SECTION 4(f) DE MINIMIS FINDING

Similar documents
Section 4(f) and Section 6(f) Technical Analysis

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

Welcome to the Cross County Trail Public Input Session!

COMMENT PERIOD INTRODUCTION

4.0 Context for the Crossing Project

County of Sonoma Agenda Item Summary Report

Appendix F Cultural Resource Consultation

November 21, 2012 Barbara Kelleher, (954)

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

To apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and

Treasure Island Supplemental Information Report Addendum

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

October 18, Terry Hartwick Director, North Little Rock Parks and Recreation 2700 Willow Street North Little Rock, AR 72114

Non-Motorized Transportation

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

West Lake Corridor Final Environmental Impact Statement/ Section 4(f) Evaluation

Community Development Committee

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Business Item No

FEASIBILITY CRITERIA

4.19 Parks, Recreation, and Conservation Lands

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

University Region Non-Motorized Plan 2015

Madison Metro Transit System

Site Location and Setting

I-70/I-71 Project Public Meeting Presented By

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

The Baker/Carver Regional Trail is intended to

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

Creating a User-Driven Long-Distance OHV Trail Through Partnering

Public Informational Meeting

CHAPTER 3 ALTERNATIVES CONSIDERED

Palm Beach County Traffic Report July 13 through July 20, 2012

PURPOSE AND NEED. Introduction

SCOPING INFORMATION PACKET

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Area Surrounding Maplewood Manor

Flow Stand Up Paddle Board Parkway Plan Analysis

Route 29 Solutions Projects

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Meeting Notes Public Open House

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

Second Street Improvements Project Project Update Archive

Little River Trail Feasibility Study

4. Safety Concerns Potential Short and Medium-Term Improvements

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

Northeast Quadrant Distinctive Features

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Human Environment. 2.1 Land Use

MEETING MINUTES Page 1 of 5

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

1.0 Purpose and Organization of the Community Impact Assessment Addendum

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

Coronado National Forest Santa Catalina Ranger District

A. CONCLUSIONS OF THE FGEIS

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

3.6 Recreation Resources

AGENDA ITEM I-6 Public Works

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

New Jersey Department of Transportation

B10. Agate Beach State Recreation Site

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

Segment 2: La Crescent to Miller s Corner

Hospital Link Project Project Update Winter 2018

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

Final Section 4(f) Evaluation

Community Development

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

Welcome to the future of Terwillegar Park a Unique Natural Park

EAST LINK EXTENSION 2017 SEPA Addendum

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

IL 390 Station. Wood Dale Open House Summary 5/18/17

Architectural Review Commission

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Airport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Arvidson, Adam R. Adam,

Preliminary Findings of Proposed Alternative

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Transcription:

Lake Merritt Improvement Project Bellevue Ave., Children s Fairyland and Garden Center Pedestrian and Bicycle Access Improvement Project SECTION 4(f) DE MINIMIS FINDING Oakland, California Ref: HP2IL 5012 (122) June 2014 DRAFT Approved By: Date: Boris Deunert, Senior Environmental Planner D4 Office of Local Assistance Prepared By: Ali Schwarz, Project Manager City of Oakland Date:

