Identifying the information you need. Data Collection & Analysis ayss. Amy Anderson FAA Sarah Brammell - ESA Airports Dan Hirchert - Mead & Hunt, Inc.
|
|
- Horace McDaniel
- 6 years ago
- Views:
Transcription
1 Identifying the information you need Data Collection & Analysis ayss Amy Anderson FAA Sarah Brammell - ESA Airports Dan Hirchert - Mead & Hunt, Inc.
2 Part 1: Overview of current/draft guidance and what is required CURRENT GUIDANCE: Wildlife Hazard Management at Airports (Second Edition Manual 2005) Standardized counts of birds should be made at least twice monthly. Specialized surveys might be needed to document mammals on the airport. These specialized mammal surveys should be conducted at least twice during a12- month WHA.
3 Part 1: Overview of current/draft guidance and what is required DRAFT AC NO: 150/5200-NEW Protocol for the conduct and review of wildlife hazard assessments, wildlife hazard management plans and wildlife hazard site visits. 1. Minimum number of bird surveys/day? 2. Minimum number of bird/ mammal surveys/month? 3. Minimum number of days between sampling periods? 4. Provide Airport Certification Safety Inspectors with guidelines/templates regarding review of WHAs/WHMPs 5. Provide airports with similar WHAs/WHMPs templates for RFPs
4 Part 1: Overview of current/draft guidance and what is required Wildlife Hazard Assessments Vs. Wildlife Hazard Site Visits Protocol for continual monitoring Items to be included din the WHA report Deliverables for Wildlife Hazard Site Visit
5 Part 2: Data collection methodologies where, when & how much The need for biologically sound data to answer the following questions (FAR Part (c) (1)-(5)): (1) An analysis of the events or circumstances that prompted the assessment. (2) Identification of the wildlife species observed and their numbers, locations, local movements, and daily and seasonal occurrences. (3) Identification and location of features on and near the airport that attract wildlife. (4) A description of wildlife hazards to air carrier operations. (5) Recommended actions for reducing identified wildlife hazards to air carrier
6 Data Collection FAA Separation p Criteria
7 Data Collection FAA Separation p Criteria (example)
8 Where do you collect data? From the Guidance: Identification of the wildlife species observed and their numbers, locations, local movements, and daily and seasonal occurrences. Identification and location of features on and near the airport that t attract t wildlife. Other considerations: Arrival and departure corridors Synergistic relationships on and near airport (ie, food and shelter)
9 Example 1: Spatial Distribution Spatially distribute observation points across airport property and beyond. Ground truth to ensure you cover entire project area thoroughly.
10 Example 2: 10,00-foot Separation Criteria, Corridors, & Land Uses Airside and landside (including offairport property). Arrival, departure, and cross-airfield areas Known or suspect attractant areas were considered in setting locations.
11 Data Collection When and How much? Minimum 12-month WHA wildlife survey efforts include: (1) Bi-monthly visits to document bird species (2) Additional Sampling Events (if applicable, may include): (1) Small mammal sampling (2) Aquatic species sampling (ie fish shocking) (3) Other species group / prey type sampling (3) Nocturnal Survey (spotlights, night vision, or FLIR)
12 Data Collection When and How much? Example #2 - Standardized Data Collection: Each observation point is monitored for 5 minutes, all species and activities recorded. Three time periods each month for 12 months: dawn, midday, and dusk
13 Data Collection Stakeholders and Interviews Important information can be learned from people who have been at and around the airport for longer than the 12-months that you will be there. Stakeholder Group Airport Operations Airport Maintenance/ Grounds FAA (Cert Inspector, ATCT, ADO) FBOs/Tenants/User Groups Other Interviews FAA ATCT Director of Maintenance/Grounds Director of Operations FBOs/Tenants/User Groups Military or Agencies Off-Airport Entities
14 Data Collection Other Sources of Information Local, State and Federal Agencies (websites) Parks, Refugees, and other wildlife/conservation areas (websites, documents, studies) ebird (website) Audubon website and local chapters (Christmas Bird Count and other information) Airport Studies (past WHAs, NEPA documents, permits)
