Passenger movement simulation in intermodal air-rail terminal

Size: px
Start display at page:

Download "Passenger movement simulation in intermodal air-rail terminal"

Transcription

1 Passenger movement simulation in intermodal air-rail terminal Antonia COKASOVA, EUROCONTROL Experimental Centre, Brétigny, France and University of Zilina, Slovakia There are numerous advantages in transferring some short haul flights to high-speed train, principally that it releases runway and ATC resources, offers immediate relief to congestion, reduce negative environmental impacts, and finally improves ground access to airports. Passenger perspective is the key element; it is rather impossible to develop a well-organized intermodal node if it does not work towards passenger satisfaction. One of the ACARE challenges is to ensure that passengers spend only 15 minutes in the airport terminal for shorthaul flight and 30 minutes for long-haul flights. Clearly today we are a million miles from this and so if this target is to be approached then we need quantum improvements in passenger flows in the terminal and in particular baggage check-in, passport control and security screening. An intermodal facility can offer enhancements to all of these processes and aim to look specifically at idealised passenger flows in order to get an assessment of the potential benefits. The layout of intermodal terminal can strongly influence the outcome of integrated intermodal services efficiency. For this reason detailed analysis is needed allowing the airport to benefit from its intermodal premises and provide user friendly services to passengers. I. INTRODUCTION With increasing integration in regional and High Speed Train networks, airports are becoming focal points of landside transport multimodal interchange nodes. Their network position is a strategic advantage that makes airports new development poles, airports are transforming into centres of activity within them. Drastic traffic growth has several downsides, notably airport delays and congestion are one of the most important threats to the future growth of civil aviation. Travel distances in Europe are such that more than 50 % of European flights are of less than 370 N.M.; a statistic heavily influenced by airlines use of a hub and spoke operation. European airlines are operating fragmented networks with approximately 50% of the traffic being concentrated on just 10% of the airport pairs. Airport congestion is seen as a mounting problem and is already a limiting factor at many airports. Many of the international hubs are operating at their maximum throughput; some have already reached their operating limits as prescribed by physical and as well political and environmental constraints. The use of such airports is heavily regulated and future traffic distribution patterns are likely to generate congestion at airports that currently do not experience capacity problems. Since 2000 airport ATFM delays have doubled in proportion (46% vs. 23% of all ATFM delays). In year 2003 in Europe, 66% of airport derived ATFM delays were caused by only 8 European airports (Frankfurt, Rome, Paris, London, Milan, Zurich, Amsterdam and Barcelona), yet these 8 airports handle only 19% of European traffic. [1] A. High-speed rail connection Some high speed rail links may improve the capacity of airports for higher-earning long-distance flights, by providing a good alternative to short haul flights. The driving force needs to be a combination of commercial considerations, customer choice and convenience. The station where people catch an airport train or high-speed train is where the ambience needs to start the transition from railway to airport to airline. The layout of intermodal terminal can strongly influence the outcome of integrated intermodal services efficiency, for this reason detailed analysis is needed allowing the airport to benefit from its intermodal premises and provide user friendly services to passengers. One of the ACARE challenges is to ensure that passengers spend only 15 minutes in the airport terminal for short-haul flight and 30 minutes for long-haul flights. Clearly today we are a million miles from this and so if this target is to be approached then we need quantum improvements in passenger flows in the terminal and in particular baggage check-in, passport control and security screening. An intermodal facility can offer enhancements to all of these processes and aim to look specifically at idealised passenger flows in order to get an assessment of the potential benefits.

