Additional Economic Development Strategy submissions- Klickitat County

Similar documents
June 17 th John Kramer Distance miles, Elevation Gain 7500 ft, Very little traffic but there may be more as July recreation picks up.

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Gorgeous Relay Driving Directions September 16, 2018

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Race Booklet

Trailhead Ambassadors 2018 Starvation Creek: Alternative Hikes

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Connect Oregon IV Final Review Committee Final Recommendation

Trailhead Ambassadors 2018 Latourell Falls: Alternative Hikes

Sam Imperati Facilitator

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

State Route 8 Corridor. Northern Summit County s Path to Success

PFC Quarterly Status Report September 30, 2016

BNA Master Plan Update Public Meeting No. 2

Basic Project Information

Transportation TRANSPORTATION PROJECTS

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Route 29 Solutions Projects

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report July 13 through July 20, 2012

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Current Corridor Characteristics

Historic Highway Advisory Committee To Meet in The Dalles

ATTACHMENT B. Reference No.

Non-Motorized Transportation

Mission Statement. Spur 601 Project Highlights

2009 Regional Solicitation Selected Projects*

SCOPING INFORMATION PACKET

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Grove Field Airport Environmental Assessment

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

RW Bruhn Bridge and Approaches Project

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

University Region Non-Motorized Plan 2015

2 Construction Program

AGENCY NAME TRANSPORTATION

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Most people notice when ODOT builds something

Projected Advertisement Date

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

5.1 Traffic and Transportation

MT. H O O D & T H E G O R G E T O U R I S M L I S T E N I N G S E S S I O N O V E R V I E W

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

1.2 Corridor History and Current Characteristics

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

BNA Master Plan Update Community Advisory Committee Meeting No. 5

10.0 Recommendations Methodology Assumptions

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

Guide to. Road Construction Projects

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Columbia River Gorge. Visitor Guide. Plan your trip. Oregon State Parks Gorge parks: Info line: oregonstateparks.

4. Safety Concerns Potential Short and Medium-Term Improvements

Massage Therapy 25 minute, 50 minute and 90 minute massages available

Pattullo Bridge Replacement Project

Central Region 2013 Welcome

Highways: Interstate. Highways: State Highways

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

FY Transportation Improvement Program Basic Project List (in Thousands)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Major Projects Overview

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Ohio Department of Transportation Construction Update

PennDOT Interstate Work next week March 30-April 3:

The Future of Aviation for Central New Mexico

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

Aviation, Rail, & Trucking 6-1

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

SAN RAFAEL City Council January 20, 2015

Activities. at Skamania Lodge

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

US 19 Sunset Point Rd to Countryside Blvd.

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

CHAPTER FOUR: TRANSPORTATION

Beginning balance available for Priority I Projects: $1,737,029

IRONTON-RUSSELL BRIDGE REPLACEMENT

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Palm Beach County Traffic Report August 24 through August 31, 2012

Launceston and Tamar Valley Traffic Vision

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Fuller/Fuller Heights Road Improvements

Transcription:

Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of the Bingen Pt funding in WA transportation package 3 Freight Mobility Study Study Freight movement needs in Bingen 4 Bingen Point Grade separated crossing Included in WA transp. package 5 SR141 Intersection Signalized intersection 6 Maryhill Spur SR 97/SR 14 study intersection improvement 7 Brooks Park to Ski Lodge Road preliminary engineering; passing lane 8 SR14 Rockfall Protection Rockfall Protection 9 SR 141 Alt to Dock Grade Study: improve width and grade 10 Lyle add sidewalk and curbs 11 Little Klickitat RV-Allen Cr study: passing lanes 12 WS to Northwestern Lake Rd Study: realignment of curves 13 Dallesport Rd to Dock Rd add left turn pocket, acceleration and deceleration lane 14 Ash St to SE 10th st sidewalk and curbs N/A Klickitat County Ongoing preservation and maintenance N/A Klickitat County Ongoing safety improvements N/A Klickitat County Ongoing transportation enhancements N/A Klickitat County Ongoing maintain and improve public transit Additional Economic Development Strategy submissions- Klickitat County 1PW Columbia Gorge Regional Airport aircraft de-icing area Construct de-icing area for planes, increasing air traffic, value and usefulness of the airport in winter months 3PW Peterson Street Improvements (Port of Klickitat) Construct a paved road to mitigate safety/traffic issues related to the transportation of farm-market goods 7PW Columbia Gorge Regional Airport Runway Lengthening Project Lengthen existing primary riunway to 5,500 ft to accommodate increased volume of larger aircraft 8PW Maple Street Project Serves targeted properties in Bingen Pt Business Park 3TA Airport Terminal Building Design to replace aging Col Gorge Regional Airport terminal bldg 5TA City of WS Loop Trail Survey design to move the loop trail due to heavy traffic on Hwy 141, making the trail unsafe for residents