15 Part 3: Data Analysis Goal of the report: to communicate the results of the data in a format that the reader can easily interpret 3 Main Areas of Data Analysis 1. Strike Data 2. Wildlife Observation Data (collected during WHA) 3. Relating Data to Airport Operations
16 Part 3: Data Analysis Strike Data
17 Part 3: Data Analysis Strike Data Column Name Explanation of Column Name and Codes INDEX NR OPID OPERATOR ATYPE AMA AMO EMA EMO AC_CLASS AC_MASS NUM_ENGS Individual record number Airline operator code A three letter International Civil Aviation Organization code for aircraft operators. (BUS = business, PVT = private aircraft other than business, GOV = government aircraft, MIL - military aircraft.) Aircraft International Civil Aviation Organization code for Aircraft Make International Civil Aviation Organization code for Aircraft Model Engine Make Code (see Engine Codes tab below) Engine Model Code (see Engine Codes tab below) Type of aircraft (see Aircraft Type tab below) 1 = 2,250 kg or less: 2 =, kg: 3 = 5,701-27,000 kg: 4 = 27, ,000 kg: 5 = above 272,000 kg Number of engines TYPE_ENG ENG_1_POS ENG_2_POS ENG_3_POS ENG_4_POS REG FLT REMAINS_COLLECTED REMAINS_SENT INCIDENT_DATE INCIDENT_MONTH INCIDENT_YEAR TIME_OF_DAY TIME AIRPORT_ID AIRPORT STATE FAAREGION Type of power A = reciprocating engine (piston): B = Turbojet: C = Turboprop: D = Turbofan: E = None (glider): F = Turboshaft (helicopter): Y = Other Where engine # 1 is mounted on aircraft (see Engine Position tab below) Where engine # 2 is mounted on aircraft (see Engine Position tab below) Where engine # 3 is mounted on aircraft (see Engine Position tab below) Where engine # 4 is mounted on aircraft (see Engine Position tab below) Aircraft registration Flight number Indicates if bird or wildlife remains were found and collected Indicates if remains were sent to the Smithsonian Institution for identifcation Date strike occurred Month strike occurred Year strike occurred Light conditions Hour and minute in local time International Civil Aviation Organization airport identifier for location of strike whether it was on or off airport Name of airport State FAA Region where airport is located ENROUTE RUNWAY LOCATION HEIGHT SPEED DISTANCE PHASE_OF_FLT DAMAGE If strike did not occur on approach, climb, landing roll, taxi or take-off, aircraft was enroute. This shows location. Runway Various information about aircraft location if enroute or airport where strike evidence was found. Some locations show the two airports for the flight departure and arrival if pilot was unaware of the strike. Feet Above Ground Level Knots (indicated air speed) Miles from airport Phase of flight during which strike occurred
18 Part 3: Data Analysis Wildlife y Observations (Example #1)
19 Part 3: Data Analysis Wildlife Observations (Example #2) Total number observed by season total nu umber observed FALL SPRING SUMMER WINTER Season
20 Part 3: Data Analysis Relative Risk y (GIS Application Example)
21 Part 3: Data Analysis Strikes to y Operations
22 Keys to success keeping an eye on the WHMP Know your airport: Understand environmental setting and challenges Understand current and future aircraft operations Be aware of changes on or near the airport (operations, construction, planned changes surrounding the airport) Develop an assessment and provide data analysis that meets the needs of the airport Work with the airport to develop real world recommendations Environmental constraints Budgeting and schedule challenges Looking for opportunities to recommend projects that are dual purpose Education and outreach Further evaluation of measures Increased coordination/documentation
Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST)
International Civil Aviation Organization Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST) Protocol Question (PQ) updates Module 5 bis 1 Module Objective
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationSafety 2010: A marginal average year in global Aviation Safety
Safety 2: A marginal average year in global Aviation Safety The year 2 was one of the best in aviation in terms of safety; however, as shown by the Safety Survey 2 data, runway safety remains a top priority.
