1 CITY OF ST. PETERS 2018 PAVEMENT MANAGEMENT PROGRAM

2 FOREWORD The purpose of the City of St. Peters pavement management program is to provide well-maintained, high quality streets, sidewalks and traffic control systems at the lowest reasonable cost. Planned levels of maintenance must be carefully correlated with available funds to achieve the best possible level of service across the City. This program book lists the streets, sidewalks, street signs, pavement markings and traffic signals scheduled for repair or replacement during the coming season in each political ward of the City. Prior to the individual ward sections are summary lists for scheduled sidewalk, concrete and asphalt street repairs, sign replacements, traffic signal improvements, and pavement marking operations. All projects are listed in order of need. Listings of all projects, in the general order they will be performed, will be available at the Street Department website, These listings will be updated periodically as the projects are completed, or conditions warrant a schedule change. In addition to the 2018 repair projects, listings of tentative repair and maintenance projects for 2019, which are currently un-funded, are shown. Street, sidewalk and traffic system repair and maintenance are hazardous and stressful jobs, which may not be understood by the general public. Operations are performed in the public road right-ofway during hot weather, and often under heavy traffic conditions. We thank those individuals who give their dedication and best effort in carrying out the details of this program Pavement Management Program i Forward

3 TABLE OF CONTENTS Foreword...i Table of Contents... ii Pavement Management System Strategy Sidewalk Maintenance Program Enhancement Maintenance Projects Asphalt Overlay Projects Concrete Slab Replacement Projects Curb Replacement Projects Joint and Crack Sealing Projects Proposed Asphalt Overlay Projects Proposed Concrete Slab Replacement Projects Joint and Crack Sealing Projects Pavement Marking and Sign Programs Sign Replacement Projects Pavement Marking Projects Traffic Signal Projects Ward 1 Projects and Pavement Ratings Ward 2 Projects and Pavement Ratings Ward 3 Projects and Pavement Ratings Ward 4 Projects and Pavement Ratings Pavement Rating Summary Pavement Management Program ii Table of Contents

4 PAVEMENT MANAGEMENT SYSTEM STRATEGY The Transportation and Development Services Group is responsible for the maintenance of approximately 547 lane miles of pavement. Approximately 195 lane miles (36%) are constructed of asphalt and 353 lane miles (64%) are constructed of concrete. As the City s pavement continue to age, more effort and financial resources will be required to maintain the current level of service condition. The American Concrete Pavement Association states the average useful life of properly installed concrete pavement is 35 years. The Asphalt Institute states that the average useful life of properly installed asphalt pavements is 17 years. Both organizations state that periodic crack sealing and miscellaneous spot repairs are generally necessary before full replacement or resurfacing is required. It has been the City St. Peters experience that major maintenance is generally required for asphalt streets, between the ages of 10 to 12 years, and for concrete streets, between the ages of 15 to 20 years. This increased frequency in maintenance is primarily due to less than optimum sub-grade conditions. Prior to 1998, concrete and asphalt streets in the City were constructed directly on a compacted soil sub-grade. Since 1998, all new pavement placed in the City of St. Peters must be constructed on four inch thick aggregate rock base. The addition of aggregate rock base provides a harder, more stabile base, thus extending pavement life. In 2017, the City of St. Peters joined the Eastern Missouri Pavement Cooperative (EMPC), a group of St. Charles area municipalities and agencies that work cooperatively to improve the quality of concrete pavement through improved specifications and staff training, more stringent material testing requirements and elimination of certain types of aggregate materials that are not suitable for use in areas that treat with salt and other deicing chemicals. While EMPC concrete mixes cost between $2.00 and $4.00 more per cubic yard compared to non EMPC concrete mixes, savings in future labor, traffic disruption and materials from less small scale replacement and patching will more than offset increased material costs. The graphs on the following page show the age distribution of the City s pavements: 2018 Pavement Management Program 1 Pavement Management System Strategy

5 2018 Pavement Management Program 2 Pavement Management System Strategy

6 Referencing the aging distribution graphs on the previous page, it can be seen that 16% of concrete streets within the City of St. Peters have met or exceeded their expected useful life of 35 years and 71% of the City s concrete streets have reached an age where some slab replacement is required. By contrast, 98% of the asphalt streets have reached an age that requires periodic overlays be performed. In order to provide planned and orderly pavement maintenance, the City of St. Peters has instituted this pavement management program, which uses a computer database containing maintenance records of each city street. This database includes the name, length, width, street material, dates and quantities of maintenance operations, and current pavement condition or street rating. All streets in the City of St. Peters are rated using the PASER rating system, developed by the University of Wisconsin. The PASER system rates pavement based on the number and type of pavement distresses. Pavement is rated on a scale of 1 to 10, with 10 being new or like new. The database is sorted, based on the PASER ratings, to formulate lists of streets that require maintenance or repair, and to establish maintenance priority and schedule. In addition, the City of St. Peter s resident concern system is used to identify locations where street repair or maintenance may be necessary. It is the goal of the City of St. Peters Pavement Management Program to achieve a 12-year overlay cycle for asphalt streets, and a 35-year replacement cycle for concrete streets. To achieve this goal, the City of St. Peters must overlay approximately 118,000 square yards of asphalt pavement and replace approximately 65,200 square yards of concrete pavement annually. Currently, the program is funded to overlay approximately 109,578 square yards of asphalt pavement, and replace approximately 25,325 square yards of concrete pavement. The City s annual pavement maintenance funding also includes additional repair treatments such as crack sealing, joint repair, and pothole patching. Also part of the City s annual pavement management program is the annual concrete curb and gutter replacement program. Curb and gutter replacement is typically performed on asphalt streets prior to planned overlay. The curb and gutter replacement program is funded to replace up to 10% of the curb and gutter present on a street scheduled for asphalt overlay. Currently the program is funded to replace 1,100 lineal feet of damaged concrete curb and gutter Pavement Management Program 3 Pavement Management System Strategy

7 SIDEWALK MAINTENANCE AND INFILL PROGRAM The City of St. Peters maintains approximately 501,600 lineal feet (95 miles) of sidewalks and 507 accessible ramps within its corporate limits. These sidewalks and accessible ramps service both residential and commercial areas and are constructed of concrete. Accessible, well maintained sidewalk networks provide safe and efficient travel for pedestrian traffic, promotes a healthy lifestyle and is environmentally friendly. Furthermore, providing a stable path, which separates pedestrian traffic from vehicular traffic, improves the overall safety of city streets. It is the policy of the City of St. Peters to ensure that its sidewalks are accessible and maintained in good condition. To this end, the City of St. Peters Transportation and Development Services (TDS) Group administers the City s sidewalk maintenance and infill program to provide well-maintained, Americans with Disability Act (ADA) compliant, high quality sidewalks and accessible ramps at the lowest reasonable cost. The City of St. Peters Sidewalk Maintenance Program and Infill Program consists of two phases. Phase one is an annual survey of all sidewalks within the City of St. Peters corporate limits. To perform this survey, all the sidewalks in the city are broken in to segments, with boundaries generally between intersections. City streets with sidewalks on both sides contain two sidewalk segments. The sidewalks are inspected for one of eight defect types, which can impact the safety and/or aesthetics of the sidewalk, and compliance with current (ADA) standards. The results of this annual inspection are recorded in a database for use determining future repair and improvement projects. Below is a summary of the defect types recorded: Sidewalk with defect Type A -Vertical edge of ¾ or more. Sidewalk with defect Type A at storm drain -When the sidewalk rises, or lowers in respect to the drain, it can cause different types of defects, here type A Pavement Management Program 4 Sidewalk Maintenance Program

8 Sidewalk with defect Type B -Raised more than 3 inches in a 10-foot run. -Depressed more than 3 inches in a 10-foot run. Sidewalk with defect Type C -Has cracked into more than 2 pieces per square -Cracks have horizontal separations equal to ¾ inch or more. Sidewalk with defect Type D -Sidewalk has spalled over 50% of the surface. Sidewalk with defect Type E -The sidewalk has horizontal separation of ¾ or more Pavement Management Program 5 Sidewalk Maintenance Program

