Staff Report Sign Design
|
|
- Sydney Benson
- 5 years ago
- Views:
Transcription
1 Staff Report Sign Design July 29, 2014 Planning & Zoning Commission Meeting Report date July 23, 2014 Project type Sign Design Legal description Section 2, Township 5, Range 82 Lots 3&4, S1/2NW1/4, SW1/4 Section 3 Township 5 Range 82 Lot 1, SE1/4, NE1/4SE1/4 Section 34 Township 4 Range 82 SE1/4SE1/4 Zoning Open Space, PUD Open Space (Wildridge) Address N/A Prepared By Brian Garner, Town Planner INTRODUCTION The West Avon preserve is a 478-acre open space parcel recently obtained by the Town of Avon as a conservation easement from the U.S. Forest Service. With construction of the segments comprising 6.5 miles of trails nearing completion this summer, the Town of Avon is developing a sign design for the trailheads and trail markers throughout the West Avon Preserve to help trail users navigate the system. As depicted on Exhibit A, trailhead signs are needed at four (4) proposed locations and trail markers are proposed at approximately 13 trail intersections. TRAIL PROJECT PARTNERS This sign design concept has been developed in accordance and shared with a number of trail project partners with a vested interest in the West Avon Preserve. Staff has gained a number of expert opinions on best practices of trail signage and how to best utilize signage in the West Avon Preserve. PROPOSED TRAILHEAD SIGNS Trailhead Sign Locations Trailhead signs are proposed for four (4) locations including: Nottingham Road Trailhead Singletree Trailhead O Neal Spur/Playground Way near the Wildridge Dog Park Trailhead Beaver Creek Point Trailhead Exact placement within these identified locations remains undetermined and will need to be field-verified to ensure best visibility, accessibility and placement on West Avon Preserve property. Trailhead Sign Design Considerations As depicted on the concept drawing attached as Exhibit B, the trailhead signs are proposed to be fabricated from wood and steel to be durable and attractive with several goals for the structures: Sign character and ability to blend-in with the Wildridge environment Appropriate sign scale and massing Durability for environmental conditions Ability to incorporate Town branding and Avon identity Ability to change-out sign components as needed to update and/or replace parts, rather than entire sign July 29, 2014 PZC Meeting 1
2 Trailhead Sign Header Message Each sign is proposed to include a header to include: Town logo/town of Avon West Avon Preserve Specific trailhead name i.e. Beaver Creek Point Trailhead Sign Copy The sign copy will contain the rules and etiquette of the trail. Staff again received input from our trail project partners to ensure the needs of all trail users are met. At this time, the following general messages are proposed for the copy component of the signs: Rules: Hours No on-street or overnight parking is permitted If parking is full, other parking areas available No smoking, alcohol or marijuana allowed Etiquette: Multi-use area Understand the use of each trail Hikers/walkers have the right-of-way at all times Bike riders must yield to other users up & down Carry-in/carry-out responsibility is yours Trailhead Map Staff is working with Eagle County GIS to develop the trail map copy. This component will be the last developed since on-site trail alignment will continue to occur until the trails are complete. Working with our trail project partners it is understood that the map needs to be: Legible and easy to understand Depict enough land detail to understand grades Illustrate trail difficulty Appropriate scale July 29, 2014 PZC Meeting 2
3 Trailhead Partners and Additional Message A simple message is proposed to thank our project partners and include their respective logos. Other message logos may be included here as needed i.e. Share the Trail Trailhead Sign Materials and Colors The sign structure materials are proposed to include wood and steel fabrication to be durable and long-lasting. Individual sign components are proposed to be.5 thick Medex material with the ability to change out components as needed for update or replacement. The stain or paint color is proposed to be a sage-brown tone for the wood and either black or sage-brown for the steel fabricated parts. Ideally, the signs will blend with the natural environment of Wildridge as much as possible. Note: Enlarged version attached as Exhibit B July 29, 2014 PZC Meeting 3
