Mt Coot-tha Protection Alliance Inc.

Size: px
Start display at page:

Download "Mt Coot-tha Protection Alliance Inc."

Transcription

1 Mt Coot-tha Protection Alliance Inc. 40 Payne St, Auchenflower QLD th December 2018 Hon Dr Anthony Lynham Minster for Natural Resources, Mines and Energy PO Box City East QLD 4002 by cc Dear Dr Lynham, RE: Response to the draft Land Management Plan for the proposed Mount Coot-tha Zipline (LMP), prepared by Connolly Project Resources Group on behalf of the Brisbane City Council (BCC), November INTRODUCTION This submission provides a response to the draft Land Management Plan (LMP) for the Mt Coot-tha Zipline on the subject land described as lot 2 on SP241566, located at 200 Sir Samuel Griffith Drive, Mt Coot-tha. The MCPA is a local organisation of Brisbane residents, many of whom have provided professional advice in the disciplines of plant and animal ecology, visual impact assessment, bushfire risk and hazard assessment, heritage impact assessment, architecture, acoustic analysis, economics and town planning. This advice has been incorporated into our collective submission. The MCPA has submitted a detailed objection to the Zipline Development Application (BCC #A ), attached below as Appendix I. The two relevant documents guiding the production of an LMP are the (1) Operational Policy - Secondary use of Trust Land under the Land Act ref. PUX/901/209 v.6 (2 May 2017) and (2) the Land Management Planning for Reserves or Deeds of Grant in Trust - Information Kit. The latter document includes a list of six 'general criteria that departmental officers will use to assess the Land Management Plans. These criteria include: the impact of the proposed use on the strategic value of the site; the consistency of the proposal with the primary use of the land (if applicable); the impact of the proposal on the state's interests; 1

2 the degree of forward planning undertaken in relation to the site and the risk of incremental progression; the proposal's relationship with the Local Government planning scheme (Town Plan); and the degree of commerciality and exclusivity associated with the proposal. This feedback document addresses the above list of six criteria. 2.0 THE STRATEGIC VALUE OF THE SITE The Mt Coot-tha Forest and Botanic Garden have several strategic values, for many different reasons. The subject site is part of the 1600 hectare Mt Coot-tha Forest and has unique strategic values as a relatively large block of old-growth forest situated next to the heart of Brisbane. No other Australian capital city residents can enjoy such proximity to a wilderness experience. The old-growth forest was visited and occupied over millennia by the traditional owners, for whom the area is of great indigenous heritage significance. Mt Coot-tha is also an integral part of the contemporary image of Brisbane. Views to Mt Coot-tha from various vantage points allow us to orientate ourselves in the Brisbane landscape. Views from the Summit Lookout allow us to connect with our local heritage values and to survey the panorama at our feet, from the Islands of Moreton Bay, the City and suburbs, the winding Brisbane River, nearby Mt Gravatt, the Mt Tamborine plateau, the Border Ranges and even westward to the Great Dividing Range. The Mt Coot-tha Forest is not an isolated patch like other near-city forests, but lies at the eastern end of the D'Aguilar Range and is an integral part of a strategic wildlife corridor linking Brisbane with Mt Nebo, Mt Glorious and beyond. The forest has a high biodiversity value, including several rare or threatened species of flora and fauna. The people of Brisbane and their families and friends have long enjoyed the Mt Coot-tha Forest for its safe and convenient recreational values; for walking, cycling, horse-riding, bird-watching, picnics and viewing their surrounds from the Summit Lookout. 3.0 SIGNIFICANT REASONS TO REJECT THE DRAFT LMP The MCPA has reviewed the draft LMP and concluded that it is not a genuine Plan for Land Management, for the following key reasons: 3.1 A Plan in Isolation The ha of the subject land comprises about 37.5% of the Mt Coot-tha Forest. Despite claiming to take a 'whole of mountain' or 'holistic' approach, this LMP does not refer to the context or character of the balance of lots that make up Mt Coot-tha. The LMP is a plan without context, presented in isolation. 2

3 3.2 A Plan against the Founders The founders of the trust deed registered the subject land as a Deed of Grant in Trust (DOGIT) as a site for a Public Park and no other purpose whatsoever (Title Reference ). The Zipline proposal seeks to alienate, for private commercial purposes, more than 15 hectares of public land, across a broad swathe of the forest. The LMP is in clear conflict with the founders' intent. 3.3 A Plan relying on False Precedents The LMP claims that the Brisbane Botanic Garden Mt Coot-tha and the Mt Coot-tha Quarry are precedents for 'pre-existing secondary uses' in the DOGIT land. However, the Gardens are consistent with the public park designation with attributes of free entry, without commercialism and of largely passive enjoyment. The Quarry is a nonconforming existing use, dating from the nineteenth century that is in conflict with nearby residents because of its noise, ground vibration, traffic and general disruption. Both these uses are historical anachronisms and do not represent precedents for new commercial amusement rides that generate loud noise and significant disruption in areas of predominantly wildlife habitat, passive recreation and botanic gardens. The proposal is clearly in conflict with the primary use of the DOGIT land. 3.4 A Plan that avoids the Statutory Planning Process BCC has effectively side-stepped the statutory planning process associated with amending the Brisbane Cityplan 2014, by producing and relying on two non-statutory, incomplete documents to support the Zipline concept - the Brisbane Botanic Garden Mt Coot-tha Masterplan 2018 and the Our Shared Vision Mt Coot-tha When the 2016 Lord Mayoral candidate Graham Quirk made an election 'commitment' to build 'a Zipline at Mt Coot-tha' and was subsequently elected, he and his Civic Cabinet couhad the opportunity to set in train a proper statutory process to amend the Brisbane Cityplan 2014, our city's planning scheme, to investigate and advise on this proposal. Investigation would have involved the development of a design brief for a comprehensive Zipline proposal that was evidence-based, logical and well founded, a draft planning stage for statutory public consultation, identifying the proposed area, size and other relevant details. There would also have been State interest checks and the comprehensive articulation of what was required in an appropriate and comprehensive Land Management Plan. Instead, the Lord Mayor and Civic Cabinet's first step in April 2017 was to call tenders for the Zipline project (Contract no ) without implementing any of the statutory processes. This is not considered to be consistent with the Local Government Planning Scheme. 3.5 A Plan lacking effective Public consultation The draft LMP relies almost entirely on the technical reports and planning assessments of the Zipline MCU Development Application and repeats many parts of them, verbatim. The draft LMP therefore is reliant entirely on advice from the Zipline proponents. No independent enquiries were made in response to the issues raised by members of the public in their many submissions, the SARA Brisbane Office or the BCC Assessment Manager. 3