9 Sidewalk with defect Type F -The sidewalk has vegetation or debris covering 50% or more of the surface. Sidewalk with Multiple Defects -Square exhibits more than one type of defect. (Type C & F shown) Phase two of the sidewalk maintenance and infill program involves evaluation of the inspection results to prioritize and schedule annual repair projects. To ease the project evaluation process, as with city streets, all the sidewalk segments identified are rated on a scale of one to ten. The sidewalk rating assigned is based on the type and severity of the defect found. Priority is given to sidewalk segments with Type A, Type A with Storm Sewer Inlets, and accessible compliance defects. These types of defects pose the greatest risk to pedestrian and bicycle traffic and to accessible travel. In compliance with current ADA standards and requirements, the City s Sidewalk Maintenance and Infill Program serves as the City of St. Peters ADA Transition Plan with the goal to provide safe, accessible routes for all pedestrians within the bounds of the program s annual budget. City of St. Peters sidewalk systems will be improved to current ADA standards in conjunction with scheduled asphalt resurfacing, large scale concrete pavement replacement projects (project involving replacement of greater than 50% of the pavement surface within the project limits), approved federal aid projects, traffic signal/intersection improvement projects, and other projects with sidewalk and trail elements. With approximately 95 miles of sidewalks and 507 accessible ramps to be maintained, it is important that a systematic approach be used to ensure the City of St. Peters sidewalk and trail systems operate safely. The 2018 sidewalk maintenance program is currently funded to replace approximately 19,895 square feet of concrete sidewalk and 1,854 square feet of accessible ramps. It is the goal of the sidewalk maintenance and infill program to provide a safe, accessible and functional sidewalk system Pavement Management Program 6 Sidewalk Maintenance Program

10

11

12

13 2018 ENHANCEMENT MAINTENANCE PROJECTS 2018 Decorative Concrete Sealing SF Repair Boone Hills Drive Islands 11,611 Seal Only Mid Rivers Mall Drive 27,743 Seal Only Suemandy Drive 2,892 Seal Only 2019 Decorative Concrete Sealing SF Repair Main Street (Old Town) 11,929 Seal and Replace St. Peters Centre Boulevard 7,800 Seal Only Executive Center Boulevard 2,000 Seal Only The City of St. Peters maintains approximately 79,475 square feet of raised islands with stamped and stained concrete. These islands require periodic sealing and re-staining every three years. It is the goal of the City s decorative island program to repair and maintain islands and medians so they remain an attractive asset to the community Pavement Management Program 10 Decorative Island Maintenance Program

14 2018 ASPHALT OVERLAY PROJECTS WARD 1 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Arrowhead Industrial Park Gerber Industrial Drive Arrowhead Ind Blvd End 2,400 4 Guenther Boulevard Start Cermak Blvd 2,020 6 Total/Average 4,420 5 Estates of Chateau Woods Bay Hill Drive Schoal Creek Dr Schoal Creek Dr 4,400 4 None Salt River Rd Shoulders Old Salt River Rd Silvers Road 2,971 n/a Shadow Creek Shadowridge Court Start Shadow Ridge Dr 2,044 4 Total, Ward 1 13,835 4 WARD 2 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Country Hill Farm Edgemont Road Elmdale Ln Fernwood Dr 1,725 5 Country Hill Manor Oak Hill Lane Southwood Dr West Meadow Dr 4,058 5 Country Hill South Edgemont Road Fernwood Dr Countryside Dr 1,724 5 Fernwood Drive Edgemont Rd Countryside Dr 2,447 5 Total/Average 4,171 5 None Mexico Road Bridge Approaches at Dardenne Creek Total, Ward 2 10, Pavement Management Program 11 Asphalt Overlay Projects

15 WARD 3 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Bethel Christan Center Azusa Street Jungerman Rd End 1,498 4 None Mexico Road Jungerman Rd Veterans Memorial Pkwy 24,906 5 Old Cultural Arts Building Parking Lot St. Peters Howell Rd St. Peters Howell Rd 1,961 n/a Timberidge Drive Hackman Rd Muegge Rd 30,937 5 Total/Average 57,804 5 Oak Creek Hills Heather Valley Circle Heather Dr Heather Dr 4,570 4 Spencer Creek South North Star Court Spencers Crossing End Spencer Creek West River Boat Court Start Sutters Mill Rd 1,128 4 Springwood Wood Path Lane Spring Way Dr Spring Way Dr 2,758 3 Timberidge Balsam Court Timberidge Dr End 1,147 5 Idlewood Court Timberidge Dr End 1,001 4 Total/Average 2,148 5 Total, Ward 3 70, Pavement Management Program 12 Asphalt Overlay Projects

16 WARD 4 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Country Creek Forest Ridge Court Start Greenfield Dr Pin Oak Court Start Country Creek Dr 1,454 7 Total/Average 2,150 6 Country Lake Estates Country Lake Drive Mc Clay Rd Magnolia Ln 1,880 5 None Dye Club Drive Mid Rivers Mall Dr End of Maintenance 1,533 n/a Ranchette Estates Cactus Court Tumbleweed Trail End Cactus Junction Start Tumbleweed Trail 2,691 3 Tumbleweed Trail Start Dingledine Rd 1,359 4 Total/Average 4,762 4 Woodbrair Bushwood Court Woodbrair Ln End 1,516 4 Cottleville City Limits Mid Rivers Mall Drive Shoulders Cottleville Pkwy North St. Peters Pkwy 1,794 n/a Total, Ward 4 13,635 5 TOTAL, ALL WARDS 108, Pavement Management Program 13 Asphalt Overlay Projects

17 2018 SLAB REPLACEMENT PROJECTS WARD 1 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Drovers Crossing Connemara Road Mexico Rd End Englewood Douglas Drive West Gatewood Dr End Hope Court Hope Drive Start Mexico Rd Horizon Business Center Turner Boulevard I-70 Service Rd N End I-70 Trade Center Trade Center Drive Start End Laurel Springs Blue Water Drive Belleau Creek Rd End Natural Spring Drive Blue Water Dr Blue Water Dr Total/Average 1,425 7 Misty Valley Estates Lantana Court Misty Valley Dr End Lantana Lane Misty Valley Dr Misty Valley Dr Misty Moss Court Misty Moss Ln End Misty Moss Lane Misty Valley Dr Lantana Ln Total/Average 1,475 5 None Boone Hills Drive Misty View Ln Jungermann Rd Richmond Estates Richmond Center Blvd Boschert Creek Dr Veteran Memorial Pkwy Total, Ward 1 11, Pavement Management Program 14 Concrete Slab Replacement Projects

18 WARD 2 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Amherst Dardenne Ridge Drive Start Mid Rivers Mall Dr Country Crossing Treeshade Drive Birdie Hills Rd Shady Patch Dr Hickory Ridge West Windfall Ridge Court Start Whispering Ridge Ln Total, Ward 2 3,500 5 WARD 3 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Applewood Bartley Street Plum Tree Dr Apple Tree Dr Plum Tree Drive Pilott Hill Dr Bartley St Total/Average 1,875 4 Cave Springs Estates Cave Springs Estates Drive Start Concord Ct Concord Court Start Cave Springs Est Dr Ticonderoga Drive Cave Springs Est Dr Cave Springs Est Dr Total/Average 1,150 5 None Spencer Road Spring Wood Dr Willott Rd Tanglewood Barkwood Trails Drive Jungermann Rd Spruce St Total, Ward 3 8, Pavement Management Program 15 Concrete Slab Replacement Projects

19 WARD 4 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Boones Trace Burning Leaf Drive Jungermann Rd Horstmeier Rd Highlands Greenburg Drive Castle Douglas Ct End Park Ridge Estates Carriage Hill Court Start Carriage Hill Dr Pasture Ridge Drive Start End Total/Average Total, Ward 4 1,750 6 TOTAL, ALL WARDS 25, Pavement Management Program 16 Concrete Slab Replacement Projects