Section 4(f) de minimus Impact Evaluation Introduction The City of Oakland (City) proposes to construct pedestrian safety and accessibility improvements (proposed project) at Lake Merritt at the intersection of Grand Avenue and Bellevue Avenue, access improvements to Children s Fairyland, improved Americans with Disabilities Act (ADA)-compliant parking on Bellevue Avenue, and access improvements to the Lakeside Park Garden Center. Section 4(f), codified at 23 USC 138 and 49 USC 303, requires the Federal Highway Administration (FHWA) to protect and preserve 4(f) properties when approving transportation projects. FHWA s Section 4(f) regulations are codified at 23 CFR 774. 4(f) properties are the following: Parks and recreational areas of national, state, or local significance that are both publicly owned and open to the public. Publicly owned wildlife and waterfowl refuges of national, state, or local significance that are open to the public to the extent that public access does not interfere with the primary purpose of the refuge. Historic sites of national, state, or local significance in public or private ownership regardless of whether they are open to the public (defined as being on or eligible for the National Register of Historic Places). In August 2005, President Bush signed into law a federal transportation reauthorization bill called the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). SAFETEA-LU introduced a new Section 4(f) determination option a de minimis finding. As defined in 23 CFR 774.17 a de minimis impact is a minimal impact to a 4(f) resource that will not adversely affect the features, attributes or activities of parks, recreational areas and wildlife and waterfowl refuges, or will have no adverse effect on a historic property. In addition, two sections of SAFETEA-LU allow Caltrans to assume the Federal Highway Administration s (FHWA) responsibilities under the National Environmental Policy Act, (NEPA) and other federal environmental laws. This NEPA assignment became effective July 1, 2007 and Caltrans is the federal lead agency for the proposed project. Project Description The proposed project is located within a fully developed urban area of Oakland, Alameda County, California. The proposed project site extends from the public right of way near the intersection of Grand Avenue and Bellevue Avenue at the park entrance near the Children s Fairyland along Bellevue Avenue to the Garden Center. The project site is entirely within City owned rights of way and public lands. The proposed project consists of several improvements for increased pedestrian safety and accessibility to the park entrance, Children s Fairyland and the Garden Center. A detailed description of each location follows. Intersection of Grand Avenue and Bellevue Avenue (west) Remove existing 18 brick wall (~200 feet); one to two parking spaces on Grand Avenue in front of the park; existing planter areas; existing sidewalk; one decorative street light; relocation of existing Lake Merritt Improvement Project_ HP2IL 5012 (122) 1

Section 4(f) de minimus Impact Evaluation traffic signal standard; and seven trees. New construction includes sidewalk widening/bulb-out for pedestrian waiting area and improved intersection alignment on Grand Avenue; relocate street light with new foundation; relocation of traffic signal standard with new foundation; restriping of pedestrian crosswalk across Grand Avenue and across Bellevue Avenue; installation of ADA ramps at either end of new crosswalks; restriping of 6 Class II bicycle lane on Grand Avenue; and restriping of park entrance on Bellevue from 2 lanes to one lane (currently one-way street with cones blocking one lane). The bus stop area at this location will be improved with new landscaping and a bench near the existing shelter. There is no change in pavement or lane widths on Grand Avenue. These improvements will create a better intersection alignment, safer pedestrian crossing for Bellevue Avenue, and larger pedestrian waiting area in front of Fairyland entrance. Entrance to Children s Fairyland and Access Pathways - Remove existing steps/landings and pathway. Install new stairs, new ADA accessible pathway from back of sidewalk at Bellevue Ave. up to the entrance plaza of Children s Fairyland, and new pathway lighting. To meet required ADA accessible grades for the new pathway seven existing trees will be removed. Repave existing degraded pathways leading from Grand Ave. and from Bellevue Ave. to Children s Fairyland. The existing path runs from Bellevue Ave. across from the Garden Center and continues northwest up to the front of Children s Fairyland and out to Grand Ave. This is a highly used pathway for both general park users and pedestrians going to and from Children s Fairyland. Sidewalk Widening on Bellevue Avenue Remove existing low brick wall (220 feet) and widen existing. Construct new low concrete wall to complement new Children s Fairyland access and garden entry improvements. Improved ADA Parking on Bellevue Avenue Reconfigure ADA parking stalls per current standards with new striping, two new curb ramps, and adjacent sidewalk repair/replacement. Entrance to the Garden Center Install new entry pathways to the building and gardens, with an ADA compliant ramp to the building. Five existing trees/shrubs will be removed. New irrigation mainlines will be installed. The non-paved improvement area will be mulched and left for future native plant volunteer landscape design and installation. The surrounding area, outside the parklands, along Grand Avenue consists primarily of commercial business. Residential areas are nearby. Construction activities associated with the project include minor grading, paving and the widening of sidewalks, pathways and landscaping. Construction is expected to take about 4-5 months to complete and would occur Monday through Friday between the hours of 8:00am and 3:00pm, the City s standard construction hours. Night time construction is not expected. The construction staging area will be located at the project site and subject to review and approval of City staff. During construction 14 trees will be removed from the project area. These trees are native and non-native that occur in landscape areas along the pathway leading to Fairyland and along the front fenced area of the Garden Center. Lake Merritt Improvement Project_ HP2IL 5012 (122) 2

