis Resources Limited
Artemis Resources Limited ASX: ARV Australian focused Mining Exploration and Development Gold, Nickel, Cobalt, Copper, Zinc, Platinum, Iron Ore Karratha West Pilbara -Western Australia Investor Update
More informationFor personal use only
Matsa Resources Limited June 2012 LIMITED ABN 48 106 732 487 ASX Announcement Fraser Range North Project Farm-In Agreement Matsa Resources (ASX:MAT) ("Matsa" or the "Company") advises that it has entered
More informationEXPERIENCED BOARD. Board Arun Jagatramka Chairman B.Com (Hons), FCA, AIMM. Maurice Anghie Independent Director & Audit Chairman BBus, FCA, FCPA, MAICD
EXPERIENCED BOARD Board Arun Jagatramka Chairman B.Com (Hons), FCA, AIMM Maurice Anghie Independent Director & Audit Chairman BBus, FCA, FCPA, MAICD Don Carroll Independent Director B.E (Mining), MAusIMM,
More informationDECEMBER 2017 QUARTERLY ACTIVITIES REPORT
DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and
More informationNEWCREST LOOKING TO THE FUTURE
NEWCREST LOOKING TO THE FUTURE Sandeep Biswas Managing Director and Chief Executive Officer Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking
More informationAnnual Mineral Resources and Ore Reserves Statement - 31 December 2016
Market Release 13 February 2017 Annual Mineral Resources and Ore Reserves Statement - 31 December 2016 Newcrest Mining Limited has updated its Mineral Resource and Ore Reserve estimates for the twelve
More informationCadia Valley. Peter Smith Executive General Manager Australian Operations
Cadia Valley Peter Smith Executive General Manager Australian Operations Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking
More informationCAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011
CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey
More informationINNOVAT MINERAL PROCESS SOLUTIONS LIMITED. INN16CO-CS-001 July 21, INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project
760 Brant St., Suite 405C, Burlington ON, L7R 4B8, Canada Tel 905-333-7133 Fax 905-333-9336 www.vatleach.com INN16CO-CS-001 July 21, 2016 Document: Project: TECHNICAL MEMORANDUM INNOVAT Case Study 5M t/a
More information2011 Annual General Meeting. Greg Robinson Managing Director & CEO
2011 Annual General Meeting Greg Robinson Managing Director & CEO Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve
More informationKinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008
DELIVERING DISCIPLINED GROWTH 1 Cautionary Statements All statements, other than statements of historical fact, contained or incorporated by reference in this presentation, including any information as