4 PROPOSED TRAIL MARKERS The concept for the trail markers is to utilize a simple and functional map that shows numbered trail junctions to illustrate the trail user s specific location within the system. Attached as Exhibit C is an example from the Dale Ball Trail System in Santa Fe, NM. This method makes production easier by replicating the map and including specific junction # for each post. Additional marker details: 4 x4 x7 wood posts, stained or painted Appropriate sized map with dot indicating location Share the Trail logo on each post Avon logo and West Avon Preserve on each post Dibond with inkjet print & laminate for components NEXT STEPS & TIMELINE July 29, 2014 PZC Meeting 4
5 Planning Analysis Chapter of the Avon Municipal Code contains the Avon Sign Code. Although official governmental signs are exempt from the regulating criteria, the proposed signs comprise a significant project that warrants Planning & Zoning Commission review and approval. As such, the Sign Design Review Criteria is included for PZC to render an official decision on the application. Review Criteria , Design Review Criteria. The Planning and Zoning Commission shall consider the following items in reviewing proposed designs: (1) The suitability of the improvement, including materials with which the sign is to be constructed and the site upon which it is to be located; (2) The nature of adjacent and neighboring improvements; (3) The quality of the materials to be utilized in any proposed improvement; (4) The visual impact of any proposed improvement, as viewed from any adjacent or neighboring property; (5) The objective that no improvement will be so similar or dissimilar to other signs in the vicinity that values, monetary or aesthetic, will be impaired; (6) Whether the type, height, size and/or quantity of signs generally complies with the sign code, and are appropriate for the project; (7) Whether the sign is primarily oriented to vehicular or pedestrian traffic, and whether the sign is appropriate for the determined orientation. Staff Recommendation Staff recommends that the Sign Design application be approved as proposed and with the following findings: 1. The signs are approved due to compliance with the Review Criteria as listed in Recommended Motion I move to approve Case #SGN14006, an application for Sign Design Review for proposed trail signage on open space at the West Avon Preserve with the finding that the proposed signs are compliant with the review criteria. Exhibits A: West Avon Preserve Trails Map B: Proposed Sign Specifications C: Dale Ball Trail System Trail Marker Example D: Vicinity Map Open Space, PUD Open Space (Wildridge) E: Trailhead & Marker Sign Concept July 29, 2014 PZC Meeting 5
6 West Avon Preserve Feet Existing Trails Parcel Boundary Easy Trail - Proposed Town Boundary Moderate Trail - Proposed Slopes over 30% Strenuous Trail - Proposed U.S. Forest Service Family Flow Trail - Proposed Riparian Habitat Moderate Trail - Existing ND OU GR AY PL This map was created by the Eagle County GIS Department. Use of this map should be for general purpose only. Eagle County does not warrant the accuracy of the data contained herein. Wildridge Y WA W 10-MILE EASY L OOP O D E DG N W RI CO NN EC TO R AY W GL ET RE E S E LE SI N LE DD SA Eagle County, Colorado Govmnt, GIS Dept P:\Towns\Town_of_Avon\WestAvonPreserve\WestAvonPreserve.mxd Date: 5/9/2014 3:55:37 PM Name: aszczesny AV ON MASHER CLIMBING TRAIL ILD WES T R I D G E Singletree EXISTING TRAILS ASC X-CUT
7 40 x 60 x 2 Angle Steel Welded Inside frame 40 x 60 x 2 Square Tube Welded outside frame 40 x 60 x 2 squares Wire Cloth TRAILHEAD SIGN.5 Thick Medex for signs 8 x 34 HEADER 6 square tube Mounting strap with welded bracket 12 x 30 TRAIL RULES & ETIQUITE 20 x 30 MAP 6 x 63 Top piece TBD 6 x 6 Western Cedar Posts to be 8 ft out of ground 20 x 34 SPONSORS
8
9
10
11 TOWN OF AVON - WEST AVON PRESERVE BEAVER CREEK POINT TRAILHEAD TRAIL RULES & ETIQUETTE THIS TRAIL WEST AVON PRESERVE THIS TRAIL EXISTS DUE TO THE LOVE OF OUR PARTNER SPONSORS: JUNCTION 2
K SIGNAGE & TRAFFIC CONTROL. Table of Contents
Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...
More informationRegional Wayfinding Sign Strategy Thurston County Trails 2017
Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of
More informationArchitectural Review Commission
Architectural Review Commission staff report Item 3: Project Planner: Applicant/Owner: VITALITY BOWLS SIGNAGE APPEAL 100 CRESCENT DRIVE PLN 14-0473 Jeff Olsen, (925) 671-5206, jolsen@ci.pleasant-hill.ca.us
More informationTRAILS INTERSECTION SIGNS
TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.
More informationAt the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).
Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core
More informationTrail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts
Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate
More informationEnvironment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)
Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF
More informationThe Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired
1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationRule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land
Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an
More informationEAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008
EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction
More informationNorthwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE
Northwest Triangle Redevelopment Proposal Property Acquisition, Engineering, and Demolition December, 2005 REDEVELOPMENT AUTHORITY OF THE CITY OF YORK York City Redevelopment Authority 14 West Market Street,
More informationAGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY
March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails
More informationREQUEST FOR PLANNING COMMISSION ACTION
REQUEST FOR PLANNING COMMISSION ACTION DATE: 06/03/09 ITEM NO: 5e Department Approval: Agenda Section: PUBLIC HEARINGS Item Description: Request by City of Roseville for the vacation of public right-of-way
More informationPARKS CANADA SIGNING ALONG PROVINCIAL HIGHWAYS
Page 1 of 5 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GUIDE AND INFORMATION General National Parks, National Historic Sites, and National Marine Conservation Areas are present across
More informationSection Three, Part 14 Signs
PART 14 SIGNS SIGNS 14.1 INTRODUCTION This part of the District Plan sets out the requirements in respect of signs. These matters were formerly controlled by bylaws. 14.2 OVERVIEW Signs form an integral
More information1803 West Hwy 160 Monte Vista, CO (719) TTY (719)
USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center
More informationDATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1
M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review
More informationBOARD OF ADJUSTMENT AGENDA
BOARD OF ADJUSTMENT AGENDA February 28, 2018 I. Call to Order II. III. Approval of Minutes Old Business: 1. Coleman Bass Construction (VAR17-0112) Variance* 1800 NW Mystic Avenue Interior Side Setback
More informationDRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION
DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine
More informationWashington Township MASTER PLAN. Addendum: Washington Township Master Plan
Washington Township MASTER PLAN Addendum: Washington Township Master Plan CHAPTER XI RECREATION CORE DISTRICT Introduction The Recreation Core District generally encompasses the areas north of 30 Mile
More informationLAND USE GUIDELINES NEW TOWN
VI LAND USE A L T ETruRck TNraiAl T I V E S AarNnelDla D E S I G N W GUIDELINES NEW TOWN ad Ro DAVEN CA LF IRE ALTERNATIVE LAND USE PLANS AND DESIGN GUIDELINES - VI VI LAND USE ALTERNATIVES Asilomar Hotel
More informationExterior Wayfinding Signage Design Standards
Exterior Wayfinding Signage Design Standards 05/25/12 TABLE OF CONTENTS CONTENTS SIGNAGE POLICY 2 VEHICULAR SIGNS 3 Main Gateway [Sign 1]... 3 Parking Lot [Sign 2]... 4 Building Identification [Sign 3]...
More informationPreferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018
Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled
More informationAPPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE
APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban
More informationCITY OF WISCONSIN DELLS MEETING AGENDA - Updated
CITY OF WISCONSIN DELLS MEETING AGENDA - Updated DESIGN REVIEW COMMITTEE Meeting Description Date: WEDNESDAY, JUNE 20, 2018 Time: 10:00AM Location: MUNICIPAL BUILDING - 300 LA CROSSE STREET, WISCONSIN
More informationDEPARTMENT OF PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT
DEPARTMENT OF PLANNING, COMMUNITY & ECONOMIC DEVELOPMENT DATE: December 11, 2015 TO: FROM: SUBJECT: City Council Kevin Cricchio, AICP Associate Planner Department of Planning, Community & Economic Development
More informationSign Library. Florida Trail Association
310: FTA SIGN LIBRARY December 2015 Sign Library Florida Trail Association Trail signs are used to inform the motoring public and/or trail users that they are approaching, or are on, the Trail. When blazes
More informationDavid Johnson. Tom, Attached please find the final scoping letter and figures for your review. David
David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter
More informationPLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner
PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationHillsborough County Florida Hillsborough County s Trailways Addressing Program
Hillsborough County Florida Hillsborough County s 9-1-1 Trailways Addressing Program 2010 ProBike/ProWalk Florida -Conference May 12-13, 2010 1 REQUEST Staff from the Hillsborough County Sheriff s Office
More informationRogue River Access and Management Plan Draft Alternatives
Rogue River Access and Management Plan Draft Alternatives The Rogue River Access and Management Plan was initiated in December, 2011 and is being led by Jackson County Parks (JCP) and Oregon Department
More informationTrans Canada Trail Signage Guidelines MADE BY CANADA
Trans Canada Trail Signage Guidelines MADE BY CANADA Mission: We will promote and assist in the development and use of the Trans Canada Trail by supporting success at the local level in the creation of
More informationWaukee Trailhead Public Art and Amenities Project
Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection
More informationROYAL VIEW DEVELOPMENT
GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00
More informationHow to Build Your Own Flour Mill and Sifter
Prototype and plans developed by Hugo Gervais Custom Fabrication, North Hero, VT Materials List: How to Build Your Own Flour Mill and Sifter Quantity Materials 4 2 X 2 X 26 3 / 16 Square tubing 1 2 X 2
More informationNorth Forty Area ( area bounded by Lark Avenue, Los Gatos Boulevard, Highway 85 and
RESOLUTION 2015-056 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING GENERAL PLAN AMENDMENTS NECESSARY FOR THE NORTH FORTY SPECIFIC PLAN. THE PLAN AREA COMPRISES APPROXIMATELY 44 ACRES
More informationLafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services
Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility
More informationProposed Peninsula Bay Bike Track Development
Proposed Peninsula Bay Bike Track Development May 2018 BACKGROUND The area of land at the northern extreme of Wanaka's Peninsula Bay development (Lot 923 DP 501325), currently owned by Infinity Investment
More informationVillage of Glenview Appearance Commission
STAFF REPORT December 5, 2012 Village of Glenview Appearance Commission TO: Chairman and Appearance Commissioners FROM: Planning and Economic Development Department CASE MANAGER: Tony Repp, Planner SUBJECT:
More informationOAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016)
OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016) 2007 2016 Millage Accomplishments Timeline in Pull-out The Mission
More informationNCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes
More informationURBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East
Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design
More informationKelly Motorized Trails Project Proposed Action
Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly
More informationPROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS
PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a
More informationArvidson, Adam R. Adam,
Arvidson, Adam R. From: Andrew Hestness Sent: Wednesday, May 18, 2016 5:39 PM To: Arvidson, Adam R. Cc: Renee Spillum; Schroeder, Michael Subject: RE: Park Dedication Attachments: FranklinPlan - Bystrom
More informationICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations
ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This
More informationSECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES
SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.
More informationCounty of Elgin Tourism Signage Policy Addendum A
1.0 INTRODUCTION County of Elgin Tourism Signage Policy Addendum A 1.1 PURPOSE OF ELGIN TOURISM SIGNAGE POLICY To define the eligibility, use, design and authority for tourism oriented directional signage
More informationPROPOSED PARK ALTERNATIVES
8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning
More informationAERODROME LICENCE APPLICATION PROCESS
0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,
More informationTUCSON PATIO AWNING INSTALLATION MANUAL
TUCSON PATIO AWNING INSTALLATION MANUAL Toll Free 877-792-1775 Fax 877-792-0031 swsuncontrolpro.com sales@swsuncontrol.com 1 INTRODUCTION...3 1.1 Symbols used in this manual... 3 1.2 Personnel requirements...
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationCHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS
CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS SOUTH COAST CAC PLANNING AREA 4.10 NAVARRO RIVER TO MALLO PASS CREEK PLANNING AREA (Includes Greenwood/Elk) This planning
More informationTrail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding
I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes
More informationWelcome and thank you for being here! Kick-Off Public Workshop November 19, 2014
Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014 OPEN SPACE MATTERS: Boise s First Reserve Master Plan Julia Grant Foothills and Open Space Manager City of Boise Ellen Campfield
More informationGardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY
Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationROAD AND TRAIL PROJECT APPROVAL
ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:
More informationTrail Feasibility Study
VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way
More informationA CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A
A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973
More informationHudson Highlands Fjord Trail Draft Master Plan. April 29, 2015
Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation
More informationThe Vision for the San Juan Islands Scenic Byway
The Vision for the San Juan Islands Scenic Byway 2 Judd Cove, Orcas Island, Courtesy of Kurt Thorson (kurtthorson.com) and San Juan County Land Bank Vision for the San Juan Islands Scenic Byway The San
More informationMorristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment
1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationROYAL GORGE PARK and RECREATION AREA. A Feat of Natural and Man-Made Engineering
ROYAL GORGE PARK and RECREATION AREA A Feat of Natural and Man-Made Engineering As Growth Resumed in the 1870 s Town Leaders Began to Envision a Tourist Industry. The Arkansas River Canyon was advertised
More informationCOMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)
CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationBringing the World to America KEY BRANDING SUGGESTIONS
Bringing the World to America KEY BRANDING SUGGESTIONS 2018 PREMIUM PLACEMENT. MAXIMUM VISIBILITY. HIGH IMPACT. THE FOLLOWING KEY BRANDING OPPORTUNITIES DELIVER A BIG IMPRESSION AT IPW. Please go to this
More informationBibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring
Trail revitalising Western Australia Bibbulmun Track 973 km Cape to Cape Track 135 km Two of the world s great long distance walking tracks 1062 km Off-road cycle touring Trail revitalising 1. Framework
More informationLONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION
3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such
More informationTRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail
Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027
More informationOther Principle Arterials Minor Arterial Major Collector Minor Collector Local
CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition
More informationTOWN COUNCIL REPORT. The PZC recommendation was ratified on September 6, 2016, and included the following findings:
TOWN COUNCIL REPORT To: Honorable Mayor Jennie Fancher and Avon Town Council From: Matt Pielsticker, Planning Director Meeting Date: September 13, 2016 Agenda Topic: First Reading of Ordinance 2016-20,
More informationWhitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1
Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Recommended Wilderness Background The Whitefish Range has a long management and legislative history associated
More informationRATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY
Town of, MA Trails Map 6a SPLIT ROCK PRIMARY SECONDARY PRIVATE PRIVATE PROPERY STAY ON HEAD FUTURE TO SKINNER (NOT MARKED) 0 miles 0.25 0.250 0.5 Mapbox, Data Odbl, OpenStreetMap contributors primary use
More informationTORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN
TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 29, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN ACTION ITEM RECOMMENDATIONS It is recommended that
More informationMPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010
MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,
More informationTrails Technical Committee
Trails Technical Committee Winter 2017 Draft Report Alignment Proposals for the Inyo National Forest and the Town of Mammoth Lakes Map ID #S18 February 08, 2017 Map ID #S18 Key Agreements As of February
More informationCOMMENT PERIOD INTRODUCTION
To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO
More informationMickelson Connector Feasibility Study
Friends of the Norbeck PO Box 2003 Rapid City, SD 57709 www.friendsofthenorbeck.org Summary Comments on the Mickelson Connector Feasibility Study Prepared by Brian Brademeyer Submitted to Wyss Associates
More informationAttachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION
Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationMemorandum / Letter of Intent
VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com
More informationMount Diablo Terrace. Master Sign Program. Dec. 29, Program: 13.SWIFT.0001 DRAWINGS CHECKED BY: PROGRAM MANAGEMENT DESIGN PRODUCTION
Mount Diablo Terrace Master Sign Program Dec. 9, 04 Program: 3.SWIFT.000 DRAWINGS CHECKED BY: PROGRAM MANAGEMENT DESIGN PRODUCTION INSTALLATION 03 GNU Group. The physical and intellectual contents of this
More informationBASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE
BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE GLENWOOD AVE MULTI-USE DIAMONDS VINCENT AVE N MORGAN AVE N PENN AVE N DOG PARK MULTI-USE FIELDS PLAYGROUND AK E RD S CHESTNUT AVE DA
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Proposed Area-Specific Amendment to Chapter 694, Signs, General, with Respect to Ricoh Coliseum and BMO Field and a Portion of Exhibition Place Date: July 23, 2014 To: From:
More informationThe following resource management issues have been identified as significant in the Art Deco Quarter:
Chapter 59 ART DECO QUARTER SIGNS INTRODUCTION The Art Deco Quarter is Napier City s foremost shopping precinct as well as being the most important public place and pedestrian area. As such there are many
More informationGreenbelt Route Signage Guidelines
Greenbelt Route Signage Guidelines Revised March 31, 2015 Waterfront Regeneration Trust (416) 943-8080 info@wrtrust.com Greenbelt Foundation (416) 960-0001 info@greenbelt.ca www.greenbeltcycles.com Greenbelt
More informationTRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT
AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access
More informationSundance Square. Liberty Hill, Texas 78642
RETAIL / OFFICE DEVELOPMENT OPPORTUNITY Bulk Sale of ±24 Acres at $4.00 / sq. ft. Existing Williamson CAD Tax Parcels Property Features Area of high residential development growth Situated at the entrance
More informationMINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011
MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 Mayor Bolender called the meeting to order at 7:00 p.m. The following Commissioners were present at roll call: Commissioner Dickmann,
More informationSTORY MILL COMMUNITY PARK
OWNER: City of Bozeman Department or Parks and Recreation P.O. Box 1230, 415 N. Bozeman Street Bozeman, MT 59715 Tel: (406)-582-2908 APPLICANT: The Trust for Public Land 1007 E. Main Street, Suite 300
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationCOMMERCIAL LAND/BUILDING
www.jimgrievesalesteam.com COMMERCIAL LAND/BUILDING Salmon Arm Industrial Park 5101 48 th Avenue SE Salmon Arm BC For Sale $1,749,000 LEASED INDUSTRIAL BLDG WITH 7% ROI ON ASKING PRICE - 13,600 square
More informationPeter Axelson. Beneficial Designs, Inc. Minden, NV
Peter Axelson Beneficial Designs, Inc. Minden, NV Arroya Sit Ski Mono Ski Dynamic Seating Spring Assist Cross Country Ski Hand Bike Adaptive Canoe Seating Available from Chosen Valley Canoe Accessories
More information