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationairportops Turbojet Differences
Data show that almost all bird strike related hull losses of turbofan and turbojet transport aircraft worldwide occur during the departure phase of flight, when the risk of substantial engine damage is
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationHazardous Wildlife Management
Hazardous Wildlife Management ACI-NA Joint Session Technical & Operations Committee Public Safety & Security Committee Emily Underhill, P.E. Division Director - Development March 16, 2009 Who We Are The
More information24-26 March 2014 Cairo, Egypt. Policies & Standards. Session #3 Presentation #2
24-26 March 2014 Cairo, Egypt Policies & Standards Session #3 Presentation #2 Tackle the Challenges of Wildlife Strikes Adel Ramlawi, P. Eng. Regional Officer, Aerodromes and Ground Aids, ICAO MID Regional
More informationSANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013
SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning
More informationWildlife Incident Neutralization Cooperative Action Plan WIN-CAP. Presented by: Gabriel Acosta OPAIN Bogota, Nov
Wildlife Incident Neutralization Cooperative Action Plan WIN-CAP Presented by: Gabriel Acosta OPAIN Bogota, Nov 13 2012 1 The Problem Bird populations are increasing. Wildlife populations are being protected.
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationLatest developments of ICAO on Wildlife hazard reduction
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln 2011 Bird Strike North America Conference, Niagara Falls Bird Strike Committee Proceedings 9-2011 Latest developments of
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationWhy we need to compare wildlife strike data among airports to improve aviation safety
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln 2011 Bird Strike North America Conference, Niagara Falls Bird Strike Committee Proceedings 9-2011 Why we need to compare
More informationAirport Runway Location and Orientation. CEE 4674 Airport Planning and Design
Airport Runway Location and Orientation CEE 4674 Airport Planning and Design Dr. Antonio A. Trani Professor of Civil Engineering Virginia Tech Virginia Tech 1 of 24 Runway Location Considerations The following
More informationFAA Office of Airport Safety and Standards
FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationDIRECTOR S ORDER #41: Wilderness Preservation and Management
These are relevant sections about Wilderness Management Plans from National Park Service 2006 Management Policies, Director s Orders #41 and Reference Manual 41. National Park Service U.S. Department of
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationBSC USA Committee Role, Composition, and Goals -Lessons Learned-
BSC USA Committee Role, Composition, and Goals -Lessons Learned- ICAO Wildlife Hazard Reduction Symposium Montreal, Canada May 16 18, 2017 Sarah Brammell, Chair BSC USA History of the Committee 1991 -
More informationHILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1
HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO
More informationRUNWAY SAFETY GO-TEAM METHODOLOGY
RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related
More informationThe Current Situation
24-26 March 2014 Cairo, Egypt The Current Situation Session #2 Presentation #2 Wildlife and Foreign Object Debris (FOD) Workshop, Cairo, Egypt, March 24-26, 2014 Chamsou Andjorin Aviation Safety Africa
More informationPlanning, Development and Environment Committee
Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY
More informationACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey
ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey Goal of Industry Survey While there are common challenges among small airports, each airport is unique, as are their
More informationUpdate to Doc 8335 Manual of Procedures for Operations Inspection, Certification and Continued Surveillance
Update to Doc 8335 Manual of Procedures for Operations Inspection, Certification and Continued Surveillance New Doc 10059 Manual on the implementation of Article 83 bis of the Convention on International
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationNantucket Memorial Airport Master Plan Update
Nantucket Memorial Airport Master Plan Update CHAPTER 1 - INTRODUCTION & PUBLIC OUTREACH PROGRAM REVIEW DRAFT SUBJECT TO CHANGE Prepared for: Nantucket Memorial Airport Commission 14 Airport Road Nantucket,
More informationRequirements for wildlife control at aerodromes
Requirements for wildlife control at aerodromes Vasileios Stefanioros Aerodromes Regulations Officer Zsofia Olah Safety Investigation Officer TE.GEN.00409-001 Legal background Regulation (EC) 1108/2009
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationAerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012
Aerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012 1 Certification what, why and how. Outline: - ICAO requirements and guidance associated with aerodrome certification. - Requirements of and