4 The final LMP should comprehensively address such issues and state explicitly how they have been resolved or whether they remain for further information and/or resolution. The interested public should be able to see how their feedback has been treated. Further, in PUX901/209 issue 6.0 of May 2017, it is stated that "an inconsistent use is not to adversely affect any business in the area surrounding the trust land". However, the Zipline proposal includes the removal of 14 car spaces used by patrons of the Summit Restaurant and Kuta Cafe on Lot 1079 on SL5015. Therefore the latter businesses will be adversely affected by the Zipline proposal, which does not comply with the relevant Policy. The draft LMP specifically excludes these establishments, stating blithely that their land will be the subject of a separate LMP, commissioned by the BCC.This is a further example of piecemeal planning where the public is not being informed of the whole story. Several local environment groups were excluded from consultation. The draft LMP states that it "conformed to the (DNRME) department's LMP consultation requirements" but this is clearly not the case and the final LMP should detail that: 1. Conforming groups of stakeholder are not artificially limited to narrow interest associations (eg birds), BCC employees and members of the LNP Council, selected on the basis of their prior-acceptance of the Zipline proposal; 2. Conforming consultation must involve interested members of the general public sought through media advertising; and 3. conforming consultation should have been undertaken before the draft LMP was completed. This is a breach of process. The public will be unable to comment on the final draft LMP. Only one hard copy of the draft LMP was available for the public to peruse. Times and places for 'pop-up kiosks' with LMP information were located in physically challenging places at inconvenient times and dates. Many attendees recounted that staff attending these kiosks were unable to answer relevant questions about the LMP or the Zipline proposal and merely advised attendees to 'read the document' or 'make a feed-back submission'. There was no genuine attempt to engage with the public or help their understanding of the planning process or merits of the proposal. The selective consultation processes were not considered democratic, representative, socially inclusive or meaningful. They did not cater for the elderly or for people with disabilities. The draft LMP contains only minimal information with many obvious omissions and inadequacies. It is recommended that the consultants be requested to finalise the draft before re-starting the consultation period with a reasonably complete copy, rather than only a part of the whole story. 3.6 A Plan that trivialises the Impacts The proposed installation of a 1.4 km Mega 6-Ziplines, a single 1.3 km zipline, and a 349m suspension bridge, involving the lease of hectares of bushland to a commercial business, will have significant, multiple impacts on the strategic values, both singly and together. The draft LMP has failed to detail or address these impacts. 4

5 The multiple impacts by a commercial Zipline operation on the DOGIT land include the following: 1. Zipline operational areas will be fenced-off and therefore the public cannot gain free access to the whole of their public park; 2. The proposed Scenic Zipline comprising six parallel ziplines will produce more than 100 decibels of noise over a length of 1.5 km for approximately 12 hours of the day, seven days per week, and possibly 52 weeks of the year, which is inconsistent with passive uses and natural quiet of this public park; 3. The proposal discriminates against access to the park by age, health, disability, gender, pregnancy, maternity, certain mental conditions, ethnic origin and poverty through enforced exclusion or self-exclusion from the proposed activities; 4. The Zipline destroys native vegetation (an unknown number but at least 400 trees to be removed or damaged); 5. The Zipline destroys and disrupts wildlife habitat over the proposed activity areas plus wider surrounding areas by significant noise over a total length of 3.5 km, general disturbance, and night-lighting; 6. Additional pressures on parking and public transport by Zipline users and staff will diminish the ability of the public to access the public park and lookout; 7. Additional road traffic caused by the Zipline operations will diminish the ability of cyclists to safely access the park for recreation. 8. Loss of public safety from the proposed introduction of a new bus service (3 metres wide) every few minutes on all pedestrian roads (4 metres wide) throughout the Botanic Gardens (therefore clearance of only 0.5 m on either side of the buses where no adjoining footpaths exist to escape). The proposed new bus service will interrupt the safety and quiet enjoyment of botanical displays throughout the whole of the Gardens; 9. Introduction of a new cohort into the Botanic Gardens that has no demonstrated interest in the purpose of the Gardens and may cause damage, theft, disturbance, vandalism and other criminal activities including possible violence; 10. Reduction of security for people and property during proposed extended hours of Botanic Gardens opening until 10pm at night, seven days per week. 3.7 A Plan that ignores Safety Standards The draft LMP fails to consider the principles applying to the design and construction of aerial amusement rides such as the proposed seven ziplines. This is a major omission and goes directly to the purpose of proving, or otherwise, the concept of zipline use on the subject land. This issue is critical and cannot be 'pushed back' to the working drawings and BA/OWA stage of design. The proposed design has not identified compliance with any Australian and/or International design, construction, operation and maintenance standards. The final LMP should canvas this issue and provide sufficient information to the State of Queensland to facilitate assessment. The MCU Bushfire Risk Assessment and Management Plan (BRAMP) report concluded that zipline management will take into account the existing BCC bushfire management regime on Mt Coot-tha, where forest mostly surrounds the subject site. The final LMP should detail an agreement between BCC and the zipline operator that confirms where, 5

