Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Similar documents
PRIORITIES COMMITTEE MEETING

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

ALBERTA CAPITAL REGION Transportation Plan ( )

Major Projects Overview

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

All closures this week happen at night, including full closures of Mesa and I-10

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Route 29 Solutions Projects

APPENDIX F List of Commitments

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

Springettsbury Township. Road Improvement Projects

November 21, 2012 Barbara Kelleher, (954)

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

State Route 8 Corridor. Northern Summit County s Path to Success

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

PROGRESS PARK CONNECTOR

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Important Lane Closures, April 3 9, 2011

Edmonton Real Estate Forum Industrial Market Update

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Sales: (780)

Constructor: Joseph B. Fay

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Palm Beach County Traffic Report July 13 through July 20, 2012

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

Guide to. Road Construction Projects

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

2 Construction Program

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Weekly construction update

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

PUBLIC INFORMATION SESSION #2

AGENDA ITEM I-6 Public Works

FDOT Treasure Coast Traffic Impact Report

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

FDOT Treasure Coast Traffic Impact Report

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Fairfax County Parkway Widening Fairfax County

Central Region 2013 Welcome

Work in 2015 and Annual Mobility- Management Plan

Appendix 4.1 L. No-Build Project Descriptions

PennDOT Interstate Work next week March 30-April 3:

Ohio Department of Transportation Construction Update

1.0 Purpose and Organization of the Community Impact Assessment Addendum

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Public Information Center August 12, 2010

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

ICEWERX CONSULTING INC. WHO IS ICEWERX

Palm Beach County Traffic Report August 24 through August 31, 2012

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Whittier Bridge Project

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

US 19 Sunset Point Rd to Countryside Blvd.

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

I-35 Reconstruction Project

State Project Reconstruction I-84

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Viaduct Demolition at Girard Interchange

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Pedestrian Safety Review Spadina Avenue

Site Location and Setting

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Mission Statement. Spur 601 Project Highlights

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

5.7 Local road upgrades

October 31, 2014 Chuck McGinness, (954)

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Progress Report for Projects of Regional Significance

Capital Beltway HOT Lanes Project

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Projected Advertisement Date

Overview. ONE Properties

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Transcription:

Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015

Project Background 2

Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest opened 2006 Southeast opened 2007 The Anthony Henday Northeast project will complete the Edmonton Ring Road as an 80km long freeway with 30 interchanges 3

Project Scope And Progress 4

Project Scope 27 kilometres of freeway: Whitemud Drive to Yellowhead Trail 9km of reconstructed freeway Yellowhead Trail to Manning Drive 9km of new freeway Yellowhead Trail River to Cloverbar Road 6km of reconstructed freeway Sherwood Park Freeway, west to 34 Street 3km of reconstructed freeway 9 interchanges 2 flyovers 47 bridges 24 stormwater ponds 103 overhead signs 5

The Team Client Owner - Alberta Transportation Owner's Engineer - ISL Engineering Concessionaire Capital City Link Group Partnership (CCLGP) Design/Build Contractor Team Flatiron Dragados Aecon Lafarge (FDAL) AECOM, Stantec and MMM Operations/Maintenance Volker Stevin 6

Manning Drive 3 new bridge structures Paving of already graded east leg to be completed as part of NEAHD N Manning Drive Progress to date Decks installed on all three bridges Mainline and ramps paving mostly complete 7

CN Crossings Six flyovers at Coronado and Vegreville CN crossings Progress to date Decks installed on the six rail flyovers Mainline grading nearly complete 8

18 Street/Victoria Trail Twin underpasses Future alignment of Victoria Trail Future alignment of LRT Fort Road/CN Coronado N CN Vegreville flyovers 18 Street Progress to date 18 Street reopened Decks installed on both bridges Mainline grading complete 9

153 Avenue New grade-separated interchange in greenfield 1 new bridge structure Progress to date Deck installed on bridge Mainline grading complete N 10

North Saskatchewan River Crossing New four-span twin bridge structures across the North Saskatchewan River N 11

North Saskatchewan River Crossing Progress to date Girders installed on both bridges Bridge panels installed Pedestrian bridge hung under SB bridge 12

130 Avenue/Aurum Road N EWMC Anthony Henday Drive Temporary detour New grade-separated interchange 1 new bridge structure Access to EWMC and gravel operations to be maintained Progress to date Deck installed on bridge Mainline paved Temporary detour along new service roads 13