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationFirst edition 2005 Aerodrome Bird Hazard Prevention and Wildlife Management Handbook
First edition 2005 Aerodrome Bird Hazard Prevention Authors: ACI World Operational Safety Subcommittee In collaboration with: Bureau de travaux et d études en environnement (BTEE) AIRPORTS COUNCIL INTERNATIONAL
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationAFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)
AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationWildlife Management from a Regulatory Perspective
Wildlife Management from a Regulatory Perspective Description Operators of aircraft have a reasonable expectation that any wildlife hazard which may exist at an airport they use will be managed to a level
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More information30th IBSC Conference - Stavanger, Norway June, Takahiro TOKUI
Bird Strike Control and Reduction in JAPAN 30th IBSC Conference - Stavanger, Norway 25-29 June, 2012 Takahiro TOKUI Civil Aviation Bureau (CAB), Ministry of Land Infrastructure, Transport and Tourism (MLIT),
More informationTUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page
TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA
More informationDave Burr - AFS-260. Steve Gibbs AFS-300
MASTER MINIMUM EQUIPMENT LIST Dave Burr - AFS-260 Steve Gibbs AFS-300 Page 1 of 48 PRESENTATION OUTLINE The Flight Standards Service Aircraft Evaluation Groups Master Minimum Equipment List Page 2 of 48
More informationOffice of Airport Safety and Standards
Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office
More informationAir Transportation Technical Advisory Committee
Reference Item 4 Air Transportation Technical Advisory Committee 2014 Committee Goals Michael Mallonee February 21, 2014 ATTAC Purpose Provide technical guidance, recommendations for regional GA system
More informationPre-Submission Consultant Briefing January 12, 2016
Pre-Submission Consultant Briefing January 12, 2016 L1408-S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD GEOMETRY ANALYSIS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MA L.G. HANSCOM FIELD,
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationINTERNATIONAL BIRD STRIKE COMMITTEE IBSC27 / WP V-4 Athens, May 2005
INTERNATIONAL BIRD STRIKE COMMITTEE IBSC27 / WP V-4 Athens, 23-27 May 2005 BIRD STRIKE DATA ANALYSIS AT SOUTH AFRICAN AIRPORTS AND SPATIAL REPRESENTATION OF BIRD PATROLS IN RELATION TO BIRD STRIKE OCCURRENCES.
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationDr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia
Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University January 27, 2009 Blacksburg, Virginia 1 Runway Design Assumptions (FAA 150/5325-4b) Applicable to
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationChapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe
Chapter 10 The aerospace subject is very large and diverse. As seen in previous chapters, there are many subject areas. So far you have learned about history, weather, space and aerodynamics. Now you will
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationSession Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau
Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationAirport Safety Management Systems: Integrating Planning Into the Process
Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationAeronautical Fees and Charges. Ottawa Macdonald-Cartier International Airport
Aeronautical Fees and Charges Ottawa Macdonald-Cartier International Airport Issue date: November 28, 2011 Effective date: February 1, 2012 1 Contents Page 1. Definitions 2-3 2. Fees and Charges 3-6 3.
More informationTPA Emergency Planning and Response
TPA Emergency Planning and Response Tampa Bay Area Contingency Planners Agenda Airport Emergency Planning Federal Aviation Regulations Plans and Procedures Airport Emergency Plan Hurricane Plan Wildlife
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationINTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur
INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationFAA Update Society of American Military Engineers
FAA Update Society of American Military Engineers May 8, 2013 Presented by Joseph Miniace Regional Administrator FAA Central Region Current FAA FAA Mission is to provide the safest, most efficient aerospace
More informationGuidance material for land use at or near aerodromes
Guidance material for land use at or near aerodromes Table of Contents Overview... 1 Glossary... 1 Types of Aerodromes... 1 Obstacle Limitation Surfaces... 2 Wildlife Hazard Management... 2 Notice of Intention
More informationICAO Regional Seminar on CORSIA Session 1: Overview of CORSIA CORSIA Administrative Aspects and Timelines
ICAO Regional Seminar on CORSIA Session 1: Overview of CORSIA CORSIA Administrative Aspects and Timelines ICAO Secretariat Outline Draft Annex 16, Volume IV, Part II, Chapter 1 and Appendix 1: 1.1 Attribution