2 B. Objective The objective of the study into Intermodality from the passenger perspective is to better understand the importance of High-Speed Train inter-modal connections between European airports and the connection between air and rail mode inside an airport terminal. There are numerous advantages to both proposals. Despite the fact that some barriers of Intermodality are highly visible there are plenty of reasons to support the idea of system integration, such as high potential growth of air travel, congestion in air and on the ground, delays and their rising cost to operators. II. PASSENGER MOVEMENT SIMULATION A. Model input As air-rail Intermodality is a well known phenomenon only at very few European airports, there is very limited information available that describes passenger movement at intermodal terminals. A general unknown in the field of Intermodality is passenger behaviour. In aim to analyze the impact of an intermodal airport terminal layout on airport services efficiency we have chosen a model that will reflect existing passenger movement at an intermodal airport, using several different inputs. Passenger and luggage movement simulation is a complex issue; it is rather indispensable to merge several focal elements in order to achieve comparable results. In the beginning we have considered only five elements to avoid result bias caused by large number of inputs, with possibility of further update in the future if needed. The model can serve as a starting point for more complex intermodal simulations in the future. 5. Traffic operations on 29/07 4. Software Tool 1. Passenger Requirements Passenger Movement Simulation 2. Airport PAX Movement Info 3. Airport Intermodal Terminal After evaluating several methodologies we have decided to undertake a self-administered questionnaire, when the questionnaire is presented and briefly explained to the respondent by someone and then the respondent is left alone to complete the questionnaire. This method of data collection ensured a high response rate, accurate sampling and minimum of interview bias, while providing necessary explanations (but not the interpretation of questions) and giving the benefit of a degree of a personal contact. The aim of the questionnaire was to address passengers exposed to the choice of undertaking their journey by either high-speed train or airplane, so questionnaires have been collected both at airport terminals and on-board of highspeed train. Regarding railway transport we have approach passengers travelling on Paris-Brussels-Amsterdam-Brussels-Paris line and Paris-London-Paris line, using services of Thalys International and Eurostar. Airport questionnaire distribution was different from railways, due to dynamic environment at the airport terminal, additional stress and lack of passenger time. Questionnaires have been collected both in boarding gates and check-in areas. We have collected 913 valid samples, after evaluating incomplete and incorrectly filled out samples. Passenger travel preferences vary depending on nationality, purpose of travel and even age. Based on questionnaire results we can conclude that it is rather difficult to find a common denominator for all passengers. About 60% of all passengers agreed that travel time, ticket price and access to airport or station are the three main decision makers. 40% of all passengers consider on-board comfort, schedule & frequency, punctuality & reliability and walking/waiting time crucial when choosing between different transport mode, while on-board services and luggage handling have little or no influence on passengers. Some factors proved to be important only to a small group of people, although they can be very influential; fear of flying or fear of crossing the Channel Tunnel (Eurostar) will certainly strongly influence passengers inclination towards the competitive mode. For detailed results of the questionnaire please see reference articles [2] [3]. Fig. 1 Passenger simulation model input A.2 Passenger movement information A.1 Passenger requirements Passenger perspective is the main driving force that will decide on the potential for mode change. Building a wellorganized and satisfactory intermodal interchange node is not possible without undertaking sound analyses of intermodal passenger requirements. One of the objectives of our research is to gain a sound knowledge of passenger requirements; a weight to determine the most important travel attributes related to intermodal transport and assign an importance to each attribute. Passenger shift to high-speed rail depends on the level of satisfaction, not necessarily providing better services than air but fulfilling certain needs that stand in priority to others. There is very little information available concerning airport passenger movement. Most of the information published by airports in based on observations of passengers moving along the terminal. It has been observed that passenger without luggage moves 10% faster than passenger with a luggage and that passenger with a trolley moves 10% slower than passenger carrying his luggage (Frankfurt Airport Expansion Program - undergraduate thesis). In general passengers move about 60 to 120 meters per minute [4]. A.3 Airport Intermodal Terminal To achieve valid simulation the best is to input an existing airport layout; an international European airport terminal