20 2018 CURB REPLACEMENT PROJECTS WARD 1 Repair Qty Pavement Subdivision: Start: End: (LF) Rating Shadow Creek Shadowridge Court Start Shadow Ridge Dr 50 4 Total, Ward WARD 2 Repair Qty Pavement Subdivision: Start: End: (LF) Rating Brookmount Estates Jane Drive East Meadow Ln Julie Ln 80 4 Jody Drive Willott Rd Christine Dr Total/Average Country Hill Farm Edgemont Road Elmdale Ln Fernwood Dr 40 5 Hillview Court Start North Hillview Dr 20 4 Total/Average 60 5 Country Hill Manor Oak Hill Lane Southwood Dr West Meadow Dr 80 5 Country Hill South Edgemont Road Fernwood Dr Countryside Dr 40 5 Fernwood Drive Edgemont Rd Countryside Dr 50 5 Total/Average 90 5 Windstream Windstream Drive Vantage Dr Willott Rd 40 6 Total, Ward Pavement Management Program 17 Curb Replacement Projects

21 WARD 3 Repair Qty Pavement Subdivision: Start: End: (LF) Rating Oak Creek Hills Heather Valley Circle Heather Dr Heather Dr 50 4 Meandering Lane Sutters Mill Rd Wisteria Way 40 5 Total/Average 90 5 Spencer Creek East Hanging Tree Court Sutters Mill Rd End 30 4 Yankee Jim Court Sutters Mill Rd End 20 3 Total/Average 50 4 Spencer Creek South North Star Court Spencers Crossing End 20 5 Spencer Creek West River Boat Court Start Sutters Mill Rd 20 4 Tailing Wheel Court Start Sutters Mill Rd 50 5 Wells Fargo Drive Sutters Mill Rd River Boat Dr 40 4 Total/Average Total, Ward WARD 4 Repair Qty Pavement Subdivision: Start: End: (LF) Rating Country Lake Estates Country Lake Drive Mc Clay Rd Magnolia Ln 60 5 Crescent Hills Constellation Hill Drive Crescent Woods Dr Crescent Hills Dr Vanguard Drive Suncrest Dr Universal Dr 40 4 Total/Average None Old Farmhouse Road Kisker Rd End 50 3 Total, Ward TOTAL, ALL WARDS 1, Pavement Management Program 18 Curb Replacement Projects

22 2018 JOINT & CRACKSEALING PROJECTS WARD 1 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Drovers Crossing Ardennais Road Carriage Way West Connemara Road Carriage Way East Connemara Road End Connemara Road Start Carriage Way East 1,960 6 Lippizan Road Carriage Way East Connemara Road 1,326 5 Total/Average 4,199 6 Hollow Creek Hollow Creek Court Start Hollow Creek Drive Hollow Creek Drive Hollow Creek Court Birdie Hills Road 1,240 8 Lazy Hollow Court Hollow Creek Drive End Total/Average 1,934 8 None Belleau Creek Road Mexico Road City Limits 2,160 7 The Towns at Belleau Creek Belleau Wood Drive Mexico Road Belleau Creek Road 1,399 9 Total, Ward 1 9,692 7 WARD 2 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Bellemeade Bellemeade Drive Dubray Drive Kimberly Lane 2,384 7 Briley Street Start Harding Street 2,032 7 Cashmere Lane Start End 1,658 8 Davidson Court Bellemeade Drive End Dubray Drive Start Mexico Road 2,189 7 Ellin Street Selene Street Chalmers Street Giles Lane Briley Street Nashville Street Grand Teton Drive Dubray Drive Mexico Road 3,295 7 Harding Street Martha Street Bellemeade Drive 1,304 7 Lorillard Street Bellemeade Drive End Martha Street Dubray Drive Briley Street Nashville Street Cashmere Lane Harding Street 1,411 7 Piper Street Nashville Street Bellemeade Drive Selene Street Start Bellemeade Drive 1,074 8 Total/Average 18, Pavement Management Program 19 Joint & Cracksealing Projects

23 WARD 2 (Continued) Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Bellemeade Manor Aldernay Street McGavock Street Bellemeade Drive 1,240 7 Bellemeade Drive McGavock Street Aldernay Street Davidson Drive McGavock Street Aldernay Street McGavock Street Aldernay Street Mcxico Road 1,831 7 Total/Average 4,288 7 Golden Triangle Golden Harvest Court Start Golden Harvest Drive Golden Harvest Drive City Limits St. Peters Howell Rd Morning Star Court Morning Star Lane End Morning Star Lane Start St. Peters Howell Rd Total/Average 1,935 7 None Kimberly Lane St. Peters Howell Rd Willott Road 5,659 7 Pegasus Farms Achilles Court Orion Way End 88 7 Adonis Court Start Athena Way Agamemnon Court Start End Apollo Court Start Pegasus Circle Argos Court Start Mount Olympus Drive Athena Way Pegasus Trail Pegasus Circle 1,811 7 Athens Drive Start Mount Olympus Drive 1,822 7 Atlas Court Start Athens Drive Calypso Court Pegasus Circle End Danson Drive Pandora Court Posiedon Court Hera Court Start Athens Drive Minus Drive Pegasus Trail Athens Drive Mount Olympus Court Pegasus Court End Mount Olympus Drive Strafford Drive Pegasus Court 1,612 6 Orion Way St. Peters Howell Rd Adonis Court Pandora Court Start Danson Drive Pegasus Circle Willott Road Willott Road 1,817 6 Pegasus Court Mount Olympus Ct End Pegasus Trail St. Peters Howell Rd Pegasus Circle 2,526 7 Poseidon Court Start Athena Way 1,214 6 Titan Court Start Pegasus Trail Venus Court Start Venus Drive 75 6 Venus Drive Athens Way Minus Drive 1,333 7 Zeus Court Athena Way End Total/Average 17, Pavement Management Program 20 Joint & Cracksealing Projects

24 WARD 2 (Continued) Repair Quanity Pavement Subdivision: Start: End: (LF) Rating The Enclaves at Eisenhower Clinton Court Start End Nixon Drive Clinton Court Eisenhower Drive Total/Average Willott Square Candice Way Willott Square Drive Willott Square Drive Willott Square Alley A Willott Square Drive Willott Square Drive Willott Square Alley B Willott Square Drive Willott Square Drive Willott Square Drive Start Willott Road 1,426 7 Total/Average 2,794 7 Windstream Vantage Drive Windstream Drive End Total, Ward 2 51,407 7 WARD 3 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating None Mexico Road Jungermann Road Cloverleaf Drive 1,475 5 Total, Ward 3 1,475 5 WARD 4 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Bella Vista Madeira Court Siena Drive End Mattina Court Start Siena Drive Mira Villa Drive Mc Clay Village Dr End 1,397 7 Saravalle Drive Start Mira Villa Drive Siena Drive Mira Villa Drive End 1,716 7 Sorano Way Mira Villa Drive Madeira Court Terrasini Drive N St. Peters Pkwy Siena Drive 1,019 6 Toscana Way Siena Drive Mattina Court Total/Average 6, Pavement Management Program 21 Joint & Cracksealing Projects

25 WARD 4 (Continued) Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Danielle Downs Magnolia Manor Circle Start Magnolia Manor Court Magnolia Manor Court Imperial Drive End Old Winery Court Imperial Drive End Plantation Manor Circle Plantation Manor Crl End Plantation Manor Court Imperial Drive End 1,096 7 Total/Average 2,363 6 Heritage Landing Heritage Crossing Wharton Street South St. Peters Parkway Heritage Manor Heritage Manor Circle Start Heritage Manor Court Heritage Manor Court Heritage Manor Circle End 1,497 7 Total/Average 1,653 7 Lienemann Forest Cinnamon Hills Drive Canyon Creek Drive Lieneman Drive Lienemann Court Start Lienemann Drive Lienemann Drive Canyon Creek Drive Cinnamon Hills Drive 1,198 7 Total/Average 2,059 7 Mc Clay Valley Mc Clay Valley Blvd Mc Clay Road End 3,360 7 Park Valley Court Mc Clay Valley BoulevarEnd Park Valley Drive Mc Clay Valley BoulevarValley Ridge Drive 2,424 7 Valley Ridge Drive Park Drive Drive End 1,143 6 Valley Vista Court Valley Vista Drive South End Valley Vista Drive North Valley Vista Drive South Valley Vista Drive South Valley Vista Drive South Mc Clay Valley BoulevarValley Vista Drive North 1,450 6 Total/Average 10,495 6 None Jungermann Road North St. Peters Parkway Willott Road 8,904 7 Queensbrooke Boulevard Jungermann Road Harvester Road Total/Average 9,370 7 Queensbrooke Bond Court Queensbrooke BoulevardEnd Pavement Management Program 22 Joint & Cracksealing Projects

