Regional Wayfinding Sign Strategy Thurston County Trails 2017

Similar documents
2016 Regional Transportation Alternatives Program (TAP) Grant Application

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

MUNICIPALITY OF ANCHORAGE

CHAPTER 5. Chapter 5 Recreation Element

Hillsborough County Florida Hillsborough County s Trailways Addressing Program

The Baker/Carver Regional Trail is intended to

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Committee. Presentation Outline

Sign Library. Florida Trail Association

The Vision for the San Juan Islands Scenic Byway

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

OR MISSION TRAIL ELEMENTARY

Waukee Trailhead Public Art and Amenities Project

Trans Canada Trail Signage Guidelines MADE BY CANADA

Staff Report Sign Design

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

TRAILS INTERSECTION SIGNS

Welcome to the Cross County Trail Public Input Session!

A VISION FOR EL MIRAGE

Trail Feasibility Study

Chapter 6. Trail Design. Trail Design

Fred Milch Project Review Manager East Central Florida Regional Planning Council

FEASIBILITY CRITERIA

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017

SCOPE Chapter 2D shall Apply to Any Road or

CHAPTER 5. SIGNAGE & WAYFINDING

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Non-Motorized Transportation

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Coast to Coast Connector Summit

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail Towns Using Trail Systems To Leverage Place, Tourism, and Economic Development

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Exterior Wayfinding Signage Design Standards

Greenbelt Route Signage Guidelines

REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA

LUDLAM TRAIL CORRIDOR DISTRICT

Item No Halifax Regional Council April 10, 2018

University Region Non-Motorized Plan 2015

Jefferson County Non-Motorized Transportation and Recreational Trails Plan 2010

CHAPTER FOUR: TRANSPORTATION

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Bicycle Wayfinding Signage Study

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

Provincial Railway Technical Standards

Welcome to the Future Kingston Point Rail Trail!

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

OPEN HOUSE PRESENTATION

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Business Item No

ROYAL GORGE PARK and RECREATION AREA. A Feat of Natural and Man-Made Engineering

FINCH HYDRO CORRIDOR TRAIL PROJECT

Mississippi River Parkway Commission of Minnesota

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Tallahassee-St. Marks Historic Railroad Trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Community Development Committee

Airport Planning Area

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Port Gamble Shoreline Area Conceptual Trail Proposal

Blue River Trail Master Plan JSA to Town Hall June 2004

SUMMER QUARTERLY MEETING JULY 21, Tri-State Trails is made possible by the generous support of Interact for Health.

Greater Minnesota Regional Parks and Trails Commission Designation Application

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

PARKS CANADA SIGNING ALONG PROVINCIAL HIGHWAYS

3.0. Wayfinding Plan. Downtown Master Plan

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Wilds. Headwaters. Lakes. Oxbows. Falls

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018

IL 390 Station. Wood Dale Open House Summary 5/18/17

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

5.1 Introduction 5-1. Modified on 7/14/05

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Park Design and Location Criteria

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Independence: overview

Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry

County of Elgin Tourism Signage Policy Addendum A

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy

Part four. In this part you will find: The next steps to deliver the master plan

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd.

Transcription:

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of Tenino, City of Tumwater, Intercity Transit, Olympia Safe Streets Campaign, Thurston County, Thurston Regional Planning Council (TRPC), and Woodland Trail Greenway Association Outline: I. Introduction II. Wayfinding Signage Current Conditions & Opportunities III. Action Plan IV. Sources I. Introduction Thurston County s Regional Trails System is a set of shared use corridors that are major assets for community health, conservation, recreation, transportation and other public objectives. Trails form part of a network that, in combination with sidewalks, bike lanes, low volume streets, and transit, supports active transportation walking, bicycling, etc. and therefore increased physical activity. When people can find trails, easily navigate through on street gaps in the trail system, and locate trail facilities, they are more inclined to use them. A. Kinds of Signage People using trails rely upon signs for accurate and timely information on which to base their decisions along the trail. They provide important information and can promote increased use. There are several types of signs that may be used along a trail to advise or assist people using the trail system. Educational This kind of sign usually appears as displays or kiosks at stopping places along trails in various locations and provides interpretation. Informational These provide direct guidance on basic trail characteristics such as direction and distance to features on or near the trail. This category of trail sign is the subject of this plan, with a focus on the subset of wayfinding. These signs complement more information rich educational signs. This can also include direction or distance information to nearby destinations. Regulatory Signs that provide rules and operational requirements for using the trails, effectively indicating traffic control (includes speed, prohibited activities/uses and, stops). Advisory/Warning Similar to regulatory, these signs alert users about trail conditions (e.g. upcoming intersections, sharing the trails as in the case of areas where horseback riding is allowed). Navigational o Mileage markers o Street names o Directional signage guiding trail users through on street gaps in the trail system. o Maps o Wayfinding to transit, rail, etc. 1