3 instead of a fictive layout, with possibility of extending into an intermodal air-rail terminal. Because of strict security issues it was very difficult to obtain an existing airport terminal layout for research purposes, out of 6 International European Airports only 1 European airport was ready to cooperate and provide us with additional support needed in later period of the study. The airport chosen for simulation is a main national hub; in 1998 it had the world s highest passenger growth rate. In 2003 the airport processed a total of 9, 63 million passengers and was served by 58 scheduled services airlines. For the simulation purposes we will design three airport layout scenarios Scenario A1: Airport without high-speed rail station Scenario A2: Airport with high-speed rail station Scenario A3: A2 with check-in facilities at railway station A.4 Simulation tool Simulation tool - A human behaviour is often thought to be hard to define in models; simulations of processes with people involved are less common than industrial simulations. After a brief review of existing products we have decided to apply for a fast-time simulation tool including passenger behaviour modelling and enabling a statistically significant number of runs to be performed for a particular set of input parameters representing all the various possible scenarios. After several month of negotiation the Preston Aviation Solutions have agreed to deliver a suitable product entirely free of charge, strictly for student research purposes. PaxSim is a graphics-based application used for the fast-time simulation of passenger and associated baggage flow at an airport terminal building. PaxSim can be used to simulate flows through discrete areas of a terminal or the entire terminal area. A simulation run using PaxSim can be viewed and interactively controlled on the screen. Further analysis can be performed and a variety of statistical information produced via spreadsheets. The analyst can view the actual flow of passengers, any potential bottlenecks and the ripple effects of passenger delays in other areas of the terminal. A.5 Traffic sample Concerning passenger traffic data we have used real traffic data from 29 th of July 2005 delivered by airport operations. The data is detailed to such extend that each flight is allocated to certain stand, gate and luggage carousel. As one of the scenarios will reflect an intermodal airport terminal, shifting possibly all short haul flights to a high-speed train services, it was necessary to analyse the exact number of short haul flights operated from/to our sample airport. Same as for airport layout scenarios we will have three different traffic data scenarios Scenario B1: 26% passengers flying less than 800 km s (as in case today) Scenario B2: 10% intermodal passenger (example of Frankfurt Airport, the best intermodal airport) Scenario B3: 26% intermodal passengers (al short-haul flights shift to HST) Airport s traffic distribution by segments is the following: International Movements: 82% Domestic Movements: 18% International Passengers: 78% Domestic Passengers: 22% B. Simulation objective The objective of the experiment is to simulate passenger flow at an intermodal air/rail passenger terminal, evaluate the feasibility and efficiency of airport layout, determine typical airport processing times and also detect bottlenecks and constraints in relation to passenger flows. The benefits identified for our study may be decomposed into several categories, as indicated below: Reduction of demand on the airport resources one of the main causes of delay at airports at the moment (in the absence of bad weather) is the saturation at the various choke-points (passport control, security screening and sometimes even check-in). Intermodal way of transport can help to shift passengers from short haul flights to railways, improve airport access, hence freeing up available runway capacity for longer, more beneficial flights and nevertheless reduce the demand on airport resources inside the terminal, due to the change of passenger and baggage flow Shorter minimum connection time the study will focus on the potential impact that an efficient layout may have on minimum connection time, assuming that a transfer passenger travelling by air/rail or rail/air instead of air/air should be able to spare significant amount of time due to shorter connection time that can be as little as 30 min Passenger flow bottlenecks intermodal way of transport may cause several bottlenecks at congested areas. This study will identify the impact of on these critical airport resources. C. Simulation scenarios There are 5 scenarios; composed of 3 traffic samples and an airport layout with 3 different configurations. The different scenarios represent different situation in terms of airport design and airport configuration, with identical airport operation procedures. The main difference between the scenarios is the connection to a railway station at airport terminal and the flow of intermodal passengers. Starting from a basic airport layout without railway station and upto-date passenger flow, up to a transition where an airport is connected to a high-speed rail station with check-in facilities and 26% passenger intermodal flow.

4 Base scenario Base Sample airport as it is known today, without a direct connection to high - speed rail station and with 26% of traffic less than 800 km s. Air/Rail Scenario 10% intermodal PAX AiRail10 Sample airport with high-speed train connection and 10% of Air/Rail Scenario 26% intermodal PAX AiRail26 Sample airport with high-speed train connection and 26% of Air/Rail Check-in Scenario 10% intermodal PAX Sample airport with high-speed train connection and checkin facilities at the railway station, with 10% of intermodal passenger flow Air/Rail Check-in Scenario 26% intermodal PAX ARCheck-in26 Sample airport with high-speed train connection and checkin facilities at the railway station, with 26% of intermodal passenger flow Our simulation will offer a valuable starting point to further intermodal studies. Results of the simulation will present an initial idea clarifying the direct impact of intermodal services on terminal resources efficiency. Thanks to tangible conclusions our simulation will present a more transparent view of transition from a regular airport terminal to an airrail intermodal terminal. As airport layout building and design is a time-consuming process it took us several month to obtain all the necessary data and information needed for our simulation. The final results of the project will be soon available. APPENDIX Simulation scenarios, description and objective ACKNOWLEDGMENT Many thanks to Mr. Louis SILLARD and the Preston Aviation Solutions for their operational help and support REFERENCES [1] EUROCONTROL PRU Performance Review Report #7, Performance Review Commission 2004, Brussels [2] Cokasova, A. (2004), Passengers Choice Between High-Speed Train and Air Transport, ICRAT2004, Zilina (SK), November 2004 [3] Cokasova, A. (2005), Analyses of Passenger Preferences in Air-Rail Intermodal Transport, COST340, Paris (FR), 13-15June [4] Fruin, J.J. (1971), Pedestrian Planning and Design The aim of the simulation is to evaluate the feasibility and efficiency of a given airport layout, to determine typical airport processing times and to detect bottlenecks and constraints in relation to passenger flow at the intermodal. The analysis will be therefore based on comparison of a number of different scenarios which consider different potential airport layouts in relation to the location and facilities of the intermodal terminal and also the potential volume of passengers who may exploit these facilities. See Appendix for main simulation scenarios and their characteristics. III. CONCLUSION In order to better understand the impact of intermodal transport on air traffic different possibilities will have to be considered in the future. The success of Intermodality and hopefully the possibility of easing congestion will depend not only on airports efficiency but mostly on passengers willingness to experience new way of travelling and operators business strategy that can develop in two different ways, either co-operation between transport modes or competition at any cost.