26 WARD 4 (Continued) Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Stoneridge Estates Grayowl Garth Court Start Pasture Gate Court Harvest Moon Court Start Surrey Lane Hearth Stone Court Start Surrey Lane Meadow Grove Court Tara Lane End Morning Wind Court Start Dingledine Road Old Buggy Court Surry Lane End Pasture Gate Court Grayowl Garth End Surrey Lane Tara Lane Dingledine Road 1,495 6 Tara Lane City Limits Upper Meadow Lane 1,988 7 Upper Meadow Lane Start Tara Lane Whispering Woods Drive Start Tara Lane Total/Average 6,315 6 The Pointe at Heritage Crossing Calvert Place Newkirk Circle End City Gate Lane Newkirk Circle End Hargrove Way Newkirk Circle Wharton Street Newkirk Circle City Gate Lane City Gate Lane 2,293 7 Wharton Street City Gate Lane Heritage Crossing Total/Average 4,030 7 Waterside Crossing Hemsath Way Drive Terrasini Drive Waterside Crossing Drive Northshore Court Waterside Crossing DriveEnd Waterside Crossing Ct Waterside Crossing DriveEnd Waterside Crossing Dr North St. Peters Parkway End 1,386 7 Total/Average 2,478 7 Total, Ward 4 45,766 7 TOTAL, ALL WARDS 108, Pavement Management Program 23 Joint & Cracksealing Projects

27 2019 PROPOSED ASPHALT OVERLAY PROJECTS WARD 1 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating None South Church Street Mexico Rd McMenamy Rd 6,360 4 Total, Ward 1 6,360 4 WARD 2 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Brookmount Estates Jane Drive East Meadow Ln Julie Ln 4,901 4 Jody Drive Willott Rd Christine Dr 4,402 4 Kim Court Kimberly Ln End Lisa Court Jody Dr End Total/Average 10,892 4 Country Hill Manor Jane Drive Willott Rd East Meadow Ln 4,901 4 Coutnry Hill Farm Hillview Court Start N Hillview Dr Drovers Crossing Karabair Road Ardennais Rd Carriage Way West 1,843 4 St. Peters Hills Cavendish Square Jody Dr End 1,180 5 Parliament Square Westminster Dr End 1,172 4 Total/Average 2,352 5 Windstream Windstream Drive St Peters Howell Rd Windstream Ct 1,852 4 Total, Ward 2 22, Pavement Management Program Proposed Asphalt Overlay Projects

28 WARD 3 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Hi-Point Acres Circle Way Oak Tree St End 10,885 4 Walnut Tree Street Start Circle Way 2,677 4 Total/Average 13,562 4 None Jungermann Road Willott Rd Bartley St 21,000 5 Suttersmill Road Plum Tree Dr Jungermann Rd 11,412 5 Total/Average 32,412 5 Oak Creek Hills Heather Drive Spencer Rd Lost Dutchman Dr 4,926 4 Meandering Lane Sutters Mill Rd Wisteria Way 2,510 5 Total/Average 7,436 5 Spencer Creek East Hanging Tree Court Sutters Mill Rd End 1,004 4 Yankee Jim Coaurt Sutters Mill Rd End Total/Average 1,802 4 Spencer Creek West Gold Rush Court Sutters Mill Rd End 1,055 4 Tailing Wheel Court Start Sutters Mill Rd Wells Fargo Drive Sutters Mill Rd River Boat Dr 3,060 4 Total/Average 5,067 4 Timberidge Jasmine Court Start Timberidge Dr 1,131 5 Total, Ward 3 61, Pavement Management Program Proposed Asphalt Overlay Projects

29 WARD 4 Repair Quanity Pavement Subdivision: Start: End: (SY) Rating Country Creek Pinehurst Court Greenfield Dr End 2,720 5 Crescent Hills Constellation Hill Drive Crescent Woods Dr Crescent Hills Dr 5,133 4 Vanguard Drive Suncrest Dr Universal Dr 2,843 4 Total/Average 7,976 4 None Harvester Court Harvester Rd End 1,442 4 Old Farm House Road Kisker Rd End 1,349 4 Total/Average 2,791 4 Woodbriar Woodbriar Court Start Woodbriar Ln 1,336 5 Total, Ward 4 14,823 5 TOTAL, ALL WARDS 105, Pavement Management Program Proposed Asphalt Overlay Projects

30 2019 PROPOSED SLAB REPLACEMENT PROJECTS WARD 1 Repair Quanity Pavement Subdivision: To: From: (SY) Rating Cherokee Industrial Park Patmos Court Cherokee Dr End Englewood Laurelwood Drive Salt Lick Road Gateswood Dr Mid Rivers Trade Center Mid Rivers Industrial Drive Start Didion Dr Total, Ward 1 1,750 4 WARD 2 Repair Quanity Pavement Subdivision: To: From: (SY) Rating None WARD 3 Repair Quanity Pavement Subdivision: To: From: (SY) Rating Tanglewood Bramblewood Drive Burning Leaf Dr End Cherrywood Court Start Barkwood Trails Spring Leaf Court Burning Leaf Dr Burning Leaf Dr Spring Leaf Drive Bramblewood Dr Burning Leaf Dr Total/Average 2,550 5 Total, Ward 3 2, Pavement Management Program Proposed Concrete Slab Replacement Projects

31 WARD 4 Repair Quanity Pavement Subdivision: To: From: (SY) Rating Mc Clay Village Mc Clay Village Circle Mc Clay Village Dr Mc Clay Vilage Dr Mc Clay Village Drive Mc Clay Village Circle Mc Clay Rd Total/Average Park Ridge Estates Carriage Hill Court Start Carriage Hill Dr Pasture Ridge Drive Hidden Lake Dr End Total/Average Tanglewood Aspenwood Court Mill Wood Drive End Total, Ward 4 1,875 5 TOTAL, ALL WARDS 6, Pavement Management Program Proposed Concrete Slab Replacement Projects

32 2019 PROPOSED JOINT & CRACKSEALING PROJECTS WARD 1 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Estates of Chateau Wood Bay Hill Drive Schoal Creek Dr Schoal Creek Dr 1,800 4 Castle Pines Drive Schoal Creek Dr Bay Hill Dr Total/Average 2,440 5 None Mexico Road BJC St Peters Dr Jungermann Rd 1,475 5 Shadow Creek Aldesan Court Start Shadow Ridge Dr Shadow Ridge Drive Shadow Creek Dr Shadow Creek Dr 2,634 4 Shadowood Court Shadow Ln End Total/Average 3,019 3 Spanish Trails El Caballo Drive Spanish Trail Southwinds Dr 1,130 3 Total, Ward 1 8,064 4 WARD 2 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Country Hill Farm Auchly Lane South Hillview Dr Creekside Dr South Hillview Drive Start Country Farm Blvd 1,491 4 Total/Average 2,185 4 Country Hill Manor Southwood Drive Mid Rivers Mall Dr Mid Rivers Mall Dr Parkwoods North Kimberly Lane St Peters Howell Rd Brickingham Dr 3,706 5 St Peters Hills Kimberly Lane Brickingham Dr Willott Rd 2,095 6 Total, Ward 2 8, Pavement Management Program Proposed Joint & Cracksealing Projects