Section 4(f) de minimus Impact Evaluation Description of Section 4(f) Resources As shown on the attached plan, there are three overlapping 4(f) resources: 1. Lake Merritt Wildlife Refuge - Lake Merritt is a large tidal lagoon in the center of Oakland, California, just east of Downtown. It is surrounded by parkland and city neighborhoods. It is historically significant as the United States' first official wildlife refuge, designated in 1870. The brackish lake water, which consists of fresh water and salt water, is eight to ten feet deep, and is home to shrimp, fish, clams, crabs, and birds (migratory and residental). Over the years five bird islands were built as sanctuaries for the birds. 2. Lake Merritt Park Lake Merritt Park features grassy shores; an interpretive center called the Rotary Nature Center; a boating center where sailboats, canoes and rowboats can be rented and classes are held; a band stand where outdoor concerts are held; the Garden Center that boasts a Japanese Garden and Koi Pond and an extensive array of herb and flower gardens; and a fairy tale themed amusement park called Children's Fairyland. The park also has a popular 3.1 mile (5 km) walking and jogging path, which runs along the lake s perimeter. 3. Lake Merritt Historical District/Landmark - Lake Merritt and the surrounding area has been listed on the National Register of Historic Places since 1966. In 1867, Dr. Samuel Merritt donated 155 acres of dammed tidal water from the headwaters of Indian Slough, it became known as "Merritt's Lake" and later Lake Merritt. Sometimes called the Jewel of Oakland, Oakland is the only city in the United States with a salt water lake in the downtown metropolitan area. Originally part of the San Francisco Bay, in 1869, Oakland Mayor Dr. Samual Merritt donated money to build a dam at the 12th Street bridge, across the "neck" of the inlet, thus creating the present day lake. In 1925, Lake Merritt's "Necklace of Lights" was lit for the first time. There are 126 lampposts, each given by an organization or an individual. The lampposts and 3,400 pearly bulbs shone until 1941 when World War II blackout conditions were enforced. In 1963, the Wildlife Refuge at Lake Merritt was registered as a National Historic Landmark. Potential Impact to Section 4(f) Resource Impacts to each 4(f) resources are summarized as follows: 1. Lake Merritt Wildlife Refuge No work is being proposed within the boundary of the Lake Merritt Wildlife Refuge. Therefore, the proposed project would have no impact to this 4(f) resource. Neither is the work close enough to generate any constructive use. 2. Lake Merritt Park - The proposed project will modify the entrance to the park to allow for a shorter pedestrian crossing at the Bellevue Ave/Grand Avenue crosswalk by adding bulb-outs, and will replace the steps up to Fairyland to be made ADA compliant. Lake Merritt Improvement Project_ HP2IL 5012 (122) 3

Section 4(f) de minimus Impact Evaluation The proposed project would improve safety and access for bicyclists and pedestrians by removing and relocating steps, regrading and resurfacing existing pathways to meet ADA accessible requirements. All improvements constructed along and adjacent to Grand Avenue and along and adjacent to Bellevue Avenue are on publicly owned lands. New pavement areas will include widened pathways and sidewalks. The majority of the widened sidewalk will be replacing existing roadway surface with sidewalk, and will be offset by new pervious planting areas. Some existing lawn will be removed for the widened sidewalk. The drainage system at Grand/Bellevue west intersection will include bio filtration with flow through to the rain garden. No modifications will occur to the existing underground drainage system. Approximately two existing parking spaces would be removed as part of the proposed project. Due to the total number of parking spaces distributed through the site (385 within the park on Bellevue Ave) and the high turnover of park users, the loss of two parking spaces is predicted to be insignificant. The project would also include restriping at the park s entrance on Bellevue from 2 lanes to one lane, which is currently a one-way street with cones blocking one lane. Finally, new irrigation and pathways including an ADA compliant ramp and a new gate to the Garden Center gardens will be constructed. Twelve trees, including five in front of the Garden Center and seven at the Fairyland entrance would be removed. Four existing trees at the Garden Center will remain, but no new trees will be added. The seven trees to be removed at the Fairyland entrance will be replaced with three Eastern Redbud s and four California Sycamore trees. Refer to the attached Tree Removal Plans for more information on the location of the trees to be removed. There would be some disruption related to construction activities inside the Park, however these impacts are temporary in nature and would cease upon project completion. Alternative access will be provided such that park users would not be impacted. Landscaping will be restored. There would also be some temporary noise impacts resulting from operation of construction equipment and vehicle, however these impacts would cease upon completion of the proposed project. None of the temporary construction related impacts would adversely affect the activities, features, or attributes of the Lake Merritt Park. Similarly, none of the permanent impacts would adversely affect the activities, features or attributes of the Lake Merritt Park. The overall effect will improve pedestrian safety and accessibility in the park. 3. Lake Merritt Historical District/Landmark A Historic Resource Evaluation Report and Historic Property Survey Report was prepared by Rincon Consultants and approved by Caltrans PQS on. This concluded that the project as described would have No Adverse Effect on the Lake Merritt Historic District. Note: This text to be reviewed and finalized after the conclusion of the Section 106 Studies. Lake Merritt Improvement Project_ HP2IL 5012 (122) 4