6 how and what responsibilities and duty of care to users will exist to prevent injury or death from catastrophic bushfires. 3.8 MCPA Recommendation Based on considerations of the above reasons, the MCPA recommends that the draft LMP be rejected. 4.0 THE CONSISTENCY OF THE PROPOSAL WITH THE PRIMARY USE OF THE LAND 4.1 The Existing Primary Use The primary use of the subject land is for a designated public park and no other purpose whatsoever. Common components of the primary use are the same as for any other large bushland park. They include one or a combination of walking, cycling, mountain bike riding, birdwatching, horse-riding, viewing, picnicking, family gatherings and similar. All of these free, low intensity recreational uses include a degree of enjoyment of the natural bushland environment, are low impact and utilise low-impact infrastructure. There may be excitement and noisy enjoyment over brief periods but, for the most part, these activities are calm and peaceful. Most of these uses are restricted to daylight hours, although the use of the Summit area and infrastructure extends into the evening. The quoted words "and no other purpose whatsoever" provide us with a clearly-expressed intent in the Trust Deed to avoid inconsistent uses being introduced to the subject land. 4.2 Zipline Proposal for an Inconsistent Secondary Use The Zipline proposal is for an inconsistent secondary use. This factual description was confirmed by the Applicant BCC in its Planning Assessment Report ( 18) for the MCU Application. The zipline rides can fairly be described as high-intensity, expensive, aerial amusement rides through and over parts of the Mt Coot-tha Forest. The essence of the Scenic Zipline ride is similar to many rides at the Gold Coast Theme Parks - briefly thrilling and speedy - and cannot be regarded as a thoughtful ecotourism experience. The rides will run for up to 15 hours per day, day and night, seven days per week. As discussed above, the Zipline proposal involves a plethora of high-impacts associated with remnant vegetation clearing, continuing pruning of vegetation over large areas, interference with the breeding and foraging habitat of threatened species, interference with heritage values including views from the Summit Lookout, the erection and maintenance of large-scale structures, increased road traffic, noise and lighting impacts. The MCPA considers that, not only is the Zipline proposal an inconsistent use, but is a conflicting use that would significantly detract from the primary uses. 6

7 5.0 THE IMPACT OF THE PROPOSAL ON THE STATE'S INTERESTS The matters of MCU referral to the State (SARA) included Native Vegetation clearing, Visual (Heritage) Impacts and several Traffic issues. 5.1 Area of Native Vegetation to be Cleared The MCPA considers that the clearing of Native Vegetation is a matter that is yet to be satisfactorily addressed in the draft LMP and that it also has secondary impacts on visual, wildlife and heritage strategic site values. The Applicant's calculation (in the Ecological Assessment Report, EAR) of area of remnant native vegetation to be cleared is incomplete, because the brief for tree survey of the subject land included only trees greater than 150mm at 1.3m above ground. The estimated area to be removed in this respect is c.2ha. It is noted that twenty-eight (28) hollow-bearing trees are included in those to be removed. However, in addition to clearing of the above ancient trees, the Bushfire Risk and Management Plan in the DA supporting documents has determined that all smaller vegetation including shrubs and trees less than 150mm at 1.3m above ground are to be removed from fire management areas surrounding various parts of the proposed infrastructure, in perpetuity. Significantly,these smaller trees have not been surveyed or identified. Their number is therefore unknown and their area is not included in the estimate of clearing. The State Referrals Agency (SARA) also stated, in their letter of further advice dated 17 October 2018 that: "The application has not taken into account clearing as a result of the Material Change of Use (MCU) that will become exempt clearing for fire breaks and safety buffers". The SARA letter calculated the maximum area likely to be cleared under these provisions of the Planning Act 2016 as being of the order of 28ha, a much greater area than that claimed in the EAR. This was the result of the necessary, exempt clearing of 60m each side of built infrastructure, based on the highest trees at 40m height. The Applicant BCC claimed, in response to the SARA letter, that bushfire management at Mt Coot-tha was being undertaken by the Trustee BCC such that fuel loads were effectively managed and there was therefore no need to clear for fire breaks around built infrastructure. Furthermore, that the built infrastructure was not vulnerable to bushfire attack, due to its design and use of materials. Their response was that no such clearing was needed, whatsoever. We therefore have a situation where, on one side are the State DNRME officers, who are applying a State-wide policy that articulates the necessity to clear vegetation (exempt clearing) for firebreaks and safety buffers up to 60m, and on the other side are the consultants for the Applicant BCC, that say no clearing is required. There was a considerable difference in opinion about what clearing is required, or allowed under current planning regulations. 7