33 WARD 3 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Golden Hills Mineral Drive Nugget Dr Peach St Silver Ridge Maple Tree St Timberidge Dr 2,410 5 Total/Average 2,929 4 Le-Jer Acres Tieman Lane Jungermann Rd End Le-Jer Manor Bartley Street Apple Tree Dr Jungermann Rd 1,241 4 Oak Creek Hills Dogwood Court Start Dogwood Ln Dogwood Lane Sutters Mill Rd Gold Run Dr 2,547 5 Total/Average 3,147 6 Spencer Creek East Pilot Hill Court Pilot Hill Dr End 63 4 Pilot Hill Drive Sutters Mill Rd Bartley St 2,170 5 Plum Tree Drive Sutters Mill Rd Bartley St Total/Average 2,926 4 Spencer Creek South Spencers Crossing Willott Rd Sutters Mill Rd 2,115 5 Spencer Creek West Wells Fargo Court Start Sutters Mill Rd Total, Ward 3 13, Pavement Management Program Proposed Joint & Cracksealing Projects

34 WARD 4 Repair Quanity Pavement Subdivision: Start: End: (LF) Rating Crescent Hills Palomar Drive Universal Dr Voyager Dr Voyager Drive Suncrest Dr Crescent Hills Dr Total/Average 1,432 4 None Dye Club Drive Mid Rivers Mall Dr Bridge 680 n/a Total, Ward 4 2,112 4 TOTAL, ALL WARDS 32, Pavement Management Program Proposed Joint & Cracksealing Projects

35 PAVEMENT MARKING AND SIGN MAINTENANCE PROGRAMS As the City of St. Peters has grown, the City has developed an extensive traffic control network consisting of street signs, pavement markings, traffic signals and streetlights. These systems work together to safely and efficiently move motorists and pedestrians into and out of the City. In order to ensure that these systems operate properly, the Street Maintenance and Traffic departments, within the Transportation and Development Services Group (TDS), have developed several maintenance programs designed to provide up-to-date, well-maintained traffic control systems, at the lowest possible cost. Below is a summary of the traffic maintenance programs and a listing of planned work for the 2018 maintenance season. Street Sign Replacement Programs The City of St. Peters owns and maintains approximately 7,196 street name and regulatory signs on 3,814 posts, within its corporate limits. These signs provide important information to motorists that allow them to get to their destination safely and efficiently. The City of St. Peters follows current Manual for Uniform Traffic Control Devices (MUTCD) standards for the design and placement of all its roadway signage. It is the policy of the City of St. Peters to ensure that all street signs are aesthetically pleasing, clearly legible and maintained in good condition. To this end, the City of St. Peters Street Department is administering a Street Name Sign Replacement Program and has developed a regulatory sign replacement program. It is the goal of both programs to provide wellmaintained, high quality signage, at the lowest reasonable cost Pavement Management Program 32 Pavement Marking and Sign Maintenance Program

36 The City of St. Peters currently owns and maintains 2,527 street name signs. City of St. Peters street name signs (see picture below) feature the City of St. Peters logo. In addition to providing a sense of place, City street name and stop signs are placed on the same post to reduce the number of post in the systems. This consolidation reduces future maintenance liabilities for the City and eases yard maintenance around the sign. The Regulatory Sign Replacement Program involves the maintenance of a sign inventory; assessment of current sign condition and the scheduled, periodic replacement of all regulatory signs (i.e. stop signs and speed limit signs). The City of St. Peters currently owns and maintains 4,669 regulatory signs. These signs have been located using GPS equipment and assigned a condition rating of Good (like new condition), Average (acceptable) and Poor (requires replacement). This condition rating is then used to allow the Department to proactively replace damaged or worn signs. Industry standard for sign life is ten years. Based on this expected life cycle, the Street Department expects to replace up to 710 regulatory signs and 250 street name signs each year. Pavement Marking Programs The City of St. Peters maintains approximately 751,000 lineal feet of reflective pavement markings, 1,250 center turn arrows and 180 marked intersections. These markings improve intersection safety and efficiency by providing channelized traffic flow and visual cues for drivers. It is the policy of the City of St. Peters to ensure that all pavement markings are clearly visible and maintained in good condition. To this end, the City of Street Maintenance and Traffic departments administers various pavement marking maintenance programs with the goal to provide well-maintained, high quality pavement markings, at the lowest reasonable cost. Long line pavement markings are markings that run parallel to the centerline of a roadway and identify individual lanes of travel. The Traffic Department contracts long line markings operations, which are performed once a year, generally in late spring. The specifications for long line markings are modeled after Missouri Department of Transportation (MoDOT) standards and include retroreflectivity standards, which require the line to achieve an initial brightness standard. A majority of the City s pavement markings are paint, which have a useful life of twelve months. However, in instances where pavement-resurfacing operations will take place, the Traffic Department will consider the use of more durable markings and/or in pavement reflectors. Durable markings have a useful life of three to five-years, where as in pavement reflectors have a useful life of up to fifteen years. Use of these types of long line markings can reduce annual maintenance costs and improve marking visibility. The Intersection Marking Program includes the placement of turn arrows, stop bars and cross walks at 130 separate intersections. A majority of these intersections are remarked by contractor. Certain low volume intersections are remarked by Street Maintenance staff. In addition to pavement markings on public streets, the Street Maintenance department also performs facility parking lot marking and has established a five-year cycle to repaint parking stalls, cross walks and other delineations at various city facilities Pavement Management Program 33 Pavement Marking and Sign Maintenance Program

37 2018 SIGN REPLACEMENT PROJECT Subdivision Type Qty 1-70 Trade Center Double Fine Zone Trade Center Speed Trade Center Street Name Blue Trade Center Yield 1 Amherst Neighborhood Watch 1 Amherst Stop 30 2 Amherst Street Name Blue 4 Applewood Street Name Blue 14 Arrowhead Industrial Park Adopt A Road 1 Arrowhead Industrial Park Street Name Blue 6 Ashleigh Estates Double Fine Zone 1 Ashleigh Estates Street Name Blue 17 Aspen Ridge Stop 30 1 Aspen Ridge Street Name Blue 2 Barnes-Jewish St Peters Hospital End of Pavement 4 Barnes-Jewish St Peters Hospital Speed 40 1 Barnes-Jewish St Peters Hospital Stop 30 2 Barnes-Jewish St Peters Hospital Street Name Blue 8 Belleau Creek Estates Double Fine Zone 1 Belleau Creek Estates Keep Kids Alive Drive 25 1 Belleau Creek Estates Right Turn Ahead 1 Belleau Creek Estates Speed 25 1 Belleau Creek Estates Stop 30 1 Belleau Creek Estates Street Name Blue 7 Bellemeade Stop 30 2 Bellemeade Street Name Blue 4 Berlekamp Street Name Blue 1 Boones Trace Keep Kids Alive Drive 25 1 Boones Trace Stop 30 1 Boones Trace Street Name Blue 9 Braewood Street Name Blue 5 Brentmoore at Oak Tree Street Name Blue 2 Briarwick Street Name Blue 2 Brookdale Street Name Blue 3 Brookmount Estates All Way 2 Brookmount Estates No Parking 2 Brookmount Estates Parks 1 Brookmount Estates Stop 30 2 Brookmount Estates Street Name Blue 59 Brookmount Woods No Outlet Pavement Management Program Sign Replacement Program 34

38 Subdivision Type Qty Brookmount Woods Street Name Blue 3 Brookwood Estates Keep Kids Alive Drive 25 1 Brookwood Estates Street Name Blue 18 Brown Road Park Handicapped Parking 3 Brown Road Park No Parking 1 Bruns Place Street Name Blue 2 Candlewick Estates Double Fine Zone 1 Candlewick Estates Street Name Blue 6 Canyon Creek City Limit 1 Canyon Creek Street Name Blue 16 Cap-au-gris Street Name Blue 3 Cardinal Commons Street Name Blue 1 Cardinal Villas Do Not Enter 1 Cardinal Villas Wrong Way 1 Carrington Estates Adopt A Road 1 Carrington Estates No Parking 1 Carrington Estates Stop 30 1 Carrington Estates Street Name Blue 15 Carrington Place Street Name Blue 25 Cave Springs Estates Street Name Blue 31 Cave Springs Shopping Center Street Name Blue 8 Cedar Ridge II Crossing Sign 1 Cedar Ridge II Street Name Blue 6 Chapel Hill Street Name Blue 3 Chapel Hill Addition Street Name Blue 3 Cherokee Industrial Park Speed 40 1 Cherokee Industrial Park Street Name Blue 11 City Hall Handicapped Parking 3 Cloverleaf Park West All Way 1 Cloverleaf Park West Cross Road 1 Cloverleaf Park West Double Fine Zone 1 Cloverleaf Park West Mid Rivers Mall 1 Cloverleaf Park West Photo Enforcement 1 Cloverleaf Park West Speed 25 1 Cloverleaf Park West Stop 30 3 Cloverleaf Park West Street Name Blue 9 Cornerstone Subdivision Street Name Blue 1 Costco Commercial Keep Right 2 Costco Commercial Street Name Blue 4 Costco Commercial Yield 1 Cottage Hills Stop 30 1 Cottage Hills Street Name Blue Pavement Management Program Sign Replacement Program 35