Skamania County Transportation Improvement Projects 1 Marble Road to Salmon Falls Road Phase 3: realign curves 2 Wind River Rd Intersection Improve intersection 3 Bridge of the Gods Intersection Improve intersection 4 Hot Springs Way/Dam Add WB deceleration and acceleration lanes 5 Countywide Rockfall Rockfall protection 6 E of Stevenson to Carson Corridor feasibility study 7 Tunnels 1-5 (currently height restricted) Feasibility study: lower grade 6", ITS 8 Half Bridge to Prindle Rd Study: Extend WB climbing lane 9 Countywide: limited shoulders Study: Widen shoulder to 4' 10 East of Smith -Cripe Rd Study: realignment 11 Cook-Underwood Intersection Study: intersection improvement 12 Stevenson Landing Study: replace public dock 13 Stevenson Industrial Land Feasibility study: industrial lands access N/A Skamania County Ongoing preservation and maintenance N/A Skamania County Ongoing safety improvements N/A Skamania County Ongoing transportation enhancements N/A Skamania County Ongoing maintain and improve public transit Included in WA Transportation Package Additional Economic Development Strategy Submissions- Skamania 5PW Wind River Boat Launch/Dredging Improvements Replace existing boat launch with new facility at different location-- recreation focus 7PW ADA sidewalk improvements Address all Skamania County facilities N/A Russell Ave Quiet Zone Complete N/A Stevenson Boat Launch Dredging Dredge areas within Col River at boat launch N/A SR14 Dam Access Rd Intersection Cascade Park intersection Easement app submitted to Corp

N/A Kanaka Rd/Gropper Rd Infrastructure City of Stevenson- engineering design and right of way acquisition is in process. Construction scheduled for summer 2016

Hood River County Transportation Improvement Projects 2 CEDS Hood River Bridge Final Environmental Impact Statement 2 CEDS Bridge of the Gods Operations and Maintenance Plan 3 CEDS I-84 Exit 47 nad Cascade Locks Truck Route Add a west bound on ramp. Widen/ rebuild Forest Lane/Frontage Rd from Cramblett Way to Exit 47 for trucks. Also, truck route through weight station 4 CEDS Cascade Ave. and Rand Rd. Signalization at Cascade Ave. and Rand Rd. Intersection 3 Enhance 7 CEDS Country Club Road: MP 1.21-3.0 Shoulder Bikeway 10 CEDS Signalization at 2nd/Oak Hood River County Country Club Road: MP 1.21-3.0 Shoulder Bikeway Construct traffic signal at the intersection of 2nd Street and Oak Street (Historic Highway 30) in Downtown Hood River. 1 Enhance May St Elevated Sidewalk City of Hood River May St Elevated Sidewalk Replacement with ADA Enhance Application. Not on 150% list Enhance Application. On 150% List 2 Enhance Rand Road Sidewalk/Bike Lanes City of Hood River Rand Road Sidewalk and Bike Lanes Enhance Application. Not on 150% list 1 Connect Ken Jernstedt Airport Port of Hood River Aviation Technology & Emergency Response Center Connect OR application Historic Columbia River Highway Gorge Bike Hubs Cascade Locks Marine Park Complete final segments to reconnect the Historic Columbia River Highway State Trail Enhance Application. Not on 150% list Develop Recreational Hubs within urban centers of Historic Highway communities (The Dalles, Mosier, Hood River, TD: Connect OR Cascade Locks, Troutdale, and Wood Village) Application Marine Park Overpass Cascade Ave and Mt Adams Ave. Signalization and Improvements at Cascade Ave and Mt Adams Ave. Intersection N/A Hood River County Ongoing preservation and maintenance N/A Hood River County Ongoing safety improvements N/A Hood River County Ongoing transportation enhancements N/A Hood River County Ongoing maintain and improve public transit