5 APPENDIX Simulation scenarios, description and objective SCENARIOS DESCRIPTION OBJECTIVE Base Sample Airport as is the case today, without a direct To compare reduction of connection to high-speed rail station and with 26% of demand on the airport traffic less than 800 km s AiRail10 AirRail10 AiRail26 AiRail10 AiRail26 ARCheck-in26 Base ARCheck-in26 Base 10% of 10% of 26% of 10% of check-in facilities at the railway station, with 10% of 26% of check-in facilities at the railway station, with 26% of check-in facilities at the railway station, with 10% of Sample International Airport as is the case today, without a direct connection to high-speed rail station and with 26% of traffic less than 800 km s check-in facilities at the railway station, with 26% of To compare reduction of demand on the airport Potential impact that an efficient layout may have on minimum connection time. We assume 30 min is sufficient to reach a connection flight in case To detect bottlenecks caused by Potential impact that an efficient layout may have on minimum connection time. To detect bottlenecks caused by To compare reduction of demand on the airport To compare reduction of demand on the airport Sample International Airport as it is known today, without a direct connection to high-speed rail station and with 26% of traffic less than 800 km s

6

I n t e r m o d a l i t y

I n t e r m o d a l i t y Innovative Research Workshop 2005 I n t e r m o d a l i t y from Passenger Perspective PASSENGER MOVEMENT SIMULATION PhD Candidate EUROCONTROL Experimental Centre (France) and University of ZILINA (Slovakia)

More information

I n t e r m o d a l i t y

I n t e r m o d a l i t y INO Workshop, 9-10 December 2004 I n t e r m o d a l i t y from Passenger Perspective or PASSENGERS CHOICE BETWEEN HIGH-SPEED TRAIN AND AIR TRANSPORT PhD Thesis EUROCONTROL Experimental Centre & University

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005 MODAIR: Measure and development of intermodality at AIRport INO WORKSHOP EEC, December 6 h 2005 What is intermodality? The use of different and coordinated modes of transports for one trip High Speed train

More information

MODAIR. Measure and development of intermodality at AIRport

MODAIR. Measure and development of intermodality at AIRport MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road

More information

Depeaking Optimization of Air Traffic Systems

Depeaking Optimization of Air Traffic Systems Depeaking Optimization of Air Traffic Systems B.Stolz, T. Hanschke Technische Universität Clausthal, Institut für Mathematik, Erzstr. 1, 38678 Clausthal-Zellerfeld M. Frank, M. Mederer Deutsche Lufthansa

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

Benefits and costs of vertical agreements between airlines and high speed rail operators

Benefits and costs of vertical agreements between airlines and high speed rail operators Benefits and costs of vertical agreements between airlines and high speed rail operators Alessandro Avenali 1, Valentina Bracaglia 2, Tiziana D Alfonso 1,*, Pierfrancesco Reverberi 1 1 Affiliazione Department

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Integrated Optimization of Arrival, Departure, and Surface Operations

Integrated Optimization of Arrival, Departure, and Surface Operations Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University

More information

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Ali S. Kiran Tekin Cetinkaya

More information

NETWORK MANAGER - SISG SAFETY STUDY

NETWORK MANAGER - SISG SAFETY STUDY NETWORK MANAGER - SISG SAFETY STUDY "Runway Incursion Serious Incidents & Accidents - SAFMAP analysis of - data sample" Edition Number Edition Validity Date :. : APRIL 7 Runway Incursion Serious Incidents

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Methodology and coverage of the survey. Background

Methodology and coverage of the survey. Background Methodology and coverage of the survey Background The International Passenger Survey (IPS) is a large multi-purpose survey that collects information from passengers as they enter or leave the United Kingdom.

