Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Similar documents
PRIORITIES COMMITTEE MEETING

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

ALBERTA CAPITAL REGION Transportation Plan ( )

Edmonton Real Estate Forum Industrial Market Update

Central Region 2013 Welcome

Major Projects Overview

APPENDIX F List of Commitments

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

PPP in the Canadian Roads Sector Presentation to PIARC Technical Committee A.2

Overview. ONE Properties

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

PUBLIC INFORMATION SESSION #2

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Engineers Conference Nassau, Bahamas. October 31, 2014

Sales: (780)

Projected Advertisement Date

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

Springettsbury Township. Road Improvement Projects

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

State Route 8 Corridor. Northern Summit County s Path to Success

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

Design Meeting Presentation

Route 29 Solutions Projects

Edmonton Airports. Annual Report Year of the Airport

US 19 Sunset Point Rd to Countryside Blvd.

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

State Project Reconstruction I-84

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Important Lane Closures, April 3 9, 2011

Canada and Alberta announce 33 new infrastructure projects

Mission Statement. Spur 601 Project Highlights

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Report through

November 21, 2012 Barbara Kelleher, (954)

ARTERIAL ROAD RECONSTRUCTION 127 STREET AVENUE TO YELLOWHEAD TRAIL

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

AGENDA ITEM I-6 Public Works

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

RIVER ACCESS STRATEGY

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Building the transportation network we need for the future in Niagara Region

Mechanized River Valley Access Public Engagement Report. April 2015

Roadside Management Manual

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

ICEWERX CONSULTING INC. WHO IS ICEWERX

10.0 Recommendations Methodology Assumptions

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Update of MDX Open Road Tolling

Fairfax County Parkway Widening Fairfax County

Hospital Link Project Project Update Winter 2018

Palm Beach County Traffic Report July 13 through July 20, 2012

Public Information Center August 12, 2010

Tr Action. Upcoming events. Join us for the annual general meeting of the. Information Sessions to be Held Across the Province

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report

2 Construction Program

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

CITY OF BROOKFIELD Capital Improvement Fund Budget

Culpeper District. Albemarle County Monthly Report. September 2012

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Provincial Railway Guides Section:

Household Travel Survey Overview

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Public Open House. Chief Peguis Trail Project

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

PROGRESS PARK CONNECTOR

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Site Location and Setting

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

THE RICHMOND REGION Transportation Priority Projects

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Carlisle Connectivity Projects Communication Plan and Project Status

Southwest LRT Alignment Video Narration

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

Weekly construction update

Most people notice when ODOT builds something

FAIRBANKS NORTH POLE REALIGNMENT. Phase III Technical Analysis

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Urban Flair, Rural Flavour

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

Stage 2 - November 2017 Survey and Map Comments (verbatim)

The purpose of this Open House is to share the third draft of the Area Concept Plan and supporting studies before the drafts are finalized.

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Transcription:

Northeast Anthony Henday Drive Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Project Background 2

Edmonton Ring Road Northwest completed Nov 2011 Northeast to be completed October 2016 Southwest completed 2006 Southeast completed 2007 Completion of the Northeast section will make Anthony Henday Drive the first complete ring road around a Canadian city. 3

Project Scope 4

Project Scope 27 kilometres of freeway: Anthony Henday Drive, from Whitemud Drive to Yellowhead Trail 9 km of reconstructed freeway Anthony Henday Drive, from Yellowhead Trail to Manning Drive 9km of new freeway Yellowhead Trail, east of the river to east of Sherwood Drive 6km of of reconstructed freeway Sherwood Park Freeway, west of 17 St to Ordze Crescent 3 km of reconstructed freeway 9 interchanges 2 flyovers 47 bridges (includes NSR crossing) 24 stormwater ponds 103 overhead signs 5

Whitemud Drive Resurfacing of existing cloverleaf interchange Addition of one lane on SB-WB ramp 6

Sherwood Park Freeway Completely new Parclo interchange Elevated Directional EB-NB ramp 4 new bridge structures N 7

Sherwood Park Freeway/17 Street Existing half diamond New full diamond interchange 1 new bridge structure 8

Baseline Road/101 Avenue Reconstruction of existing interchange to meet geometric requirements Signalized ramp intersection 3 new bridge structures N 9

Petroleum Way Underpass Evacuation route for Petro Canada refinery Road to be widened with grading for 4 lanes; 2 lanes paved in Stage 1 Existing bridge culvert structure to be removed and replaced with new ultimate stage structure 10

Yellowhead Trail Systems Interchange 6 new bridge structures on 3 elevations New major, multilevel, free-flow interchange replacing existing service interchange N 11

Yellowhead Trail 2 basket weaves N 12

Yellowhead Trail N CP Railway N 9 new rail crossing structures 13

Yellowhead Trail Modification to 2 existing rail structures 14

Yellowhead Trail/Broadmoor Boulevard Existing parclo interchange to be replaced. 1 new bridge structure N 15

Yellowhead Trail/Sherwood Drive Existing right-in-right-out intersection to be replaced with new grade-separated interchange 1 new bridge structure N 16

130 Avenue EWMC access New grade-separated interchange 1 new bridge structure Access to EWMC and gravel operations to be maintained Waste Management Centre N 17

North Saskatchewan River Crossing New four-span twin bridge structures across the North Saskatchewan River Looking north N 18

153 Avenue New grade-separated interchange in greenfield 1 new bridge structure 18 Street N 19

Victoria Trail/CN Crossings Anthony Henday Drive New Victoria Trail underpass Flyovers at Coronado and Vegreville CN crossings 26 Street N 20

Manning Drive 3 new bridge structures Paving of already graded east leg to be completed as part of NEAHD. N Manning Drive 21

Project information 22

Project Costs Net present value $1.81B Largest provincial road contract ever Previous Alberta Projects Northwest Ring Road $1,420M net present value Southeast Ring Road $497M net present value Northeast Stony Trail $651M net present value 23

Challenges Construction on existing roads 9 rail crossings North Saskatchewan River crossing 500+ identified potential utility conflicts including major pipelines 24

Detour Standards Yellowhead Trail, Anthony Henday Drive - 2 lanes each direction at all times Baseline Road, Sherwood Park Freeway, Broadmoor Boulevard, Sherwood Drive, Whitemud Drive 2 lanes each direction at all times All other roadways 1 lane each direction at all times 25

Technical Requirements Maintain existing traffic movements throughout construction at all loops and ramps, atgrade intersections Maintain access to properties affected by construction Submit traffic accommodation plans for approval 26

Yellowhead Trail/Anthony Henday Drive 4 Stages to construction June 2012 to August 2016 Various detours 27

The Contract Design, Build, Finance, Operate Innovative solutions Integrate design, construction and maintenance More rapid implementation Fixed price Fixed completion date 30 year warranty 28

The Team Client Owner - Alberta Transportation Owner's Engineer - ISL Engineering Concessionaire Capital City Link Group Partnership (CCLGP) Design/Build Contractor Team Flatiron Dragados Aecon Lafarge (FDAL) AECOM, Stantec and MMM Operations/Maintenance Volker Stevin 29

The Program Contract Award May 2012 Traffic Availability October 2016 30

Drive-through 31

Any Questions? 32