Hayter Road CN Railway/Hayter Road N Two new flyovers Progress to date Temporary detour along service road Girders installed on both bridges Anthony Henday Drive Anthony Henday Drive Temporary detour 14

Yellowhead Trail Systems Interchange 16 new bridge structures on 3 elevations New multilevel, free-flow interchange replacing existing interchange Broadmoor Bld Meridian Street Anthony Henday Drive Progress to date Decks installed on 5 bridges Girders installed on a further 3 bridges Grading underway N Yellowhead Trail 15

Yellowhead Trail/Broadmoor Boulevard Existing interchange to be replaced 1 new bridge structure Progress to date Minor grading and utility works Bridge substructure underway N 16

Yellowhead Trail/Sherwood Drive Existing right-in-right-out intersection replaced with new grade-separated interchange 1 new bridge structure N Progress to date Bridge complete Paving mostly complete 17

Petroleum Way Underpass Evacuation route for Petro Canada refinery Road to be widened for 4 lanes; 2 lanes paved in Stage 1 Existing bridge culvert to be replaced with three bridges Progress to date NB traffic detoured to SB side Deck installed on new NB bridge 18 N

Baseline Road/101 Avenue Progress to date Signalization of ramps EB traffic detoured to WB side EB bridge demolished Decks installed on two bridges Girders installed on third bridge Reconstruction of existing interchange Signalized ramp intersection 3 new bridge structures N 19

Sherwood Park Freeway/17 Street Existing half diamond New full diamond interchange 2 new bridge structures N Progress to date Demolition of 76 Avenue bridge Girders installed on new NB bridge SPF from 34 St to 17 St overlaid 20

Sherwood Park Freeway N Progress to date WB traffic detoured to EB side Demolition of WB bridge Decks installed on two bridges Girders installed on third bridge Completely new Parclo interchange Elevated Directional EB-NB ramp 4 new bridge structures 21

Whitemud Drive Resurfacing of existing cloverleaf interchange Addition of one lane on SB-WB ramp Progress to date EB-SB ramp reconstructed NB-EB ramp reconstructed WB-NB ramp partially reconstructed Mainline to 34 Avenue overlaid N 22

2015 Program 23

2015 Program North of River Completion of Anthony Henday from Manning Drive to 153 Avenue Completion of the river bridges 24

2015 Program Highway 216 Corridor Traffic to be switched to new NB roadway between Petroleum Way and Yellowhead in the fall Existing SB roadway and bridges over Petroleum Way and CP rail to be reconstructed once traffic has switched Traffic to be switched to new NB roadway between SPF and Petroleum Way in the spring 25

2015 Program Highway 216 Corridor: Construction of Detour Mainline gap across existing NB-EB/WB ramp at Baseline filled in AHD mainline traffic remains on current alignment NB-EB/WB Baseline traffic detoured off AHD just north of SPF WB-NB ramp at Wye Road closed to construct tie-in. Traffic detoured around 3 loop ramps 26

2015 Program Baseline Road Existing WB bridge to be demolished once traffic has switched Traffic to be switched to new bridge in late spring 27

2015 Program Sherwood Park Fwy Existing EB bridge to be demolished once traffic has switched Traffic to be switched onto new WB bridge 28 in late spring

Interchange closed May to September 2015 Program SPF/17 Street New NB bridge completed by September New WB off-ramp constructed New EB on-ramp constructed Existing WB onramp reconstructed Existing bridge demolished in May Existing EB offramp reconstructed 29

2015 Program - Yellowhead Trail/ Anthony Henday Drive Interchange Girders to be installed on new six span SB-EB directional ramp in early spring Traffic to be switched to new SB bridge in late spring Existing bridge to be demolished once traffic has switched 30

2015 Program Yellowhead Corridor W Yellowhead Trail to be detoured onto CD roads west of Meridian in early summer CD roads and bridges over ramps to be completed during summer 31

2015 Program Yellowhead Corridor E Broadmoor Boulevard bridge to be closed once Sherwood Drive is open until September 2016 Sherwood Drive interchange to be fully opened in spring 32

2015 Program Yellowhead Detour Stage 1 (Spring 2015) Broadmoor closed over bridge, and ramps closed Temporary link from EB Yellowhead to CD road Temporary link from Service Road to WB Yellowhead 121 Ave/ RR232 intersection is signalized Sherwood Dr interchange is fully operational Free-flow right in/right out at Broadmoor Broadmoor Boulevard Sherwood Drive 33