39 Subdivision Type Qty Country Creek All Way 2 Country Creek Double Fine Zone 3 Country Creek No Outlet 2 Country Creek No Parking 2 Country Creek Stop 30 3 Country Creek Street Name Blue 45 Country Creek Weight Limit 1 Country Crossing Keep Kids Alive Drive 25 1 Country Crossing Parks 1 Country Crossing Stop 30 4 Country Crossing Street Name Blue 27 Country Crossing Estates Street Name Blue 26 Country Crossing Manor Street Name Blue 33 Country Hill Estates Stop 30 1 Country Hill Estates Street Name Blue 25 Country Hill Farm All Way 5 Country Hill Farm Left Turn Signal 1 Country Hill Farm No Left Turn 1 Country Hill Farm Stop 30 4 Country Hill Farm Street Name Blue 30 Country Hill Farm Walk Button 1 Country Hill Manor Street Name Blue 11 Country Hill Plaza Double Arrow 1 Country Hill Plaza Double Fine Zone 1 Country Hill Plaza Speed 25 1 Country Hill South Cross Road 1 Country Hill South Emergency Vehicles 1 Country Hill South End of Pavement 3 Country Hill South Handicapped Parking 1 Country Hill South No Outlet 1 Country Hill South No Parking 1 Country Hill South Parks 2 Country Hill South Street Name Blue 30 Country Lake Estates Double Fine Zone 1 Country Lake Estates Speed 25 1 Country Lake Estates Street Name Blue 9 Country Manor Street Name Blue 6 Covenant Park Speed 35 1 Covenant Park Street Name Blue 5 Crescent Hills No Parking 1 Crescent Hills Parks 2 Crescent Hills Street Name Blue Pavement Management Program Sign Replacement Program 36

40 Subdivision Type Qty Crown Colony Double Fine Zone 3 Crown Colony Keep Kids Alive Drive 25 1 Crown Colony No Parking 7 Crown Colony One Way 1 Crown Colony Speed 25 3 Crown Colony Stop 30 1 Crown Colony Street Name Blue 11 Crown Pointe No Parking 1 Crown Pointe Street Name Blue 4 Crystal Lake Estates Street Name Blue 5 Danielle Downs Double Fine Zone 1 Danielle Downs Speed 25 1 Danielle Downs Stop 30 7 Danielle Downs Street Name Blue 14 Dardenne Crossing Double Fine Zone 1 Dardenne Crossing Speed 40 1 Dardenne Crossing Street Name Blue 2 Dardenne Lake Estates 4 Way 1 Dardenne Lake Estates All Way 3 Dardenne Lake Estates No Outlet 1 Dardenne Lake Estates Parks 2 Dardenne Lake Estates Stop 30 8 Dardenne Lake Estates Street Name Blue 18 Deer Ridge Double Fine Zone 2 Deer Ridge Keep Kids Alive Drive 25 2 Deer Ridge Speed 25 2 Deer Ridge Street Name Blue 4 Dierbergs 79 Crossing Bike Route 2 Dierbergs 79 Crossing Local Deliveries 1 Dierbergs 79 Crossing No Trucks Allowed 1 Dierbergs 79 Crossing Stop 30 1 Dierbergs 79 Crossing Street Name Blue 2 Dollar Tree Plaza Mid Rivers Mall 1 Drovers Crossing Street Name Blue 17 Eldorado Estates Limited Sight Dist 1 Ellington Place Street Name Blue 10 Englewood Street Name Blue 24 Enwood Arrow 1 Enwood Crossing Sign 1 Enwood Curve Ahead 1 Enwood Double Fine Zone 1 Enwood No Outlet Pavement Management Program Sign Replacement Program 37

41 Subdivision Type Qty Enwood No Parking 1 Enwood Sensory Impaired 1 Enwood Speed 25 1 Enwood Street Name Blue 22 Estates of Chateau Woods Street Name Blue 12 Fairfield Place City Limit 1 Fairfield Place Double Fine Zone 1 Fairfield Place Speed 25 1 Fairfield Place Street Name Blue 2 Fawn Lake Street Name Blue 4 Gailwood Estates Street Name Blue 3 Golden Hills Street Name Blue 19 Golden Hills Estates Street Name Blue 2 Golden Triangle No Outlet 2 Golden Triangle Stop 30 2 Golden Triangle Street Name Blue 7 Green Forest Estates Street Name Blue 23 Greenhurst Manor Cross Road 1 Greenhurst Manor No Outlet 1 Greenhurst Manor Stop 30 1 Greenhurst Manor Street Name Blue 2 Hanover Crossing All Way 1 Hanover Crossing Double Fine Zone 1 Hanover Crossing Keep Kids Alive Drive 25 1 Hanover Crossing No Outlet 1 Hanover Crossing Speed 25 1 Hanover Crossing Stop 30 1 Hanover Crossing Street Name Blue 11 Harvest Point No Outlet 1 Harvest Point Stop 30 1 Harvest Point Street Name Blue 17 Harvester Square Stop 30 1 Harvester Square Street Name Blue 2 Harvestowne Double Fine Zone 1 Harvestowne No Parking 4 Harvestowne Speed 25 1 Harvestowne Stop 30 4 Harvestowne Street Name Blue 6 Haywood Manor Stop 30 1 Haywood Manor Street Name Blue 1 Heather Ridge No Outlet 1 Heritage Landing All Way Pavement Management Program Sign Replacement Program 38

42 Subdivision Type Qty Heritage Landing Double Fine Zone 1 Heritage Landing Speed 25 1 Heritage Landing Stop 30 1 Heritage Landing Storm Ready 1 Heritage Landing Street Name Blue 4 Heritage Manor Stop 30 1 Heritage Manor Street Name Blue 4 Hermitage Double Fine Zone 1 Hermitage Local Deliveries 1 Hermitage No Trucks Allowed 1 Hermitage One Hour Parking 2 Hermitage Speed 25 2 Hermitage Stop 30 4 Hermitage Street Name Blue 46 Hickory Ridge All Way 1 Hickory Ridge Crossing Sign 1 Hickory Ridge Keep Kids Alive Drive 25 1 Hickory Ridge Local Deliveries 1 Hickory Ridge Neighborhood Watch 1 Hickory Ridge No Outlet 2 Hickory Ridge No Parking 2 Hickory Ridge Stop 30 3 Hickory Ridge Street Name Blue 64 Hidden Lake Estates Double Fine Zone 1 Hidden Lake Estates Keep Kids Alive Drive 25 1 Hidden Lake Estates Stop 30 3 Hidden Lake Estates Street Name Blue 9 Highland Estates All Way 2 Highland Estates Double Fine Zone 2 Highland Estates Keep Kids Alive Drive 25 1 Highland Estates Speed 25 2 Highland Estates Stop 30 2 Highland Estates Street Name Blue 7 Highland Park Stop Ahead 1 Highlands Double Fine Zone 2 Highlands Keep Kids Alive Drive 25 1 Highlands No Outlet 3 Highlands Slow Children 1 Highlands Speed 25 3 Highlands Stop Highlands Street Name Blue 39 Highlands Yield Pavement Management Program Sign Replacement Program 39