8 SARA subsequently considered the BCC opinion in their letter of 6 December 2018, stating that: "The department is satisfied that the development will not necessitate additional clearing of native vegetation (future exempt clearing work) for firebreaks and safety buffers as a result of the establishment of built infrastructure". Note, built infrastructure. Unfortunately, two significant factors were omitted from both the Applicant BCC response and the SARA letter. These factors are that, firstly, the Zipline proposal will invite large numbers of visitors into a high-risk bushfire environment (mature mixed eucalypt open forest) for a commercial purpose, thereby encouraging visitors to take this risk. MCPA members recall a 6 October 2004 high intensity canopy bushfire over 200 hectares in the Mt Coot-tha Forest, documented in the BRAMP report; recalls the speed at which such fires can spread; and is further aware of increased frequency of fires expected in future, due to climate change. The State Planning Policy 2017 states on 48 that "increased temperatures (due to climate change) will increase the likelihood, intensity and extent of areas affected by bushfires, lengthen fire seasons and reduce the opportunity for hazard reduction between fire seasons". Therefore there may be no perceived need by the Applicant BCC to clear firebreaks for protection of built infrastructure, but there will be an obvious and urgent need to create such buffers for the safety of visitors. There is still a duty of professional care! It is questionable whether insurance cover can effectively be provided for public liability risks that have been identified, but classified as some-how being 'tolerable'. The Queensland State Planning Policy 2017 requires that "the risks associated with natural hazards, including the projected impacts of climate change, are avoided or mitigated to protect people and property and enhance the community's resilience to natural hazards". Avoided first, mitigated second. In this case, avoidance can only occur by simply clearing the necessary firebreaks and safety buffers, or relocating the Zipline away from open eucalypt forests. The required fire breaks and safety buffers have not been comprehensively assessed and are not included in the calculation of area to be cleared, because the Applicant BCC asserts they are not needed. The Assessment Manager BCC differs in its view and states, in the 2 October 2018 Information Request that the Applicant BCC should "Amend the (Bushfire Hazard and Risk Assessment Report) methodology to omit any reliance on the management of land outside the proposed lease areas...". The MCPA concludes that the proposed fire risk management plan does not comply with the BCC Bushfire Overlay Code and that it understates the area that will, ultimately, need to be cleared for fire-breaks and safety buffers. This non-compliance needs to be thoroughly canvassed in the draft LMP. Secondly, there are other hazards for people and property from limb-fall and tree-fall associated with the Mt Coot-tha forest, which is regularly subject to severe storms including hailstorms and occasionally, extreme cyclone or localised typhoon events. 8

9 The latter have not been acknowledged or assessed with respect to large canopy trees occurring in the landscape above the proposed Ziplines. The removal of such trees has not been included in the calculation of area to be cleared. No extreme weather management plan is mentioned in the proposal. No allowance has been made for such pro-active safety clearing. The MCPA considers that, when taken together, the above facts lead to the conclusion that the referral is incomplete in terms of the estimated area to be cleared. This means that the likely impact on the local koala and Greater Glider populations is also underestimated and will, in fact, be significant. This is because all trees to be cleared are classified as koala food trees and their removal will add to the overall impact. The draft LMP needs to address these issues prior to it being assessed for approval. 6.0 THE DEGREE OF FORWARD PLANNING UNDERTAKEN IN RELATION TO THE SITE AND THE RISK OF INCREMENTAL PROGRESSION 6.1 BCC Forward Planning is Opaque The MCU documents, although they are many and long, do not canvas alternative Zipline sites or, indeed, any logical reasons why the proposal is located where it is. Further, the public consultation process has not provided any background of alternatives. There may have been alternatives, but we have not heard anything about them. For example, several already-cleared areas of Mt Coot-tha, in the western portion are used for other recreational purposes and could have been chosen. Also, no other parts of Brisbane, with already-cleared land, views and recreational opportunities were considered. Many sites are available that do not carry the same constraints and likely impacts of the proposed site, that is a Brisbane landmark. The Courier-Mail recently published an article (headlined Queen's Wharf zipline plan to be Brisbane's Star attraction, December 24th), informing the public that two other commercial Zipline proposals are being investigated or prepared by the Star Entertainment Group for use in the inner City. These would be more conveniently located and likely to be of more interest to tourists than the proposed Mt Coot-tha ziplines. The degree of forward planning for the site is opaque to the residents of Brisbane. The sidestepping of the planning scheme amendment process is noted above. No details are provided by BCC on the tender process, other than that is was 'exhaustive', or the alternative tender proposals. Now that a decision has been made on the preferred operator, 'commercial-in-confidence' tactics may no longer apply. 6.2 Incremental Progression of Commercial Use The risk of incremental progression, though, is considered to be very real on BCC's agenda. 9

10 Firstly, reference is made in the non-statutory document Our Shared Vision Mt Coot-tha 2030 (OSVMC2030) to 'commercial opportunities in the Mt Coot-tha Precinct'. No detail is provided by BCC, but this vision-mention could be used in the future to support such development proposals within the DOGIT land. Secondly, reference is made in the Brisbane Botanic Garden Mt Coot-tha Masterplan 2018 (BBGMP2018) to the relationship between 'further... visitation numbers' and 'opening up potential business opportunities within the gardens'. These could easily also be located in DOGIT land. Thirdly, the Mt Coot-tha Quarry is a pre-existing non-conforming use on DOGIT land and the future of the quarry is very relevant to this criterion, but direct discussion of this topic has been studiously avoided by BCC. The draft LMP referenced the 'BCC opinion' that the Zipline secondary use is appropriate and consistent with Policy, "especially considering that the DOGIT currently supports other pre-existing secondary uses, including parts of the Brisbane Botanic Gardens Mt Coot-tha, and the use of parts of the site for the Mt Coot-tha Quarry". The MCPA does not know of any evidence of prior ministerial approval for these two referenced 'pre-existing secondary uses'. The BBCGMP2018 was confirmed by BCC to be a 15-year master plan. However, the introduction to the master plan (despite feedback requests from residents) takes care to mention that "Not (sic) part of the scope of this master plan is the Mt Coot-tha quarry which remains an operational asset providing value to Council". In contradiction to this, the statutory Planning Scheme states that "Any rehabilitation and restoration measures are consistent with the post-(mt Coot-tha) quarry use as an extension of, and incorporation into, the Brisbane Botanic Gardens" (Section (b).ii of the Mt Coot-tha Neighbourhood Plan Code). An Editor's note continues that: "Council intends to commence planning for post-quarry use around Detailed planning will seek to implement the Mt Coot-tha 2030 Vision for the Brisbane City Council quarry site". The quarry resource is diminishing and is estimated in the planning scheme to be closed around BCC has, on many occasions, confirmed that it will become incorporated into the Brisbane Botanic Gardens. The final LMP should, in the interests of relevance and completeness, be amended to include this circumstance. The fact that the 30 hectare quarry is still operational, and may be for the next 7 years, is not a reason to omit it from a 15-year master planning process. It is currently understood that: 1. The BBGMP2018 is a 15-year planning guide; 2. The master plan specifically excludes the 30 hectare Mt Coot-tha Quarry (which represents more than 50% of the size of the existing 56 hectare Botanic Garden); 10