More information

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA SIMULATION ANALYSIS OF PASSENGER CHECK IN AND BAGGAGE SCREENING AREA AT CHICAGO-ROCKFORD INTERNATIONAL AIRPORT PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University

More information

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

Airport Slot Capacity: you only get what you give

Airport Slot Capacity: you only get what you give Airport Slot Capacity: you only get what you give Lara Maughan Head Worldwide Airport Slots 12 December 2018 Good afternoon everyone, I m Lara Maughan head of worldwide airports slots for IATA. Over the

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport Izumi YAMADA, Hisae AOYAMA, Mark BROWN, Midori SUMIYA and Ryota MORI ATM Department,ENRI i-yamada enri.go.jp Outlines

More information

ASDA Session 3: Airport Performance More Punctuality. 11-November-2016 Chris Schneider

ASDA Session 3: Airport Performance More Punctuality. 11-November-2016 Chris Schneider ASDA Session 3: Airport Performance More Punctuality 11-November-2016 Chris Schneider Content: ACARE Mobility challenge The aviation environment The punctuality (and predictability) challenge ACARE Mobility

More information

Future airport concept

Future airport concept 1 Future airport concept Martin Matas University of Zilina, EPHE Eurocontrol Experimental Centre Supervisors: Antonin KAZDA University of Zilina Zilina, Slovak Republic Prof. Ivan LAVALLÉE École Pratique

More information

Analysis of Air Transportation Systems. Airport Capacity

Analysis of Air Transportation Systems. Airport Capacity Analysis of Air Transportation Systems Airport Capacity Dr. Antonio A. Trani Associate Professor of Civil and Environmental Engineering Virginia Polytechnic Institute and State University Fall 2002 Virginia

More information

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus. Regional Focus A series of short papers on regional research and indicators produced by the Directorate-General for Regional and Urban Policy 01/2013 SEPTEMBER 2013 MEASURING ACCESSIBILITY TO PASSENGER

More information

Flight Arrival Simulation

Flight Arrival Simulation Flight Arrival Simulation Ali Reza Afshari Buein Zahra Technical University, Department of Industrial Engineering, Iran, afshari@bzte.ac.ir Mohammad Anisseh Imam Khomeini International University, Department

More information

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SECTORIZATION AND ITS INFLUENCE ON FAB CE Valentina Barta, student Department of Aeronautics, Faculty of Transport and Traffic Sciences, University of Zagreb,

More information

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business

More information

Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition -

Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition - Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition - Juergen Antes Deutsche Bahn Strategic Network Management Guido Friebel University of Toulouse

More information

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive Transport Focus Train punctuality the passenger perspective 2 March 2017 Anthony Smith, Chief Executive Transport Focus Independent transport user watchdog Rail passengers in Great Britain Bus, coach &

More information

Peter Forsyth, Monash University Conference on Airports Competition Barcelona 19 Nov 2012

Peter Forsyth, Monash University Conference on Airports Competition Barcelona 19 Nov 2012 Airport Competition: Implications for Regulation and Welfare Peter Forsyth, Monash University Conference on Airports Competition Barcelona 19 Nov 2012 1 The Issue To what extent can we rely on competition

More information

2013 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2013

2013 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2013 213 Travel Survey for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 213 May 21st 213 Table of Contents Page No. Summary of Results 1 Survey Results 2 Breakdown of departing

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

Simulation of disturbances and modelling of expected train passenger delays

Simulation of disturbances and modelling of expected train passenger delays Computers in Railways X 521 Simulation of disturbances and modelling of expected train passenger delays A. Landex & O. A. Nielsen Centre for Traffic and Transport, Technical University of Denmark, Denmark

More information

FAST Future Airport STrategies

FAST Future Airport STrategies FAST Future Airport STrategies ASDA 2012 University of Delft, Netherlands, 20 June 2012 Isabelle Laplace Context Low-cost airlines: Strong development Airport status: Evolution from public to private ownership

More information

Follow-the-Greens: The Controllers Point of View Results from a SESAR Real Time Simulation with Controllers

Follow-the-Greens: The Controllers Point of View Results from a SESAR Real Time Simulation with Controllers Follow-the-Greens: The Controllers Point of View Results from a SESAR Real Time Simulation with Controllers AHFE 2016, Human Factors in Transportation Orlando 30th July 2016 Karsten Straube 1, Marcus Roßbach

More information

No Hard Analysis. A critique by HACAN of the recently-published

No Hard Analysis. A critique by HACAN of the recently-published No Hard Analysis A critique by HACAN of the recently-published report, Aviation Services and the City, the City of London commissioned from York Aviation consultants about the aviation needs of the City.