43 Subdivision Type Qty Hi-Point Acres Advisory Speed Sign 1 Hi-Point Acres All Way 2 Hi-Point Acres Center Lane Two Way 1 Hi-Point Acres Chevron 1 Hi-Point Acres Curve Ahead 1 Hi-Point Acres Double Fine Zone 8 Hi-Point Acres Keep Kids Alive Drive 25 1 Hi-Point Acres No Parking 1 Hi-Point Acres Speed 25 5 Hi-Point Acres Stop 30 4 Hi-Point Acres Street Name Blue 22 Hollow Creek Double Fine Zone 1 Hollow Creek Keep Kids Alive Drive 25 1 Hollow Creek Neighborhood Watch 1 Hollow Creek No Outlet 1 Hollow Creek Speed 25 1 Hollow Creek Stop 30 1 Hollow Creek Street Name Blue 4 Home Depot Street Name Blue 1 Homestead Estates Double Fine Zone 1 Homestead Estates Keep Kids Alive Drive 25 1 Homestead Estates Neighborhood Watch 1 Homestead Estates No Outlet 2 Homestead Estates Speed 25 1 Homestead Estates Stop 30 1 Homestead Estates Street Name Blue 13 Hope Court Stop 30 1 Hope Court Street Name Blue 4 Horizon Business Center Cross Road 1 Horizon Business Center Double Fine Zone 1 Horizon Business Center Right Turn Ahead 1 Horizon Business Center Speed 25 1 Horizon Business Center Stop 30 2 Horizon Business Center Street Name Blue 4 Hunters Valley Neighborhood Watch 1 Hunters Valley No Outlet 1 Hunters Valley Stop 30 1 Hunters Valley Street Name Blue 2 Huntleigh Estates All Way 4 Huntleigh Estates Double Fine Zone 2 Huntleigh Estates One Hour Parking 1 Huntleigh Estates Speed Pavement Management Program Sign Replacement Program 40

44 Subdivision Type Qty Huntleigh Estates Stop 30 4 Huntleigh Estates Street Name Blue 9 I-70 Parkway Cross Road Does Not Stop 1 I-70 Parkway Double Fine Zone 1 I-70 Parkway No Parking 1 I-70 Parkway Speed 25 2 I-70 Parkway Speed 45 1 I-70 Parkway Stop 30 2 I-70 Parkway Street Name Blue 5 Jungermann Commercial Arrow 3 Jungermann Commercial Cross Road 1 Jungermann Commercial Double Fine Zone 1 Jungermann Commercial Hospital 2 Jungermann Commercial Library 1 Jungermann Commercial No Parking 2 Jungermann Commercial Speed 35 2 Jungermann Commercial Speed 40 1 Jungermann Commercial Stop 30 2 Jungermann Commercial Street Name Blue 4 Kindred Hill Street Name Blue 2 Koenig Subdivision Tree City USA 1 Lake View Gardens Double Fine Zone 1 Lake View Gardens Stop 30 1 Lake View Gardens Street Name Blue 2 Lakes of Devondale Double Fine Zone 1 Lakes of Devondale Hearing Impaired 1 Lakes of Devondale Keep Kids Alive Drive 25 1 Lakes of Devondale Neighborhood Watch 1 Lakes of Devondale Sensory Impaired 1 Lakes of Devondale Speed 25 1 Lakes of Devondale Stop 30 4 Lakes of Devondale Street Name Blue 6 Laurel Park Handicapped Parking 9 Laurel Park Stop 30 1 Laurel Springs Double Fine Zone 1 Laurel Springs No Outlet 1 Laurel Springs Speed 25 1 Laurel Springs Stop 30 3 Laurel Springs Street Name Blue 7 Laurel Village Double Fine Zone 1 Laurel Village Speed 25 2 Laurel Village Stop Pavement Management Program Sign Replacement Program 41

45 Subdivision Type Qty Laurel Village Street Name Blue 4 Le-Jer Acres End of Pavement 4 Le-Jer Manor Double Fine Zone 1 Le-Jer Manor Keep Kids Alive Drive 25 1 Le-Jer Manor Speed 25 1 Lienemann Forest Double Fine Zone 1 Lienemann Forest Keep Kids Alive Drive 25 2 Lienemann Forest Speed 25 1 Lienemann Forest Street Name Blue 4 Lindys Landing Double Fine Zone 1 Lindys Landing Speed 25 1 Lindys Landing Stop 30 2 Lindys Landing Street Name Blue 4 Manors at Orchard Glen All Way 1 Manors at Orchard Glen Crossing Sign 2 Manors at Orchard Glen Double Fine Zone 2 Manors at Orchard Glen Keep Kids Alive Drive 25 1 Manors at Orchard Glen No Outlet 1 Manors at Orchard Glen Speed 25 2 Manors at Orchard Glen Stop 30 6 Manors at Orchard Glen Street Name Blue 4 Mc Clay Gardens Double Fine Zone 1 Mc Clay Gardens No Outlet 1 Mc Clay Jungermann Commercial Library 1 Mc Clay Jungermann Commercial Speed 35 2 Mc Clay Jungermann Commercial Stop 30 4 Mc Clay Jungermann Commercial Street Name Blue 8 Mc Clay Meadows Double Fine Zone 1 Mc Clay Meadows Keep Kids Alive Drive 25 1 Mc Clay Meadows Stop 30 5 Mc Clay Meadows Street Name Blue 8 Mc Clay Valley End of Pavement 2 Mc Clay Valley Keep Kids Alive Drive 25 1 Mc Clay Valley No Outlet 1 Mc Clay Valley One Hour Parking 14 Mc Clay Valley Speed 35 1 Mc Clay Valley Street Name Blue 16 Mc Clay Village Double Fine Zone 1 Mc Clay Village Keep Kids Alive Drive 25 1 Mc Clay Village Neighborhood Watch 1 Mc Clay Village Speed 25 1 Mc Clay Village Street Name Blue Pavement Management Program Sign Replacement Program 42

Anchor Name:HENDERSON ELEMENTARY Route:HE01A SLT01

Anchor Name:HENDERSON ELEMENTARY Route:HE01A SLT01 Route:HE01A SLT01 8:12 am FAIRMOUNT ELEMENTARY 8:23 am MCCLAY RD @ STONE MEADOW CT 8:27 am MUEGGE RD @ HAMPTON PLACE CT 8:28 am 2357 SPRING MILL EST 8:29 am SPRING MILL EST @ DOROTHY ANN CT 8:30 am SPRING

More information

Woodside Plantation Property Owners' Association ROAD CONDITION SURVEY And IMPROVEMENT PLAN

Woodside Plantation Property Owners' Association ROAD CONDITION SURVEY And IMPROVEMENT PLAN Woodside Plantation Property Owners' Association ROAD CONDITION SURVEY And IMPROVEMENT PLAN 1 Table of Contents Page Introductory Memo 3 Pavement Evaluation Process 4 Sample Condition Photographs 5-8 Life

More information

Bus Stop Locations For ME03SSP IES ELEM & MMS MIDDLE OUT REG. 03:45 pm 05:07 pm 82: mi. Start Time: End Time: Total Time: Distance:

Bus Stop Locations For ME03SSP IES ELEM & MMS MIDDLE OUT REG. 03:45 pm 05:07 pm 82: mi. Start Time: End Time: Total Time: Distance: 6/4/06 9:0:0 AM First Planning Solutions Page Bus Stop Locations For ME03SSP IES ELEM & MMS MIDDLE OUT REG. Route: ME03SSP 05:07 pm 8:04 3.80 mi. Total Riders: 9 Max Load: 9 9 4:00 pm STOP HARNESS DR @

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Work zone activities often create conditions on the travelled way that are hazardous particularly at night when the ability of motorists to see is

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES DEVELOPMENT DEPARTMENT 120 Gary Wade Boulevard Sevierville, TN 37862 (865) 453-5504 seviervilletn.org Pamela S. Caskie, Development Director Judith

More information

COPPELL HIGH SCHOOL (Morning Pick-up) Updated 9/18/17 Bus Route # 101. Bus Route # 102. Bus Route # 103. Bus Route # 105.