B. Signage as Evidence based Practice for Increasing Levels of Physical Activity Wayfinding signs along trails aid people using the facilities available to them and in knowing their location better should they need assistance. This can increase use, confidence of users and efficiency of our transportation system as more people are supported in choosing active transportation. Wayfinding signs on approaches to trails can help promote their use and also call attention to trails to inform motor vehicle drivers of the presence of people walking, bicycling or other active transportation nearby. By providing this information, they increase the sense of safety and security and allow people to be able to plan a particular outing, set goals for reaching specific destinations, or gauge their ability to accomplish recreation or transportation purposes by using trails. These signs are an encouragement to physical activity, recreation and healthy transportation (PBIC 2012). II. Wayfinding Signage Current Conditions and Opportunities A. Existing Signage Existing wayfinding on the Chehalis Western, I 5, Woodland and Yelm to Tenino trails (the existing major regional shared use paths in Thurston County) is limited, with a couple of exceptions, to street style (green blade) informational signs that indicate direction and distances to main urban areas. These can be found at main trailheads and at junctions. In at least one location, the Eastside Street trailhead of the Woodland Trail in Olympia, wayfinding is provided along the adjacent street, helping people who are approaching the trail (and the I 5 Bike Path next to it) to find their way and know how far from particular locations they are before they access the trail. City of Lacey: The Lacey portion of the Woodland Trail has navigation through roundabouts at the Lacey Boulevard/Pacific Avenue couplet, and a "Future trail connection" sign at end of pavement (eastern terminus). City of Olympia: Olympia Woodland Trail at Eastside Street has street approach signs; monument signs are located on the Woodland Trail near the Boulevard St. SE and Dayton Street SE trail access points, indicating the direction to the I 5 bike path and other nearby streets. City of Rainier: There are a limited number of signs pointing out amenities adjacent to the trail and providing some interpretive information about the area s history. City of Tenino: In 2016, City of Tenino has proposed through the TRPC regional transportation funding process to construct additional wayfinding signs along its portion of the Yelm to Tenino trail. City of Yelm: 2

There are a couple of green miles to signs in the city limits. Thurston County: Street style signs, with distinctive font for the trail and referring to distances to towns on the trail system, are placed in several locations near trailheads in the southern section of the Chehalis Western and Yelm to Tenino trails. Examples include: at the Lacey access from 45 th Ave. SE, at the Fir Tree Rd. SE trailhead, and in the vicinity of the Yelm to Tenino and Chehalis Western Trail junction. There is also regulatory and warning signage (trail connections) along these trails in the unincorporated areas of the county. Extensive street style signage is in place at the Hub junction where the Chehalis Western meets the Woodland Trail. Maps on low sign posts by the side of the trail (with you are here indication of location) are posted along the section of the Chehalis Western north of 26 th Ave. NE. Mileage Markers: Woodland Trail Greenway Association installed mileage markers for the Woodland Trail (Olympia Phase 1 & 2; Lacey) in 2015 and completed the I 5 bike path in early 2016. The markers, a simple white on green retroreflective road sign material mounted to a 6 x 6 post, are placed every ¼ mile along these trails. These mile posts also include a white jurisdiction sign with contact info and a QR code, and the intention is for them to become the trail mileage markers for the region s whole multi use trail system. The County s Chehalis Western north and south sections have mileage markers dating from the completion of those segments. These are expected to be replaced, at new locations, with the style of sign being used on the Woodland and I 5 trails when the planning for the latest improvements to trail alignment in the vicinity of the BNSF main line rail crossing is finalized in 2016. Mile markers on the CWT and Yelm to Tenino trail are placed every 1/2 mile. They will be replaced by the standard simple white on green retroreflective road sign material used on the other trails, with standard white jurisdictional sign. B. Opportunities for Enhancement Recommendations Define a style or brand that local jurisdictions will follow for new signage design, as well as standards for where and how they will be installed, would greatly improve the perception of the trail system. If wayfinding signs are added in a haphazard or variable fashion, trail users may deem them to be unreliable. Examples of branding would be a consistent font, set of symbols and color scheme (e.g. white on green for street and city directions and distance; blue for other facility direction/distance information) for the wayfinding signs. This process would be carried out into 2018 in conjunction with the Regional Trails Plan update process. Considerations: Create regional logo for developing a recognizable identity for the regional trails system. 3