More information

Future Automation Scenarios

Future Automation Scenarios Future Automation Scenarios Francesca Lucchi University of Bologna Madrid, 05 th March 2018 AUTOPACE Project Close-Out Meeting. 27th of March, 2018, Brussels 1 Future Automation Scenarios: Introduction

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Door-to-Gate Air Passenger Flow Model

Door-to-Gate Air Passenger Flow Model Door-to-Gate Air Passenger Flow Model Martin Matas Air transport department University of Zilina Zilina, Slovakia martin.matas@fpedas.uniza.sk Milan Stefanik, PhD, milan.stefanik@fpedas.uniza.sk and Sandra

More information

Future Airport Concept (Increasing the Airport Capacity)

Future Airport Concept (Increasing the Airport Capacity) Future Airport Concept (Increasing the Airport Capacity) 4th EUROCONTROL Innovative Research Workshop Presentation Martin Matas - PhD student Supervisors: Antonin Kazda - University of Žilina - Slovakia

More information

FINEST LINK WP2 Appendix 2. Passenger volume estimation

FINEST LINK WP2 Appendix 2. Passenger volume estimation FINEST LINK WP2 Appendix 2. Passenger volume estimation Content Objectives and approach 3 9 Present situation 10 14 Preliminary train operating concept and land use projections 15 17 Trip type analysis

More information

American Airlines Next Top Model

American Airlines Next Top Model Page 1 of 12 American Airlines Next Top Model Introduction Airlines employ several distinct strategies for the boarding and deboarding of airplanes in an attempt to minimize the time each plane spends

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

De-peaking Lufthansa Hub Operations at Frankfurt Airport

De-peaking Lufthansa Hub Operations at Frankfurt Airport Advances in Simulation for Production and Logistics Applications Markus Rabe (ed.) Stuttgart, Fraunhofer IRB Verlag 2008 De-peaking Lufthansa Hub Operations at Frankfurt Airport De-peaking des Lufthansa-Hub-Betriebs

More information

Measuring Productivity for Car Booking Solutions

Measuring Productivity for Car Booking Solutions Measuring Productivity for Car Booking Solutions Value Creation Study Rebecca Bartlett 20th January 2014 Table of Contents Executive Summary Introduction Method Productivity Analysis Scenario 1 Scenario

More information

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens Australian Airport Association Stakeholder Dinner 31 May 2018 Sydney, Australia Speech by Angela Gittens Good evening ladies and gentlemen. It is a pleasure to be with you tonight and thank you again Caroline

More information

EUROCONTROL and the Airport Package

EUROCONTROL and the Airport Package European Economic and Social Committee Public Hearing Brussels, 20 February 2012 EUROCONTROL and the Airport Package François HUET EUROCONTROL Directorate Single Sky, Performance Review Unit The European

More information

Network of International Business Schools

Network of International Business Schools Network of International Business Schools WORLDWIDE CASE COMPETITION Sample Case Analysis #1 Qualification Round submission from the 2015 NIBS Worldwide Case Competition, Ottawa, Canada Case: Ethiopian

More information

APPENDIX D MSP Airfield Simulation Analysis

APPENDIX D MSP Airfield Simulation Analysis APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Study on Self Bag Drop System for Airport Baggage Handling System Simulation

Study on Self Bag Drop System for Airport Baggage Handling System Simulation , pp.22-27 http://dx.doi.org/10.14257/astl.2018.149.06 Study on Self Bag Drop System for Airport Baggage Handling System Simulation Kang-Seok Lee 1, Seung-Hun Kim 2 and Won-Hyuck Choi 3* 1 Department of

More information

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Yan Xu and Xavier Prats Technical University of Catalonia (UPC) Outline Motivation & Background Trajectory optimization

More information

1. Introduction. 2.2 Surface Movement Radar Data. 2.3 Determining Spot from Radar Data. 2. Data Sources and Processing. 2.1 SMAP and ODAP Data

1. Introduction. 2.2 Surface Movement Radar Data. 2.3 Determining Spot from Radar Data. 2. Data Sources and Processing. 2.1 SMAP and ODAP Data 1. Introduction The Electronic Navigation Research Institute (ENRI) is analysing surface movements at Tokyo International (Haneda) airport to create a simulation model that will be used to explore ways

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka

Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka SL Wong Senior Manager - Technical & Industry Affairs The Question I Try to Answer How

More information

Aviation Trends. Quarter Contents

Aviation Trends. Quarter Contents Aviation Trends Quarter 1 2013 Contents Introduction 2 1 Historical overview of traffic 3 a Terminal passengers b Commercial flights c Cargo tonnage 2 Terminal passengers at UK airports 7 3 Passenger flights