COPPELL HIGH SCHOOL (Morning Pick-up) Updated 9/18/17 Bus Route # 101. Bus Route # 102. Bus Route # 103. Bus Route # 105. COPPELL HIGH SCHOOL (Morning Pick-up) Updated 9/18/17 Bus Route # 101 7:54 am... RANCHVIEW DR @ CHUY CT 7:55 am... RANCHVIEW DR @ LAKERIDGE LN 7:56 am... WOLF CREEK DR @ STONE GATE DR 7:58 am... 9746 VALLEY

More information

Department of Public Works

Department of Public Works The reports that the following streets may be closed or disrupted and have CLOSURE 350569 Ryan Ave - 18th St/20th St Paving -- 4/10/2019-4/11/2019 COMBINATION 350205 10th St - At St Louis Ave Replace valve

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

A Message from the Director

A Message from the Director Lee s Summit Public Works Department Director Chuck Owsley Deputy Director & City Engineer Dena Mezger Deputy Director Administration & Operations Bob Hartnett Airport Manager John Ohrazda City Traffic

More information

CHS9 (Afternoon Drop-off) Updated 9/19/18 Bus Route # 102. Bus Route # 107. Bus Route # 114. Bus Route # 117

CHS9 (Afternoon Drop-off) Updated 9/19/18 Bus Route # 102. Bus Route # 107. Bus Route # 114. Bus Route # 117 CHS9 (Afternoon Drop-off) Updated 9/19/18 Bus Route # 102 BRIARGLEN DR @ S MOORE RD PELICAN LN @ MALLARD DR E BETHEL SCHOOL RD @ CONDOR DR SPRINGOAK LN @ REDCEDAR WAY DR ROLLING BROOK LN @ TIMBER RIDGE

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

Anchor Name:FRANCIS HOWELL CENTRAL HS Route:FC01A SLTB2/ANX84PASS

Anchor Name:FRANCIS HOWELL CENTRAL HS Route:FC01A SLTB2/ANX84PASS Route:FC01A SLTB2/ANX84PASS 6:30 am FIRST STUDENT ANNEX BUS DEPOT 6:47 am BUCKINGTON ST @ MANNINGTON DR 6:49 am 426MANNINGTON DR 6:49 am 440 MANNINGTON DR 6:50 am OXBOROUGH CT @ SCOTSDALE CT 6:50 am OXBOROUGH

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

Aloha Township Local Road Ratings Report for 2018

Aloha Township Local Road Ratings Report for 2018 Cheboygan County Road Commission Aloha Township Local s Report for 2018 The goal of the Road Commission is to use Asset Management Strategies when planning projects for the roads under the jurisdiction

More information

Staff Report Sign Design

Staff Report Sign Design Staff Report Sign Design July 29, 2014 Planning & Zoning Commission Meeting Report date July 23, 2014 Project type Sign Design Legal description Section 2, Township 5, Range 82 Lots 3&4, S1/2NW1/4, SW1/4

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP BONITA BEACH ROAD May 18, 2016 Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA Greg Diserio, RLA Tara Salmieri, AICP Toole Design Group Engineers Planners Landscape Architects Authors BONITA BEACH

More information

Tuscarora Township Local Road Ratings Report for 2018

Tuscarora Township Local Road Ratings Report for 2018 Cheboygan County Road Commission Tuscarora Township Local Road Ratings Report for 2018 The goal of the Road Commission is to use Asset Management Strategies when planning projects for the roads under the

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS. August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets

More information

SUBDIVISIONS EXEMPT FROM LANDSCAPE ORDINANCE Revised 06/02/15 ------------------------------------------------------------------------ ALOHA GARDENS, UNIT 6 ALTO ACRES ABERDEEN LAKES PH I ARISTIDA 1-A

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Public Service Department MONTHLY REPORT November 2017

Public Service Department MONTHLY REPORT November 2017 - Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

8:30 am CENTER SCHOOL (18031) 8:39 am ALL-STAR TRANSPORTATION

8:30 am CENTER SCHOOL (18031) 8:39 am ALL-STAR TRANSPORTATION 11 CES/ST. JOES BUS - AM 7:45 am WHISCONIER MIDDLE SCHOOL 7:51 am 133 CANDLEWOOD LAKE ROAD 7:57 am HICKORY HILL RD & LAUREL DR 7:59 am KELLOGG ST & TAYLOR ST 8:04 am N LAKE SHORE DR & CLEARVIEW DR 8:05

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

ADA Compliance Projects Summary Sheet

ADA Compliance Projects Summary Sheet District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:

More information

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes STAFF REPORT ACTION REQUIRED St. Dennis Drive Conversion of Traffic s to On- Street Parking and Bicycle s Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

SELF RE-ERECTING MARKER POSTS

SELF RE-ERECTING MARKER POSTS ONE OF A KIND TECHNOLOGY FOR OUR TIMES MULTI APPLICATIONS SELF RE-ERECTING MARKER POSTS TEMPORARY OR PERMANENT BICYCLE LANES CROSSWALKS CHANALIZATION BRIDGES CITY US REFLECTOR WORK ZONES ALL-ROUND RUGGEDNESS

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The east half of Sections 21, 28, and 33, Township 37 North,

More information

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

WADSWORTH ROAD & VICTORIA CIR

WADSWORTH ROAD & VICTORIA CIR CLAGGETT BUS #1 6:47 AM 1091 E SMITH ROAD 6:47 AM 4107 E SMITH ROAD 6:49 AM 4025 E SMITH ROAD 6:49 AM 3880 E SMITH ROAD 6:49 AM 3860 E SMITH ROAD 6:50 AM 5410 CHAMPION CREEK BLVD 6:52 AM 3801 CLAY MOUNTAIN

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

PLEASE READ Proposal for Sustainable Service

PLEASE READ Proposal for Sustainable Service IMPORTANT PLEASE READ 019 Proposal for Sustainable Service 019 Service Change Proposal IMPLEMENT A SUSTAINABLE NETWORK Everett Transit completed its Long Range Plan in May, and the plan was adopted by

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 26, 2017 Good News: City offices will be closed Monday, May 29 th, in

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

Street, Sidewalk, Curb, and Alley Assessment

Street, Sidewalk, Curb, and Alley Assessment Street, Sidewalk, Curb, and Alley Assessment Contributing Organizations: Department of Public Works (DPW) School of Public and Environmental Affairs (SPEA) (Indiana University Purdue University, Indianapolis)

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

https://hillsborough.taxsys.net/tcb/app/admin/distribution/distributions

https://hillsborough.taxsys.net/tcb/app/admin/distribution/distributions Page 1 of 7 03/01/2017-03/31/2017, Pending, Current (tp, re, ca), Delinquent (tp, re, ca), Homestead (re), Installment (tp, re, ca) FA100 FA130 COUNTY OPERATING ENVIRONMENTAL LAND $16,041,423.50 $-747,797.71

More information

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda

City of Sutherlin Planning Commission Meeting Tuesday, September 15, :00 p.m. Sutherlin Civic Auditorium Agenda City of Sutherlin Planning Commission Meeting Tuesday, September 15, 2015 7:00 p.m. Sutherlin Civic Auditorium Agenda Pledge of Allegiance Welcome and Introductions Introduction of Media Approval of Minutes:

More information

Assessing Your Trails, Keeping Them Safe and Enjoyable

Assessing Your Trails, Keeping Them Safe and Enjoyable Jon Wood, PLA, ASLA Associate Vice President Stewart Bert Lynn, PLA, ASLA, LEED AP Project Manager Mecklenburg County Asset and Facility Management Assessing Your Trails, Keeping Them Safe and Enjoyable

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

Page 1 of 8 03/01/2019-03/31/2019, Pending, Current (tp, re, ca), Delinquent (tp, re, ca), Homestead (re), Installment (tp, re, ca) CCC FA100 FA130 CLERK OF THE CIRCUIT COURT COUNTY OPERATING ENVIRONMENTAL

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

River Parks Trail: Tulsa, Oklahoma

River Parks Trail: Tulsa, Oklahoma River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information