11 3. The Mt Coot-tha Quarry is likely to close in a mere 7 years after the 15-year master plan is published and therefore right in the middle of the stated planning period; 4. The Mt Coot-tha Quarry is formally declared by BCC to become incorporated into the Botanic Garden; 5. The Botanic Garden will, in future, include commercial opportunities; 6. The rehabilitation of the Mt Coot-tha Quarry will cost a great deal of money (a specific budget for which appears to be missing); 7. Commercial opportunities may provide a great deal of money; and therefore 8. Further redevelopment of the Quarry will facilitate further commercial use of the Mt Coot-tha Forest and Botanic Gardens. If the Zipline proposal is implemented, this in turn will be used to justify extension of commercial development within the DOGIT area as the ultimate post-quarry use and will result in a major progression of commercial use on all the DOGIT land. None of this is canvassed in the Brisbane City Plan 2014, our statutory planning scheme, nor is it discussed in the draft LMP. 7.0 RELATIONSHIP WITH THE LOCAL GOVERNMENT PLANNING SCHEME (TOWN PLAN) As noted in paragraph 3.4 above, when the then 2016 Lord Mayoral Candidate Graham Quirk made an election 'commitment' to build 'a zipline at Mt Coot-tha' and was subsequently elected as Lord Mayor, he and his Civic Cabinet could have used the statutory process to amend the Brisbane City Plan 2014, our city's planning scheme, to make their proposal compliant. This would have included the usual steps such as statutory public consultation and State interest checks. Unfortunately this statutory process was ignored and effectively side-stepped, by BCC's production and reliance on two non-statutory, partly-complete documents to provide support for the Zipline concept, according to the Planning Assessment Report in the MCU Application. These are the Brisbane Botanic Garden Mt Coot-tha Masterplan 2018 and the Our Shared Vision Mt Coot-tha Notwithstanding the emphasis on these documents in the Applicant's MCU Planning Assessment Report, the Zipline proposal was only briefly mentioned, without locational or any other details, in the final version of the Brisbane Botanic Garden Mt Coot-tha Masterplan "installing a zipline attraction (subject to approval)" - and notably, did not appear in the 2017 draft documents including the 'Fly-through video' dated March 2017, that were available for public 'consultation'. 11

12 The Zipline proposal is not even mentioned in the Our Shared Vision Mt Coot-tha 2030 document. The Planning Assessment Report concluded that the proposal is 'substantially' consistent with the relevant Planning Scheme Codes, but its development application had to be classified as impact assessable - generally inconsistent with the planning scheme. It is inconsistent with the strategic planning intent and is not even contemplated in the finergrain detail of planning in the Mt Coot-tha Neighbourhood Plan and Code. Despite its ability to amend the Brisbane City Plan 2014 to make this proposal comply, Council decided to push ahead with a generally inconsistent -Impact Assessment application - to be assessed by itself. The result is a flawed, ill-conceived concept that has been 'shoe-horned' into a public park where its impacts are multiple and manifest. 8.0 THE DEGREE OF COMMERCIALITY AND EXCLUSIVITY ASSOCIATED WITH THE PROPOSAL Put simply, the Zipline proposal is a purely commercial enterprise that will result in the exclusive use of its lease area by paying customers. The commercial impact by the proposed Zipline on existing businesses at Mt Coot-tha and the Botanic Garden has not been investigated. In PUX901/209 issue 6.0 of May 2017, it is stated that "an inconsistent use is not to adversely affect any business in the area surrounding the trust land". As outlined in paragraph 3.5 above, the Zipline proposal will cause the removal of 14 car spaces used by patrons of the Summit Restaurant and Kuta Cafe on Lot 1079 on SL5015. Therefore the latter businesses will be adversely affected by the Zipline proposal, which does not comply with the relevant Policy. The draft LMP specifically excludes these establishments, stating that their land will be the subject of a separate LMP, commissioned by the BCC. This is an example of piecemeal planning and the public has not been fully informed. The Brisbane Botanic Garden Mt Coot-tha Master Plan 2018 includes reference to a proposal to introduce a new Tricontinental Tree Top Walk and Lookout Cafe in the Central Precinct. The Zipline proposal introduces a refreshment kiosk and souvenir retail outlet in the Botanic Garden that will compete with both planned and existing similar businesses. The draft LMP should be clear about how these economic impacts will be avoided or mitigated. 12

13 9.0 CONCLUSIONS AND RECOMMENDATIONS 1. The land that is the subject of the Mt Coot-tha Zipline proposal is approximately 600 hectares of bushland and comprises 37.5% of the greater Mt Coot-tha Forest; 2. The Mt Coot-tha forest is an iconic, multiply-constrained part of the Brisbane landscape, with significant wilderness experience, indigenous heritage, regional wildlife corridor, biodiversity, threatened species and recreational strategic values; 3. The draft LMP is artificially constrained to Lot 2 on SP and does not consider the balance of the Mt Coot-tha Forest. There is no 'whole of mountain' or 'holistic' plan. 4. The Zipline proposal will alienate hectares of public parkland in the Mount Coot-tha Forest for strictly commercial purposes. A much greater area than stated will need to be cleared for fire and disaster planning reasons but this matter remains unresolved; 5. The Zipline proposal is both inconsistent and in conflict with the primary use of the DOGIT land for public park and no other purpose whatsoever; 6. The Zipline proposal is non-compliant with the SEQ Regional Plan and the Brisbane City Plan 2014, our statutory planning scheme; 7. The Applicant BCC has not comprehensively demonstrated any economic and/or social benefits accrued by the Zipline proposal; 8. The Zipline proposal has not demonstrated compliance with relevant engineering and safety standards; 9. The Zipline proposal will cause a range of poorly articulated and understated ecological, noise, traffic, visual and heritage impacts; 10. The Brisbane community has not been properly consulted about the draft LMP; 11. The draft LMP is an incomplete first draft that does not address the likely impacts and whether they can be avoided or mitigated. A second draft should be referred to the public for a true consultation process that meets the statutory planning standards; 12. The Zipline proposal will, if implemented, be a dangerous precedent for the incremental progression of commercial development of the Mt Coot-tha Forest and Botanic Garden, including the Mt Coot-tha Quarry; 13. The Zipline proposal is clearly against the wishes of the residents of Brisbane. Over the last three days (13-15 December) of the public notification period, 1205 or 95.9% of the total 1256 submission uploaded to the Assessment Manager BCC's pd online website objected to the proposal. Submissions in favour during this period numbered only 51, or 4.1%; 13