More information

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET TRANSPORTATION RESEARCH BOARD Passenger Value of Time, BCA, and Airport Capital Investment Decisions Thursday, September 13, 2018 2:00-3:30 PM ET Purpose Discuss research from the Airport Cooperative Research

More information

Flight Efficiency Initiative

Flight Efficiency Initiative Network Manager nominated by the European Commission EUROCONTROL Flight Efficiency Initiative Making savings through improved flight planning Flight efficiency The Network Manager is playing a pivotal

More information

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR Validation Results of Airport Total Operations Planner Prototype CLOU FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR FAA/EUROCONTROL ATM Seminar 2007 > Andreas Pick > July 07 1 Contents TOP and TOP

More information

Evaluation of Quality of Service in airport Terminals

Evaluation of Quality of Service in airport Terminals Evaluation of Quality of Service in airport Terminals Sofia Kalakou AIRDEV Seminar Lisbon, Instituto Superior Tecnico 20th of October 2011 1 Outline Motivation Objectives Components of airport passenger

More information

Kosovo Feasibility Study. EUs Chance to Anchor Kosovo

Kosovo Feasibility Study. EUs Chance to Anchor Kosovo Kosovo Feasibility Study EUs Chance to Anchor Kosovo EUs Prishtina, Chance to Anchor May Kosovo 20121 Kosovo Feasibility Study EUs Chance to Anchor Kosovo Author: Shenoll Muharremi www.developmentgroup-ks.com

More information

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET TRANSPORTATION RESEARCH BOARD Preparing and Using Airport Design Day Flight Schedules Wednesday, July 18, 2018 2:00-3:30 PM ET Purpose Discuss research from the Airport Cooperative Research Program (ACRP)

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT Tiffany Lester, Darren Walton Opus International Consultants, Central Laboratories, Lower Hutt, New Zealand ABSTRACT A public transport

More information

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS Terminal 3 offers a swift, pleasant and modern airport experience reinforcing Changi s award-winning reputation for exceptional service. A major aviation

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain s rail

More information

Aircraft Arrival Sequencing: Creating order from disorder

Aircraft Arrival Sequencing: Creating order from disorder Aircraft Arrival Sequencing: Creating order from disorder Sponsor Dr. John Shortle Assistant Professor SEOR Dept, GMU Mentor Dr. Lance Sherry Executive Director CATSR, GMU Group members Vivek Kumar David

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

Air Connectivity and Competition

Air Connectivity and Competition Air Connectivity and Competition Sainarayan A Chief, Aviation Data and Analysis Section, ATB Concept of Connectivity in Air Transport Movement of passengers, mail and cargo involving the minimum of transit

More information

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach

More information

Airport Access The challenge for Business Aviation in the 21st century. Vlad Olteanu, Policy Manager

Airport Access The challenge for Business Aviation in the 21st century. Vlad Olteanu, Policy Manager Airport Access The challenge for Business Aviation in the 21st century Vlad Olteanu, Policy Manager EUACA Seminar, Amsterdam, 30 September 2009 THE VOICE OF EUROPE S AIRPORTS More than 400 AIRPORTS / 46

More information

System Wide Modeling for the JPDO. Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006

System Wide Modeling for the JPDO. Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006 System Wide Modeling for the JPDO Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006 Outline Quick introduction to the JPDO, NGATS, and EAD Modeling Overview Constraints

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG UNDERGRADUATE REPORT National Aviation System Congestion Management by Sahand Karimi Advisor: UG 2006-8 I R INSTITUTE FOR SYSTEMS RESEARCH ISR develops, applies and teaches advanced methodologies of design

More information

Baku, Azerbaijan November th, 2011

Baku, Azerbaijan November th, 2011 Baku, Azerbaijan November 22-25 th, 2011 Overview of the presentation: Structure of the IRTS 2008 Main concepts IRTS 2008: brief presentation of contents of chapters 1-9 Summarizing 2 1 Chapter 1 and Chapter

More information

Validation of Runway Capacity Models

Validation of Runway Capacity Models Validation of Runway Capacity Models Amy Kim & Mark Hansen UC Berkeley ATM Seminar 2009 July 1, 2009 1 Presentation Outline Introduction Purpose Description of Models Data Methodology Conclusions & Future

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

Airport Simulation Technology in Airport Planning, Design and Operating Management

Airport Simulation Technology in Airport Planning, Design and Operating Management Applied and Computational Mathematics 2018; 7(3): 130-138 http://www.sciencepublishinggroup.com/j/acm doi: 10.11648/j.acm.20180703.18 ISSN: 2328-5605 (Print); ISSN: 2328-5613 (Online) Airport Simulation