Region 1 Rumble Strips I-84 EB Bridge over Hood River Region 1 Rumble Strips (Multiple Locations) Retrofitting the structural steel; replacing the concrete deck, rivets, bolts, and expansion joints; installing new concrete rail; and, cleaning steel surface. All Roads Transporation Safety Systemic Bridge Rockfall OR35 at MP 63.72, MP 72.69 and MP 72.8 Operations US30 at MP 49.3 Rectangular Rapid Flashing Beacon (RRFB) and sidewalk Operations US30 at MP 49.7 RRFB Operations Preservation activities ODOT Region 150% List ARTS, Operations, Preservation OR-281: OR-282 US30, OR-35: Robin Hood Bridge Polallie Creek, OR-35: US-26 White River Preservation

Wasco County Transportation Improvement Projects The Dalles Bridge Bridge Redecking: ODOT scoping the project Historic Highway communities (The Dalles, Mosier, Hood River, Cascade Locks, Troutdale, and Wood Village) are in various TD: Connect OR 7 CEDS Gorge Bike Hubs stages of developing Recreational Hubs within their urban centers. Application Complete final segments to reconnect the Historic Columbia Historic Columbia River Highway River Highway State Trail Enhance Application City of Mosier Bike/Ped Streetscape Improvement Project Enhance Application MCCOG Transit Center Bus Covered Parking Shelters Enhance Application Columbia Gorge Regional Airport Taxiway A rehabilitation Connect OR Application West 6th Street, The Dalles The Dalles Downtown Parking The Dalles Downtown Streetscape Improvements, Phase III Construct center turn lane for major arterial. Construct curbs/sidewalks. Provide signalization. Provide additional downtown parking has long been identified as a local priority. This is the third phase of a downtown streetscape improvement project, for Third and Fourth Streets in The Dalles. Design to replace aging Col Gorge Regional Airport terminal bldg Airport Terminal Building Columbia Gorge Regional Airport aircraft de-icing area N/A Wasco County Ongoing preservation and maintenance N/A Wasco County Ongoing safety improvements N/A Wasco County Ongoing transportation enhancements N/A Wasco County Ongoing maintain and improve public transit Construct de-icing area for planes, increasing air traffic, value and usefulness of the airport in winter months

Gorge TransLink Alliance/Transit Project/Location Notes Alleviate congestion around Multnomah Falls with shuttle service. Satellite parking facility at Ainsworth or Rooster Rock. Gorge Transit Study Gateway transit public transportation (Gateway to Multnomah Falls and return) this summer, with potential extension to Hood River in 2-5 years. Gorge Transit Study Skamania County- Extend Transit Eastward Develop sustainable funding for WET bus Mt Hood Express: Extend Service to Mt Hood Meadows Klickitat County- Add weekend public transit service Analysis of Fixed Route Service in The Dalles Develop sustainable funding for WET bus Mt Hood Express: Extend Service to Mt Hood Meadows Analysis of Fixed Route Service in Hood River County Increased non-emergent Medical Transportation funding Volunteer Driver Program development Gorge-wide MCCOG Transit Facility Skamania County Bus Garage Columbia Area Transit replacement vehicles

Sherman County Transportation Improvement Projects Moro Streetscape Streetscape Improvements Moro Street Resurfacing Street Resurfacing City of Wasco Streetscape Streetscape Design Rufus Streetscape Old Hwy 30 Streetscape Project Biggs Truck Parking Biggs Junction Truck Parking Facility SOI ODOT N/A Sherman County Ongoing preservation and maintenance N/A Sherman County Ongoing safety improvements N/A Sherman County Ongoing transportation enhancements N/A Sherman County Ongoing maintain and improve public transit