14 14. The many interested residents of Brisbane deserve to review a comprehensive, well-referenced draft LPM that addresses all the issues raised in this and other submissions. 15. In view of these facts, the MCPA respectfully recommends that the draft Land Management Plan be not accepted and that no permission be given to the Applicant BCC for a lease to any commercial operator, including Zipline Australia Pty Ltd. Kind Regards Peter Hale President, Mt Coot-tha Protection Alliance, Inc. mobile pthale@bigpond.com APPENDIX I - See attached document for the MCPA,Inc 13 December 2018 objection against the MCU Application A to the Assessment Manager, BCC. 14

F.J. Martin Roberts Evening (Mt Coot-tha from Dutton Park) 1898

F.J. Martin Roberts Evening (Mt Coot-tha from Dutton Park) 1898 F.J. Martin Roberts Evening (Mt Coot-tha from Dutton Park) 1898 A Deed of Grant in Trust protecting Mt Coot-tha was enacted in 1880 after community pressure, the reserve to be managed as a public park

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02. Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Recreation Management Plan Lake Baroon and Ewen Maddock Dam

Recreation Management Plan Lake Baroon and Ewen Maddock Dam Lake Baroon and Ewen Maddock Dam December 2013 Contents Overview... 3 The Value of Our Natural Areas... 4 Management Approach... 6 Funding... 7 Recreation Management... 8 Conditions of Access and Use...

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND October 2017 Version 2 1. BACKGROUND 1.1 Article 14.5 of Council Regulation (EEC) No 95/93, as amended by Regulation (EC) No

More information

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1. 54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council

More information

information memorandum Business and Technology Precinct Westlink Green Darra

information memorandum Business and Technology Precinct Westlink Green Darra information memorandum Business and Technology Precinct Westlink Green Darra contents about... 1 heritage precinct... 1 key features... 1 location... 2 access... 2 amenities... 2 public transport... 2

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

Gawler Environment and Heritage Association Inc, C/- 42 Finniss Street Gawler SA 5118

Gawler Environment and Heritage Association Inc, C/- 42 Finniss Street Gawler SA 5118 Gawler Environment and Heritage Association Inc, C/- 42 Finniss Street Gawler SA 5118 4 April 2008 Mr Richard Osborne General Manager SA Delfin Lend Lease 1 Main Street Mawson Lakes SA 5106 cc Ms Maria

More information

Briefing Pack for the role of Executive Manager, Roads and Drainage Whitsunday Regional Council

Briefing Pack for the role of Executive Manager, Roads and Drainage Whitsunday Regional Council Briefing Pack for the role of Executive Manager, Roads and Drainage Whitsunday Regional Council Whitehaven Beach Closing date for Applications is Monday 15 th May 2017 BRIEFING PACK CONTENTS THE POSITION,

More information

Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573

Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573 Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573 ABN 53 627 632 278 www.developmentwatch.org.au 26 June 2013 The Chief Executive Officer Sunshine Coast Council PO Box 76 NAMBOUR QLD 4560 (By

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

Cooloolabin Dam Recreation Management Discussion Paper. November 2013

Cooloolabin Dam Recreation Management Discussion Paper. November 2013 Cooloolabin Dam Recreation Management Discussion Paper November 2013 Contents November 2013... 1 Background... 3 Overview of Cooloolabin Dam... 6 Weed Management... 7 Cultural Heritage... 7 Commercial

More information

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 FOR THE DEVELOPMENT PERMIT BOARD JULY 15, 2013 760 PACIFIC BOULEVARD (COMPLETE APPLICATION) DE408507/408622

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for: 6. POUND ROAD ROAD STOPPING AND LAND SWAP General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Asset and Network Planning Manager

More information

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 February 14, 2012 Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 Via e-mail: public.engagement@dhs.gov RE: Comments on USCIS

More information

Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by

Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR Closes 8 April 2010 Submission by Logan and Albert Conservation Association Prepared by Anne Page (BA Hons Dip Ed M Env Mgt)

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan.