More information

IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY

IMPROVING ATM CAPACITY WITH DUAL AIRSPACE: A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY Jean-Yves GRAU - SynRjy Didier DOHY - NeoSys Laurent GUICHARD EUROCONTROL Sandrine GUIBERT

More information

Corporate Productivity Case Study

Corporate Productivity Case Study BOMBARDIER BUSINESS AIRCRAFT Corporate Productivity Case Study April 2009 Marketing Executive Summary» In today's environment it is critical to have the right tools to demonstrate the contribution of business

More information

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport A Multi-Agent Microsimulation Model of Toronto Pearson International Airport Gregory Hoy 1 1 MASc Student, Department of Civil Engineering, University of Toronto 35 St. George Street, Toronto, Ontario

More information

Cooperative traffic management

Cooperative traffic management 3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency

More information

Submission to the Airports Commission

Submission to the Airports Commission Submission to the Airports Commission Greengauge 21 February 2013 www.greengauge21.net 1 1. Introduction Greengauge 21 is a not for profit company established to promote the debate and interest in highspeed

More information

OPTIMAL PUSHBACK TIME WITH EXISTING UNCERTAINTIES AT BUSY AIRPORT

OPTIMAL PUSHBACK TIME WITH EXISTING UNCERTAINTIES AT BUSY AIRPORT OPTIMAL PUSHBACK TIME WITH EXISTING Ryota Mori* *Electronic Navigation Research Institute Keywords: TSAT, reinforcement learning, uncertainty Abstract Pushback time management of departure aircraft is

More information

COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim)

COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim) COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim) SUMMARY BY RINZING LAMA UNDER THE SUPERVISION OF PROFESSOR MANJULA CHAUDHARY DEPARTMENT OF TOURISM AND HOTEL MANAGEMENT KURUKSHETRA UNIVERSITY,

More information

CANSO Workshop on Operational Performance. LATCAR, 2016 John Gulding Manager, ATO Performance Analysis Federal Aviation Administration

CANSO Workshop on Operational Performance. LATCAR, 2016 John Gulding Manager, ATO Performance Analysis Federal Aviation Administration CANSO Workshop on Operational Performance LATCAR, 2016 John Gulding Manager, ATO Performance Analysis Federal Aviation Administration Workshop Contents CANSO Guidance on Key Performance Indicators Software

More information

ACI EUROPE POSITION PAPER

ACI EUROPE POSITION PAPER ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has

More information

Minimizing the Cost of Delay for Airspace Users

Minimizing the Cost of Delay for Airspace Users Minimizing the Cost of Delay for Airspace Users 12 th USA/Europe ATM R&D Seminar Seattle, USA Stephen KIRBY 29 th June, 2017 Overview The problem The UDPP* concept The validation exercise: Exercise plan

More information

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING Ms. Grace Fattouche Abstract This paper outlines a scheduling process for improving high-frequency bus service reliability based

More information

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA Airport-CDM Workshop Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA Jean-Baptiste Djebbari Airline Pilot International Affairs DSNA Content Introduction 1. CANSO and A-CDM 2. A-CDM

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain

More information

EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH. Annex 4 Network Congestion

EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH. Annex 4 Network Congestion EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH Annex 4 Network Congestion 02 / EUROPEAN AVIATION IN 2040 - CHALLENGES OF GROWTH - NETWORK CONGESTION IN 2040 ///////////////////////////////////////////////////////////////////

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS SUILING LI, NATIONAL PENGHU UNIVERSITY OF SCIENCE AND TECHNOLOGY,SUILING@NPU.EDU.TW

More information

SOUTHWEST AIRLINES. Submitted By: P.Ranjithkumar 10MBA0031. Batch-D

SOUTHWEST AIRLINES. Submitted By: P.Ranjithkumar 10MBA0031. Batch-D SOUTHWEST AIRLINES Submitted By: P.Ranjithkumar 10MBA0031 Batch-D PROBLEM STATEMENT: The chief competitor of South West Airlines, Braniff International airways has introduced a 60 day half price ticket

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE IRPORT GROUND-HOLDING PROBLEM Lili WNG Doctor ir Traffic Management College Civil viation University of China 00 Xunhai Road, Dongli District, Tianjin P.R.

More information

Carbon Offset Schemes for Aviation: Inconsistent supply and weak

Carbon Offset Schemes for Aviation: Inconsistent supply and weak ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Carbon Offset Schemes for Aviation: Inconsistent supply and weak demand. What hope for the future? Dr Paul Hooper

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn 2005 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information