More informationInitiated by: AAS-300
U.S. Department of Transportation Federal Aviation Administration Subject: Qualifications for Wildlife Biologist Conducting Wildlife Hazard Assessments and Training Curriculums for Airport Personnel Involved
More informationWelcome to the Boise Airport Master Plan Update Open House
Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationFaa Flight Manual Commercial
Faa Flight Manual Commercial If you are looking for a ebook Faa flight manual commercial in pdf format, then you have come on to the correct website. We present utter release of this book in txt, DjVu,
More informationBuchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationFAA Requirements for Engine-out Procedures and Obstacle Clearance
FAA Requirements for Engine-out Procedures and Obstacle Clearance Presentation to: CAAC Engine-out Procedures Seminar Name: Chuck Friesenhahn Date: 11/29/2005 Flight Standards Senior Advisor, Advanced
More informationDr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia
CEE 4674 Airport Planning and Design Runway Length Calculations Addendum 1 Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University Spring 2015 Blacksburg,
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced
More informationAirport Master Planning Process & Update
Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David
More informationEstimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports
Estimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports 2016 Purdue Road School Mary E. Johnson, Ph.D. Associate Professor Chenyu Huang Ph.D. student Facts The 117 public-use
More informationInternational Civil Aviation Organization. Runway and Ground Safety Working Group
International Civil Aviation Organization Runway and Ground Safety Working Group Third Meeting (RGS WG/3) (Cairo, Egypt, 19-22 September 2016) Agenda Item 3: Implementation of Aerodrome Safety Priorities
More informationHow to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield
How to be Prepared for an Airport Emergency and What to Look for When Inspecting Your Airfield David Decoteau, A.A.E., C.A.E. Hayward Executive Airport Job of Airport Operations Commercial vs GA Airfield
More informationRegional Jets ,360 A319/ , , , ,780
Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.
More informationFederal Aviation Administration Office of Airports Safety and Standards
Federal Aviation Administration Office of Airports Safety and Standards Ed Cleary FAA Staff Wildlife Biologist Landfills Landfill History 10 March 1960, Boston Logan, Lockheed Electra ingests European
More informationMarch 2016 Safety Meeting
March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC
More informationLehigh Valley International Airport 14 CFR Part 150 Noise Compatibility Study Update. Community Advisory Committee Meeting #1
Lehigh Valley International Airport 14 CFR Part 150 Noise Compatibility Study Update Community Advisory Committee Meeting #1 LNAA Boardroom Allentown, PA Presented by: Wyle Laboratories, Inc. January 28,
More informationAeronautical Studies (Safety Risk Assessment)
Advisory Circular Aeronautical Studies (Safety Risk Assessment) FIRST EDITION GEORGIAN CIVIL AVIATION AGENCY Chapter LIST OF EFFECTIVE PAGES Pages Amend. No Date of Issue List of effective pages 2 0.00
More informationAUTHORIZATION TO CONDUCT ETOPS OPERATIONS
oi oauu-^.o CHAPTER 4 AUTHORIZATION TO CONDUCT ETOPS OPERATIONS 4.1. ETOPS Authorizations. As stated earlier in this chapter, the DAAO determines the final decision on whether the certificate holder has
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationNational Transportation Safety Board Aviation Accident Final Report
National Transportation Safety Board Aviation Accident Final Report Location: COVINGTON, KY Accident Number: Date & Time: 02/22/1999, 1455 EST Registration: N682DA Aircraft: Boeing 757 Aircraft Damage:
More informationFAA Unmanned Aircraft Systems (UAS)
FAA Unmanned Aircraft Systems (UAS) Overview: Proposed Small UAS Rule Presented To: Small Business Aviation Safety Roundtable Presented By: Mark Bury, Assistant Chief Counsel, Regulations Division of the
More informationAirports and UAS: Integrating UAS into Airport Infrastructure and Planning
ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements
More informationAthens International Airport
Athens International Airport Wildlife Hazard Management Plans and ICAO s Safety Management System Anastasios Anagnostopoulos Head Wildlife and Landscaping Environmental Services Department ICAO, World
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationAdvisory Circular. AC No: 150/ B
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Qualifications for Wildlife Biologist Conducting Wildlife Hazard Assessments and Training Curriculums for Airport
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures
VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating
More information