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan. 4 ORDINARY MEETING 22 OCTOBER 2014 1 REEF 2050 LONG-TERM SUSTAINABILITY PLAN D Walton 8/24/18-01 #4506842v2 RECOMMENDATION: That Council endorses the attached submission on the Reef 2050 Long-term Sustainability

More information

Community Sports Hub

Community Sports Hub The Adelaide City Council invites engagement from the community about Project Summary Council is seeking your feedback on a draft agreement to enable the South Australian Cricket Association (SACA) to

More information

NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY NO 44 KOALA HABITAT PROTECTION

NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY NO 44 KOALA HABITAT PROTECTION Director, Planning Frameworks NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001 16 December 2016 NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Mimosa Creek Precinct Landscape Plan

Mimosa Creek Precinct Landscape Plan Mimosa Creek Precinct Landscape Plan Version 2.0 Prepared by: Michael Fox President Mt Gravatt Environment Group PO Box 5 Carina Qld 4152 www.megoutlook.wordpress.com Table of Contents 1 Purpose 2 2 Foundation

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

Implementation Framework. Expression of Interest. Queensland Ecotourism Investment Opportunities. Ecotourism Facilities on National Parks

Implementation Framework. Expression of Interest. Queensland Ecotourism Investment Opportunities. Ecotourism Facilities on National Parks Queensland Ecotourism Investment Opportunities Implementation Framework Expression of Interest Ecotourism Facilities on National Parks Great state. Great opportunity. Contents Introduction...1 Purpose

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Powered by TCPDF (www.tcpdf.org) Draft Greater Sydney Region Plan Submission_id: 31119 Date of Lodgment: 12 Dec 2017 Origin of Submission: Online Organisation name: Serapark Pty Ltd Organisation type:

More information

ACCESS FEES TO AIRPORT INSTALLATIONS (CP5/2004) COMMENTS OF AER LINGUS

ACCESS FEES TO AIRPORT INSTALLATIONS (CP5/2004) COMMENTS OF AER LINGUS ACCESS FEES TO AIRPORT INSTALLATIONS (CP5/2004) COMMENTS OF AER LINGUS We refer to the above in which the Commission has sought the views of interested parties on Aer Rianta s application for prospective

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

Global Sustainable Tourism Destinations Criteria

Global Sustainable Tourism Destinations Criteria Global Sustainable Tourism Destinations Criteria Draft destination level Global Sustainable Tourism Criteria as proposed after Destinations and International Standards joint working group meeting and follow-up

More information

Land Management Summary

Land Management Summary photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the

More information

Revalidation of UKPHR s registrants: Guidance

Revalidation of UKPHR s registrants: Guidance March 2016 Revalidation of UKPHR s registrants: Guidance Index Page No. Foreword by the Registrar 2 Who is this guidance for? 3 What is covered in this guidance? 4 Standards on revalidation 5 Practical

More information

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION Page 41 REPORT TITLE: SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION REPORT PROVIDED BY: Road Services Engineer Director City Infrastructure 1.

More information

Green Fields Leppington

Green Fields Leppington Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE

More information

This is a submission to Council s Delivery Plan and Operational Plan

This is a submission to Council s Delivery Plan and Operational Plan Goulburn Mulwaree Council Locked Bag 22 Goulburn NSW 2580 Emailed: strategy@goulburn.nsw.gov.au and council@goulburn.nsw.gov.au Marulan/Tallong Community Network C/O 843 Marulan South Road Marulan NSW,

More information

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED 1601214 Table of Contents 1. Introduction... 1 2. Observation 1: How has the GSC Draft

More information

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31732 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: APP Corporation Pty Ltd Organisation type:

More information

Navigation event 28 km north-west of Sydney Airport, NSW 11 January 2007

Navigation event 28 km north-west of Sydney Airport, NSW 11 January 2007 ATSB TRANSPORT SAFETY INVESTIGATION REPORT Aviation Occurrence Investigation 200700065 Final Navigation event 28 km north-west of Sydney Airport, NSW 11 January 2007 ZK-OJB Airbus A320 ATSB TRANSPORT

More information

Appendix 7 Local Green Spaces - Detailed Evidence

Appendix 7 Local Green Spaces - Detailed Evidence Appendix 7 Local Green Spaces - Detailed Evidence Neigh Bridge Country Park, Somerford Keynes General information Neigh Bridge Country Park is situated at the southern entrance to Somerford Keynes village.

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What has been decided? What are the details of the plan? What

More information

WATTS BRIDGE MEMORIAL AIRFIELD INC.

WATTS BRIDGE MEMORIAL AIRFIELD INC. ABN: 79 419 622 WATTS BRIDGE MEMORIAL AIRFIELD INC. ADMINISTRATION BY LAWS September 2014 (Provided as indicative only - subject to change without notice) Contents 1.0 INTRODUCTION... 3 2.0 OBLIGATION

More information

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw Submission to Southland District Council on Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw Date: 9 November 2018 Tourism Industry Aotearoa (TIA) welcomes the opportunity to comment on Southland

More information

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES The Canadian Airport Authority ( CAA ) shall be incorporated in a manner consistent with the following principles: 1. Not-for-profit Corporation

More information

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Response from the Aviation Environment Federation 18.3.10 The Aviation Environment

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person Consumer Protection Group Air Travel Organisers Licensing Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person ATOL Policy and Regulations

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

DRAFT PLAN OF MANAGEMENT MASSY GREENE

DRAFT PLAN OF MANAGEMENT MASSY GREENE DRAFT PLAN OF MANAGEMENT MASSY GREENE The draft Plan of Management for the Reflections Holiday Parks Massy Greene is on public exhibition from Monday, 19 November 2018 to Sunday, 6 January 2019. The plans

More information

BLAIRGOWRIE COMMON GOOD FUND COMMITTEE. 1 May 2013 QUEEN ELIZABETH II FIELDS 2012 CHALLENGE IN PERTH AND KINROSS

BLAIRGOWRIE COMMON GOOD FUND COMMITTEE. 1 May 2013 QUEEN ELIZABETH II FIELDS 2012 CHALLENGE IN PERTH AND KINROSS BLAIRGOWRIE COMMON GOOD FUND COMMITTEE 4 13/205 1 May 2013 QUEEN ELIZABETH II FIELDS 2012 CHALLENGE IN PERTH AND KINROSS Report by Depute Director (Environment) PURPOSE OF REPORT This report seeks the

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?:

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?: Kaufland Stores in Victoria Advisory Committee Epping E08 Request to be heard?: Yes Full Name: Organisation: Affected property: Attachment 1: Attachment 2: Attachment 3: Comments: Bernard McNamara BMDA