Allow for local identifiers. Adhere to MUTCD, with local adaptation. Research national recommendations for placement of signage (i.e. frequency) Install new signage. On trail wayfinding signage is needed: To indicate nearby facilities that support people using the trails, specifically indicating direction and distance to: Food Parking Restrooms Shelter Water Other destinations, to be defined: include parks, recreation opportunities, libraries, schools as well as some categories of commercial enterprises (food, shopping, services) For navigation: Through on street gaps in the trail system Identifying names of intersecting streets Transit stops This kind of wayfinding could be indicated by a symbol system and could be either standing alone (blade on metal post) or attached to mileage markers. Adjacent street wayfinding signage is needed To indicate location and direction to the trail access and indicate possible on trail destinations such as parks, city centers At major trail crossings (e.g. collector streets, overpasses of arterials/highways) III. Action Plan A. Short term Activities (2016 2017) In the first year of this effort, the Community Design Action Team of Thurston Thrives (CDAT), using Healthiest Cities & Counties Challenge seed money and Transportation Enhancement grant resources awarded to Woodland Trail Greenway Association, will work on initial implementation of this strategy. This includes the following activities: 1) Inventory of existing Regional Trails System signage. 2) Development of branding and symbology for the Thurston County Regional Trails System so that wayfinding is both easily recognizable and reliable for people using the trail. 3) Designing and printing wayfinding signage, and install at priority locations. Priority locations for the placement of on trail wayfinding signs are: Direction and distance to the nearest restroom, especially near the HUB intersection. At major trail junctions or trail/street junctions (e.g., South Bay Rd. crossing) 4

On segments that approach significant destinations (major park or activity center with facilities) or where there are oases in the midst of significant gaps in facilities/services (e.g., near Monarch Sculpture Park) Priority locations for adjacent street wayfinding are: At major street crossings From neighborhoods of higher density housing to the trails Note: Further refinement of the priorities above for installation locations of trail signs will be determined by trail walkshed analysis 2016 2017 being conducted by CDAT and TRPC. B. Longer term (2017 and beyond) Additional development and implementation of this strategy will be needed beyond the next year. 1) Build out system of compelling wayfinding signs for all Thurston County trails, consistent with the style discussed here. 2) Explore the possibility of defining particular recreational routes or loops with wayfinding signage and accompanying guide (virtual or print) 3) Incorporate into a more comprehensive signage plan for Thurston County Regional Trails System that makes access to and using the trails easier and promotes their availability. IV. Sources: PBIC, 2012. Hunting, P., M. Balluff, K. Peterson, A. Haushalter. Communities Putting Prevention to Work. Pedestrian Bicycle Information Center: Livable Communities Webinar Series. Accessed at: http://www.pedbikeinfo.org/pdf/webinar_pbic_lc_091912_apha_2.pdf. 2 March 2016. TRPC, 2007. Thurston Regional Trails Plan (especially Chapter 4: Design, Operations and Maintenance, pp. 4 2 4 4). Thurston Regional Planning Council. 5