Section 4(f) de minimus Impact Evaluation Discussion of Coordination Activities The public input process for this project began late 2011 and completed in winter of 2013. Two stakeholder meetings were held at early part of the design process that included Lakeside Park volunteers, Children s Fairyland staff, and Lakeside Park maintenance staff. The design team presented the project concept and 65% design at number of standing public meetings including the Measure DD Community Coalition and the Parks and Recreation Advisory Commission. There has also been input from the Bike and Pedestrian Advisory Commission. Additionally, in order to obtain City of Oakland Conditional Use and Tree Removal Permits there was a 30 day public comment period for written comments. During this period there were signs posted at the site indicating the scope of the improvement project and the seven trees identified for removal in front of Children s Fairyland were tagged. No written comments were received. An additional tree removal permit will be obtained for removal of the five trees in front of the Garden Center. A further 30 day consultation is now being carried out in June 2014 on this proposed de minimis finding. The results of this consultation will then be analyzed and included in the final version of this document. Officials with Jurisdiction over the 4(f) Resources The City of Oakland are the Officials with jurisdiction over the wildlife refuge and the park and the State Historic Preservation Office (SHPO) are the Officials with jurisdiction over the Historic Property. Following conclusion of the public consultation and Caltrans review of the Section 106 determination, if de minimis determination is still considered appropriate or the affected 4(f) resources, concurrence will be sought from these organizations. Proposed Conclusions 1. Based on the information presented above, there would be no direct or constructive use on Lake Merritt wildlife refuge. 2. Based on the information presented above, the coordination and the attached documents, the effects of the proposed project on Lake Merritt Park constitute a de minimis impact, and the requirements of 23 USC 138 and 149 USC 303 have been satisfied. 3. Based on the information presented above, the coordination and the attached documents, the effects of the proposed project on Lake Merritt as a Historic District/ Historic Landmark constitute a de minimis impact, and the requirements of 23 USC 138 and 149 USC 303 have been satisfied. These findings are considered valid unless new information is obtained or the proposed effects change to the extent that a new analysis is needed. Lake Merritt Improvement Project_ HP2IL 5012 (122) 5

Grand Ave nue Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, GrandUSDA, Avenue Project i-cubed, USGS,Improvement AEX, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community 4(f)swisstopo, Resources 0 0.075 0.15 0.3 Miles Lake Merritt Wildlife Refuge Lake Merritt Park Lake Merritt Historical District/Landmark

ENTRY DEMOLITION PLAN ENTRY RENOVATION 699 Bellevue Avenue Oakland, CA 94610 No. BY DATE REFERENCE 07/25/11 30% SUBMITTAL 11/12/12 PROGRESS SET 01/11/13 75% SUBMITTAL 11/15/13 100% SUBMITTAL 02/24/14 REV. 100% SUBMITTAL ACE ARCHITECTS 330 SECOND STREET #1, OAKLAND, CA 94607 PHONE: 510 452 0775, FAX: 510 452 1175, WWW.ACELAND.COM CHECKED BY LH DESIGNED BY ACE ARCHITECTS DRAWN BY AG SCALE: AS SHOWN DATE: DECEMBER 5, 2013 PROJECT NO. C377910 SHEET NO. A1 4 13 OF