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4 P R E S E R V I N G A U S T R A L I A ' S O L D E S T G A R D E N S U B U R B 5 August 2015 General Manager Hunters Hill Council NSW 2111 P.O. BOX 85, HUNTERS HILL, N.S.W. 2110 Cc: Clr Richard Quinn, Clr

More information

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU YOUR OPPORTUNITY IS NOW LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU AUSTRALIA FAIR EVOLUTION With the evolution of the official Southport CBD and an associated boost in local economic indicators, Australia

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

Aeronautical Studies (Safety Risk Assessment)

Aeronautical Studies (Safety Risk Assessment) Advisory Circular Aeronautical Studies (Safety Risk Assessment) FIRST EDITION GEORGIAN CIVIL AVIATION AGENCY Chapter LIST OF EFFECTIVE PAGES Pages Amend. No Date of Issue List of effective pages 2 0.00

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124 31 March 2017 Sean O Toole Sheridan Dudley District Commissioner - West District Commissioner - South West Greater Sydney Commission Greater Sydney Commission PO Box 257 PO Box 257 PARRAMATTA NSW 2124

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE 15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Authors: PURPOSE OF REPORT Transport

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 16, 2005 DATE: March 28, 2005 SUBJECTS: A. Adoption of the Fort Myer Heights North Plan. B. GP-300-04-1 Adoption of the following General

More information

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board Certification Memorandum Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board EASA CM No.: CM CS-008 Issue 01 issued 03 July 2017 Regulatory requirement(s):

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

TOWN TRUST. Bury St Edmunds Railway Station

TOWN TRUST. Bury St Edmunds Railway Station BURY ST EDMUNDS TOWN TRUST conserving buildings of historic interest The future of Bury St Edmunds Railway Station Part I Report October 2015 1 The future of Bury St Edmunds Railway Station NOTE: This

More information

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3 -- WORKSHOP REPORT -- Project: Client: Event: South Beach Basketball Court City of Fremantle Community Consultation Forum Date: 12 th November 2015 6:00pm 8:00pm Author: Joel Levin, Aha! Consulting Contents:

More information

Cumberland Conservation Corridor

Cumberland Conservation Corridor Cumberland Conservation Corridor A concept for protecting and managing the remnant Ecological Communities of the Cumberland Plain. A call for the NSW Government to commit funding and resources towards

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors.

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors. APPENDIX A FEDERATION SQUARE CIVIC AND CULTURAL CHARTER The Federation Square Civic and Cultural Charter recognises Melbourne s pre-eminence as a centre for creativity and innovation, its diverse and successful

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands The Adelaide City Council invites engagement from the community about Feedback on an event licence application for the Park Lands Project Summary The Adelaide City Council has received an application from

More information

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288 Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288 CAP 1288 Invitation to participate in the ATOL Reporting Accountants scheme Invitation to participate in the ATOL Reporting Accountants

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

Report. on an investigation into complaint no 06/B/15306 against Plymouth City Council. 21 January 2008

Report. on an investigation into complaint no 06/B/15306 against Plymouth City Council. 21 January 2008 Report on an investigation into complaint no against Plymouth City Council 21 January 2008 The Oaks No 2, Westwood Way, Westwood Business Park, Coventry CV4 8JB Investigation into complaint no against

More information

INTERNATIONAL CONFERENCE ON AIR LAW. (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1

INTERNATIONAL CONFERENCE ON AIR LAW. (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1 DCAS Doc No. 5 15/7/10 INTERNATIONAL CONFERENCE ON AIR LAW (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1 OPTIONS PAPER FOR AMENDMENT OF ARTICLE 4 OF THE MONTREAL CONVENTION (Presented by

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization WORKING PAPER 5/3/13 English only WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key issues

More information

CAA Strategy and Policy

CAA Strategy and Policy CAA Strategy and Policy Ms Tamara Goodwin Senior Air Services Negotiator Department for Transport Great Minster House Zone 1/26 33 Horseferry Road London SW1P 4DR 14 July 2017 Dear Tamara APPLICATION BY

More information

A summary of Draft Makara Peak Mountain Bike Park Master Plan

A summary of Draft Makara Peak Mountain Bike Park Master Plan A summary of Draft Makara Peak Mountain Bike Park Master Plan OVEMBER 216 Image: Peter Marshall 2 3 Introduction Since it was established in 1998, the Makara Peak Mountain Bike Park (Makara Peak) has grown

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

PART D: Stakeholder consultation

PART D: Stakeholder consultation PART D: Stakeholder consultation 4. Stakeholder consultation Iluka is committed to ongoing consultation with its stakeholders to achieve sustained mutual benefits for the life of the project. Ongoing

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

OUTDOOR AND ENVIRONMENTAL STUDIES

OUTDOOR AND ENVIRONMENTAL STUDIES Victorian Certificate of Education 2002 SUPERVISOR TO ATTACH PROCESSING LABEL HERE Figures Words STUDENT NUMBER Letter OUTDOOR AND ENVIRONMENTAL STUDIES Written examination Monday 18 November 2002 Reading

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Communication and consultation protocol

Communication and consultation protocol Communication and consultation protocol Airservices Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

Supporting information to an application for preapplication 3 rd February 2017

Supporting information to an application for preapplication 3 rd February 2017 Development Services, West Lindsey District Council, Guildhall, Marshall s Yard, Gainsborough DN21 2NA Supporting information to an application for preapplication advice. 3 rd February 2017 Proposal for

More information

Recreation Opportunity Spectrum for River Management v

Recreation Opportunity Spectrum for River Management v Recreation Opportunity Spectrum for Management v. 120803 Introduction The following Recreation Opportunity Spectrum (ROS) characterizations and matrices mirror the presentation in the ROS Primer and Field

More information