2015 Program Yellowhead Detour Stage 1 Eastbound Yellowhead to southbound Broadmoor East along Yellowhead Loop ramp to Broadmoor Broadmoor Boulevard Sherwood Drive 34

2015 Program Yellowhead Detour Stage 1 Eastbound Yellowhead to northbound 17 Street Temporary ramp to CD road Left at Sherwood Drive North along RR232 West along 121 Ave Broadmoor Boulevard Sherwood Drive 35

2015 Program Yellowhead Detour Stage 1 Westbound Yellowhead to southbound Broadmoor No direct route Alternative routes south are Clover Bar Road, Sherwood Drive or Anthony Henday Drive Broadmoor Boulevard Sherwood Drive 36

2015 Program Yellowhead Detour Stage 1 Westbound Yellowhead to northbound 17 Street Exit ramp at Sherwood Drive North along RR232 West along 121 Ave Broadmoor Boulevard Sherwood Drive 37

2015 Program Yellowhead Detour Stage 1 Northbound Broadmoor to northbound 17 Street East along CD road Left at Sherwood Drive North along RR232 West along 121 Ave Broadmoor Boulevard Sherwood Drive 38

2015 Program Yellowhead Detour Stage 1 Northbound Broadmoor to eastbound Yellowhead East along CD road Ramp onto Yellowhead Broadmoor Boulevard Sherwood Drive 39

2015 Program Yellowhead Detour Stage 1 Northbound Broadmoor to westbound Yellowhead East along CD road Left at Sherwood Drive Left down ramp onto WB Yellowhead Broadmoor Boulevard Sherwood Drive 40

2015 Program Yellowhead Detour Stage 1 Southbound 17 Street to southbound Broadmoor No direct route Alternative routes south are Sherwood Drive or Anthony Henday Drive Broadmoor Boulevard Sherwood Drive 41

2015 Program Yellowhead Detour Stage 1 Southbound 17 Street to eastbound Yellowhead East along 121 Ave Right at RR232 Across Yellowhead Bridge Left down ramp onto Yellowhead Broadmoor Boulevard Sherwood Drive 42

2015 Program Yellowhead Detour Stage 1 Southbound 17 Street to westbound Yellowhead East along 121 Ave; south along 21 Street East along 119 Ave; south along 24 Street Straight on down temporary ramp onto Yellowhead Broadmoor Boulevard Sherwood Drive 43

2015 Program Yellowhead Detour Stage 1 Westcan to westbound Yellowhead South along 17 Street East along north service road Right down temporary ramp onto Yellowhead Broadmoor Boulevard Sherwood Drive 44

2015 Program Yellowhead Detour Stage 2 (Summer 2015) Additional key features WB Yellowhead detoured onto EB Yellowhead and new CD roads Anthony Henday Broadmoor Boulevard Sherwood Drive EB Yellowhead detoured onto new CD roads 45

2015 Program Yellowhead Detour Stage 2 (Summer 2015) Additional key features Ramp from new CD road onto EB Yellowhead Anthony Henday Broadmoor Boulevard Sherwood Drive Free-flow right in/right out at Broadmoor/EB Yellowhead 46

Project information 47

Project Costs Net present value $1.81B Largest provincial road contract ever Previous Alberta Projects Northwest Ring Road $1,420M net present value Southeast Ring Road $497M net present value Northeast Stony Trail $651M net present value 48

Challenges Construction on existing roads 15 rail crossings North Saskatchewan River crossing 500+ identified potential utility conflicts including major pipelines 49

Detour Standards Yellowhead Trail, Anthony Henday Drive - 2 lanes each direction at all times Baseline Road, Sherwood Park Freeway, Sherwood Drive, Whitemud Drive 2 lanes each direction at all times All other roadways 1 lane each direction at all times 50

Contacts Alberta Transportation (Owner) Bill van der Meer 780-422-3918 ISL Engineering (Owner s Engineer) Pat Whalen 780-438-9000 Jacqueline Miller 780-438-9000 FDAL (Contractor) Vanessa Urkow 1-855-272-3184 www.northeastanthonyhenday.com 51 NEAHDInquiries@flatironcorp.com

Any Questions? 52